Professional Documents
Culture Documents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Cap 1 generacion
37
38
39
40
water gate
water intake
water treatment plant
powerhouse
compuerta
bocatoma
planta de tratamiento de agua
casa de maquinas
333762646.xlsx
Cap 1 generacion
Cap 1 generacion
Water gates are placed at the beginning of a channel to crontrol the flow.
Water for hydro station is taken from a river by a water intake
steam power plants requiere water treatment plants.
The power house is made of reinforced concrete.
333762646.xlsx
Cap 1 generacion
36
37
38
39
40
switch
under load tap changer
underghround cable
voltage drop
windings
seccionador
cambiador de tomas bajo carga
cable subterraneo
cada de ten sin
bobinados
333762646.xlsx
switches are always installed at beginning and at the end of a power line.
power transformers have under load tal changers to keep voltage constant at the load side.
333762646.xlsx