Professional Documents
Culture Documents
Residence
Number
Nature
of
Permit
Description
Date Issued
Current Status
Merritt
14
BLD
REVISION - to alter the proposed driveway Proposal to construct a new 2 storey single
family dwelling with integral garage
Jun 15 2016
Revision Issued
BLD
PLB
DRN
BLD
BLD
Aug 3 2016
Jun 17 2016
Jun 17 2016
Revision #1: Changes to roof, remove crawlspace, footings .To construct an excavated Jul 4 2016
front porch with a canopy above, and a 1 storey frame addition at the entrance to the
Mar 10 2016
rear of the house.
Refusal Notice
Inspection
Inspection
Revision Issued
Inspection
14
18
Furnival
23
117
123
21
27
32
Tiago
DEM
BLD
HVA
PLB
DRN
BLD
PLB
BLD
PLB
BLD
DRN
PLB
DEM
BLD
HVA
PLB
DRN
Zoning
Review
Proposal to construct a new 2 storey SFD with basement and detached garage. Note:
Existing foundations to remail. See Demo, ZZC and COA
Proposal for second storey addition with interior alteration to the existing detached
single family dwelling.
CONSTRUCT 2ND STOREY ADDITION, 2 STOREY REAR ADDITION, INTERIOR
ALTERATIONS, DECK
Proposal to construct a 2nd story addition over existing, fill in existing front porch, 2
storey rear and front addition and new detached garage in the rear yard. See previosu
COA for front yard parking.
Apr 25 2016
Apr 25 2016
Apr 25 2016
Apr 25 2016
Apr 25 2016
Jun 10 2016
Jun 10 2016
Sep 16 2016
Sep 16 2016
Jun 1 2016
sep 12 2016
Jun 2 2016
Feb 24 2016
Feb 24 2016
Mar 4 2016
Feb 24 2016
Feb 24 2016
Proposed construction of a new two storey single family dwelling with an integral garage May 17 2016
Permit Issued
Inspection
Permit Issued
Inspection
Permit Issued
Permit Issued
Permit Issued
Permit Issued
Permit Issued
Inspection
Permit Issued
Permit Issued
Permit Issued
Inspection
Inspection
Inspection
Inspection
Notice Sent
56
Tiago
78
89
HVA
BLD
HVA
DRN
PLB
BLD
DRN
PLB
107
BLD
112
HVA
BLD
56
PLB
Yardley
83
88
94
Westview
260
BLD
DEM
BLD
HVA
PLB
DRN
BLD
BLD
HVA
PLB
HVAC - NEW TWO STOREY REAR ADDITION & SECOND STOREY ADDITION ON
EXISTING ONE STOREY DWELLING. NEW ADDITION = 129.13m2, INTERIOR
RENO = 74.32m2 , NEW REAR DECK, NEW FRONT PORCH.
New two storey dwelling with attached garage
Mar 11 2016
Permit Issued
Feb 2 2016
Feb 2 2016
Feb 2 2016
Feb 2 2016
Feb 2 2016
Mar 7 2016
Mar 7 2016
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
REV01- Rear basement walkout added. Proposal for multiple projects to an existing 1
storey SFD-detached dwelling. Scope of work includes a 2 storey rear addition, new 2nd Jul 18 2016
floor addition, interior alterations and a new rear deck.
HVAC - Proposal for a 2nd floor addition and interior alterations to the ground floor of
existing detached single family dwelling.
To alter the existing detached single family dwelling by constructing a second storey
addition above the one-storey portion, vertically extending the existing second storey
walls at the rear, constructing a new roof and new front canopy. Alterations include
applying a new exterior surface to the entire dwelling at the exterior, interior alterations,
and altering the landscaping in the west side and front yards.
REVISION 02 - Proposed revision to rear deck as per drawings. To alter the existing
two-storey detached dwelling by constructing an integral garage, a second storey
addition, a two-storey side addition, a new front porch, and a rear deck. See CofA
Decision A0720/14TEY
Revision Issued
Sept 13 2016
Not Started
Apr 7 2016
Under review
Apr 7 2016
Issuance pending
Jun 2 2016
revision issued
Jun 20 2016
Jun 16 2016
Proposal to construct a new two storey single family dwelling with integral garage and
Jun 17 2016
finished basement
Jun 16 2016
Jun 16 2016
Proposal to construct a canopy over existing front porch
May 2 2016
Feb 22 2016
Proposal to construct a one storey rear addition with basement walkout, new front porch
Feb 16 2016
and interior alteration to existing two unit dwelling
Feb 22 2016
Permit Issued
Inspection
Permit Issued
Permit Issued
Inspection
Inspection
Permit Issued
Refusal Notice
Permit Issued
Holland
Gardens
24
52
BLD
DRN
PLB
BLD
PLB
Apr 11 2016
Revision Issued
Jan 25 2016
Jan 25 2016
Jan 25 2016
Sep 14 2016
Inspection
Inspection
Permit Issued
Permit Issued
Sep 14 2016
Permit Issued
Sept 2 2016
Aug 10 2016
Revision to remove portion of existing wall originally proposed to remain. More than
May 4 2016
50% of existing exterior walls above grade have been demolished, NEW HOUSE
May 4 2016
May 4 2016
May 25 2016
May 25 2016
Proposal to construct a new 2 storey SFD with finished basement and detached garage
Aug 2 2016
at rear. See Demo, ZZC, and COA.
May 25 2016
May 25 2016
Feb 24 2016
Proposal for rear second floor addition (88.47m2), interior alterations (118.56m2), new
Mar 7 2016
ground floor porch at front, and new ground floor deck at rear of existing single family
Aug 4 2016
detached dwelling.
Feb 24 2016
Under review
Permit Issued
Inspection
Permit Issued
Permit Issued
Permit Issued
Inspection
Permit Issued
Permit Issued
Permit Issued
Inspection
Inspection
Revision Issued
Inspection
12
BLD
Proposal for interior alterations at main floor to replace load bearing wall with new beam
Mar 29 2016
and posts.
Inspection
68
BLD
REVISION: Proposal to extend existing roof over new front porch. Proposal to construct
Jun 23 2016
new porch and concrete steps in front yard of existing detached - single family dwelling.
Revision Issued
53
56
29
Adair
7 (Apt bldg)
FSU
BLD
Glenburn
REVISION - as per the drawings HVAC - Proposal for a 2nd floor addition, interior
alterations to the ground floor and new rear ground floor deck in existing detached
single family dwelling.
BLD
HVA
BLD
PLB
DRN
DEM
BLD
HVA
PLB
DRN
BLD
HVA
HVA
PLB
Joanith
Dalecrest
HVA
18
39
HVA
PLB
BLD
Proposal to replace existing fire alarm control panel with a new fire alarm control panel,
all zones to remain the same; garbage room, garbage chute boiler room and locker
May 4 2016
rooms protected by sprinkler
Proposal to construct second storey & rear two storey addition, interior alterations to all Feb 26 2016
floors, basement walk-out and covered porch.
May 16 2016
Feb 26 2016
Sep 2 2016
Inspection
Inspection
Inspection
Inspection
Permit Issued
Glenburn
49
51
BLD
BLD
BLD
Squires
75
HVA
Peard
21
27
67
Holmstead
69
73
38
Galbraith
BLD
PLB
DRN
HVA
DEM
BLD
HVA
PLB
DRN
DEM
BLD
HVA
PLB
DRN
BLD
DRN
BLD
HVA
HVA
PLB
98B
BLD
98A
BLD
98
DEM
BLD
BLD
PLB
Jul 19 2016
Jul 14 2016
Revision - to the 2ND floor - Proposal for multiple projects to an existing 1 storey SFDMar 31 2016
detached dwelling. Scope of work includes a new 2nd floor addition, a new attached
garage with 2nd floor addition over the new garage and interior aletrations. See also 15
204784 ZZC and 15 217557 MV.
Jul 21 2016
Construct second storey addition and two storey rear addition w/ first floor interior
alterations, new rear deck and covered front porch with cold room.
HVAC 01 - to radiant floor to forced air heating
Proposal to demolish existing dwelling and construct new 2 storey detached single
family dwelling with integral garage
Proposal to demolish existing dwelling and construct new 2 storey detached single
family dwelling with integral garag
Jun 20 2016
Jun 20 2016
Jun 8 2016
Jan 19 2016
May 12 2016
May 12 2016
May 17 2016
May 12 2016
May 12 2016
May 13 2016
May 13 2016
May 17 2016
May 13 2016
May 13 2016
Apr 11 2016
Jan 28 2016
Jan 28 2016
Feb 8 2016
Jul 13 2016
Jan 28 2016
Proposal to sever lot and construct a new two storey single family dwelling with integral
May 12 2016
garage and finished basement (Part A)
Proposal to sever lot and construct a new two storey single family dwelling with integral
May 12 2016
garage and finished basement (Part A)
May 12 2016
Proposal to sever lot and construct a new two storey single family dwelling with integral May 12 2016
garage and finished basement (Part A)
Mar 21 2016
Mar 21 2016
Permit Issued
Permit Issued
Revision Issued
Revision Issued
Permit Issued
Permit Issued
Permit Issued
Revision Issued
Permit Issued
Inspection
Inspection
Inspection
Inspection
Permit Issued
Inspection
Inspection
Inspection
Inspection
Examiners Note Sent
Inspection
Inspection
Inspection
Revision Issued
Inspection
Inspection
Inspection
Permit Issued
Inspection
Inspection
Permit Issued
98
PLB
DRN
DRN
Topham
Valor
Amsterdam
Barrett
Selwyn
St Clair
Victoria Park
May 12 2016
Mar 21 2016
May 12 2016
NONE
NONE
NONE
NONE
NONE
NONE
NONE
Glossary
Examiners Note Issued
Inspection
Permit Issued
Refusal Notice
Revision Issued
Under Review
Application has been accepted, and the Review has resulted with Notice that has been sent.
The permit has been issued and the permit is under active inspection
The permit has been issued
Application has been Accepted, the review has resulted in a Refused Notice that was
sent to applicant. It is advisable that all items in the Refusal Notice to be addressed
before a response is submitted to Building Division
A Notice of Change has been submitted to the Chief Building Official and the revision has
been accepted
Application has been accepted and the Review has started but not completed
Permit Issued
Permit Issued
Permit Issued