3.

8 CRONOGRAMA VALORADO DE TRABAJOS


PROYECTO: CONSTRUCCIN DE LAS OBRAS DE MEJORAMIENTO INTEGRAL DEL
BARRIO VISTA HERMOSA DE CHILLOGALLO Y DE LA CALLE MANUELA CAIZARES
UBICACION : PARROQUIA DE CHILLOGALLO DEL D,M,Q,

PLAZO OFERTADO 300 DIAS (10 MESES DE 30 DIAS)


COD. E.T.

ITEM

1
2
3
4
5
6
7A
8
9
10A
11
10B
12
13
14
14A
15
16
17
18
19
20
188
158
159
160
161
162
163
165
166
170
171
173
174

A
A1
A1.1
A1.2
A1.3
A1.4
A1.5
A1.6
A1.7
A1.8
A1.9
A1.10
A1.11
A1.12
A1.13
A1.14
A1.15
A1.16
A1.17
A1.18
A1.19
A1.20
A1.21
A1.22
A1.23
A1.24
A1.25
A1.26
A1.27
A1.28
A1.29
A1.30
A1.31
A1.32
A1.33
A1.34
A1.35

1
2
21
22
5
3
18A
18B
6
11
23
13
12
10C
10D
10E
10F
10H
10I
10A
19
14B
24
25
26
26A
27
28A
28
28B
29A
29B
29
30
31
31A
32
33
33A
33B
175
34
182
187
35
35A
35B
35C
20A
36
36A
36B
36C
37
38
39
41
41A
41B
42
42A
43
43A
43B
44
189
190
191
192

A2
A2.1
A2.2
A2.3
A2.4
A2.5
A2.6
A2.7
A2.8
A2.9
A2.10
A2.11
A2.12
A2.13
A2.14
A2.15
A2.16
A2.17
A2.18
A2.19
A2.20
A2.21
A2.22
A2.23
A2.24
A2.25
A2.26
A2.27
A2.28
A2.29
A2.30
A2.31
A2.32
A2.33
A2.34
A2.35
A2.36
A2.37
A2.38
A2.39
A2.40
A2.41
A2.42
A2.43
A2.44
A2.45
A2.46
A2.47
A2.48
A2.49
A2.50
A2.51
A2.52
A2.53
A2.54
A2.55
A2.56
A2.57
A2.58
A2.59
A2.60
A2.61
A2.62
A2.63
A2.64
A2.65
A2.66
A2.67
A2.68
A2.69

11
13A
15
16
12
17
18
19

A3
A3.1
A3.2
A3.4
A3.5
A3.6
A3.7
A3.8
A3.9

1
2
45
5
3
4
6
7B
7A
8
9
46
47
48
49
50
3A
18B
6
51
51A
18
52
53

A4
A4.1
A4.2
A4.3
A4.4
A4.5
A4.6
A4.7
A4.8
A4.9
A4.10
A4.11
A4.12
A4.13
A4.14
A4.15
A4.16
A4.17
A4.18
A4.19
A4.20
A4.21
A4.22
A4.23
A4.24

A5
A5.1

DESCRIPCION

1 MES
2 MES
3 MES
4 MES
5 MES
6 MES
7 MES
8 MES
9 MES
10 MES
11 MES
12 MES
1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16 SEMANA 17 SEMANA 18 SEMANA 19 SEMANA 20 SEMANA 21 SEMANA 22 SEMANA 23 SEMANA 24 SEMANA 25 SEMANA 26 SEMANA 27 SEMANA 28 SEMANA 29 SEMANA 30 SEMANA 31 SEMANA 32 SEMANA 33 SEMANA 34 SEMANA 35 SEMANA 36 SEMANA 37 SEMANA 38 SEMANA 39 SEMANA 40 SEMANA 41 SEMANA 42 SEMANA 43 SEMANA 44 SEMANA 45 SEMANA 46 SEMANA 47 SEMANA 48 SEMANA

BARRIO VISTA HERMOSA


PLAZA CVICA
Replanteo y nivelacin con equipo topogrfico
536,29
Cerramiento provisional h=2.00m
322,05
Excavacin a mquina
Conformacin y compactacin de subrasante
Excavacin manual
Desalojo de material
Bordillos H. S. h=22 b=10 cm fc=180kg/cm2
Adoquinado color e=6cm(fc=400 kg/cm2)
Subbase clase 3
Hormign en gradero (fc=210Kg/cm2)
Acero de refuerzo (fy=4200kg/cm2)
Hormign en muro (f'c=210 Kg/cm2)
Hormign en replantillo (f'c=140kg/cm2)
Hormign ciclpeo en plinto corrido
Malla electrosoldada de 6x15
Malla electrosoldada de 8x15
Banda de PVC de 25mm para juntas
Geomembrana e= 1.0mm
Dren con tubera de PVC - D 110mm
Relleno con material granular
Encofrado
Asiento de hormign A=35 cm
Rejilla de hierro corrugado
Capaceta monofsica
Tablero de distribucin y accesorios
Iluminacin con ojo de buey de 18W
Iluminacin tipo BORNA de 35W
Cable aislado tipo TTU No. 6 AWG
Luminaria ornamental tipo columna de 70W
Control de iluminacion y fotocelula
Poste de hormign de 10mx400Kg., incluye instalacin
Tubo poste de 50mm y flejes para asegurar
Desmontaje poste de madera de 9m, incluye transporte
Cajas de revisin de 80x80x100 cm de hormign
Puesta a tierra
SUBTOTAL
TRIBUNA Y CAMERINOS
Replanteo y nivelacin con equipo topogrfico
90,37
Cerramiento provisional h=2.00m
176,27
Desmontaje cubierta de gradero existente
Desmontaje gradero existente
Excavacin manual
Excavacin a mquina
Relleno compactado con material de excavacin
Relleno compactado con material de excavacin equipo liviano
Desalojo de material
Acero de refuerzo (fy=4200kg/cm2)
Acero Estructural en perfil grado A-36
Hormign ciclpeo en plinto corrido
Hormign en replantillo (f'c=140kg/cm2)
Hormign en plintos (fc:210Kg/cm2)
Hormign en cadenas de amarre (f'c=210Kg/cm2)
Hormign en cimiento de cadenas (f'c=180kg/cm2)
Hormign en columnas (f'c=210Kg/cm2)
Hormign en vigas (f'c=210kg/cm2)
Hormign en viga de cimentacin (f'c=210kg/cm2)
Hormign en gradero (fc=210Kg/cm2)
Encofrado
Malla electrosoldada de 6x10
Cubierta tipo galvalume e=0.4mm
Cable tensor de acero D= 10mm
Mampostera de bloque de 15cm
Mampostera de bloque de 10cm
Contrapiso hormign simple fc=180kg/cm2 e=7 (inc. Piedra bola e=15cm, malla)
Cermica de piso de bao 20x20 cm.
Cermica de piso 30x30 cm.
Cermica de pared 20x20 cm.
Enlucido vertical paleteado fino interior
Enlucido vertical paleteado fino exterior
Enlucido horizontal paleteado fino
Loseta de mesn de lavamanos ms grano de mrmol
Pintura de caucho interior
Pintura de caucho exterior
Espejo claro de 4 mm incluye soportes
Puerta metlica 0,70m con cerradura
Puerta metlica 0,80m con cerradura
Puerta metlica 0,90m con cerradura
Ventana de hierro con vidrio 4mm, incluye reja de proteccin
Divisin de tool dos lados (inc. Pintura, instalado y tubo rectangular y puerta)
Mueble bajo con mesn de melaminico y fregadero de 1 pozo
Mueble empotrado en oficina y consejera
Urinario, incluye grifera y accesorios
Inodoro tanque bajo incluye accesorios
Lavamanos empotrado incluye accesorios y grifera
Ducha incluye accesorios y grifera
Asiento de madera A=35cm, provisin y montaje
Tubera PVC-R 1 1/2"
Tubera PVC-R 1"
Tubera PVC-R 3/4"
Tubera PVC-R 1/2"
V Compuerta tipo R.W 1/2"
Salida de agua potable PVC-R 1/2"
Llaves de paso 3/4"
Tubera de PVC-Desage 110mm
Tubera de PVC-Desage 75mm
Tubera de PVC-Desage 50mm
Desages PVC 50mm
Desages PVC 110mm
Trampa de piso 50mm, incluye rejilla
Trampa de piso 75mm, incluye rejilla
Trampa de piso 110mm, incluye rejilla
Bajante de agua lluvia 110mm
Luminaria Fluorescente 3x17w, 120 v
Tomacorriente doble
Circuito 2 TW #12 AWG + 1#14 AWG y tubera tipo EMT, dimetro 1/2"
Tablero de distribucin normal
SUBTOTAL
MURO DE TRIBUNA Y CAMERINOS
Acero de refuerzo (fy=4200kg/cm2)
Hormign ciclpeo en muro
Banda de PVC de 25mm para juntas
Geomembrana e= 1.0mm
Hormign en replantillo (f'c=140kg/cm2)
Dren con tubera de PVC - D 110mm
Relleno con material granular
Enconfrado
SUBTOTAL
CANCHA DE FTBOL
Replanteo y nivelacin con equipo topogrfico
Cerramiento provisional h=2.00m
Retiro de arcos
Excavacin manual
Excavacin a mquina
Conformacin y compactacin de subrasante
Desalojo de material
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
Bordillos H. S. h=22 b=10 cm fc=180kg/cm2
Adoquinado color e=6cm(fc=400 kg/cm2)
Subbase clase 3
Encespado de perimetro de cancha
Antepecho de H.S. fc=180 kg/cm2 para pasamanos
Cerramiento de malla eletrosoldada tipo pronto 3D
Encespado de Cancha
Arco de futbol (poste 4") (provisin y montaje)
Excavacin zanja a mquina h=0.00-2.75m (en tierra)
Relleno compactado con material de excavacin equipo liviano
Desalojo de material
Tubera PVC UE perforada D.N.I. 110mm (mat.tran.inst)
Tubera PVC UE perforada D.N.I. 200mm (mat.tran.inst)
Relleno con material granular
Geotextil para subdrenes (1600 NT)
Cama de arena
SUBTOTAL
MURO DE RAMPA
Excavacin a mquina

750,16
467,63
44,04
744,29
415,43

415,43
1.573,82
491,83

415,43
1.573,82
491,83

415,425
1573,82
491,83

1573,82

1.573,82

1.573,82

1048,125

1.162,06
448,22
1.048,13

1.162,06
448,22

221,43
979,71
540,025
488,525

324,94333

540,03
488,53
20,55

324,94

20,55
116,70
135,36
101,53
324,94

116,70
135,36
101,53
578,50
508,42

578,50
508,42

695,80

1.296,90
223,96
695,80

1.296,90
223,96
695,80

25,39
214,99
1.296,90
223,96
1.200,92
24,77
962,08

962,08

962,08
48,71

178,56
753,50
407,50

108,08
122,29
8,71
726,79

726,79
416,94
110,06

416,94
110,06
950,90

950,9
3572,5333

3572,5333

3572,5333

3.572,53
1.271,66

3.572,53
1.271,66

3.572,53
1.271,66

1193,64
727,4275

1.193,64
727,43

1.193,64
727,43

727,43

796,17333

796,17

1.485,05
796,17
22,16

1.271,66

1.271,66

1.485,05
796,17

1.485,05

1.271,66

90,13
505,04
517,495
1.009,63

517,495
474,35

1009,625
1193,64

1.476,74

1476,735
796,17333

1.485,05
796,17

928,05

1.636,30
147,84
928,05

1.636,30
928,05
476,22

928,05
311,64
476,22

476,22
549,27
903,26
681,69
1.328,57

681,69

1.328,57
367,38
668,04
420,44
1.039,87
164,39
155,97
539,15
545,68
459,84

539,15

112,37
1.424,14
228,49
320,10
447,96
879,39
623,70
352,92
1.967,10
201,15
109,58
77,26
83,77
34,88
490,88
102,69
146,76
23,19
125,67
285,43
263,43
244,08
24,62
78,94
310,98
2.580,48
774,59
786,79
97,19

510,60

784,03
1.353,76
93,92

784,03
1.353,76
93,92

1.555,71

221,86
516,98
1.555,71

510,60
271,61

953,24
165,83
15,08
195,24
616,24
24,86
667,07
371,48
865,49
502,07
78,41
739,54
1.462,46

1.462,46
1.566,18

1.566,18

1.566,18

1.566,18
1.046,25

1.046,25

1.046,25

1.046,25
930,56

352,40
88,70
2.920,62
770,39
241,44
1.004,73
793,79
72,56

181,10

2.920,62
770,39
241,44
1.004,73
793,79
72,56

2.920,62

2.920,62

COD. E.T.
6
13A
12
15
17
19

1
2
3
5
6
7B
7A
8
4
9
10A
46
178

1
2
3
5
6
7B
7A
8
4
9
54
46
55
56
57
58
59
60
61
63
64
65
66
67
68
69
158
159
161
162
163
165
170
173
174

70
71
72
73
6
26
28A
28
28B
29
29A
29B
30
31
31A
32
33
33A
33B
33
175
34
40
35
35A
35B
36A
36B
36C
37A
38
39
41
41B
42
42A
43
44
74
75
188
189
190
191
192

1
2
76
3
5
18A
6
77
78
80
54
11
23
10I
10C
12
10D
10F
10B
14A
15
16
17
18
81
82
83
19
7C
54
10A
13
183
184

1
2
5
6
79
7D
7C
8
46
84
181
85

ITEM

DESCRIPCION

Desalojo de material
Hormign ciclpeo en muro
Hormign en replantillo (f'c=140kg/cm2)
Banda de PVC de 25mm para juntas
Dren con tubera de PVC - D 50mm
Encofrado
SUBTOTAL
A6
PLAZA INFANTIL
A6.1
Replanteo y nivelacin con equipo topogrfico
A6.2
Cerramiento provisional h=2.00m
A6.3
Excavacin a mquina
A6.4
Excavacin manual
A6.5
Desalojo de material
A6.6
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
A6.7
Bordillos H. S. h=22 b=10 cm fc=180kg/cm2
A6.8
Adoquinado color e=6cm(fc=400 kg/cm2)
A6.9
Conformacin y compactacin de subrasante
A6.10 Subbase clase 3
A6.11 Hormign en gradero (fc=210Kg/cm2)
A6.12 Encespado
A6.13 Sealizacin de rayuela e=2.5cm
SUBTOTAL
A7
PARQUE DE JUEGOS
A7.1
Replanteo y nivelacin con equipo topogrfico
A7.2
Cerramiento provisional h=2.00m
A7.3
Excavacin a mquina
A7.4
Excavacin manual
A7.5
Desalojo de material
A7.6
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
A7.7
Bordillos H. S. h=22 b=10 cm fc=180kg/cm2
A7.8
Adoquinado color e=6cm(fc=400 kg/cm2)
A7.9
Conformacin y compactacin de subrasante
A7.10 Subbase clase 3
A7.11 Cascajo apisonado de piedra e=2cm
A7.12 Encespado
A7.13 Piso prefabricado de hormign 1,20 x0 ,20 en area verde
A7.14 Rasanteo manual
A7.15 Basureros metlicos cilndricos
A7.16 Banca 0.60x3.00 de hormign con asiento de madera tratada
A7.17 Banca 0.60x1.5 de hormign con asiento de madera tratada
A7.18 Columpio de 3 asientos, provisin y montaje
A7.19 Sube y baja de madera
A7.20 Estacin de juego de tres plataformas, provisin y montaje
A7.21 Laberinto de madera tratada, provisin y montaje
A7.22 Caballito, provisin y montaje
A7.23 Pirmide giratoria, provisin y montaje
A7.24 Triki Traka 3D
A7.25 Seto de bamb ornamental
A7.26 Tierra Abonada
A7.27 Capaceta monofsica
A7.28 Tablero de distribucin y accesorios
A7.29 Iluminacin tipo BORNA de 35W
A7.30 Cable aislado tipo TTU No. 6 AWG
A7.31 Luminaria ornamental tipo columna de 70W
A7.32 Control de iluminacion y fotocelula
A7.33 Tubo poste de 50mm y flejes para asegurar
A7.34 Cajas de revisin de 80x80x100 cm de hormign
A7.35 Puesta a tierra
SUBTOTAL
A8
SEDE SOCIAL
A8.1
Derrocamiento de mampostera
A8.2
Derrocamiento de hormign armado
A8.3
Retiro de puertas
A8.4
Retiro de ventanas
A8.5
Desalojo de material
A8.6
Mampostera de bloque de 15cm
A8.7
Cermica de piso de bao 20x20 cm.
A8.8
Cermica de piso 30x30 cm.
A8.9
Cermica de pared 20x20 cm.
A8.10 Enlucido horizontal paleteado fino
A8.11 Enlucido vertical paleteado fino interior
A8.12 Enlucido vertical paleteado fino exterior
A8.13 Loseta de mesn de lavamanos ms grano de mrmol
A8.14 Pintura de caucho interior
A8.15 Pintura de caucho exterior
A8.16 Espejo claro de 4 mm incluye soportes
A8.17 Puerta metlica 0,70m con cerradura
A8.18 Puerta metlica 0,80m con cerradura
A8.19 Puerta metlica 0,90cm con cerradura
A8.20 Puerta metlica 1.5m con cerradura
A8.21 Ventana de hierro con vidrio 4mm, incluye reja de proteccin
A8.22 Divisin de tool dos lados (inc. Pintura, instalado y tubo rectangular y puerta)
A8.23 Accesorios de Baos
A8.24 Urinario, incluye grifera y accesorios
A8.25 Inodoro tanque bajo incluye accesorios
A8.26 Lavamanos empotrado incluye accesorios y grifera
A8.27 Tubera PVC-R 1"
A8.28 Tubera PVC-R 3/4"
A8.29 Tubera PVC-R 1/2"
A8.30 V Compuerta R.W 1"
A8.31 Salida de agua potable PVC-R 1/2"
A8.32 Llaves de paso 3/4"
A8.33 Tubera de PVC-Desage 110mm
A8.34 Tubera de PVC-Desage 50mm
A8.35 Desages PVC 50mm
A8.36 Desages PVC 110mm
A8.37 Trampa de piso 50mm, incluye rejilla
A8.38 Bajante de agua lluvia 110mm
A8.39 Tubera de ventilacin 50 mm
A8.40 Tubera de ventilacin 110 mm
A8.41 Rejilla de hierro corrugado
A8.42 Luminaria Fluorescente 3x17w, 120 v
A8.43 Tomacorriente doble
A8.44 Circuito 2 TW #12 AWG + 1#14 AWG y tubera tipo EMT, dimetro 1/2"
A8.45 Tablero de distribucin normal
SUBTOTAL
A9
MIRADOR
A9.1
Replanteo y nivelacin con equipo topogrfico
A9.2
Cerramiento provisional h=2.00m
A9.3
Desbroce y limpieza
A9.4
Excavacin a mquina
A9.5
Excavacin manual
A9.6
Relleno compactado con material de excavacin
A9.7
Desalojo de material
A9.8
Pasamanos de madera colorado inmunizado (segn diseo de planos)
A9.9
Pasamanos ecolgico de eucalipto
A9.10 Contrahuellas de madera
A9.11 Cascajo apisonado de piedra e=2cm
A9.12 Acero de refuerzo (fy=4200kg/cm2)
A9.13 Acero Estructural en perfil grado A-36
A9.14 Hormign en viga de cimentacin (f'c=210kg/cm2)
A9.15 Hormign en plintos (fc:210Kg/cm2)
A9.16 Hormign en replantillo (f'c=140kg/cm2)
A9.17 Hormign en cadenas de amarre (f'c=210Kg/cm2)
A9.18 Hormign en columnas (f'c:210Kg/cm2)
A9.19 Hormign en muro (f'c=210 Kg/cm2)
A9.20 Malla electrosoldada de 8x15
A9.21 Banda de PVC de 25mm para juntas
A9.22 Geomembrana e= 1.0mm
A9.23 Dren con tubera de PVC - D 110mm
A4.22 Relleno con material granular
A9.24 Viguetas 50x50 mm
A9.25 Entablado con tabln de colorado
A9.26 Tirafondos de hierro D = 3/8"x2"
A9.28 Encofrado
A9.29 Bordillo de confinamiento de escalinata
A9.30 Cascajo apisonado de piedra e=2cm
A9.31 Hormign en gradero (fc=210Kg/cm2)
A9.32 Hormign ciclpeo en plinto corrido
A9.33 Anclaje de acero tipo 1
A9.34 Anclaje de acero tipo 2
SUBTOTAL
A10
ESCALINATA 1
A10.1 Replanteo y nivelacin con equipo topogrfico
A10.2 Cerramiento provisional h=2.00m
A10.3 Excavacin manual
A10.4 Desalojo de material
A10.5 Pasamanos tubo HG 2" (incluye instalacin y pintura)
A10.6 Bordillos H. S. h=30 b= 8 cm fc=180kg/cm2
A10.7 Bordillo de confinamiento de escalinata
A10.8 Adoquinado color e=6cm(fc=400 kg/cm2)
A10.9 Encespado
A10.10 Arboles varias especies 3 m de alto (prov. Transp y trasplante)
A10.11 Rejilla protectora de calistemo
A10.12 Arbusto
SUBTOTAL
A11
ESCALINATA 2
A11.1 Replanteo y nivelacin con equipo topogrfico

1 MES

2 MES

3 MES

4 MES

5 MES

6 MES

A5.2
A5.3
A5.4
A5.5
A5.6
A5.7

7 MES

8 MES

9 MES

10 MES

11 MES

12 MES

175,97
1.049,11
54,54
22,89
38,60
891,59

114,88
99,00
64,59
56,32
82,48
262,99
39,26
1.762,53
87,28
275,41
272,43
79,65
36,31

950,29
531,38
354,40
891,80
656,35
1.018,01
99,24

1.018,01

1.018,01
3.319,83

3.319,83

3.319,83

3.319,83

498,52

498,52

498,52
505,00
37,50

657,62
1.037,50

1.037,50
57,65

744,64

744,64
713,46

744,64
713,46

713,46
1.006,81

1.006,81

1.006,81
965,32
999,48
2.489,43
1.112,82
1.671,40
578,90
640,31
942,79
147,90

25,39
214,99
2.076,72
2.453,89
428,90
24,77
48,71
1.808,40
978,00

14,34
66,81
68,76
42,77
11,45
55,35
203,84
794,18
637,65
448,45
673,88
489,57
160,50
405,38
219,07
49,96
359,43
272,84
153,28
320,59
933,33
405,09
103,17
111,99
390,84
311,85
67,03
91,09
46,86
28,73
151,04
102,69
45,34
39,17
67,16
117,08
61,02
142,65
10,14
27,09
159,28
860,16
240,39
229,26
97,19

279,79
166,32
605,35
2.668,96
182,82
283,86
1.262,89

1.262,89
5.352,35

928,39
3.621,68
626,66
490,80

928,39
3.621,68

928,39
3.621,68

928,39
3.621,68

638,12
272,92
138,26
3.018,97
1.259,90
32,52
236,49
171,21
124,70
4.771,80
10.169,28
1.300,00
234,99

234,99

234,99

234,99
813,45
15,79
252,78
50,48
274,62
195,96

84,25
61,72
27,58
9,65
1.203,90
179,40
147,90
190,15
109,15
198,14
96,55
182,92

85,53

1.203,90

813,45
15,79
252,78
50,48
274,62
195,96

5.352,35
1.984,87
288,45

1.984,87
288,45
34,02

COD. E.T.

ITEM

2
5
6
79
7B
7B
8
58
46
84
181
85

A11.2
A11.3
A11.4
A11.5
A11.6
A11.7
A11.8
A11.9
A11.10
A11.11
A11.12
A11.13

1
2
5
6
79
7D
7B
8
84
181
85

A12
A12.1
A12.2
A12.3
A12.4
A12.5
A12.6
A12.7
A12.8
A12.9
A12.10
A12.11

1
79
46

A13
A13.1
A13.2
A13.3

1
86
87
6
54
78
57
59
88

A14
A14.1
A14.2
A14.3
A14.5
A14.6
A14.7
A14.8
A14.9
A14.10

89
90
91
3
5
4
6
9
7E
8
92
8A
106

A15
A15.1
A15.2
A15.3
A15.4
A15.5
A15.6
A15.7
A15.8
A15.9
A15.10
A15.11
A15.12
A15.13

132
133
134
135
136
137
138
139
140
141
143
145
150
146
151
152
147

A15.14
A15.15
A15.16
A15.17
A15.18
A15.19
A15.20
A15.21
A15.22
A15.23
A15.24
A15.25
A15.26
A15.27
A15.28
A15.29
A15.30

1
2
93
94
95
71
3
5
6
10A
4
7B
9
8
18A
46
54

A16
A16.1
A16.2
A16.3
A16.4
A16.5
A16.6
A16.7
A16.8
A16.9
A16.10
A16.11
A16.12
A16.13
A16.14
A16.15
A16.16
A16.17

48
96
27A
97
176
177

A16.18
A16.19
A16.20
A16.21
A16.22
A16.23

89
5
11
12
10C
10D
13A
10F
19
26
29A
31A

A16.22
A16.23
A16.24
A16.25
A16.26
A16.27
A16.28
A16.29
A16.30
A16.31
A16.32
A16.33

98
99
100
161
162
163
172
173
174

A16.34
A16.35
A16.36
A16.37
A16.38
A16.39
A16.40
A16.41
A16.42

13A
16
15
41
10J
101

A17
A17.1
A17.2
A17.3
A17.4
A17.5
A17.6

186
23
102
41B

A18
A18.1
A18.2
A18.3
A18.4

3A
18B
6
113
114
115
116
117
118

A19
A19.1
A19.2
A19.3
A19.4
A19.5
A19.6
A19.7
A19.8
A19.9

1
2
3

B
B1
B1.1
B1.2
B1.3

DESCRIPCION

1 MES
Cerramiento provisional h=2.00m
Excavacin manual
Desalojo de material
Pasamanos tubo HG 2" (incluye instalacin y pintura)
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
Bordillo de confinamiento de escalinata
Adoquinado color e=6cm(fc=400 kg/cm2)
Banca 0.60x3.00 de hormign con asiento de madera tratada
Encespado
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
Arbusto
SUBTOTAL
ESCALINATA 3
Replanteo y nivelacin con equipo topogrfico
Cerramiento provisional h=2.00m
Excavacin manual
Desalojo de material
Pasamanos tubo HG 2" (incluye instalacin y pintura)
Bordillos H. S. h=30 b= 8 cm fc=180kg/cm2
Bordillo de confinamiento de escalinata
Adoquinado color e=6cm(fc=400 kg/cm2)
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
Arbusto
SUBTOTAL
ESCALINATA 4 - 5
Replanteo y nivelacin con equipo topogrfico
Pasamanos tubo HG 2" (incluye instalacin y pintura)
Encespado
SUBTOTAL
PARQUE ECOLOGICO
Replanteo y nivelacin con equipo topogrfico
Derrocamiento estructura de hormign simple
Desenchambado
Desalojo de material
Cascajo apisonado de piedra e=2cm
Pasamanos ecolgico de eucalipto
Basureros metlicos cilndricos
Banca 0.60x1.5 de hormign con asiento de madera tratada
Tarabita, provisin y montaje
SUBTOTAL
ACERAS Y VIAS
Replanteo y nivelacin lineal
527,46
527,46
Retiro de bordillos
830,68
Rotura de aceras
Excavacin a mquina
Excavacin manual
Conformacin y compactacin de subrasante
Desalojo de material
Subbase clase 3
Bordillo H. S. h=50 B=20 b=15 cm fc=180kg/cm2
Adoquinado color e=6cm(fc=400 kg/cm2)
Aceras de Hormign
Adoquinado vehicular e=8cm(fc=400 kg/cm2)
Bolardos metlicos, provisin y montaje
SEALIZACIN VIAL VISTA HERMOSA DE CHILLOGALLO
Marcas de pavimento (lnea continua blanca o amarilla a= 10 cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 1-3 m a= 15 cm; incluye microesferas)
Marcas de pavimento (lnea continua blanca ; a= 40cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 0.60-0.60 m; a= 40 cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 0.60-0.60 m; a= 20 cm; incluye microesferas)
Marcas de pavimento (paso cebra)
Marcas de pavimento (flechas ,letras, etc.; incluye microesferas)
Seales al lado de la calzada( reglamentaria octogonal de pare 600 x600mm)
Seales al lado de la calzada( reglamentaria rectangular de prohibido estacionar 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de estacionamiento permitido) 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de lmite de velocidad 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de cruce peatonal 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de parada de bus (600x900 mm)
Seales al lado de la calzada( reglamentaria rombo de no vehculos motor (600x600 mm)
Seales paralelas a la calzada ( reglamentaria rectangular de una va (900x300 mm)
Seales paralelas a la calzada ( reglamentaria rectangular de doble va (900x300 mm)
Seales al lado de la calzada( preventiva rombo de zona de juegos 600x600 mm)
SUBTOTAL
REA DEPORTIVA
Replanteo y nivelacin con equipo topogrfico
Cerramiento provisional h=2.00m
Retiro de bancas de madera
Retiro de aro
Rotura de contrapiso
Derrocamiento de hormign armado
Excavacin a mquina
Excavacin manual
Desalojo de material
Hormign en gradero (fc=210Kg/cm2)
Conformacin y compactacin de subrasante
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
Subbase clase 3
Adoquinado color e=6cm(fc=400 kg/cm2)
Relleno compactado con material de excavacin
Encespado
Cascajo apisonado de piedra e=2cm
SUBTOTAL
CANCHA VOLEY Y BASQUET
Cerramiento de malla eletrosoldada tipo pronto 3D
Alisado con cuarzo
Contrapiso hormign simple fc=240kg/cm2 e=7 (inc. Piedra bola e=15cm, malla)
Sealizacin de canchas
Aro de bsquet (poste de 4") (provisin y montaje)
Poste de vley (poste de 4") (provisin y montaje)
SUBTOTAL
CERRAMIENTO DE MAMPOSTERA EN REA DEPORTIVA
Replanteo y nivelacin lineal
26,08
Excavacin manual
12,01
Acero de refuerzo (fy=4200kg/cm)
Hormign en replantillo (f'c=140kg/cm2)
134,17
Hormign en plintos (fc:210Kg/cm2)
Hormign en cadenas de amarre (f'c=210Kg/cm2)
Hormign ciclpeo en muro
Hormign en columnas (f'c=210Kg/cm2)
Encofrado
Mampostera de bloque de 15cm
Enlucido vertical paleteado fino
Pintura de caucho exterior
SUBTOTAL
GIMNASIO BIOSALUDABLE
Espalda, provisin y montaje
Mono, provisin y montaje
Esqu, provisin y montaje
Iluminacin tipo BORNA de 35W
Cable aislado tipo TTU No. 6 AWG
Luminaria ornamental tipo columna de 70W
Canalizacin de I va en acera
Cajas de revisin de 80x80x100 cm de hormign
Puesta a tierra
SUBTOTAL
ESTABILIZACIN DE TALUD CON GEOMANTO EN ZONA DE RIESGO 1
Hormign ciclpeo en muro
1.523,20
1.523,20
Geomembrana e= 1.0mm
Banda de PVC de 25mm para juntas
117,40
117,40
Tubera de PVC-Desage 110mm
Hormign en cuneta fc=210 kg/cm2
Geomanto de red simple
SUBTOTAL
ESTABILIZACIN DE TALUD CON MALLA Y MORTERO EN ZONA DE RIESGO 2
Anclaje de acero tipo 4
Acero estructural para placa de sujecin en perfil grado A-36
Malla triple torsin galvanizada enlucida con mortero 1:4
Tubera de PVC-Desage 50mm
SUBTOTAL
ALCANTARILLADO EXTERIOR PARQUE DE VISTA HERMOSA
Excavacin zanja a mquina h=0.00-2.75m (en tierra)
Relleno compactado con material de excavacin equipo liviano
Desalojo de material
Tubera PVC UE alcantarillado D.N.I. 110mm (mat.tran.inst)
Tubera PVC UE alcantarillado D.N.I. 160mm (mat.tran.inst)
Tubera PVC UE alcantarillado D.N.I. 200mm (mat.tran.inst)
Tubera PVC UE alcantarillado D.N.I. 300mm (mat.tran.inst)
Caja de revisin H.S incluye tapa
Pozo de revisin incluye tapa h=2.5 m
SUBTOTAL
TOTAL A
PARQUE LINEAL
CUADRA 1 Entre las abscisas 0+050-0+340 y entre las Calles E-Oe11H
Replanteo y nivelacin con equipo topogrfico
606,44
Cerramiento provisional h=2.00m
Excavacin a mquina

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

10 MES

11 MES

12 MES

83,40
65,51
22,92
2.006,50

2.006,50

372,60
343,50
520,71
305,77
236,30
396,28
193,10
462,68

39,39
77,56
29,57
10,35
1.244,03

1.244,03

148,20
274,80
203,84
198,14
96,55
355,08

56,32
2.488,06

2.488,06

2.488,06

2.488,06

2.488,06

708,91

708,91

708,91

708,91

708,91

302,08

683,32
1.561,50

1.561,50

1.561,50
1.248,61

1.248,61
514,18
506,19

1.483,72

830,68
1.299,85

1.299,85
3.980,69

1.483,72

1.023,88
1.483,72

4.049,75

4.049,75

588,99

588,99

6.043,84

6.043,84

4.049,75

4.049,75

1.023,88

3980,69
270,56
4035,55

1579,9533
4035,55

1579,9533

1.579,95
3.665,16

3.665,16

3.665,16
3.196,34

3.665,16
3.196,34

3.665,16
3.196,34
4.695,56

3.665,16
3.196,34
4.695,56

3.196,34
4.695,56
5.204,47

3.196,34
4.695,56
5.204,47

4.695,56
5.204,47
6.043,84

4.695,56
5.204,47
6.043,84

5.204,47
6.043,84

5.204,47
6.043,84

6.043,84

6.043,84

6.043,84

6.043,84

6.043,84

6.043,84
708,91
531,68
38,12
19,84
8,04
4,80

531,68
38,12
19,84
8,04
4,80
119,75
290,40
91,13
273,38
91,13

119,75
290,40
91,13
273,38
91,13
60,75
486,00
1.304,10
121,50
121,50
121,50

60,75
486,00
1.304,10
121,50
121,50
121,50
121,50

121,50

274,85
209,75
15,69
31,11
830,55
180,46
170,23
23,19
243,53
924,03
89,59
246,29
282,72
904,57

904,57

330,48
77,75

77,75
6,93

874,05

874,05
361,74
1.433,23

361,74
1.433,23
57,60

551,52
144,60

726,00

725,995

725,995

725,995

1344,315
31,503333

1344,315
31,503333

170,42
90,97
252,36
31,503333

217,18

217,18
313,83

313,83
320,13

1.660,68
1.676,03
1.188,86
702,42
1.079,23

702,42
1.079,23
686,24
1.017,23

554,40
1.017,23

554,40
550,13

1.523,20

1.523,20

117,40

117,40
81,4

81,4

82,80

82,80

81,4

81,40

359,4

359,40

82,80

82,80

359,40

359,40

155,95

170,63

170,63
220,08

220,08
1.506,67

1.506,67

1.506,67

75,80

319,41
79,81
783,12
540,06
625,92
1.153,28
157,29
554,57

606,44
1.229,68

1.229,68
236,31

236,305

387,66
554,57

387,66

387,66

550,13

686,24

COD. E.T.

ITEM

5
4
6
7B
7A
10A
9
8
54
46
55
56

B1.4
B1.5
B1.6
B1.7
B1.8
B1.9
B1.10
B1.11
B1.12
B1.13
B1.14
B1.15

48
96
27A
97
107
177

B1.16
B1.17
B1.18
B1.19
B1.20
B1.21

5
18B
6
11
23
12
10C
10D
10F
10E
103
185
10G
104
14B
13A
26
29
29B
29A
27
28A
28
28B
30
31
31A
32
35A
35B
35
33
33A
33B
175
34
105
36A
36B
37A
38
39
41
41B
42
42A
43
44
74
75
189
193
190
191
192

B1.20
B1.21
B1.22
B1.23
B1.24
B1.25
B1.26
B1.27
B1.28
B1.29
B1.30
B1.31
B1.32
B1.33
B1.34
B1.35
B1.36
B1.38
B1.40
B1.42
B1.44
B1.46
B1.48
B1.50
B1.52
B1.54
B1.56
B1.58
B1.60
B1.62
B1.64
B1.66
B1.68
B1.70
B1.72
B1.74
B1.76
B1.78
B1.80
B1.82
B1.84
B1.86
B1.88
B1.90
B1.92
B1.94
B1.96
B1.98
B1.100
B1.102
B1.104
B1.106
B1.108
B1.110
B1.112

106
59

B1.69
B1.70

62
64
65
66

B1.71
B1.72
B1.73
B1.74

109
110
111
100
112
99
60
98

B1.75
B1.76
B1.77
B1.78
B1.79
B1.80
B1.81
B1.82

84
181
85

B1.83
B1.84
B1.85

158
159
160
161
162
163
164
165
166
167
168
169
170
171
173
174

B1.86
B1.87
B1.88
B1.89
B1.90
B1.91
B1.92
B1.93
B1.94
B1.95
B1.96
B1.97
B1.98
B1.99
B1.100
B1.101

1
2
3
5
6
4
9
7B
7A
8
54
46
55
56
96
27A

B2
B2.1
B2.2
B2.3
B2.4
B2.5
B2.6
B2.7
B2.8
B2.9
B2.10
B2.11
B2.12
B2.13
B2.14
B2.15
B2.16

5
18B
6
11
23
12
10C
10D
10F
10E
103
185
10G
104
14B
13A
26
29
29A
29B
27
28A
28
28B
30
31

B2.17
B2.18
B2.19
B2.20
B2.21
B2.22
B2.23
B2.24
B2.25
B2.26
B2.27
B2.28
B2.29
B2.30
B2.31
B2.32
B2.33
B2.34
B2.35
B2.36
B2.37
B2.38
B2.39
B2.40
B2.41
B2.42

DESCRIPCION
Excavacin manual
Conformacin y compactacin de subrasante
Desalojo de material
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
Bordillos H. S. h=22 b=10 cm fc=180kg/cm2
Hormign en gradero (fc=210Kg/cm2)
Subbase clase 3
Adoquinado color e=6cm(fc=400 kg/cm2)
Cascajo apisonado de piedra e=2cm
Encespado
Piso prefabricado de hormign 1,20 x0 ,20 en area verde
Rasanteo manual
CANCHA
Cerramiento de malla eletrosoldada tipo pronto 3D
Alisado con cuarzo
Contrapiso hormign simple fc=240kg/cm2 e=7 (inc. Piedra bola e=15cm, malla)
Sealizacin de canchas
Arco de futbol (poste 4") aro de bsquet(provisin y montaje)
Poste de vley (poste de 4") (provisin y montaje)
BATERA SANITARIA
Excavacin manual
Relleno compactado con material de excavacin equipo liviano
Desalojo de material
Acero de refuerzo (fy=4200kg/cm2)
Acero Estructural en perfil grado A-36
Hormign en replantillo (f'c=140kg/cm2)
Hormign en plintos (fc:210Kg/cm2)
Hormign en cadenas de amarre (f'c=210Kg/cm2)
Hormign en columnas (f' =210 Kg/cm2)
Hormign en cimiento de cadenas (f'c=180kg/cm2)
Placa colaborante e=0.65mm
Anclaje de acero tipo 3
Hormign en loseta de compresin (f'c=210 Kg/cm2)
Malla para tumbado de metal expandido 15x7x0.45mm
Malla electrosoldada de 6x10
Hormign ciclpeo en muro
Mampostera de bloque de 15cm
Enlucido horizontal paleteado fino
Enlucido vertical paleteado fino interior
Enlucido vertical paleteado fino exterior
Contrapiso hormign simple fc=180kg/cm2 e=7 (inc. Piedra bola e=15cm, malla)
Cermica de piso de bao 20x20 cm.
Cermica de piso 30x30 cm.
Cermica de pared 20x20 cm.
Loseta de mesn de lavamanos ms grano de mrmol
Pintura de caucho interior
Pintura de caucho exterior
Espejo claro de 4 mm incluye soportes
Inodoro tanque bajo incluye accesorios
Lavamanos empotrado incluye accesorios y grifera
Urinario, incluye grifera y accesorios
Puerta metlica 0,70m con cerradura
Puerta metlica 0,80m con cerradura
Puerta metlica 0,90m con cerradura
Ventana de hierro con vidrio 4mm, incluye reja de proteccin
Divisin de tool dos lados (inc. Pintura, instalado y tubo rectangular y puerta)
Tubo rectangular 100x50x2mm para persiana
Tubera PVC-R 1"
Tubera PVC-R 3/4"
V Compuerta tipo R.W 1"
Salida de agua potable PVC-R 1/2"
Llaves de paso 3/4"
Tubera de PVC-Desage 110mm
Tubera de PVC-Desage 50mm
Desages PVC 50mm
Desages PVC 110mm
Trampa de piso 50mm, incluye rejilla
Bajante de agua lluvia 110mm
Tubera de ventilacin 50 mm
Tubera de ventilacin 110 mm
Luminaria Fluorescente 3x17w, 120 v
Luminaria tipo Ojo de Buey fijo, empotrable, foco ahorrador, du lux 1x26w, 120v
Tomacorriente doble
Circuito 2 TW #12 AWG + 1#14 AWG y tubera tipo EMT, dimetro 1/2"
Tablero de distribucin normal
MOBILIARIO URBANO
Bolardos metlicos, provisin y montaje
Banca 0.60x1.5 de hormign con asiento de madera tratada
JUEGOS INFANTILES
Estacin de juego de 2 plataformas, provisin y montaje
Laberinto de madera tratada, provisin y montaje
Caballito, provisin y montaje
Pirmide giratoria, provisin y montaje
GIMNASIO BIOSALUDABLE
Volante, provisin y montaje
Cintura, provisin y montaje
Caminadora
Esqu, provisin y montaje
Remo, provisin y montaje
Mono, provisin y montaje
Columpio de 3 asientos, provisin y montaje
Espalda, provisin y montaje
VEGETACIN
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
Arbusto
ELCTRICO
Capaceta monofsica
Tablero de distribucin y accesorios
Iluminacin con ojo de buey de 18W
Iluminacin tipo BORNA de 35W
Cable aislado tipo TTU No. 6 AWG
Luminaria ornamental tipo columna de 70W
Luminaria de vapor de mercurio de 400W
Control de iluminacion y fotocelula
Poste de hormign de 10mx400Kg., incluye instalacin
Poste de hormign de 14mx500Kg., incluye instalacin
Cruceta de 1,2m y accesorios
Pie amigo de 75cm y accesorios
Tubo poste de 50mm y flejes para asegurar
Desmontaje poste de madera de 9m, incluye transporte
Cajas de revisin de 80x80x100 cm de hormign
Puesta a tierra
SUBTOTAL
CUADRA 2 Entre las abscisas 0+340-0+700 y entre las Calles Oe11H-S32L
Replanteo y nivelacin con equipo topogrfico
2.402,80
Cerramiento provisional h=2.00m
Excavacin a mquina
Excavacin manual
Desalojo de material
Conformacin y compactacin de subrasante
Subbase clase 3
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
Bordillos H. S. h=22 b=10 cm fc=180kg/cm2
Adoquinado color e=6cm(fc=400 kg/cm2)
Cascajo apisonado de piedra e=2cm
Encespado
Piso prefabricado de hormign 1,20 x0 ,20 en area verde
Rasanteo manual
Alisado con cuarzo
Contrapiso hormign simple fc=240kg/cm2 e=7 (inc. Piedra bola e=15cm, malla)
BATERA SANITARIA
Excavacin manual
Relleno compactado con material de excavacin equipo liviano
Desalojo de material
Acero de refuerzo (fy=4200kg/cm)
Acero Estructural en perfil grado A-36
Hormign en replantillo (f'c=140kg/cm2)
Hormign en plintos (fc:210Kg/cm2)
Hormign en cadenas de amarre (f'c=210Kg/cm2)
Hormign en columnas (f' =210 Kg/cm2)
Hormign en cimiento de cadenas (f'c=180kg/cm2)
Placa colaborante e=0.65mm
Anclaje de acero tipo 3
Hormign en loseta de compresin (f'c=210 Kg/cm2)
Malla para tumbado de metal expandido 15x7x0.45mm
Malla electrosoldada de 6x10
Hormign ciclpeo en muro
Mampostera de bloque de 15cm
Enlucido horizontal paleteado fino
Enlucido vertical paleteado fino interior
Enlucido vertical paleteado fino exterior
Contrapiso hormign simple fc=180kg/cm2 e=7 (inc. Piedra bola e=15cm, malla)
Cermica de piso de bao 20x20 cm.
Cermica de piso 30x30 cm.
Cermica de pared 20x20 cm.
Loseta de mesn de lavamanos ms grano de mrmol
Pintura de caucho interior

1 MES
84,62

2 MES
84,62
259,215

3 MES
175,23
259,215

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

10 MES

11 MES

12 MES

175,23
784,93

552,92

784,93

784,93
672,30

784,93
672,30
273,14

273,14

1.769,20

1.769,20

273,14

273,14

552,92
1.769,20

1.769,20

50,93
1.236,77
257,55
12,65

1.236,77

1.236,77

699,55

699,55

699,55

699,55
127,98
797,71

127,98
797,71

127,98
797,71

127,98
797,71
57,60

871,54
144,60

871,54

173,42
17,20
53,64
426,77
3.138,32

426,77
3.138,32

426,77
3.138,32

56,72
127,24
204,04
292,62
1.357,22
1.252,31
239,36
645,31
218,02
190,85
133,39
752,79
574,22
1.164,79
618,73
537,47
479,56
179,72
566,85
697,38
344,25
238,10
149,88
586,26
727,65
223,98
479,24
545,68
919,68
586,97
1.284,89
1.268,10
67,03
91,09
26,34
302,08
102,69
84,25
63,77
151,11
204,89
101,70
98,43
55,04
27,09
788,48
315,04
267,10
328,26
97,19
2.292,87

2.292,87
1.430,73

1.430,73
1.907,66
1.112,82
2.507,10
578,90
951,50
1.075,29
1.075,29
1.188,86
1.017,79
1.676,03
482,66
1.660,68

2.476,75
1.931,00
1.549,44
76,17
644,97
1.858,89
1.160,52
5.628,80
772,02
6.476,88
74,31
2.164,68
2.522,22
342,30
223,26
146,13
133,92
1.657,70
448,25

1.844,97

1.844,97
425,99
65,79

425,99
65,79
436,93

436,93
446,84

446,835
704,9525

704,9525

704,9525
896,165
893,5375

704,95
896,17
893,54

896,17
893,54
3.609,19

896,17
893,54
3.609,19

3.609,19

3.609,19

3.609,19

1.393,12

1.393,12

448,25

38,50
1.393,12

1.393,12

1.393,12
161,60

161,60

161,60

426,77
3.138,32

426,77
3.138,32

426,77
3.138,32

28,57
105,33
417,33

105,33
417,33

105,33
417,33

173,42
17,20
5,36

56,72
127,24
204,04
292,62
1.357,22
1.252,31
239,36
645,31
218,02
190,85
133,39
752,79
574,22
1.164,79
618,73
537,47
479,56
179,72
566,85
697,38
344,25

COD. E.T.

ITEM

31A
32
35A
35B
35
33
33A
33B
175
34
105
36A
36B
37A
38
39
41
41B
42
42A
43
44
74
75
189
193
190
191
192

B2.43
B2.44
B2.45
B2.46
B2.47
B2.48
B2.49
B2.50
B2.51
B2.52
B2.53
B2.54
B2.55
B2.56
B2.57
B2.58
B2.59
B2.60
B2.61
B2.62
B2.63
B2.64
B2.65
B2.66
B2.67
B2.68
B2.69
B2.70
B2.71

106
59

B2.64
B2.65

62
60
65
66

B2.67
B2.68
B2.69
B2.70

109
110
111
100
112
99
60
98

B2.71
B2.72
B2.73
B2.74
B2.75
B2.76
B2.77
B2.78

84
181
85

B2.79
B2.80
B2.81

158
159
160
161
162
165
163
170
173
174

B2.82
B2.83
B2.84
B2.85
B2.86
B2.87
B2.88
B2.89
B2.90
B2.91

1
2
3
5
6
4
9
8
7B
54
46
55
56

B3
B3.1
B3.2
B3.3
B3.4
B3.5
B3.6
B3.7
B3.8
B3.9
B3.10
B3.11
B3.12
B3.13

106
59

B3.14
B3.15

62
65
66
61
60

B3.16
B3.17
B3.18
B3.19
B3.20

84
181
85

B3.21
B3.22
B3.23

1
2

B4
B4.1
B4.2

106

B4.8

84
181

B4.9
B4.10

1
2
5
6
54
46
55
56

B5
B5.1
B3.2
B5.3
B5.4
B5.8
B5.9
B5.10
B5.11

106
59

B5.12
B5.13

62
65
66
61
60

B5.14
B5.15
B5.16
B5.17
B5.18

84
181
85

B5.19
B5.20
B5.21

89
119
120
5
90
3
4
18C
52
121
6
7E
7B
18D
122
123
124
125

C
C1
C1.1
C1.2
C1.3
C1.4
C1.5
C1.6
C1.7
C1.8
C1.9
C1.10
C1.11
C1.12
C1.13
C1.14
C1.15
C1.16
C1.17

3
18C
52
121
6

C2
C2.1
C2.2
C2.3
C2.4
C2.5

89
3
6
18D
4
9

C3
C3.1
C3.2
C3.3
C3.4
C3.5
C3.6

DESCRIPCION

1 MES
Pintura de caucho exterior
Espejo claro de 4 mm incluye soportes
Inodoro tanque bajo incluye accesorios
Lavamanos empotrado incluye accesorios y grifera
Urinario, incluye grifera y accesorios
Puerta metlica 0,70m con cerradura
Puerta metlica 0,80m con cerradura
Puerta metlica 0,90m con cerradura
Ventana de hierro con vidrio 4mm, incluye reja de proteccin
Divisin de tool dos lados (inc. Pintura, instalado y tubo rectangular y puerta)
Tubo rectangular 100x50x2mm para persiana
Tubera PVC-R 1"
Tubera PVC-R 3/4"
V Compuerta tipo R.W 1"
Salida de agua potable PVC-R 1/2"
Llaves de paso 3/4"
Tubera de PVC-Desage 110mm
Tubera de PVC-Desage 50mm
Desages PVC 50mm
Desages PVC 110mm
Trampa de piso 50mm, incluye rejilla
Bajante de agua lluvia 110mm
Tubera de ventilacin 50 mm
Tubera de ventilacin 110 mm
Luminaria Fluorescente 3x17w, 120 v
Luminaria tipo Ojo de Buey fijo, empotrable, foco ahorrador, du lux 1x26w, 120v
Tomacorriente doble
Circuito 2 TW #12 AWG + 1#14 AWG y tubera tipo EMT, dimetro 1/2"
Tablero de distribucin normal
MOBILIARIO URBANO
Bolardos metlicos, provisin y montaje
Banca 0.60x1.5 de hormign con asiento de madera tratada
JUEGOS INFANTILES
Estacin de juego de 2 plataformas, provisin y montaje
Columpio de 3 asientos, provisin y montaje
Caballito, provisin y montaje
Pirmide giratoria, provisin y montaje
GIMNASIO BIOSALUDABLE
Volante, provisin y montaje
Cintura, provisin y montaje
Caminadora
Esqu, provisin y montaje
Remo, provisin y montaje
Mono, provisin y montaje
Columpio de 3 asientos, provisin y montaje
Espalda, provisin y montaje
VEGETACIN
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
Arbusto
ELCTRICO
Capaceta monofsica
Tablero de distribucin y accesorios
Iluminacin con ojo de buey de 18W
Iluminacin tipo BORNA de 35W
Cable aislado tipo TTU No. 6 AWG
Control de iluminacion y fotocelula
Luminaria ornamental tipo columna de 70W
Tubo poste de 50mm y flejes para asegurar
Cajas de revisin de 80x80x100 cm de hormign
Puesta a tierra
SUBTOTAL
CUADRA 3 Entre las abscisas 0+700-0+975 y entre las Calles S32L-Oe12p
Replanteo y nivelacin con equipo topogrfico
Cerramiento provisional h=2.00m
Excavacin a mquina
Excavacin manual
Desalojo de material
Conformacin y compactacin de subrasante
Subbase clase 3
Adoquinado color e=6cm(fc=400 kg/cm2)
Bordillos H. S. h=22 b= 8 cm fc=180kg/cm2
Cascajo apisonado de piedra e=2cm
Encespado
Piso prefabricado de hormign 1,20 x0 ,20 en area verde
Rasanteo manual
MOBILIARIO URBANO
Bolardos metlicos, provisin y montaje
Banca 0.60x1.5 de hormign con asiento de madera tratada
JUEGOS INFANTILES
Estacin de juego de 2 plataformas, provisin y montaje
Caballito, provisin y montaje
Pirmide giratoria, provisin y montaje
Sube y baja de madera
Columpio de 3 asientos, provisin y montaje
VEGETACIN
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
Arbusto
SUBTOTAL
CUADRA 4 Entre las abscisas 0+9751+185 y entre las Calles Oe12p-S31H
Replanteo y nivelacin con equipo topogrfico
Cerramiento provisional h=2.00m
MOBILIARIO URBANO
Bolardos metlicos, provisin y montaje
VEGETACIN
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
SUBTOTAL
CUADRA 5 Entre las abscisas 1+180-1+785 y entre las calles S31H-Profeta Ageo
Replanteo y nivelacin con equipo topogrfico
Cerramiento provisional h=2.00m
Excavacin manual
Desalojo de material
Cascajo apisonado de piedra e=2cm
Encespado
Piso prefabricado de hormign 1,20 x0 ,20 en area verde
Rasanteo manual
MOBILIARIO URBANO
Bolardos metlicos, provisin y montaje
Banca 0.60x1.5 de hormign con asiento de madera tratada
JUEGOS INFANTILES
Estacin de juego de 2 plataformas, provisin y montaje
Caballito, provisin y montaje
Pirmide giratoria, provisin y montaje
Sube y baja de madera
Columpio de 3 asientos, provisin y montaje
VEGETACIN
Arboles varias especies 3 m de alto (prov. Transp y trasplante)
Rejilla protectora de calistemo
Arbusto
SUBTOTAL
TOTAL B
INTERVENCIN CALLE MANUELA CAIZARES
RECTIFICACIN DEL TRAZADO GEOMTRICO
Replanteo y nivelacin lineal
1.169,65
Perfilado de asfalto
580,93
Corte de asfalto
Excavacin manual
Retiro de bordillos
Excavacin a mquina
Conformacin y compactacin de subrasante
Relleno compactado con material importado
Geotextil para subdrenes (1600 NT)
Geomalla biaxial (BX 1100)
Desalojo de material
Bordillo H. S. h=50 B=20 b=15 cm fc=180kg/cm2
Bordillo H. S. h=22 b=8 cm fc=180kg/cm2
Relleno compactado con material de mejoramiento
Base Clase 1
Asfalto MC para imprimacin 1.5 lt/m2
Asfalto Diluido para riego de adherencia 0.3 lt/m2
Capa de rodadura de hormign asfltico mezclado en planta, e= 0,075 m (incluye transporte)
SUBTOTAL
TRATAMIENTO SOBRE RELLENO DE MATERIAL ORGANICO
Excavacin a mquina
Relleno compactado con material importado
Geotextil para subdrenes (1600 NT)
Geomalla biaxial (BX 1100)
Desalojo de material
SUBTOTAL
ADOQUINADO DE VAS Y ACERAS
Replanteo y nivelacin lineal
Excavacin a mquina
Desalojo de material
Relleno compactado con material de mejoramiento
Conformacin y compactacin de subrasante
Subbase clase 3

2 MES

3 MES

4 MES

5 MES

6 MES

7 MES

8 MES

9 MES

10 MES

11 MES

12 MES
238,10
149,88
683,97
727,65
223,98
718,86
409,26
153,28
586,97
1.284,89
1.268,10

67,03
91,09
26,34
302,08
102,69
84,25
63,77
151,11
204,89
101,70
98,43
55,04
27,09
788,48
315,04
267,10
328,26
97,19
3.356,23
1.351,25

3.356,23
1.351,25
953,83
241,33
626,78
289,45

953,83
241,33
626,78
289,45

475,75
537,65
537,65
594,43
508,90
838,02
241,33
830,34

475,75
537,65
537,65
594,43
508,90
838,02
241,33
830,34

198,14
96,55
2.593,16
25,39
214,99
5.706,36
916,20
3.974,06
24,77
343,12
48,71
1.883,75
1.018,75

641,43

641,425
1447,875

1447,875
54,71
66,95
71,27
57,39
181,05
1.158,83
2.195,24
38,50
4.520,40
202,00
8,93
1.329,20

1.329,20

1.329,20
874,34

1.329,20
874,34
1.907,66
2.507,10
578,90
999,48
482,66
5.250,71
4.537,85
1.570,96

585,31
2.623,50
1.927,34
1.386,98
1.062,05

2.414,25
6.353,33
3,16
1,11
38,50
3.288,93
393,90
23,21
2.159,95
953,82

2.159,95
953,82
1.907,66
2.507,10
578,90
2.332,12
482,66
5.250,71
4.441,30
538,00

580,93
154,11
123,89
820,75

820,75
2051,7467

2051,7467

2051,7467
399

2029,4867

399,00
4.774,00

2.029,49

2.161,25

1189,7167

1.189,72

4.774,00

4.774,00

4.774,00
1.771,00
3.136,00

1.771,00
3.136,00

1.188,15
375,93

1.188,15
375,93

2.029,49

2.161,25

2.161,25

1.188,15
375,93

1.188,15
375,93

1.188,15
375,93

1.188,15
375,93

1.668,63

1.668,63

2.161,25
1.668,63

1.668,63
1.039,50
178,50

1.039,50
178,50
3.815,00

3.815,00

3.815,00

3.815,00

4.566,72
1.064,12
4.624,32

4.566,72
1.064,12
4.624,32

4.566,72
1.064,12
4.624,32

1.064,12
4.624,32

1.189,72
1.827,93
3.236,80
1.734,00

4.927,45
1.827,93
3.236,80

4.927,45

773,31

773,31
5.734,49

4.927,45

4.927,45

5.734,49
5.571,97

5.734,49
5.571,97
4.566,72

1.734,00

5.734,49
5.571,97
4.566,72

5.571,97
4.566,72
1.064,12

4.566,72
1.064,12

4.566,72
1.064,12
4.624,32

1.064,12
4.624,32

4.624,32

4.624,32

COD. E.T.

ITEM

122
8A
8
108
126
7E
7B

C3.7
C3.8
C3.9
C3.10
C3.11
C3.12
C3.13

132
133
134
135
136
137
138
139
143
144
145
150
147
148
149
153
156
157

C3.14
C3.15
C3.16
C3.17
C3.18
C3.19
C3.20
C3.21
C3.22
C3.23
C3.24
C3.25
C3.26
C3.27
C3.28
C3.29
C3.30
C3.31

3A
18B
6
127
128
129
9
130
179
180

C4
C4.1
C4.2
C4.3
C4.4
C4.5
C4.6
C4.7
C4.8
C4.9
C4.10

131

C5
C5.1

89
3
4
52
121
6
18D
9
122
7E
8A
158
159
161
162
163
165
170
173
174

C6
C6.1
C6.2
C6.3
C6.4
C6.5
C6.6
C6.8
C6.9
C6.10
C6.11
C6.12
C6.13
C6.14
C6.15
C6.16
C6.17
C6.18
C6.19
C6.20
C6.21

89
3
4
6
8
18D
9
122
7E
8A
7B

C7
C7.1
C7.2
C7.3
C7.4
C7.5
C7.6
C7.7
C7.8
C7.9
C7.10
C7.11

132
133
134
137
138
139
145

C8
C8.1
C8.2
C8.3
C8.4
C8.5
C8.6
C8.7

90
91
3
6
9
92
7E
8A

D
D1
D2
D3
D4
D5
D6
D7
D8
E
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22

DESCRIPCION

1 MES
Base clase 1
Adoquinado vehicular e=8cm(fc=400 kg/cm2)
Adoquinado color e=6cm(fc=400 kg/cm2)
Parada de bus segun diseo
Hormign para bermas fc=350 kg/cm2
Bordillo H. S. h=50 B=20 b=15 cm fc=180kg/cm2
Bordillo H. S. h=22 b=8 cm fc=180kg/cm2
SEALIZACIN VIAL MANUELA CAIZARES
Marcas de pavimento (lnea continua blanca o amarilla a= 10 cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 1-3 m a= 15 cm; incluye microesferas)
Marcas de pavimento (lnea continua blanca ; a= 40cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 0.60-0.60 m; a= 40 cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 0.60-0.60 m; a= 20 cm; incluye microesferas)
Marcas de pavimento (paso cebra)
Marcas de pavimento (flechas ,letras, etc.; incluye microesferas)
Seales al lado de la calzada( reglamentaria octogonal de pare 600 x600mm)
Seales al lado de la calzada( reglamentaria rectangular de lmite de velocidad 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de no entre 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de cruce peatonal 600x600 mm)
Seales al lado de la calzada( reglamentaria rectangular de parada de bus (600x900 mm)
Seales al lado de la calzada( preventiva rombo de zona de juegos 600x600 mm)
Seales al lado de la calzada( preventiva rombo de peatones en la va 600x600 mm)
Seales al lado de la calzada( preventiva rombo de nios 600x600 mm)
Seales al lado de la calzada( preventiva rectangular de parque 650x250 mm)
Seales al lado de la calzada( informativa rectangular 1800x540 mm)
Tachas bidireccionales
SUBTOTAL
DRENAJE VIAL
Excavacin zanja a mquina h=0.00-2.75m (en tierra)
Relleno compactado con material de excavacin equipo liviano
Desalojo de material
Hormign simple f'c=180 kg/cm2
Sumidero calzada (taza) con rejilla (provisin y montaje)
Empate a pozo mortero 1:3
Subbase clase 3
Tubera hormign simple CL3 200mm (mat.tran.inst)
Alzada de pozos de revisin
Bajada de pozos de revisin
SUBTOTAL
SISTEMA CONTRAINCENDIOS INCLUYE ACCESORIOS E INSTALACIN
Hidrante pedestal 04"
SUBTOTAL
VAS DE ACCESO A PREDIOS
Replanteo y nivelacin lineal
Excavacin a mquina
Conformacin y compactacin de subrasante
Geotextil para subdrenes (1600 NT)
Geomalla biaxial (BX 1100)
Desalojo de material
Relleno compactado con material de mejoramiento
Subbase clase 3
Base Clase 1
Bordillo H. S. h=50 B=20 b=15 cm fc=180kg/cm2
Adoquinado vehicular e=8cm(fc=400 kg/cm2)
Capaceta monofsica
Tablero de distribucin y accesorios
Iluminacin tipo BORNA de 35W
Cable aislado tipo TTU No. 6 AWG
Luminaria ornamental tipo columna de 70W
Control de iluminacion y fotocelula
Tubo poste de 50mm y flejes para asegurar
Cajas de revisin de 80x80x100 cm de hormign
Puesta a tierra
SUBTOTAL
VS CONECTORAS
Replanteo y nivelacin lineal
Excavacin a mquina
Conformacin y compactacin de subrasante
Desalojo de material
Adoquinado color e=6cm(fc=400 kg/cm2)
Relleno compactado con material de mejoramiento
Subbase clase 3
Base Clase 1
Bordillo H. S. h=50 B=20 b=15 cm fc=180kg/cm2
Adoquinado vehicular e=8cm(fc=400 kg/cm2)
Bordillo H. S. h=22 b=8 cm fc=180kg/cm2
SUBTOTAL
SEALIZACIN VIAL CALLES CONECTORAS
Marcas de pavimento (lnea continua blanca o amarilla a= 10 cm; incluye microesferas)
Marcas de pavimento (lnea segmentada blanca ;brecha 1-3 m a= 15 cm; incluye microesferas)
Marcas de pavimento (lnea continua blanca ; a= 40cm; incluye microesferas)
Marcas de pavimento (paso cebra)
Marcas de pavimento (flechas ,letras, etc.; incluye microesferas)
Seales al lado de la calzada( reglamentaria octogonal de pare 600 x600mm)
Seales al lado de la calzada( reglamentaria rectangular de cruce peatonal 600x600 mm)
SUBTOTAL
TOTAL C
BARRIO CANTERAS
Retiro de bordillos
Rotura de aceras
Excavacin a mquina
Desalojo de material
Subbase clase 3
Aceras de Hormign
Bordillo H. S. h=50 B=20 b=15 cm fc=180kg/cm2
Adoquinado vehicular e=8cm(fc=400 kg/cm2)
TOTAL D
PROGRAMA DE PREVENCIN Y MITIGACION DE IMPACTOS AMBIENTALES NEGATIVOS
Riego para control de polvo
561,25
PROGRAMA DE SEALIZACIN OBRA
Gigantografia full color, incluye base metalica y respaldo en sintra, resistente
328,02
al agua
Letreros mviles preventivas (1,20X1,20)m
755,76
Conos reflectivos
587,80
Bases moviles
1.456,00
Cinta de seguridad
480,00
Letreros fijos preventivas(0.60x0.60)m
576,08
Letreros ambientales fijos(1,5X1,20)m
578,46
PROGRAMA DE CONTIGENCIA
Simulacro por contingencia de incendio
299,00
Simulacro por contingencia de accidentado
299,00
PROGRAMA DE SEGURIDAD INDUSTRIAL Y SALUD OCUPACIONAL
Equipos de proteccin personal (casco, chaleco reflectivo y calzado) 2.760,00
Extintor contra incendio
195,21
Botiquin de primeros auxilio
16,45
PROGRAMA DE MANEJO DE DESECHO
Letrina movil
144,14
Tachos para basura
308,20
PROGRAMA DE RELACIONES COMUNITARIAS
Charlas de divulgacin
676,20
Comunicados radiales
3.450,00
Trpticos informativos
100,00
PROGRAMA DE CAPACITACIN AMBIENTAL
Charla riesgo en el trabajo y seguridad laboral
225,40
Charla de educacin Ambiental
225,40
Charla de primero auxilios
225,40
PROGRAMA DE SEGUIMIENTO DE MONITOREO
Monitoreo de calidad de aire (niveles de presion sonora)
412,85
TOTAL D
TOTAL PROYECTO
12.883,55

____________________________________
ING FERNANDO MAYA DIAZ
CONTRATISTA

11.569,86
9.759,66
45.493,54
45.493,54
2,61%
2,61%

2 MES

3 MES

4 MES

5 MES

3.834,38
667,16

283,92

3.834,38
667,16

6 MES
4.029,49
4.029,49

3.834,38
667,16

7 MES

8 MES

9 MES

4.029,49
6.964,45
4.974,62

4.029,49

4.029,49

4.029,49

10 MES
4.029,49
4.029,49

11 MES
13.058,34

13.058,34
9.327,42
3.901,70

13.058,34
9.327,42
3.901,70

12 MES

13.058,34
9.327,42
3.901,70

13.058,34
9.327,42
3.901,70

13.058,34
9.327,42
3.901,70
260,49

13.058,34
9.327,42
3.901,70
260,49

6.093,89
9.327,42
3.901,70
260,49

4.352,80
3.901,70
260,49

607,50
50,82
19,84
8,04
4,80
156,47
387,20
445,50
222,75
60,75
405,00
289,80
101,25
101,25
101,25
60,75
60,75
357,75

607,50
50,82
19,84
8,04
4,80
156,47
387,20
445,50
222,75
60,75
405,00
289,80
101,25
101,25
101,25
60,75
60,75
357,75

607,50
50,82
19,84
8,04
4,80
156,47
387,20
445,50
222,75
60,75
405,00
289,80
101,25
101,25
101,25
60,75
60,75
357,75

4.792,95

4.792,95

1.252,14
1.640,62
257,34
12,39
24,36

1.252,14
1.640,62
257,34
12,39
24,36

3.834,38
667,16

283,92
771,83
34,95

771,83
34,95
68,23

68,23
2.212,47
232,96

2.212,47
232,96

2.212,47
232,96

2.212,47
232,96

1.705,60

1.705,60

1.705,60

1.705,60

436,44

436,44
84,38
54,81

527,46

527,46
5.135,50

84,38
54,81

84,38
54,81

84,38
54,81

5.135,50
745,28

3.326,64
5.382,54

3.326,64
5.382,54

745,28
3.307,98
5.857,60
3.326,64
5.382,54
1.306,41

3.307,98
5.857,60
5.382,54
1.306,41

5.382,54
1.306,41
1.662,27

5.382,54
1.306,41
1.662,27

1.306,41

1.306,41
1.662,27

1.662,27

1.662,27
1.359,93

1.662,27
1.359,93

1.359,93

1.359,93

1.359,93

1.359,93
5.386,90

5.386,90

5.386,90

5.386,90

5.386,90
12,70
107,50

715,83

5.386,90
12,70
107,50

715,83
774,25

210,09
1.062,87

1.256,41
986,34

1.062,87
1.032,75

248,52
1.032,75

1.256,41
986,34
1.108,60
760,74

1.256,41
986,34
1.108,60
760,74

188,91

188,91

248,52
1.104,50

1.104,50

3.592,64

3.592,64

50,55
8,47
3,31
25,55
64,53
40,50
40,50

50,55
8,47
3,31
25,55
64,53
40,50
40,50

74.394,64 129.851,03
322.966,35
1.740.465,50
18,56%
100,00%

60.460,25

1.108,60
760,74
3.592,64
188,91

50,55
8,47
3,31
25,55
64,53
40,50
40,50

209,48

209,475
79,645

79,645
819,68

819,68
796,45

796,45
2.050,23

2.050,23
2.803,70

561,25

561,25

561,25

561,25

561,25

561,25

2.468,85

2.468,85

2.468,85

2.468,85

4.227,03

4.227,03

4.227,03

4.227,03

2.803,70

561,25

412,85

11.280,46

19.601,81

27.151,95 23.006,03
95.978,04
141.471,57
5,51%
8,13%

26.218,24

37.125,85

39.874,25 37.709,80
152.242,24
293.713,81
8,75%
16,88%

37.532,35

55.767,90

51.482,80 57.297,66
212.305,52
506.019,34
12,20%
29,07%

47.757,16

57.842,15

53.667,82 60.590,18
236.314,18
742.333,51
13,58%
42,65%

64.214,03

64.598,29

73.747,79 51.688,66
262.683,00
1.005.016,51
15,09%
57,74%

____________________________________
ING WILSON TAPIA
FISCALIZADOR

72.648,26

17.735,49

20.511,74 11.977,34
63.732,06
1.068.748,57
3,66%
61,41%

13.507,48

9.000,98

5.581,73
5.443,31
28.873,44
1.097.622,01
1,66%
63,06%

8.847,42

22.739,00

16.167,44 15.782,78
69.005,28
1.166.627,30
3,96%
67,03%

14.316,06

13.015,96

7.353,94
7.997,21
44.351,56
1.210.978,86
2,55%
69,58%

____________________________________
ING. ALEX PINTO
ADMINISTRADOR

15.984,44

48.976,10

52.861,55 50.824,36
206.520,30
1.417.499,15
11,87%
81,44%

53.858,30

58.260,43