Professional Documents
Culture Documents
99)
Chapter 7
7.1.1
Statutory Requirements
(Safety
Officers
and
Safety
Supervisors)
employment.
Safety Supervisors must not be
duties properly.
((FIU(SO&SS)R).
assist
the
proprietor
of
an
industrial
of persons employed.
The main duties as
stipulated
in
the
(FIU(SO&SS)R)
are
as
follows :
(i)
findings
with
recommendations
for
personal
injury)
and
dangerous
occurrences
and
reporting
with
proprietor;
and health;
(v)
Supervisors;
(vi) receiving,
discussing
and
signing reports submitted to
Safety Supervisors; and
counter
him by
(vii) preparing
and
submitting
a
monthly
form.
(ii) supervising
the
observance
by
workers of the safety standards;
the
(v)
7.1.2
in a specified form.
Contractual Requirements
safety
personnel
for
PWP
contracts.
The
Architect/Engineer
may
stipulate
or
may
have
Total no.
of workers
50 to 200
201 to 700
701 to 1200
1200 and above
Minimum no. of
full-time
Safety Officer
Officer.
The time thus spent on Site
additional
Safety
Officers
shall
be
table.
Total no.
of workers
201 to 700
701 to 1200
1200 and above
Minimum no. of
full-time
Safety Officer
supervise
and
monitor
the
implementation
of
the
Safety
Plan/Contractor's
site
safety
Plan/Contractor's
site
safety
Architect/Engineers Representative.
prepare
detailed
reports
on
incidents/accidents
and
complete
standard
forms
provided
by
Architect/Engineer.
and/or
conduct
trainings
and
of
specific
method
statements
keep
a
register
of
the
names,
the
Safety
Supervisors,
Safety
the contract.
Contract.
(b)
prepare
a
monthly
report
for
Management Committee.
Safety Supervisor
(i)
Site.
Where the number of workers
50 workers.
tier
(directly
employed
by
the
Safety Supervisors.
(v)
required to
Committee
and
the
Site
Safety
Management Committee
techniques.
is required to ensure
carried out;
safety practices
workers; and
times.
are
adopted
by
the
7.2.1
(a) The
Architect/Engineer
has
the
following
(i)
health;
providing
or
arranging
suitable
equipment,
first-aid
and
welfare
facilities etc.;
Plan;
(iv) chair
the
Site
Safety
Management
(v)
the
Contractor
on
deficiencies
identified;
(vii) take
follow-up
action
against
deficiencies
identified
in
site
Department
as
well
as
Improvement
duties.
7.2.2
(a) General
to
include
staff
to
determine
his
resident
safety
staff
Architect/Engineer
in
dealing
with
Officer.
7.3
(RSO)
(b)
contracts
Architect/Engineer
shall
request
the
information:
(ii)
a
copy
of
the
proposed
RSO's
Department
experience /background
capacity
in
which
he
is
employed(part-time or full-time); the
If the
submitted information indicates that
the proposed RSO is already working either
full-time on another contract or part-time
in three other contracts, then the proposed
nomination should be rejected (see para.
7.3(b) above) unless it is confirmed that
the proposed nominated RSO has relinquished
his employment in other contracts.
Appendix I.
(iv)
DSEA shall provide his comment on the proposed
database.
(v)
The
Architect/Engineer shall then consider
taking
also
into
consideration
the
following:
(vi)
After
the employment of any approved
within
2
weeks
using
the
standard
unsatisfactory
performance
etc.,
the
Architect/Engineer
shall
provide
his
(ix)
(x)
provision
comments
of
practical
advice
and
(Dept)
(Name/Post)
to
letter ref. (
dated
) in
(file ref.)
to be the *full-time Safety Officer / part-time Safety Officer of not less than *6/12/18 hours
worked per week for the captioned contract. Prior to the approval, I should be grateful for your
advice on the current employment status and the previous performance record of the proposed
Safety Officer in other public works contract(s), if any.
Delete as appropriate
Post
Signature
Fax No.:
Date
(Dept)
(Name/Post)
to
letter ref. (
) in
dated
(file ref.)
[* Delete as appropriate]
(date)
This is to report the appointment of the above SO starting from:
and his/her employment status is:
full time
Part-time of *6/12/18 hour per week
(date)
This is to report the change of status of the above SO starting from:
and the new employment status is:
full time
Part-time of *6/12/18 hour per week
Post
Signature
Date
Fax No.:
c.c.
(Attn:
(Name of Contractor)
(Dept)
(Name/Post)
(
(English)
)
(Chinese)
(Please provide evidence to support any adverse comments on the Safety Officer)
Completed
by:
Name of the *Architect/Engineers
Representative
Signature
Date
Tel. No.
Endorsed by:
Name of the *Architect/Engineer
Signature
Date
(Attn:
(Attn:
(Attn:
Delete as appropriate