Aims at reducing the overall Aggregate Technical and Commercial (AT&C) losses of distribution
companies.
Establishment of reliable and automated systems for sustained collection of accurate base line
data.
The adoption of information Technology in the areas of energy accounting before taking up the
regular distribution strengthening projects.
Objectives:
To reduce AT&C Losses of selected towns to less than 15% over a period of 5 years.
To reduce annually overall AT&C losses of ESCOMs:a) By 3% if the existing AT&C Losses are more than 30%.
b) By 1.5% if the existing AT&C Losses are less than 30%.
Sources of funding:
GoI will provide up to 25% Loan for Part B.The balance 75% shall be sourced from FIs/REC/PFC etc.
Up to 50% loan for Part-B projects shall be converted into grant in five equal trenches on achieving
15% AT&C loss in the project area duly verified by Third Party Independent Evaluation AgencyEnergy Accounting (TPIEA-EA) on a sustainable basis for a period of five years. If the utility fails to
achieve 15% AT&C loss target in a particular year, that years trench of conversion to grant will be
reduced in proportion to the short fall in achieving 15% AT&C loss.
The sanctioned DPR works shall be executed on Turnkey basis for better quality and timely
completion of project
Scope of works :
As per the guidelines, the DPRs were prepared for 24 Towns in BESCOM and sanctioned for Rs. 290.28
Crores. BESCOM invited tenders for 24 towns for R-APDRP Part-B amounting to Rs. 290.28 Crores
(Sanctioned by M/s PFC, New Delhi), in 7 packages (District Wise) on Total Turnkey basis as per the
directions of Steering committee, MOP.
Accordingly detailed work award for R-APDRP Part-B have been issued and RAPDRP Part-B project
shall be completed within the targeted time.
The works shall be executed in 3 stages for the period of 24 months which are as under:
Stage-I
Providing Autoreclosures
Providing Sectionalisers
Stage-II
Stage-III
Providing trolley mounted Compact substation with 11kV, 50Hz 500kva distribution
transformer
Conversion of Single phase 2 wire to 3 Ph. 5 wire of LT line
Conversion of Single phase 3 wire to 3 Ph. 5 wire of LT line
Anekal
Doddaballapura
Hoskote
Chikkaballapura
Chintamani
Name of the
District
Bangalore rural
Approved DPR
Cost in Cr
Awarded cost
in Cr
15.44
11.57
14.51
14.31
6.11
7.3
7.65
7.88
11.47
11.53
Date of Award
Name of the
Firms Awarded
31.03.2011
M/s. Shalaka
Infratech Pvt.
Lmtd
05.04.2011
08.04.2011
M/s.Vishwanatha
Projects Ltd.,
1.04.2011
M/s. A2Z
Maintenance and
Engineering
Services Ltd,
Chikkaballapura
6
Gowribidanur
5.97
5.88
Sidlaghatta
5.61
5.73
Channpatna
7.72
7.86
Kanakapura
6.08
6.22
10
Ramanagar
11.8
12.03
11
Kolar
13.08
12.84
12
Bangarpet
8.06
8.07
Ramanagara
Kolar
13
Mulabagilu
8.66
11.48
14
KGF
14.74
13.54
15
Chitradurga
20.84
21
16
Challakere
4.55
4.88
17
Hiriyur
3.89
3.93
18
Davanagere
51.83
47.43
19
Harappanahalli
2.93
3.42
20
Harihara
11.53
13.43
21
Kunigal
2.65
3.18
22
Tumkur
42.76
43.15
4.23
4.6
8.17
8.97
Chitradurga
Davanagere
Tumkur
23
Sira
24
Tiptur
10.02.2011