CUADRO RESUMEN DE AVANCES DEL PROYECTO GENERAL

MES: DICIEMBRE 2015

: MEJORAMIENTO E IMPLEMENTACIN DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLGICO PBLICO "JOS CAR
OBRA
DE MARISCAL NIETO, REGIN DE MOQUEGUA"
RESIDENTE: ING. KARIN DEL CARPIO RIMACHI
INSPECTOR: ARQ. GLADYS L. RAMREZ CHARRES
EJECUTA : GOBIERNO REGIONAL MOQUEGUA
LUGAR
: SAMEGUA - MOQUEGUA

DESCRIPCION

PROGRAMADO
EXP .TEC. S/.

ANTERIOR
%

S/.

ETAPA II: PRE OPERATIVA

515,457.58

100.00%

613,524.44

119.03%

PLAN DE CONTINGENCIA
Costo Directo
Gastos Generales 10%
Gsatos de Supervision 2%
Gastos de Liquidacin 0.08%
Gastos de Administracin 1.5%
Presupuesto Total

127,382.16
12,738.22
2,547.64
1,019.06
1,910.73
145,597.81

100.00%

39,941.94
3,994.19
798.84
319.54
599.13
45,653.63

31.36%

INFRAESTRUCTURA
Costo Directo
Gastos Generales 10%
Gsatos de Supervision 2%
Gastos de Liquidacin 0.08%
Gastos de Administracin 1.5%
Presupuesto Total

18,747,688.18
1,874,768.82
374,953.76
149,981.51
281,215.32
21,428,607.59

100.00%

9,979,054.59
997,905.46
199,581.09
79,832.44
149,685.82
11,406,059.40

53.23%

MPLEMENTACION
Costo Directo
Gastos Generales 1.6%
Gsatos de Supervision 0.70%
Gastos de Liquidacin 0.40%
Gastos de Administracin 0.60%
Presupuesto Total

19,886,283.36
318,180.53
139,203.98
79,545.13
119,317.70
20,542,530.72

100.00%

4,447,161.83
71,154.59
31,130.13
17,788.65
26,682.97
4,593,918.17

22.36%

CAPACITACION
Costo Directo
Gastos Generales 10%
Gsatos de Supervision 2%
Gastos de Liquidacin 0.8%
Gastos de Administracin 1.5%
Presupuesto Total

240,352.00
24,035.20
4,807.04
1,922.82
3,605.28
274,722.34

100.00%

103,560.00
10,356.00
2,071.20
828.48
1,553.40
118,369.08

43.09%

IMPACTO AMBIENTAL
Costo Directo
Gastos Generales 10%
Gsatos de Supervision 2%
Gastos de Liquidacin 0.8%
Gastos de Administracin 1.5%

319,432.66
31,943.27
6,388.65
2,555.46
4,791.49

100.00%

28,367.57
2,836.76
567.35
226.94
425.51

8.88%

Presupuesto Total

365,111.53

32,424.13

COSTO DIRECTO TOTAL

39,836,595.94

15,211,610.36

PRESUPUESTO TOTAL

43,272,027.56

100.00%

16,809,948.85

38.85%

EXP. TECNICO
RESUMEN DE AVANCE FISICO - FINANCIERO GLOBAL
DESCRIPCION
AVANCE ANTERIOR
AVANCE DEL MES
AVANCE ACUMULADO
SALDO
Presupuesto Total

AVANCE FISICO
VALORIZADO

15,211,610.36
162,043.70
15,373,654.06
24,462,941.88
39,836,595.94

38.19%
0.41%
38.59%
61.41%
100.00%

AVANCE FINANCIERO
VALORIZADO
%

22,817,521.97
567,824.85
23,385,346.82
19,886,680.74
43,272,027.56

52.73%
1.31%
54.04%
45.96%
100.00%

PIN ASIGNADO HASTA 2015

RESUMEN DE AVANCE FISICO - FINANCIERO GLOBAL


DESCRIPCION
AVANCE ANTERIOR
AVANCE DEL MES
AVANCE ACUMULADO
SALDO
Presupuesto Total PIM

AVANCE FISICO
VALORIZADO

1,002,523.26
162,043.70
1,164,566.96
2,167,464.04
3,332,031.00

30.09%
4.86%
34.95%
65.05%
100.00%

3473071.4885213
3,332,031.00

Costo Directo
Gastos Generales 10%
Gsatos de Supervision 2%
Gastos de Liquidacin 0.8%
Gastos de Administracin 1.5%

515457.57988
39,321,138.36
2,261,666.03
527,901.08
235,023.97
410,840.53
43,272,027.56

AVANCE FINANCIERO
VALORIZADO
%

2,955,670.40
567,824.85
3,523,495.25
329,714.75
3,853,210.00

76.71%
14.74%
91.44%
8.56%
100.00%

1.1095
3,696,732.19

100.00%

613,524.44 1.19025205
14,598,085.92
1,086,247.00
234,148.61
98,996.04
178,946.83
16,809,948.85

CES DEL PROYECTO GENERAL


EMBRE 2015

RIOR TECNOLGICO PBLICO "JOS CARLOS MARITEGUI" DEL DISTRITO DE SAMEGUA, PROVINCIA
RAMREZ CHARRES

AVANCE ACTUAL
S/.

AVANCE ACUMULADO
S/.

SALDO ACUMULADO
S/.

0.00

0.00%

613,524.44

119.03%

-98,066.86

-19.03%

71.16
7.12
1.42
0.57
1.07
81.34

0.06%

40,013.10
4,001.31
800.26
320.10
600.20
45,734.97

31.41%

87,369.06
8,736.91
1,747.38
698.95
1,310.54
99,862.84

68.59%

161,972.54
16,197.25
3,239.45
1,295.78
2,429.59
185,134.61

0.86%

10,141,027.13
1,014,102.71
202,820.54
81,128.22
152,115.41
11,591,194.01

54.09%

8,606,661.05
860,666.10
172,133.22
68,853.29
129,099.92
9,837,413.58

45.91%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%

4,447,161.83
71,154.59
31,130.13
17,788.65
26,682.97
4,593,918.17

22.36%

15,439,121.53
247,025.94
108,073.85
61,756.49
92,634.73
15,948,612.54

77.64%

0.00
0.00
0.00
0.00
0.00
0.00

0.00%

103,560.00
10,356.00
2,071.20
828.48
1,553.40
118,369.08

43.09%

136,792.00
13,679.20
2,735.84
1,094.34
2,051.88
156,353.26

56.91%

0.00
0.00
0.00
0.00
0.00

0.00%

28,367.57
2,836.76
567.35
226.94
425.51

8.88%

291,065.09
29,106.51
5,821.30
2,328.52
4,365.98

91.12%

0.00

32,424.13

332,687.40

162,043.70

15,373,654.06

24,462,941.88

185,215.95

0.43%

16,995,164.80

39.28%

26,276,862.76

60.72%

-0.19025205
162,043.70
16,204.37
3,240.87
1,296.35
2,430.66
185,215.95

14,760,129.62
1,102,451.37
237,389.49
100,292.39
181,377.49
16,381,640.36

24,561,008.74
1,159,214.67
290,511.59
134,731.58
229,463.04
26,374,929.62

RESUMEN DE VALORIZACION MENSUAL


MES: DICIEMBRE 2015

: MEJORAMIENTO E IMPLEMENTACIN DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLGICO PBL


DE MARISCAL NIETO, REGIN DE MOQUEGUA"

OBRA

RESIDENTE : ING. KARIN DEL CARPIO RIMACHI


EJECUTA
: GOBIERNO REGIONAL MOQUEGUA
LUGAR
: SAMEGUA - MOQUEGUA

ITEM

1.00

COMPONENTE

INSPECTOR: ARQ. GLADYS L. RAMREZ CHARRES

PRESUPUESTO
EXP. TECNICO
COSTO DIRECTO

ANTERIOR
S/.

402,495.60

192,943.31

47.94%

47,140.45

7,800.59

16.55%

533,276.72

8,463.47

1.59%

1,057,349.81

969,569.63

91.70%

705,040.30

0.00

0.00%

1,817,846.71

1,446,437.41

79.57%

INFRAESTRUCTURA
1.01

Demoliciones, desmontajes y montajes

1.02

rea de Bienestar Social (Farmacia y Enfermeria)

1.03

Reparacin y Reforzamiento

1.04

Construccin de Pabelln Administrativo

1.05

Construccin de Biblioteca

1.06

Construccin de Auditorio

1.07

Laboratorio de Fsica, Qumica y Biologa

631,156.02

0.00

0.00%

1.08

Laboratorio de Enologia y Anatoma Pecuaria

489,341.43

0.00

0.00%

1.09

Laboratorio de Mecnica de Suelos y Concreto

435,301.13

428,326.31

98.40%

1.10

Taller de Electrotecnia Industrial

653,347.94

621,919.46

95.19%

1.11

Taller de Mecnica de Produccin

1,641,366.33

1,513,432.76

92.21%

1.12

Taller de Mecnica Automotrz

1,121,566.00

1,094,570.51

97.59%

1.13

Servicios higinicos Subestacin y Cisterna

805,481.16

279,601.48

34.71%

1.14

Cerco Perimtrico Interior y Exterior

671,336.91

294,835.00

43.92%

1.15

reas De Estacionamiento , vas de circulacin

271,536.49

55,355.68

20.39%

1.16

Plazoleta y Areas Verdes

4,737,932.34

1,471,578.15

31.06%

1.17

Instalaciones Elctricas Red Primaria

436,781.41

214,510.08

49.11%

1.18

Instalaciones Elctricas Red Secundaria

1,583,817.86

811,300.10

51.22%

1.19

Instalaciones Sanitarias Global

705,573.60

568,410.66

80.56%

18,747,688.18

9,979,054.59

53.23%

TOTAL COSTO DIRECTO

2.00

ETAPA II: PRE OPERATIVA

515,457.58

613,524.44

119.03%

3.00

PLAN DE CONTINGENCIA

127,382.16

39,941.94

31.36%

4.00

IMPLEMENTACION

19,886,283.35

4,447,161.83

22.36%

5.00

CAPACITACION

240,352.00

103,560.00

43.09%

6.00

IMPACTO AMBIENTAL

319,432.66

28,367.57

8.88%

39,836,595.93

15,211,610.36

38.19%

TOTAL COSTO DIRECTO

MEN DE VALORIZACION MENSUAL


MES: DICIEMBRE 2015

DEL INSTITUTO SUPERIOR TECNOLGICO PBLICO "JOS CARLOS MARITEGUI" DEL DISTRITO DE SAMEGUA, PROVINCIA
ARQ. GLADYS L. RAMREZ CHARRES

AVANCE ACTUAL
S/.

AVANCE ACUMULADO

SALDO ACUMULADO

S/.

S/.

776.03

0.19%

193,719.34

48.13%

208,776.26

51.87%

10,412.41

22.09%

18,213.00

38.64%

28,927.44

61.36%

0.00

0.00%

8,463.47

1.59%

524,813.24

98.41%

0.00

0.00%

969,569.63

91.70%

87,780.19

8.30%

0.00

0.00%

0.00

0.00%

705,040.30

100.00%

39,756.48

2.19%

1,486,193.89

81.76%

331,652.82

18.24%

0.00

0.00%

0.00

0.00%

631,156.02

100.00%

0.00

0.00%

0.00

0.00%

489,341.43

100.00%

0.00

0.00%

428,326.31

98.40%

6,974.82

1.60%

0.00

0.00%

621,919.46

95.19%

31,428.49

4.81%

0.00

0.00%

1,513,432.76

92.21%

127,933.57

7.79%

0.00

0.00%

1,094,570.51

97.59%

26,995.49

2.41%

0.00

0.00%

279,601.48

34.71%

525,879.68

65.29%

0.00

0.00%

294,835.00

43.92%

376,501.90

56.08%

0.00

0.00%

55,355.68

20.39%

216,180.81

79.61%

104,172.75

2.20%

1,575,750.90

33.26%

3,162,181.44

66.74%

0.00

0.00%

214,510.08

49.11%

222,271.33

50.89%

3,977.13

0.25%

815,277.23

51.48%

768,540.63

48.52%

2,877.73

0.41%

571,288.39

80.97%

134,285.20

19.03%

161,972.54

0.86%

10,141,027.13

54.09%

8,606,661.05

45.91%

0.00

0.00%

613,524.44

119.03%

-98,066.86

-19.03%

71.16

0.06%

40,013.10

31.41%

87,369.06

68.59%

0.00

0.00%

4,447,161.83

22.36%

15,439,121.52

77.64%

0.00

0.00%

103,560.00

43.09%

136,792.00

56.91%

0.00

0.00%

28,367.57

8.88%

291,065.09

91.12%

162,043.70

0.41%

15,373,654.06

38.59%

24,462,941.87

61.41%

CUADRO VALORIZACION DEL COMPONENTE DEMOLICIONES, DESMONTAJES Y MONTAJE


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JO


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

UND

AVANCE ANTERIOR
S/.

AVANCE ACTUAL DEL MES

METRADO

P. UNITARIO

PARCIAL

CANT.

CANT.

S/.

105.16

28,393.20

270.00

28,393.20

100.00%

0.00

0.00

EXPEDIENTE TCNICO

01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.01

ALMACEN, OFICINA Y CASETA DE GUARDIANIA.

M2

270.00

01.01.02

SERVICIOS HIGIENICOS PARA LA OBRA

M2

6.00

263.83

1,582.98

6.00

1,582.98

100.00%

0.00

0.00

01.01.03

CERCO PROVISIONAL DE TRIPLAY

ML

345.01

30.91

10,664.26

0.00

0.00

0.00%

0.00

0.00

01.01.04

CARTEL DE OBRA 2.40 X 3.60 - PINTADO.

1.00

749.14

01.02.00

INSTALACIONES PROVISIONALES

01.02.01

PZA

1.00

749.14

749.14

0.00

0.00

0.00%

AGUA PARA OBRA

MES

15.00

150.00

2,250.00

1.00

150.00

6.67%

0.00

0.00

01.02.02

DESAGUE PARA LA OBRA

Pto

1.00

87.86

87.86

1.00

87.86

100.00%

0.00

0.00

01.02.03

SUMINISTRO DE ELECTRICIDAD

300.00

6.67%

0.00

0.00

01.02.04

TRANSPORTE DE EQUIPO Y MAQUINARIA

0.00

0.00

02.00.00

OBRAS PRELIMINARES

02.01.00

DESMONTAJES

02.01.01

DESMONTAJE DE PUERTAS.

02.01.02

DESMONTAJE DE TABIQUES DE MADERA.

M2

533.30

7.15

3,813.10

02.01.03

DESMONTAJE DE VENTANAS

M2

508.30

6.06

3,080.30

02.01.04

DESMONTAJE DE APARATOS SANITARIOS

UND

31.00

17.85

553.35

02.01.05

DESMONTAJE DE COBERTURA DE ETERNIT/CALAMINA.

02.01.06

DESMONTAJE DE REJAS METALICAS

MES

15.00

300.00

4,500.00

1.00

GLB

1.00

3,500.00

3,500.00

1.00

3,500.00

100.00%

M2

260.73

5.05

1,316.69

125.14

631.96

48.00%

0.00

0.00

260.58

1,863.15

48.86%

0.00

0.00

183.28

1,110.68

36.06%

0.00

0.00

22.00

392.70

70.97%

0.00

0.00

16,736.73

40.81%

0.00

0.00

36.88

100.00%

0.00

0.00

M2
M2

2,564.96
3.74

15.99
9.86

41,013.71 1,046.70
36.88

3.74

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

02.01.07

DESMONTAJE DE ESTRUCTURAS METALICAS

M2

146.00

9.21

1,344.66

97.26

895.76

66.62%

0.00

0.00

02.01.08

DESMONTAJE DE MUROS PREFABRICADOS

M2

616.57

7.15

4,408.48

190.73

1,363.72

30.93%

0.00

0.00

02.01.09

DESMONTAJE DE ARTEFACTOS DE ILUMINACION

380.16

38.82%

0.00

0.00

02.01.10

ELIMINACION DE POSTE DE LUZ.

PZA

6.00

53.28

319.68

0.00

0.00

0.00%

0.00

0.00

02.01.11

ELIMINACION DE BANCAS METALICAS

PZA

17.00

26.82

455.94

0.00

0.00

0.00%

0.00

0.00

02.01.12

ELIMINACION DE ARBOL.

PZA

55.00

131.89

7,253.95

52.00

6,858.28

94.55%

0.00

0.00

02.02.00

DEMOLICIONES

02.02.02

DEMOLICION MUROS LADRILLO KK SOGA.

M2

1,060.58

12.99

13,776.93

450.50

5,852.00

42.48%

2.07

26.89

02.02.03

DEMOLICION MUROS DE ADOBE

M2

178.94

8.47

1,515.62

15.81

133.91

8.84%

0.00

0.00

02.02.04

DEMOLICION DE LOSA ALIGERADA, H=0.20m.

M2

106.09

18.22

1,932.96

9.68

176.37

9.12%

0.00

0.00

02.02.05

DEMOLICION DE VIGAS

301.55

46.23%

0.00

0.00

02.02.06

DEMOLICION COLUMNAS

M3

45.44

50.68

2,302.90

33.18

1,681.56

73.02%

0.00

0.00

02.02.07

DEMOLICION DE BLOQUES DE CONCRETO (VARIOS 1ER NIVEL)

M2

56.23

27.62

1,553.07

34.30

947.37

61.00%

0.00

0.00

02.02.08

DEMOLICION DE MUROS DE PIEDRA

M3

97.87

44.33

4,338.58

19.29

855.13

19.71%

0.00

0.00

02.02.09

DEMOLICION DE PISO DE CONCRETO INC.F.P.

6,962.30

65.37%

0.00

0.00

PZA

M3

M2

170.00

12.87

1,363.81

5.76

50.68

7.81

979.20

652.25

10,651.36

66.00

5.95

891.46

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

02.02.10

DEMOLICION DE LOSAS DE PATIOS e= 10 CMS

M2

6,819.79

6.63

M3

25.91

19.06

AVANCE ANTERIOR

PARCIAL

CANT.

45,215.21 1,524.06

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

10,104.52

22.35%

0.00

0.00

446.00

90.31%

0.00

0.00

4,610.35

59.65%

0.00

0.00

0.00

0.00

02.02.11

DEMOLICION DE SOBRECIMIENTOS.

02.02.12

DEMOLICION DE CIMIENTOS DE CONCRETO.

02.02.13

DEMOLICION DE ZAPATAS

M3

44.60

58.70

2,618.02

24.91

1,462.22

55.85%

02.02.14

DEMOLICION DE CERCO PERIMETRICO

M2

584.38

13.56

7,924.19

491.81

6,668.94

84.16%

0.00

0.00

02.02.16

DEMOLICION DE VEREDAS EXTERIORES C/EQUIPO

M2

507.72

7.88

4,000.83

44.47

350.42

8.76%

0.00

0.00

02.02.17

ELIMINACION DE MATERIAL DE DEMOLICION (CARGUIO EQUIPO-VOLQUETE) D=1

0.00

0.00

02.03.00

APUNTALAMIENTOS

02.03.01

M3

190.03

40.67

493.84
7,728.52

23.40
113.36

M3

3,736.22

22.02

82,271.56

731.19

16,100.80

19.57%

APUNTALAMIENTO DE LOSA ALIGERADA 1 NIVEL

M2

211.48

56.52

11,952.85

0.00

0.00

0.00%

0.00

0.00

02.03.02

APUNTALAMIENTO DE VIGAS

ML

91.34

34.39

3,141.18

0.00

0.00

0.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.08.00

FALSO PISO

04.08.01

FALSO PISO MEZCLA 1:8 e=4"

M2

1,282.48

26.63

34,152.44

0.00

0.00

0.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 01

352,525.69

120,937.49

776.03

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.01

ALMACEN, OFICINA Y CASETA DE GUARDIANIA.

M2

23.39

105.16

2,459.69

23.39

2,459.69

100.00%

0.00

0.00

PARTIDAS NUEVAS
01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.05

CERCO PROVISIONAL DE MALLA RASCHELL

ML

54.00

14.26

770.04

54.00

770.04

100.00%

0.00

0.00

01.01.06

CARTEL DE IDENTIFICACION DE LA OBRA 2.40 X 3.60 MTS.

PZA

1.00

715.25

715.25

1.00

715.25

100.00%

0.00

0.00

01.02.00

INSTALACIONES PROVISIONALES

01.02.05

TRANSPORTE DE MATERIALES

GLB

1.00

1,000.00

1,000.00

1.00

1,000.00

100.00%

0.00

0.00

02.00.00

OBRAS PRELIMINARES

02.02.00

DEMOLICIONES

02.02.18

DEMOLICION DE ESTRUCTURAS DE CONCRETO

M3

11.25

215.67

2,426.29

11.25

2,426.29

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

02.02.19

DEMOLICION DE BLOQUES DE CONCRETO CON MAQUINARIA

03.00.00

MOVIMIENTO DE TIERRAS

03.17.00

ACARREO DE MATERIAL DE DEMOLICION MANUAL A DIST. 30.00 M

UND

METRADO

P. UNITARIO

EXPEDIENTE ADICIONAL N 03

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M3

159.20

8.78

1,397.78

159.20

1,397.78

100.00%

0.00

0.00

M3

300.00

20.33

6,099.00

300.00

6,099.00

100.00%

0.00

0.00

SUB TOTAL

AVANCE ANTERIOR

14,868.05

14,868.05

0.00

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.01

ALMACEN, OFICINA Y CASETA DE GUARDIANIA.

02.00.00

OBRAS PRELIMINARES

02.02.00

DEMOLICIONES

02.02.15

DEMOLICION DE GRADERIAS

M2

4.00

105.16

420.64

4.00

420.64

100.00%

0.00

0.00

M3

9.12

40.65

370.73

9.12

370.73

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

02.02.18

DEMOLICION DE ESTRUCTURAS DE CONCRETO

03.00.00

MOVIMIENTO DE TIERRAS

03.19.00
03.20.00

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M3

71.74

215.67

15,472.17

71.74

15,472.17

100.00%

0.00

0.00

ACARREO DE MATERIAL DE DEMOLICION CON MAQUINARIA

M3

61.46

11.04

678.52

61.46

678.52

100.00%

0.00

0.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

47.85

15.60

746.46

47.85

746.46

100.00%

0.00

0.00

ML

95.80

47.31

4,532.30

95.80

4,532.30

100.00%

0.00

0.00

56.77

2,545.00

100.00%

0.00

0.00

628.04

100.00%

0.00

0.00

PARTIDAS NUEVAS
01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.07

CERCO PROVISIONAL DE CALAMINA

02.00.00

OBRAS PRELIMINARES

02.02.00

DEMOLICIONES

02.02.20

DEMOLICION DE ESTRUCTURAS DE CONCRETO CON MAQUINARIA

M3

56.77

44.83

2,545.00

02.02.21

DEMOLICION DE BLOQUES DE CONCRETO CON EQUIPO

M3

22.98

27.33

628.04

SUB TOTAL

EXPEDIENTE ADICIONAL N 04

22.98

25,393.85

25,393.85

0.00

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.05

CERCO PROVISIONAL DE MALLA RASCHELL

02.00.00

OBRAS PRELIMINARES

02.02.00

DEMOLICIONES

02.02.15

DEMOLICIONES DE GRADERIAS

03.00.00

MOVIMIENTO DE TIERRAS

03.19.00
03.20.00

ML

70.00

14.26

998.20

70.00

998.20

100.00%

0.00

0.00

M3

1.13

40.56

45.83

1.13

45.83

100.00%

0.00

0.00

ACARREO DE MATERIAL DE DEMOLICION CON MAQUINARIA

M3

5.00

11.04

55.20

5.00

55.20

100.00%

0.00

0.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

5.00

15.60

78.00

5.00

78.00

100.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 07

MAYORES METRADOS

1,177.23
MAYORES METRADOS - PARTIDAS NUEVAS

1,177.23

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES

METRADO

P. UNITARIO

CANT.

S/.

ML

103.00

14.26

1,468.78

103.00

1,468.78

100.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

01.00.00

OBRAS PROVISIONALES

01.01.00

CONSTRUCCIONES PROVISIONALES

01.01.05

CERCO PROVISIONAL DE MALLA RASCHELL

02.00.00

OBRAS PRELIMINARES

02.01.00

DESMONTAJES

02.01.03

DESMONTAJE DE VENTANAS DE MADERA Y METALICAS

M2

17.52

6.06

106.17

02.01.05

DESMONTAJE DE TECHOS CALAMINAS DE ETERNIT

M2

45.50

15.99

727.50

02.01.06

DESMONTAJE DE REJAS METALICAS

M2

9.90

9.86

97.61

6.16

60.74

62.22%

02.02.00

DEMOLICIONES

02.02.12

DEMOLICION DE CIMIENTOS CORRIDOS

M3

20.54

40.67

835.36

0.00

0.00

0.00%

0.00

0.00

03.00.00

MOVIMIENTO DE TIERRAS

03.17.00

ACARREO DE MATERIAL DE DEMOLICION MANUAL A DIST. 30.00 M

M3

82.00

20.33

1,667.06

82.00

1,667.06

100.00%

0.00

0.00

03.19.00

ELIMINACION DE MATERIAL DE DEMOLICION CON MAQUINARIA

M3

200.00

11.04

2,208.00

200.00

2,208.00

100.00%

0.00

0.00

0.00

PARTIDAS NUEVAS
02.00.00

OBRAS PRELIMINARES

02.01.00

DESMONTAJES

02.01.13

DESMONTAJE DE ACCESORIOS ELECTRICOS

Pto

4.00

4.44

17.76

4.00

17.76

100.00%

0.00

0.00

02.01.14

DESMONTAJE DE ANTENA DE COMUNICACIONES (H=24 m)

UND

1.00

403.47

403.47

0.00

0.00

0.00%

0.00

0.00

02.02.00

DEMOLICIONES

02.02.22

DEMOLICION DE VIGAS Y COLUMNAS CON EQUIPO

M3

10.13

235.48

2,386.18

10.13

2,385.41

99.97%

0.00

0.00

02.02.23

DEMOLICION MUROS LADRILLO DE CABEZA C/EQUIPO

M2

136.31

123.85

16,882.30

136.31

16,881.99

100.00%

0.00

0.00

02.02.24

DEMOLICION DE LOSA ALIGERADA CON EQUIPO

M2

38.44

137.33

5,278.62

38.44

5,278.97

100.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 08

32,078.82

29,968.71

0.00

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
02.00.00

OBRAS PRELIMINARES

02.02.00

DEMOLICIONES

02.02.21

DEMOLICION DE BLOQUES DE CONCRETO CON EQUIPO


SUB TOTAL

M3

21.88

27.33

597.98
597.98

21.88

597.98
597.98

100.00%

0.00

0.00
0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

COSTO DIRECTO
GASTOS GENERALES 10%

UND

METRADO

P. UNITARIO

426,641.63

AVANCE ANTERIOR

PARCIAL

100.00%

CANT.

S/.

192,943.31

AVANCE ACTUAL DEL MES


%

45.22%

CANT.

S/.

776.03

42,664.16

19,294.33

77.60

GASTOS DE SUPERVISIN 2%

8,532.83

3,858.87

15.52

GASTOS DE LIQUIDACIN 0.8%

3,413.13

1,543.55

6.21

GASTOS ADMINISTRATIVOS 1.5%


PRESUPUESTO TOTAL (S/.)

6,399.62
487,651.38

2,894.15
100.00%

220,534.21

11.64
45.22%

887.00

ENTE DEMOLICIONES, DESMONTAJES Y MONTAJES

: DICIEMBRE 2015

STRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

SALDO

CANT.

S/.

CANT.

S/.

0.00%

270.00

28,393.20

100.00%

0.00

0.00

0.00%

0.00%

6.00

1,582.98

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

345.01

10,664.26

100.00%

0.00

0.00

0.00%

14.00

2,100.00

93.33%

100.00%

1.00

749.14

100.00%

0.00%

1.00

150.00

6.67%

0.00%

1.00

87.86

100.00%

0.00

0.00

0.00%

300.00

6.67%

14.00

4,200.00

93.33%

0.00

0.00

0.00%

0.00%

1.00

0.00%

1.00

3,500.00

100.00%

0.00%

125.14

631.96

48.00%

135.59

684.73

52.00%

0.00%

260.58

1,863.15

48.86%

272.72

1,949.95

51.14%

0.00%

183.28

1,110.68

36.06%

325.02

1,969.62

63.94%

0.00%

22.00

392.70

70.97%

9.00

160.65

29.03%

16,736.73

40.81%

1,518.26

24,276.98

59.19%

36.88

100.00%

0.00

0.00

0.00%

0.00% 1,046.70
0.00%

3.74

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

97.26

895.76

66.62%

48.74

448.90

33.38%

0.00%

190.73

1,363.72

30.93%

425.84

3,044.76

69.07%

104.00

599.04

61.18%

0.00%

66.00

380.16

38.82%

0.00%

0.00

0.00

0.00%

6.00

319.68

100.00%

0.00%

0.00

0.00

0.00%

17.00

455.94

100.00%

0.00%

52.00

6,858.28

94.55%

3.00

395.67

5.45%

0.20%

452.57

5,878.88

42.67%

608.01

7,898.05

57.33%

0.00%

15.81

133.91

8.84%

163.13

1,381.71

91.16%

0.00%

9.68

176.37

9.12%

96.41

1,756.59

90.88%

6.92

350.71

53.77%

0.00%

5.95

301.55

46.23%

0.00%

33.18

1,681.56

73.02%

12.26

621.34

26.98%

0.00%

34.30

947.37

61.00%

21.93

605.71

39.00%

0.00%

19.29

855.13

19.71%

78.58

3,483.45

80.29%

6,962.30

65.37%

472.35

3,689.05

34.63%

0.00%

891.46

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.
0.00% 1,524.06
0.00%
0.00%

23.40
113.36

S/.

SALDO
%

CANT.

10,104.52

22.35%

446.00

S/.

5,295.73

35,110.69

77.65%

90.31%

2.51

47.84

9.69%

4,610.35

59.65%

76.67

3,118.17

40.35%

19.69

1,155.80

44.15%

92.57

1,255.25

15.84%

0.00%

24.91

1,462.22

55.85%

0.00%

491.81

6,668.94

84.16%

0.00%

44.47

350.42

8.76%

463.25

3,650.41

91.24%

3,005.03

66,170.76

80.43%

0.00%

731.19

16,100.80

19.57%

0.00%

0.00

0.00

0.00%

211.48

11,952.85

100.00%

0.00%

0.00

0.00

0.00%

91.34

3,141.18

100.00%

0.00%

0.00

0.00

0.00%

1,282.48

34,152.44

100.00%

121,713.52

230,812.17

0.00%

23.39

2,459.69

100.00%

0.00

0.00

0.00%

0.00%

54.00

770.04

100.00%

0.00

0.00

0.00%

0.00%

1.00

715.25

100.00%

0.00

0.00

0.00%

0.00%

1.00

1,000.00

100.00%

0.00

0.00

0.00%

0.00%

11.25

2,426.29

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

159.20

1,397.78

100.00%

0.00

0.00

0.00%

0.00%

300.00

6,099.00

100.00%

0.00

0.00

0.00%

14,868.05

0.00

0.00%

4.00

420.64

100.00%

0.00

0.00

0.00%

0.00%

9.12

370.73

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

SALDO

CANT.

S/.

CANT.

S/.

0.00%

71.74

15,472.17

100.00%

0.00

0.00

0.00%

0.00%

61.46

678.52

100.00%

0.00

0.00

0.00%

0.00%

47.85

746.46

100.00%

0.00

0.00

0.00%

0.00%

95.80

4,532.30

100.00%

0.00

0.00

0.00%

0.00%

56.77

2,545.00

100.00%

0.00

0.00

0.00%

0.00%

22.98

628.04

100.00%

0.00

0.00

0.00%

25,393.85

0.00

0.00%

70.00

998.20

100.00%

0.00

0.00

0.00%

0.00%

1.13

45.83

100.00%

0.00

0.00

0.00%

0.00%

5.00

55.20

100.00%

0.00

0.00

0.00%

0.00%

5.00

78.00

100.00%

0.00

0.00

0.00%

1,177.23

0.00

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

103.00

1,468.78

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

17.52

106.17

100.00%

45.50

727.50

100.00%

0.00%

0.00

0.00

0.00%

0.00%

6.16

60.74

62.22%

3.74

36.88

37.78%

0.00%

0.00

0.00

0.00%

20.54

835.36

100.00%

0.00%

82.00

1,667.06

100.00%

0.00

0.00

0.00%

0.00%

200.00

2,208.00

100.00%

0.00

0.00

0.00%

0.00%

4.00

17.76

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

403.47

100.00%

0.00%

10.13

2,385.41

99.97%

0.00

0.77

0.03%

0.00%

136.31

16,881.99

100.00%

0.00

0.31

0.00%

0.00%

38.44

5,278.97

100.00%

0.00

0.00

0.00%

29,968.71

0.00%

21.88

597.98
597.98

2,110.46

100.00%

0.00

0.00
0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

0.18%

S/.

193,719.34

SALDO
%

45.41%

S/.

232,922.63

19,371.93

23,292.26

3,874.39

4,658.45

1,549.75

1,863.38

2,905.79
0.18%

CANT.

221,421.21

54.59%

3,493.84
45.406%

266,230.56

54.59%

CUADRO VALORIZACION DEL COMPONENTE AREA DE BIENESTAR SOCIAL (FARMACIA Y ENFER


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JO


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

A
08.00.00

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

EXPEDIENTE TCNICO
REVOQUES ENLUCIDOS Y MOLDURAS

08.01.00

TARRAJEO PRIMARIO, MORTERO C:A 1:5

m2

44.33

19.51

864.88

0.00

0.00

0.00%

0.00

0.00

08.02.00

TARRAJEO EN MURO: INTERIOR Y EXTERIOR

m2

314.30

21.84

6864.31

101.41

2214.79

32.27%

69.20

1511.33

08.04.00

TARRAJEO DE COLUMNAS

m2

46.79

30.56

1429.90

31.39

959.28

67.09%

0.00

0.00

08.05.00

TARRAJEO DE VIGAS

m2

17.57

42.73

750.77

17.57

750.77

100.00%

0.00

0.00

08.08.00

VESTIDURA DE DERRAMES (1:5)

88.36

11.01

972.84

42.30

465.72

47.87%

0.00

0.00

09.00.00

CIELORRASOS

09.01.00

CIELO RASO CON MEZCLA C:A 1:5

m2

79.69

30.01

2391.50

73.54

2206.94

92.28%

0.00

0.00

09.02.00

VESTIDURA EN FONDO DE ESCALERAS

m2

6.16

30.92

190.47

0.00

0.00

0.00%

0.00

0.00

m2

344.22

27.11

9331.80

0.00

0.00

0.00%

0.00

0.00

m2

73.39

50.10

3676.84

0.00

0.00

0.00%

0.00

0.00

57.43

15.45

887.29

0.00

0.00

0.00%

0.00

0.00

m2

44.86

51.17

2295.49

0.00

0.00

0.00%

32.50

1663.03

m2

11.39

25.45

289.88

0.00

0.00

0.00%

11.39

289.88

m2

13.37

228.28

3052.10

0.00

0.00

0.00%

13.37

3052.10

14.87

80.12

1191.38

0.00

0.00

0.00%

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00%

18.00

10.00.00

PISOS Y PAVIMENTOS

10.05.00

CONTRAPISO DE 48 mm.

10.07.00

PISO CERAMICO 40x40cm - ALTO TRANSITO

11.00.00
11.01.00
12.00.00
12.01.00
13.00.00
13.04.00

CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO H = 0.10 m.
ZOCALOS
ZOCALOS DE CERAMICO
REVESTIMIENTO DE GRADAS Y ESCALERAS
ACABADO DE DESCANSO CEMENTO PULIDO Y BRUADO

14.00.00

CUBIERTAS

15.00.00

CARPINTERIA DE MADERA

15.02.00
16.00.00
16.17.00
17.00.00
17.02.00

PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO


CARPINTERIA METALICA Y HERRERIA
BARANDA DE TUBO METALICO DE 2 1/2"
CERRAJERIA
BISAGRA CAPUCHINA DE ALUMINIO DE 3" X 3"

pza

18.00

13.46

242.28

0.00

242.28

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

17.04.00

CERRADURA DOS GOLPES EN PUERTAS

pza

3.00

60.70

182.10

0.00

0.00

0.00%

0.00

0.00

17.05.00

CERRADURA PARA INTERIOR DOBLE PERILLA

pza

3.00

47.70

143.10

0.00

0.00

0.00%

3.00

143.10

PICAPORTE CROMADO DE 2"

pza

5.00

8.38

41.90

0.00

0.00

0.00%

0.00

0.00

p2

316.57

19.01

6018.00

0.00

0.00

0.00%

0.00

0.00

17.09.00
18.00.00
18.01.00
19.00.00

VIDRIOS, CRISTALES Y SIMILARES


VIDRIO SISTEMA MODUGLAS CON VIDRIO TEMPLADO COLOR GRISS DE 6mm I
PINTURA

19.02.00

PINTURA SUPER MATE 2 MANOS EN CIELO RASO Y VIGAS

m2

147.80

8.14

1203.09

147.80

1203.09

100.00%

0.00

0.00

19.03.00

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

m2

431.29

8.14

3510.70

0.00

0.00

0.00%

431.29

3510.70

19.07.00

PINTURA BARNIZ 2 MANOS EN CARPINTERIA DE MADERA

m2

45.98

15.30

703.49

0.00

0.00

0.00%

0.00

0.00

19.12.00

PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS, EN CARPINTERIA METALICA

m2

36.55

12.79

467.47

0.00

0.00

0.00%

0.00

0.00

m2

342.87

1.28

438.87

0.00

0.00

0.00%

0.00

0.00

20.00.00
20.07.00

VARIOS
LIMPIEZA FINAL DE LA OBRA
SUB TOTAL
COSTO DIRECTO
GASTOS GENERALES 10%

47,140.45
47,140.45

100.00%

7,800.59

10,412.41

7,800.59

16.55%

10,412.41

4,714.05

780.06

1,041.24

GASTOS DE SUPERVISIN 2%

942.81

156.01

208.25

GASTOS DE LIQUIDACIN 0.8%

377.12

62.40

83.30

GASTOS ADMINISTRATIVOS 1.5%


PRESUPUESTO TOTAL (S/.)

707.11
53,881.53

117.01
100.00%

8,916.07

156.19
16.55%

11,901.39

AREA DE BIENESTAR SOCIAL (FARMACIA Y ENFERMERIA)


: DICIEMBRE 2015

STRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

44.33

864.88

100.00%

22.02%

170.61

3726.12

54.28%

143.69

3138.19

45.72%

0.00%

31.39

959.28

67.09%

15.40

470.62

32.91%

0.00%

17.57

750.77

100.00%

0.00

0.00

0.00%

0.00%

42.30

465.72

47.87%

46.06

507.12

52.13%

0.00%

73.54

2206.94

92.28%

6.15

184.56

7.72%

0.00%

0.00

0.00

0.00%

6.16

190.47

100.00%

0.00%

0.00

0.00

0.00%

344.22

9331.80

100.00%

0.00%

0.00

0.00

0.00%

73.39

3676.84

100.00%

0.00%

0.00

0.00

0.00%

57.43

887.29

100.00%

72.45%

32.50

1663.03

72.45%

12.36

632.46

27.55%

100.00%

11.39

289.88

100.00%

0.00

0.00

0.00%

100.00%

13.37

3052.10

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

14.87

1191.38

100.00%

100.00%

0.00

0.00

0.00%

18.00

242.28

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

3.00

182.10

100.00%

100.00%

3.00

143.10

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

5.00

41.90

100.00%

0.00%

0.00

0.00

0.00%

316.57

6018.00

100.00%

0.00%

147.80

1203.09

100.00%

0.00

0.00

0.00%

100.00%

431.29

3510.70

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

45.98

703.49

100.00%

0.00%

0.00

0.00

0.00%

36.55

467.47

100.00%

0.00%

0.00

0.00

0.00%

342.87

438.87

100.00%

17,970.72
22.09%

17,970.72

29,169.74
38.12%

2,916.97

359.41

583.39

143.77

233.36

269.56
22.09%

29,169.74

1,797.07

20,540.54

61.88%

437.55
38.122%

33,341.01

61.88%

CUADRO VALORIZACION DEL COMPONENTE CONSTRUCCION DE BIBLIOTECA


MES: DICIEMBRE 2015

OBRA : MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JO


RESIDENTE : ING. KARIN JANETH DEL CARPIO RIMACHI
ENTIDAD EJECUTORA : GOBIERNO REGIONAL DE MOQUEGUA.
MODALIDAD DE EJECUCION : EJECUCION PRESUPUESTARIA DIRECTA

INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES


CADENA FUNCIONAL : 036

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

EXPEDIENTE TCNICO

02

OBRAS PRELIMINARES

02.04
02.04.04
02.05

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

LIMPIEZA DE TERRENO
ELIMINACION DE BASURA Y ELEMENTOS SUELTOS LIVIANOS

m2

456.84

1.36

621.30

0.00

0.00%

0.00

TRAZOS, NIVELES Y REPLANTEO

02.05.01

TRAZO Y REPLANTEO PRELIMINAR.

m2

456.84

1.87

854.29

0.00

0.00%

0.00

02.05.02

TRAZO DURANTE LA EJECUCION DE LA OBRA

m2

456.84

1.08

493.39

0.00

0.00%

0.00

03

MOVIMIENTO DE TIERRAS

03.01

NIVELACION DE TERRENO Y APISONADO

m2

266.31

2.71

721.70

0.00

0.00%

0.00

03.07

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL

m3

152.26

33.87

5157.05

0.00

0.00%

0.00

03.08

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

m3

23.22

29.03

674.08

0.00

0.00%

0.00

03.09

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION

m3

24.31

25.40

617.47

0.00

0.00%

0.00

03.10

RELLENO COMPACTADO CON EQUIPO, MATERIAL PROPIO

m3

165.41

20.15

3333.01

0.00

0.00%

0.00

03.13

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

m3

44.70

16.94

757.22

0.00

0.00%

0.00

03.14

ELIMINACION MATERIAL EXCEDENTE ACARREADO

m3

44.70

37.88

1693.24

0.00

0.00%

0.00

m2

131.45

26.58

3493.94

0.00

0.00%

0.00

m3

20.82

167.28

3482.77

0.00

0.00%

0.00

04
04.01
04.01.01
04.04
04.04.01
04.05

OBRAS DE CONCRETO SIMPLE


SOLADOS
SOLADOS CONCRETO f'c=100 kg/cm2 E= 10 CM
CIMIENTOS CORRIDOS
CONCRETO F'C=140 KG/CM2 +30% PG EN CIMIENTOS CORRIDOS
SOBRECIMIENTOS

04.05.01

CONCRETO f'c=140 kg/cm2 + 30% PM 4" EN SOBRECIMIENTOS

m3

3.79

235.26

891.64

0.00

0.00%

0.00

04.05.02

SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO

m2

48.62

33.95

1650.65

0.00

0.00%

0.00

04.08

FALSO PISO

PRESUPUESTO EXPEDIENTE
ITEM
04.08.01
05
05.01

DESCRIPCION
FALSO PISO MEZCLA 1:8 e=4"

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

m2

266.31

26.63

7091.84

0.00

0.00%

0.00

OBRAS DE CONCRETO ARMADO


ZAPATAS

05.01.03

ZAPATAS, CONCRETO 210 kg/cm2

m3

33.75

299.23

10099.01

0.00

0.00%

0.00

05.01.04

ZAPATAS, ACERO fy= 4200 kg/cm2

kg

816.84

4.33

3536.92

0.00

0.00%

0.00

05.02

VIGAS DE CIMENTACION

05.02.01

VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2

m3

16.36

311.23

5091.72

0.00

0.00%

0.00

05.02.02

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

m2

128.81

45.77

5895.63

0.00

0.00%

0.00

05.02.03

VIGAS DE CIMENTACION ACERO fy= 4200kg/cm2

kg

2,209.44

4.33

9566.88

0.00

0.00%

0.00

05.05

PLACAS

05.05.01

PLACAS, CONCRETO f'c=210 kg/cm2

m3

2.78

425.28

1182.28

0.00

0.00%

0.00

05.05.02

PLACAS, ENCOFRADO Y DESENCOFRADO

m2

43.82

46.38

2032.37

0.00

0.00%

0.00

05.05.03

PLACAS, ACERO fy= 4200kg/cm2

kg

161.87

4.33

700.90

0.00

0.00%

0.00

05.06

COLUMNAS

05.06.01

CONCRETO EN COLUMNETAS DE ARRIOSTRE f'c=175 kg/cm2

m3

1.36

395.44

537.80

0.00

0.00%

0.00

05.06.02

COLUMNAS, CONCRETO f'c= 210kg/cm2

m3

43.08

436.79

18816.91

0.00

0.00%

0.00

05.06.03

COLUMNAS, ENCOFRADO Y DESENCOFRADO

m2

344.07

50.14

17251.67

0.00

0.00%

0.00

05.06.04

COLUMNAS, ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

94.96

70.35

6680.44

0.00

0.00%

0.00

COLUMNAS, ACERO fy=4200 kg/cm2

kg

9,737.49

4.33

42163.33

0.00

0.00%

0.00

05.06.05
05.07

VIGAS

05.07.01

CONCRETO EN VIGUETAS DE ARRIOSTRE f'c=175 kg/cm2

m3

3.01

305.58

919.80

0.00

0.00%

0.00

05.07.02

VIGAS, CONCRETO f'c=210 kg/cm2 (2 PISOS)

m3

58.01

338.49

19635.80

0.00

0.00%

0.00

05.07.03

VIGAS, ENCOFRADO Y DESENCOFRADO

m2

487.42

54.75

26686.25

0.00

0.00%

0.00

05.07.04

VIGAS, ACERO fy= 4200kg/cm2

kg

7,741.51

4.33

33520.74

0.00

0.00%

0.00

2.53

305.22

772.21

0.00

0.00%

0.00

05.08

LOSAS

05.08.01

LOSAS MACIZAS, CONCRETO f'c=210 kg/cm2

m3

05.08.02

LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO

m2

16.88

43.15

728.37

0.00

0.00%

0.00

05.08.03

LOSAS MACIZAS ACERO fy= 4200kg/cm2

kg

453.49

4.33

1963.61

0.00

0.00%

0.00

05.08.04

LOSA ALIGERADA, CONCRETO f'c=210 kg/cm2 (2 PISOS)

m3

42.64

333.88

14236.64

0.00

0.00%

0.00

05.08.05

LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO

m2

494.74

38.61

19101.91

0.00

0.00%

0.00

05.08.06

LOSA ALIGERADA, ACERO fy= 4200kg/cm2

kg

3,033.61

4.33

13135.53

0.00

0.00%

0.00

05.08.07

LOSA ALIGERADA, LADRILLO HUECO 15x30x30

4,121.20

4.09

16855.71

0.00

0.00%

0.00

4.13

412.33

1702.92

0.00

0.00%

0.00

05.09
05.09.01

ESCALERAS
ESCALERAS, CONCRETO f'c=210 kg/cm2

m3

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

05.09.02

ESCALERAS, ENCOFRADO Y DESENCOFRADO

m2

24.17

74.24

1794.38

0.00

0.00%

0.00

05.09.03

ESCALERAS, ACERO fy= 4200kg/cm2

kg

295.23

4.33

1278.35

0.00

0.00%

0.00

06

ESTRUCTURAS METALICAS Y COBERTURAS

06.08

ARMADURA PRINCIPAL VMP-01 (BIBLIOTECA) INC/PINTADO Y COLOCADO

pza

6.00

6349.38

38096.28

0.00

0.00%

0.00

06.09

ARMADURA PRINCIPAL VMP-01 (EN BIBLIOTECA TERRAZA)

pza

6.00

3333.00

19998.00

0.00

0.00%

0.00

06.18

CORREA VMS-02 (BIBLIOTECA) INC./PINTADO Y COLOCADO

pza

45.00

509.41

22923.45

0.00

0.00%

0.00

06.19

CORREA VMS-02 (EN BIBLIOTECA TERRAZA) INC./PINTADO Y COLOCADO

pza

70.00

502.52

35176.40

0.00

0.00%

0.00

06.23

COBERTURA TRASLUCIDA DE POLICARBONATO COLOR 6 mm

m2

275.82

37.53

10351.52

0.00

0.00%

0.00

MURO DE LADRILLO KK CABEZA M1:1:4 E=1.5 cm

m2

71.21

123.91

8823.63

0.00

0.00%

0.00

MURO DE LADRILLO KK SOGA M:1:1:4 E=1.5 cm

m2

270.64

78.98

21375.15

0.00

0.00%

0.00

07
07.01
07.02
08

MUROS Y TABIQUES DE ALBAILERIA

REVOQUES ENLUCIDOS Y MOLDURAS

08.01

TARRAJEO PRIMARIO, MORTERO C:A 1:5

m2

101.20

19.51

1974.41

0.00

0.00%

0.00

08.02

TARRAJEO EN MURO: INTERIOR Y EXTERIOR

m2

487.82

21.84

10653.99

0.00

0.00%

0.00

08.03

TARRAJEO EN MUROS EXTERIORES A PARTIR DEL 2do. PISO

m2

219.73

29.33

6444.68

0.00

0.00%

0.00

08.04

TARRAJEO DE COLUMNAS

m2

221.10

30.56

6756.82

0.00

0.00%

0.00

08.05

TARRAJEO DE VIGAS

m2

275.23

42.73

11760.58

0.00

0.00%

0.00

08.08

VESTIDURA DE DERRAMES (1:5)

223.95

11.01

2465.69

0.00

0.00%

0.00

09

CIELORRASOS

09.01

CIELO RASO CON MEZCLA C:A 1:5

m2

551.96

30.01

16564.32

0.00

0.00%

0.00

09.02

VESTIDURA EN FONDO DE ESCALERAS

m2

24.88

30.92

769.29

0.00

0.00%

0.00

10

PISOS Y PAVIMENTOS

10.01

PISO DE CEMENTO PULIDO E=2" MEZCLA 1:4

m2

44.09

26.40

1163.98

0.00

0.00%

0.00

10.05

CONTRAPISO DE 48 mm.

m2

596.99

27.11

16184.40

0.00

0.00%

0.00

10.06

PISO CERAMICO 30x30cm - ALTO TRANSITO

m2

74.55

49.18

3666.37

0.00

0.00%

0.00

10.09

PISO DE PORCELANATO

m2

522.60

56.24

29391.02

0.00

0.00%

0.00

11

CONTRAZOCALOS

11.01

CONTRAZOCALO DE CERAMICO H = 0.10 m.

13.35

15.45

206.26

0.00

0.00%

0.00

11.02

CONTRAZOCALO DE PORCELANATO

178.19

40.25

7172.15

0.00

0.00%

0.00

m2

119.36

51.17

6107.65

0.00

0.00%

0.00

12
12.01
13

ZOCALOS
ZOCALOS DE CERAMICO
REVESTIMIENTO DE GRADAS Y ESCALERAS

13.01

REVESTIMIENTO EN ESCALERAS CON CERAMICA ANTIDESLIZANTE

m2

64.03

44.53

2851.26

0.00

0.00%

0.00

13.02

REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASO

64.03

25.20

1613.56

0.00

0.00%

0.00

PRESUPUESTO EXPEDIENTE
ITEM
14

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

CUBIERTAS

14.01

CUBIERTA LADRILLO PASTELERO + FRAGUA CON MORTERO 1:1/2:5

m2

295.70

34.52

10207.56

0.00

0.00%

0.00

14.02

IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA

m2

295.70

5.51

1629.31

0.00

0.00%

0.00

14.03

JUNTA DE DILATACION EN COB. PAST C/MORTERO ASFALTICO e=1

230.30

4.25

978.78

0.00

0.00%

0.00

PUERTA C/TABLERO REBAJADO

m2

2.43

308.51

749.68

0.00

0.00%

0.00

PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO

m2

9.36

228.28

2136.70

0.00

0.00%

0.00

15
15.01
15.02
16

CARPINTERIA DE MADERA

CARPINTERIA METALICA Y HERRERIA

16.10

VENTANA DE ALUMINIO TIPO VITROVEN

m2

23.00

100.74

2317.02

0.00

0.00%

0.00

16.11

PUERTA DE ALUMINIO EN SS.HH.

m2

6.65

261.01

1735.72

0.00

0.00%

0.00

16.13

MAMPARA DE ALUMINIO

m2

60.08

267.27

16057.58

0.00

0.00%

0.00

16.17

BARANDA DE TUBO METALICO DE 2 1/2"

110.44

80.12

8848.45

0.00

0.00%

0.00

201.90

0.00

0.00%

0.00

17

CERRAJERIA

17.02

BISAGRA CAPUCHINA DE ALUMINIO DE 3" X 3"

pza

15.00

13.46

17.04

CERRADURA DOS GOLPES EN PUERTAS

pza

1.00

60.70

60.70

0.00

0.00%

0.00

17.05

CERRADURA PARA INTERIOR DOBLE PERILLA

pza

4.00

47.70

190.80

0.00

0.00%

0.00

17.06

CERRADURA DE POMO PARA MAMPARA DE INGRESO

pza

6.00

80.70

484.20

0.00

0.00%

0.00

18

VIDRIOS, CRISTALES Y SIMILARES

18.01

VIDRIO SISTEMA MODUGLAS CON VIDRIO TEMPLADO COLOR GRISS DE 6mm

p2

2,216.36

19.01

42133.00

0.00

0.00%

0.00

18.02

VIDRIO SISTEMA MODUGLAS CON VIDRIO TEMPLADO COLOR GRISS DE 10mm

p2

249.86

26.73

6678.76

0.00

0.00%

0.00

18.05

VIDRIOS BLOK INCOLORO

p2

122.35

30.95

3786.73

0.00

0.00%

0.00

19

PINTURA

19.01

SELLADO DE CONCRETO CARAVISTA

m2

118.43

5.21

617.02

0.00

0.00%

0.00

19.02

PINTURA SUPER MATE 2 MANOS EN CIELO RASO Y VIGAS

m2

827.19

8.14

6733.33

0.00

0.00%

0.00

19.03

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

m2

708.42

8.14

5766.54

0.00

0.00%

0.00

19.04

PINTURA SUPER MATE 2 MANOS EN MUROS EXT. A PARTIR DEL 2DO PISO

m2

219.73

13.42

2948.78

0.00

0.00%

0.00

PINTURA BARNIZ 2 MANOS EN CARPINTERIA DE MADERA

m2

23.58

15.30

360.77

0.00

0.00%

0.00

25.58

19.72

504.44

0.00

0.00%

0.00

19.07
20
20.01

VARIOS
JUNTA DE DILATACION CON ESPUMA PLASTICA Y SELLADOR
SUB TOTAL
COSTO DIRECTO

705,040.30
705,040.30

100.00%

0.00

0.00
0.00

0.00%

0.00

GASTOS GENERALES 10%

70,504.03

0.00

0.00

GASTOS DE SUPERVISIN 2%

14,100.81

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION
GASTOS DE LIQUIDACIN 0.8%
GASTOS ADMINISTRATIVOS 1.5%
PRESUPUESTO TOTAL (S/.)

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

5,640.32

0.00

0.00

10,575.60

0.00

0.00

805,861.06

100.00%

0.00

0.00%

0.00

OMPONENTE CONSTRUCCION DE BIBLIOTECA

: DICIEMBRE 2015

STRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES

REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

456.84

621.30

100.00%

0.00%

0.00

0.00

0.00%

456.84

854.29

100.00%

0.00%

0.00

0.00

0.00%

456.84

493.39

100.00%

0.00%

0.00

0.00

0.00%

266.31

721.70

100.00%

0.00%

0.00

0.00

0.00%

152.26

5157.05

100.00%

0.00%

0.00

0.00

0.00%

23.22

674.08

100.00%

0.00%

0.00

0.00

0.00%

24.31

617.47

100.00%

0.00%

0.00

0.00

0.00%

165.41

3333.01

100.00%

0.00%

0.00

0.00

0.00%

44.70

757.22

100.00%

0.00%

0.00

0.00

0.00%

44.70

1693.24

100.00%

0.00%

0.00

0.00

0.00%

131.45

3493.94

100.00%

0.00%

0.00

0.00

0.00%

20.82

3482.77

100.00%

0.00%

0.00

0.00

0.00%

3.79

891.64

100.00%

0.00%

0.00

0.00

0.00%

48.62

1650.65

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

266.31

7091.84

100.00%

0.00%

0.00

0.00

0.00%

33.75

10099.01

100.00%

0.00%

0.00

0.00

0.00%

816.84

3536.92

100.00%

0.00%

0.00

0.00

0.00%

16.36

5091.72

100.00%

0.00%

0.00

0.00

0.00%

128.81

5895.63

100.00%

0.00%

0.00

0.00

0.00%

2,209.44

9566.88

100.00%

0.00%

0.00

0.00

0.00%

2.78

1182.28

100.00%

0.00%

0.00

0.00

0.00%

43.82

2032.37

100.00%

0.00%

0.00

0.00

0.00%

161.87

700.90

100.00%

0.00%

0.00

0.00

0.00%

1.36

537.80

100.00%

0.00%

0.00

0.00

0.00%

43.08

18816.91

100.00%

0.00%

0.00

0.00

0.00%

344.07

17251.67

100.00%

0.00%

0.00

0.00

0.00%

94.96

6680.44

100.00%

0.00%

0.00

0.00

0.00%

9,737.49

42163.33

100.00%

0.00%

0.00

0.00

0.00%

3.01

919.80

100.00%

0.00%

0.00

0.00

0.00%

58.01

19635.80

100.00%

0.00%

0.00

0.00

0.00%

487.42

26686.25

100.00%

0.00%

0.00

0.00

0.00%

7,741.51

33520.74

100.00%

0.00%

0.00

0.00

0.00%

2.53

772.21

100.00%

0.00%

0.00

0.00

0.00%

16.88

728.37

100.00%

0.00%

0.00

0.00

0.00%

453.49

1963.61

100.00%

0.00%

0.00

0.00

0.00%

42.64

14236.64

100.00%

0.00%

0.00

0.00

0.00%

494.74

19101.91

100.00%

0.00%

0.00

0.00

0.00%

3,033.61

13135.53

100.00%

0.00%

0.00

0.00

0.00%

4,121.20

16855.71

100.00%

0.00%

0.00

0.00

0.00%

4.13

1702.92

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

24.17

1794.38

100.00%

0.00%

0.00

0.00

0.00%

295.23

1278.35

100.00%

0.00%

0.00

0.00

0.00%

6.00

38096.28

100.00%

0.00%

0.00

0.00

0.00%

6.00

19998.00

100.00%

0.00%

0.00

0.00

0.00%

45.00

22923.45

100.00%

0.00%

0.00

0.00

0.00%

70.00

35176.40

100.00%

0.00%

0.00

0.00

0.00%

275.82

10351.52

100.00%

0.00%

0.00

0.00

0.00%

71.21

8823.63

100.00%

0.00%

0.00

0.00

0.00%

270.64

21375.15

100.00%

0.00%

0.00

0.00

0.00%

101.20

1974.41

100.00%

0.00%

0.00

0.00

0.00%

487.82

10653.99

100.00%

0.00%

0.00

0.00

0.00%

219.73

6444.68

100.00%

0.00%

0.00

0.00

0.00%

221.10

6756.82

100.00%

0.00%

0.00

0.00

0.00%

275.23

11760.58

100.00%

0.00%

0.00

0.00

0.00%

223.95

2465.69

100.00%

0.00%

0.00

0.00

0.00%

551.96

16564.32

100.00%

0.00%

0.00

0.00

0.00%

24.88

769.29

100.00%

0.00%

0.00

0.00

0.00%

44.09

1163.98

100.00%

0.00%

0.00

0.00

0.00%

596.99

16184.40

100.00%

0.00%

0.00

0.00

0.00%

74.55

3666.37

100.00%

0.00%

0.00

0.00

0.00%

522.60

29391.02

100.00%

0.00%

0.00

0.00

0.00%

13.35

206.26

100.00%

0.00%

0.00

0.00

0.00%

178.19

7172.15

100.00%

0.00%

0.00

0.00

0.00%

119.36

6107.65

100.00%

0.00%

0.00

0.00

0.00%

64.03

2851.26

100.00%

0.00%

0.00

0.00

0.00%

64.03

1613.56

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

295.70

10207.56

100.00%

0.00%

0.00

0.00

0.00%

295.70

1629.31

100.00%

0.00%

0.00

0.00

0.00%

230.30

978.78

100.00%

0.00%

0.00

0.00

0.00%

2.43

749.68

100.00%

0.00%

0.00

0.00

0.00%

9.36

2136.70

100.00%

0.00%

0.00

0.00

0.00%

23.00

2317.02

100.00%

0.00%

0.00

0.00

0.00%

6.65

1735.72

100.00%

0.00%

0.00

0.00

0.00%

60.08

16057.58

100.00%

0.00%

0.00

0.00

0.00%

110.44

8848.45

100.00%

0.00%

0.00

0.00

0.00%

15.00

201.90

100.00%

0.00%

0.00

0.00

0.00%

1.00

60.70

100.00%

0.00%

0.00

0.00

0.00%

4.00

190.80

100.00%

0.00%

0.00

0.00

0.00%

6.00

484.20

100.00%

0.00%

0.00

0.00

0.00%

2,216.36

42133.00

100.00%

0.00%

0.00

0.00

0.00%

249.86

6678.76

100.00%

0.00%

0.00

0.00

0.00%

122.35

3786.73

100.00%

0.00%

0.00

0.00

0.00%

118.43

617.02

100.00%

0.00%

0.00

0.00

0.00%

827.19

6733.33

100.00%

0.00%

0.00

0.00

0.00%

708.42

5766.54

100.00%

0.00%

0.00

0.00

0.00%

219.73

2948.78

100.00%

0.00%

0.00

0.00

0.00%

23.58

360.77

100.00%

0.00%

0.00

0.00

0.00%

25.58

504.44

100.00%

0.00
0.00%

705,040.30
0.00

0.00%

705,040.30

0.00

70,504.03

0.00

14,100.81

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

0.00%

S/.

SALDO
%

CANT.

S/.

0.00

5,640.32

0.00

10,575.60

0.00

0.000%

805,861.06

100.00%

CUADRO VALORIZACION DEL COMPONENTE CONSTRUCCION DEL AUDITORI


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUB


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAM
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

EXPEDIENTE TCNICO

02.00.00

OBRAS PRELIMINARES

02.04.00

LIMPIEZA DE TERRENO

02.04.04

ELIMINACION DE BASURA Y ELEMENTOS SUELTOS LIVIANOS

02.05.00

TRAZOS, NIVELES Y REPLANTEO

02.05.01

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL
%

CANT.

M2

1,283.30

1.36

1,745.29

1,283.30

1,745.29

100.00%

0.00

TRAZO Y REPLANTEO PRELIMINAR.

M2

1,283.30

1.87

2,399.77

1,283.30

2,399.77

100.00%

0.00

02.05.02

TRAZO DURANTE LA EJECUCION DE LA OBRA

M2

1,283.30

1.08

1,385.96

1,283.30

1,385.96

100.00%

0.00

03.00.00

MOVIMIENTO DE TIERRAS

03.07.00

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL

M3

533.31

33.87

18,063.21

361.42

12,241.30

67.77%

0.00

03.08.00

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

M3

59.67

29.03

1,732.22

59.67

1,732.22

100.00%

0.00

03.09.00

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION

M3

55.01

25.40

1,397.25

0.00

0.00

0.00%

0.00

03.10.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL PROPIO

M3

647.99

20.15

13,057.00

75.52

1,521.73

11.65%

0.00

03.11.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL DE PRESTAMO

M3

81.65

45.35

3,702.83

0.00

0.00

0.00%

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.01

SOLADOS CONCRETO f'c=100 kg/cm2 E= 10 CM

M2

165.75

26.58

4,405.64

165.75

4,405.64

100.00%

0.00

04.02.00

SUBZAPATAS

04.02.01

CONCRETO f'c=100 kg/cm2 + 50% P.G. SUBZAPATAS

M3

50.81

222.65

11,312.85

0.00

0.00

0.00%

0.00

04.03.00

BASE DE CONCRETO

04.03.01

CONCRETO f'c=100 kg/cm2 + 30% P.G. PARA BASE DE CONCRETO

M2

86.48

27.61

2,387.71

86.48

2,387.71

100.00%

0.00

04.03.02

BASE DE CONCRETO, ENCOFRADO Y DESENCOFRADO

M2

99.18

33.45

3,317.57

99.18

3,317.57

100.00%

0.00

04.04.00

CIMIENTOS CORRIDOS

04.04.01

CONCRETO F'C=140 KG/CM2 +30% PG EN CIMIENTOS CORRIDOS

M3

100.49

167.28

16,809.97

0.00

0.00

0.00%

0.00

04.05.00

SOBRECIMIENTOS

04.05.01

CONCRETO f'c=140 kg/cm2 + 30% PM 4" EN SOBRECIMIENTOS

M3

16.83

235.26

3,959.43

0.00

0.00

0.00%

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

04.05.02

SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO

04.08.00

FALSO PISO

04.08.01

FALSO PISO MEZCLA 1:8 e=4"

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

05.01.03

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL
%

CANT.

M2

163.29

33.95

5,543.70

55.63

1,888.64

34.07%

0.00

M2

1,082.36

26.63

28,823.25

1,082.36

28,823.25

100.00%

0.00

ZAPATAS, CONCRETO 210 kg/cm2

M3

131.05

299.23

39,214.09

0.00

0.00

0.00%

0.00

05.01.04

ZAPATAS, ACERO fy= 4200 kg/cm2

KG

6,696.57

4.33

28,996.15

6,027.57

26,099.38

90.01%

0.00

05.02.00

VIGAS DE CIMENTACION

05.02.01

VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2

M3

20.68

311.23

6,436.24

2.13

662.92

10.30%

0.00

05.02.02

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

M2

165.46

45.77

7,573.10

156.18

7,148.36

94.39%

0.00

05.02.03

VIGAS DE CIMENTACION ACERO fy= 4200kg/cm2

KG

1,803.96

4.33

7,811.15

1,803.96

7,811.15

100.00%

0.00

05.03.00

SOBRECIMIENTO ARMADO

05.03.04

SOBRECIMIENTO REFORZADO, ACERO fy= 4200kg/cm2

M3

141.01

4.33

610.57

0.00

0.00

0.00%

0.00

05.04.00

MUROS DE CONTENCION

05.04.01

MUROS DE CONTENCION, CONCRETO f'c=140 kg/cm2

M3

13.18

271.09

3,572.97

0.00

0.00

0.00%

0.00

05.04.04

MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO (DOS CARAS)

M2

105.43

43.52

4,588.31

90.95

3,958.14

86.27%

0.00

05.04.06

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2

943.04

4,083.36

41.99%

0.00

05.05.00

PLACAS

05.05.01

KG

2,245.71

4.33

9,723.92

PLACAS, CONCRETO f'c=210 kg/cm2

M3

72.53

425.28

30,845.56

0.00

0.00

0.00%

0.00

05.05.02

PLACAS, ENCOFRADO Y DESENCOFRADO

M2

658.79

46.38

30,554.68

658.79

30,554.68

100.00%

0.00

05.05.03

PLACAS, ACERO fy= 4200kg/cm2

9,692.81

41,969.87

100.00%

0.00

05.06.00

COLUMNAS

05.06.01

0.00%

0.00

KG

9,692.81

4.33

41,969.87

CONCRETO EN COLUMNETAS DE ARRIOSTRE f'c=175 kg/cm2

M3

4.08

395.44

1,613.40

0.00

0.00

05.06.02

COLUMNAS, CONCRETO f'c= 210kg/cm2

M3

36.63

436.79

15,999.62

0.00

0.00

0.00%

0.00

05.06.03

COLUMNAS, ENCOFRADO Y DESENCOFRADO

M2

359.11

50.14

18,005.78

359.11

18,005.78

100.00%

0.00

05.06.04

COLUMNAS, ENCOFRADO Y DESENCOFRADO CARAVISTA

M2

114.72

70.35

8,070.55

114.72

8,070.55

100.00%

0.00

05.06.05

COLUMNAS, ACERO fy=4200 kg/cm2

KG

5,583.97

4.33

24,178.59

5,583.97

24,178.59

100.00%

0.00

05.07.00

VIGAS

05.07.02

VIGAS, CONCRETO f'c=210 kg/cm2 (2 PISOS)

M3

70.04

338.49

23,707.84

0.00

0.00

0.00%

0.00

05.07.03

VIGAS, ENCOFRADO Y DESENCOFRADO

M2

543.17

54.75

29,738.56

543.17

29,738.56

100.00%

0.00

05.07.04

VIGAS, ACERO fy= 4200kg/cm2

KG

12,224.59

4.33

52,932.47

11,888.68

51,477.98

97.25%

0.00

05.08.00

LOSAS

05.08.01

LOSAS MACIZAS, CONCRETO f'c=210 kg/cm2

M3

37.41

305.22

11,418.28

0.00

0.00

0.00%

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL
%

CANT.

05.08.02

LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO

M2

187.06

43.15

8,071.64

0.00

0.00

0.00%

0.00

05.08.03

LOSAS MACIZAS ACERO fy= 4200kg/cm2

KG

3,912.31

4.33

16,940.30

3,855.87

16,695.92

98.56%

0.00

05.08.04

LOSA ALIGERADA, CONCRETO f'c=210 kg/cm2 (2 PISOS)

M3

14.71

333.88

4,911.37

0.00

0.00

0.00%

0.00

05.08.05

LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO

M2

168.64

38.61

6,511.19

168.64

6,511.19

100.00%

0.00

05.08.06

LOSA ALIGERADA, ACERO fy= 4200kg/cm2

KG

2,401.40

4.33

10,398.06

1,656.86

7,174.20

69.00%

0.00

05.08.07

LOSA ALIGERADA, LADRILLO HUECO 15x30x30

UND

1,404.77

4.09

5,745.51

1,404.77

5,745.51

100.00%

0.00

06.00.00

ESTRUCTURAS METALICAS Y COBERTURAS

06.06.00

ARMADURA PRINCIPAL VMP-01 (AUDITORIO) INC/ PINTADO Y COLOCADO

PZA

8.00

10,230.68

81,845.44

0.00

0.00

0.00%

0.00

06.10.00

COBERTURA METALICA VL-1 (EN AUDITORIO LOBBY)

PZA

14.00

1,362.22

19,071.08

0.00

0.00

0.00%

0.00

06.20.00

CORREA VL-02 (EN AUDITORIO LOBBY) INC. PINTADO Y COLOCADO

PZA

52.00

377.97

19,654.44

0.00

0.00

0.00%

0.00

06.21.00

COBERTURA METALICA EN INGRESO DE AUDITORIO

PZA

1.00

3,482.84

3,482.84

0.00

0.00

0.00%

0.00

06.23.00

COBERTURA TRASLUCIDA DE POLICARBONATO COLOR 6 mm

M2

123.33

37.53

4,628.57

0.00

0.00

0.00%

0.00

07.00.00

MUROS Y TABIQUES DE ALBAILERIA

07.01.00

MURO DE LADRILLO KK CABEZA M1:1:4 E=1.5 cm

M2

416.07

123.91

51,555.23

394.10

48,832.93

94.72%

0.00

07.02.00

MURO DE LADRILLO KK SOGA M:1:1:4 E=1.5 cm

M2

588.13

78.98

46,450.51

382.26

30,190.89

65.00%

0.00

08.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

08.01.00

TARRAJEO PRIMARIO, MORTERO C:A 1:5

M2

208.16

19.51

4,061.20

208.16

4,061.20

100.00%

0.00

08.02.00

TARRAJEO EN MURO: INTERIOR Y EXTERIOR

M2

2,036.62

21.84

44,479.78

2,036.62

44,479.78

100.00%

0.00

08.03.00

TARRAJEO EN MUROS EXTERIORES A PARTIR DEL 2do. PISO

M2

1,387.62

29.33

40,698.89

1,387.62

40,698.89

100.00%

0.00

08.04.00

TARRAJEO DE COLUMNAS

M2

167.03

30.56

5,104.44

167.03

100.00%

0.00

08.05.00

TARRAJEO DE VIGAS

M2

352.97

42.73

15,082.41

352.97

15,082.41

100.00%

0.00

08.08.00

VESTIDURA DE DERRAMES (1:5)

ML

908.20

11.01

9,999.28

908.20

9,999.28

100.00%

0.00

09.00.00

CIELORRASOS

09.01.00

CIELO RASO CON MEZCLA C:A 1:5

M2

527.13

30.01

15,819.17

398.62

11,962.59

75.62%

0.00

09.02.00

VESTIDURA EN FONDO DE ESCALERAS

M2

125.68

30.92

3,886.03

15.88

491.01

12.64%

0.00

09.03.00

CIELO RASO DE CELOTEX (0.60 x 0.60)

M2

562.56

140.96

79,298.46

562.56

79,298.46

100.00%

0.00

10.00.00

PISOS Y PAVIMENTOS

10.01.00

PISO DE CEMENTO PULIDO E=2" MEZCLA 1:4

M2

634.97

26.40

16,763.21

622.91

16,444.90

98.10%

0.00

10.02.00

PISO DE CEMENTO ACABADO PULIDO Y BRUADO 2"

M2

135.13

21.44

2,897.19

109.97

2,357.76

81.38%

0.00

10.04.00

PISO DE ADOQUINES DE CONCRETO

M2

66.15

56.03

3,706.38

0.00

0.00

0.00%

66.15

10.05.00

CONTRAPISO DE 48 mm.

M2

1,465.23

27.11

39,722.39

1,025.59

27,803.74

70.00%

0.00

10.06.00

PISO CERAMICO 30x30cm - ALTO TRANSITO

M2

61.06

49.18

3,002.93

61.06

3,002.93

100.00%

0.00

10.07.00

PISO CERAMICO 40x40cm - ALTO TRANSITO

M2

368.84

50.10

18,478.88

368.84

18,478.88

100.00%

0.00

5,104.44

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL
%

CANT.

10.08.00

PISO DE MADERA MACHIHEMBRADO

M2

106.31

74.53

7,923.28

106.31

7,923.28

100.00%

0.00

10.09.00

PISO DE PORCELANATO

M2

143.82

56.24

8,088.44

0.00

0.00

0.00%

0.00

10.10.00

PISO DE ALFOMBRA TAPIZADO

M2

610.69

24.66

15,059.62

610.69

15,059.62

100.00%

0.00

11.00.00

CONTRAZOCALOS

11.01.00

CONTRAZOCALO DE CERAMICO H = 0.10 m.

ML

183.32

15.45

2,832.29

0.00

0.00

0.00%

0.00

11.02.00

CONTRAZOCALO DE PORCELANATO

ML

61.48

40.25

2,474.57

0.00

0.00

0.00%

0.00

11.03.00

CONTRAZOCALO DE MADERA CEDRO DE 3/4"x4" + RONDON DE 3/4"

ML

204.77

15.67

3,208.75

204.77

3,208.75

100.00%

0.00

12.00.00

ZOCALOS

12.01.00

ZOCALOS DE CERAMICO

M2

107.15

51.17

5,482.87

107.15

5,482.87

100.00%

0.00

12.04.00

ZOCALO DE PIEDRA LAJA

ML

118.77

62.52

7,425.50

110.54

6,910.96

93.07%

0.00

13.00.00

REVESTIMIENTO DE GRADAS Y ESCALERAS

13.01.00

REVESTIMIENTO EN ESCALERAS CON CERAMICA ANTIDESLIZANTE

M2

16.61

44.53

739.64

16.61

739.64

100.00%

0.00

13.02.00

REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASO

0.00

0.00

0.00%

0.00

14.00.00

CUBIERTAS

14.01.00

16.61

25.20

418.57

CUBIERTA LADRILLO PASTELERO + FRAGUA CON MORTERO 1:1/2:5

M2

407.64

34.52

14,071.73

258.36

8,918.59

63.38%

0.00

14.02.00

IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA

M2

407.64

5.51

2,246.10

0.00

0.00

0.00%

0.00

14.03.00

JUNTA DE DILATACION EN COB. PAST C/MORTERO ASFALTICO e=1

0.00

0.00

0.00%

0.00

15.00.00

CARPINTERIA DE MADERA

15.01.00

307.51

4.25

1,306.92

PUERTA C/TABLERO REBAJADO

M2

18.62

308.51

5,744.46

18.62

5,744.46

100.00%

0.00

15.02.00

PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3"

M2

39.16

228.28

8,939.44

39.16

8,939.44

100.00%

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.01.00

PUERTA METALICA TERMOACUSTICA ANTIPANICO DE EMERGENCIA

UND

3.78

1,729.93

6,539.14

3.78

6,539.14

100.00%

0.00

16.10.00

VENTANA DE ALUMINIO TIPO VITROVEN

M2

25.13

100.74

2,531.60

0.00

0.00

0.00%

25.13

M2

12.96

261.01

3,382.69

0.00

0.00

0.00%

12.96

14.08

3,763.16

100.00%

0.00

16.11.00

PUERTA DE ALUMINIO EN SS.HH.

16.13.00

MAMPARA DE ALUMINO

M2

14.08

267.27

3,763.16

16.14.00

TABIQUERIA DE ALUMINIO CON ACRILICO EN SS.HH. H=1.80m

ML

16.94

247.82

4,198.07

0.00

0.00

0.00%

16.94

16.17.00

BARANDA DE TUBO METALICO DE 2 1/2"

ML

201.75

80.12

16,164.21

0.00

0.00

0.00%

0.00

17.00.00

CERRAJERIA

17.02.00

BISAGRA CAPUCHINA DE ALUMINIO DE 3" X 3"

PZA

87.00

13.46

1,171.02

87.00

1,171.02

100.00%

0.00

17.04.00

CERRADURA DOS GOLPES EN PUERTAS

PZA

9.00

60.70

546.30

9.00

546.30

100.00%

0.00

17.05.00

CERRADURA PARA INTERIOR DOBLE PERILLA

PZA

9.00

47.70

429.30

9.00

429.30

100.00%

0.00

17.06.00

CERRADURA DE POMO PARA MAMPARA DE INGRESO

PZA

2.00

80.70

161.40

0.00

0.00

0.00%

0.00

18.00.00

VIDRIOS, CRISTALES Y SIMILARES

PRESUPUESTO EXPEDIENTE

AVANCE ANTERIOR

AVANCE ACTUAL

ITEM

DESCRIPCION

UND

18.01.00

VIDRIO SISTEMA MODUGLAS CON VIDRIO TEMPLADO COLOR GRISS DE 6mm INC/ACCES

P2

270.65

19.01

5,145.06

0.00

0.00

0.00%

270.65

18.03.00

VIDRIO SEMIDOBLE ARENADO BLANCO

P2

151.64

8.82

1,337.46

0.00

0.00

0.00%

0.00

18.05.00

VIDRIOS BLOK INCOLORO

P2

190.63

30.95

5,900.00

158.84

4,916.10

83.32%

0.00

19.00.00

PINTURA

19.02.00

PINTURA SUPER MATE 2 MANOS EN CIELO RASO Y VIGAS

M2

652.81

8.14

5,313.87

652.81

5,313.87

100.00%

0.00

19.03.00

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

M2

2,819.98

8.14

22,954.64

2,819.98

22,954.64

100.00%

0.00

19.04.00

PINTURA SUPER MATE 2 MANOS EN MUROS EXT. A PARTIR DEL 2DO PISO

M2

1,387.62

13.42

18,621.86

1,387.62

18,621.86

100.00%

0.00

19.07.00

PINTURA BARNIZ 2 MANOS EN CARPINTERIA DE MADERA

M2

18.62

15.30

284.89

18.62

284.89

100.00%

0.00

20.00.00

VARIOS

20.01.00

JUNTA DE DILATACION CON ESPUMA PLASTICA Y SELLADOR

ML

45.07

19.72

888.78

0.00

0.00

0.00%

0.00

20.07.00

LIMPIEZA FINAL DE LA OBRA

M2

18.62

1.28

23.83

18.62

23.83

100.00%

0.00

METRADO

P. UNITARIO

SUB TOTAL
B

EXPEDIENTE ADICIONAL N 07

PARCIAL

CANT.

1,285,191.63

S/.

CANT.

837,517.02

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.03.00

CORTE DE TERRENO A MAQUINARIA

M3

795.00

4.72

3,752.40

795.00

3,752.40

100.00%

0.00

03.07.00

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL

M3

87.68

33.87

2,969.72

87.68

2,969.72

100.00%

0.00

03.08.00

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

M3

66.20

29.03

1,921.79

66.20

1,921.79

100.00%

0.00

03.09.00

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION

M3

0.90

25.40

22.86

0.90

22.86

100.00%

0.00

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

1,043.60

16.94

17,678.58

1,043.60

17,678.58

100.00%

0.00

03.16.00

ACARREO DE MATERIAL DE CORTE CON MAQUINARIA

M3

210.00

6.48

1,360.80

210.00

1,360.80

100.00%

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

1,628.60

15.60

25,406.16

1,628.60

25,406.16

100.00%

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO MATERIAL PROPIO

M3

2,060.44

62.73

129,251.40

823.27

51,643.73

39.96%

0.00

03.25.00

PREPARACION DE MATERIAL DE RELLENO - MATERIAL PROPIO

M3

275.00

17.11

4,705.25

275.00

4,705.25

100.00%

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.01

SOLADOS CONCRETO f'c=100 kg/cm2 E= 10 CM

M2

92.11

26.58

2,448.28

92.11

2,448.28

100.00%

0.00

04.03.00

BASE DE CONCRETO

04.03.02

BASE DE CONCRETO, ENCOFRADO Y DESENCOFRADO

M2

11.98

33.45

400.73

11.98

400.73

100.00%

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

05.01.04

ZAPATAS, ACERO fy= 4200 kg/cm2

KG

78.14

4.33

338.35

0.72

3.12

0.92%

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

05.01.05

ZAPATAS, CONCRETO F'c= 210 KG/CM2 CON ADITIVO

05.02.00

VIGAS DE CIMENTACION

05.02.04

VIGAS DE CIMENTACION, CONCRETO F'c= 210 KG/CM2 CON ADITIVO

05.04.00

MUROS DE CONTENCION

05.04.04

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL
%

CANT.

M3

148.72

293.09

43,588.34

148.72

43,588.34

100.00%

0.00

M3

20.68

306.99

6,348.55

16.53

5,074.54

79.93%

0.00

MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO (DOS CARAS)

M2

388.75

43.52

16,918.40

197.50

8,595.20

50.80%

0.00

05.04.06

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2

KG

457.06

4.33

1,979.07

457.06

1,979.07

100.00%

0.00

05.04.07

MUROS DE CONTENCION, CONCRETO F'c= 210 KG/CM2 CON ADITIVO

M3

59.66

320.48

19,119.84

59.66

19,119.84

100.00%

0.00

05.05.00

PLACAS

05.05.02

PLACAS, ENCOFRADO Y DESENCOFRADO

M2

52.49

46.38

2,434.49

52.49

2,434.49

100.00%

0.00

05.05.03

PLACAS, ACERO fy= 4200kg/cm2

KG

756.83

4.33

3,277.07

756.83

3,277.07

100.00%

0.00

05.05.04

PLACAS, CONCRETO f'c=210 KG/CM2 CON ADITIVO

M3

76.32

407.24

31,080.56

76.32

31,080.56

100.00%

0.00

05.06.00

COLUMNAS

05.06.03

COLUMNAS, ENCOFRADO Y DESENCOFRADO

M2

29.90

50.14

1,499.19

26.35

1,321.19

88.13%

0.00

05.06.06

CONCRETO EN COLUMNETAS DE ARRIOSTRE, F'c= 175 KG/CM2 CON ADITIVO

M3

6.76

378.76

2,560.42

5.44

2,060.45

80.47%

0.00

05.06.07

COLUMNAS, CONCRETO F'c=210 KG/CM2 CON ADITIVO

M3

40.96

416.55

17,061.89

40.96

17,061.89

100.00%

0.00

05.07.00

VIGAS

05.07.03

VIGAS, ENCOFRADO Y DESENCOFRADO

M2

77.78

54.75

4,258.46

77.78

4,258.46

100.00%

0.00

05.07.04

VIGAS, ACERO fy= 4200kg/cm2

KG

1,442.88

4.33

6,247.67

428.87

1,857.01

29.72%

0.00

05.07.05

VIGAS, CONCRETO 210 KG/CM2 (2 PISOS), CON ADITIVO

M3

92.89

332.18

30,856.20

90.15

29,946.03

97.05%

0.00

05.07.06

CONCRETO EN VIGUETAS DE ARRIOSTRE F'c=175 KG/CM2 CON ADITIVO

M3

1.97

312.84

616.29

1.97

616.29

100.00%

0.00

05.08.00

LOSAS

05.08.03

LOSAS MACIZAS ACERO fy= 4200kg/cm2

KG

119.99

4.33

519.56

0.00

0.00

0.00%

0.00

05.08.05

LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO

M2

11.67

38.61

450.58

11.67

450.58

100.00%

0.00

05.08.07

LOSA ALIGERADA, LADRILLO HUECO 15x30x30

UND

104.00

4.09

425.36

100.00

409.00

96.15%

0.00

05.08.08

LOSA ALIGERADA, CONCRETO 210 KG/CM2 (2 PISOS), CON ADITIVO

M3

15.89

330.39

5,249.90

15.89

5,249.90

100.00%

0.00

05.08.09

LOSAS MACIZAS, CONCRETO f'c=210 kg/cm2 CON ADITIVO

M3

37.41

300.43

11,239.09

35.76

10,743.38

95.59%

0.00

07.00.00

MUROS Y TABIQUES DE ALBAILERIA

07.01.00

MURO DE LADRILLO KK CABEZA M1:1:4 E=1.5 cm

M2

108.69

123.91

13,467.78

7.77

962.78

7.15%

0.00

07.02.00

MURO DE LADRILLO KK SOGA M:1:1:4 E=1.5 cm

M2

30.02

78.98

2,370.98

18.43

1,455.60

61.39%

0.00

07.05.00

TABIQUERIA SISTEMA DRIWALL

M2

5.04

221.97

1,118.73

0.00

0.00

0.00%

0.00

08.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

08.01.00

TARRAJEO PRIMARIO, MORTERO C:A 1:5

M2

35.89

19.51

700.21

35.89

700.21

100.00%

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

08.02.00

TARRAJEO EN MURO: INTERIOR Y EXTERIOR

M2

138.47

21.84

3,024.22

08.03.00

TARRAJEO EN MUROS EXTERIORES A PARTIR DEL 2do. PISO

M2

52.49

29.33

1,539.42

08.04.00

TARRAJEO DE COLUMNAS

M2

52.35

30.56

08.05.00

TARRAJEO DE VIGAS

M2

50.19

09.00.00

CIELORRASOS

09.01.00

CIELO RASO CON MEZCLA C:A 1:5

M2

10.00.00

PISOS Y PAVIMENTOS

10.01.00

PISO DE CEMENTO PULIDO E=2" MEZCLA 1:4

10.02.00
10.04.00

S/.

AVANCE ACTUAL
%

CANT.

2,401.09

79.40%

0.00

16.00

469.28

30.48%

0.00

1,599.96

52.35

1,599.96

100.00%

0.00

42.73

2,144.53

50.19

2,144.53

100.00%

0.00

160.59

30.01

4,819.16

12.30

369.12

7.66%

0.00

M2

30.62

26.40

808.37

30.62

808.37

100.00%

0.00

PISO DE CEMENTO ACABADO PULIDO Y BRUADO 2"

M2

13.60

21.44

291.67

0.00

0.00

0.00%

0.00

PISO DE ADOQUINES DE CONCRETO

M2

32.37

56.03

1,813.69

0.00

0.00

0.00%

32.37

10.05.00

CONTRAPISO DE 48 mm.

M2

50.71

27.11

1,374.75

50.71

1,374.75

100.00%

0.00

10.06.00

PISO CERAMICO 30x30cm - ALTO TRANSITO

M2

24.31

49.18

1,195.66

24.31

1,195.66

100.00%

0.00

10.07.00

PISO CERAMICO 40x40cm - ALTO TRANSITO

M2

194.51

50.10

9,745.05

194.51

9,745.05

100.00%

0.00

10.10.00

PISO DE ALFOMBRA TAPIZADO

M2

39.74

24.66

979.99

4.30

106.04

10.82%

0.00

10.13.00

CONTRAPISO f'c = 140 KG/CM2 E=5 cm PARA BASE DE COLOCACION DE ADOQUINES

M2

98.52

396.62

39,076.67

0.00

0.00

0.00%

0.00

11.00.00

CONTRAZOCALOS

11.01.00

CONTRAZOCALO DE CERAMICO H = 0.10 m.

ML

74.85

15.45

1,156.43

0.00

0.00

0.00%

0.00

11.03.00

CONTRAZOCALO DE MADERA CEDRO DE 3/4"x4" + RONDON DE 3/4"

ML

4.31

15.67

67.54

0.00

0.00

0.00%

4.31

12.00.00

ZOCALOS

12.01.00

ZOCALOS DE CERAMICO

M2

20.97

51.17

1,073.03

20.97

1,073.03

100.00%

0.00

15.00.00

CARPINTERIA DE MADERA

15.14.00

PUERTA CON TABLERO REBAJADO, C/ACABADO

M2

20.30

650.38

13,202.71

7.08

4,604.69

34.88%

0.00

15.20.00

PUERTA CONTRAPLACADA 35MM C/TRIPLAY 4MM INC./MARCO CEDRO 2"x3"C/ ACABADO

M2

41.68

355.14

14,802.24

40.04

14,219.81

96.07%

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA


0.00

0.00

0.00%

0.54
1.50

109.94

16.11.00

PUERTA DE ALUMINIO EN SS.HH.

M2

0.54

261.01

140.95

16.14.00

TABIQUERIA DE ALUMINIO CON ACRILICO EN SS.HH. H=1.80m

ML

1.50

247.82

371.73

0.00

0.00

0.00%

18.00.00

VIDRIOS, CRISTALES Y SIMILARES

18.13.00

VIDRIO SISTEMA MODUGLAS TEMPLADO INCOLORO DE 6 MM, INC./ COLOCADO Y ACCES

P2

276.42

33.50

9,260.07

0.00

0.00

0.00%

0.00

19.00.00

PINTURA

19.02.00

PINTURA SUPER MATE 2 MANOS EN CIELO RASO Y VIGAS

M2

210.77

8.14

1,715.69

210.77

1,715.69

100.00%

0.00

19.03.00

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

M2

104.84

8.14

853.41

104.84

853.41

100.00%

0.00

19.16.00

EMPASTADO DE SUPERFICIE

M2

5,176.03

7.58

39,234.27

0.00

0.00

0.00%

59.73

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL
%

CANT.

20.00.00

VARIOS

20.12.00

JUNTA DE DILATACION CON TECKNOPORT Y SELLADOR E= 2"

ML

27.80

18.49

514.02

0.00

0.00

0.00%

0.00

20.13.00

JUNTA DE DILATACION CON TECKNOPORT Y SELLADOR E= 1"

ML

72.80

11.21

816.09

0.00

0.00

0.00%

0.00

M2

307.45

10.79

3,317.43

259.06

2,795.26

84.26%

0.00

M3

67.30

279.27

18,794.87

46.10

12,874.35

68.50%

0.00

M3

100.49

232.44

23,357.90

41.03

9,537.01

40.83%

0.00

M3

16.83

265.99

4,476.61

4.51

1,199.61

26.80%

0.00

100.00%

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.39.00

COMPACTADO Y PERFILADO EN ZONA DE EXCAVACION C/ EQUIPO

04.00.00

OBRAS DE CONCRETO SIMPLE

04.02.00

SUB ZAPATAS

04.02.03

SUB ZAPATA CONCRETO F'C= 140 KG/CM2 + 30% P.G. CON ADITIVO

04.04.00

CIMIENTOS CORRIDOS

04.04.05

CONCRETO 140 KG/CM2 +30% PG. EN CIMIENTO CORRIDO CON ADITIVO

04.05.00

SOBRECIMIENTOS

04.05.03

SOBRECIMIENTO, CONCRETO 140 KG/CM2 CON ADITIVO

06.00.00

ESTRUCTURAS METALICAS Y COBERTURAS

06.36.00

COBERTURA METALICA EN TERRAZA DE AUDITORIO

M2

108.94

127.54

13,893.89

108.94

13,893.89

06.37.00

COBERTURA METALICA SOBRE RAMPA DE AUDITORIO

M2

138.85

155.41

21,578.68

0.00

0.00

0.00%

0.00

06.38.00

COBERTURA TRASLUCIDA DE POLICARBONATO COLOR E=8.00 MM

M2

116.29

86.71

10,083.51

116.29

10,083.51

100.00%

0.00

06.39.00

TECHO DE AUDITORIO CON PLANCHA TERMOACUSTICA CINDULIT 180 INC./SUMINISTRO E

GLB

1.00

60,000.00

60,000.00

1.00

60,000.00

100.00%

0.00

06.40.00

ESTRUCTURA METALICA PARA TECHO DE AUDITORIO INC./ SUMINISTRO E INSTALACION

GLB

1.00

150,000.00

150,000.00

1.00

150,000.00

100.00%

0.00

15.00.00

CARPINTERIA DE MADERA

15.25.00

REVESTIMIENTO CON MADERA ESTRUCUTRAL EN MADERA Y DESCANSO

M2

8.57

122.61

1,050.31

0.00

0.00

0.00%

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.65.00

PASAMANO METALICO INC./ COLOCADO Y PINTADO

ML

19.20

50.78

974.98

0.00

0.00

0.00%

19.20

16.66.00

BARANDA METALICA INC./ COLOCADO Y PINTADO

ML

188.84

89.87

16,971.05

0.00

0.00

0.00%

188.84

16.67.00

CLARABOYA DE TUBO METALICO

M2

7.35

163.70

1,203.20

0.00

0.00

0.00%

0.00

16.68.00

ESTRUCTURA EN ESCALERA Y DESCANSO TERRAZA DE AUDITORIO (SEGN DISEO)

GLB

1.00

7,180.94

7,180.94

0.00

0.00

0.00%

0.00

16.69.00

ESCALERA TIPO GATO CON TAPA METALICA

GLB

1.00

2,595.77

2,595.77

0.00

0.00

0.00%

0.00

16.70.00

REJILLA METALICA PARA EVACIANDION DE AGUAS FLUVIALES

ML

24.28

163.83

3,977.79

0.00

0.00

0.00%

0.00

18.00.00

VIDRIOS, CRISTALES Y SIMILARES

18.20.00

MAMPARA DE ALUMINIO CON VIDRIO TEMPLADO PAVONADO DE 10.00 MM

M2

14.08

440.00

6,195.20

0.00

0.00

0.00%

0.00

22.00.00

INSTALACIONES ELECTRICAS

22.03.00

SALIDAS PARA TOMACORRIENTES

22.03.06

SALIDA PARA TOMACORRIENTE TRIPLE PARA ADOSAR

Pto

13.00

59.69

775.97

13.00

775.97

100.00%

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

22.12.00

ARTEFACTOS DE ALUMBRADO

22.12.26

ARTEFACTO P/ ADOSAR DE 2 LAMPARAS FLUORECENTES DE 2x40w

UND

UND

METRADO

5.00

P. UNITARIO

105.00

SUB TOTAL

COSTO DIRECTO
GASTOS GENERALES 10%

2,197,410.98

AVANCE ANTERIOR

PARCIAL

CANT.

525.00

5.00

S/.

525.00

912,219.35

608,920.38

100.00%

1,446,437.41

219,741.10

144,643.74

GASTOS DE SUPERVISIN 2%

43,948.22

28,928.75

GASTOS DE LIQUIDACIN 0.8%

17,579.29

11,571.50

GASTOS ADMINISTRATIVOS 1.5%

32,961.16

21,696.56

PRESUPUESTO TOTAL (S/.)

2,511,640.75

100.00%

AVANCE ACTUAL

1,653,277.95

100.00%

65.82%

65.82%

CANT.

0.00

ENTE CONSTRUCCION DEL AUDITORIO


EMBRE 2015

URA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES
S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

0.00

0.00%

1283.30

1745.29

100.00%

0.00

0.00

0.00%

0.00

0.00%

1283.30

2399.77

100.00%

0.00

0.00

0.00%

0.00

0.00%

1283.30

1385.96

100.00%

0.00

0.00

0.00%

0.00

0.00%

361.42

12241.30

67.77%

171.89

5821.91

32.23%

0.00

0.00%

59.67

1732.22

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

55.01

1397.25

100.00%

0.00

0.00%

75.52

1521.73

11.65%

572.47

11535.28

88.35%

0.00

0.00%

0.00

0.00

0.00%

81.65

3702.83

100.00%

0.00

0.00%

165.75

4405.64

100.00%

0.00

0.01

0.00%

0.00

0.00%

0.00

0.00

0.00%

50.81

11312.85

100.00%

0.00

0.00%

86.48

2387.71

100.00%

0.00

0.00

0.00%

0.00

0.00%

99.18

3317.57

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

100.49

16809.97

100.00%

0.00

0.00%

0.00

0.00

0.00%

16.83

3959.43

100.00%

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

0.00

0.00%

55.63

1888.64

34.07%

107.66

3655.06

65.93%

0.00

0.00%

1082.36

28823.25

100.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

131.05

39214.09

100.00%

0.00

0.00%

6027.57

26099.38

90.01%

669.00

2896.77

9.99%

0.00

0.00%

2.13

662.92

10.30%

18.55

5773.32

89.70%

0.00

0.00%

156.18

7148.36

94.39%

9.28

424.75

5.61%

0.00

0.00%

1803.96

7811.15

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

141.01

610.57

100.00%

0.00

0.00%

0.00

0.00

0.00%

13.18

3572.97

100.00%

0.00

0.00%

90.95

3958.14

86.27%

14.48

630.17

13.73%

0.00

0.00%

943.04

4083.36

41.99%

1,302.67

5640.56

58.01%

0.00

0.00%

0.00

0.00

0.00%

72.53

30845.56

100.00%

0.00

0.00%

658.79

30554.68

100.00%

0.00

0.00

0.00%

0.00

0.00%

9692.81

41969.87

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.08

1613.40

100.00%

0.00

0.00%

0.00

0.00

0.00%

36.63

15999.62

100.00%

0.00

0.00%

359.11

18005.78

100.00%

0.00

0.00

0.00%

0.00

0.00%

114.72

8070.55

100.00%

0.00

0.00

0.00%

0.00

0.00%

5583.97

24178.59

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

70.04

23707.84

100.00%

0.00

0.00%

543.17

29738.56

100.00%

0.00

0.00

0.00%

0.00

0.00%

11888.68

51477.98

97.25%

335.91

1454.49

2.75%

0.00

0.00%

0.00

0.00

0.00%

37.41

11418.28

100.00%

0.00% saldo 594.28

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

0.00

0.00%

0.00

0.00

0.00%

187.06

8071.64

100.00%

0.00

0.00%

3855.87

16695.92

98.56%

56.44

244.39

1.44%

0.00

0.00%

0.00

0.00

0.00%

14.71

4911.37

100.00%

0.00

0.00%

168.64

6511.19

100.00%

0.00

0.00

0.00%

0.00

0.00%

1656.86

7174.20

69.00%

744.54

3223.86

31.00%

0.00

0.00%

1404.77

5745.51

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.00

81845.44

100.00%

0.00

0.00%

0.00

0.00

0.00%

14.00

19071.08

100.00%

0.00

0.00%

0.00

0.00

0.00%

52.00

19654.44

100.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

3482.84

100.00%

0.00

0.00%

0.00

0.00

0.00%

123.33

4628.57

100.00%

0.00

0.00%

394.10

48832.93

94.72%

21.97

2722.30

5.28%

0.00

0.00%

382.26

30190.89

65.00%

205.87

16259.61

35.00%

0.00

0.00%

208.16

4061.20

100.00%

0.00

0.00

0.00%

0.00

0.00%

2036.62

44479.78

100.00%

0.00

0.00

0.00%

0.00

0.00%

1387.62

40698.89

100.00%

0.00

0.00

0.00%

0.00

0.00%

167.03

5104.44

100.00%

0.00

0.00

0.00%

0.00

0.00%

352.97

15082.41

100.00%

0.00

0.00

0.00%

0.00

0.00%

908.20

9999.28

100.00%

0.00

0.00

0.00%

344.17

0.00

0.00%

398.62

11962.59

75.62%

128.51

3856.59

24.38%

37.44

0.00

0.00%

15.88

491.01

12.64%

109.80

3395.02

87.36%

0.00

0.00%

562.56

79298.46

100.00%

0.00

0.00

0.00%

0.00

0.00%

622.91

16444.90

98.10%

12.06

318.30

1.90%

0.00

0.00%

109.97

2357.76

81.38%

25.16

539.43

18.62%

3706.38

100.00%

66.15

3706.38

100.00%

0.00

0.00

0.00%

0.00

0.00%

1025.59

27803.74

70.00%

439.64

11918.64

0.00

0.00%

61.06

3002.93

100.00%

0.00

0.00

0.00%

0.00

0.00%

368.84

18478.88

100.00%

0.00

0.00

0.00%

55.88
952.81
1387.62

28.42

30.00% MEDIR AUDITORI

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

%
0

0.00

0.00%

106.31

7923.28

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

143.82

8088.44

100.00%

0.00

0.00%

610.69

15059.62

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

183.32

2832.29

100.00%

0.00

0.00%

0.00

0.00

0.00%

61.48

2474.57

100.00%

0.00

0.00%

204.77

3208.75

100.00%

0.00

0.00

0.00% MM

30.67

0.00

0.00%

107.15

5482.87

100.00%

0.00

0.00

0.00% MM

15.78

0.00

0.00%

110.54

6910.96

93.07%

8.23

514.54

0.00

0.00%

16.61

739.64

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.61

418.57

100.00%

0.00

0.00%

258.36

8918.59

63.38%

149.28

5153.15

36.62%

0.00

0.00%

0.00

0.00

0.00%

407.64

2246.10

100.00%

0.00

0.00%

0.00

0.00

0.00%

307.51

1306.92

100.00%

0.00

0.00%

18.62

5744.46

100.00%

0.00

0.00

0.00%

0.00

0.00%

39.16

8939.44

100.00%

0.00

0.00

0.00%

0.00

0.00%

3.78

6539.14

100.00%

0.00

0.00

0.00%

2531.60

100.00%

25.13

2531.60

100.00%

0.00

0.00

0.00%

3382.69

100.00%

12.96

3382.69

100.00%

0.00

0.00

0.00% OBS

0.00

0.00%

14.08

3763.16

100.00%

0.00

0.00

0.00%

4198.07

100.00%

16.94

4198.07

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

201.75

16164.21

100.00%

0.00

0.00%

87.00

1171.02

100.00%

0.00

0.00

0.00%

0.00

0.00%

9.00

546.30

100.00%

0.00

0.00

0.00%

0.00

0.00%

9.00

429.30

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

161.40

100.00%

6.93%

- MELAMIN

-20.00
-1.00

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

5145.06

100.00%

270.65

5145.06

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

151.64

1337.46

100.00%

0.00

0.00%

158.84

4916.10

83.32%

31.79

983.90

16.68%

0.00

0.00%

652.81

5313.87

100.00%

0.00

0.00

0.00%

0.00

0.00%

2819.98

22954.64

100.00%

0.00

0.00

0.00%

0.00

0.00%

1387.62

18621.86

100.00%

0.00

0.00

0.00%

0.00

0.00%

18.62

284.89

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

45.07

888.78

100.00%

0.00

0.00%

18.62

23.83

100.00%

0.00

0.00

0.00%

18,963.80

856,480.82

-139.78
-1000.00
-1200.00

428,710.82

0.00

0.00%

795.00

3752.40

100.00%

0.00

0.00

0.00%

0.00

0.00%

87.68

2969.72

100.00%

0.00

0.00

0.00%

0.00

0.00%

66.20

1921.79

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.90

22.86

100.00%

0.00

0.00

0.00%

0.00

0.00%

1043.60

17678.58

100.00%

0.00

0.00

0.00%

0.00

0.00%

210.00

1360.80

100.00%

0.00

0.00

0.00%

0.00

0.00%

1628.60

25406.16

100.00%

0.00

0.00

0.00%

0.00

0.00%

823.27

51643.73

39.96%

1,237.17

77607.67

60.04%

0.00

0.00%

275.00

4705.25

100.00%

0.00

0.00

0.00%

0.00

0.00%

92.11

2448.28

100.00%

0.00

0.00

0.00%

0.00

0.00%

11.98

400.73

100.00%

0.00

0.00

0.00% OK

0.00

0.00%

0.72

3.12

0.92%

77.42

335.23

99.08%

413.90

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

0.00

0.00%

148.72

43588.34

100.00%

0.00

0.00

0.00%

0.00

0.00%

16.53

5074.54

79.93%

4.15

1274.01

20.07%

0.00

0.00%

197.50

8595.20

50.80%

191.25

8323.20

49.20%

0.00

0.00%

457.06

1979.07

100.00%

0.00

0.00

0.00%

0.00

0.00%

59.66

19119.84

100.00%

0.00

0.00

0.00%

0.00

0.00%

52.49

2434.49

100.00%

0.00

0.00

0.00% OK

0.00

0.00%

756.83

3277.07

100.00%

0.00

0.00

0.00%

0.00

0.00%

76.32

31080.56

100.00%

0.00

0.00

0.00%

0.00

0.00%

26.35

1321.19

88.13%

3.55

178.00

11.87%

0.00

0.00%

5.44

2060.45

80.47%

1.32

499.96

19.53%

0.00

0.00%

40.96

17061.89

100.00%

0.00

0.00

0.00%

0.00

0.00%

77.78

4258.46

100.00%

0.00

0.00

0.00%

0.00

0.00%

428.87

1857.01

29.72%

1,014.01

4390.66

70.28%

0.00

0.00%

90.15

29946.03

97.05%

2.74

910.17

2.95%

0.00

0.00%

1.97

616.29

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

119.99

519.56

100.00%

0.00

0.00%

11.67

450.58

100.00%

0.00

0.00

0.00%

0.00

0.00%

100.00

409.00

96.15%

4.00

16.36

3.85%

0.00

0.00%

15.89

5249.90

100.00%

0.00

0.00

0.00%

0.00

0.00%

35.76

10743.38

95.59%

1.65

495.71

4.41%

0.00

0.00%

7.77

962.78

7.15%

100.92

12505.00

92.85%

0.00

0.00%

18.43

1455.60

61.39%

11.59

915.38

38.61%

0.00

0.00%

0.00

0.00

0.00%

5.04

1118.73

100.00%

0.00

0.00%

35.89

700.21

100.00%

0.00

0.00

0.00% OK

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

0.00

0.00%

109.94

2401.09

79.40%

28.53

623.13

20.60%

0.00

0.00%

16.00

469.28

30.48%

36.49

1070.14

69.52%

0.00

0.00%

52.35

1599.96

100.00%

0.00

0.00

0.00%

0.00

0.00%

50.19

2144.53

100.00%

0.00

0.00

0.00%

0.00

0.00%

12.30

369.12

7.66%

148.29

4450.03

92.34%

0.00

0.00%

30.62

808.37

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

13.60

291.67

100.00%

1813.69

100.00%

32.37

1813.69

100.00%

0.00

0.00

0.00%

0.00

0.00%

50.71

1374.75

100.00%

0.00

0.00

0.00%

0.00

0.00%

24.31

1195.66

100.00%

0.00

0.00

0.00% OK

0.00

0.00%

194.51

9745.05

100.00%

0.00

0.00

0.00

0.00%

4.30

106.04

10.82%

35.44

873.95

89.18%

0.00

0.00%

0.00

0.00

0.00%

98.52

39076.67

100.00%

0.00% OK

0.00

0.00%

0.00

0.00

0.00%

74.85

1156.43

100.00%

67.54

100.00%

4.31

67.54

100.00%

0.00

0.00

0.00%

0.00

0.00%

20.97

1073.03

100.00%

0.00

0.00

0.00% OK

0.00

0.00%

7.08

4604.69

34.88%

13.22

8598.02

65.12%

0.00

0.00%

40.04

14219.81

96.07%

1.64

582.43

3.93%

140.95

100.00%

0.54

140.95

100.00%

0.00

0.00

0.00%

371.73

100.00%

1.50

371.73

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

276.42

9260.07

100.00%

0.00

0.00%

210.77

1715.69

100.00%

0.00

0.00

0.00% OK

0.00

0.00%

104.84

853.41

100.00%

0.00

0.00

0.00% OK

452.75

1.15%

59.73

452.75

1.15%

5,116.30

38781.52

98.85%

-16.00
-52.00

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

OBS

S/.

0.00

0.00%

0.00

0.00

0.00%

27.80

514.02

100.00% OK

0.00

0.00%

0.00

0.00

0.00%

72.80

816.09

100.00% OK

0.00

0.00%

259.06

2795.26

84.26%

48.39

522.17

15.74%

0.00

0.00%

46.10

12874.35

68.50%

21.20

5920.52

31.50%

0.00

0.00%

41.03

9537.01

40.83%

59.46

13820.88

59.17%

0.00

0.00%

4.51

1199.61

26.80%

12.32

3277.00

73.20%

0.00

0.00%

108.94

13893.89

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

138.85

21578.68

100.00%

0.00

0.00%

116.29

10083.51

100.00%

0.00

0.00

0.00%

0.00

0.00%

1.00

60000.00

100.00%

0.00

0.00

0.00%

0.00

0.00%

1.00

150000.00

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.57

1050.31

100.00%

974.98

100.00%

19.20

974.98

100.00%

0.00

0.00

16971.05

100.00%

188.84

16971.05

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

7.35

1203.20

100.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

7180.94

100.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

2595.77

100.00%

0.00

0.00%

0.00

0.00

0.00%

24.28

3977.79

100.00%

0.00

0.00%

0.00

0.00

0.00%

14.08

6195.20

100.00%

0.00

0.00%

13.00

775.97

100.00%

0.00

0.00

0.00%

-50.00

0.00% 170.80 MAORES MET

AVANCE ACTUAL DEL MES


S/.

TOTAL ACUMULADO
%

0.00

CANT.

0.00%

20,792.68

39,756.48

S/.

5.00

SALDO
%

525.00

100.00%

629,713.07

1.81%

1,486,193.89

CANT.

OBS

S/.

0.00

0.00
282,506.28

67.63%

711,217.10

3,975.65

148,619.39

71,121.71

795.13

29,723.88

14,224.34

318.05

11,889.55

5,689.74

596.35

22,292.91

10,668.26

45,441.66

1.81%

1,698,719.61

0.00%

67.634%

812,921.14

32.37%

32.37%

CUADRO VALORIZACION DEL COMPONENTE DE PLAZOLETA Y AREAS VERDES


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JO


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

EXPEDIENTE TCNICO

02.00.00

OBRAS PRELIMINARES

02.04.00

LIMPIEZA DE TERRENO

02.04.04

ELIMINACION DE BASURA Y ELEMENTOS SUELTOS LIVIANOS

02.05.00

TRAZOS, NIVELES Y REPLANTEO

02.05.01

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M2

11,380.75

1.36

15,477.82

6,958.72

9463.86

61.14%

0.00

0.00

TRAZO Y REPLANTEO PRELIMINAR.

M2

11,380.75

1.87

21282.00

8,855.28

16559.37

77.81%

0.00

0.00

02.05.02

TRAZO DURANTE LA EJECUCION DE LA OBRA

M2

11,380.75

1.08

12291.21

6,548.66

7072.55

57.54%

0.00

0.00

03.00.00

MOVIMIENTO DE TIERRAS

03.01.00

NIVELACION DE TERRENO Y APISONADO

M2

11,356.75

2.71

30776.79

6,387.21

17309.34

56.24%

192.10

520.59

03.04.00

CORTE DE MATERIAL SUELTO PARA PLATAFORMAS

M3

5,846.10

4.36

25489.00

4,182.01

18233.56

71.54%

425.21

1853.90

03.05.00

CONFORMACION DE TERRAPLENES PARA PLATAFORMAS

M3

16,764.15

37.00

620273.55

0.00

0.00

0.00%

226.23

8370.62

03.07.00

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL

M3

683.05

33.87

23134.90

195.67

6627.34

28.65%

72.66

2460.85

03.08.00

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

M3

379.92

29.03

11029.08

176.73

5130.47

46.52%

0.00

0.00

03.09.00

EXCAVACION DE ZANJAS PARA VIGAS DE CIMENTACION

M3

4.70

25.40

119.38

0.00

0.00

0.00%

0.00

0.00

03.10.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL PROPIO

M3

4,407.21

20.15

88805.28

2,079.61

41904.14

47.19%

100.00

2015.00

03.11.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL DE PRESTAMO

M3

17,891.01

45.35

811357.30

0.00

0.00

0.00%

0.00

0.00

03.12.00

RELLENO MASIVO MATERIAL PRESTAMO

M3

2,205.00

34.53

76138.65

0.00

0.00

0.00%

0.00

0.00

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

33.76

16.94

571.89

33.76

571.89

100.00%

0.00

0.00

03.14.00

ELIMINACION MATERIAL EXCEDENTE ACARREADO

M3

33.76

37.88

1278.83

33.76

1278.83

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.01

SOLADOS CONCRETO f'c=100 kg/cm2 E= 10 CM

M2

888.69

26.58

23621.38

1.22

32.43

0.14%

45.21

1201.68

04.02.00

SUBZAPATAS

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

04.02.01

CONCRETO F'C=100 KG/CM2 + 50% P.G. SUB ZAPATAS

04.04.00

CIMIENTOS CORRIDOS

04.04.01

CONCRETO F'C=140 KG/CM2 +30% PG EN CIMIENTOS CORRIDOS

04.05.00

SOBRECIMIENTOS

04.05.01

CONCRETO f'c=140 kg/cm2 + 30% PM 4" EN SOBRECIMIENTOS

04.05.02

SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO

04.06.00

GRADAS Y RAMPAS

04.06.01

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M3

2.96

222.65

659.04

0.00

0.00

0.00%

0.00

0.00

M3

264.30

167.28

44212.10

69.06

11552.36

26.13%

0.60

100.37

M3

1.59

235.26

374.06

0.00

0.00

0.00%

0.32

75.28

M2

22.30

33.95

757.09

0.00

0.00

0.00%

2.70

91.67

CONCRETO f'c=140 kg/cm2 + 30% PM 4" EN GRADAS

M3

90.26

235.26

21234.57

74.71

17576.27

82.77%

0.00

0.00

04.06.02

CONCRETO EN RAMPAS f'c=140 kg/cm2

M3

777.21

249.12

193618.56

76.79

19129.92

9.88%

0.00

0.00

04.06.03

GRADAS Y RAMPAS, ENCOFRADO Y DESENCOFRADO

M2

238.86

33.95

8109.30

139.45

4734.33

58.38%

0.00

0.00

04.07.00

PAVIMENTOS

04.07.01

CONFORMACION DE BASE E=0.20 M

M2

10,343.66

15.81

163533.26

2,889.91

45689.48

27.94%

0.00

0.00

04.07.02

CONFORMACION DE SUB BASE E=0.20 M

M2

2,779.30

15.81

43940.73

2,779.30

43940.73

100.00%

0.00

0.00

04.07.03

IMPRIMACION ASFALTICA

M2

2,779.30

6.00

16675.80

2,779.30

16675.80

100.00%

0.00

0.00

04.07.04

CARPETA ASFALTICA DE 2"

M2

2,779.30

60.08

166980.34

0.00

0.00

0.00%

0.00

0.00

04.07.05

CONCRETO FC= 140 KG/CM2 EN LOSAS (caminerias y/o patios)

M2

7,564.36

32.64

246900.71

1,987.73

64879.51

26.28%

0.00

0.00

04.07.06

JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"

ML

4,143.75

5.44

22542.00

707.86

3850.76

17.08%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

05.01.01

ZAPATAS, CONCRETO 140 kg/cm2

M3

232.46

258.58

60109.51

0.00

0.00

0.00%

0.00

0.00

05.01.03

ZAPATAS, CONCRETO 210 kg/cm2

M3

8.10

299.23

2423.76

1.70

508.69

20.99%

0.52

155.60

05.01.04

ZAPATAS, ACERO fy= 4200 kg/cm2

KG

7,051.81

4.33

30534.34

6,025.70

26091.28

85.45%

0.00

0.00

05.02.00

VIGAS DE CIMENTACION

05.02.01

VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2

M3

11.09

311.23

3451.54

0.00

0.00

0.00%

0.00

0.00

05.02.02

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

M2

43.91

45.77

2009.76

10.00

457.70

22.77%

0.00

0.00

05.02.03

VIGAS DE CIMENTACION ACERO fy= 4200kg/cm2

KG

666.24

4.33

2884.82

0.00

0.00

0.00%

0.00

0.00

05.03.00

SOBRECIMIENTO ARMADO

05.03.01

SOBRECIMIENTO REFORZADO, CONCRETO f'c= 140 kg/cm2

M3

135.41

270.98

36693.40

7.29

1974.39

5.38%

0.00

0.00

05.03.03

SOBRECIMIENTO REFORZADO, ENCOFRADO Y DESENCOFRADO

M2

1,683.56

30.38

51146.55

145.44

4418.47

8.64%

0.00

0.00

05.03.04

SOBRECIMIENTO REFORZADO, ACERO fy= 4200kg/cm2

KG

7,191.36

4.33

31138.59

489.60

2119.97

6.81%

0.00

0.00

05.04.00

MUROS DE CONTENCION

05.04.01

MUROS DE CONTENCION, CONCRETO f'c= 140 kg/cm2

M3

341.30

271.09

92523.02

3.47

940.68

1.02%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

05.04.05

MUROS DE CONTENCION, ENCOFRADO Y DESENCOFRADO CARAVISTA

05.04.06

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2

05.05.00

PLACAS

05.05.01

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M2

1,889.58

64.72

122293.62

1,400.64

90649.42

74.12%

367.67

23795.34

KG

11,927.25

4.33

51644.99

8,626.62

37353.26

72.33%

2,757.60

11940.41

PLACAS, CONCRETO f'c=210 kg/cm2

M3

0.84

425.28

357.24

0.00

0.00

0.00%

0.00

0.00

05.05.02

PLACAS, ENCOFRADO Y DESENCOFRADO

M2

13.02

46.38

603.87

0.00

0.00

0.00%

0.00

0.00

05.05.03

PLACAS, ACERO fy= 4200kg/cm2

KG

149.79

4.33

648.59

0.00

0.00

0.00%

0.00

0.00

05.06.00

COLUMNAS

05.06.02

COLUMNAS, CONCRETO f'c= 210kg/cm2

M3

24.07

436.79

10513.54

6.64

2899.41

27.58%

0.60

262.07

05.06.03

COLUMNAS, ENCOFRADO Y DESENCOFRADO

M2

239.41

50.14

12004.02

101.25

5076.49

42.29%

2.80

140.39

05.06.04

COLUMNAS, ENCOFRADO Y DESENCOFRADO CARAVISTA

M2

22.56

70.35

1587.10

0.00

0.00

0.00%

0.00

0.00

05.06.05

COLUMNAS, ACERO fy=4200 kg/cm2

KG

3,006.28

4.33

13017.19

1,778.40

7700.47

59.16%

286.92

1242.36

05.07.00

VIGAS

05.07.02

VIGAS, CONCRETO f'c=210 kg/cm2 (2 PISOS)

M3

10.18

338.49

3445.83

4.06

1374.27

39.88%

0.17

57.54

05.07.03

VIGAS, ENCOFRADO Y DESENCOFRADO

M2

100.53

54.75

5504.02

77.08

4220.13

76.67%

3.00

164.25

05.07.04

VIGAS, ACERO fy= 4200kg/cm2

KG

1,042.44

4.33

4513.77

0.00

0.00

0.00%

0.00

0.00

05.08.00

LOSAS

05.08.01

LOSAS MACIZAS, CONCRETO f'c=210 kg/cm2

M3

0.20

305.22

61.04

0.00

0.00

0.00%

0.00

0.00

05.08.02

LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO

M2

0.90

43.15

38.84

0.00

0.00

0.00%

0.00

0.00

05.08.04

LOSA ALIGERADA, CONCRETO f'c=210 kg/cm2 (2 PISOS)

M3

0.28

333.88

93.49

0.28

93.49

100.00%

0.00

0.00

05.08.05

LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO

M2

3.19

38.61

123.17

3.19

123.17

100.00%

0.00

0.00

05.08.06

LOSA ALIGERADA, ACERO fy= 4200kg/cm2

KG

21.77

4.33

94.26

0.00

0.00

0.00%

0.00

0.00

05.08.07

LOSA ALIGERADA, LADRILLO HUECO 15x30x30

UND

27.00

4.09

110.43

27.00

110.43

100.00%

0.00

0.00

05.09.00

ESCALERAS

05.09.01

ESCALERAS, CONCRETO f'c=210 kg/cm2

M3

2.45

412.33

1010.21

0.00

0.00

0.00%

0.00

0.00

05.09.02

ESCALERAS, ENCOFRADO Y DESENCOFRADO

M2

17.12

74.24

1270.99

0.00

0.00

0.00%

0.00

0.00

05.09.03

ESCALERAS, ACERO fy= 4200kg/cm2

KG

198.78

4.33

860.72

0.00

0.00

0.00%

0.00

0.00

05.10.00

PARASOL DE CONCRETO

05.10.01

PARASOL DE CONCRETO, CONCRETO f'c=175 kg/cm2

M3

2.74

305.58

837.29

0.00

0.00

0.00%

0.00

0.00

05.10.02

PARASOL DE CONCRETO, ENCOFRADO Y DESENCOFRADO

M2

36.52

54.75

1999.47

0.00

0.00

0.00%

0.00

0.00

05.10.03

PARASOL DE CONCRETO, ACERO fy= 4200kg/cm2

KG

124.44

4.33

538.83

0.00

0.00

0.00%

0.00

0.00

06.00.00

ESTRUCTURAS METALICAS Y COBERTURAS

06.24.00

COBERTURA DE POLICARBONATO INCOLORO 3 mm

M2

337.33

31.81

10730.47

0.00

0.00

0.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

06.26.00

ESCALERA METALICA EN ESTACIONAMIENTO

UND

1.00

7869.78

7869.78

0.00

0.00

0.00%

0.00

0.00

06.28.00

PUENTE METALICO PU-1 (MECANICA AUTOMOTRIZ)

UND

1.00

12059.24

12059.24

0.00

0.00

0.00%

0.00

0.00

06.29.00

PUENTE METALICO E-3 (BIBLIOTECA)

UND

1.00

15441.34

15441.34

0.00

0.00

0.00%

0.00

0.00

06.30.00

SOPORTE DE COBERTURA EN PUENTE DE CONCRETO

UND

1.00

5769.66

5769.66

0.00

0.00

0.00%

0.00

0.00

08.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

08.02.00

TARRAJEO EN MURO: INTERIOR Y EXTERIOR

M2

145.70

21.84

3182.09

21.66

473.05

14.87%

10.31

225.17

08.03.00

TARRAJEO EN MUROS EXTERIORES A PARTIR DEL 2do. PISO

M2

40.99

29.33

1202.24

0.00

0.00

0.00%

0.00

0.00

08.04.00

TARRAJEO DE COLUMNAS

M2

76.24

30.56

2329.89

76.24

2329.89

100.00%

0.00

0.00

08.05.00

TARRAJEO DE VIGAS

M2

8.28

42.73

353.80

0.00

0.00

0.00%

8.28

353.80

08.08.00

VESTIDURA DE DERRAMES (1:5)

ML

49.60

11.01

546.10

0.00

0.00

0.00%

0.00

0.00

09.00.00

CIELORRASOS

09.01.00

CIELO RASO CON MEZCLA C:A 1:5

M2

56.10

30.01

1683.56

0.00

0.00

0.00%

5.94

178.26

09.02.00

VESTIDURA EN FONDO DE ESCALERAS

M2

10.95

30.92

338.57

0.00

0.00

0.00%

0.00

0.00

10.00.00

PISOS Y PAVIMENTOS

10.02.00

PISO DE CEMENTO ACABADO PULIDO Y BRUADO 2"

M2

7,200.97

21.44

154388.80

1,897.79

40688.62

26.35%

221.86

4756.68

10.03.00

PISO DE CEMENTO PULIDO COLOREADO

M2

111.22

31.68

3523.45

111.22

3523.45

100.00%

0.00

0.00

10.04.00

PISO DE ADOQUINES DE CONCRETO

M2

973.25

56.03

54531.20

110.50

6191.32

11.35%

506.14

28359.02

10.05.00

CONTRAPISO DE 48 mm.

M2

54.40

27.11

1474.78

0.00

0.00

0.00%

0.00

0.00

10.06.00

PISO CERAMICO 30x30cm - ALTO TRANSITO

M2

54.40

49.18

2675.39

0.00

0.00

0.00%

0.00

0.00

10.11.00

PISO CON PIEDRA LAJA MOQUEGUANA

M2

71.69

56.13

4023.96

40.45

2270.46

56.42%

0.00

0.00

10.13.00

CONTRAPISO f'c=140 kg/cm2 E=5 CM PARA BASE EN COLOCACION DE ADOQUIN

M2

973.25

17.32

16856.69

17.64

305.52

1.81%

0.00

0.00

10.16.00

ACABADO CON CONFICTILLO Y BRUADO DE E=1 CM.

M2

180.47

34.67

6256.89

61.02

2115.56

33.81%

0.00

0.00

13.00.00

REVESTIMIENTO DE GRADAS Y ESCALERAS

13.02.00

REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASO

9.80

25.20

246.96

9.80

246.96

100.00%

0.00

0.00

13.04.00

ACABADO DE DESCANSO CEMENTO PULIDO Y BRUADO

M2

5.97

25.45

151.94

0.00

0.00

0.00%

0.00

0.00

14.00.00

CUBIERTAS

14.01.00

CUBIERTA LADRILLO PASTELERO + FRAGUA CON MORTERO 1:1/2:5

M2

57.04

34.52

1969.02

0.00

0.00

0.00%

0.00

0.00

14.02.00

IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA

M2

57.04

5.51

314.29

0.00

0.00

0.00%

0.00

0.00

15.00.00

CARPINTERIA DE MADERA

15.02.00

PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"

M2

21.76

228.28

4967.37

0.00

0.00

0.00%

0.00

0.00

15.12.00

BANCAS DE MADERA EN EXTERIORES

UND

12.00

146.63

1759.56

0.00

0.00

0.00%

0.00

0.00

15.13.00

GLORIETAS DE MADERA

UND

3.00

2560.73

7682.19

0.00

0.00

0.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.02.00

PUERTA DE PLANCHA METALICA

M2

21.76

234.41

5100.76

0.00

0.00

0.00%

0.00

0.00

16.10.00

VENTANA DE ALUMINIO TIPO VITROVEN

M2

13.88

100.74

1398.27

0.00

0.00

0.00%

0.00

0.00

16.19.00

PASAMANOS DE TUBO METALICO DE 2 1/2" PARA RAMPAS

ML

789.16

81.40

64237.62

0.00

0.00

0.00%

0.00

0.00

17.00.00

CERRAJERIA

17.02.00

BISAGRA CAPUCHINA DE ALUMINIO DE 3" X 3"

PZA

12.00

13.46

161.52

0.00

0.00

0.00%

0.00

0.00

17.04.00

CERRADURA DOS GOLPES EN PUERTAS

PZA

2.00

60.70

121.40

0.00

0.00

0.00%

0.00

0.00

17.08.00

PICAPORTE CROMADO DE 4"

PZA

2.00

9.52

19.04

0.00

0.00

0.00%

0.00

0.00

19.00.00

PINTURA

19.02.00

PINTURA SUPER MATE 2 MANOS EN CIELO RASO Y VIGAS

M2

50.57

8.14

411.64

0.00

0.00

0.00%

0.00

0.00

19.03.00

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

M2

115.68

8.14

941.64

50.00

407.00

43.22%

65.68

534.64

19.04.00

PINTURA SUPER MATE 2 MANOS EN MUROS EXT. A PARTIR DEL 2DO PISO

M2

74.75

13.42

1003.15

0.00

0.00

0.00%

0.00

0.00

19.07.00

PINTURA BARNIZ 2 MANOS EN CARPINTERIA DE MADERA

M2

21.76

15.30

332.93

0.00

0.00

0.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

20.00.00

VARIOS

20.08.00

SEMBRADO DE CESPED

20.09.00

PLANTADO DE ARBUSTOS

20.10.00
20.11.00

UND

METRADO

P. UNITARIO

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

4,977.71

38.15

189899.64

586.25

22365.44

11.78%

0.00

0.00

UND

215.00

53.65

11534.75

15.00

804.75

6.98%

0.00

0.00

RELLENO CON MATERIAL DE CHACRA

M3

185.92

47.81

8888.84

106.78

5105.15

57.43%

0.00

0.00

PLACA RECORDATORIA DE BRONCE

GLB

1.00

411.30

411.30

0.00

0.00

0.00%

0.00

0.00

M2

SUB TOTAL
B

AVANCE ANTERIOR

EXPEDIENTE ADICIONAL N 01

3,844,064.13

625,151.85

88,855.50

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
02.00.00

OBRAS PRELIMINARES

02.04.00

LIMPIEZA DE TERRENO

02.04.04

ELIMINACION DE BASURA Y ELEMENTOS SUELTOS LIVIANOS

02.05.00

TRAZOS, NIVELES Y REPLANTEO

02.05.01

M2

469.74

1.36

638.85

469.74

638.85

100.00%

0.00

0.00

TRAZO Y REPLANTEO PRELIMINAR.

M2

469.74

1.87

878.41

469.74

878.41

100.00%

0.00

0.00

02.05.02

TRAZO DURANTE LA EJECUCION DE LA OBRA

M2

1,230.00

1.08

1328.40

1,230.00

1328.40

100.00%

0.00

0.00

03.00.00

MOVIMIENTO DE TIERRAS

03.01.00

NIVELACION DE TERRENO Y APISONADO

M2

231.38

2.71

627.04

0.00

0.00

0.00%

0.00

0.00

03.04.00

CORTE DE MATERIAL SUELTO PARA PLATAFORMAS

M3

126.38

4.36

551.02

2.11

9.20

1.67%

0.00

0.00

03.05.00

CONFORMACION DE TERRAPLENES PARA PLATAFORMAS

M3

66.36

37.00

2455.32

0.00

0.00

0.00%

0.00

0.00

03.07.00

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL

M3

265.43

33.87

8990.11

0.00

0.00

0.00%

0.00

0.00

03.08.00

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

M3

43.32

29.03

1257.58

43.32

1257.58

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.04.00

CIMIENTOS CORRIDOS

04.04.01

CONCRETO F'C=140 KG/CM2 +30% PG EN CIMIENTOS CORRIDOS

M3

35.44

167.28

5928.40

0.00

0.00

0.00%

0.00

0.00

04.07.00

PAVIMENTOS

04.07.01

CONFORMACION DE BASE E=0.20 M

M2

231.38

15.81

3658.12

0.00

0.00

0.00%

0.00

0.00

04.07.02

CONFORMACION DE SUB BASE E=0.20 M

M2

231.38

15.81

3658.12

231.38

3658.12

100.00%

0.00

0.00

04.07.03

IMPRIMACION ASFALTICA

M2

231.38

6.00

1388.28

231.38

1388.28

100.00%

0.00

0.00

04.07.04

CARPETA ASFALTICA DE 2"

M2

231.38

60.08

13901.31

0.00

0.00

0.00%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

05.01.04

ZAPATAS, ACERO fy= 4200 kg/cm2

KG

2,755.16

4.33

11929.84

0.00

0.00

0.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

05.03.00

SOBRECIMIENTO ARMADO

05.03.01

SOBRECIMIENTO REFORZADO, CONCRETO f'c= 140 kg/cm2

M3

2.05

270.98

555.51

0.00

0.00

0.00%

0.00

0.00

05.03.03

SOBRECIMIENTO REFORZADO, ENCOFRADO Y DESENCOFRADO

M2

27.39

30.38

832.11

0.00

0.00

0.00%

0.00

0.00

05.03.04

SOBRECIMIENTO REFORZADO, ACERO fy= 4200kg/cm2

KG

110.50

4.33

478.47

0.00

0.00

0.00%

0.00

0.00

05.04.00

MUROS DE CONTENCION

05.04.05

MUROS DE CONTENCION, ENCOFRADO Y DESENCOFRADO CARAVISTA

M2

1,149.76

64.72

74412.47

0.00

0.00

0.00%

0.00

0.00

05.04.06

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2

KG

3,878.05

4.33

16791.96

0.00

0.00

0.00%

0.00

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.19.00

PASAMANOS DE TUBO METALICO DE 2 1/2" PARA RAMPAS

ML

35.00

81.40

2849.00

0.00

0.00

0.00%

0.00

0.00

M3

39.90

150.33

5998.17

39.90

5998.17

100.00%

0.00

0.00

PARTIDAS NUEVAS
04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.03

SOLADOS CONCRETO f'c=100 kg/cm2

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

05.01.05

ZAPATAS, CONCRETO 210 kg/cm2 CON ADITIVO

05.03.00

SOBRECIMIENTO ARMADO

05.03.05

SOBRECIMIENTO REFORZADO, CONCRETO f'c=210 kg/cm2 CON ADITIVO

05.04.00

MUROS DE CONTENCION

05.04.07

MUROS DE CONTENCION, CONCRETO f'c= 210 kg/cm2 CON ADITIVO

10.00.00

PISOS Y PAVIMENTOS

10.18.00
10.19.00

UND

METRADO

P. UNITARIO

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M3

127.81

293.09

37459.83

95.50

27990.10

74.72%

0.00

0.00

M3

2.05

318.96

653.87

0.00

0.00

0.00%

0.00

0.00

M3

138.82

320.48

44489.03

138.82

44489.03

100.00%

0.00

0.00

EMPEDRADO DE PISOS PG=4"

M2

1,641.18

14.16

23239.11

1,564.83

22157.99

95.35%

0.00

0.00

ENCOFRADO Y DESENCOFRADO DE PISOS

M2

208.58

33.19

6922.77

208.58

6922.77

100.00%

0.00

0.00

SUB TOTAL
C

AVANCE ANTERIOR

EXPEDIENTE ADICIONAL N 02

271,873.09

116,716.90

0.00

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.03.00

CORTE DE TERRENO A MAQUINARIA

M3

317.40

4.72

1498.13

317.40

1498.13

100.00%

0.00

0.00

03.10.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL PROPIO

M3

248.64

20.15

5010.10

248.64

5010.10

100.00%

0.00

0.00

03.15.00

CORTE DE TERRENO MANUAL

M3

36.36

25.40

923.54

36.36

923.54

100.00%

0.00

0.00

03.16.00

ACARREO DE MATERIAL CON MAQUINARIA

M3

564.50

6.48

3657.96

564.50

3657.96

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

564.50

15.60

8806.20

564.50

8806.20

100.00%

0.00

0.00

03.25.00

PREPARACION DE MATERIAL DE RELLENO - MATERIA PROPIO MC

M3

268.55

17.11

4594.89

268.55

4594.89

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.03

SOLADOS CONCRETO f'c=100 kg/cm2

M3

9.23

150.33

1387.55

0.50

75.17

5.42%

0.00

0.00

04.07.00

PAVIMENTOS

04.07.03

IMPRIMACION ASFALTICA

M2

389.32

6.00

2335.92

323.54

1941.24

83.10%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.04.00

MUROS DE CONTENCION

05.04.05

MUROS DE CONTENCION, ENCOFRADO Y DESENCOFRADO CARAVISTA

M2

188.60

64.72

12206.19

0.00

0.00

0.00%

0.00

0.00

05.04.06

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2

KG

3,498.24

4.33

15147.38

0.00

0.00

0.00%

0.00

0.00

05.04.07

MUROS DE CONTENCION, CONCRETO f'c= 210 kg/cm2 CON ADITIVO

M3

77.90

320.48

24965.39

20.51

6573.04

26.33%

47.72

15293.31

M3

98.40

4.72

464.45

98.40

464.45

100.00%

0.00

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.28.00

EXCAVACION DE ZANJAS P /ZAPATA CON MAQUINARIA

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

04.00.00

OBRAS DE CONCRETO SIMPLE

04.07.00

PAVIMENTOS

04.07.07

CARPETA ASFALTICA DE 2" CON EMULSION DE ROTURA LENTA

UND

M2

METRADO

3,183.00

P. UNITARIO

51.74

SUB TOTAL
D

EXPEDIENTE ADICIONAL N 03

AVANCE ANTERIOR

PARCIAL

164688.42

CANT.

2,902.06

245,686.12

S/.

AVANCE ACTUAL DEL MES


%

150152.58

91.17%

CANT.

S/.

0.00

183,697.30

0.00
15,293.31

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.03.00

CORTE DE TERRENO A MAQUINARIA

M3

2,224.94

4.72

10501.72

2,224.94

10501.72

100.00%

0.00

0.00

03.08.00

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

M3

28.71

29.03

833.45

28.71

833.45

100.00%

0.00

0.00

03.15.00

CORTE DE TERRENO MANUAL

M3

141.24

25.40

3587.50

141.24

3587.50

100.00%

0.00

0.00

03.16.00

ACARREO DE MATERIAL CON MAQUINARIA

M3

2,209.23

6.48

14315.81

2,209.23

14315.81

100.00%

0.00

0.00

03.19.00

ACARREO DE MATERIAL DE DEMOLICION CON MAQUINARIA

M3

295.82

11.04

3265.85

295.82

3265.85

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

2,744.35

15.60

42811.86

2,744.35

42811.86

100.00%

0.00

0.00

03.23.00

RELLENO Y COMPACTADO CON MAQUINARIA, MATERIAL PROPIO

M3

736.33

51.24

37729.55

736.33

37729.55

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

03.25.00

PREPARACION DE MATERIAL DE RELLENO - MATERIA PROPIO MC

M3

701.45

17.11

12001.81

701.45

12001.81

100.00%

0.00

0.00

03.28.00

EXCAVACION DE ZANJAS P /ZAPATA CON MAQUINARIA

M3

184.62

4.72

871.41

184.62

871.41

100.00%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.04.00

MUROS DE CONTENCION

05.04.04

MUROS DE CONTENCION ENCOFRADO Y DESENCOFRADO (DOS CARAS)

M2

67.12

43.52

2921.06

67.12

2921.06

100.00%

0.00

0.00

08.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

08.06.00

TARRAJEO DE MUROS DE CONCRETO (1:5)

M2

81.21

21.77

1767.94

81.21

1767.94

100.00%

0.00

0.00

105.82

18.84

1993.65

105.82

1993.65

100.00%

0.00

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.30.00

EXCAVACION DE ZANJAS PARA UAS

04.00.00

OBRAS DE CONCRETO SIMPLE

04.04.00

CIMIENTOS CORRIDOS

04.04.03

CONCRETO f'c=175 kg/cm2 , EN CIMIENTOS CORRIDOS, CON ADITIVO

M3

25.23

331.03

8351.89

25.23

8351.89

100.00%

0.00

0.00

04.04.04

CONCRETO f'c=140 kg/cm2 +30% PG, EN MUROS DE CONTENCIN

M3

4.14

227.19

940.57

4.14

940.57

100.00%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.18.00

SARDINEL REFORZADO

05.18.01

SARDINEL REFORZADO, ENCOFRADO Y DESENCOFRADO

M2

31.71

46.11

1462.15

31.71

1462.15

100.00%

0.00

0.00

05.18.02

SARDINEL REFORZADO, CONCRETO f'c=140 kg/cm2 +30% PG

M3

0.75

267.44

200.58

0.75

200.58

100.00%

0.00

0.00

05.18.03

SARDINEL REFORZADO, ACERO FY=4200 kg/cm2

KG

112.90

4.23

477.57

112.90

477.57

100.00%

0.00

0.00

05.18.04

SARDINEL REFORZADO, CONCRETO f'c=175 kg/cm2

M3

3.02

374.88

1132.14

3.02

1132.14

100.00%

0.00

0.00

08.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

08.11.00

TARRAJEO COLOREADO Y BRUADO DE MURO SARDINEL

M2

23.82

28.55

680.06

23.82

680.06

100.00%

0.00

0.00

08.12.00

TARRAJEO ESCARCHADO DE MURO SARDINEL

M2

3.63

56.75

206.00

3.63

206.00

100.00%

0.00

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.50.00

ESCALERA METLICA, PINTADO Y COLOCADO (SEGN DISEO)

GLB

1.00

8866.73

8866.73

1.00

8866.73

100.00%

0.00

0.00

20.00.00

VARIOS

20.13.00

JUNTA DE DILATACION CON TECKNOPORT Y SELLADOR E=1"

31.08

11.21

348.41

31.08

348.41

100.00%

0.00

0.00

SUB TOTAL
E

EXPEDIENTE ADICIONAL N 04
MAYORES METRADOS

03.00.00

MOVIMIENTO DE TIERRAS

MAYORES METRADOS - PARTIDAS NUEVAS

155,267.69

155,267.69

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

318.27

16.94

5391.49

318.27

5391.49

100.00%

0.00

0.00

03.16.00

ACARREO DE MATERIAL CON MAQUINARIA

M3

2,209.23

6.48

14315.81

2,209.23

14315.81

100.00%

0.00

0.00

03.18.00

ACARREO DE BASURA Y ELEMENTOS LIVIANOS SUELTOS

M3

15.00

12.70

190.50

15.00

190.50

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

3,065.20

15.60

47817.12

3,065.20

47817.12

100.00%

0.00

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO C/MATERIAL PROPIO

M3

110.10

62.73

6906.57

110.10

6906.57

100.00%

0.00

0.00

03.30.00

EXCAVACION DE ZANJAS PARA UAS

M3

54.38

18.84

1024.52

54.38

1024.52

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.04.00

CIMIENTOS CORRIDOS

04.04.03

CONCRETO f'c=175 kg/cm2 , EN CIMIENTOS CORRIDOS, CON ADITIVO

M3

1.20

331.03

397.24

1.20

397.24

100.00%

0.00

0.00

04.07.00

PAVIMENTOS

04.07.05

CONCRETO f'c = 140 KG/CM2 EN LOSAS (caminerias y/o patios)

M2

1.20

32.64

39.17

1.20

39.17

100.00%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.18.00

SARDINEL REFORZADO

05.18.01

SARDINEL REFORZADO, ENCOFRADO Y DESENCOFRADO

M2

29.12

46.11

1342.72

29.12

1342.72

100.00%

0.00

0.00

05.18.02

SARDINEL REFORZADO, CONCRETO f'c=140 kg/cm2 +30% PG

M3

1.46

267.44

390.46

1.46

390.46

100.00%

0.00

0.00

05.18.03

SARDINEL REFORZADO, ACERO FY=4200 kg/cm2

KG

146.73

4.23

620.67

146.73

620.67

100.00%

0.00

0.00

05.18.04

SARDINEL REFORZADO, CONCRETO f'c=175 kg/cm2

M3

2.02

374.88

757.26

2.02

757.26

100.00%

0.00

0.00

07.00.00

MUROS Y TABIQUES DE ALBAILERIA

07.02.00

MURO DE LADRILLO KK SOGA M:1:1:4 E=1.5cm

M2

2.66

78.98

210.09

2.66

210.09

100.00%

0.00

0.00

08.00.00

REVOQUES ENLUCIDOS Y MOLDURAS

08.06.00

TARRAJEO DE MUROS DE CONCRETO (1:5)

M2

81.21

21.77

1767.94

0.00

0.00

0.00%

1.10

23.95

08.11.00

TARRAJEO COLOREADO Y BRUADO DE MURO SARDINEL

M2

7.26

28.55

207.27

7.26

207.27

100.00%

0.00

0.00

08.12.00

TARRAJEO ESCARCHADO DE MURO SARDINEL

M2

6.40

56.75

363.20

6.40

363.20

100.00%

0.00

0.00

10.00.00

PISOS Y PAVIMENTOS

10.19.00

ENCOFRADO Y DESENCOFRADO DE PISOS

M2

81.20

33.19

2695.03

81.20

2695.03

100.00%

0.00

0.00

13.00.00

REVESTIMIENTO DE GRADAS Y ESCALERAS

13.02.00

REVESTIMIENTO C/CEMENTO PULIDO PASO Y CONTRAPASO

M2

126.10

25.20

3177.72

126.10

3177.72

100.00%

0.00

0.00

19.00.00

PINTURA

19.16.00

EMPASTADO DE MUROS

M2

167.37

7.58

1268.66

167.37

1268.66

100.00%

0.00

0.00

20.00.00

VARIOS

20.07.00

LIMPIEZA FINAL DE OBRA

880.80

1.28

1127.42

880.80

1127.42

100.00%

0.00

0.00

20.13.00

JUNTA DE DILATACION CON TECKNOPORT Y SELLADOR E=1"

80.90

11.21

906.89

80.90

906.89

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.35.00

RELLENO Y COMPACTADO CON MAQUINARIA, MATERIAL DE PRSTAMOS

M3

596.04

87.79

52326.35

596.04

52326.35

100.00%

0.00

0.00

03.36.00

RELLENO MANUAL COMPACTADO CON EQUIPO MATERIAL DE PRSTAMO

M3

202.90

90.90

18443.61

202.90

18443.61

100.00%

0.00

0.00

03.37.00

RELLENO MANUAL COMPACTADO CON MAQUINARIA MATERIAL DE PRSTAMO

M3

203.25

105.22

21385.97

203.25

21385.97

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.06.00

GRADAS Y RAMPAS

04.06.04

CONCRETO f'c=175 kg/cm2 EN GRADAS C/ADITIVO

M3

13.32

428.77

5711.22

13.32

5711.22

100.00%

0.00

0.00

04.07.00

PAVIMENTOS

04.07.08

MORTERO ASFLTICO (SLURRY)

M2

189.40

12.66

2397.80

189.40

2397.80

100.00%

0.00

0.00

15.00.00

CARPINTERIA DE MADERA

15.22.00

BANCA DE MADERA CON SOPORTE METLICO

UND

6.00

178.72

1072.32

6.00

1072.32

100.00%

0.00

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.54.00

PERGOLA METLICA CON POLICARBONATO TIPO I

UND

1.00

1779.60

1779.60

1.00

1779.60

100.00%

0.00

0.00

16.55.00

PERGOLA METLICA CON POLICARBONATO TIPO II

UND

1.00

1666.88

1666.88

1.00

1666.88

100.00%

0.00

0.00

16.56.00

BARANDA DE TUBO METALICO DE 2" EN EXTERIORES ACABADO Y COLOCADO

184.44

94.78

17481.22

184.44

17481.22

100.00%

0.00

0.00

19.00.00

PINTURA

19.23.00

PINTURA ESMALTE 2 MANOS EN MURO DE CONTENCIN

M2

332.24

10.64

3535.03

332.24

3535.03

100.00%

0.00

0.00

20.00.00

VARIOS

20.21.00

LETRAS METLICAS DE INOX E=1/16 INC. COLOCACIN.

UND

57.00

90.00

5130.00

57.00

5130.00

100.00%

0.00

0.00

20.22.00

ESCUDOS DE INOX E=1/16 INC. COLOCACIN.

UND

2.00

500.00

1000.00

2.00

1000.00

100.00%

0.00

0.00

20.24.00

PLANTADO DE ESPECIES FLORALES DE DIFERENTES VARIEDADES

UND

460.00

3.50

1610.00

460.00

1610.00

100.00%

0.00

0.00

20.25.00

ROSAS RELLENAS , DE COLORES

UND

4.00

23.00

92.00

4.00

92.00

100.00%

0.00

0.00

20.26.00

THUJA DORADA ORNAMENTAL PIRAMIDAL H=1.5

UND

2.00

65.04

130.08

2.00

130.08

100.00%

0.00

0.00

20.27.00

THUJA DORADA ORNAMENTAL PIRAMIDAL H=2.5

UND

1.00

110.00

110.00

1.00

110.00

100.00%

0.00

0.00

UND

70.00

5.00

350.00

70.00

350.00

100.00%

0.00

0.00

ML

490.53

9.23

4527.59

490.53

4527.59

100.00%

0.00

0.00

10.69

5248.79

491.00

5248.79

100.00%

0.00

0.00

20.28.00

MIOPORO ARBUSTO EN JARDINERA

23.00.00

SEALIZACIN

23.01.00

SEALIZACIN HORIZONTAL

23.01.01

PINTADO LINEAL INTERMITENTE

23.01.02

PINTADO LINEAL LATERAL CONTNUO

ML

491.00

23.01.03

PINTADO DE MARCAS EN EL PAVIMENTO

M2

22.26

16.03

356.83

22.26

356.83

100.00%

0.00

0.00

23.01.04

PINTURA DE TRAFICO EN BORDE DE VEREDAS

ML

33.16

12.93

428.76

33.16

428.76

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

23.02.00

SEALIZACIN VERTICAL

23.02.01

PINTADO DE POSTES

UND

UND

METRADO

13.00

P. UNITARIO

21.61

SUB TOTAL
F

EXPEDIENTE ADICIONAL N 07

AVANCE ANTERIOR

PARCIAL

CANT.

280.94

S/.

13.00

235,982.75

AVANCE ACTUAL DEL MES


%

280.94

CANT.

100.00%

S/.

0.00

234,214.81

0.00
23.95

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
02.00.00

OBRAS PRELIMINARES

02.04.00

LIMPIEZA DE TERRENO

02.04.04

ELIMINACION DE BASURA Y ELEMENTOS SUELTOS LIVIANOS

02.05.00

TRAZOS, NIVELES Y REPLANTEO

02.05.01

M2

51.30

1.36

69.77

51.30

69.77

100.00%

0.00

0.00

TRAZO Y REPLANTEO PRELIMINAR.

M2

435.52

1.87

814.42

435.52

814.42

100.00%

0.00

0.00

02.05.02

TRAZO DURANTE LA EJECUCION DE LA OBRA

M2

435.52

1.08

470.36

435.52

470.36

100.00%

0.00

0.00

03.00.00

MOVIMIENTO DE TIERRAS

03.03.00

CORTE DE TERRENO A MAQUINARIA

M3

204.43

4.72

964.91

204.43

964.91

100.00%

0.00

0.00

03.07.00

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL

M3

39.25

33.87

1329.40

39.25

1329.40

100.00%

0.00

0.00

03.08.00

EXCAVACION DE ZANJAS EN CIMIENTOS CORRIDOS H=1.00m / MANUAL

M3

93.42

29.03

2711.98

28.74

834.32

30.76%

0.00

0.00

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

151.40

16.94

2564.72

151.40

2564.72

100.00%

0.00

0.00

03.15.00

CORTE DE TERRENO MANUAL

M3

39.62

25.40

1006.35

39.62

1006.35

100.00%

0.00

0.00

03.16.00

ACARREO DE MATERIAL DE CORTE CON MAQUINARIA

M3

652.86

6.48

4230.53

652.86

4230.53

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

430.16

15.60

6710.44

430.16

6710.44

100.00%

0.00

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO

M3

201.01

62.73

12609.36

201.01

12609.36

100.00%

0.00

0.00

03.25.00

PREPARACION DE MATERIAL DE RELLENO - MATERIAL PROPIO

M3

612.30

17.11

10476.45

612.30

10476.45

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.03

SOLADOS CONCRETO F'C=100 KG/CM2

M3

5.55

150.33

834.33

5.55

834.33

100.00%

0.00

0.00

04.04.00

CIMIENTOS CORRIDOS

04.04.03

CONCRETO F'c= 175 KG/CM2, EN CIMIENTOS CORRIDOS, CON ADITIVO

M2

8.85

331.03

2929.62

8.85

2929.62

100.00%

0.00

0.00

04.07.00

PAVIMENTOS

04.07.06

JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"

ML

381.03

5.44

2072.80

0.00

0.00

0.00%

0.00

0.00

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

05.01.04

ZAPATAS, ACERO fy= 4200 kg/cm2

KG

2,422.88

4.33

10491.07

2,422.88

10491.07

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

05.01.05

ZAPATAS, CONCRETO F'c= 210 KG/CM2 CON ADITIVO

05.04.00

MUROS DE CONTENCION

05.04.05

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M3

36.99

293.09

10841.40

36.99

10841.40

100.00%

0.00

0.00

MUROS DE CONTENCION, ENCOFRADO Y DESENCOFRADO CARAVISTA

M2

332.41

64.72

21513.58

332.41

21513.58

100.00%

0.00

0.00

05.04.06

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2

KG

4,980.60

4.33

21566.00

4,980.60

21566.00

100.00%

0.00

0.00

05.04.07

MUROS DE CONTENCION, CONCRETO F'c= 210 KG/CM2 CON ADITIVO

M3

45.35

320.48

14533.77

45.35

14533.77

100.00%

0.00

0.00

10.00.00

PISOS Y PAVIMENTOS

10.16.00

ACABADO CON CONFICTILLO Y BRUADO DE E=1 CM.

M2

4.99

34.67

173.10

0.00

0.00

0.00%

0.00

0.00

10.18.00

EMPEDRADO DE PISOS PG=4"

M2

564.45

14.16

7992.62

431.38

6108.34

76.42%

0.00

0.00

10.19.00

ENCOFRADO Y DESENCOFRADO DE PISOS

M2

76.21

33.19

2529.28

76.21

2529.28

100.00%

0.00

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.56.00

BARANDA DE TUBO METALICO DE 2" EN EXTERIORES, ACABADO Y COLOCADO

ML

126.40

94.78

11980.19

116.16

11009.64

91.90%

0.00

0.00

20.00.00

VARIOS

20.13.00

JUNTA DE DILATACION CON TECKNOPORT Y SELLADOR E= 1"

20.26.00

THUJA DORADA ORNAMENTAL PIRAMIDAL H=1.5

ML

34.40

11.21

385.62

34.40

385.62

100.00%

0.00

0.00

UND

9.00

65.04

585.36

4.00

260.16

44.44%

0.00

0.00

M2

80.92

10.79

873.13

80.92

873.13

100.00%

0.00

0.00

M3

24.03

279.27

6710.17

24.03

6710.17

100.00%

0.00

0.00

M3

65.42

253.24

16567.18

0.00

0.00

0.00%

0.00

0.00

M2

26.07

68.13

1776.42

26.07

1776.42

100.00%

0.00

0.00

ML

53.00

50.78

2691.34

35.96

1826.05

67.85%

0.00

0.00

UND

5.00

65.00

325.00

4.00

260.00

80.00%

0.00

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.39.00

COMPACTADO Y PERFILADO EN ZONA DE EXCAVACION C/ EQUIPO

04.00.00

OBRAS DE CONCRETO SIMPLE

04.02.00

SUBZAPATAS

04.02.03

SUB ZAPATA CONCRETO F'C= 140 KG/CM2 + 30% P.G. CON ADITIVO

04.07.00

PAVIMENTOS

04.07.09

CONCRETO F'C= 140 kg/cm2 EN LOSAS CON ADITIVO (caminerias y/o patios)

05.00.00

OBRAS DE CONCRETO ARMADO

05.01.00

ZAPATAS

05.01.06

ENCOFRADO Y DESENCOFRADO DE ZAPATAS

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.65.00

PASAMANO METALICO INC./ COLOCADO Y PINTADO

20.00.00

VARIOS

20.29.00

FICUS BENJAMINA H= 1.5 mt (ARBOL ORNAMENTAL)


SUB TOTAL
COSTO DIRECTO

181,330.66
4,934,204.44

100.00%

156,529.60
1,471,578.15

0.00
29.82%

104,172.75

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION
GASTOS GENERALES 10%

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

493,420.44

147,157.81

10,417.28

GASTOS DE SUPERVISIN 2%

98,684.09

29,431.56

2,083.46

GASTOS DE LIQUIDACIN 0.8%

39,473.64

11,772.63

833.38

GASTOS ADMINISTRATIVOS 1.5%

74,013.07

22,073.67

1,562.59

PRESUPUESTO TOTAL (S/.)

5,639,795.67

100.00%

1,682,013.82

29.82%

119,069.46

MPONENTE DE PLAZOLETA Y AREAS VERDES


: DICIEMBRE 2015

STRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

6,958.72

9463.86

61.14%

4,422.03

6013.96

38.86%

0.00%

8,855.28

16559.37

77.81%

2,525.47

4722.63

22.19%

0.00%

6,548.66

7072.55

57.54%

4,832.09

5218.66

42.46%

1.69%

6,579.31

17829.93

57.93%

4,777.44

12946.86

42.07%

7.27%

4,607.22

20087.46

78.81%

1,238.88

5401.53

21.19%

1.35%

226.23

8370.62

1.35%

16,537.92

611902.93

98.65%

10.64%

268.33

9088.19

39.28%

414.72

14046.72

60.72%

0.00%

176.73

5130.47

46.52%

203.19

5898.61

53.48%

0.00%

0.00

0.00

0.00%

4.70

119.38

100.00%

2.27%

2,179.61

43919.14

49.46%

2,227.60

44886.14

50.54%

0.00%

0.00

0.00

0.00%

17,891.01

811357.30

100.00%

0.00%

0.00

0.00

0.00%

2,205.00

76138.65

100.00%

0.00%

33.76

571.89

100.00%

0.00

0.00

0.00%

0.00%

33.76

1278.83

100.00%

0.00

0.00

0.00%

5.09%

46.43

1234.11

5.22%

842.26

22387.27

94.78%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

2.96

659.04

100.00%

0.23%

69.66

11652.72

26.36%

194.64

32559.38

73.64%

20.13%

0.32

75.28

20.13%

1.27

298.78

79.87%

12.11%

2.70

91.67

12.11%

19.60

665.42

87.89%

0.00%

74.71

17576.27

82.77%

15.55

3658.29

17.23%

0.00%

76.79

19129.92

9.88%

700.42

174488.63

90.12%

0.00%

139.45

4734.33

58.38%

99.41

3374.97

41.62%

0.00%

2,889.91

45689.48

27.94%

7,453.75

117843.79

72.06%

0.00%

2,779.30

43940.73

100.00%

0.00

0.00

0.00%

0.00%

2,779.30

16675.80

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

2,779.30

166980.34

100.00%

0.00%

1,987.73

64879.51

26.28%

5,576.63

182021.20

73.72%

0.00%

707.86

3850.76

17.08%

3,435.89

18691.24

82.92%

0.00%

0.00

0.00

0.00%

232.46

60109.51

100.00%

6.42%

2.22

664.29

27.41%

5.88

1759.47

72.59%

0.00%

6,025.70

26091.28

85.45%

1,026.11

4443.06

14.55%

0.00%

0.00

0.00

0.00%

11.09

3451.54

100.00%

0.00%

10.00

457.70

22.77%

33.91

1552.06

77.23%

0.00%

0.00

0.00

0.00%

666.24

2884.82

100.00%

0.00%

7.29

1974.39

5.38%

128.12

34719.01

94.62%

0.00%

145.44

4418.47

8.64%

1,538.12

46728.09

91.36%

0.00%

489.60

2119.97

6.81%

6,701.76

29018.62

93.19%

0.00%

3.47

940.68

1.02%

337.83

91582.33

98.98%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

19.46%

1,768.31

114444.76

93.58%

121.27

7848.85

6.42%

23.12%

11,384.22

49293.67

95.45%

543.03

2351.32

4.55%

0.00%

0.00

0.00

0.00%

0.84

357.24

100.00%

0.00%

0.00

0.00

0.00%

13.02

603.87

100.00%

0.00%

0.00

0.00

0.00%

149.79

648.59

100.00%

2.49%

7.24

3161.49

30.07%

16.83

7352.05

69.93%

1.17%

104.05

5216.88

43.46%

135.36

6787.13

56.54%

0.00%

0.00

0.00

0.00%

22.56

1587.10

100.00%

9.54%

2,065.32

8942.84

68.70%

940.96

4074.36

31.30%

1.67%

4.23

1431.81

41.55%

5.95

2014.02

58.45%

2.98%

80.08

4384.38

79.66%

20.45

1119.64

20.34%

0.00%

0.00

0.00

0.00%

1,042.44

4513.77

100.00%

0.00%

0.00

0.00

0.00%

0.20

61.04

100.00%

0.00%

0.00

0.00

0.00%

0.90

38.84

100.00%

0.00%

0.28

93.49

100.00%

0.00

0.00

0.00%

0.00%

3.19

123.17

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

21.77

94.26

100.00%

0.00%

27.00

110.43

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

2.45

1010.21

100.00%

0.00%

0.00

0.00

0.00%

17.12

1270.99

100.00%

0.00%

0.00

0.00

0.00%

198.78

860.72

100.00%

0.00%

0.00

0.00

0.00%

2.74

837.29

100.00%

0.00%

0.00

0.00

0.00%

36.52

1999.47

100.00%

0.00%

0.00

0.00

0.00%

124.44

538.83

100.00%

0.00%

0.00

0.00

0.00%

337.33

10730.47

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

1.00

7869.78

100.00%

0.00%

0.00

0.00

0.00%

1.00

12059.24

100.00%

0.00%

0.00

0.00

0.00%

1.00

15441.34

100.00%

0.00%

0.00

0.00

0.00%

1.00

5769.66

100.00%

7.08%

31.97

698.22

21.94%

113.73

2483.86

78.06%

0.00%

0.00

0.00

0.00%

40.99

1202.24

100.00%

0.00%

76.24

2329.89

100.00%

0.00

0.00

0.00%

100.00%

8.28

353.80

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

49.60

546.10

100.00%

10.59%

5.94

178.26

10.59%

50.16

1505.30

89.41%

0.00%

0.00

0.00

0.00%

10.95

338.57

100.00%

3.08%

2,119.65

45445.30

29.44%

5,081.32

108943.50

70.56%

0.00%

111.22

3523.45

100.00%

0.00

0.00

0.00%

52.01%

616.64

34550.34

63.36%

356.61

19980.86

36.64%

0.00%

0.00

0.00

0.00%

54.40

1474.78

100.00%

0.00%

0.00

0.00

0.00%

54.40

2675.39

100.00%

0.00%

40.45

2270.46

56.42%

31.24

1753.50

43.58%

0.00%

17.64

305.52

1.81%

955.61

16551.17

98.19%

0.00%

61.02

2115.56

33.81%

119.45

4141.33

66.19%

0.00%

9.80

246.96

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

5.97

151.94

100.00%

0.00%

0.00

0.00

0.00%

57.04

1969.02

100.00%

0.00%

0.00

0.00

0.00%

57.04

314.29

100.00%

0.00%

0.00

0.00

0.00%

21.76

4967.37

100.00%

0.00%

0.00

0.00

0.00%

12.00

1759.56

100.00%

0.00%

0.00

0.00

0.00%

3.00

7682.19

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

21.76

5100.76

100.00%

0.00%

0.00

0.00

0.00%

13.88

1398.27

100.00%

0.00%

0.00

0.00

0.00%

789.16

64237.62

100.00%

0.00%

0.00

0.00

0.00%

12.00

161.52

100.00%

0.00%

0.00

0.00

0.00%

2.00

121.40

100.00%

0.00%

0.00

0.00

0.00%

2.00

19.04

100.00%

0.00%

0.00

0.00

0.00%

50.57

411.64

100.00%

56.78%

115.68

941.64

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

74.75

1003.15

100.00%

0.00%

0.00

0.00

0.00%

21.76

332.93

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

586.25

22365.44

11.78%

4,391.46

167534.20

88.22%

0.00%

15.00

804.75

6.98%

200.00

10730.00

93.02%

0.00%

106.78

5105.15

57.43%

79.14

3783.68

42.57%

0.00%

0.00

0.00

0.00%

1.00

411.30

100.00%

714,007.35

3,130,056.78

0.00%

469.74

638.85

100.00%

0.00

0.00

0.00%

0.00%

469.74

878.41

100.00%

0.00

0.00

0.00%

0.00%

1,230.00

1328.40

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

231.38

627.04

100.00%

0.00%

2.11

9.20

1.67%

124.27

541.82

98.33%

0.00%

0.00

0.00

0.00%

66.36

2455.32

100.00%

0.00%

0.00

0.00

0.00%

265.43

8990.11

100.00%

0.00%

43.32

1257.58

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

35.44

5928.40

100.00%

0.00%

0.00

0.00

0.00%

231.38

3658.12

100.00%

0.00%

231.38

3658.12

100.00%

0.00

0.00

0.00%

0.00%

231.38

1388.28

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

231.38

13901.31

100.00%

0.00%

0.00

0.00

0.00%

2,755.16

11929.84

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

2.05

555.51

100.00%

0.00%

0.00

0.00

0.00%

27.39

832.11

100.00%

0.00%

0.00

0.00

0.00%

110.50

478.47

100.00%

0.00%

0.00

0.00

0.00%

1,149.76

74412.47

100.00%

0.00%

0.00

0.00

0.00%

3,878.05

16791.96

100.00%

0.00%

0.00

0.00

0.00%

35.00

2849.00

100.00%

0.00%

39.90

5998.17

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

95.50

27990.10

74.72%

32.31

9469.74

25.28%

0.00%

0.00

0.00

0.00%

2.05

653.87

100.00%

0.00%

138.82

44489.03

100.00%

0.00

0.00

0.00%

0.00%

1,564.83

22157.99

95.35%

76.35

1081.12

4.65%

0.00%

208.58

6922.77

100.00%

0.00

0.00

0.00%

116,716.90

155,156.19

0.00%

317.40

1498.13

100.00%

0.00

0.00

0.00%

0.00%

248.64

5010.10

100.00%

0.00

0.00

0.00%

0.00%

36.36

923.54

100.00%

0.00

0.00

0.00%

0.00%

564.50

3657.96

100.00%

0.00

0.00

0.00%

0.00%

564.50

8806.20

100.00%

0.00

0.00

0.00%

0.00%

268.55

4594.89

100.00%

0.00

0.00

0.00%

0.00%

0.50

75.17

5.42%

8.73

1312.38

94.58%

0.00%

323.54

1941.24

83.10%

65.78

394.68

16.90%

0.00%

0.00

0.00

0.00%

188.60

12206.19

100.00%

0.00%

0.00

0.00

0.00%

3,498.24

15147.38

100.00%

61.26%

68.23

21866.35

87.59%

9.67

3099.04

12.41%

0.00%

98.40

464.45

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

0.00%

2,902.06

S/.

SALDO
%

150152.58

91.17%

CANT.

S/.

280.94

198,990.61

14535.84

8.83%

46,695.51

0.00%

2,224.94

10501.72

100.00%

0.00

0.00

0.00%

0.00%

28.71

833.45

100.00%

0.00

0.00

0.00%

0.00%

141.24

3587.50

100.00%

0.00

0.00

0.00%

0.00%

2,209.23

14315.81

100.00%

0.00

0.00

0.00%

0.00%

295.82

3265.85

100.00%

0.00

0.00

0.00%

0.00%

2,744.35

42811.86

100.00%

0.00

0.00

0.00%

0.00%

736.33

37729.55

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

701.45

12001.81

100.00%

0.00

0.00

0.00%

0.00%

184.62

871.41

100.00%

0.00

0.00

0.00%

0.00%

67.12

2921.06

100.00%

0.00

0.00

0.00%

0.00%

81.21

1767.94

100.00%

0.00

0.00

0.00%

0.00%

105.82

1993.65

100.00%

0.00

0.00

0.00%

0.00%

25.23

8351.89

100.00%

0.00

0.00

0.00%

0.00%

4.14

940.57

100.00%

0.00

0.00

0.00%

0.00%

31.71

1462.15

100.00%

0.00

0.00

0.00%

0.00%

0.75

200.58

100.00%

0.00

0.00

0.00%

0.00%

112.90

477.57

100.00%

0.00

0.00

0.00%

0.00%

3.02

1132.14

100.00%

0.00

0.00

0.00%

0.00%

23.82

680.06

100.00%

0.00

0.00

0.00%

0.00%

3.63

206.00

100.00%

0.00

0.00

0.00%

0.00%

1.00

8866.73

100.00%

0.00

0.00

0.00%

0.00%

31.08

348.41

100.00%

0.00

0.00

0.00%

155,267.69

0.00

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

318.27

5391.49

100.00%

0.00

0.00

0.00%

0.00%

2,209.23

14315.81

100.00%

0.00

0.00

0.00%

0.00%

15.00

190.50

100.00%

0.00

0.00

0.00%

0.00%

3,065.20

47817.12

100.00%

0.00

0.00

0.00%

0.00%

110.10

6906.57

100.00%

0.00

0.00

0.00%

0.00%

54.38

1024.52

100.00%

0.00

0.00

0.00%

0.00%

1.20

397.24

100.00%

0.00

0.00

0.00%

0.00%

1.20

39.17

100.00%

0.00

0.00

0.00%

0.00%

29.12

1342.72

100.00%

0.00

0.00

0.00%

0.00%

1.46

390.46

100.00%

0.00

0.00

0.00%

0.00%

146.73

620.67

100.00%

0.00

0.00

0.00%

0.00%

2.02

757.26

100.00%

0.00

0.00

0.00%

0.00%

2.66

210.09

100.00%

0.00

0.00

0.00%

1.35%

1.10

23.95

1.35%

80.11

1743.99

98.65%

0.00%

7.26

207.27

100.00%

0.00

0.00

0.00%

0.00%

6.40

363.20

100.00%

0.00

0.00

0.00%

0.00%

81.20

2695.03

100.00%

0.00

0.00

0.00%

0.00%

126.10

3177.72

100.00%

0.00

0.00

0.00%

0.00%

167.37

1268.66

100.00%

0.00

0.00

0.00%

0.00%

880.80

1127.42

100.00%

0.00

0.00

0.00%

0.00%

80.90

906.89

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

596.04

52326.35

100.00%

0.00

0.00

0.00%

0.00%

202.90

18443.61

100.00%

0.00

0.00

0.00%

0.00%

203.25

21385.97

100.00%

0.00

0.00

0.00%

0.00%

13.32

5711.22

100.00%

0.00

0.00

0.00%

0.00%

189.40

2397.80

100.00%

0.00

0.00

0.00%

0.00%

6.00

1072.32

100.00%

0.00

0.00

0.00%

0.00%

1.00

1779.60

100.00%

0.00

0.00

0.00%

0.00%

1.00

1666.88

100.00%

0.00

0.00

0.00%

0.00%

184.44

17481.22

100.00%

0.00

0.00

0.00%

0.00%

332.24

3535.03

100.00%

0.00

0.00

0.00%

0.00%

57.00

5130.00

100.00%

0.00

0.00

0.00%

0.00%

2.00

1000.00

100.00%

0.00

0.00

0.00%

0.00%

460.00

1610.00

100.00%

0.00

0.00

0.00%

0.00%

4.00

92.00

100.00%

0.00

0.00

0.00%

0.00%

2.00

130.08

100.00%

0.00

0.00

0.00%

0.00%

1.00

110.00

100.00%

0.00

0.00

0.00%

0.00%

70.00

350.00

100.00%

0.00

0.00

0.00%

0.00%

490.53

4527.59

100.00%

0.00

0.00

0.00%

0.00%

491.00

5248.79

100.00%

0.00

0.00

0.00%

0.00%

22.26

356.83

100.00%

0.00

0.00

0.00%

0.00%

33.16

428.76

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

0.00%

S/.

13.00

SALDO
%

280.94

CANT.

100.00%

S/.

0.00

234,238.75

0.00

0.00%

1,743.99

0.00%

51.30

69.77

100.00%

0.00

0.00

0.00%

0.00%

435.52

814.42

100.00%

0.00

0.00

0.00%

0.00%

435.52

470.36

100.00%

0.00

0.00

0.00%

0.00%

204.43

964.91

100.00%

0.00

0.00

0.00%

0.00%

39.25

1329.40

100.00%

0.00

0.00

0.00%

0.00%

28.74

834.32

30.76%

64.68

1877.66

69.24%

0.00%

151.40

2564.72

100.00%

0.00

0.00

0.00%

0.00%

39.62

1006.35

100.00%

0.00

0.00

0.00%

0.00%

652.86

4230.53

100.00%

0.00

0.00

0.00%

0.00%

430.16

6710.44

100.00%

0.00

0.00

0.00%

0.00%

201.01

12609.36

100.00%

0.00

0.00

0.00%

0.00%

612.30

10476.45

100.00%

0.00

0.00

0.00%

0.00%

5.55

834.33

100.00%

0.00

0.00

0.00%

0.00%

8.85

2929.62

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

381.03

2072.80

100.00%

0.00%

2,422.88

10491.07

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

36.99

10841.40

100.00%

0.00

0.00

0.00%

0.00%

332.41

21513.58

100.00%

0.00

0.00

0.00%

0.00%

4,980.60

21566.00

100.00%

0.00

0.00

0.00%

0.00%

45.35

14533.77

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

4.99

173.10

100.00%

0.00%

431.38

6108.34

76.42%

133.07

1884.28

23.58%

0.00%

76.21

2529.28

100.00%

0.00

0.00

0.00%

0.00%

116.16

11009.64

91.90%

10.24

970.55

8.10%

0.00%

34.40

385.62

100.00%

0.00

0.00

0.00%

0.00%

4.00

260.16

44.44%

5.00

325.20

55.56%

0.00%

80.92

873.13

100.00%

0.00

0.00

0.00%

0.00%

24.03

6710.17

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

65.42

16567.18

100.00%

0.00%

26.07

1776.42

100.00%

0.00

0.00

0.00%

0.00%

35.96

1826.05

67.85%

17.04

865.29

32.15%

0.00%

4.00

260.00

80.00%

1.00

65.00

20.00%

156,529.60
2.11%

1,575,750.90

24,801.06
31.94%

3,358,453.53

68.06%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

2.11%

S/.

SALDO
%

CANT.

S/.

157,575.09

335,845.35

31,515.02

67,169.07

12,606.01

26,867.63

23,636.26

50,376.80

1,801,083.28

31.935%

3,838,712.39

68.06%

CUADRO VALORIZACION DEL COMPONENTE INST. ELECTRCIAS RED SECUNDARIA


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JO


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

EXPEDIENTE TCNICO

22.00.00

INSTALACIONES ELECTRICAS

22.01.00

SALIDAS PARA CENTRO DE LUZ

22.01.01

SALIDA PARA LUMINARIA DE TECHO (CENTRO DE LUZ)

Pto

781.00

22.36

17,463.16

485.00

10844.60

62.10%

0.00

0.00

22.01.02

SALIDAS PARA LUMINARIA EN PARED (BRAQUET)

Pto

230.00

22.36

5,142.80

140.00

3130.40

60.87%

0.00

0.00

22.01.03

SALIDAS PARA VENTILADORES

Pto

49.00

24.36

1,193.64

32.00

779.52

65.31%

0.00

0.00

22.01.04

SALIDAS PARA CONTROLADORES DE VENTILADORES

Pto

33.00

22.36

737.88

26.00

581.36

78.79%

0.00

0.00

22.02.00

SALIDAS PARA INTERRUPTOR DE LUZ

22.02.01

INTERRUPTOR UNIPOLAR SIMPLE

Pto

236.00

35.37

8,347.32

165.00

5836.05

69.92%

2.00

70.74

22.02.02

INTERRUPTOR UNIPOLAR DOBLE

Pto

49.00

38.37

1,880.13

30.00

1151.10

61.22%

0.00

0.00

22.02.03

INTERRUPTOR UNIPOLAR TRIPLE

Pto

13.00

37.94

493.22

3.00

113.82

23.08%

0.00

0.00

22.02.04

INTERRUPTOR UNIPOLAR DE CONMUTACION

63.33%

0.00

0.00

22.03.00

SALIDAS PARA TOMACORRIENTES

22.03.01

Pto

30.00

43.41

1,302.30

19.00

824.79

SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA EN PARED H=0.40 SN

Pto

549.00

32.16

17,655.84

323.00

10387.68

58.83%

17.00

546.72

22.03.02

SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA EN PARED H=1.20 SN

Pto

25.00

32.91

822.75

25.00

822.75

100.00%

0.00

0.00

22.03.03

SALIDA DE TOMACORRIENTE PROTECCION CON LINEA DE TIERRA EN PARED H=1

Pto

42.00

83.02

3,486.84

29.00

2407.58

69.05%

0.00

0.00

22.03.04

SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA EN PARED H=2.20 SN

Pto

99.00

92.12

9,119.88

47.00

4329.64

47.47%

0.00

0.00

22.03.05

SALIDA DE TOMACORRIENTE DOBLE CON LINEA ESTABILIZADORA EN PISO/PARE

Pto

158.00

78.48

12,399.84

0.00

0.00

0.00%

0.00

0.00

22.04.00

SALIDAS DE FUERZA

22.04.01

SALIDA DE FUERZA PARA TOMACORRIENTE TRIFASICO C/LINEA DE TIERRA EN P

Pto

28.00

285.30

7,988.40

19.00

5420.70

67.86%

0.00

0.00

22.04.02

SALIDA DE FUERZA PARA TOMACORRIENTE MONOFASICO C/LINEA DE TIERRA EN

Pto

10.00

247.78

2,477.80

2.00

495.56

20.00%

0.00

0.00

22.04.03

SALIDA DE FUERZA PARA MAQUINAS MONOFASICO C/LINEA DE TIERRA EN PISO

Pto

24.00

31.25

750.00

0.00

0.00

0.00%

0.00

0.00

22.04.04

SALIDA DE FUERZA PARA MAQUINAS TRIFASICO C/LINEA DE TIERRA EN PISO

Pto

75.00

31.25

2,343.75

72.00

2250.00

96.00%

0.00

0.00

22.04.05

SALIDA DE GRUPO ELECTROGENO

0.00

0.00

0.00%

0.00

0.00

PZA

1.00

39,640.97

39,640.97

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

22.05.00

SISTEMA DE COMUNICACION

22.05.01

SALIDA RED DE COMPUTO

Pto

187.00

54.97

10,279.39

0.00

0.00

0.00%

0.00

0.00

22.05.02

SALIDA PARLANTE/ALTA VOZ

Pto

9.00

35.85

322.65

0.00

0.00

0.00%

0.00

0.00

22.05.03

SALIDA PARA CENTRAL DE MUSICA/RED DE AUDIO

Pto

2.00

36.85

73.70

0.00

0.00

0.00%

0.00

0.00

22.05.04

SALIDA PARA INTERCOMUNICADOR/ TELEFONO EXTREMO

Pto

43.00

198.47

8,534.21

0.00

0.00

0.00%

0.00

0.00

22.05.05

SALIDA DE TIMBRE/ALARMA

Pto

2.00

52.55

105.10

1.00

52.55

50.00%

0.00

0.00

22.05.06

SALIDA RECEPTOR DE TIMBRE

Pto

2.00

199.55

399.10

0.00

0.00

0.00%

0.00

0.00

22.05.07

SALIDA DE UPS

PZA

2.00

22,349.56

44,699.12

0.00

0.00

0.00%

0.00

0.00

22.06.00

CAJAS DE PASE

22.06.01

CAJA DE PASE OCTOGONAL DE 100 x 55 mm

UND

120.00

21.11

2,533.20

120.00

2533.20

100.00%

0.00

0.00

22.06.02

CAJA DE PASE CUADRADA DE 100 x 100 x 55 mm

UND

49.00

25.61

1,254.89

40.00

1024.40

81.63%

9.00

230.49

22.06.03

CAJA DE PASE CUADRADA DE 100 x 100 x 100 mm

UND

28.00

26.11

731.08

26.00

678.86

92.86%

0.00

0.00

22.06.04

CAJA DE PASE CUADRADA DE 150 x 150 x 100 mm

UND

40.00

29.11

1,164.40

0.00

0.00

0.00%

0.00

0.00

22.06.05

CAJA DE PASE CUADRADA DE 200 x 200 x 150 mm

UND

17.00

32.11

545.87

3.00

96.33

17.65%

0.00

0.00

22.06.06

CAJA DE PASE CUADRADA DE 300 x 300 x 150 mm

UND

13.00

39.11

508.43

2.00

78.22

15.38%

0.00

0.00

22.07.00

CONDUCTOS Y CANALIZACIONES

22.07.01

TUBERIA PVC-SAP (ELECTRICA) D=20 mm.

6,174.13

3.65

22,535.57 5,389.24

19670.73

87.29%

72.00

262.80

22.07.02

TUBERIA PVC-SAP (ELECTRICA) D=25 mm.

ML

5,594.58

4.43

24,783.99 3,082.43

13655.16

55.10%

3.00

13.29

22.07.03

TUBERIA PVC-SAP (ELECTRICA) D=50 mm.

ML

1,910.50

7.50

14,328.75 1,161.62

8712.12

60.80%

102.00

765.00

22.07.04

TUBERIA PVC-SAP (ELECTRICA) D=75 mm

ML

1,740.97

16.95

29,509.44 1,323.73

22437.22

76.03%

0.00

0.00

22.07.05

TUBERIA PVC-SAP (ELECTRICA) D=100 mm

ML

123.00

21.54

2,649.42

123.00

2649.42

100.00%

0.00

0.00

22.08.00

REDES EXTERIORES

22.08.01

EXCAVACION DE ZANJA DE 100x70 P/ REDES DE ALIMENTADOR DE ENERGIA

962.67

12.12

11,667.56

148.00

1793.76

15.37%

0.00

0.00

22.08.02

EXCAVACION DE ZANJA DE 40x40 P/ REDES

454.10

4.83

2,193.30

241.76

1167.70

53.24%

0.00

0.00

22.08.03

RELLENO MANUAL C/EQUIPO MAT/PROPIO

M3

746.53

10.53

7,860.96

369.86

3894.63

49.54%

0.00

0.00

22.08.04

BUZON DE CONCRETO PREFABRICADO DE 1.00x1.00x1.20m

UND

56.00

65.71

3,679.76

0.00

0.00

0.00%

0.00

0.00

22.08.05

BUZON DE CONCRETO PREFABRICADO DE 0.60x0.60x0.60m

UND

28.00

50.56

1,415.68

0.00

0.00

0.00%

8.00

404.48

22.08.06

BUZON DE EMPALME PREFABRICADO 0.20m X 0.20m x 0.40m

UND

108.00

152.13

16,430.04

0.00

0.00

0.00%

0.00

0.00

22.08.07

POSTE DE CONCRETO x 8.00m.

UND

24.00

1,112.05

26,689.20

13.00

14456.65

54.17%

0.00

0.00

22.08.08

PASTORAL DE FG DE 2" x 2.00m

UND

32.00

229.35

7,339.20

19.00

4357.65

59.38%

0.00

0.00

22.08.09

POSTE METALICO DE 3.5m, CON UN BRAZO

UND

45.00

197.81

8,901.45

21.00

4154.01

46.67%

3.00

593.43

22.08.10

POSTE METALICO DE 3.5m, CON DOS BRAZOS

UND

36.00

199.31

7,175.16

8.00

1594.48

22.22%

3.00

597.93

ML

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES

METRADO

P. UNITARIO

CANT.

S/.

UND

31.00

76.06

2,357.86

0.00

0.00

0.00%

0.00

0.00

22.08.11

SOPORTE METALICO UN BRAZO

22.09.00

TABLEROS

22.09.01

TABLERO GENERAL TG 01, 3 - 380/220

PZA

1.00

6,296.99

6,296.99

0.50

3148.50

50.00%

0.00

0.00

22.09.02

TABLERO DE DISTRIBUCION TD 01, 3 - 380/220v

PZA

1.00

1,972.72

1,972.72

0.00

0.00

0.00%

0.00

0.00

22.09.03

TABLERO DE DISTRIBUCION TD 02, 3 - 380/220v

PZA

1.00

1,053.93

1,053.93

0.00

0.00

0.00%

0.00

0.00

22.09.04

TABLERO DE DISTRIBUCION TD 03, 3 - 380/220v

PZA

1.00

1,318.25

1,318.25

1.00

1318.25

100.00%

0.00

0.00

22.09.05

TABLERO DE DISTRIBUCION TD 04, 3 - 380/220v

PZA

1.00

353.48

353.48

0.00

0.00

0.00%

0.00

0.00

22.09.06

TABLERO DE DISTRIBUCION TD 05, 3 - 380/220v

PZA

1.00

323.48

323.48

0.00

0.00

0.00%

0.00

0.00

22.09.07

TABLERO DE DISTRIBUCION TD 06, 3 - 380/220v

PZA

1.00

1,842.06

1,842.06

1.00

1842.06

100.00%

0.00

0.00

22.09.08

TABLERO DE DISTRIBUCION TD 07, 3 - 380/220v

PZA

1.00

980.85

980.85

0.00

0.00

0.00%

0.00

0.00

22.09.09

TABLERO DE DISTRIBUCION TD 08, 3 - 380/220v

PZA

1.00

770.67

770.67

1.00

770.67

100.00%

0.00

0.00

22.09.10

TABLERO DE DISTRIBUCION TD 09, 3 - 380/220v

PZA

1.00

915.82

915.82

1.00

915.82

100.00%

0.00

0.00

PZA

1.00

1,355.61

1,355.61

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

22.09.11

TABLERO DE DISTRIBUCION STDE 01-01, 3 - 380/220v

22.09.12

TABLERO DE DISTRIBUCION STD 01-02, 3 - 380/220v

PZA

1.00

1,245.33

1,245.33

0.00

0.00

22.09.13

TABLERO DE DISTRIBUCION STDE 01-03, 3 - 380/220v

PZA

1.00

1,355.61

1,355.61

0.00

0.00

0.00%

0.00

0.00

22.09.14

TABLERO DE DISTRIBUCION STD 02-01, 3 - 380/220v

PZA

1.00

1,469.81

1,469.81

0.00

0.00

0.00%

0.00

0.00

22.09.15

TABLERO DE DISTRIBUCION STD 02-02, 3 - 380/220v

PZA

1.00

1,036.17

1,036.17

0.00

0.00

0.00%

0.00

0.00

22.09.16

TABLERO DE DISTRIBUCION STD 02-03, 3 - 380/220v

PZA

1.00

1,036.17

1,036.17

0.00

0.00

0.00%

0.00

0.00

22.09.17

TABLERO DE DISTRIBUCION STD 02-04, 3 - 380/220v

PZA

1.00

1,036.17

1,036.17

0.00

0.00

0.00%

0.00

0.00

22.09.18

TABLERO DE DISTRIBUCION STD 02-05, 3 - 380/220v

PZA

1.00

1,036.17

1,036.17

0.00

0.00

0.00%

0.00

0.00

22.09.19

TABLERO DE DISTRIBUCION STD 03-01, 3 - 380/220v

PZA

1.00

1,228.16

1,228.16

1.00

1228.16

100.00%

0.00

0.00

22.09.20

TABLERO DE DISTRIBUCION STD 04-02, 3 - 380/220v

PZA

1.00

1,036.17

1,036.17

0.00

0.00

0.00%

0.00

0.00

22.09.21

TABLERO DE DISTRIBUCION STD 05-01, 3 - 380/220v

PZA

1.00

998.84

998.84

0.00

0.00

0.00%

0.00

0.00

22.09.22

TABLERO DE DISTRIBUCION STD 05-01-01, 3 - 380/220v

PZA

1.00

1,083.01

1,083.01

0.00

0.00

0.00%

0.00

0.00

22.09.23

TABLERO DE DISTRIBUCION STD 06-01, 3 - 380/220v

PZA

1.00

1,427.25

1,427.25

1.00

1427.25

100.00%

0.00

0.00

22.09.24

TABLERO DE DISTRIBUCION STD 06-02, 3 - 380/220v

PZA

1.00

1,716.66

1,716.66

0.00

0.00

0.00%

0.00

0.00

22.09.25

TABLERO DE DISTRIBUCION STD 07-01, 3 - 380/220v

PZA

1.00

1,011.37

1,011.37

0.00

0.00

0.00%

0.00

0.00

22.09.26

TABLERO DE DISTRIBUCION STD 07-02, 3 - 380/220v

PZA

1.00

915.82

915.82

0.00

0.00

0.00%

0.00

0.00

22.09.27

TABLERO GENERAL TG 02, 3 - 220v

PZA

1.00

8,308.44

8,308.44

0.50

4154.22

50.00%

0.00

0.00

22.09.28

TABLERO DE DISTRIBUCION TD 01, 3 - 220v

PZA

1.00

3,075.62

3,075.62

1.00

3075.62

100.00%

0.00

0.00

22.09.29

TABLERO DE DISTRIBUCION TD 02, 3 - 220v

PZA

1.00

2,137.08

2,137.08

1.00

2137.08

100.00%

0.00

0.00

22.09.30

TABLERO DE DISTRIBUCION TD 03, 3 - 220v

PZA

1.00

954.01

954.01

1.00

954.01

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

22.09.31

TABLERO DE DISTRIBUCION TD 04, 3 - 220v

22.09.32

TABLERO DE DISTRIBUCION STD 01-01, 3 - 220v

PZA

1.00

1,428.25

22.09.33

TABLERO DE DISTRIBUCION STD 01-02, 3 - 220v

PZA

1.00

22.09.34

TABLERO DE DISTRIBUCION STD 01-03, 3 - 220v

PZA

22.09.35

TABLERO DE DISTRIBUCION STD 01-04, 3 - 220v

PZA

22.09.36

TABLERO DE DISTRIBUCION STD 01-05, 3 - 220v

PZA

1.00

1,173.15

22.09.37

TABLERO DE DISTRIBUCION STD 01-06, 3 - 220v

PZA

1.00

22.09.38

TABLERO DE DISTRIBUCION STD 01-07, 3 - 220v

PZA

22.09.39

TABLERO DE DISTRIBUCION STD 01-08, 3 - 220v

PZA

22.09.40

TABLERO DE DISTRIBUCION STD 01-09, 3 - 220v

PZA

1.00

1,246.49

22.09.41

TABLERO DE DISTRIBUCION STD 02-01, 3 - 220v

PZA

1.00

22.09.42

TABLERO DE DISTRIBUCION STD 02-02, 3 - 220v

PZA

22.09.43

TABLERO DE DISTRIBUCION STD 03-01, 3 - 220v

PZA

22.09.44

TABLERO DE DISTRIBUCION STD 04-01, 3 - 220v

PZA

1.00

1,376.44

22.09.45

TABLERO DE DISTRIBUCION STD 04-02, 3 - 220v

PZA

1.00

22.09.46

TABLERO DE DISTRIBUCION STD 04-03, 3 - 220v

PZA

22.09.47

TABLERO DE DISTRIBUCION STD 04-04, 3 - 220v

PZA

22.09.48

TABLERO DE DISTRIBUCION STD 04-05, 3 - 220v

PZA

1.00

956.22

22.09.49

TABLERO DE DISTRIBUCION STD 04-06, 3 - 220v

PZA

1.00

22.09.50

TABLERO DE ILUMINACION TI 01, 3 - 380/220v

PZA

22.09.51

TABLERO DE ILUMINACION TI 02, 3 - 380/220v

PZA

22.09.52

TABLERO DE ILUMINACION TI 03, 3 - 380/220v

PZA

1.00

964.52

22.09.53

TABLERO DE ILUMNACION TI 04, 3 - 380/220v

PZA

1.00

22.09.54

TABLERO DE ILUMNACION TI 05, 3 - 380/220v

PZA

22.09.55

TABLERO DE ILUMNACION TI 06, 3 - 380/220v

PZA

22.09.56

TABLERO DE ILUMNACION TI 07, 3 - 380/220v

PZA

1.00

964.52

22.09.57

TABLERO DE ILUMNACION TI 08, 3 - 380/220v

PZA

1.00

22.09.58

TABLERO DE TRANSFERENCIA AUTOMATICA

PZA

22.10.00

SISTEMA DE PUESTA A TIERRA

22.10.01

POZO DE PUESTA A TIERRA

UND

22.11.00

CABLES Y CONDUCTORES

22.11.01

CABLE ELECTRICO THW-90, 2.5 mm2

PZA

ML

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

1.00

5977.25

100.00%

0.00

0.00

1,428.25

1.00

1428.25

100.00%

0.00

0.00

1,487.08

1,487.08

1.00

1487.08

100.00%

0.00

0.00

1.00

1,066.20

1,066.20

1.00

1066.20

100.00%

0.00

0.00

1.00

1,552.68

1,552.68

1.00

1552.68

100.00%

0.00

0.00

1,173.15

1.00

1173.15

100.00%

0.00

0.00

1,228.93

1,228.93

1.00

1228.93

100.00%

0.00

0.00

1.00

1,193.67

1,193.67

1.00

1193.67

100.00%

0.00

0.00

1.00

1,193.67

1,193.67

1.00

1193.67

100.00%

0.00

0.00

1,246.49

1.00

1246.49

100.00%

0.00

0.00

1,574.40

1,574.40

1.00

1574.40

100.00%

0.00

0.00

1.00

810.90

810.90

1.00

810.90

100.00%

0.00

0.00

1.00

1,083.93

1,083.93

1.00

1083.93

100.00%

0.00

0.00

1,376.44

1.00

1376.44

100.00%

0.00

0.00

872.28

872.28

1.00

872.28

100.00%

0.00

0.00

1.00

788.14

788.14

1.00

788.14

100.00%

0.00

0.00

1.00

848.20

848.20

1.00

848.20

100.00%

0.00

0.00

956.22

1.00

956.22

100.00%

0.00

0.00

1,000.33

1,000.33

0.00

0.00

0.00%

0.00

0.00

1.00

1,339.10

1,339.10

0.00

0.00

0.00%

0.00

0.00

1.00

964.52

964.52

0.00

0.00

0.00%

0.00

0.00

964.52

1.00

964.52

100.00%

0.00

0.00

964.52

964.52

1.00

964.52

100.00%

0.00

0.00

1.00

1,309.78

1,309.78

0.00

0.00

0.00%

0.00

0.00

1.00

1,184.52

1,184.52

1.00

1184.52

100.00%

0.00

0.00

964.52

0.00

0.00

0.00%

0.00

0.00

964.52

964.52

0.00

0.00

0.00%

0.00

0.00

1.00

18,263.42

18,263.42

1.00

18263.42

100.00%

0.00

0.00

23.00

626.21

14,402.83

17.00

10645.57

73.91%

0.00

0.00

8,172.63

5.03

41,108.33 6,796.57

34186.75

83.16%

15.00

75.45

1.00

5,977.25

5,977.25

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

22.11.02

CABLE ELECTRICO THW-90, 4 mm2

22.11.03

CABLE ELECTRICO THW-90, 6 mm2

ML

3,224.71

6.14

22.11.04

CABLE ELECTRICO THW-90, 10 mm2

ML

904.98

8.28

7,493.23

22.11.05

CABLE 1x10mm2, NYY 0,6/1kV

ML

5,846.61

8.20

22.11.06

CABLE 1x16mm2, NYY 0,6/1kV

ML

3,940.04

10.81

22.11.07

CABLE 1x25mm2, NYY 0,6/1kV

ML

1,493.17

15.03

22.11.08

CABLE 1x35mm2, NYY 0,6/1kV

ML

1,041.24

22.11.09

CABLE 1x50mm2, NYY 0,6/1kV

ML

22.11.10

CABLE 1x70mm2, NYY 0,6/1kV

ML

22.11.11

CABLE 1x95mm2, NYY 0,6/1kV

ML

104.00

44.79

22.11.12

CABLE ELECTRICO 1x2.5mm2 (T), THW-90

ML

4,339.86

4.95

22.11.13

CABLE ELECTRICO 1x4mm2 (T), THW-90

ML

1,362.82

5.13

6,991.27

22.11.14

CABLE ELECTRICO 1x6mm2 (T), THW-90

ML

185.88

6.06

1,126.43

22.11.15

CABLE DE COBRE DESNUDO 10 mm2

22.12.00

ARTEFACTOS DE ALUMBRADO

22.12.01

ML

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

43,165.11 7,861.72

40959.56

94.89%

80.00

416.80

19,799.72 1,842.72

11314.32

57.14%

0.00

0.00

758.98

6284.35

83.87%

0.00

0.00

47,942.20

0.00

0.00

0.00%

0.00

0.00

42,591.83

104.00

1124.24

2.64%

0.00

0.00

22,442.35

0.00

0.00

0.00%

0.00

0.00

19.07

19,856.45

174.00

3318.18

16.71%

0.00

0.00

1,680.47

25.42

42,717.55

0.00

0.00

0.00%

0.00

0.00

904.58

33.35

30,167.74

690.00

23011.50

76.28%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

21,482.31 1,678.85

8310.31

38.68%

0.00

0.00

276.82

1420.09

20.31%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

8,285.05

5.21

4,658.16

ML

100.00

12.83

1,283.00

0.00

0.00

ARTEFACTO P/ ADOSAR DE 3 LAMPARAS FLUORESCENTES DE 3x36w.

UND

45.00

364.78

16,415.10

6.00

2188.68

13.33%

0.00

0.00

22.12.02

ARTEFACTO P/ ADOSAR DE 2 LAMPARAS FLUORESCENTES DE 2x36w.

UND

277.00

193.38

53,566.26

107.00

20691.66

38.63%

0.00

0.00

22.12.03

ARTEFACTO P/ ADOSAR DE 1 LAMPARA FLUORESCENTES DE 1x36w.

UND

34.00

103.78

3,528.52

7.00

726.46

20.59%

0.00

0.00

22.12.04

ARTEFACTO P/ ADOSAR DE 2 LAMPARAS FLUORESCENTES DE 2x18w.

UND

82.00

179.48

14,717.36

61.00

10948.28

74.39%

0.00

0.00

22.12.05

ARTEFACTO P/ ADOSAR DE 2 LAMPARAS AHORRADORA DE 2x26w.

UND

129.00

249.78

32,221.62

96.00

23978.88

74.42%

0.00

0.00

22.12.06

ARTEFACTO P/ ADOSAR DE 4 LAMPARAS FLUORESCENTES DE 4x14w.

UND

10.00

373.78

3,737.80

10.00

3737.80

100.00%

0.00

0.00

22.12.07

ARTEFACTO TIPO BRAQUET C/ EQUIPO DE ALTO FACTOR DE POTENCIA

UND

120.00

645.78

77,493.60

70.00

45204.60

58.33%

0.00

0.00

22.12.08

ARTEFACTO TIPO DICROICO CON LAMPARA DE 10 w.

UND

64.00

129.93

8,315.52

64.00

8315.52

100.00%

0.00

0.00

22.12.09

ARTEFACTO TIPO BRAQUET CON LAMPARA DE 28 w.

UND

18.00

129.93

2,338.74

18.00

2338.74

100.00%

0.00

0.00

22.12.10

ARTEFACTO P/ EMPOTRAR SPOT CON LAMPARA DICROICA DE 50W

UND

5.00

163.78

818.90

0.00

0.00

0.00%

0.00

0.00

22.12.11

ARTEFACTO P/ EMPOTRAR METAL SPOT DE 150W

UND

6.00

163.78

982.68

6.00

982.68

100.00%

0.00

0.00

22.12.12

ARTEFACTO P/ ADOSAR METAL SPOT CON LAMPARA HALOGENA 100w

UND

5.00

745.78

3,728.90

5.00

3728.90

100.00%

0.00

0.00

22.12.13

ARTEFACTO P/ EMPOTRAR SPOT LIGHT DE 26W,

UND

72.00

163.78

11,792.16

0.00

0.00

0.00%

0.00

0.00

22.12.14

ARTEFACTO P/ EMPOTRAR SPOT LIGHT DE 13W,

UND

91.00

173.78

15,813.98

12.00

2085.36

13.19%

0.00

0.00

22.12.15

ARTEFACTO P/ ADOSAR ALPHA SPOT DE 26W,

UND

29.00

163.78

4,749.62

23.00

3766.94

79.31%

0.00

0.00

22.12.16

ARTEFACTO INDUSTRIAL DE 250W

UND

102.00

358.02

36,518.04

82.00

29357.64

80.39%

0.00

0.00

22.12.17

ARTEFACTO FAROLA ESFERICA P/EXTERIORES DE 70W

UND

148.00

393.02

58,166.96

29.00

11397.58

19.59%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

8.00

288.52

22.12.18

ARTEFACTO REFLECTOR DE 250w

22.12.19

LUMINARIA TIPO 2 CON LAMPARA DE SODIO 50w.

UND

32.00

243.78

22.12.20

LAMPARA INCANDESCENTE COMPACTA C/ BATERIA INCORPORADA

UND

103.00

22.12.21

ARTEFACTO REFLECTOR DE 2000w

UND

22.13.00

PRUEBAS ELECTRICAS

22.13.01

PRUEBAS ELECTRICAS SEGUN CODIGO NACIONAL DE ELECTRICIDAD

22.14.00

INSTALACIONES ESPECIALES

22.14.01

SALIDA PARA EXTRACTOR DE AIRE

EXPEDIENTE ADICIONAL N 01

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

0.00

0.00

0.00%

0.00

0.00

7,800.96

24.00

5850.72

75.00%

0.00

0.00

53.78

5,539.34

66.00

3549.48

64.08%

0.00

0.00

12.00

303.78

3,645.36

0.00

0.00

0.00%

0.00

0.00

GLB

2.00

318.92

637.84

0.00

0.00

0.00%

0.00

0.00

Pto

15.00

621.41

9,321.15

0.00

0.00

0.00%

0.00

0.00

UND

2,308.16

SUB TOTAL
B

AVANCE ANTERIOR

1,238,371.44

540,013.92

3,977.13

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
22.00.00

INSTALACIONES ELECTRICAS

22.08.00

REDES EXTERIORES

22.08.02

EXCAVACION DE ZANJA DE 40x40 P/ REDES

438.81

4.83

2,119.45

0.00

0.00

0.00%

0.00

0.00

PARTIDAS NUEVAS
22.00.00

INSTALACIONES ELECTRICAS

22.11.00

CABLES Y CONDUCTORES

22.11.16

CONDUCTOR NYY 3 - 1 x 10 mm2

100.00

23.98

2,398.00

30.00

719.40

30.00%

0.00

0.00

22.11.17

CONDUCTOR NYY 3 - 1 x 16 mm2

1,700.00

32.29

54,893.00

445.00

14369.05

26.18%

0.00

0.00

22.11.18

CONDUCTOR NYY 3 - 1 x 25 mm2

290.00

46.32

13,432.80

215.00

9958.80

74.14%

0.00

0.00

22.11.19

CONDUCTOR NYY 3 - 1 x 35 mm2

360.00

62.00

22,320.00

11.00

682.00

3.06%

0.00

0.00

22.11.20

CONDUCTOR NYY 3 - 1 x 50 mm2

480.00

87.12

41,817.60

411.00

35806.32

85.63%

0.00

0.00

22.11.21

CONDUCTOR NYY 3 - 1 x 70 mm2

550.00

116.49

64,069.50

292.00

34015.08

53.09%

0.00

0.00

22.11.22

CONDUCTOR NYY 3 - 1 x 120 mm2

20.00

227.03

4,540.60

0.00

0.00

0.00%

0.00

0.00

22.11.23

CONDUCTOR NYY 4 - 1 x 70 mm2

10.00

175.03

1,750.30

0.00

0.00

0.00%

0.00

0.00

22.11.24

CABLE DESNUDO DE COBE 16 mm2, TEMPLE BLANDO

143.00

13.69

1,957.67

99.50

1362.16

69.58%

0.00

0.00

22.11.25

CABLE DESNUDO DE COBE 25 mm2, TEMPLE BLANDO

120.00

16.85

2,022.00

120.00

2022.00

100.00%

0.00

0.00

SUB TOTAL
C

EXPEDIENTE ADICIONAL N 03
MAYORES METRADOS

03.00.00

MOVIMIENTO DE TIERRAS

211,320.92
MAYORES METRADOS - PARTIDAS NUEVAS

98,934.81

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

31.00

16.94

525.14

31.00

525.14

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

31.00

15.60

483.60

31.00

483.60

100.00%

0.00

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO C/MATERIAL PROPIO

M3

13.76

62.73

863.16

13.76

863.16

100.00%

0.00

0.00

03.26.00

COLOCACION DE CAMA PARA TUBERIA C/ARENA

M3

26.91

70.40

1,894.46

26.91

1894.46

100.00%

0.00

0.00

03.27.00

COLOCACION DE RELLENO PARA TUBERIA C/ARENA

M3

20.20

70.40

1,422.08

20.20

1422.08

100.00%

0.00

0.00

22.00.00

INSTALACIONES ELECTRICAS

22.01.00

SALIDAS PARA CENTRO DE LUZ

22.01.03

SALIDAS PARA VENTILADORES

Pto

5.00

24.36

121.80

5.00

121.80

100.00%

0.00

0.00

22.01.04

SALIDAS PARA CONTROLADORES DE VENTILADORES

Pto

2.00

22.36

44.72

2.00

44.72

100.00%

0.00

0.00

22.07.00

CONDUCTOS Y CANALIZACIONES

22.07.05

TUBERIA PVC-SAP (ELECTRICA) D=100 mm

ML

105.30

21.54

2,268.16

105.30

2268.16

100.00%

0.00

0.00

Pto

69.00

314.41

21,694.29

69.00

21694.29

100.00%

0.00

0.00

PARTIDAS NUEVAS
22.00.00

INSTALACIONES ELECTRICAS

22.01.00

SALIDAS PARA CENTRO DE LUZ

22.01.05

SALIDA PARA LUMINARIA SUSPENDIDAS EN TECHO DE TALLERES

22.08.00

REDES EXTERIORES

22.08.12

EXCAVACION MANUAL DE ZANJA P/ REDES DE ALIMENTADOR DE ENERGIA

M3

105.45

33.98

3,583.19

105.45

3583.19

100.00%

0.00

0.00

22.08.13

EXCAVACION MANUAL DE ZANJA DE 40x40 P/ REDES DE DATA

M3

20.52

40.64

833.93

20.52

833.93

100.00%

0.00

0.00

22.08.14

EXCAVACIN MANUAL PARA BUZONES P/ REDES DE ALIMENTADOR DE ENERGA

M3

14.24

53.48

761.56

14.24

761.56

100.00%

0.00

0.00

22.08.15

EXCAVACIN MANUAL PARA BUZONES P/ REDES DE DATA

M3

1.29

50.81

65.54

1.29

65.54

100.00%

0.00

0.00

22.08.16

EXCAVACION MANUAL DE ZANJA P/ POZO A TIERRA

M3

18.19

67.74

1,232.19

18.19

1232.19

100.00%

0.00

0.00

22.08.17

BUZON DE CONCRETO DE 0.60X0.60 EN EXTERIORES

UND

4.00

362.76

1,451.04

4.00

1451.04

100.00%

0.00

0.00

22.08.18

BUZON DE CONCRETO DE 1.0X1.0x1.2 P/REDES DE ALIMENTACIN DE ENERGA

UND

3.00

769.05

2,307.15

3.00

2307.15

100.00%

0.00

0.00

22.08.19

BUZON DE CONCRETO DE 1.0X0.70x0.55 P/REDES DE ALIMENTACIN DE ENERG

UND

1.00

466.04

466.04

1.00

466.04

100.00%

0.00

0.00

22.12.00

ARTEFACTOS DE ALUMBRADO

22.12.22

ARTEFACTO INDUSTRIAL DE 80W

UND

11.00

255.70

2,812.70

11.00

2812.70

100.00%

0.00

0.00

22.14.00

INSTALACIONES ESPECIALES

22.14.02

VENTILADOR DE 3 ALETAS COLOR BLANCO CON CONTROL ELECTRNICO DE 5

UND

22.00

291.11

6,404.42

22.00

6404.42

100.00%

0.00

0.00

22.16.00

EQUIPAMIENTO ELECTROMECANICOS

22.16.01

GRUPO ELECTROGENO DE 72KW, INCLUYE TABLERO DE TRANSFERENCIA, CARG

UND

1.00

72,943.00

72,943.00

1.00

72943.00

100.00%

0.00

0.00

SUB TOTAL
D

EXPEDIENTE ADICIONAL N 04

122,178.19
MAYORES METRADOS -PARTIDAS NUEVAS

122,178.19

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

AVANCE ANTERIOR

METRADO

P. UNITARIO

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

70.00

16.94

1,185.80

70.00

1185.80

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

60.00

15.60

936.00

60.00

936.00

100.00%

0.00

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO C/MATERIAL PROPIO

M3

39.91

62.73

2,503.55

39.91

2503.55

100.00%

0.00

0.00

03.26.00

COLOCACION DE CAMA PARA TUBERIA C/ARENA

M3

37.93

70.40

2,670.27

37.93

2670.27

100.00%

0.00

0.00

03.27.00

COLOCACION DE RELLENO PARA TUBERIA C/ARENA

M3

37.51

70.40

2,640.70

37.51

2640.70

100.00%

0.00

0.00

22.00.00

INSTALACIONES ELECTRICAS

22.08.00

REDES EXTERIORES

22.08.12

EXCAVACION MANUAL DE ZANJA P/REDES DE ALIMENTADOR DE ENERGIA

M3

164.56

33.98

5,591.75

164.56

5591.75

100.00%

0.00

0.00

22.08.16

EXCAVACION MANUAL DE ZANJA P/POZO A TIERRA

M3

4.46

67.74

302.12

4.46

302.12

100.00%

0.00

0.00

UND

17.00

41.23

700.91

17.00

700.91

100.00%

0.00

0.00

UND

2.00

568.42

1,136.84

2.00

1136.84

100.00%

0.00

0.00

PARTIDAS NUEVAS
22.00.00

INSTALACIONES ELECTRICAS

22.08.00

REDES EXTERIORES

22.08.20

PEDESTAL DE CONCRETO 140 KG/CM2 PARA POSTES DE FIERRO GALVANIZADO

22.09.00

TABLEROS

22.09.59

TABLERO DE DISTRIBUCION DT -10 , 3 - 380/220 v

22.11.00

CABLES Y CONDUCTORES

22.11.26

CONDUCTOR NYY2 - 1 x 10 mm2

600.00

13.87

8,322.00

600.00

8322.00

100.00%

0.00

0.00

22.11.27

CONDUCTOR NYY4 - 1 x 25 mm2

357.50

45.37

16,219.78

357.50

16219.78

100.00%

0.00

0.00

22.12.00

ARTEFACTOS DE ALUMBRADO

22.12.23

SPOT LIGHT TIPO LED

UND

8.00

52.13

417.04

8.00

417.04

100.00%

0.00

0.00

22.12.24

ARTEFACTO REFLECTOR TIPO HALOGENO INC/ SOPORTE METALICO

UND

5.00

259.01

1,295.05

5.00

1295.05

100.00%

0.00

0.00

22.12.25

ARTEFACTO TIPO LAMPARA SUMERGIBLE DE 12 VOLT. 50W

UND

3.00

165.39

496.17

3.00

496.17

100.00%

0.00

0.00

22.14.00

INSTALACIONES ESPECIALES

22.14.03

TOMACORRIENTE INDUSTRIAL TRIFASICO DE 30 AMP.

UND

14.00

72.67

1,017.38

14.00

1017.38

100.00%

0.00

0.00

SUB TOTAL
E

EXPEDIENTE ADICIONAL N 08
MAYORES METRADOS

22.00.00

INSTALACIONES ELECTRICAS

22.03.00

SALIDAS PARA TOMACORRIENTES

45,435.36
MAYORES METRADOS - PARTIDAS NUEVAS

45,435.36

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

22.03.01

SALIDAS DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA EN PARED H=0.4 S

UND

22.07.00

CONDUCTOS Y CANALIZACIONES

22.07.02

TUBERIA PVC-SAP (ELECTRICA) D=25 mm

22.07.05

TUBERIA PVC-SAP (ELECTRICA) D=100 mm

22.08.00

REDES EXTERIORES

22.08.12

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

8.00

32.16

257.28

0.00

0.00

0.00%

0.00

0.00

ML

140.20

4.43

621.09

126.00

558.18

89.87%

0.00

0.00

ML

10.85

21.54

233.71

10.85

233.71

100.00%

0.00

0.00

EXCAVACION MANUAL DE ZANJA P/ REDES DE ALIMENTADOR DE ENERGIA

M3

10.86

33.98

369.02

10.86

369.02

100.00%

0.00

0.00

22.08.15

EXCAVACIN MANUAL PARA BUZONES P/ REDES DE DATA

M3

0.81

50.81

41.16

0.81

41.16

100.00%

0.00

0.00

22.08.17

BUZON DE CONCRETO DE 0.60X0.60 EN EXTERIORES

UND

6.00

362.76

2,176.56

6.00

2176.56

100.00%

0.00

0.00

22.11.00

CABLES Y CONDUCTORES

22.11.04

CABLE ELECTRICO THW - 90, 10 mm2

ML

112.50

8.28

931.50

112.50

931.50

100.00%

0.00

0.00

22.11.13

CABLE ELECTRICO 1x4 mm2 (T), THW-90

ML

37.50

5.13

192.38

37.50

192.38

100.00%

0.00

0.00

22.11.16

CONDUCTOR NYY 3 - 1 x 10 mm2

ML

15.24

23.98

365.46

0.00

0.00

0.00%

0.00

0.00

ML

0.25

1,810.16

452.54

0.13

235.32

52.00%

0.00

0.00

ML

13.66

37.50

512.25

0.00

0.00

0.00%

0.00

0.00

PARTIDAS NUEVAS
21.00.00

INSTALACIONES SANITARIAS

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.25

CAJA CIEGA

22.00.00

INSTALACIONES ELECTRICAS

22.11.00

CABLES Y CONDUCTORES

22.11.28

CABLE NLT EXTRA FLEXIBLE 3 x 4 mm2


SUB TOTAL

COSTO DIRECTO
GASTOS GENERALES 10%

1,623,458.84

6,152.93

4,737.82

100.00%

811,300.10

0.00
49.97%

3,977.13

162,345.88

81,130.01

397.71

GASTOS DE SUPERVISIN 2%

32,469.18

16,226.00

79.54

GASTOS DE LIQUIDACIN 0.8%

12,987.67

6,490.40

31.82

GASTOS ADMINISTRATIVOS 1.5%

24,351.88

12,169.50

59.66

PRESUPUESTO TOTAL (S/.)

1,855,613.46

100.00%

927,316.01

49.97%

4,545.86

PONENTE INST. ELECTRCIAS RED SECUNDARIA


: DICIEMBRE 2015

STRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

485.00

10844.60

62.10%

296.00

6618.56

37.90%

0.00%

140.00

3130.40

60.87%

90.00

2012.40

39.13%

0.00%

32.00

779.52

65.31%

17.00

414.12

34.69%

0.00%

26.00

581.36

78.79%

7.00

156.52

21.21%

0.85%

167.00

5906.79

70.76%

69.00

2440.53

29.24%

0.00%

30.00

1151.10

61.22%

19.00

729.03

38.78%

0.00%

3.00

113.82

23.08%

10.00

379.40

76.92%

0.00%

19.00

824.79

63.33%

11.00

477.51

36.67%

3.10%

340.00

10934.40

61.93%

209.00

6721.44

38.07%

0.00%

25.00

822.75

100.00%

0.00

0.00

0.00%

0.00%

29.00

2407.58

69.05%

13.00

1079.26

30.95%

0.00%

47.00

4329.64

47.47%

52.00

4790.24

52.53%

0.00%

0.00

0.00

0.00%

158.00

12399.84

100.00%

0.00%

19.00

5420.70

67.86%

9.00

2567.70

32.14%

0.00%

2.00

495.56

20.00%

8.00

1982.24

80.00%

0.00%

0.00

0.00

0.00%

24.00

750.00

100.00%

0.00%

72.00

2250.00

96.00%

3.00

93.75

4.00%

0.00%

0.00

0.00

0.00%

1.00

39640.97

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

187.00

10279.39

100.00%

0.00%

0.00

0.00

0.00%

9.00

322.65

100.00%

0.00%

0.00

0.00

0.00%

2.00

73.70

100.00%

0.00%

0.00

0.00

0.00%

43.00

8534.21

100.00%

0.00%

1.00

52.55

50.00%

1.00

52.55

50.00%

0.00%

0.00

0.00

0.00%

2.00

399.10

100.00%

0.00%

0.00

0.00

0.00%

2.00

44699.12

100.00%

0.00%

120.00

2533.20

100.00%

0.00

0.00

0.00%

18.37%

49.00

1254.89

100.00%

0.00

0.00

0.00%

0.00%

26.00

678.86

92.86%

2.00

52.22

7.14%

0.00%

0.00

0.00

0.00%

40.00

1164.40

100.00%

0.00%

3.00

96.33

17.65%

14.00

449.54

82.35%

0.00%

2.00

78.22

15.38%

11.00

430.21

84.62%

1.17%

5461.24

19933.53

88.45%

712.89

2602.05

11.55%

0.05%

3085.43

13668.45

55.15%

2,509.15

11115.53

44.85%

5.34%

1263.62

9477.12

66.14%

646.88

4851.63

33.86%

0.00%

1323.73

22437.22

76.03%

417.24

7072.22

23.97%

0.00%

123.00

2649.42

100.00%

0.00

0.00

0.00%

0.00%

148.00

1793.76

15.37%

814.67

9873.80

84.63%

0.00%

241.76

1167.70

53.24%

212.34

1025.60

46.76%

0.00%

369.86

3894.63

49.54%

376.67

3966.34

50.46%

0.00%

0.00

0.00

0.00%

56.00

3679.76

100.00%

28.57%

8.00

404.48

28.57%

20.00

1011.20

71.43%

0.00%

0.00

0.00

0.00%

108.00

16430.04

100.00%

0.00%

13.00

14456.65

54.17%

11.00

12232.55

45.83%

0.00%

19.00

4357.65

59.38%

13.00

2981.55

40.63%

6.67%

24.00

4747.44

53.33%

21.00

4154.01

46.67%

8.33%

11.00

2192.41

30.56%

25.00

4982.75

69.44%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

31.00

2357.86

100.00%

0.00%

0.50

3148.50

50.00%

0.50

3148.50

50.00%

0.00%

0.00

0.00

0.00%

1.00

1972.72

100.00%

0.00%

0.00

0.00

0.00%

1.00

1053.93

100.00%

0.00%

1.00

1318.25

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

353.48

100.00%

0.00%

0.00

0.00

0.00%

1.00

323.48

100.00%

0.00%

1.00

1842.06

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

980.85

100.00%

0.00%

1.00

770.67

100.00%

0.00

0.00

0.00%

0.00%

1.00

915.82

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

1355.61

100.00%

0.00%

0.00

0.00

0.00%

1.00

1245.33

100.00%

0.00%

0.00

0.00

0.00%

1.00

1355.61

100.00%

0.00%

0.00

0.00

0.00%

1.00

1469.81

100.00%

0.00%

0.00

0.00

0.00%

1.00

1036.17

100.00%

0.00%

0.00

0.00

0.00%

1.00

1036.17

100.00%

0.00%

0.00

0.00

0.00%

1.00

1036.17

100.00%

0.00%

0.00

0.00

0.00%

1.00

1036.17

100.00%

0.00%

1.00

1228.16

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

1036.17

100.00%

0.00%

0.00

0.00

0.00%

1.00

998.84

100.00%

0.00%

0.00

0.00

0.00%

1.00

1083.01

100.00%

0.00%

1.00

1427.25

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

1716.66

100.00%

0.00%

0.00

0.00

0.00%

1.00

1011.37

100.00%

0.00%

0.00

0.00

0.00%

1.00

915.82

100.00%

0.00%

0.50

4154.22

50.00%

0.50

4154.22

50.00%

0.00%

1.00

3075.62

100.00%

0.00

0.00

0.00%

0.00%

1.00

2137.08

100.00%

0.00

0.00

0.00%

0.00%

1.00

954.01

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

1.00

5977.25

100.00%

0.00

0.00

0.00%

0.00%

1.00

1428.25

100.00%

0.00

0.00

0.00%

0.00%

1.00

1487.08

100.00%

0.00

0.00

0.00%

0.00%

1.00

1066.20

100.00%

0.00

0.00

0.00%

0.00%

1.00

1552.68

100.00%

0.00

0.00

0.00%

0.00%

1.00

1173.15

100.00%

0.00

0.00

0.00%

0.00%

1.00

1228.93

100.00%

0.00

0.00

0.00%

0.00%

1.00

1193.67

100.00%

0.00

0.00

0.00%

0.00%

1.00

1193.67

100.00%

0.00

0.00

0.00%

0.00%

1.00

1246.49

100.00%

0.00

0.00

0.00%

0.00%

1.00

1574.40

100.00%

0.00

0.00

0.00%

0.00%

1.00

810.90

100.00%

0.00

0.00

0.00%

0.00%

1.00

1083.93

100.00%

0.00

0.00

0.00%

0.00%

1.00

1376.44

100.00%

0.00

0.00

0.00%

0.00%

1.00

872.28

100.00%

0.00

0.00

0.00%

0.00%

1.00

788.14

100.00%

0.00

0.00

0.00%

0.00%

1.00

848.20

100.00%

0.00

0.00

0.00%

0.00%

1.00

956.22

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

1000.33

100.00%

0.00%

0.00

0.00

0.00%

1.00

1339.10

100.00%

0.00%

0.00

0.00

0.00%

1.00

964.52

100.00%

0.00%

1.00

964.52

100.00%

0.00

0.00

0.00%

0.00%

1.00

964.52

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

1309.78

100.00%

0.00%

1.00

1184.52

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

964.52

100.00%

0.00%

0.00

0.00

0.00%

1.00

964.52

100.00%

0.00%

1.00

18263.42

100.00%

0.00

0.00

0.00%

0.00%

17.00

10645.57

73.91%

6.00

3757.26

26.09%

0.18%

6811.57

34262.20

83.35%

1,361.06

6846.13

16.65%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.97%

7941.72

41376.36

95.86%

343.33

1788.75

4.14%

0.00%

1842.72

11314.32

57.14%

1,381.99

8485.40

42.86%

0.00%

758.98

6284.35

83.87%

146.00

1208.88

16.13%

0.00%

0.00

0.00

0.00%

5,846.61

47942.20

100.00%

0.00%

104.00

1124.24

2.64%

3,836.04

41467.59

97.36%

0.00%

0.00

0.00

0.00%

1,493.17

22442.35

100.00%

0.00%

174.00

3318.18

16.71%

867.24

16538.27

83.29%

0.00%

0.00

0.00

0.00%

1,680.47

42717.55

100.00%

0.00%

690.00

23011.50

76.28%

214.58

7156.24

23.72%

0.00%

0.00

0.00

0.00%

104.00

4658.16

100.00%

0.00%

1678.85

8310.31

38.68%

2,661.01

13172.00

61.32%

0.00%

276.82

1420.09

20.31%

1,086.00

5571.18

79.69%

0.00%

0.00

0.00

0.00%

185.88

1126.43

100.00%

0.00%

0.00

0.00

0.00%

100.00

1283.00

100.00%

0.00%

6.00

2188.68

13.33%

39.00

14226.42

86.67%

0.00%

107.00

20691.66

38.63%

170.00

32874.60

61.37%

0.00%

7.00

726.46

20.59%

27.00

2802.06

79.41%

0.00%

61.00

10948.28

74.39%

21.00

3769.08

25.61%

0.00%

96.00

23978.88

74.42%

33.00

8242.74

25.58%

0.00%

10.00

3737.80

100.00%

0.00

0.00

0.00%

0.00%

70.00

45204.60

58.33%

50.00

32289.00

41.67%

0.00%

64.00

8315.52

100.00%

0.00

0.00

0.00%

0.00%

18.00

2338.74

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

5.00

818.90

100.00%

0.00%

6.00

982.68

100.00%

0.00

0.00

0.00%

0.00%

5.00

3728.90

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

72.00

11792.16

100.00%

0.00%

12.00

2085.36

13.19%

79.00

13728.62

86.81%

0.00%

23.00

3766.94

79.31%

6.00

982.68

20.69%

0.00%

82.00

29357.64

80.39%

20.00

7160.40

19.61%

0.00%

29.00

11397.58

19.59%

119.00

46769.38

80.41%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

8.00

2308.16

100.00%

0.00%

24.00

5850.72

75.00%

8.00

1950.24

25.00%

0.00%

66.00

3549.48

64.08%

37.00

1989.86

35.92%

0.00%

0.00

0.00

0.00%

12.00

3645.36

100.00%

0.00%

0.00

0.00

0.00%

2.00

637.84

100.00%

0.00%

0.00

0.00

0.00%

15.00

9321.15

100.00%

543,991.05

694,380.38

0.00%

0.00

0.00

0.00%

438.81

2119.45

100.00%

0.00%

30.00

719.40

30.00%

70.00

1678.60

70.00%

0.00%

445.00

14369.05

26.18%

1,255.00

40523.95

73.82%

0.00%

215.00

9958.80

74.14%

75.00

3474.00

25.86%

0.00%

11.00

682.00

3.06%

349.00

21638.00

96.94%

0.00%

411.00

35806.32

85.63%

69.00

6011.28

14.38%

0.00%

292.00

34015.08

53.09%

258.00

30054.42

46.91%

0.00%

0.00

0.00

0.00%

20.00

4540.60

100.00%

0.00%

0.00

0.00

0.00%

10.00

1750.30

100.00%

0.00%

99.50

1362.16

69.58%

43.50

595.52

30.42%

0.00%

120.00

2022.00

100.00%

0.00

0.00

0.00%

98,934.81

112,386.12

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

31.00

525.14

100.00%

0.00

0.00

0.00%

0.00%

31.00

483.60

100.00%

0.00

0.00

0.00%

0.00%

13.76

863.16

100.00%

0.00

0.00

0.00%

0.00%

26.91

1894.46

100.00%

0.00

0.00

0.00%

0.00%

20.20

1422.08

100.00%

0.00

0.00

0.00%

0.00%

5.00

121.80

100.00%

0.00

0.00

0.00%

0.00%

2.00

44.72

100.00%

0.00

0.00

0.00%

0.00%

105.30

2268.16

100.00%

0.00

0.00

0.00%

0.00%

69.00

21694.29

100.00%

0.00

0.00

0.00%

0.00%

105.45

3583.19

100.00%

0.00

0.00

0.00%

0.00%

20.52

833.93

100.00%

0.00

0.00

0.00%

0.00%

14.24

761.56

100.00%

0.00

0.00

0.00%

0.00%

1.29

65.54

100.00%

0.00

0.00

0.00%

0.00%

18.19

1232.19

100.00%

0.00

0.00

0.00%

0.00%

4.00

1451.04

100.00%

0.00

0.00

0.00%

0.00%

3.00

2307.15

100.00%

0.00

0.00

0.00%

0.00%

1.00

466.04

100.00%

0.00

0.00

0.00%

0.00%

11.00

2812.70

100.00%

0.00

0.00

0.00%

0.00%

22.00

6404.42

100.00%

0.00

0.00

0.00%

0.00%

1.00

72943.00

100.00%

0.00

0.00

0.00%

122,178.19

0.00

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

70.00

1185.80

100.00%

0.00

0.00

0.00%

0.00%

60.00

936.00

100.00%

0.00

0.00

0.00%

0.00%

39.91

2503.55

100.00%

0.00

0.00

0.00%

0.00%

37.93

2670.27

100.00%

0.00

0.00

0.00%

0.00%

37.51

2640.70

100.00%

0.00

0.00

0.00%

0.00%

164.56

5591.75

100.00%

0.00

0.00

0.00%

0.00%

4.46

302.12

100.00%

0.00

0.00

0.00%

0.00%

17.00

700.91

100.00%

0.00

0.00

0.00%

0.00%

2.00

1136.84

100.00%

0.00

0.00

0.00%

0.00%

600.00

8322.00

100.00%

0.00

0.00

0.00%

0.00%

357.50

16219.78

100.00%

0.00

0.00

0.00%

0.00%

8.00

417.04

100.00%

0.00

0.00

0.00%

0.00%

5.00

1295.05

100.00%

0.00

0.00

0.00%

0.00%

3.00

496.17

100.00%

0.00

0.00

0.00%

0.00%

14.00

1017.38

100.00%

0.00

0.00

0.00%

45,435.36

0.00

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

8.00

257.28

100.00%

0.00%

126.00

558.18

89.87%

14.20

62.91

10.13%

0.00%

10.85

233.71

100.00%

0.00

0.00

0.00%

0.00%

10.86

369.02

100.00%

0.00

0.00

0.00%

0.00%

0.81

41.16

100.00%

0.00

0.00

0.00%

0.00%

6.00

2176.56

100.00%

0.00

0.00

0.00%

0.00%

112.50

931.50

100.00%

0.00

0.00

0.00%

0.00%

37.50

192.38

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

15.24

365.46

100.00%

0.00%

0.13

235.32

52.00%

0.12

217.22

48.00%

0.00%

0.00

0.00

0.00%

13.66

512.25

100.00%

4,737.82
0.24%

0.24%

815,277.23

1,415.11
50.22%

808,181.61

81,527.72

80,818.16

16,305.54

16,163.63

6,522.22

6,465.45

12,229.16

12,122.72

931,861.87

50.219%

923,751.58

49.78%

49.78%

CUADRO VALORIZACION DEL COMPONENTE INSTALACIONES SANITARIAS GLOBAL


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO J


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRE
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

EXPEDIENTE TCNICO

21.00.00

INSTALACION SANITARIA

21.01.00

APARATOS SANITARIOS

21.01.01

INODORO BLANCO Y/O SIMILAR

UND

20.00

251.41

5,028.20

15.00

3771.15

75.00%

0.00

0.00

21.01.02

INODORO BLANCO Y/O SIMILAR CON FLUXOMETRO

UND

46.00

521.41

23,984.86

17.00

8863.97

36.96%

0.00

0.00

21.01.03

URINARIOS DE LOZA DE PICO DE LORO BLANCO

UND

26.00

191.41

4,976.66

12.00

2296.92

46.15%

0.00

0.00

21.01.04

LAVATORIO DE LOSA BLANCA

UND

74.00

171.41

12,684.34

14.00

2399.74

18.92%

0.00

0.00

21.01.05

LAVATORIO DE ACERO INOXIDABLE SIMPLE

PZA

39.00

281.41

10,974.99

0.00

0.00

0.00%

0.00

0.00

21.01.06

LAVATORIO DE ACERO INOXIDABLE DOBLE

PZA

6.00

396.41

2,378.46

3.00

1189.23

50.00%

0.00

0.00

21.01.07

DUCHA SIMPLE CON GRIFERIA

UND

44.00

75.72

3,331.68

11.00

832.92

25.00%

0.00

0.00

21.01.08

DISPENSADOR DE PAPEL TOALLA

UND

46.00

51.95

2,389.70

5.00

259.75

10.87%

0.00

0.00

21.01.09

DISPENSADOR DE JABON LIQUIDO TIPO PERA

UND

56.00

37.95

2,125.20

0.00

0.00

0.00%

0.00

0.00

21.01.10

GANCHO METALICO CROMADO

UND

44.00

39.95

1,757.80

0.00

0.00

0.00%

0.00

0.00

21.01.11

DISPENSADOR DE PAPEL HIGIENICO

UND

66.00

51.95

3,428.70

8.00

415.60

12.12%

0.00

0.00

21.01.12

JABONERA DE DUCHA

UND

44.00

15.58

685.52

12.00

186.96

27.27%

0.00

0.00

21.01.13

BEBEDERO CORRIDO DE CONCRETO REVESTIDO CON MAYOLICA 20x20

ML

3.00

211.22

633.66

0.00

0.00

0.00%

0.00

0.00

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.01

EMPALME A TUBERIA EXISTENTE DE DESAGUE

UND

3.00

174.86

524.58

1.00

174.86

33.33%

0.00

0.00

21.02.02

SALIDA DE DESAGUE EN PVC

Pto

330.00

87.22

28,782.60

0.00

0.00

0.00%

0.00

0.00

21.02.03

SALIDA PARA VENTILACION

Pto

67.00

83.93

5,623.31

17.00

1426.81

25.37%

0.00

0.00

21.02.04

BAJADA DE LLUVIAS

Pto

27.00

86.24

2,328.48

7.00

603.68

25.93%

0.00

0.00

21.02.05

TUBERIA PVC ISO 200 mm S-20

ML

163.20

61.64

10,059.65

140.30

8648.09

85.97%

0.00

0.00

21.02.06

TUBERIA PVC ISO 160 mm S-25

ML

334.60

54.30

18,168.78

300.90

16338.87

89.93%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

21.02.07

TUBERIA PVC SAL 4"

21.02.08

CAJA DE REBOSE CON REJILLA DE FIERRO

21.02.09

CAJA DE REGISTRO PREFABRICADA DE CONCRETO DE 0.30x0.60m

21.02.10

UND
ML

METRADO

P. UNITARIO

185.70

23.53

UND

1.00

UND

47.00

CAJA DE REGISTRO PREFABRICADA DE CONCRETO DE 0.45x0.60m

UND

21.02.11

CAJA DE REGISTRO PREFABRICADA DE CONCRETO DE 0.60x0.60m

UND

21.02.12

BUZON TIPO I Hprom=1.80m

21.02.13

PRUEBA HIDRAULICA DE DESAGUE

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.01

EMPALME A TUBERIA EXISTENTE DE AGUA

21.03.02
21.03.03

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

4,369.52

127.20

2993.02

68.50%

3.00

70.59

364.13

364.13

1.00

364.13

100.00%

0.00

0.00

208.27

9,788.69

0.00

0.00

0.00%

0.00

0.00

26.00

213.27

5,545.02

0.00

0.00

0.00%

0.00

0.00

9.00

235.21

2,116.89

1.00

235.21

11.11%

0.00

0.00

UND

10.00

1,742.69

17,426.90

9.50

16555.56

95.00%

0.00

0.00

ML

683.50

1.79

1,223.47

424.40

759.68

62.09%

0.00

0.00

UND

1.00

454.65

454.65

0.00

0.00

0.00%

0.00

0.00

SALIDA DE AGUA FRIA - PVC

Pto

258.00

84.15

21,710.70

0.00

0.00

0.00%

0.00

0.00

TUBERIA PVC CLASE 10 - 1/2"

ML

4.68

9.02

42.21

4.68

42.21

100.00%

0.00

0.00

21.03.04

TUBERIA PVC CLASE 10 - 3/4"

ML

165.65

9.47

1,568.71

165.65

1568.71

100.00%

0.00

0.00

21.03.05

TUBERIA PVC CLASE 10 - 1"

ML

184.09

10.19

1,875.88

184.09

1875.88

100.00%

0.00

0.00

21.03.06

TUBERIA PVC CLASE 10 - 1 1/4"

ML

85.28

11.62

990.95

37.90

440.40

44.44%

0.00

0.00

21.03.07

TUBERIA PVC CLASE 10 - 1 1/2"

ML

246.87

13.26

3,273.50

72.92

966.92

29.54%

0.00

0.00

21.03.08

TUBERIA PVC CLASE 10 - 2"

ML

122.17

16.44

2,008.47

122.17

2008.47

100.00%

0.00

0.00

21.03.09

TUBERIA PVC CLASE 10 - 2 1/2"

ML

130.21

20.24

2,635.45

9.87

199.77

7.58%

0.00

0.00

21.03.10

TUBERIA PVC CLASE 10 - 3"

ML

370.46

27.08

10,032.06

233.30

6317.76

62.98%

0.00

0.00

21.03.11

PRUEBA HIDRAULICA + DESINFECCION TUBERIA DE AGUA POTABLE

ML

1,912.02

2.29

4,378.53

460.44

1054.41

24.08%

0.00

0.00

21.03.12

GRIFO DE RIEGO 3/4"

UND

30.00

117.04

3,511.20

0.00

0.00

0.00%

0.00

0.00

21.03.13

TUBERIA FIERRO GALVANIZADO 2"

ML

15.00

33.90

508.50

5.20

176.28

34.67%

0.00

0.00

21.03.14

TUBERIA FIERRO GALVANIZADO 3"

ML

28.00

43.01

1,204.28

28.00

1204.28

100.00%

0.00

0.00

21.03.15

TEE FG 2"

UND

3.00

41.26

123.78

0.00

0.00

0.00%

0.00

0.00

21.03.16

TEE FG 3"

UND

6.00

56.26

337.56

1.00

56.26

16.67%

0.00

0.00

21.03.17

CODO 90 DE FG 2"

UND

3.00

36.26

108.78

0.00

0.00

0.00%

0.00

0.00

21.03.18

CODO 90 DE FG 3"

UND

6.00

56.26

337.56

6.00

337.56

100.00%

0.00

0.00

21.03.19

VALVULA ESFERICA DE BRONCE 2"

UND

3.00

96.52

289.56

1.00

96.52

33.33%

0.00

0.00

21.03.20

VALVULA ESFERICA DE BRONCE 3"

UND

5.00

216.52

1,082.60

4.00

866.08

80.00%

0.00

0.00

21.03.21

VALVULA DE ALIVIO 2"

UND

1.00

256.52

256.52

0.00

0.00

0.00%

0.00

0.00

21.03.22

CANASTILLA DE BRONCE 4"

UND

2.00

256.52

513.04

0.00

0.00

0.00%

0.00

0.00

21.03.23

VALVULA FLOTADORA DE 3/4"

UND

2.00

96.52

193.04

0.00

0.00

0.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

21.03.24

TAPA METALICO C/PLANCHA FF 0.80x0.80 e=1/4"

UND

1.00

329.13

329.13

0.00

0.00

0.00%

0.00

0.00

21.03.25

VALVULA COMPUERTA SCH 40 4"

UND

3.00

663.32

1,989.96

0.00

0.00

0.00%

0.00

0.00

21.03.26

VALVULA CHECK DE BRONCE 4"

UND

2.00

586.52

1,173.04

0.00

0.00

0.00%

0.00

0.00

21.03.27

CODO 90 SCH 40 4"

UND

22.00

311.26

6,847.72

5.00

1556.30

22.73%

0.00

0.00

21.03.28

TEE SCHU 40 4"

UND

14.00

461.26

6,457.64

3.00

1383.78

21.43%

0.00

0.00

21.03.29

TUBERIA DE ACERO NEGRO SCHUDELE 40 4"

ML

602.61

154.62

93,175.56

80.61

12463.92

13.38%

0.00

0.00

21.03.30

GABINETE CONTRA INCENDIO

UND

11.00

1,387.13

15,258.43

1.00

1387.13

9.09%

2.00

2774.26

21.03.31

VALVULA SIAMESA, TIPO PARED DE 4"X2 1/2"X2 1/2" DE BRONCE CROMADA

UND

3.00

1,914.26

5,742.78

0.00

0.00

0.00%

0.00

0.00

21.03.32

SELLO DE AGUA CON PLANCHA DE FIERRO

UND

1.00

162.67

162.67

0.00

0.00

0.00%

0.00

0.00

21.03.33

MANOMETRO PRESOSTATO 1"

UND

1.00

253.56

253.56

0.00

0.00

0.00%

0.00

0.00

21.03.34

ABRAZADERA DE FIJACION PARA TUBO MAX 3"

UND

12.00

17.68

212.16

0.00

0.00

0.00%

0.00

0.00

21.03.35

ELECTROBOMBA 4.00 HP, Q: 10.29 l/s, HDT:15.00 m

UND

2.00

4,915.56

9,831.12

0.00

0.00

0.00%

0.00

0.00

21.03.36

ELECTROBOMBA 10.00 HP, Q:10.00 l/s, HDT:70.00 m

UND

1.00

8,915.56

8,915.56

0.00

0.00

0.00%

0.00

0.00

21.03.37

ELECTROBOMBA JOCKEY 1.00 HP, Q:1.00 l/s, HDT:45.00 m

UND

1.00

1,665.56

1,665.56

0.00

0.00

0.00%

0.00

0.00

21.03.38

TRAMPA DE GRASAS (INCLUYE CAJA C/REJILLAS)

UND

4.00

123.33

493.32

0.00

0.00

0.00%

0.00

0.00

21.03.39

REJILLA DE EVACUACION (5x0.25)

UND

1.00

518.96

518.96

0.00

0.00

0.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 01

391,166.48

102,318.78

2,844.85

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
21.00.00

INSTALACION SANITARIA

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.07

TUBERIA PVC SAL 4"

ML

9.33

23.53

219.53

9.33

219.53

100.00%

0.00

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.21.00

EXCAVACIONES PARA REDES DE AGUA 0.40 x 0.40 m C/MAQUINARIA

M3

69.58

7.80

542.72

69.58

542.72

100.00%

0.00

0.00

03.22.00

EXCAVACIONES PARA REDES DE DESAGUE C/MAQUINARIA, H=1.20M Max.

M3

228.50

13.90

3,176.15

228.50

3176.15

100.00%

0.00

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO C/MATERIAL PROPIO

M3

223.40

62.73

14,013.88

223.40

14013.88

100.00%

0.00

0.00

03.26.00

COLOCACION DE CAMA PARA TUBERIA C/ARENA

M3

37.34

70.40

2,628.74

37.34

2628.74

100.00%

0.00

0.00

03.27.00

COLOCACION DE RELLENO PARA TUBERIA C/ARENA

M3

37.34

70.40

2,628.74

37.34

2628.74

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

21.00.00

INSTALACION SANITARIA

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.14

SALIDA DE DESAGUE EN TUBERIAS DE PVC

Pto

123.00

98.87

12,161.01

96.00

9491.52

78.05%

0.00

0.00

21.02.15

CAJA DE REGISTRO DE CONCRETO DE 0.30x0.60m

UND

26.00

277.35

7,211.10

26.00

7211.10

100.00%

0.00

0.00

21.02.16

CAJA DE REGISTRO DE CONCRETO DE 0.45x0.60m

UND

9.00

314.22

2,827.98

9.00

2827.98

100.00%

0.00

0.00

21.02.17

CAJA DE REGISTRO DE CONCRETO DE 0.60x0.60m

UND

4.00

335.09

1,340.36

4.00

1340.36

100.00%

0.00

0.00

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.40

SALIDA DE AGUA FRIA EN TUBERIA PVC

Pto

91.00

82.67

7,522.97

91.00

7522.97

100.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 03

54,273.18

51,603.69

0.00

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

41.14

16.94

696.91

41.14

696.91

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

39.00

15.60

608.40

39.00

608.40

100.00%

0.00

0.00

03.21.00

EXCAVACIONES PARA REDES DE AGUA 0.40 x 0.40 m C/MAQUINARIA

M3

2.18

7.80

17.00

2.18

17.00

100.00%

0.00

0.00

03.26.00

COLOCACION DE CAMA PARA TUBERIA C/ARENA

M3

49.65

70.40

3,495.36

49.65

3495.36

100.00%

0.00

0.00

03.27.00

COLOCACION DE RELLENO PARA TUBERIA C/ARENA

M3

72.09

70.40

5,075.14

72.09

5075.14

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.03

SOLADOS CONCRETO f'c=100 kg/cm2

M3

0.22

150.33

33.07

0.22

33.07

100.00%

0.00

0.00

21.00.00

INSTALACION SANITARIA

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.07

TUBERIA PVC SAL 4"

ML

124.57

23.53

2,931.13

124.57

2931.13

100.00%

0.00

0.00

21.02.14

SALIDA DE DESAGUE EN TUBERIAS DE PVC

Pto

4.00

98.87

395.48

4.00

395.48

100.00%

0.00

0.00

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.04

TUBERIA PVC CLASE 10 - 3/4"

ML

14.40

9.47

136.37

14.40

136.37

100.00%

0.00

0.00

21.03.08

TUBERIA PVC CLASE 10 - 2"

ML

38.53

16.44

633.43

38.53

633.43

100.00%

0.00

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

03.31.00

EXCAVACIONES MANUAL DE ZANJA PARA REDES DE AGUA

M3

111.54

29.03

3,238.01

111.54

3238.01

100.00%

0.00

0.00

03.32.00

EXCAVACIONES MANUAL DE ZANJA PARA REDES DE DESAGUE

M3

264.36

29.89

7,901.72

264.36

7901.72

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.11.00

ESTRUCTURAS DE SOSTENIMIENTO EN EXCAVACIN P/ TRAMPA DE GRASA

04.11.01

ESTRUCTURAS DE SOSTENIMIENTO DE EXCAVACIN, CONCRETO FC= 100 KG/C

M3

3.14

185.18

581.47

3.14

581.47

100.00%

0.00

0.00

M2

15.82

62.51

988.91

15.82

988.91

100.00%

0.00

0.00

M3

4.11

2,074.88

8,527.76

4.11

8527.76

100.00%

0.00

0.00

04.11.02

ESTRUCTURAS DE SOSTENIMIENTO DE EXCAVACIN, ENCOFRADO Y DESENCO

05.00.00

OBRAS DE CONCRETO ARMADO

05.19.00

TRAMPA DE GRASAS

05.19.01

TRAMPA DE GRASA, CONCRETO FC= 175 KG/CM2

05.19.02

TRAMPA DE GRASA, ENCOFRADO Y DESENCOFRADO

M2

23.68

46.11

1,091.88

23.68

1091.88

100.00%

0.00

0.00

05.19.03

TRAMPA DE GRASA, ACERO fy= 4200kg/cm2

KG

57.42

4.23

242.89

57.42

242.89

100.00%

0.00

0.00

15.00.00

CARPINTERIA DE MADERA

15.19.00

MARCOS C/PUERTA DE MADERA PARA LLAVES DE PASO

M2

4.18

62.14

259.75

4.18

259.75

100.00%

0.00

0.00

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.51.00

REJILLA DE EVACUACIN PARA TRAMPA DE GRASA

M2

1.58

1,146.62

1,811.66

1.58

1811.66

100.00%

0.00

0.00

21.00.00

INSTALACION SANITARIA

21.01.00

APARATOS SANITARIOS

21.01.14

LAVATORIOS OVALIN CON ACCESORIOS

UND

10.00

194.32

1,943.20

10.00

1943.20

100.00%

0.00

0.00

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.18

SALIDA PARA TRAMPA DE GRASA

Pto

2.00

71.85

143.70

2.00

143.70

100.00%

0.00

0.00

21.02.19

BAJADA DE LLUVIA, PINTADO Y COLOCADO

Pto

16.00

648.46

10,375.36

16.00

10375.36

100.00%

0.00

0.00

21.02.20

TUBERIA PVC SAL 2"

15.75

23.35

367.76

15.75

367.76

100.00%

0.00

0.00

21.02.21

TUBERIA PVC SAL 3"

63.10

28.24

1,781.94

63.10

1781.94

100.00%

0.00

0.00

21.02.22

REGISTRO ROSCADO DE BRONCE DE 6"

UND

14.00

54.39

761.46

14.00

761.46

100.00%

0.00

0.00

21.02.23

SUMIDERO DE BRONCE DE 4"

UND

7.00

52.15

365.05

7.00

365.05

100.00%

0.00

0.00

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.41

CAJA DE CONCRETO PARA CONTROL DE AGUA FRA

M3

0.25

407.21

101.80

0.25

101.80

100.00%

0.00

0.00

21.03.42

SISTEMA CONTRAINCENDIOS(BOMBA 1 HP, BOMBAJOCKEY1.5 HP PANEL CONTROL, UND

1.00

151,881.00

151,881.00

1.00

151881.00

100.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 04

206,387.61

MAYORES METRADOS - PARTIDAS NUEVAS

206,387.61

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.11.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL DE PRESTAMO

M3

14.70

45.35

666.65

14.70

666.65

100.00%

0.00

0.00

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

192.30

16.94

3,257.56

192.30

3257.56

100.00%

0.00

0.00

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

150.00

15.60

2,340.00

150.00

2340.00

100.00%

0.00

0.00

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO C/MATERIAL PROPIO

M3

113.49

62.73

7,119.23

113.49

7119.23

100.00%

0.00

0.00

03.26.00

COLOCACION DE CAMA PARA TUBERIA C/ARENA

M3

73.74

70.40

5,191.30

73.74

5191.30

100.00%

0.00

0.00

03.27.00

COLOCACION DE RELLENO PARA TUBERIA C/ARENA

M3

97.74

70.40

6,880.90

97.74

6880.90

100.00%

0.00

0.00

03.31.00

EXCAVACIONES MANUAL DE ZANJA PARA REDES DE AGUA

M3

273.67

29.03

7,944.64

273.67

7944.64

100.00%

0.00

0.00

03.32.00

EXCAVACIONES MANUAL DE ZANJA PARA REDES DE DESAGUE

M3

96.12

29.89

2,873.03

96.12

2873.03

100.00%

0.00

0.00

04.00.00

OBRAS DE CONCRETO SIMPLE

04.01.00

SOLADOS

04.01.03

SOLADOS CONCRETO f'c=100 kg/cm2

M3

0.08

150.33

12.03

0.08

12.03

100.00%

0.00

0.00

04.10.00

ESTRUCTURAS DE SOSTENIMIENTO/TANQUE CISTERNA

04.10.03

ESTRUCTURA DE SOSTENIMIENTO ACERO fy = 4200 Kg/cm2

KG

26.00

3.80

98.80

0.00

0.00

0.00%

0.00

0.00

04.11.00

ESTRUCTURAS DE SOSTENIMIENTO EN EXCAVACIN P/ TRAMPA DE GRASA

04.11.01

ESTRUCTURA DE SOSTENIMIENTO DE EXCAVACION, CONCRETO fc = 100 Kg/cm2

M3

3.14

185.18

581.47

0.00

0.00

0.00%

0.00

0.00

04.11.02

ESTRUCTURA DE SOSTENIMIENTO DE EXCAVACION, ENCONFRADO Y DESENCO

M2

15.82

62.51

988.91

0.00

0.00

0.00%

0.00

0.00

21.00.00

INSTALACION SANITARIA

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.17

CAJA DE REGISTRO DE CONCRETO DE 0.60x0.60m

UND

3.00

335.09

1,005.27

3.00

1005.27

100.00%

0.00

0.00

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.04

TUBERIA PVC CLASE 10 - 3/4"

ML

17.00

9.47

160.99

17.00

160.99

100.00%

0.00

0.00

21.03.08

TUBERIA PVC CLASE 10 - 2"

ML

72.69

16.44

1,195.02

72.69

1195.02

100.00%

0.00

0.00

21.03.41

CAJA DE CONCRETO PARA CONTROL DE AGUA FRA

M3

1.03

407.21

419.43

1.03

419.43

100.00%

0.00

0.00

21.03.42

SISTEMA CONTRAINCENDIOS(BOMBA 1 HP, BOMBAJOCKEY1.5 HP PANEL CONTROL, UND

0.30

151,881.00

45,564.30

0.30

45564.30

100.00%

0.00

0.00

PARTIDAS NUEVAS
03.00.00

MOVIMIENTO DE TIERRAS

03.33.00

EXCAVACIONES DE ZANJA PARA REDES DE AGUA C/MAQUINARIA

M3

171.25

15.28

2,616.70

171.25

2616.70

100.00%

0.00

0.00

03.34.00

EXCAVACIONES DE ZANJA PARA REDES DE DESAGUE C/MAQUINARIA

M3

4.79

16.58

79.42

4.79

79.42

100.00%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

10.00.00

PISOS Y PAVIMENTOS

10.21.00

PAVIMENTO DE CONCRETO fc = 210 Kg/cm2

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.57.00

REJILLA DE EVACIACION DE 1.10 x 0.30 m

21.00.00

INSTALACION SANITARIA

21.01.00

APARATOS SANITARIOS

21.01.15

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

M3

4.42

378.64

1,673.59

4.42

1673.59

100.00%

0.00

0.00

UND

3.00

358.44

1,075.32

3.00

1075.32

100.00%

0.00

0.00

TOALLERO DE LOSA SIMPLE

UND

9.00

24.81

223.29

9.00

223.29

100.00%

0.00

0.00

21.01.16

TOALLERO DE LOSA DOBLE

UND

4.00

29.81

119.24

4.00

119.24

100.00%

0.00

0.00

21.01.17

DISPENSADOR DE JABON LIQUIDO

UND

18.00

44.81

806.58

18.00

806.58

100.00%

0.00

0.00

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.24

CAJA DE CONCRETO PARA REJILLA DE EVACUACION

M3

1.07

239.43

256.19

1.07

256.19

100.00%

0.00

0.00

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.43

BOMBA DE 4HP PARA SISTEMA DE TANQUE ELEVADO INCLUYE PANEL DE CONTR

UND

2.00

5,992.50

11,985.00

2.00

11985.00

100.00%

0.00

0.00

21.03.44

BOMBA SUMERGIBLE DE 1.8 HP PARA CISTERNA INCLUYE PANEL DE CONTROL,

UND

1.00

4,588.00

4,588.00

1.00

4588.00

100.00%

0.00

0.00

21.03.45

TEE PVC DE 2"

UND

1.00

34.63

34.63

1.00

34.63

100.00%

0.00

0.00

21.03.46

UNION UNIVERSAL PVC DE 2"

UND

2.00

25.43

50.86

2.00

50.86

100.00%

0.00

0.00

21.03.47

NIPLES PVC DE 2"

UND

3.00

10.63

31.89

3.00

31.89

100.00%

0.00

0.00

21.03.48

LLAVE DE PASO TIPO BOLA DE 2"

UND

1.00

115.63

115.63

1.00

115.63

100.00%

0.00

0.00

21.03.49

CODO PVC 2"

UND

1.00

7.13

7.13

1.00

7.13

100.00%

0.00

0.00

21.03.50

LLAVE CHECK DE 2"

UND

1.00

160.63

160.63

1.00

160.63

100.00%

0.00

0.00

21.03.51

TEE PVC DE 1 1/2"

UND

1.00

3.71

3.71

1.00

3.71

100.00%

0.00

0.00

21.03.52

REDUCCION DE PVC DE 2" A 1 1/2"

UND

1.00

17.63

17.63

1.00

17.63

100.00%

0.00

0.00

SUB TOTAL

EXPEDIENTE ADICIONAL N 08

110,144.94

108,475.77

0.00

MAYORES METRADOS - PARTIDAS NUEVAS

MAYORES METRADOS
03.00.00

MOVIMIENTO DE TIERRAS

03.13.00

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

M3

214.88

16.94

03.20.00

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA

M3

214.88

03.24.00

RELLENO MANUAL Y COMPACTADO CON EQUIPO C/MATERIAL PROPIO

M3

388.13

3,640.07

185.30

3138.98

86.23%

0.00

0.00

15.60

3,352.13

62.73

24,347.39

130.00

2028.00

60.50%

0.00

0.00

338.43

21229.71

87.20%

0.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

03.26.00

COLOCACION DE CAMA PARA TUBERIA C/ARENA

M3

03.27.00

COLOCACION DE RELLENO PARA TUBERIA C/ARENA

03.31.00

EXCAVACIONES MANUAL DE ZANJA PARA REDES DE AGUA

03.32.00

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

82.65

70.40

5,818.56

M3

82.65

70.40

M3

223.49

29.03

EXCAVACIONES MANUAL DE ZANJA PARA REDES DE DESAGUE

M3

0.56

03.33.00

EXCAVACION DE ZANJA CON MAQUINARIA Y MATERIAL PROPIO

M3

16.00.00

CARPINTERIA METALICA Y HERRERIA

16.51.00

REJILLA DE EVACUACION PARA TRAMPA DE GRASA

21.00.00

INSTALACIONES SANITARIAS

21.02.00

INSTALACIONES SANITARIAS DESAGUE

21.02.02
21.02.07
21.02.15

CAJA DE REGISTRO DE CONCRETO DE 0.30 x 0.60 m

21.02.20

TUBERIA PVC SAL 2"

21.02.23

SUMIDERO DE BRONCE DE 4"

21.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

21.03.02

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

82.65

5818.56

100.00%

0.00

0.00

5,818.56

82.65

5818.56

100.00%

0.00

0.00

6,487.91

223.49

6487.91

100.00%

0.00

0.00

29.89

16.74

0.56

16.74

100.00%

0.00

0.00

379.53

15.28

5,799.22

306.52

4683.63

80.76%

0.00

0.00

M2

0.18

1,146.62

206.39

0.00

0.00

0.00%

0.00

0.00

SALIDA DE DESAGUE EN PVC

Pto

5.00

87.22

436.10

5.00

436.10

100.00%

0.00

0.00

TUBERIA PVC SAL 4"

ML

9.70

23.53

228.24

9.50

223.54

97.94%

0.00

0.00

UND

2.00

277.35

554.70

2.00

554.70

100.00%

0.00

0.00

ML

6.50

23.35

151.78

6.50

151.78

100.00%

0.00

0.00

UND

1.00

52.15

52.15

1.00

52.15

100.00%

0.00

0.00

SALIDA DE AGUA FRIA - PVC

PTO

1.00

84.15

84.15

0.00

0.00

0.00%

0.00

0.00

21.03.03

TUBERIA PVC CLASE 10 - 1/2"

ML

15.00

9.02

135.30

15.00

135.30

100.00%

0.00

0.00

21.03.04

TUBERIA PVC CLASE 10 - 3/4"

ML

63.00

9.47

596.61

33.11

313.55

52.56%

0.00

0.00

21.03.06

TUBERIA PVC CLASE 10 - 1 1/4"

ML

3.20

11.62

37.18

3.20

37.18

100.00%

0.00

0.00

21.03.08

TUBERIA PVC CLASE 10 - 2"

ML

53.10

16.44

872.96

43.98

723.03

82.82%

2.00

32.88

21.03.10

TUBERIA PVC CLASE 10 - 3"

ML

159.80

27.08

4,327.38

86.74

2348.92

54.28%

0.00

0.00

21.03.11

PRUEBA HIDRAULICA + DESINFECCION TUBERIA DE AGUA POTABLE

ML

262.20

2.29

600.44

164.40

376.48

62.70%

0.00

0.00

1.00

85,000.00

85,000.00

0.53

45050.00

53.00%

0.00

PARTIDAS NUEVAS
21.00.00

INSTALACIONES SANITARIAS

21.03.00

SISTEMA DE AGUA FRIA Y CONTRAINCENDIO

21.03.53

INSTALACION DE MONTAJE CONTRAINCENDIO, ACCESORIOS Y GABINETES CON

UND

SUB TOTAL

COSTO DIRECTO

910,536.18

148,563.97

99,624.82

100.00%

568,410.66

0.00
32.88

62.43%

2,877.73

GASTOS GENERALES 10%

91,053.62

56,841.07

287.77

GASTOS DE SUPERVISIN 2%

18,210.72

11,368.21

57.55

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION
GASTOS DE LIQUIDACIN 0.8%
GASTOS ADMINISTRATIVOS 1.5%
PRESUPUESTO TOTAL (S/.)

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

7,284.29

S/.

4,547.29

13,658.04
1,040,742.85

CANT.

AVANCE ACTUAL DEL MES

649,693.39

S/.
23.02

8,526.16
100.00%

CANT.

43.17
62.43%

3,289.25

PONENTE INSTALACIONES SANITARIAS GLOBAL


S: DICIEMBRE 2015

AESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

15.00

3771.15

75.00%

5.00

1257.05

25.00%

0.00%

17.00

8863.97

36.96%

29.00

15120.89

63.04%

0.00%

12.00

2296.92

46.15%

14.00

2679.74

53.85%

0.00%

14.00

2399.74

18.92%

60.00

10284.60

81.08%

0.00%

0.00

0.00

0.00%

39.00

10974.99

100.00%

0.00%

3.00

1189.23

50.00%

3.00

1189.23

50.00%

0.00%

11.00

832.92

25.00%

33.00

2498.76

75.00%

0.00%

5.00

259.75

10.87%

41.00

2129.95

89.13%

0.00%

0.00

0.00

0.00%

56.00

2125.20

100.00%

0.00%

0.00

0.00

0.00%

44.00

1757.80

100.00%

0.00%

8.00

415.60

12.12%

58.00

3013.10

87.88%

0.00%

12.00

186.96

27.27%

32.00

498.56

72.73%

0.00%

0.00

0.00

0.00%

3.00

633.66

100.00%

0.00%

1.00

174.86

33.33%

2.00

349.72

66.67%

0.00%

0.00

0.00

0.00%

330.00

28782.60

100.00%

0.00%

17.00

1426.81

25.37%

50.00

4196.50

74.63%

0.00%

7.00

603.68

25.93%

20.00

1724.80

74.07%

0.00%

140.30

8648.09

85.97%

22.90

1411.56

14.03%

0.00%

300.90

16338.87

89.93%

33.70

1829.91

10.07%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

55.50

1.62%

130.20

3063.61

70.11%

1305.92

29.89%

0.00%

1.00

364.13

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

47.00

9788.69

100.00%

0.00%

0.00

0.00

0.00%

26.00

5545.02

100.00%

0.00%

1.00

235.21

11.11%

8.00

1881.68

88.89%

0.00%

9.50

16555.56

95.00%

0.50

871.35

5.00%

0.00%

424.40

759.68

62.09%

259.10

463.79

37.91%

0.00%

0.00

0.00

0.00%

1.00

454.65

100.00%

0.00%

0.00

0.00

0.00%

258.00

21710.70

100.00%

0.00%

4.68

42.21

100.00%

0.00

0.00

0.00%

0.00%

165.65

1568.71

100.00%

0.00

0.00

0.00%

0.00%

184.09

1875.88

100.00%

0.00

0.00

0.00%

0.00%

37.90

440.40

44.44%

47.38

550.56

55.56%

0.00%

72.92

966.92

29.54%

173.95

2306.58

70.46%

0.00%

122.17

2008.47

100.00%

0.00

0.00

0.00%

0.00%

9.87

199.77

7.58%

120.34

2435.68

92.42%

0.00%

233.30

6317.76

62.98%

137.16

3714.29

37.02%

0.00%

460.44

1054.41

24.08%

1,451.58

3324.12

75.92%

0.00%

0.00

0.00

0.00%

30.00

3511.20

100.00%

0.00%

5.20

176.28

34.67%

9.80

332.22

65.33%

0.00%

28.00

1204.28

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

3.00

123.78

100.00%

0.00%

1.00

56.26

16.67%

5.00

281.30

83.33%

0.00%

0.00

0.00

0.00%

3.00

108.78

100.00%

0.00%

6.00

337.56

100.00%

0.00

0.00

0.00%

0.00%

1.00

96.52

33.33%

2.00

193.04

66.67%

0.00%

4.00

866.08

80.00%

1.00

216.52

20.00%

0.00%

0.00

0.00

0.00%

1.00

256.52

100.00%

0.00%

0.00

0.00

0.00%

2.00

513.04

100.00%

0.00%

0.00

0.00

0.00%

2.00

193.04

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

1.00

329.13

100.00%

0.00%

0.00

0.00

0.00%

3.00

1989.96

100.00%

0.00%

0.00

0.00

0.00%

2.00

1173.04

100.00%

0.00%

5.00

1556.30

22.73%

17.00

5291.42

77.27%

0.00%

3.00

1383.78

21.43%

11.00

5073.86

78.57%

0.00%

80.61

12463.92

13.38%

522.00

80711.64

86.62%

18.18%

3.00

4161.39

27.27%

8.00

11097.04

72.73%

0.00%

0.00

0.00

0.00%

3.00

5742.78

100.00%

0.00%

0.00

0.00

0.00%

1.00

162.67

100.00%

0.00%

0.00

0.00

0.00%

1.00

253.56

100.00%

0.00%

0.00

0.00

0.00%

12.00

212.16

100.00%

0.00%

0.00

0.00

0.00%

2.00

9831.12

100.00%

0.00%

0.00

0.00

0.00%

1.00

8915.56

100.00%

0.00%

0.00

0.00

0.00%

1.00

1665.56

100.00%

0.00%

0.00

0.00

0.00%

4.00

493.32

100.00%

0.00%

0.00

0.00

0.00%

1.00

518.96

100.00%

105,163.63

286,002.85

0.00%

9.33

219.53

100.00%

0.00

0.00

0.00%

0.00%

69.58

542.72

100.00%

0.00

0.00

0.00%

0.00%

228.50

3176.15

100.00%

0.00

0.00

0.00%

0.00%

223.40

14013.88

100.00%

0.00

0.00

0.00%

0.00%

37.34

2628.74

100.00%

0.00

0.00

0.00%

0.00%

37.34

2628.74

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

96.00

9491.52

78.05%

27.00

2669.49

21.95%

0.00%

26.00

7211.10

100.00%

0.00

0.00

0.00%

0.00%

9.00

2827.98

100.00%

0.00

0.00

0.00%

0.00%

4.00

1340.36

100.00%

0.00

0.00

0.00%

0.00%

91.00

7522.97

100.00%

0.00

0.00

0.00%

51,603.69

2,669.49

0.00%

41.14

696.91

100.00%

0.00

0.00

0.00%

0.00%

39.00

608.40

100.00%

0.00

0.00

0.00%

0.00%

2.18

17.00

100.00%

0.00

0.00

0.00%

0.00%

49.65

3495.36

100.00%

0.00

0.00

0.00%

0.00%

72.09

5075.14

100.00%

0.00

0.00

0.00%

0.00%

0.22

33.07

100.00%

0.00

0.00

0.00%

0.00%

124.57

2931.13

100.00%

0.00

0.00

0.00%

0.00%

4.00

395.48

100.00%

0.00

0.00

0.00%

0.00%

14.40

136.37

100.00%

0.00

0.00

0.00%

0.00%

38.53

633.43

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

111.54

3238.01

100.00%

0.00

0.00

0.00%

0.00%

264.36

7901.72

100.00%

0.00

0.00

0.00%

0.00%

3.14

581.47

100.00%

0.00

0.00

0.00%

0.00%

15.82

988.91

100.00%

0.00

0.00

0.00%

0.00%

4.11

8527.76

100.00%

0.00

0.00

0.00%

0.00%

23.68

1091.88

100.00%

0.00

0.00

0.00%

0.00%

57.42

242.89

100.00%

0.00

0.00

0.00%

0.00%

4.18

259.75

100.00%

0.00

0.00

0.00%

0.00%

1.58

1811.66

100.00%

0.00

0.00

0.00%

0.00%

10.00

1943.20

100.00%

0.00

0.00

0.00%

0.00%

2.00

143.70

100.00%

0.00

0.00

0.00%

0.00%

16.00

10375.36

100.00%

0.00

0.00

0.00%

0.00%

15.75

367.76

100.00%

0.00

0.00

0.00%

0.00%

63.10

1781.94

100.00%

0.00

0.00

0.00%

0.00%

14.00

761.46

100.00%

0.00

0.00

0.00%

0.00%

7.00

365.05

100.00%

0.00

0.00

0.00%

0.00%

0.25

101.80

100.00%

0.00

0.00

0.00%

0.00%

1.00

151881.00

100.00%

0.00

0.00

0.00%

206,387.61

0.00

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

14.70

666.65

100.00%

0.00

0.00

0.00%

0.00%

192.30

3257.56

100.00%

0.00

0.00

0.00%

0.00%

150.00

2340.00

100.00%

0.00

0.00

0.00%

0.00%

113.49

7119.23

100.00%

0.00

0.00

0.00%

0.00%

73.74

5191.30

100.00%

0.00

0.00

0.00%

0.00%

97.74

6880.90

100.00%

0.00

0.00

0.00%

0.00%

273.67

7944.64

100.00%

0.00

0.00

0.00%

0.00%

96.12

2873.03

100.00%

0.00

0.00

0.00%

0.00%

0.08

12.03

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

26.00

98.80

100.00%

0.00%

0.00

0.00

0.00%

3.14

581.47

100.00%

0.00%

0.00

0.00

0.00%

15.82

988.91

100.00%

0.00%

3.00

1005.27

100.00%

0.00

0.00

0.00%

0.00%

17.00

160.99

100.00%

0.00

0.00

0.00%

0.00%

72.69

1195.02

100.00%

0.00

0.00

0.00%

0.00%

1.03

419.43

100.00%

0.00

0.00

0.00%

0.00%

0.30

45564.30

100.00%

0.00

0.00

0.00%

0.00%

171.25

2616.70

100.00%

0.00

0.00

0.00%

0.00%

4.79

79.42

100.00%

0.00

0.00

0.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

4.42

1673.59

100.00%

0.00

0.00

0.00%

0.00%

3.00

1075.32

100.00%

0.00

0.00

0.00%

0.00%

9.00

223.29

100.00%

0.00

0.00

0.00%

0.00%

4.00

119.24

100.00%

0.00

0.00

0.00%

0.00%

18.00

806.58

100.00%

0.00

0.00

0.00%

0.00%

1.07

256.19

100.00%

0.00

0.00

0.00%

0.00%

2.00

11985.00

100.00%

0.00

0.00

0.00%

0.00%

1.00

4588.00

100.00%

0.00

0.00

0.00%

0.00%

1.00

34.63

100.00%

0.00

0.00

0.00%

0.00%

2.00

50.86

100.00%

0.00

0.00

0.00%

0.00%

3.00

31.89

100.00%

0.00

0.00

0.00%

0.00%

1.00

115.63

100.00%

0.00

0.00

0.00%

0.00%

1.00

7.13

100.00%

0.00

0.00

0.00%

0.00%

1.00

160.63

100.00%

0.00

0.00

0.00%

0.00%

1.00

3.71

100.00%

0.00

0.00

0.00%

0.00%

1.00

17.63

100.00%

0.00

0.00

0.00%

108,475.77

0.00%

185.30

0.00%
0.00%

1,669.17

3138.98

86.23%

29.58

501.09

13.77%

130.00

2028.00

60.50%

84.88

1324.13

39.50%

338.43

21229.71

87.20%

49.70

3117.68

12.80%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.
0.00%

S/.

SALDO
%

CANT.

S/.

82.65

5818.56

100.00%

0.00

0.00

0.00%

0.00%

82.65

5818.56

100.00%

0.00

0.00

0.00%

0.00%

223.49

6487.91

100.00%

0.00

0.00

0.00%

0.00%

0.56

16.74

100.00%

0.00

0.00

0.00%

0.00%

306.52

4683.63

80.76%

73.01

1115.59

19.24%

0.00%

0.00

0.00

0.00%

0.18

206.39

100.00%

0.00%

5.00

436.10

100.00%

0.00

0.00

0.00%

0.00%

9.50

223.54

97.94%

0.20

4.71

2.06%

0.00%

2.00

554.70

100.00%

0.00

0.00

0.00%

0.00%

6.50

151.78

100.00%

0.00

0.00

0.00%

0.00%

1.00

52.15

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

84.15

100.00%

0.00%

15.00

135.30

100.00%

0.00

0.00

0.00%

0.00%

33.11

313.55

52.56%

29.89

283.06

47.44%

0.00%

3.20

37.18

100.00%

0.00

0.00

0.00%

3.77%

45.98

755.91

86.59%

7.12

117.05

13.41%

0.00%

86.74

2348.92

54.28%

73.06

1978.46

45.72%

0.00%

164.40

376.48

62.70%

97.80

223.96

37.30%

0.00%

0.53

45050.00

53.00%

0.47

39950.00

47.00%

99,657.70

0.32%

571,288.39

48,906.27

62.74%

339,247.79

57,128.84

33,924.78

11,425.77

6,784.96

37.26%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

4,570.31

652,982.63

S/.

2,713.98

8,569.33
0.32%

CANT.

5,088.72
62.742%

387,760.22

37.26%

CUADRO VALORIZACION DEL COMPONENTE PLAN DE CONTINGENCIA


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JO


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

617.47

8.09

AVANCE ANTERIOR

PARCIAL

CANT.

4,995.33

617.47

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

EXPEDIENTE TCNICO

01.00.00

PLAN DE CONTINGENCIA

01.01.00

MONTAJES Y DESMONTAJES

01.01.01

DESMONTAJE DE MODULOS PREFABRICADOS

01.01.02

ARMADO DE MODULOS PREFABRICADOS

01.02.00

TRANSPORTE

01.02.01

TRASLADO DE MODULOS PREFABRICADOS

01.02.02

TRASLADO DE MAQUINARIA

01.02.03

TRASLADO DE EQUIPOS Y MUEBLES

01.03.00

LOSAS DE CONCRETO

01.03.01

TRAZO Y REPLANTEO PRELIMINAR.

01.03.02

CONFORMACION DE BASE E=0.20 M

01.03.03

NIVELACION DE TERRENO Y APISONADO

m2

208.91

2.81

587.04

01.03.04

CONCRETO FC= 140 KG/CM2 EN LOSAS

m2

208.91

33.48

6,994.31

01.03.05

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS

m2

33.14

24.81

822.20

01.03.06

PISO DE CEMENTO ACABADO PULIDO

01.04.00

PINTURA

01.04.01

m2
m2

617.47

10.80

kg

21,611.32

0.57

vje

6.00

989.47

kg

31,550.00

0.93

m2

208.91

1.88

m2

208.91

10.63

4,995.33

100.00%

0.00

0.00

617.47

6,668.68

100.00%

0.00

0.00

12,318.45 6,682.01

3,808.75

30.92%

0.00

0.00

4,947.35

83.33%

0.00

0.00

4,119.90

14.04%

0.00

0.00

392.75

100.00%

0.00

0.00

2,220.71

100.00%

0.00

0.00

208.91

587.04

100.00%

0.00

0.00

208.91

6,994.31

100.00%

0.00

0.00

33.14

822.20

100.00%

0.00

0.00

0.00

0.00

6,668.68

5,936.82

5.00

29,341.50 4,430.00

392.75
2,220.71

208.91
208.91

m2

208.91

9.41

1,965.84

208.91

1,965.84

100.00%

LIJADO Y DESMANCHADO EN CARPINTERIA DE MADERA PARA PINTADO.

m2

651.63

2.04

1,329.33

39.48

80.54

6.06%

0.00

0.00

01.04.02

PINTURA ESMALTE 2 MANOS EN CARPINTERIA DE MADERA

m2

651.63

5.93

3,864.17

0.00

0.00

0.00%

12.00

71.16

01.04.03

PINTADO DE MURO INTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)

255.04

2.67%

0.00

0.00

01.04.04

PINTURA VINILICA EN CIELO RASO 2 MANOS

0.00

0.00

01.05.00

VARIOS

01.05.01

PAGO DE LUZ

0.00

0.00

m2

1,476.00

6.46

9,534.96

39.48

m2

870.00

7.24

6,298.80

0.00

0.00

0.00%

est

15.00

1,000.00

15,000.00

0.00

0.00

0.00%

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

01.05.02

JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"

01.05.03

MODULOS PREFABRICADOS PARA SS.HH.

02.00.00

INSTALACIONES ELECTRICAS

02.01.00

SALIDA PARA LUMINARIA DE TECHO (CENTRO DE LUZ)

02.02.00

SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA EN PARED H=0.40 SN

02.03.00

INTERRUPTOR UNIPOLAR TRIPLE

pto

3.00

46.54

139.62

02.04.00

TABLERO DE DISTRIBUCION TD 03, 3 - 220v

pza

1.00

826.06

826.06

02.05.00

HABILITACION DE CORRIENTE ELECTRICA

glb

1.00

7,500.00

03.00.00

INSTALACION SANITARIA

03.01.00

APARATOS SANITARIOS

03.01.01

INODORO BLANCO Y/O SIMILAR

4.00

03.01.02

URINARIOS DE LOZA DE PICO DE LORO BLANCO

2.00

03.01.03

LAVATORIO DE LOSA BLANCA

03.01.04

DISPENSADOR DE JABON LIQUIDO TIPO PERA

2.00

38.40

76.80

03.01.05

DISPENSADOR DE PAPEL HIGIENICO

4.00

52.40

209.60

42.00

7.28

305.76

0.00

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

m2

12.30

165.06

2,030.24

0.00

0.00

pto

15.00

40.53

607.95

9.00

364.77

60.00%

0.00

0.00

627.12

100.00%

0.00

0.00

3.00

139.62

100.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

7,500.00

0.00

0.00

0.00%

0.00

0.00

252.48

1,009.92

0.00

0.00

0.00%

0.00

0.00

192.48

384.96

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

pto

12.00

2.00

52.26

172.48

627.12

344.96

12.00

0.00

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

03.01.06

BEBEDERO CORRIDO DE CONCRETO REVESTIDO CON MAYOLICA 20x20

03.02.00

INSTALACIONES SANITARIAS DESAGUE

03.02.01

EMPALME A TUBERIA EXISTENTE DE DESAGUE

03.02.02

SALIDA DE DESAGUE EN PVC

03.02.03

SALIDA PARA VENTILACION

03.02.04

TUBERIA PVC SAL 4"

25.00

23.79

594.75

03.02.05

CAJA DE REGISTRO PREFABRICADA DE CONCRETO DE 0.30x0.60m

3.00

209.76

629.28

03.02.06

CAJA DE REGISTRO PREFABRICADA DE CONCRETO DE 0.45x0.60m

1.00

214.76

03.03.00

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

03.03.01

EMPALME A TUBERIA EXISTENTE DE AGUA

1.00

03.03.02

SALIDA DE AGUA FRIA - PVC

pto

03.03.03

TUBERIA PVC CLASE 10 - 1/2"

03.03.04

TUBERIA PVC CLASE 10 - 3/4"

03.03.05

GRIFO DE RIEGO 3/4"

COSTO DIRECTO
GASTOS GENERALES 10%

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

2.00

196.20

392.40

0.00

0.00

0.00%

0.00

0.00

1.00

177.44

177.44

0.00

0.00

0.00%

0.00

0.00

pto

9.00

88.02

792.18

2.00

176.04

22.22%

0.00

0.00

0.00

0.00%

0.00

0.00

8.40

199.84

33.60%

0.00

0.00

0.00

0.00

0.00%

0.00

0.00

214.76

0.00

0.00

0.00%

0.00

0.00

462.08

462.08

0.00

0.00

0.00%

0.00

0.00

12.00

86.69

1,040.28

2.00

173.38

16.67%

0.00

0.00

18.00

9.36

168.48

14.70

137.59

81.67%

0.00

0.00

147.15

50.00%

0.00

0.00

117.99

100.00%

0.00

0.00

39,941.94

31.36%

pto

m
u

2.00

30.00
1.00

82.17

9.81

164.34

294.30

117.99

117.99

127,382.16

100.00%

0.00

15.00
1.00

71.16

12,738.22

3,994.19

7.12

GASTOS DE SUPERVISIN 2%

2,547.64

798.84

1.42

GASTOS DE LIQUIDACIN 0.8%

1,019.06

319.54

0.57

GASTOS ADMINISTRATIVOS 1.5%

1,910.73

599.13

1.07

PRESUPUESTO TOTAL (S/.)

145,597.81

100.00%

45,653.63

31.36%

81.34

L COMPONENTE PLAN DE CONTINGENCIA


: DICIEMBRE 2015

STRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

617.47

4,995.33

100.00%

0.00

0.00

0.00%

0.00%

617.47

6,668.68

100.00%

0.00

0.00

0.00%

0.00%

6,682.01

3,808.75

30.92%

14,929.31

8,509.71

69.08%

0.00%

5.00

4,947.35

83.33%

1.00

989.47

16.67%

0.00%

4,430.00

4,119.90

14.04%

27,120.00

25,221.60

85.96%

0.00%

208.91

392.75

100.00%

0.00

0.00

0.00%

0.00%

208.91

2,220.71

100.00%

0.00

0.00

0.00%

0.00%

208.91

587.04

100.00%

0.00

0.00

0.00%

0.00%

208.91

6,994.31

100.00%

0.00

0.00

0.00%

0.00%

33.14

822.20

100.00%

0.00

0.00

0.00%

0.00%

208.91

1,965.84

100.00%

0.00

0.00

0.00%

0.00%

39.48

80.54

6.06%

612.15

1,248.79

93.94%

1.84%

12.00

71.16

1.84%

639.63

3,793.01

98.16%

0.00%

39.48

255.04

2.67%

1,436.52

9,279.92

97.33%

0.00%

0.00

0.00

0.00%

870.00

6,298.80

100.00%

0.00%

0.00

0.00

0.00%

15.00

15,000.00

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

42.00

305.76

100.00%

0.00%

0.00

0.00

0.00%

12.30

2,030.24

100.00%

0.00%

9.00

364.77

60.00%

6.00

243.18

40.00%

0.00%

12.00

627.12

100.00%

0.00

0.00

0.00%

0.00%

3.00

139.62

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

1.00

826.06

100.00%

0.00%

0.00

0.00

0.00%

1.00

7,500.00

100.00%

0.00%

0.00

0.00

0.00%

4.00

1,009.92

100.00%

0.00%

0.00

0.00

0.00%

2.00

384.96

100.00%

0.00%

0.00

0.00

0.00%

2.00

344.96

100.00%

0.00%

0.00

0.00

0.00%

2.00

76.80

100.00%

0.00%

0.00

0.00

0.00%

4.00

209.60

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

2.00

392.40

100.00%

0.00%

0.00

0.00

0.00%

1.00

177.44

100.00%

0.00%

2.00

176.04

22.22%

7.00

616.14

77.78%

0.00%

0.00

0.00

0.00%

2.00

164.34

100.00%

0.00%

8.40

199.84

33.60%

16.60

394.91

66.40%

0.00%

0.00

0.00

0.00%

3.00

629.28

100.00%

0.00%

0.00

0.00

0.00%

1.00

214.76

100.00%

0.00%

0.00

0.00

0.00%

1.00

462.08

100.00%

0.00%

2.00

173.38

16.67%

10.00

866.90

83.33%

0.00%

14.70

137.59

81.67%

3.30

30.89

18.33%

0.00%

15.00

147.15

50.00%

15.00

147.15

50.00%

0.00%

1.00

117.99

100.00%

0.00

0.00

0.00%

40,013.10

31.41%

87,369.06

68.59%

0.06%

0.06%

4,001.31

8,736.91

800.26

1,747.38

320.10

698.95

600.20

1,310.54

45,734.97

31.412%

99,862.83

68.59%

CUADRO VALORIZACION DEL COMPONENTE IMPLEMENTACION


MES: DICIEMBRE 2015
OBRA
RESIDENTE
ENTIDAD EJECUTORA
MODALIDAD DE EJECUCION

:
:
:
:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO J


ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES
GOBIERNO REGIONAL DE MOQUEGUA.
CADENA FUNCIONAL : 036
EJECUCION PRESUPUESTARIA DIRECTA
PRESUPUESTO EXPEDIENTE

ITEM

DESCRIPCION

UND

AVANCE ANTERIOR

METRADO

P. UNITARIO

PARCIAL

CANT.

346.82

85.05

29,497.04

0.00

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

EXPEDIENTE TCNICO - AUDITORIO


PALCO DE PBLICO 1 PLANTA
MOBILIARIO

MPA-ALF-01 ALFOMBRA

0.00

0.00%

0.00
0.00

MPA-BUT-01 BUTACAS

und

340.00

441.00

340.00

149,940.00

100.00%

MPA-C06-01 CORTINAS 0.60X6.00M. C/ ACCESORIOS

und

8.00

703.50

5,628.00

0.00

0.00

0.00%

0.00

und

100.00

441.00

44,100.00

100.00

44,100.00

100.00%

0.00

und

8.00

32.55

260.40

0.00

0.00

0.00%

0.00

und

1.00

262.50

262.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

149,940.00

PALCO DE PBLICO 2 PLANTA


MOBILIARIO
MPA-BUT-02 BUTACAS
SS.HH PBLICO (DAMAS Y VARONES)
MOBILIARIO
MPA-CBP-11 CESTO BOTAPAPELES DE PLSTICO DIMETRO DE 0.27A+X0.30M
ESCENARIO
MOBILIARIO
MPA-BPA-10 BOTIQUN DE PRIMEROS AUXILIOS
MPA-C95-01 CORTINAS 9.50X7.30M. C/ ACCESORIOS

und

2.00

3,412.50

6,825.00

0.00

MPA-MR6-01 MESA DE REUNIONES 6.00X1.00X0.75M

und

1.00

1,764.00

1,764.00

1.00

1,764.00

100.00%

MPA-PCO-01 PODIO DE CONFERENCIAS

und

2.00

378.00

756.00

1.00

378.00

50.00%

0.00

MPA-SMR-01 SILLA DE MESA DE REUNIONES

und

10.00

189.00

1,890.00

10.00

1,890.00

100.00%

0.00

MPE-EXT-14 EXTINTORES DE INCENDIOS TIPO ABC 6 KILOS

und

4.00

188.70

754.80

0.00

0.00

0.00%

0.00

EQI-ECP-01 ECRAN DE PARED 3.00 X 3.00 M CONTROL REMOTO

und

1.00

2,362.50

2,362.50

0.00

0.00

0.00%

0.00

EQI-LAP-04

und

1.00

4,725.00

4,725.00

0.00

0.00

0.00%

0.00

EQUIPO

LAP TOP CORE I7

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

EQI-PYC-01 PROYECTOR MULTIMEDIA PROFESIONAL DE LARGO ALCANCE

UND

METRADO

P. UNITARIO

AVANCE ANTERIOR

PARCIAL

CANT.

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

und

1.00

8,400.00

8,400.00

0.00

0.00

0.00%

0.00

und

2.00

189.00

378.00

0.00

0.00

0.00%

0.00

und

16.00

294.00

4,704.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

EQUIPOS DE AUDIO
EQI-AEP-01

AURICULARES ESTREO PROFESIONAL

EQI-BMA-01 BRAQUETS METLICOS PARA CAJAS ACSTICAS


EQI-CED-01 CABINA DE EFECTOS DIGITAL

und

EQI-CAC-01 CAJAS ACSTICAS DE 2 VAS 500 WATTS RMS RESPUESTA DE FRECUENCIA DE 20HZund
3

1.00

1,029.00

1,029.00

0.00

20.00

840.00

16,800.00

0.00

0.00

0.00%

EQI-CAM-01 CAJAS ACSTICAS DE MONITOR PARA PISO 2 VAS 500 WATTS RMS

und

4.00

840.00

3,360.00

0.00

0.00

0.00%

0.00

EQI-CPP-01 CAJAS DE PASO PVC PESADO

und

20.00

21.00

420.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

EQI-CBD-01 CAJAS DE SUB BAJO DOBLES 2000


EQI-CCT-01

und

4.00

3,129.00

12,516.00

0.00

und

5.00

18.90

94.50

0.00

0.00

0.00%

EQI-ECU-01 ECUALIZADORES DE 30 BANDAS POR CANAL

und

2.00

619.50

1,239.00

0.00

0.00

0.00%

0.00

EQI-ECM-01 EXTENSIONES DE CABLE PARA MICRFONO. 15 M. C/U

und

12.00

56.70

680.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00
0.00

EQI-CIA-01

CIENTOS DE CINTILLO PVC 30 CM.

KIT DE CABLES PARA INTERCONEXIN DE EQUIPOS DE AUDIO EN CABINA

und

1.00

451.50

451.50

0.00

EQI-CAE-01 KIT DE CONECTORES PARA 28 CAJAS ACSTICAS

und

1.00

1,470.00

1,470.00

0.00

0.00

0.00%

EQI-MEC-01 MANGUERA DE EXTENSIN DE 24 CANALES DE 50 M. 4 RETORNOS

und

1.00

3,129.00

3,129.00

0.00

0.00

0.00%

PRESUPUESTO EXPEDIENTE
ITEM

DESCRIPCION

UND

EQI-MVP-01 MICRFONOS PARA VOCES PROFESIONALES

und

METRADO
6.00

P. UNITARIO
378.00

AVANCE ANTERIOR

PARCIAL

CANT.

2,268.00

0.00

S/.

AVANCE ACTUAL DEL MES


%

CANT.

S/.

0.00

0.00%

0.00
0.00

EQI-MPI-01

MICRFONOS PROFESIONALES PARA INSTRUMENTOS

und

6.00

336.00

2,016.00

0.00

0.00

0.00%

EQI-MIX-01

MIXER DE 24 CANALES, CON 4 SUB, 6 AUXILIARES

und

1.00

5,239.50

5,239.50

0.00

0.00

0.00%

0.00

und

4.00

94.50

378.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

EQI-PCA-01 PEDESTALES PARA CAJAS ACSTICAS CAP. 80 KG


EQI-PMB-01 PEDESTALES PARA MICRFONO TIPO BOOM

und

12.00

42.00

504.00

0.00

EQI-PST-01

POWER DE 2500 WATTS RMS STEREO, HI-FI

und

6.00

1,572.90

9,437.40

0.00

0.00

0.00%

EQI-BAS-01

POWER PARA BAJOS DE 4000 WATTS ESTREO

und

2.00

4,410.00

8,820.00

0.00

0.00

0.00%

0.00

und

2.00

787.50

1,575.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

EQI-RKS-01 RACKS MODULAR PARA SISTEMA DE AUDIO 25 UNIDADES.


EQI-RDP-01 REPRODUCTOR DE CD / MP3 DIGITAL PROFESIONAL

und

1.00

974.40

974.40

0.00

EQI-RCO-01 ROLLOS DE CABLE OXIGENADO POLARIZADO AUDIO

und

20.00

304.50

6,090.00

0.00

0.00

0.00%

EQI-RTC-01 ROLLOS DE TUBO CORRUGADO PVC PESADO

und

10.00

126.00

1,260.00

0.00

0.00

0.00%

0.00

EQI-SIN-01

SERVICIO TCNICO DE INSTALACIN TOTAL SISTEMA

und

1.00

8,347.50

8,347.50

0.00

0.00

0.00%

0.00

EQI-SMI-01

SISTEMAS DE MICRFONOS INALMBRICOS UHF MULTIFRECUENCIA, MULTICANAL und

0.00

2.00

2,520.00

5,040.00

0.00

0.00

0.00%

4.00

577.50

2,310.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00
0.00

CAMERINO DE DAMAS C/ BAOS


MOBILIARIO
MPA-BRE-01 BANCA CON RESPALDAR DE TRES CUERPO 1.20X0.40X0.84M
MPT-CME-04 CASILLEROS METLICOS ALTO 1.80X FRENTE1.60X FONDO0.50M (08 DIVISIONES)
MPA-CBP-12 CESTO BOTAPAPELES DE PLSTICO DIMETRO DE 0.27A+X0.30M

und
und

4.00

999.60

3,998.40

0.00

und

2.00

32.55

65.10

0.00

0.00

0.00%

und

4.00

577.50

2,310.00

0.00

0.00

0.00%

0.00
0.00

CAMERINO DE VARONES C/ BAOS


MOBILIARIO
MPA-BRE-02 BANCA CON RESPALDAR DE TRES CUERPO 1.20X0.40X0.84M
MPT-CME-03 CASILLEROS METLICOS ALTO 1.80X FRENTE1.60X FONDO0.50M (08 DIVISIONES)

und

4.00

999.60

3,998.40

0.00

0.00

0.00%

MPA-CBP-13 CESTO BOTAPAPELES DE PLSTICO DIMETRO DE 0.27A+X0.30M

und

2.00

32.55

65.10

0.00

0.00

0.00%

0.00

368,133.44

100.00%

198,072.00

53.80%

0.00

COSTO DIRECTO
GASTOS GENERALES 1.6%

5,890.14

3,169.15

0.00

GASTOS DE SUPERVISIN 0.7%

2,576.93

1,386.50

0.00

GASTOS DE LIQUIDACIN 0.4%

1,472.53

792.29

0.00

GASTOS ADMINISTRATIVOS 0.6%

2,208.80

1,188.43

0.00

PRESUPUESTO TOTAL (S/.)

380,281.84

100.00%

204,608.38

53.80%

0.00

DEL COMPONENTE IMPLEMENTACION


: DICIEMBRE 2015

AESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI DEL DISTRITO DE SAMEGUA
ARQ. GLADYS L. RAMREZ CHARRES
REGION : MOQUEGUA
PROVINCIA: MARISCAL NIETO
DISTRITO: SAMEGUA
AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

346.82

29,497.04

100.00%

0.00%

340.00

149,940.00

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

8.00

5,628.00

100.00%

0.00%

100.00

44,100.00

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

8.00

260.40

100.00%

0.00%

0.00

0.00

0.00%

1.00

262.50

100.00%

0.00%

0.00

0.00

0.00%

2.00

6,825.00

100.00%

0.00%

1.00

1,764.00

100.00%

0.00

0.00

0.00%

0.00%

1.00

378.00

50.00%

1.00

378.00

50.00%

0.00%

10.00

1,890.00

100.00%

0.00

0.00

0.00%

0.00%

0.00

0.00

0.00%

4.00

754.80

100.00%

0.00%

0.00

0.00

0.00%

1.00

2,362.50

100.00%

0.00%

0.00

0.00

0.00%

1.00

4,725.00

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

1.00

8,400.00

100.00%

0.00%

0.00

0.00

0.00%

2.00

378.00

100.00%

0.00%

0.00

0.00

0.00%

16.00

4,704.00

100.00%

0.00%

0.00

0.00

0.00%

1.00

1,029.00

100.00%

0.00%

0.00

0.00

0.00%

20.00

16,800.00

100.00%

0.00%

0.00

0.00

0.00%

4.00

3,360.00

100.00%

0.00%

0.00

0.00

0.00%

20.00

420.00

100.00%

0.00%

0.00

0.00

0.00%

4.00

12,516.00

100.00%

0.00%

0.00

0.00

0.00%

5.00

94.50

100.00%

0.00%

0.00

0.00

0.00%

2.00

1,239.00

100.00%

0.00%

0.00

0.00

0.00%

12.00

680.40

100.00%

0.00%

0.00

0.00

0.00%

1.00

451.50

100.00%

0.00%

0.00

0.00

0.00%

1.00

1,470.00

100.00%

0.00%

0.00

0.00

0.00%

1.00

3,129.00

100.00%

AVANCE ACTUAL DEL MES

TOTAL ACUMULADO
%

CANT.

S/.

SALDO
%

CANT.

S/.

0.00%

0.00

0.00

0.00%

6.00

2,268.00

100.00%

0.00%

0.00

0.00

0.00%

6.00

2,016.00

100.00%

0.00%

0.00

0.00

0.00%

1.00

5,239.50

100.00%

0.00%

0.00

0.00

0.00%

4.00

378.00

100.00%

0.00%

0.00

0.00

0.00%

12.00

504.00

100.00%

0.00%

0.00

0.00

0.00%

6.00

9,437.40

100.00%

0.00%

0.00

0.00

0.00%

2.00

8,820.00

100.00%

0.00%

0.00

0.00

0.00%

2.00

1,575.00

100.00%

0.00%

0.00

0.00

0.00%

1.00

974.40

100.00%

0.00%

0.00

0.00

0.00%

20.00

6,090.00

100.00%

0.00%

0.00

0.00

0.00%

10.00

1,260.00

100.00%

0.00%

0.00

0.00

0.00%

1.00

8,347.50

100.00%

0.00%

0.00

0.00

0.00%

2.00

5,040.00

100.00%

0.00%

0.00

0.00

0.00%

4.00

2,310.00

100.00%

0.00%

0.00

0.00

0.00%

4.00

3,998.40

100.00%

0.00%

0.00

0.00

0.00%

2.00

65.10

100.00%

0.00%

0.00

0.00

0.00%

4.00

2,310.00

100.00%

0.00%

0.00

0.00

0.00%

4.00

3,998.40

100.00%

0.00%

0.00

0.00

0.00%

2.00

65.10

100.00%

198,072.00

53.80%

170,061.44

46.20%

0.00%

0.00%

3,169.15

2,720.98

1,386.50

1,190.43

792.29

680.25

1,188.43

1,020.37

204,608.38

53.804%

175,673.47

46.20%

PLANILLA DE METRADOS SEGN EXPEDIENTE TECNICO


OBRA :

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLSO MARIATEGUI

RESIDENTE:

ING. KARIN JANETH DEL CARPIO RIMACHI

INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES


ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.
FECHA :

DICIEMBRE 2015

PARTIDA

DESCRIPCION

UND

# VECES

LARGO

ANCHO

Instalado en la sede del gobierno regional

pza

1.00

demolicion de pared en policlinico (cambios en ss.hh)

m2

1.00

0.80

0.15

ALTURA

SEGN EXPEDIENTE TECNICO

COMPONENTE DEMOLICIONES, DESMONTAJES Y MONTAJES


01.01.04

02.02.02

CARTEL DE OBRA 2.40 X 3.60 - PINTADO.


1.00

DEMOLICION MUROS LADRILLO KK SOGA.


2.40

COMPONENTE BIENESTAR SOCIAL (FARMACIA Y ENFERMERIA)


08.02.00

TARRAJEO EN MURO: INTERIOR Y EXTERIOR


tarrajeo en ss.hh damas policlinico

12.01.00

13.04.00

15.02.00

m2

1.00

2.80

2.40

tarrajeo en muro de policlinico

m2

1.00

2.70

2.40

tarrajeo de muro asentado en policlinico

m2

4.00

2.80

5.00

zocalos de ceramico

m2

1.00

7.00

1.00

ceramico en ss.hh discapacitados

m2

1.00

5.00

1.00

ceramico en ss.hh discapacitados

m2

1.00

7.00

1.00

ceramico en ss.hh discapacitados

m2

1.00

7.50

1.00

ceramico en ss.hh policlinico

m2

1.00

5.00

1.00

ceramico en ss.hh policlinico

m2

1.00

1.00

1.00

m2

15.00

1.40

0.25

m2

17.00

1.40

0.17

m2

1.00

1.40

0.90

m2

1.00

4.15

0.20

ZOCALOS DE CERAMICO

ACABADO DE DESCANSO CEMENTO PULIDO Y BRUADO

PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3"


Almacen

17.02.00

BISAGRA CAPUCHINA DE ALUMINIO DE 3" X 3"

m2

1.00

0.90

2.70

Triaje

m2

1.00

0.90

2.70

Laboratorio

m2

1.00

0.90

2.70

Protesis

m2

1.00

0.90

2.70

SS.HH. Discapacitados

m2

1.00

1.00

2.70

SS.HH. Triaje

m2

0.47

0.75

2.70

PARTIDA

17.05.00

19.03.00

DESCRIPCION

UND

# VECES

LARGO

Almacen

pza

1.00

3.00

Triaje

pza

1.00

3.00

Laboratorio

pza

1.00

3.00

Protesis

pza

1.00

3.00

SS.HH. Discapacitados

pza

1.00

3.00

SS.HH. Triaje

pza

1.00

3.00

Almacen

ANCHO

ALTURA

CERRADURA PARA INTERIOR DOBLE PERILLA


pza

1.00

1.00

Triaje

pza

1.00

1.00

Laboratorio

pza

1.00

1.00

pintado en policlinico

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS


m2

1.00

32.00

2.40

acabados en policlinico

m2

1.00

13.00

2.40

pintado de ambien 4 ambientes en policlinico

m2

1.00

20.00

7.00

pintado de ambien 2 ambientes en policlinico

m2

2.00

5.00

7.00

pintura en hall de policlinico

m2

2.00

8.25

2.80

pintura en pasadizo principal

m2

2.00

2.16

6.00

fachada zona posterior de policlinico

m2

2.00

9.30

2.80

fachada lateral del policlinico

m2

2.00

6.30

2.80

Hall recepcion Exterior

m2

0.37

area Cad =

179.99

V1

m2

2.00

3.25

0.70

V2

m2

2.00

0.80

0.70

V3

m2

9.00

0.50

0.70

V5

m2

2.00

5.25

0.70

V6

m2

4.00

2.50

0.70

V7

m2

3.00

0.60

0.70

V8

m2

1.00

1.00

0.70

sshh varones

m2

4.00

0.60

1.80

COMPONENTE CONSTRUCCION DEL AUDITORIO


10.04.00

16.10.00

16.11.00

16.14.00

PISO DE ADOQUINES DE CONCRETO

VENTANA DE ALUMINIO TIPO VITROVEN

PUERTA DE ALUMINIO EN SS.HH.

sshh damas

m2

3.00

0.60

1.80

sshh damas camerinos

m2

3.00

0.60

1.80

sshh varones camerinos

m2

2.00

0.60

1.80

sshh varones

1.00

0.85

sshh varones

3.00

1.85

sshh damas

1.00

0.27

sshh damas

2.00

1.85

1.00

1.70

TABIQUERIA DE ALUMINIO CON ACRILICO EN SS.HH. H=1.80m

sshh damas camerinos

PARTIDA

16.17.00

18.01.00

DESCRIPCION

UND

# VECES

LARGO

ANCHO

sshh damas camerinos

1.00

0.40

sshh damas camerinos

1.00

1.40

sshh damas camerinos

1.00

0.70

sshh varones camerinos

1.00

1.40

sshh varones camerinos

1.00

0.27

sshh varones camerinos

1.00

0.70

Rampa de dos tramos en fachada lateral izquierda

4.00

27.66

Descanso

2.00

2.13

Descanso

1.00

3.60

Anfiteatro

1.00

15.97

Anfiteatro

2.00

2.50

Rampa de acceso a Camerinos

2.00

7.15

Baranda en gradas de Terraza

1.00

14.15

ALTURA

BARANDA DE TUBO METALICO DE 2 1/2"

VIDRIO SISTEMA MODUGLAS CON VIDRIO TEMPLADO COLOR GRISS DE 6mm INC/ACCESORIOS Y COLOCADO
V1

p2

2.00

10.77

3.25

0.70

V2

p2

2.00

10.77

0.80

0.70

V3

p2

9.00

10.77

0.50

0.70

V5

p2

2.00

10.77

5.25

0.70

V6

p2

4.00

10.77

2.50

0.70

V7

p2

3.00

10.77

0.60

0.70

V8

p2

1.00

10.77

1.00

0.70

nivelacion de terreno para adoquinado ingreso audi-peatonal

m2

1.00

7.00

25.30

m2

1.00

5.00

3.00

Estacionamiento ingreso principal

m3

1.00

30.07

3.19

3.45

Estacionamiento ingreso principal - costado de losa

m3

1.00

10.93

2.50

3.45

m3

1.00

area =

323.19

0.70

COMPONENTE PLAZOLETA Y AREAS VERDES


03.01.00

NIVELACION DE TERRENO Y APISONADO

en estacionamiento costado del policlinico


03.04.00

03.05.00

CORTE DE MATERIAL SUELTO PARA PLATAFORMAS

CONFORMACION DE TERRAPLENES PARA PLATAFORMAS


Estacionamiento ingreso principal

03.07.00

03.10.00

EXCAVACION DE ZANJAS Y ZAPATAS H=1.00m / MANUAL


en estacionamiento costado del policlinico

m3

1.00

13.10

0.80

1.00

zapatas muros de estacionamiento principal - costado losa

m3

1.00

30.07

1.80

0.60

zapatas muros de estacionamiento principal

m3

1.00

11.00

1.80

1.50

m3

1.00

10.00

5.00

2.00

RELLENO COMPACTADO CON EQUIPO, MATERIAL PROPIO


extendido y compactado para adoquinado zona de estacionamiento 1

04.01.01

SOLADOS CONCRETO f'c=100 kg/cm2 E= 10 CM

PARTIDA

04.04.01

DESCRIPCION

UND

# VECES

LARGO

ANCHO

solado en muros mc-29,mc-30,mc-31;mc-32

m2

4.00

4.50

1.80

solado en muros mc-08,mc-09,mc-10;mc-11

m2

1.00

10.90

0.90

solado en ingreso vehicular

m2

1.00

2.00

1.50

m3

1.00

2.00

0.50

0.60

M3

1.00

3.60

0.15

0.60

encofrado en sobrecimiento ingreso vehicular

m2

2.00

1.35

concreto en zapatas de ingreso vehicular

m3

1.00

1.00

CONCRETO F'C=140 KG/CM2 +30% PG EN CIMIENTOS CORRIDOS


concreto en cimientos corridos de ingreso vehicular

04.05.01

CONCRETO f'c=140 kg/cm2 + 30% PM 4" EN SOBRECIMIENTOS


concreto en sobrecimiento ingreso vehicular

04.05.02

05.01.03

05.04.05

05.04.06

ALTURA

SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO


1.00

ZAPATAS, CONCRETO 210 kg/cm2


1.30

0.40

MUROS DE CONTENCION, ENCOFRADO Y DESENCOFRADO CARAVISTA


encofrado en zapatas mc-29,mc-30,mc-31,mc-32.

m2

1.00

4.80

4.00

encofrado en zapatas mc-07,mc-08,mc-09,mc-10,mc-11.

m2

1.00

8.00

0.60

encofrado en pantalla mc-30

m2

2.00

4.00

3.00

encofrado en pantalla mc-32

m2

2.00

4.30

3.00

encofrado en pantalla mc-07

m2

2.00

1.40

1.80

encofrado en pantalla mc-09

m2

2.00

2.10

1.90

encofrado en pantalla mc-11

m2

2.00

2.30

1.90

encofrado en zona de parqueo

m2

1.00

0.40

9.00

encofrado en pantalla mc-08

m2

2.00

2.60

1.30

encofrado en pantalla mc-10

m2

2.00

1.47

1.40

encofrado en pantalla mc-29

m2

2.00

4.00

2.70

encofrado en pantalla mc-31

m2

2.00

4.00

2.70

encofrado en pantalla mc-12

m2

2.00

2.80

2.00

dencofrado en pantalla mc-30

m2

2.00

4.00

3.00

dencofrado en pantalla mc-32

m2

2.00

4.30

3.00

dencofrado en pantalla mc-07

m2

2.00

1.00

1.80

dencofrado en pantalla mc-09

m2

2.00

2.00

1.90

dencofrado en pantalla mc-11

m2

2.00

2.05

1.90

encofrado en pantalla mc-13

m2

2.00

3.60

2.00

encofrado en pantalla mc-15

m2

2.00

3.60

2.40

desencofrado en pantalla mc-29

m2

2.00

4.00

2.70

desencofrado en pantalla mc-31

m2

2.00

4.00

2.70

desencofrado en pantalla mc-12

m2

2.00

2.80

2.00

desencofrado en pantalla mc-13

m2

2.00

3.60

2.00

desencofrado en pantalla mc-15

m2

2.00

3.60

2.40

encofrado en pantalla mc-14

m2

2.00

3.60

2.40

MUROS DE CONTENCION, ACERO fy= 4200kg/cm2


armado 1/2'' para zapata y pantalla mc-12,mc-13,mc-14

kg

45.00

9.00

1.02

armado 3/8'' para pantalla acero horizontal mc-12,mc-13,mc-14

kg

20.00

9.00

0.56

armado 1/2'' para zapata mc-08,mc-09,mc-10,mc-11.

kg

95.00

9.00

1.02

armado 1/2'' para zapata y pantalla mc-29,mc-30;mc-31;mc-32

kg

100.00

9.00

1.02

PARTIDA

05.06.02

05.06.03

DESCRIPCION

UND

# VECES

LARGO

ANCHO

armado 3/8'' para pantalla acero horizontal mc-29,mc-30

kg

15.00

9.00

0.56

armado 3/8'' para pantalla acero horizontal mc-30,mc-31

kg

20.00

9.00

0.56

armado 3/8'' para pantalla acero horizontal mc-7,8,9,11.

kg

55.00

9.00

0.56

concreto en columnas de muro en ingreso vehicular

m3

1.00

0.25

0.60

2.80

concreto en columnas de muro en ingreso vehicular

m3

1.00

0.25

0.25

2.80

m2

4.00

7.00

0.25

0.40

armado 1/2'' para columnas del ingreso vehicular

kg

15.00

9.00

1.02

armado 5/8'' para columnas del ingreso vehicular

kg

6.00

9.00

1.55

kg

13.00

9.00

0.56

m3

1.00

1.65

0.25

0.40

m2

4.00

7.50

0.25

0.40

COLUMNAS, CONCRETO f'c= 210kg/cm2

COLUMNAS, ENCOFRADO Y DESENCOFRADO


encofrado en columnas de muro en ingreso vehicular

05.06.05

COLUMNAS, ACERO fy=4200 kg/cm2

armado 5/8'' para estribos de columnas del ingreso vehicular


05.07.02

VIGAS, CONCRETO f'c=210 kg/cm2


concreto en vigas de muro en ingreso vehicular

05.07.03

VIGAS, ENCOFRADO Y DESENCOFRADO


encofrado en vigas de muro en ingreso vehicular

08.02.00

08.05.00

09.01.00

10.02.00

TARRAJEO EN MURO: INTERIOR Y EXTERIOR


tarrajeo en guardiania

m2

1.00

1.35

2.00

tarrajeo en columnas de ingreso vehicular

m2

8.00

2.60

0.35

tarrajeo en borde de ventana de ingreso vehicular

m2

1.00

3.30

0.10

tarrajeo en vigas de ingreso peatonal - av a. avelino

m2

1.00

4.04

2.05

cielo raso en caseta de guardiania

m2

1.00

1.80

3.30

m2

4.00

5.00

6.00
3.00

TARRAJEO DE VIGAS

CIELO RASO CON MEZCLA C:A 1:5

PISO DE CEMENTO ACABADO PULIDO Y BRUADO 2"


baceo de piso y rampa en ingreso vehicular

10.04.00

ALTURA

baceo de piso en rampa en ingreso peatonal

m2

4.00

4.00

baceo de piso en rampa ingreso a policlinico

m2

4.00

2.00

4.60

baceo de piso y rampa en ingreso peatonal

m2

3.00

3.00

0.70

piso de ingreso a caseta de guardiania

m2

3.00

1.80

2.00

adoquinado en estacionamiento

m2

1.00

6.00

8.09

adoquinado en estacionamiento

m2

1.00

7.00

7.00

frente a policlinico

m2

1.00

7.00

7.40

adoquinado estacionamiento frente a policlinico

m2

1.00

7.00

7.20

1.00

6.00

4.00

PISO DE ADOQUINES DE CONCRETO

adoquinado frente auditorio

m2

PARTIDA

19.03.00

DESCRIPCION

UND

# VECES

LARGO

ANCHO

adoquinado en estacionamiento

m2

1.00

10.00

5.00

adoquinado en estacionamiento

m2

1.00

10.00

9.00

adoquinado en estacionamiento

m2

1.00

10.00

10.00

adoquinado en estacionamiento

m2

1.00

5.40

6.00

frente a auditorio anfiteatro

m2

1.00

10.00

1.00

pintado de muros de contencion en zona lateral al auditorio

m2

1.00

33.29

1.30

pintado en fachada principal de auditorio

m2

2.00

2.80

4.00

pto

2.00

instalacion de tomacorrientes en policlinico

pto

9.00

instalacion de tomacorrientes en policlinico

pto

4.00

instalacion de tomacorrientes en policlinico

pto

4.00

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

COMPONENTE INSTALACIONES ELECTRICAS RED SECUNDARIA


22.02.01

INTERRUPTOR UNIPOLAR SIMPLE


interruptor en ss.hh en policlinico

22.03.01

22.06.02

22.07.01

22.07.03

22.07.03

SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA EN PARED H=0.40 SNPT

CAJA DE PASE CUADRADA DE 100 x 100 x 55 mm


instalacion en policlinico

und

instalacion en policlinico

und

instalacion en guardiania

und

tuberia pvc-sap (electrica) d=20 mm.

ml
ml

5.00
1.00

6.00

entubado para cajas rectangulares en policlinico


tubo pvc en policlinico modificaciones

ml

2.00

6.00

TUBERIA PVC-SAP (ELECTRICA) D=20 mm.

entubado en ss.hh

ml

1.00

6.00

entubado en caseta de guardiania

ml

3.00

6.00

entubado en caseta de guardiania

ml

1.00

3.00

entubado en caseta de guardiania

ml

1.00

6.00

ml

16.00

6.00

und

1.00

8.00

und

1.00

3.00

TUBERIA PVC-SAP (ELECTRICA) D=50 mm.

TUBERIA PVC-SAP (ELECTRICA) D=50 mm.

entubado en alimentadores de farolas


22.08.05

BUZON DE CONCRETO PREFABRICADO DE 0.60x0.60x0.60m


buzones de concreto en zona de estacionamiento

22.08.09

POSTE METALICO DE 3.5m, CON UN BRAZO


en zona de estacionamiento

22.08.10

6.00

POSTE METALICO DE 3.5m, CON DOS BRAZOS

ALTURA

PARTIDA

22.11.01

22.11.02

DESCRIPCION

UND

# VECES

LARGO

en zona de estacionamiento

und

1.00

3.00

cableado en policlinico en tablero de distribucion modificaciones

ml

1.00

18.00

cableado en policlinico en tablero de distribucion modificaciones

ml

1.00

10.00

cableado en policlinico para tomacorrientes

ml

1.00

50.00

cableado en policlinico para tomacorrientes

ml

1.00

20.00

tuberia en bao discapacitados policlinico

ml

1.00

3.00

entrada principal auditorio frente a salida de emergencia

und

2.00

m2

1.00

ANCHO

CABLE ELECTRICO THW-90, 2.5 mm2

CABLE ELECTRICO THW-90, 4 mm2

COMPONENTE INSTALACIONES SANITARIAS GLOBAL


21.02.07

21.03.30

TUBERIA PVC SAL 4"

GABINETE CONTRA INCENDIO

COMPONENTE PLAN DE CONTINGENCIA


01.04.02

PINTURA ESMALTE 2 MANOS EN CARPINTERIA DE MADERA


pintura en modulos fundo locumbilla

30.00

0.40

ALTURA

METRADOS SEGN EXPEDIENTE TECNICO

EL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLSO MARIATEGUI

PARCIAL

TOTAL

UND

1.00

PZA

2.07

M2

69.20

M2

32.50

M2

11.39

M2

13.37

M2

18.00

PZA

1.00

2.07

6.72
6.48
56.00

7.00
5.00
7.00
7.50
5.00
1.00

5.25
4.05
1.26
0.83

2.43
2.43
2.43
2.43
2.70
0.95

PARCIAL

TOTAL

UND

3.00
3.00
3.00
3.00
3.00
3.00
3.00

PZA

431.29

M2

66.15

M2

25.13

M2

12.96

M2

16.94

1.00
1.00
1.00

76.80
31.20
140.00
70.00
25.92
52.08
35.28

66.15

4.55
1.12
3.15
7.35
7.00
1.26
0.70

4.32
3.24
3.24
2.16

0.85
5.55
0.27
3.70
1.70

PARCIAL

TOTAL

UND

0.40
1.40
0.70
1.40
0.27
0.70
167.92

270.65

P2

192.10

M2

425.21

M3

226.23

M3

72.66

M3

100.00

M3

45.21

M2

110.64
4.26
3.60
15.97
5.00
14.30
14.15

49.00
12.06
33.93
79.16
75.39
13.57
7.54

177.10
15.00

330.94
94.27

226.23

10.48
32.48
29.70

100.00

PARCIAL

TOTAL

UND

32.40
9.81
3.00

0.60

M3

0.32

M3

2.70

M2

0.52

M3

367.67

M2

2757.60

KG

0.60

0.32

2.70

0.52

9.60
8.00
24.00
25.80
5.04
7.98
8.74
9.40
6.76
4.12
21.60
21.60
11.20
24.00
25.80
3.60
7.60
7.79
14.40
17.28
21.60
21.60
11.20
14.40
17.28
17.28

413.10
100.80
872.10
918.00

PARCIAL

TOTAL

UND

75.60
100.80
277.20
0.60

M3

2.80

M2

286.92

KG

0.17

M3

3.00

M2

10.31

M2

8.28

M2

5.94

M2

221.86

M2

506.14

M2

0.42
0.18

2.80

137.70
83.70
65.52

3.00

2.70
7.28
0.33

8.28

5.94

120.00
48.00
36.76
6.30
10.80

48.54
49.00
51.80
50.40
24.00

PARCIAL

TOTAL

UND

50.00
90.00
100.00
32.40
10.00
65.68

M2

2.00

PTO

17.00

PTO

9.00

UND

72.00

ML

3.00

ML

102.00

ML

8.00

UND

3.00

UND

3.00

UND

43.28
22.40

2.00

9.00
4.00
4.00

4.00
2.00
3.00

30.00
6.00
12.00
6.00
18.00

3.00

6.00
96.00

8.00

3.00

PARCIAL

TOTAL

UND

3.00
18.00

ML

80.00

ML

3.00

ML

2.00

UND

12.00

M2

18.00

10.00
50.00
20.00

3.00

2.00

12.00

PLANILLA DE METRADOS SEGN MAYORES METRADOS


OBRA :

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLSO MARIATEGUI

RESIDENTE:

ING. KARIN JANETH DEL CARPIO RIMACHI

INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES


ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.
FECHA :

DICIEMBRE 2015

PARTIDA

DESCRIPCION

UND

# VECES

LARGO

ANCHO

ALTURA

m2

0.180

area Cad =

179.99

Escenario

1.00

4.31

sshh varones

m2

0.30

sshh varones

1.00

1.5

empastado de fachada exterior en auditorio

m2

8.20

3.65

empastado de ventanas de auditorio

m2

0.10

10.00

3.00

4.80

concreto en pantalla muro mc-29

m3

1.80

0.40

concreto en pantalla muro mc-30

m3

1.80

0.40

concreto en pantalla muro mc-31

m3

1.80

0.40

concreto en pantalla muro mc-32

m3

1.80

0.40

concreto en zapatas muro mc-07

m3

0.90

0.40

concreto en zapatas muro mc-08

m3

0.90

0.40

0.90

0.40

SEGN MAYORES METRADOS


COMPONENTE CONSTRUCCION DEL AUDITORIO

10.04.00

PISO DE ADOQUINES DE CONCRETO


Hall recepcion Exterior

11.03.00

16.11.00

16.14.00

19.16.00

CONTRAZOCALO DE MADERA CEDRO DE 3/4"x4" + RONDON DE 3/4"

PUERTA DE ALUMINIO EN SS.HH.


1.8

TABIQUERIA DE ALUMINIO CON ACRILICO EN SS.HH. H=1.80m

EMPASTADO DE SUPERFICIE

empastado de fachada exterior en auditorio

COMPONENTE PLAZOLETA Y AREAS VERDES


05.04.07

MUROS DE CONTENCION, CONCRETO f'c= 210 kg/cm2

concreto en zapatas muro mc-09

m3

concreto en zapatas muro mc-10

m3

0.90

0.40

concreto en zapatas muro mc-11

m3

0.90

0.40

concreto en pantalla muro mc-07

m3

0.15

1.80

concreto en pantalla muro mc-09

m3

0.15

1.90

0.15

1.90

concreto en pantalla muro mc-11

m3

concreto en pantalla muro mc-30

m3

0.25

3.50

concreto en pantalla muro mc-32

m3

0.25

3.50

PARTIDA

DESCRIPCION

UND

# VECES

LARGO

ANCHO

ALTURA

concreto en pantalla muro mc-08

m3

0.15

1.10

concreto en pantalla muro mc-10

m3

0.15

1.20

concreto en zapatas muro mc-12

m3

1.30

0.40

concreto en zapatas muro mc-13

m3

1.30

0.40

concreto en zapatas muro mc-14

m3

1.30

0.40

concreto en zapatas muro mc-15

m3

1.30

0.40

0.25

2.90

concreto en pantalla muro mc-29

m3

concreto en pantalla muro mc-31

m3

0.25

2.90

concreto en pantalla muro mc-12

m3

0.25

2.00

concreto en pantalla muro mc-13

m3

0.15

2.90

concreto en pantalla muro mc-15

m3

0.15

2.90

0.15

2.90

m2

1.00

11.00

0.10

ml

1.00

2.00

Hall recepcion Exterior

m2

0.453

area Cad =

pintado de vigas de interiores de auditorio

m2

1.38

7.60

pintado de columnas de interiores de auditorio

m2

12

2.48

0.98

pintado de muros de interiores de auditorio

m2

15.60

1.50

m2

10.00

0.98

m2

6.00

0.98

m2

7.80

1.10

m2

10.00

6.80

concreto en pantalla muro mc-14


08.06.00

TARRAJEO DE MUROS DE CONCRETO (1:5)


tarrajeo de bordes de ventanas

COMPONENTE INSTALACIONES SANITARIAS GLOBAL


21.03.08

TUBERIA PVC CLASE 10 - 2"


tuberia en bao discapacitados policlinico

SEGN MAYORES METRADOS - NO VALORIZADOS


COMPONENTE CONSTRUCCION DEL AUDITORIO

10.04.00

19.02.00

19.03.00

PISO DE ADOQUINES DE CONCRETO

PINTURA SUPER MATE 2 MANOS EN CIELO RASO Y VIGAS

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

COMPONENTE PLAZOLETA Y AREAS VERDES


03.13.00

179.99

ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES

PARTIDA

03.30.00

DESCRIPCION

UND

# VECES

LARGO

ANCHO

ALTURA

acarreo de material excendete de los costados de la rampa

m3

1.00

1.50

1.00

1.00

eliminacion al costado de zona de estacionamiento 1

m3

1.00

12.00

2.00

2.00

m3

4.00

0.25

0.30

m2

4.80

0.60

m3

4.80

0.15

m2

m2

m2

cerco perimetrico fachada interior en columnas

m2

cerco perimetrico fachada interior en columnas

m2

sobrecimiento en cerco perimetrico interior

EXCAVACION DE ZANJAS PARA UAS


excavacion de uas en muros MC-29,MC-30,MC-31;MC-32

05.18.01

SARDINEL REFORZADO, ENCOFRADO Y DESENCOFRADO


encofrado en sardinel en parte lateral de policlinico

05.18.02

SARDINEL REFORZADO, CONCRETO f'c=140 kg/cm2 +30% PG


concreto en sardinel en parte lateral de policlinico

07.02.00

MURO DE LADRILLO KK SOGA M:1:1:4 E=1.5cm


muro en zona de ingreso vehicular mayta capac

10.19.00

19.16.00

1.60

1.50

ENCOFRADO Y DESENCOFRADO DE PISOS


encofrado en pase peatonal frente a auditorio

19.03.00

0.60

15.00

0.60

12.00

0.90

2.40

13.00

0.63

2.40

m2

26.00

5.00

0.60

cerco perimetrico fachada interior en columnas

m2

24.00

0.95

2.80

sobrecimiento en cerco perimetrico interior

m2

13.00

6.00

0.60

muros en rampa frente a auditorio

PINTURA SUPER MATE 2 MANOS EN MUROS Y COLUMNAS

EMPASTADO DE MUROS
m2

1.00

18.00

1.68

empastado de muros y sardineles frente a auditorio

m2

1.00

9.33

1.60

fachada lateral de policlinico

m2

1.00

3.97

empastado en murosy sardinales exteriores al auditorio

m2

1.00

20.00

6.70
1.00

empastado en murosy sardinales exteriores al auditorio

m2

1.00

10.00

1.00

muros y sardineles en zona de policlinico

m2

1.00

5.00

1.20

1.00

5.00

1.26

1.00

2.85

1.10

1.00

5.00

0.80

1.00

4.30

0.80

empastado en fachada exteriores al policlinico

m2

1.00

0.80

8.16

empastado en sardineles exteriores al policlinico

m2

1.00

23.40

2.00

empastado en muros de contencion exteriores al policlinico

m2

1.00

13.00

1.20

empastado gabinete contra incendio puerta antipanico

m2

1.00

2.00

2.00

muros en rampa en zona lateral al policlinico

m2

9.00

2.00

1.00

6.00

2.00

1.00

empastado en fachada de policlinico posterior

m2

1.00

18.00

2.80

empastado en laterales de policlinico

m2

1.00

11.00

2.80

empastado en fachada de policlinico (hacia estacionamiento )

m2

2.00

5.00

3.80

empastado en muro de ingreso vehicular

m2

2.00

4.60

3.60

empastado en zona lateral de caseta

m2

1.00

3.36

5.00

empastado de tabiques en zona superior de caseta

m2

3.00

2.80

1.00

PARTIDA

DESCRIPCION

UND

# VECES

LARGO

und

instalacion en policlinico

und

1.00

instalacion de conductores en auditorio

ml

24.00

tomacorriente industrial trifasico de 30 amp.

ml

78.00

instalacion de tomacorrientes en policlinico

pto

2.00

instalacion de tomacorrientes en policlinico

pto

3.00

pto

1.00

und

1.00

reinstalacion de llave de paso en zona de parqueo

und

1.00

instalacion en bao de discapacitados - policlinico

und

7.00

COMPONENTE INSTALACIONES ELECTRICAS RED SECUNDARIA


22.06.01

CAJA DE PASE OCTOGONAL DE 100 x 55 mm


caja de pase octagonal en caseta de guardiania

22.06.02

22.11.17

22.11.26

22.14.03

2.00

CAJA DE PASE CUADRADA DE 100 x 100 x 55 mm

CONDUCTOR NYY 3 - 1 x 16 mm2

CONDUCTOR NYY2 - 1 x 10 mm2

TOMACORRIENTE INDUSTRIAL TRIFASICO DE 30 AMP.

instalacion de tomacorrientes en policlinico

COMPONENTE INSTALACIONES SANITARIAS GLOBAL


21.03.45

TEE PVC DE 2"


instalacion de tee en sshh discapacitados - policlinico

21.03.48

21.03.49

LLAVE DE PASO TIPO BOLA DE 2"

CODO PVC 2"

ANCHO

ALTURA

METRADOS SEGN MAYORES METRADOS

EL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLSO MARIATEGUI

PARCIAL

TOTAL

UND

32.37

M2

4.31

0.54

M2

1.50

59.73

M2

47.72

M3

32.37

4.31

0.54

1.50

29.93
1.00
28.80

3.31
3.31
3.31
4.32
0.58
0.90
0.90
0.58
1.01
0.38
0.60
0.66
3.50
3.68

PARCIAL

TOTAL

UND

0.43
0.26
1.98
1.82
2.18
2.29
2.90
3.08
1.40
1.17
1.52
1.65
1.10

M2

2.00

ML

81.48

M2

10.49

M2

144.82

M2

49.50

M3

1.10

2.00

81.48

10.49

29.16
23.40
9.80
5.88
8.58
68.00

PARCIAL

TOTAL

UND

1.50
48.00
0.30

M3

5.76

M2

0.43

M3

2.40

M2

9.00

M2

234.22

M2

405.08

M2

0.30

5.76

0.43

2.40

9.00

25.92
19.66
78.00
63.84
46.80

30.24
14.92
26.60
20.00
10.00
6.00
6.30
3.14
4.00
3.44
6.53
46.80
15.60
4.00
18.00
12.00
50.40
30.80
38.00
33.12
16.80
8.40

PARCIAL

TOTAL

UND

2.00

UND

1.00

UND

24.00

ML

78.00

ML

6.00

PTO

1.00

UND

1.00

UND

7.00

UND

2.00

1.00

24.00

78.00

2.00
3.00
1.00

1.00

1.00

7.00

PLANILLA DE METRADOS SEGN PARTIDAS NUEVAS


OBRA :

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLSO MARIATEGUI

RESIDENTE:

ING. KARIN JANETH DEL CARPIO RIMACHI

INSPECTOR : ARQ. GLADYS L. RAMREZ CHARRES


ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.
FECHA :

DICIEMBRE 2015

PARTIDA

DESCRIPCION

UND

# VECES

LARGO

pasamanos en mezanine

ml

19.20

barandas en rampas auditorio

ml

188.84

ANCHO

ALTURA

SEGN PARTIDAS NUEVAS


COMPONENTE CONSTRUCCION DEL AUDITORIO

16.65.00

16.66.00

PASAMANOS METALICOS INC/COLOCADO Y PINTADO

BARANDAS METALICAS INC/COLOCADO Y PINTADO

SEGN PARTIDAS NUEVAS - NO VALORIZADAS


COMPONENTE BIENESTAR SOCIAL

15.02.00

P.N

P.N

PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3"


SS.HH. Triaje

m2

0.53

0.75

2.7

Deposito

m2

1.20

2.5

Sala Reposo

m2

0.90

2.7

Consultorio

m2

1.20

2.7

Pasadizo

m2

2.06

2.5

picado en contrapiso en 01 ambiente de policlinico

m2

5.00

10.00

picado en contrapiso en 01 ambiente de policlinico

m2

6.00

2.00

picado en contrapiso en 01 ambiente de policlinico

m2

8.00

5.00

picado en contrapiso en 01 ambiente de policlinico

m2

8.00

7.00

baceo de piso en sshh policlinico

m2

2.00

3.50

baceo de piso al costado de ingreso peatonal en policlinico

m2

5.00

0.40

und

PICADO DE CONTRAPISO E=20MM

PISO DE CEMENTO ACABADO PULIDO

COMPONENTE INSTALACIONES SANITARIAS


P.N

LLAVE DE PASO DE 1/2'' PVC T/BOLA


cambio de llave en ingreso principal a tecnologico

PARTIDA

P.N

P.N

P.N

DESCRIPCION

UND

# VECES

codo en ss.hh policlinico

und

tee en ss.hh policlinico

und

codo pvc en caseta de guardiania

und

CODO PVC 4"

TEE PVC DE 4"

CODO PVC 1''

LARGO

ANCHO

ALTURA

METRADOS SEGN PARTIDAS NUEVAS

EL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLSO MARIATEGUI

PARCIAL

TOTAL

UND

19.20

ML

188.84

ML

20.04

M2

50.00

M2

7.00

M2

1.00

UND

19.20

188.84

1.07
3.00
2.43
3.24
10.30

50.00
12.00
40.00
56.00

7.00
2.00

1.00

PARCIAL

TOTAL

UND

1.00

UND

1.00

UND

4.00

UND

1.00

1.00

4.00

RESUMEN DE PRESUPUESTO PROGRAMADO Y EJECUCION DESAGREGADO SEGN EXPE


SNIP N
86159
PROYECTO
MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS
RESIDENTE DE OBRA
ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR DE OBRA
ARQ. GLADYS L. RAMREZ CHARRES
FECHA INICIO
15 de Noviembre del 2010 PLAZO EJECUCION
450 DIAS
OTROS DETALLES
FECHA CULMINACION
08 de Febrero del 2012 AMPLIACIONES DE PLAZO
1706 DIAS
CULM. REPROGRAMADO
02 de Enero del 2016 TOTAL PLAZO EJECUCION
2156

PROGRAMACION PRESUPUESTAL SEGN ANALITICO DEL EXPEDIENTE TECNICO Y ADICIONALES


ADICIONALES DE OBRAS
ITEM

MONTO EXP.
TECNICO

MODIFICACI MODIFICACI MODIFICAC MODIFICAC MODIFICAC MODIFICAC MODIFICAC MODIFICACIO


ON N 01
ON N 02 ION N 03 ION N 04 ION N 05 ION N 06 ION N 07
N N 08

TOTAL
MODIFICA PRESUPUEST
CION N
O
09

1. ETAPA PREOPERATIVA

COSTO DIRECTO

515,457.58

0.00

515,457.58

127,382.16

0.00

127,382.16

12,738.22

0.00

12,738.22

2,547.64

0.00

2,547.64

1,019.06

0.00

1,019.06

1,910.73

0.00

1,910.73

2. PLAN DE CONTINGENCIA

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.5 %
3. INFRAESTRUCTURA

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.5 %

145,597.81
###

### 110,872.15 817,553.80

461,099.03

992,336.16

### 18,747,688.17

1,518,719.22

102,760.98

11,087.22

81,755.38

46,109.90

99,233.62 15,102.51

303,743.84

20,552.20

2,217.44

16,351.08

9,221.98

19,846.72

3,020.50

374,953.76

121,497.54

8,220.88

886.98

6,540.43

3,688.79

7,938.69

1,208.20

149,981.51

227,807.88

15,414.15

1,663.08

12,263.31

6,916.49

14,885.04

2,265.38

281,215.32

4. IMPLEMENTACION

COSTO DIRECTO
G. GENERALES 1.6 %
G. SUPERVICION 0.7 %
G. LIQUIDACION 0.4%
G. ADMINISTRACION 0.6 %

1,874,768.82

21,428,607.58
###

34,560.31

770,790.00

111,772.53

-3,032.50 19,886,283.35

303,555.09

552.96

12,332.64

1,788.36

-48.52

318,180.53

132,805.35

241.92

5,395.53

782.41

-21.23

139,203.98

75,888.77

138.24

3,083.16

447.09

-12.13

79,545.13

113,833.16

207.36

4,624.74

670.64

-18.20

119,317.70

5. CAPACITACION

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.5 %

20,542,530.70
240,352.00

240,352.00

24,035.20

24,035.20

4,807.04

4,807.04

1,922.82

1,922.82

3,605.28

3,605.28

6. IMPACTO AMBIENTAL

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.5 %

274,722.34
319,432.66

319,432.66

31,943.27

31,943.27

6,388.65

6,388.65

2,555.46

2,555.46

4,791.49

4,791.49
365,111.53

SUB TOTAL COSTO DIRECTO


SUB TOTAL C. INDIRECTO
TOTAL EXPEDIENTE

###
2,896,115.71
38,258,125.30
100.00%

OBSERVACION :

###
146,948.20
###
3.07%

###

###

###

###

###

992,336.16

15,854.72

116,910.19

67,077.65

25,436.07

3,688.49

141,904.07

126,726.87

934,463.99

562,736.99

796,226.07

115,461.02

1,134,240.23

0.33%

2.44%

0.00%

1.47%

2.08%

0.30%

2.96%

### 39,836,595.92
21,496.51

3,435,431.61

### 43,272,027.56
0.44%

100.00%

La asignacin de los porcentajes - montos en costos INDIRECTOS, esta supeditado a la aprobacin segn expediente tcnico ( en muchos casos va

Segn la nueva Resolucin de Asignacin de nuevos porcentajes en costos INDIRECTOS debe de ser reformulado el analtico y aprobado va acta re

SAGREGADO SEGN EXPEDIENTE TECNICO Y ADICIONALES DE OBRA


DESCRIPCION Y/O META DEL PROYECTO

OBSERVACIONES
LA ASIGNACION DE PRESUPUESTO PARA EL PRESENTE AO ES EN FORMA PARCIAL POR UN
MONTO DE S/. 3,853,210.00

EJECUCION PRESUPUESTAL DESAGREGADO Y ACUMULADO 2015


DESCRIPCION

PRESUPUESTO
PROGRAMADO

EJECUTADO
ANTERIOR

EJECUCION
EN EL MES
DE
DICIEMBRE

EJECUCION
SALDO
ACUMULADA PRESUPUESTAL

1. ETAPA PREOPERATIVA

COSTO DIRECTO
2. PLAN DE
CONTINGENCIA

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.
3. INFRAESTRUCTURA

515,457.58

613,524.44

-98,066.86

127,382.16

39,941.94

71.16

40,013.10

87,369.06

12,738.22

3,994.19

7.12

4,001.31

8,736.91

2,547.64

798.84

1.42

800.26

1,747.38

1,019.06

319.54

0.57

320.10

698.95

1,910.73

599.13

1.07

600.20

1,310.54

9,979,054.59

161,972.54

997,905.46

16,197.25

1,014,102.71

860,666.10

199,581.09

3,239.45

202,820.54

172,133.22

79,832.44

1,295.78

81,128.22

68,853.29

149,685.82

2,429.59

152,115.41

129,099.92

145,597.81

COSTO DIRECTO
18,747,688.17
G. GENERALES 10 %
1,874,768.82
G. SUPERVICION 2 %
374,953.76
G. LIQUIDACION 0.8%
149,981.51
G. ADMINISTRACION 1.
281,215.32
4. IMPLEMENTACION

613,524.44

145,597.81
###

21,428,607.58

COSTO DIRECTO
19,886,283.35
G. GENERALES 1.6 %
318,180.53
G. SUPERVICION 0.7 %
139,203.98
G. LIQUIDACION 0.4%
79,545.13
G. ADMINISTRACION 0.
119,317.70

8,606,661.04

21,428,607.58
4,447,161.83

### 15,439,121.52

71,154.59

71,154.59

247,025.94

31,130.13

31,130.13

108,073.85

17,788.65

17,788.65

61,756.49

26,682.97

26,682.97

92,634.73

5. CAPACITACION

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.
6. IMPACTO AMBIENTAL

COSTO DIRECTO
G. GENERALES 10 %
G. SUPERVICION 2 %
G. LIQUIDACION 0.8%
G. ADMINISTRACION 1.

20,542,530.70

20,542,530.70

240,352.00

103,560.00

103,560.00

136,792.00

24,035.20

10,356.00

10,356.00

13,679.20

4,807.04

2,071.20

2,071.20

2,735.84

1,922.82

828.48

828.48

1,094.34

3,605.28

1,553.40

1,553.40

2,051.88

319,432.66

28,367.57

28,367.57

291,065.09

31,943.27

2,836.76

2,836.76

29,106.51

6,388.65

567.35

567.35

5,821.30

2,555.46

226.94

226.94

2,328.52

4,791.49

425.51

425.51

4,365.98

274,722.34

274,722.34

365,111.53

SUB TOTAL COSTO DIR 39,836,595.94 15,211,610.36


SUB TOTAL C. INDIRECTO 3,435,431.61
1,598,338.49
TOTAL EXPEDIENTE
43,272,027.56
16,809,948.85
100.00%

38.19%

162,043.70
23,172.25
185,215.95
0.41%

### 24,462,941.86
1,621,510.73
###
38.59%

1,813,920.88
26,276,862.74
61.41%

segn expediente tcnico ( en muchos casos varan en los porcentajes, segn componentes)

er reformulado el analtico y aprobado va acta resolutivo, dependiendo de los porcentajes asignados inicialmente y la disponibilidad de saldos.

PROYECTO:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INS


CARLOS MARIATEGUI

PRESUPUESTO EXP. TECNICO:

S/. 43,272,027.56

FUENTE DE FINANCIAMIENTO:

NUEVOS SOLES

RECURSOS ORDINARIOS - CANON Y SOBRE CANON

DESCRIPCION
COSTO DIRECTO
Gastos Generales
Gastos por Supervision
Gastos por Liquidacin
Gastos por Administracin
PRESUPUESTO TOTAL
SUB TOTAL

MONTO PROG.

EJECUTADO

POR EJECUTAR

39,836,595.94
2,261,666.03
527,901.08
235,023.97
410,840.52

15,373,654.06
1,102,451.37
237,389.49
100,292.39
181,377.49

24,462,941.86
1,159,214.66
290,511.59
134,731.58
229,463.04

43,272,027.58

16,995,164.80

26,276,862.74

43,272,027.58

16,995,164.80

26,276,862.74

AVANCE FISICO (S/.)


PROGRAMADO
Acumulado hasta
2014

14,209,087.11

35.67%

% ACUM.

35.67%

EJECUTADO

14,209,087.11

35.67%

% ACUM.

35.67%

16,

14,

PROYECTO:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INS


CARLOS MARIATEGUI

16,

Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16

ACUMULADO
SALDO
TOTAL

OBSERVACIN

0.00
10,309.31
53,463.33
154,675.50
92,940.86
130,000.61
86,371.31
101,875.15
696,102.93
658,723.21
644,215.23
409,036.32
294,317.24

0.00%
0.03%
0.13%
0.39%
0.23%
0.33%
0.22%
0.26%
1.75%
1.65%
1.62%
1.03%
0.74%

17,541,118.11 44.03%
22,295,477.83 55.97%
39,836,595.94 100.00%

35.67%
35.69%
35.83%
36.22%
36.45%
36.78%
36.99%
37.25%
39.00%
40.65%
42.27%
41.68%
43.01%

0.00
4,047.65
52,848.76
82,911.74
54,408.68
131,009.57
145,281.24
22,834.54
68,084.08
60,091.00
430,131.96
162,043.70

0.00%
0.01%
0.13%
0.21%
0.14%
0.33%
0.36%
0.06%
0.17%
0.15%
1.08%
0.41%
0.00%

15,422,780.02 38.72%
24,413,815.92 61.28%
39,836,595.94 100.00%

35.67%
35.68%
35.81%
36.02%
36.16%
36.48%
36.85%
36.91%
37.08%
37.23%
38.31%
38.72%
38.72%

14,

12,

10,

8,

6,
NUEVOS SOLES S/.

4,

2,

PROYECTO:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INS


CARLOS MARIATEGUI

AVANCE FINANCIERO (S/.)


PROGRAMADO
Ao-2010
Ao-2011
Ao-2012
Ao-2013
Ao 2014
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15

1,182,204.94
3,798,719.30
5,586,273.51
7,989,937.09
1,304,716.73
11,783.54
61,108.59
176,794.10
106,231.40
148,590.70
201,620.73
116,443.30
696,102.93
718,723.21

2.73%
8.78%
12.91%
18.46%
3.02%
0.00%
0.03%
0.14%
0.41%
0.25%
0.34%
0.47%
0.27%
1.61%
1.66%

% ACUM.

2.73%
11.51%
24.42%
42.88%
45.90%
45.90%
45.93%
46.07%
46.48%
46.72%
47.07%
47.53%
47.80%
49.41%
51.07%

EJECUTADO

1,182,204.94
3,798,719.30
5,586,273.51
7,989,937.09
1,304,716.73
6,230.66
102,069.53
191,363.00
221,397.33
306,854.09
313,058.73
204,569.26
393,496.60
483,772.46
302,726.78

2.73%
8.78%
12.91%
18.46%
3.02%
0.01%
0.24%
0.44%
0.51%
0.71%
0.72%
0.47%
0.91%
1.12%
0.70%

% ACUM.

2.73%
11.51%
24.42%
42.88%
45.90%
45.91%
46.15%
46.59%
47.10%
47.81%
48.54%
49.01%
49.92%
51.04%
51.74%

NUEVOS SOLES S/.

NUEVOS SOLES S/.

PROYECTO:

Nov-15
Dec-15
Jan-16

ACUMULADO
SALDO
TOTAL

744,215.23
525,036.32
346,559.96

23,715,061.57
19,556,966.00
43,272,027.56

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INS


CARLOS MARIATEGUI

1.72%
1.21%
0.80%

54.80%
45.20%
100.00%

52.79%
54.00%
54.80%

430,131.96
567,824.85

0.99%
1.31%
0.00%

23,385,346.82 54.04%
19,886,680.74 45.96%
43,272,027.56 100.00%

OBSERVACIN
EL AVANCE FINANCIERO SE TOMO COMO REFERENCIA LA INFORMACION DE EJECUCION FINANCIERA
DE LA OFICINA DE PRESUPUESTO .
PARA EL PRESENTE MES EL AVANCE FINANCIERO ES A NIVEL DE COMPROMISOS.

52.73%
54.04%
54.04%
50.05%

AESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE


CARLOS MARIATEGUI

ESTADO
MES

: EJECUCION
: DICIEMBRE 2015

AVANCE FISICO (%)

ACUMULADO; 39%
SALDO; 61%

AVANCE FISICO
16,000,000.00
14,000,000.00

AESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE


CARLOS MARIATEGUI

AVANCE FISICO

16,000,000.00
14,000,000.00
12,000,000.00
10,000,000.00
8,000,000.00
6,000,000.00
NUEVOS SOLES S/.
4,000,000.00
2,000,000.00
0.00

AESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE


CARLOS MARIATEGUI

AVANCE FINANCIERO
8,000,000.00

7,000,000.00

6,000,000.00

5,000,000.00

4,000,000.00
NUEVOS SOLES S/.
3,000,000.00

2,000,000.00

1,000,000.00

0.00

4,000,000.00
NUEVOS SOLES S/.
3,000,000.00

2,000,000.00
AESTRUCTURA DEL INSTIRUTO
SUPERIOR TECNOLOGICO PUBLICO JOSE
CARLOS MARIATEGUI
1,000,000.00

0.00

AVANCE FISICO (%)

SALDO; 46%

ACUMULADO; 54%

RECURSOS HUMANOS UTILIZADOS


MES: DICIEMBRE 2015
PROYECTO :
MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI
OBRA:
MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI
RESIDENTE:
ING. KARIN JANETH DEL CARPIO RIMACHI
INSPECTOR:
ARQ. GLADYS L. RAMREZ CHARRES
ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.
MODALIDAD: EJECUCION PRESUPUESTARIA DIRECTA

ITEM

DESCRIPCION

UND

ANTERIOR
CANTIDAD
PARCIAL

EJECUCIN REAL EN EL AO 2015


AVANCE ACTUAL
CANTIDAD
PARCIAL

ACUMULADO
CANTIDAD
PARCIAL

01

TOPOGRAFO

hh

02

CAPATAZ

hh

2,077.50

35,798.07

2,077.50

35,798.07

03

OPERARIO

hh

40,845.00

657,369.44

40,845.00

657,369.44

04

OFICIAL

hh

18,649.00

245,455.65

18,649.00

245,455.65

05

PEON

hh

36,213.50

422,694.62

36,213.50

422,694.62

COSTO TOTAL

1,361,317.78

0.00

1,361,317.78

CONTROL DE TIEMPO MES OCTUBRE DEL 2015


PROYECTO:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOG

FUENTE FINANCIAMIENTO
REGIMEN

N DE
ORDEN

NOMBRE Y APELLIDOS

RECURSOS ORDINARIOS
CONSTRUCCION CIVIL

N DNI

NIVEL Y/O
CATEGORIA

CARGO

10

11

12

13

14

15

16

17

QUISPE JORGE LORENZO JOSE

40101805

Maestro de Obra

Maestro de Obra

SOTOMAYOR CACALLICA EDWARD GABRIEL

46258312

Operario

Operario Albail

LEON ACHAHUANCO EFRAIN BONNY

45016935

Operario

Operario Soldador

CORNEJO MALDONADO CARLA

40878550

Oficial

Almacenera

PINTO PACHO MIRTHA HAYDEE

04415325

Peon

Peon

DM

MAMANI COLANA FREDDY WILFREDO

40419709

Operario

Operario sanitario

MUOZ FALCON JOSE ANTONIO

04742350

Operario

Carpintero Ebanista

GOMEZ HUIZA ANDRES LUCHO

04432225

Operario

Operario Multiple

CHATA VELASQUEZ TITO FROILAN

04643797

Operario

Operario Albail

10

JIMENEZ CONDORI ROGER

44561531

Operario

Operario Multiple

11

MAQUERA FLORES OBTULIO MAXIMO

04742204

Operario

Operario Multiple

12

NINA NINA CESAR PERCY

80660138

Operario

Operario Multiple

13

CHAMBILLA CHAMBILLA EFRAIN TITO

01323406

Operario

Operario Multiple

14

APAZA JIMENEZ SATURNINO

04408639

Operario

Operario Multiple

15

NINA CONDORI RICHAR

41772966

Operario

Operario Albail

DM

16

ASQUI HUISA FRANCISCO JAVIER

01276713

Oficial

Oficial

17

VALDIVIA CUTIPA VALERIANO VIDAL

30833409

Oficial

Guardian

18

VILCA MAMANI LIDER FERNANDEZ

42078660

Oficial

Guardian

19

CASTRO COTERA EDWIN LUIS

41935647

Oficial

Oficial

20

CHAMBILLA ALLCCA JOSE MANUEL

42471130

Oficial

Oficial

CONTROL DE TIEMPO MES OCTUBRE DEL 2015


PROYECTO:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOG

FUENTE FINANCIAMIENTO
REGIMEN

N DE
ORDEN

NOMBRE Y APELLIDOS

RECURSOS ORDINARIOS
CONSTRUCCION CIVIL

N DNI

NIVEL Y/O
CATEGORIA

CARGO

10

11

12

13

14

15

16

17

21

MAMANI CHOQUE MANUEL

44074750

Peon

Peon

22

SIHUACOLLO VARGAS ELSA

10165174

Peon

Peon

23

MAMANI RAMOS BERLY REYNALDO

42547530

Peon

Peon

24

COPA GUTIERREZ ASENCIO

42953561

Peon

Peon

25

LINARES FLORES ALFREDO

00434799

Peon

Peon

26

CONDORI MAMANI ATANACIO MIGUEL

04424206

Peon

Peon

27

LLAYQUI MAMANI HECTOR MARTIN

45628630

Peon

Peon

28

COLANA DE CORVACHO BACILIA TORIBIA

04426689

Peon

Peon

29

CABANILLAS CUEVA RUBEN HIGINIO

04647482

Oficial

Guardian

30

MARCA AROCUTIPA EMILIO

04425848

Peon

Peon

31

VIZARRETA MUOZ RONALD GIANCARLO

04436258

Operario

Oficial Carpintero

32

MAMANI MAMANI NELY

00498646

Peon

Peon

33

FIGUEROA CUETO PEDRO HILARIO

04429406

Operario

Operario Pintor

34

HUARACHI MAMANI EDWIN

80475620

Operario

Operario Pintor

35

CONDORI HUANACUNI CIRILO

40722374

Operario

Laboratorista

36

RICALDE PEALOZA MIRIAN ISABEL

40194871

Peon

Peon

37

JINES CABEZAS FREDDY JORGE

41395588

Peon

Peon

38

QUILLAHUAMAN CANDIA PEDRO HUGO

04402291

Operario

Oficial

39

CHOQUEHUANCA HUAYAPA RUBEN ROSALIO

40509975

Operario

Oficial

40

QUISPE LOPEZ NELSON RYDER

42197273

Peon

Peon

CONTROL DE TIEMPO MES OCTUBRE DEL 2015


PROYECTO:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOG

FUENTE FINANCIAMIENTO
REGIMEN

N DE
ORDEN

NOMBRE Y APELLIDOS

RECURSOS ORDINARIOS
CONSTRUCCION CIVIL

N DNI

NIVEL Y/O
CATEGORIA

CARGO

10

11

12

13

14

15

16

17

41

POMA CHOQUE DAVID MASIAS

04433201

Peon

Peon

42

RIVERA APAZA MICHAEL JEFFERSON

46612248

Operario

Operario Pintor

43

RAMOS EUGENIO. JUAN SILVERIO

44324719

Operario

Electrico

44

CHURA MAMANI ELIAS SAMUEL

80383537

Peon

Peon

Oficial

Topografo

45

QUISPE ORDOEZ, SALVADOR

04403792

Oficial

46

CORONEL LAURA JOSE LUIS

41017238

Operario

CNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI

18

19

20

21

22

23

24

25

26

27

28

29

30

31

DIAS

CONTR
OL

LAB

DIAS

26

31

26

31

26

31

26

31

25

30

26

31

26

31

26

29

26

31

25

29

26

31

26

31

26

31

26

31

24

28

26

31

26

31

26

31

26

31

26

31

CNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI

18

19

20

21

22

23

24

25

26

27

28

29

30

31

DIAS

CONTR
OL

LAB

DIAS

26

31

26

31

26

31

26

31

26

31

26

31

26

31

26

31

26

31

26

31

26

31

25

29

26

31

26

31

26

31

26

31

26

31

26

31

26

31

25

29

CNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI

18

19

20

21

22

23

24

25

26

27

28

29

30

31

DIAS

CONTR
OL

LAB

DIAS

26

31

26

31

26

31

26

31

26

31

RESUMEN DE AVANCE FINANCIERO


MES: DICIEMBRE 2015
PROYECTO :

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI

OBRA:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEG

RESIDENTE:

ING. KARIN JANETH DEL CARPIO RIMACHI

INSPECTOR DE OBRA:

SECUENCIA FUNCIONAL: 036

ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.


MODALIDAD: EJECUCION PRESUPUESTARIA DIRECTA

RUBROS

MONTO APROBADO MAS


ADICIONALES
S/.

ARQ. GLADYS L. RAMREZ CHARRES

ACUMULADO
HASTA FINALES
DEL 2014
S/.

EJECUTADO DEL AO 2015


ANTERIOR
S/.

ACTUAL
%

ACUMULADO
%

S/.

COSTO DIRECTO

39,836,595.92 92.06%

Mano de Obra

14,030,168.25 32.42%

1,363,935.28

170,938.19

1,534,873.47

Materiales

22,377,575.00 51.71%

984,802.34

281,155.30

1,265,957.64

131,088.33

51,712.25

182,800.58

17,007,325.10

2,545,834.45

5.88%

537,555.74

1.24%

3,083,390.19

Servicios

3,412,352.67

Mobiliario

0.00

11,550.00

14,250.00

25,800.00

Electricidad y electronica

0.00

8,370.00

0.00

8,370.00

Equipos e instrumentos de medic

0.00

11,130.00

8,850.00

19,980.00

34,958.50

10,650.00

45,608.50

Maquinaria y Moviliario

7.89%

16,500.00

0.04%

COSTO INDIRECTO

3,435,431.61

7.94%

Gastos Generales

2,261,666.03

5.23%

286,282.43

29,793.11

316,075.54

Gastos de Supervisin

527,901.08

1.22%

56,445.59

0.00

56,445.59

Gastos de Administracin

235,023.97

0.54%

44,028.10

0.00

44,028.10

Gastos de Liquidaciones

410,840.52

0.95%

23,079.83

476.00

23,555.83

0.00%

0.00

0.00

0.00

Gastos de Difusin

TOTAL

43,272,027.56 100.00%

2,854,526.47

19,861,851.57

409,835.95

2,955,670.40

0.95%

6.83%

30,269.11

567,824.85

0.07%

1.31%

ACUMULADO DEL AO
2010 2015

440,105.06

3,523,495.25

7.13%

1.02%

8.14%

20,090,715.29 46.43%

3,294,631.53

7.61%

23,385,346.82 54.04%

AVANCE FINANCIERO
ICIEMBRE 2015

ACUMULADO DEL AO
2010 2015
%
46.43%

7.61%

54.04%

SALDO TOTAL

S/.

19,745,880.63 45.63%

140,800.08

0.33%

19,886,680.74 45.96%

GASTO FINANCIERO
PROYECTO : MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI
OBRA:

MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI

RESIDENTE: ING. KARIN JANETH DEL CARPIO RIMACHI

INSPECTOR DE OBRA: ARQ. GLADYS L. RAMREZ CHARRES

ENTIDAD EJECUTORA: GOBIERNO REGIONAL DE MOQUEGUA.

SECUENCIA FUNCIONAL:

036

MODALIDAD: EJECUCION PRESUPUESTARIA DIRECTA


TIPO DE COSTO

C.D.

COSTO DIRECTO

META

0036

ESPECIFIC
A

DESCRIPCION ESPECIFICA

2.6.22.23

COSTO DE CONSTRUCCION POR


ADMINISTRACION DIRECTA - PERSONAL

2.6.22.24

0069

FEBRERO

MARZO

23,850.13

77,801.02

COSTO DE CONSTRUCCION POR


ADMINISTRACION DIRECTA - BIENES

4,411.00

47,579.40

2.6.22.25

COSTO DE CONSTRUCCION POR


ADMINISTRACION DIRECTA - SERVICIOS

4,500.00

11,724.31

2.6.32.22

MOBILIARIO

2.6.32.94

ELECTRICIDAD Y ELECTRONICA

2.6.32.95

EQUIPOS E INSTRUMENTOS DE MEDICION

2.6.32.9 99 MAQUINARIAS, EQUIPOS Y OTROS

GESTION DE
PROYECTOS

ENERO

2.6.81.41

GASTO POR LA CONTRATACION DE


PERSONAL

2.6.81.42
2.6.81.43

11,089.17

20,731.80

GASTO POR LA COMPRA DE BIENES

6,385.52

9,213.30

GASTO POR LA CONTRATACION DE


SERVICIOS

1,300.00

13,698.00

2.6.81.4 99 OTROS GASTOS

SUPERVISION

0070

C.I.

2.6.81.41

GASTO POR LA CONTRATACION DE


PERSONAL

2.6.81.42

GASTO POR LA COMPRA DE BIENES

2.6.81.43
2.6.81.41
ADMINISTRACION

0071

2.6.81.42
2.6.81.43
2.6.81.41

LIQUIDACION

0072

GASTO POR LA CONTRATACION DE


SERVICIOS
GASTO POR LA CONTRATACION DE
PERSONAL

8,140.61

10,615.17

42,393.10

GASTO POR LA COMPRA DE BIENES


GASTO POR LA CONTRATACION DE
SERVICIOS
GASTO POR LA CONTRATACION DE
PERSONAL

2.6.81.42

GASTO POR LA COMPRA DE BIENES

2.6.81.43

GASTO POR LA CONTRATACION DE


SERVICIOS

TOTAL

4,643.99

1,586.67

6,230.66

###

###

NANCIERO AO 2015
MARIATEGUI

S MARIATEGUI

ABRIL

MAYO

JUNIO

JULIO

AGOSTO

SETIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

TOTAL

116,476.28

140,769.93

155,754.01

156,005.96

141,343.10

170,385.25

166,294.87

215,254.73

170,938.19

45,297.00

106,742.70

84,219.20

60,121.67

233,449.00

163,285.49

120,211.90

122,200.65

281,155.30

7,746.56

16,867.90

18,385.19

19,671.63

1,121.50

36,450.00

24,861.08

51,712.25
14,250.00 3,081,680.36

(11,739.84)

11,550.00

8,370.00

11,130.00

8,850.00

23,000.00

10,650.00

17,115.50

18,068.00

25,288.00
2,684.96

747.50

1,300.00

(210.00)

700.00

9,033.00
21,854.50

18,929.67

1,468.60

780.00

14,000.00

3,950.00
-

17,113.00
260.00
-

17,061.10

16,964.57

6,350.40

4,514.62

31,227.77

700.00

106.45

1,200.00

(3,950.00)
600.00

468.80
10,656.31
600.00

292,967.54

10,737.53

8,427.06

8,344.23

5,232.00

210.00

95.00

1,635.00

1,655.16

###

###

###

10,137.00

###

9,701.00

###

###

###

56,445.59

44,028.10

476.00

###

###

23,555.83

###

MOVIMIENTO DE ALMACEN Y MATERIALES EN OBRA

MES: DICIEMBRE 2015


PROYECTO
OBRA
RESIDENTE
INSPECTOR DE OBRA
ENTIDAD EJECUTORA
MODALIDAD

: MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLO


: MEJORAMIENTO E IMPLEMENTACION DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLO
: ING. KARIN JANETH DEL CARPIO RIMACHI
: ARQ. GLADYS L. RAMREZ CHARRES.
: GOBIERNO REGIONAL DE MOQUEGUA.
: EJECUCION PRESUPUESTARIA DIRECTA

MATERIAL

UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE

SALDO 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

ESCOBILLA DE ACERO
UND
PICAPORTE DE 6"
UND
PICAPORTE DE 5"
UND
ACOPLE PARA PISTOLA DE PINTADO
JGO
FRAGUA DE DISTINTOS COLORES
KG
REMOVEDOR DE OXIDO
GLN
THINNER STANDART
GLN
TORNILLO AUTORROSCANTE DE 21/2"
UND
PUNTERO HEXAGONAL DE 5/16
UND
CLAVO NEGRO DE CEMENTO DE 1"
UND
CLAVO NEGRO ACERADO PARA ZOCALO DE 11/2"
CJAS
PUNTERO ESTRELLA PH2
UND
PUNTERO ESTRELLA PH2 (IMANTADO)
UND
CLAVO DE CEMENTO DE DRYWALL DE 1"
CJAS
CLAVO DE CEMENTO DE 1" NORMAL
UND
CLAVO DE CEMENTO DE 2" NORMAL
UND
HOJA DE SIERRA N 18 SANDFLEX
UND
BROCA DIAMANTADA DE 1/2" P/CONCRETO
UND
BROCA DIAMANTADA DE 3/8" P/CONCRETO /ROTOMARTILLO pl UND
BROCA PARA FIERRO DE 1/4"
UND
BROCA PARA FIERRO DE 1/2"
UND
BROCA PARA FIERRO DE 3/16"
UND
BROCA PARA CONCRETO DE 3/8" (N10)
UND
SOLDADURA (ELECTRODOS) EXA 106
KG
BISAGRA DE 3X3X1/8"
UND
DISCO DE MADERA DE 10" TRUPPER
UND
DISCO DE MADERA DE 12" TRUPPER
UND
DISCO DE MADERA DE 7" TRUPPER
UND
FAJAS N A-72
UND
DISCO PARA FIERRO N 14
UND
DISCO DESBASTE DE 9"METAL
UND
DISCO DESBASTE DE 7" METAL
UND
DISCO CORTE METAL DE 9"
UND
BROCA DE FIERRO DE 3/8"
UND
BROCA DE FIERRO DE 1/2" DIAMANTADA
UND
BROCA DE MADERA DE 3/8" T/TORNILLO
UND
BROCA DE MADERA DE 3/8"
UND
BROCA DE FIERRO DE 5/8"
UND
BROCA DIAMANTADA PARA CONCRETO 1"
UND
BROCA DE METAL DE 1/16
UND
BROCA DIAMANTADA DE CONCRETO DE 1/4"
UND
BROCA DE CONCRETO DE 1/4"
UND
BROCA DIAMANTADA DE CONCRETO DE 3/8"
UND
PUNTA PARA ROTOMARTILLO E=18MMX40CM
UND
CINCEL P/ROTOMARTILLO 20X14X250MM KAMASA
UND

0.00
0.00
6.00
0.00
39.00
7.00
1.00
5.00
0.00
3.00
0.00
0.00
1.00
2.50
96.00
10.00
0.00
0.00
0.00
0.00
11.00
1.00
0.00
0.00
11.00
0.00
0.00
0.00
6.00
0.00
3.00
7.00
0.00
0.00
6.00
0.00
0.00
3.00
0.00
3.00
0.00
2.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
1.00
5.00
0.00
3.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
4.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
2.00
0.00
0.00
0.00

N
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

MATERIAL
BROCA PARA ROTOMARTILLO DE 11/4" (570X32)
LLANTAS PARA BUGUI CON ARO
LLANTAS PARA BUGUI SIN ARO
MANGUERA DE 3/4"
FAJAS A-35 P/PLANCHADORA
FAJAS A-65
FAJAS A-71
DISCO PARA CONCRETO DE 7" KRUPS
DISCO DE 9" PARA CONCRETO KRUPS
DISCO DE 6" PARA CONCRETO KRUPS
DISCO DE 41/2" PARA CONCRETO KRUPS corte
DISCO DE 4" PARA PULIR CONCRETO KRUPS
PERNOS TIRAFON DE 21/2"
PERNOS AUTORROSCANTE DE 6X3/4"
PERNOS STOBE DE 11/2"
PERNOS DE 3/8"X1" C/TUERCA Y 02 BOLANDAS
PERNO ESTOBE BO 9LT RECTANGULAR DE 2"
PERNO TIRAFON CON TARUGO DE 2X11/4
PERNO PARA BUGUI DE 11/4"X11/2"
ESCOBILLA DE ACERO DE COPA 4"
CINCEL DE 3/4" PLANO TRUPER
COMBO DE 4"
CINCEL DE 3/4 PUNTA TRUPPER
PICO C/MANGO
SIKADUR 32 GEL A+B
EXPANSOR PARA MEZCLA CEMENTO SIKA
BIDON X 5GLN
URINARIOS PICO DE LORO DE LOZA TREBOL
ACEITE PARA MOTORES SAE20W50 CASTROL
CHAPA PERILLA COMPACTADAS FORTE
TORNILLO STOBOL P/CAJA CTAGONAL
ACEITE C/SILICONA RENOVADOR DE MADERA
LIMPIADOR DE CARBURADOR
SILICONA TRANSPARENTE
CORDEL NYLON DE 1,0MMX100MT
MANGUERA DE NIVEL
GRAPAS ACRILICOS
CORREDERA TELESCOPICA 45CM
CORREDERA DE 40 CM
FILTRO DE ACEITE LF-9
ESCOBILLA PARA LAVAR BIDON
ESPONJA VERDE SCOTH BRITE
SILBATO
LIMPIA VIDRIOS C/BRAZA
PAO PARA PISO
JEBE DE 0,4X8CM
ESCOBA CLORINDA
RECOGEDOR PVC
RODILLO DE 9" C/BLANCO TORO
GRASA X 1LB
MANGUERA DE AIRE ALTA PRESION
BROCHA DE 3" TUMI
ESPATULA DE 3" KAMASA
ESPATULA DE 2" KAMASA
ESPATULA DE 11/2" KAMASA
PLANCHA DE EMPASTE KAMASA
CARBONES PARA MAQUINA CIRCULAR
CARBON PARA ROTO MARTILLO ROTATORIO
CARBON PARA AMOLADORA DE 4"

UND
UND
UND
UND
MT
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
JGO
BL
UND
UND
GLN
UND
UND
UND
UND
UND
RLLO
MT
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
MT
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
1.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
1.00
0.00
4.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
3.00
625.00
625.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
120.00
120.00
2.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.00
0.00
1.00
0.00
1.00
0.00
1.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00

N
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163

MATERIAL
CARBON PARA TALADRO
CARBON PARA AMOLADORA DE 7"
CARBON PARA AMOLADORA DE 9"
CARBON PARA TRONZADORA
CARBON PARA CORTADORA CIRCULAR SKILSAW
SAPITO PLUS PARA PUERTA DE MADERA
SAPITO PLUS PARA
TIZAS DE COLOR
FILTRO
BUJIAS
ABRAZADERA DE 11/2"
ABRAZADERA METAL
PASACABLE DE 2"
TORNILLO SPACK DE 3"
TORNILLO DE ENCARNE DE 21/2"
TAPA CANTO DELGADA
JALADORES P/PUERTA CORREDIZA COLOR MADERA
DIAMANTE PARA CORTAR CERAMICA N16
JALADORES C/NEGRO
BISAGRA DE 11/2" X1
BISAGRA CAPUCCINO DE 4X3"
BISAGRA DE 2X2X3/8"
CINTA MASKENTAPE DE 1"
CRUZETAS DE 3X3
CRUZETAS DE 5X5
LIJA N80 C/ROJO
LIJA N 80 C/NEGRO P/METAL
LIJA N120 P/FIERRO
LIJA N100 P/FIERRO
LIJA N100 P/MADERA
DETERGENTE INDUSTRIAL
LEJIA CLOROX
LIMPIA VIDRIOS /LIQUIDO
KRESO
ACIDO MURIATICO INDUSTRIAL
OCRE BAYER AMARILLO
MICROESFERAS
OCRE BAYER NEGRO
OCRE BAYER ROJO
TIZA MOLIDA
TRAPO INDUSTRIAL
WAYPE INDUSTRIAL
ACOPLE DE ACERO REGIDO DE 4" (ABRAZADERA)
BRIDA DE ACERO DE 4"
PERNOS C*/TUERCA GALVAN. 5/8X31/2"
TAPON RANURADO DE 4"
VALVULA ESFERICA DE 1/2"
PEGAMENTO NEOPRENE 3M
CINTA AISLANTE DE 2X30MT (SCOTH)
CODO DE FG 3X90
CODO DE FG DE 2X90
CODO DE PVC 3X90 P/DESAGUE
TEE DE 3X3 FG
TEE DE 2X2 FG
REDUCCION DE 3-2 FG
REDUCCION DE 2-1 FG
TAPON MACHO DE 3" FG
REDUCCION C/HILO FG DE 3-1
ADAPTADOR DE 3" PVC (NIPLE)

UND
UND
UND
UND
UND
UND
UND
UND
CJAS
UND
UND
UND
UND
UND
UND
UND
MT
UND
UND
UND
UND
UND
UND
UND
BL
BL
MT
MT
PLG
PLG
PLG
KG
GLN
GLN
GLN
GLN
KG
KG
KG
KG
KG
KG
KG
UND
UND
UND
UND
UND
UND
RLLO
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
3.00
1.00
5.00
0.00
9.00
0.00
6.00
0.00
5.00
0.00
35.00
0.00
39.00
0.00
7.75
0.00
9.00
0.00
4.00
0.00
3.00
1.00
1.00
1.00
5.00
0.00
0.00
0.00
85.00
85.00
690.00
0.00
25.00
0.00
1.00
1.00
31.00
0.00
8.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
179.00
11.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.50
0.00
0.00
0.00
2.50
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
2.00
0.00
1.00
0.00
2.00
0.00
12.00
0.00
0.00
0.00
2.00
0.00
4.00
0.00
7.00
1.00
6.00
0.00
3.00
0.00
1.00
1.00

N
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222

MATERIAL
ADAPTADOR DE 3 C/HILO INTERIOR X1LADO (NIPLE)
CODO DE 75MMX90 C/ANILLO
CODO DE 3/4" FG
NIPLE DE 3/4"X11/2 FG
TEE DE 1/2 FG
NIPLE DE 3/4X11/2" PVC FABRICA
NIPLE DE 1/2X2" PVC
NIPLE DE ACERO DE 1/2"X1 CROMADO
NIPLE DE 3/4X2 PVC FABRICA
NIPLE DE 1X3 PVC FABRICA
NIPLE DE 11/4X2 PVC IPS
NIPLE DE 11/4X4 PVC
NIPLE DE 11/2"x2 PVC FABRICA-HIDRO
NIPLE DE 11/2"X2 PVC DE FABRICA
NIPLE DE 11/4X11/2 PVC FABRICA
LLAVE DE PASO 1/2" (ESFERICA Y/O PASO)
LLAVE DE PASO DE 3/4
LLAVE DE PASO DE 11/4"
LLAVE DE PASO DE 11/2" T/BOLA
LLAVE DE PASO DE 2" T/BOLA
LLAVE DE PASO DE 3" T/BOLA
VALVULA COMPUERTA DE 3"
VALVULA COMPUERTA DE 4"
GRIFO Y/O LLAVE JARDINERA DE 3/4"
ADAPTADOR T/BUSHING DE 1/2" CROMADO
REDUCCION DE 11/4-1/2 PVC IPS
TAPON MACHO DE 2" PVC
TAPON MACHO DE 11/4" PVC IPS
TAPON MACHO DE 3/4" PVC IPS
TAPON MACHO DE 1/2" IPS
TAPON HEMBRA DE 2" IPS
TAPON HEMBRA DE 11/4" IPS
TAPON HEMBRA DE 1 IPS
TAPON HEMBRA DE 3/4" IPS
TAPON HEMBRA DE 1/2 IPS
REDUCCION DE 3/4-1/2 (BUSHING) IPS
REDUCCION DE 1-3/4 (BUSHING) IPS
FORMADOR DE EMPAQUETADURA ADEX
REDUCCION DE 2-11/2 PVC IPS
REDUCCION DE 2-11/4 PVC IPS
REDUCCION DE 2-1 PVC IPS
REDUCCION DE 2-3/4 PVC IPS
REDUCCION DE 11/2-11/4 PVC IPS
REDUCCION DE 11/2-1 PVC IPS
REDUCCION DE 11/4-1 PVC IPS
REDUCCION DE 11/4-3/4 PVC IPS
CODO INJERTO DE 1/2"
CODO INJERTO DE 1"
CODO INJERTO DE 3/4"
CODO DE 3/4" PVC IPS
CODO DE 11/4" PVC IPS
CODO DE 1" PVC IPS
CODO DE 11/2" PVC IPS
CODO DE 1/2" PVC IPS
CODO DE 2" PVC IPS
TEE DE 1/2 PVC IPS
TEE DE 3/4 PVC IPS
TEE DE 11/4" PVC IPS
TEE DE 1" C/R PVC

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
LTA
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
7.00
0.00
1.00
0.00
1.00
0.00
1.00
1.00
3.00
0.00
20.00
10.00
0.00
0.00
6.00
0.00
21.00
0.00
18.00
3.00
17.00
0.00
19.00
0.00
11.00
0.00
15.00
0.00
20.00
0.00
0.00
0.00
1.00
0.00
3.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
3.00
0.00
2.00
0.00
0.00
0.00
14.00
0.00
18.00
0.00
31.00
0.00
21.00
1.00
27.00
0.00
0.00
0.00
2.00
0.00
4.00
0.00
9.00
0.00
26.00
1.00
4.00
0.00
0.00
0.00
32.00
0.00
0.00
0.00
49.00
0.00
25.00
1.00
14.00
0.00
3.00
0.00
33.00
0.00
10.00
1.00
12.00
0.00
4.00
0.00
1.00
1.00
7.00
0.00
23.00
0.00
0.00
0.00
6.00
0.00
22.00
7.00
18.00
0.00
4.00
4.00
2.00
1.00
80.00
12.00
19.00
0.00
13.00
0.00
35.00
1.00

N
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281

MATERIAL
TEE DE 2" PVC IPS
TEE DE 11/2" PVC IPS
UNION UNIVERSAL DE 2" PVC IPS
UNION UNIVERSAL DE 11/2" PVC IPS
UNION UNIVERSAL DE 11/4" PVC PCP
UNION UNIVERSAL DE 11/4" PVC IPS
UNION UNIVERSAL DE 3/4" PVC IPS
UNION SIMPLE DE 2" IPS
UNION UNIVERSAL DE 1/2" IPS
UNION SIMPLE DE 11/2" PVC IPS
UNION SIMPLE DE 1" PVC IPS
UNION SIMPLE DE 11/4" PVC IPS
UNION SIMPLE DE 3/4" PVC IPS
UNION SIMPLE DE 1/2" C/R PVC C-10 IPS
CODO DE 160X45 PVC C/NARANJA
UNION DE 110 C/DOBLE ANILLO
TEE DE 75 MM C/ ANILLOS
CURVA DE 75 MM PVC C/01 ANILLO
CODO DE VENTILACION DE 4-2 P/DESAGUE
CACHIMBA DE 8-6 C/NARANJA C/ANILLO
TEE DE 110-90 C/ 02 ANILLOS PVC
TEE DE 4X4 P/DESAGUE PVC
TEE DE 4-2 P/DESAGUE
TEE DE 3X3 P/DESAGUE PVC
TEE DE 2X2 P/DESAGUE PVC
YEE DE 4-2 PARA DESAGUE
YEE PVC DE 4-3 P/DESAGUE
YEE DE 3X3 P/DESAGUE
YEE DE 4X4 P/DESAGUE PVC
YEE DE 2X2 P/DESAGUE PVC
SUMIDERO DE 2" CROMADO
ACCESORIOS P/TANQUE BAJO inhodoro
SUMIDERO DE 4" CROMADO
REGISTRO ROSCADO DE 4"
SUMIDERO DE 3" CROMADO
REGISTRO DE 4" CROMADO
REGISTRO DE 6" BRONCE
ABRAZADERA DE 75MM-3/4 PVC C/NEGRO
UAS C/PERNOS Y TARUGO P/URINARIO
UAS C/PERNOS Y TARUGO /LAVATORIO DE ANCLAJE
UAS C/PERNOS Y TARUGO /LAVATORIO DE ANCLAJE FF
MANIJA DE BRONCE DE 4"
SOMBRERO DE VENTILACION DE 2" PVC P/DESAGUE
ABRAZADERA DE 2" FG C/01 OREJA C/TARUG
BINDER CLIPS DE 1"
POS IT
BINDER CLIPS DE 2"
C.D
TIJERA GRANDE C/NARANJA
CINTA DE EMBALAJE
CINTA SCOTH
CORRECTOR
RESALTADOR FABER CASTELL
PLUMON INDELEBLE
PLUMON GRUESO N 23 MULTIMARK
INDEX TABS X 10 UND
LAPIZ PORTAMINA 0,5 ROTRING
LAPICERO T/LIQUIDA PILOT
PLUMON PARA PIZARRA FABER CASTELL

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
JGO
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PQT
UND
UND
UND
RLLO
UND
UND
UND
UND
UND
CJAS
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
13.00
0.00
18.00
0.00
22.00
0.00
3.00
0.00
4.00
0.00
10.00
0.00
17.00
0.00
24.00
0.00
0.00
0.00
10.00
0.00
18.00
0.00
27.00
0.00
16.00
0.00
8.00
3.00
2.00
0.00
1.00
0.00
4.00
0.00
1.00
0.00
12.00
2.00
1.00
0.00
1.00
0.00
3.00
3.00
29.00
2.00
14.00
0.00
14.00
0.00
0.00
0.00
2.00
0.00
12.00
0.00
6.00
0.00
31.00
1.00
0.00
0.00
4.00
0.00
3.00
0.00
6.00
0.00
1.00
0.00
4.00
0.00
1.00
0.00
1.00
0.00
10.00
0.00
16.00
0.00
2.00
0.00
6.00
0.00
9.00
0.00
92.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

N
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340

MATERIAL
LAPICERO T/SECA PILOT
CUADERNO DE OBRA
PAPEL CARBON M/NORMA
SOBRE PARA CD SLEVE
SOBRES MANILA A-4
MICAS A-4
VINIFAN
PAPEL LUSTRE
CLIPS 33MM
CHINCHES
CLIPS MARIPOSA
SEPARADORES INDEX
FOLDER FILE A-4 C/AZUL
PAPEL A-3 75 GR. REPORT
PAPEL BOND A-4 XEROX
LIBRETA DE APUNTES PEQUEA
CUADERNO A-5 X 100HOJAS
TONNER TN118
CUADERNO ANILLADO A-5/200 hojas
CUADERNO A-4 X 100 HJAS
BORRADOR BLANCO
ALGODN X 100GR
AGUA OXIGENADA
GASA
JELONET
GUANTES QUIRURGICOS
BAJALENGUA
VENDA 4X5 YARDAS/TRIANGULARES
COLLARIN CERVICAL
LUBRICANTE PARA TUBERIA
LUBRICANTE PARA CONDUCTOR ELECTRICO X1/4GLN
TUBO DE ABASTO DE 1/2" X 5/8"
LLAVES DE LAVATORIO TREBOL
LLAVE DE DUCHA INC. DUCHA TREBOL
ANILLO DE CERA PARA INHODORO
ANILLO DE CERA C/GUIA PARA SANITARIO
REDUCCION DE 4-2 P/DESAGUE NICOLL
REDUCCION DE 4-3 P/DESAGUE NICOLL
TAPON CON ANILLO DE 75MM
UNION SIMPLE DE 3" C/R PVC
CODOS DE 3X45 P/DES. NICOLL /PLASTISUR
CODO DE 2X45 P/DESAGUE NICOLL
CODO DE 2X90 P/DESAGUE NICOLL
CODO DE 2X90 PVC P/AGUA IPS
ANILLO DE 160 C/NARANJA
UNION SIMPLE 21/2" C-10 PVC
CINTA DE SEGURIDAD
PERNO ARMADO AG 5/8X1/4 C/TUERCA
TERMINALES DE 35MM T/OJO
TERMINALES DE 2,5 MM T/OJO
TERMINALES DE 50 MM T/OJO
TERMINALES DE 25MM T/OJO
TERMINALES T/PIN DE 4MM
TERMINALES T/PIN DE 10MM
TERMINALES T/PIN DE 16MM
TERMINALES T/PIN DE 6MM
TERMINALES T/OJO PARA CABLE 70MM
ENCHUFE
ENCHUFE TRIFASICO INDUSTRIAL 220V 32AM

UND
UND
UND
UND
UND
UND
PQT
UND
PLG
CJAS
CJAS
CJAS
PQT
PQT
PQT
MLL
UND
UND
UND
UND
UND
UND
PQT
BT
PQT
PQT
PAR
UND
UND
UND
GLN
UND
UND
UND
JGO
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
RLLO
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
0.00
0.00
25.00
0.00
46.00
32.00
17.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
1.00
3.00
2.00
8.00
1.00
6.00
0.00
6.00
6.00
60.00
10.00
1.00
0.00
2.00
0.00
2.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
11.00
0.00
0.00
0.00
15.00
0.00
10.00
0.00
5.00
5.00
0.00
0.00
1.00
1.00
3.00
0.00
9.00
0.00
3.00
0.00
3.00
0.00
13.00
0.00
22.00
22.00
12.00
0.00
10.00
6.00
34.00
0.00
256.00
0.00
121.00
2.00
214.00
33.00
2.00
0.00
0.00
0.00
1.00
0.00

N
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399

MATERIAL
TOMACORRIENTE BIPOLAR DOBLE C/TOMA A TIERRA 220V 20A
KIT DE EMPALME PARA CONDUCTOR NYY
TOMA PARA RED DE COMPUTO CAT SE
CINTA AISLANTE 3M
CINTA AISLANTE 3M COLORES
CINTA VULCANIZANTE
TOMACORRIENTE TRIPLE PARA ADOSAR
UNION DE 1" PVC 25MM para luz
TOMACORRIENTE INDUSTRIAL 2X220V C/TOMA TIERRA MONOF
TOMACORRIENTE INDUSTRIAL 3X220V TOMA A TIERRA
CADENETA
DOSIS QUIMICO P/POZO A TIERRA
CAJA CUADRADA DE 12X12X7,5 C/TAPA
INTERRUPTOR DIFERENCIAL 3X32
INTERRUPTOR TERMOMAGNETICO 3X32
INTERRUPTOR DIFERENCIAL 2X16
INTERRUPTOR TERMOMAGNETICO 2X25
INTERRUPTOR TERMOMAGNETICO 2X16
INTERRUPTOR TERMOMAGNETICO 3X20
INTERRUPTOR TERMOMAGNETICO 3X40
INTERRUPTOR TERMOMAGNETICO 3X25
INTERRUPTOR TERMOMAGNETICO 3X16
INTERRUPTOR TERMOMAGNETICO 3X160
INTERRUPTOR UNIPOLAR DOBLE
INTERRUPTOR UNIPOLAR DE 2 DE 15AM 220V
INTERRUPTOR UNIPOLAR DE 2 TIEMPOS 15AM 220V
INTERRUPTOR UNIPOLAR DE 1 DE 15AM 220V
INTERRUPTOR HORARIO 024HR
INTERRUPTOR UNIPOLAR DE COMMUTACION DE 15AM 220V
INTERRUPTOR TERMOMAGNETICO 2X32 AM
INTERCOMUNICADOR T/TELEFONO DE 02PTOS
CONDUCTOR NLT EXTRA FLEXIBLE DE 3X12
CONDUCTOR EXTRA FLEXIBLE NLT 4X12
CONDUCTOR NYY DE 3X1X70MM2
CONDUCTOR NYY DE 3X1X35MM2
CABLE DE ALUMINIO TIPO AAAC DESNUDO DE 35
CABLE ELCTRICO THW90D1X6MM
CABLE ELECTRICO THW 90D1X4MM
CABLE ELCTRICO THW90D1X2,5MM
CABLE ELECTRICO 4X1X16MMNYY
CABLE DE COBRE TIPO N2XSYD1X35MM 2,15KB
CABLE ELECTRICO THW90D1X10MM
CONDUCTOR NYY3X1X50MM
CABLE ELECTRICO 4X1X25NYY
CABLE ELECTRICO 2X1X10NYY (3X1X10MM)
CABLE ELCTRICO 2X1X10NYY
CABLE ELCTRICO 3X1X16NYY
CABLE ELCTRICO 3X1X25MM NYY
TAPA CIEGA PARA CAJA RECTANGULAR
TAPA CIEGA PARA CAJA OCTAGONAL
TOMACORRIENTE DOBLE BIPOLAR A TIERRA 220V
CAJA 200X200X150
CAJA 300X300X150
ABRAZADERA CIRCULAR 2X1/4 PARA POSTE
TERMINALES CON PRESION CON ESTAO 16MM
TERMINALES T/OJO PARA CABLE 10MM
MARCADORES T/CLIP DE CABLE 1,5 / numerador
MARCADORES ALFABETICO T/CLIP DE CABLE
MARCADOR T/CLIP 16MM

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
MT
CJAS
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
CJAS
CJAS
CJAS

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
17.00
0.00
36.00
0.00
51.00
6.00
6.00
0.00
4.00
1.00
0.00
0.00
83.00
0.00
10.00
0.00
1.00
0.00
5.80
0.00
3.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
9.00
0.00
19.00
4.00
16.00
2.00
1.00
0.00
0.00
0.00
5.00
0.00
2.00
0.00
1.00
0.00
3.00
0.00
7.00
0.00
1.00
0.00
0.00
0.00
3.00
0.00
1.00
0.00
1.00
0.00
22.00
0.00
185.50
36.00
93.00
0.00
14.00
0.00
6.00
0.00
100.00
0.00
86.00
0.00
0.00
0.00
0.00
0.00
101.00
0.00
64.00
0.00
103.00
103.00
39.00
0.00
15.00
0.00
0.00
0.00
124.00
78.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.00
0.00
2.00
0.00
12.00
0.00
0.00
0.00
0.00
0.00
14.00
0.00
8.00
0.00
5.00
0.00

N
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458

MATERIAL

UND

HALOGENOS 500W
UND
CINTILLO DE 3MM
UND
ARRANCADORES DE 40W
UND
BALASTRO DE 40W
UND
CAJAS OCTAGONALES
UND
CAJAS RECTANGULARES
UND
CURVAS DE 100MM SAP LUZ
UND
CURVAS DE 50MM SAP LUZ
UND
CONECTORES DE 3/4 (20MM) SAP LUZ
UND
CONECTORES DE 1" (25MM) SAP LUZ
UND
CURVAS DE 3/4" SAP LUZ (20MM)
UND
CURVAS DE 1" (25MM) SAP LUZ
UND
CURVAS DE 75 MM O 3 PARA LUZ
UND
CAJAS DE 100X100X5
UND
ZAPATO DE SEGURIDAD MINER
PAR
BOTAS DE JEBE PUNTA DE ACERO
PAR
LUNA PARA CARETA DE SOLDAR N 12
UND
LUNA PARA CARETA DE SOLDAR N11
UND
LUNA PARA CARETA DE SOLDADOR TRANSPARENTE
UND
LUNA PARA CARETA DE SOLDAR N14
UND
LUNA INACTINICAS PARA MASCARA DE SOLDAR
UND
LENTES DE SEGURIDAD TRANSPARENTE
UND
PROTECTORES AUDITIVOS (TAPONES DE OIDO)
UND
MAMELUCO PARA SOLDAR
UND
OREJERAS T/COPA 3M
UND
LENTES DE SEGURIDAD TRANSPSRENTES Y OSCUROS
UND
MANDIL DE CUERO PARA SOLDAR
UND
GORRO T/CHAVO PARA SOLDAR
UND
FRANELA C/ROJO
MT
UNIFORME DE TRABAJO (CAMISA Y PANTALON)
JGO
CHALECO DE SEGURIDAD C/NARANHA
UND
ZAPATO DE SEGURIDAD DIELECTRICO
PAR
MANDIL DE CUERO
UND
CORTAVIENTO T/GORRO
UND
ESCARPINES DE CUERO PARA SOLDAR
PAR
CARETA DE PROTECCION TRANSPARENTE ACOPLABLE P/ SOLA UND
CARETA Y VISOR FACIAL TRANSPARENTE P/SOLDAR
UND
CARETA PARA SOLDAR
UND
RESPIRADOR DOBLE VIA
UND
UNIFORME DE TRABAJO (CAMISA Y PANTALON)
PAR
CARETA VISOR FACIAL TRANSPARENTE
UND
BARBIQUEJOS
UND
MASCARILLA Y/O RESPIRADOR N95
UND
GUANTES DE CUERO T/BADANA
PAR
GUANTES DE CUERO REFORZADO
PAR
GUANTES DE MANGA LARGA PARA SOLADR
PAR
GUANTES DE HILO TEJIDO PARA OPERARIO
PAR
CAJA DE ALUMINIO DE 36 POLOS C/LLAVE
UND
CAJA DE ALUMINIO DE 18POLOS C/LLAVE
UND
CAJA CUADRADA GALVANIZADA PESADA 4X4X2,5
UND
TABLERO DE 30 POLOS C/LLAVE
UND
YUTE
MT
CASCO DE SEGURIDAD
UND
TUBO DE 4" O 100 P/LUZ PVC SAP
UND
TUBO DE 4X3MT P/DESAGUE
UND
TUBO DE 3X3MT P/DESAGUE
UND
TUBO DE 3/4X5MT. P/AGUA C/R
UND
TUBO DE 3" X 5MT C-10 P C/R
UND
TUBO DE 21/2X5MT C-10 C/R
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
67.00
0.00
7.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
49.00
0.00
742.00
11.00
145.00
0.00
319.00
5.00
726.00
7.00
16.00
0.00
70.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
41.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
55.00
0.00
2.00
2.00
6.00
6.00
10.00
10.00
0.00
0.00
21.00
0.00

N
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517

MATERIAL
TUBO DE 2X3MT PARA DESAGUE
TUBO DE 2" X 5MT C-10 C/R
TUBO DE 11/2X5MT C-10 C/R
TUBO DE 11/4X5MT C-10 C/R
TUBO DE 1X5MT C-10 C/R
TUBO DE 1/2X5MT C-10 C/R
TUBO DE 1" P/LUZ (25MM) SAP
TUBO DE 3/4" PARA LUZ SAP X3MT
PASTORAL FG DE 1,20 MT
SELLADOR ELASTOPOLIURETANO SIKAFLEX
LACA DESMOLDANTE CHEMALAC c/solvente
LACA DESMOLDANTE CHEMALAC
ARTEFACTO DICROICO DE 10 W
LUMINARIA DE METAL SPOT LIGH C/LAMPARA 100W
LAMPARA DICROICO SPOT 50W
LUMINARIA ADOSADO C/LAMPARA AHORRADOR 2X26
LUMINARIA METAL SPOT E-150W
LUMINARIA FIJA FCN 250 2XPLC26W P/EMPOTRAR
FLUORESCENTE LARGO 40W
ARTEFACTO FLUORESCENTE C/REGILLA 4X19W
LUZ DE EMERGENCIA
FOCOS T/GLOBO
RUEDAS P/ANDAMIOS
ESMALTE GRIS ANIPSA (MATIZADO)
ANTICORROSIVO GRIS ANIPSA
ESPONJA 4" DE 11/2 PLAZA
LATEX ANIPSA
PINTURA DE TRAFICO
PINTURA TRAFICO T/III
ESMALTE SINTETICO X 1/8
BARNIZ PARACAS
PINTURA SUPERMATE M/VAENCEDOR
TEROKAL TEKNO
COLA SINTETICA TEKNO
SPOT LIGH CON 1X P/=CL P W 2P 13W
FAROLAS ESFERICAS P/ESTERIOR ACRILICAS
FAROLAS ESFERICAS DE 70W
LUMINARIA DE ALUMBRADO PUBLICO
LAVATORIO DE LOZA BLANCA C/ACCESORIO
LAVATORIOS DE LOZA BLANCO OVALIN SONNET TREBOL
INHODORO TANQUE BAJO RAPID JET
CLAVO DE 21/2" P/MADERA
CLAVO DE 3" P/MADERA
CLAVO DE 4" PARA MADERA
CLAVO DE 2" PARA MADERA
CLAVO DE 31/2 PARA MADERA
CLAVO DE 2" S/C
CLAVO DE 11/2" S/C
CLAVO DE 3/4" S/C
ALAMBRE GALVANIZADO N16
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
TUBO DE 3" PVC P/INSTALACION ELECTRICA (75MM)
TUBO P/INSTALACION ELECTRICA DE 50MM"
TUBO 3" FG C/R X 6MT
TUBO 3" FG C/R X 6MT
TUBO REDONDO NEGRO DE 1" E=1,5
TUBO 2" X5MT FG
TUBO NEGRO DE 2"X5MT FG

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
GLN
GLN
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
GLN
GLN
UND
GLN
GLN
GLN
LTA
GLN
GLN
GLN
GLN
UND
UND
UND
UND
UND
UND
UND
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
KG
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
0.00
0.00
21.00
0.00
13.00
0.00
38.00
1.00
0.00
0.00
142.00
1.00
0.00
0.00
13.00
0.00
0.00
0.00
0.00
0.00
14.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
0.00
0.00
40.50
0.00
114.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
9.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
0.00
9.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
157.50
23.00
0.00
0.00
0.00
0.00
0.00
0.00
26.50
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
1.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00

N
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576

MATERIAL
TUBO DE 2" FG C/ROJO
TUBO DE 11/2" C/ROJO
FIERRO LISO DE 1/2"
FIERRO LISO DE 5/8
TUBO CUADRADO DE F" 1"
TUBO CUADRADO F 11/2"
TUBO REDONDO 1" F LISO
PLATINA DE 1"X1/8 FG
PLATINA DE 11/2X1/4
PLATINA DE 1/2"X1/8 FG
TEE 1X1/8X6M FG (VARILLA)
TUBO DE 200 X 6MT P/ALCANTARILLA C/NARANJA
TUBO PVC SAP C-10 8"
TUBO PVC SAP C-10 UNION FLEXIBLE NTP 75MM C/ANILLO
TUBO NEGRO DE 11/2" F
ANGULO DE 2X2X3/16X6MT
PLASTICO C/NEGRO Y AZUL DOBLE ANCHO
MANGUERA P/VIBRADOR
ACERO CORRUGADO DE 1"
ACERO CORRUGADO DE 1/4
ACERO CORRUGADO DE 3/8
ACERO CORRUGADO DE 1/2
ACERO CORRUGADO DE 5/8
ACERO CORRUGADO DE 3/4
ANGULO DE FIERRO DE 11/2X11/2 E=3/16
ANGULO DE ACERO A=36D25X25X3 0MMX6MM (1X1X1/8)
CODO DE 4X90 P/DESAGUE
CODO DE 4X45 P/DESAGUE
DRIZA DE 3/8"
LAVADORES DE PLASTICO
PINTURA BASE SUR X5KG
PLANCHA METALICA DE 1,2X2,4 E1X32
TAPA JUNTA DE ALUMINIO TIPO L DE 3X11/2
BIODIESEL B-5
GASOLINA 84 OCT
RODOPLAST X 1,8 MT
BLOCK DE VIDRIO DE 19X19CM
PINTURA ESMALTE C/ALUMINIO
CODO RANURA RC 4X90 SHURJOINT 901 UL-FM
TUBO DE ACERO SHED 40 S/C 4X6 MT RANURADO
DESLIZADORES C/NEGRO
TAPA TORNILLO
TAPA JUNTAS DE ALUMINIO TIPO PLANO DE 4"
ARENA FINA
ARENA GRUESA
PIEDRA CHANCADA 1/2-3/4
PIEDRA CHANCADA DE 3/8"
PIEDRA GRANDE DE 8"
GRAVILLA DE 3/4"
LADRILLO KING KONG DE 10X24X14
LADRILLO HUECO PARA TECHO DE 15X30
LADRILLO PASTELERO DE 20X20X3CM
EMULSION ASFALTICA
ADOQUINES DE CONCRETO 10X20X4CM
ASFALTO RC-250
ASFALTO LIQUIDO IMPRIMANTE MC-30
ANTISOL CURADOR DE CONCRETO COMPUESTO LIQUIDO
MELAMINE COLOR CEDRO NATURE 1,83X2,5X18MM
NORDEX 3MM

SALIDA
SALDO DEL
DEL MES
UND
MES DE
DE
NOVIEMBRE
DICIEMBRE
UND
1.00
0.00
UND
1.00
0.00
UND
4.00
0.00
UND
0.00
0.00
UND
10.00
0.00
UND
1.00
0.00
UND
0.00
0.00
UND
0.00
0.00
VLLA
0.00
0.00
UND
0.00
0.00
UND
1.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
8.00
0.00
UND
2.00
0.00
UND
79.00
0.00
MT
0.00
0.00
UND
0.00
0.00
VLLA
32.00
0.00
VLLA
0.00
0.00
VLLA
0.00
0.00
VLLA
0.00
0.00
VLLA
46.00
6.00
VLLA
160.00
1.00
VLLA
1.00
0.00
VLLA
450.00
0.00
UND
21.00
7.00
UND
12.00
1.00
MT
0.00
0.00
UND
2.00
1.00
BL
0.00
0.00
PCHA
2.00
0.00
UND
26.00
0.00
GLN
0.00
0.00
GLN
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
GLN
0.25
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
257.00
0.00
UND
75.00
0.00
UND
6.00
0.00
M3
0.00
0.00
M3
0.00
0.00
M3
0.00
0.00
M3
0.75
0.00
M3
0.00
0.00
M3
1.24
0.00
UND
0.00
0.00
UND
2303.00
0.00
UND
9733.00
0.00
GLN
243.79
0.00
UND
215.00
0.00
GLN
29.50
0.00
GLN
110.00
0.00
GLN
0.00
0.00
PCHA
2.00
0.00
PCHA
3.00
0.00

MATERIAL

UND

577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608

CERAMICA DE PRIMERA PARA PARED DE 30X30X1.95


CERAMICA DE PRIMERA PARA PARED DE 20X30X1,53
CERAMICA DE PRIMERA ALTO TRANSITO P/PISO 30X30
CERAMICA DE PRIMERA PARA PISO ANTI DESLIZANTE 40X40
CERAMICA DE PRIMERA ALTO TRANSITO PARA PISO DE 40X40
CERAMICA PARA PISO ORION PLUS BYG
PIEDRA LAJA CORTE ESCUADRA
MADERA CEDRO
TRIPLAY DE 4MM
TRIPLAY DE 6MM
TRIPLAY DE 12MM
TRIPLAY DE 18MM
ARNES DE SEGURIDAD TIPO PARACAIDAS CON
SOPORTE LUMBAR DE 4 ANILLOS (2ESP,2CINTURA)
LINEA DE POSICIONAMIENTO COLA DE AMARRE
LINEA DE SEGURIDAD PERLON CON GANCHO
MOSQUETON DE SEGURIDAD C/CIERRE ROSCA
MALLA METALICA ACERADA PAA ARENA FINA
MALLAMETALICA DE 1/4" PARA ZARANDA
MALLA CUADRADA GALVANIZADA COCADA DE 1/2
TECNOPORT
HUMUS DE LOMBRIZ
MUSGO
ABONO NPK
TABLERO DE DISTRIBUCION TD 06
TABLERO DE DISTRIBUCION STD 6,5
TABLERO DE DISTRIBUCION TI 03
TABLERO DE DISTRIBUCION TI 04
TABLERO DE DISTRIBUCION STD 6,2
BROCHA DE 4" TUMI
INHODORO CON FLUXOMETRO
SISTEMA PUESTA A TIERRA

M2
M2
M2
M2
M2
M2
M2
P2
PCHA
PCHA
PCHA
PCHA
UND
UND
UND
UND
M2
M2
M2
PCHA
KG
KG
KG
UND
UND
UND
UND
UND
UND
UND
JGO

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
1.00
0.00
18.42
0.00
9.50
0.00
16.27
0.00
0.00
0.00
2.00
0.00
32.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
3.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
25.00
0.00
20.00
0.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00

PERIODO 2015
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

TONNER RENDIMIENTO 1600 PAG COLOR NEGRO HP 85A CE 2 CJA


LAPICERO D/TINTA LIQUIDACOLOR AZUL D/PUNTA FINA DIAME UND
VINIFAN FORRO DE PLASTICO T:OFICIO X5MT UND ARTESCO E UND
LIBRO DE ACTAS D/PAPEL BOND EMPASTADO RAYADO D/56 GRX1UND
CINTA MASKING TAPE T:2X55YD UNIDAD PEGAFAN ND
UND
ENGRAPADOR DE ESTRUCTURA METALICA Y COMPONENTE DE B UND
BANDERITA ADHESIVA D/PPLASTICO SEALIZADORA D/PAGINA UND
FOLDER FILE MANILA REFORZADO T.A-4 BOLSA X 25UND GRAF BOL
MICA P/ANILLADO TRANSPARENTE T:A-4
UND
PERFORADOR D/02 ESPIGAS C:50 HOJAS ARTESCO
UND
LAPICERO D/TINTA SECA COLOR AZUL D/PUNTA MEDIANA PUN UND
GRAPAS 26/6 CJA X5000 UND ARTESCO
CJA
CORRECTOR LIQUIDO T/BOLIGRAFO FABER CASTELL
UND
TAJADOR METALICO P/LAPIZ D/BOLSILLO ARTESCO
UND
CINTA ADHESIVA (EMBALAJE) TRANSPARENTE 2X72YD. SHURT UND
GRAPAS 23720 CJA X 1000VUND ARTESCO
CJA
CLIP METALICO T/MARIPOSA T:MEDIANO CJA X 50UND ARTESC CJA
PAPEL LUSTRE COLORES VARIADOS T:50CMX65CM GRAPHOS PLGO
LAPIZ DE MADERA C/MINA DE GRAFITO N2 C/BORRADOR FAB UND
LAPICERO DE TINTA SECA COLOR ROJO FABER CASTELL
UND
BINDER CLIP MET. 11/4 (32MM) CJAX12UND
CJA
BINDER CLIP MET. T:15/8 (41MM) CJA X12UND ARTESCO
CJA
PAPEL BOND D/75 GR.COLORES VARIADOS T:A-4 PQTEX500UN POTE
ARCHIVADOR D/CARTON C/PALANCA GRANDE,ANILLO Y SUJET. UND

0.00
3.00
0.00
0.00
0.00
1.00
2.00
0.00
50.00
1.00
0.00
1.00
0.00
2.00
0.00
1.00
5.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00

0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MATERIAL

UND

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

CLIP METALICO ESTANDART CJAX100 UND ARTESCO


PAPEL BOND FOTOCOPIA D/75 GR T:A-3 PQTX500 UND CHAME
RESALTADOR F/RECTANG. COLOR VARIOS D/PUNTA BISELADA
TIJERA METALICA C/MANGO PLASTICO T:8
TABLERO ACRILICO C/MANIJA DE PRESION T/OFICIO
FASTENER METAL. CJA X500UND ARTESCO
CUADERNO EMPASTADO CUADRIC. D/56 T:A-5X100HJAS
PAPEL BOND FOTOCOPIA D/75 GR T:A-4 PQTX500 UND XEROX
PLUMON P/PIZARRA ACRILICA COLOR VARIADO PUNTA GRUESA
PORTA LAPICEROS ACRILICO T/VASO
LAPICERO TINTA SECA NEGRO 01MM FABER CASTELL
LAPIZ DE MADERA C/MINA DE GRAFITO 2B 1210
SACA GRAPAS METALICO ARTESCO M-E08B
SELLO POST FIRMA TRODAT
SELLO VB TRODAT
SELLO DE CARGO TRODAT
LAPIZ PORTAMINAS 0,5MM ROTRING
POS IT X 320 HOJAS- FABER CASTELL
CD MAS ESTUCHE
CUADERNO DE APUNTE ANILLADO X 100 HJAS.
PAPEL BOND A-1 90GR-DILAID
KARDEX
MEMORIA EXTRIBLE DE 16 GB
RECARGA DE TONNER HP 85A
MICAS PORTA PAPEL A-4
EXTENSION TRIPLE PARA ADOSAR
JABON LIQUIDO
TRAPEADOR COMPLETO-VIRUTEX
LEJIA SAPOLIO
PINO DESINFECTANTE X 5 LTS - SAPOLIO
AMBIENTADOR - SAPOLIO
ESPONJA VERDE-SCOTH BRITE
AYUDIN GRANDE
ESCOBA DE PLASTICO
DETERGENTE
PAPEL HIGIENICO
PEGAMENTO PARA CERAMICA EXTRA FUERTE X 25 KG CHEMA
LINTERNA RECARGABLE SPOT LIGHT PARA PERSONAL DE GUA
WINCHAS DE 5 MT. TRUPPER
WINCHA DE METAL DE 50 MT-TRUPPER
BALDES DE PLASTICO DE 05 GLN
CILINDRO METALICO DE COLOR VERDE
CILINDRO METALICO DE COLOR AMARILLO
CILINDRO METALICO DE COLOR AZUL
CILINDRO METALICO DE COLOR CELESTE
SURTIDOR DE COMBUSTIBLE
GUANTES DE BADANA REFORZADO P/OPERADOR
GUANTES DE JEBE
ZAPATO DE SEGURIDAD DE CUERO PUNTA ACERO ANTICLAVO
CASCO DE SEGURIDAD C/NARANJA
CORTAVIENTO DRILL C/NARANJA
UNIFORME DE TRABAJO DRILL (PANTALON Y CAMISA) C/ROJO
CASCO DE SEGURIDAD SEGN NORMA ANZI Z89 1 1997 COLO
YODO POVIDONA DE 120 ML. SOLUCION ANTISEPTICO
ALCOHOL MEDICO MEDIANO DE 250 ML
COLIRIO DE 10ML
BLOQUEADOR FPS 70 EN FRASCO DE 60 GR
GOMA LIQUIDA X 1/4 LT.
PAPEL BOND D/75 GR.S T:A-4 PQTEX500UND COPIMAX

CJA
PQTE
UND
UND
UND
CJA
UND
PQTE
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
RLLO
MLL
UND
UND
PQTE
UND
GLN
UND
GLN
GLN
FCO
UND
UND
UND
KG
UND
BL
UND
UND
UND
UND
UND
UND
UND
UND
UND
PAR
PAR
PAR
UND
UND
JGO
UND
UND
UND
UND
UND
UND
PQTE

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
1.00
0.00
3.00
3.00
2.00
2.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
2.00
2.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00

N
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142

SALIDA
SALDO DEL
DEL MES
MATERIAL
UND
MES DE
DE
NOVIEMBRE
DICIEMBRE
GOMA EN BARRA D/40 GR. UND ARTESCO STICKY
UND
1.00
1.00
CUCHILLA P/CORTAR PAPEL T/CUTER C/CUBIERTA PLASTICA
UND
0.00
0.00
PAPEL CARBON P/ESCRITURA MANUAL C/AZUL T/OFICIO
PQTE
1.00
0.50
PAPEL BOND D/75GR T/A-3 PQT X 500 UND
PQTE
4.00
0.00
ARCHIVADOR D/CARTON C/PALANCA MEDIO OFICIO,ANILLO Y S UND
11.00
0.00
AGUA DE MESA SIN GAS EN CAJA DE 20 LT
CJA
0.00
0.00
BIODIESEL B-5
GLN
0.00
0.00
GASOLINA 84 OCTANOS
GLN
0.00
0.00
CHALECO DE SEGURIDAD DE OBRA PANOPLY
UND
0.00
0.00
CASCO DE SEGURIDAD COLOR BLANCO 3M
UND
0.00
0.00
LENTES DE SEGURIDAD 3M
UND
0.00
0.00
ZAPATOS DE SEGURIDAD CAT
PAR
0.00
0.00
ROPA DE TRABAJO (PANTALON JEAN AZUL NACIONAL Y CAMISA JGO
0.00
0.00
RESPIRADOR ANTIPOLVO 3M Y/O SIMILAR DOBLE VIA C/CART
UND
1.00
1.00
PROTECTOR AUDITIVO T/COPA DELTA PLUS
UND
1.00
0.00
FRANELA
MT
0.00
0.00
CABLE ELECTRICO DE 7 HILOS-THW 90D1X4MM2(VARIOS COL
MT
0.00
0.00
CABLE ELECTRICO DE 7 HILOS-THW 90D1X2.5MM2(VERDE)IN
MT
0.00
0.00
TUBO ELECTRICO PVC SAP 3/4" O 20MM NACIONAL
UND
0.00
0.00
TUBO ELECTRICO PVC SAP 3 O 75MM NACIONAL
UND
0.00
0.00
CAJA RECTANGULAR GALVANIZADA PESADA DE 4"X2 1/8- NAC UND
45.00
14.00
CAJA OCTOGONAL GALVANIZADA PESADA 4"X2 1/8-NACIONAL UND
0.00
0.00
TONNER RENDIMIENTO 17500 PAG COLOR NEGRO POLIM. SIMI CJA
1.00
0.00
TONNER RENDIMIENTO 12000 PAG SIMITRI HD TN 118
CJA
2.00
1.00
ARENA FINA
M3
0.00
0.00
PIEDRA CHANCADA 1/2" Y 3/4"
M3
0.00
0.00
ARENA GRUESA
M3
0.00
0.00
CEMENTO I`P YURA
BL
0.00
0.00
ADITIVO ACELERANTE DE CONCRETO SIKA 3
GLN
15.00
0.00
ADITIVO CURADOR DE CONCRETO-SIKA ANTISOL
GLN
43.50
6.00
ALAMBRE NEGRO N 8 PRODAC
KG
0.00
0.00
CRUZETAS DE 3MM PARA CERAMICA (BL X 100 UND)
UND
1.00
1.00
CEMENTO PVC OATEY
GLN
0.00
0.00
ESCOBA DE PAJA
UND
0.00
0.00
BOLSA DE BASURA (PQT X 100 UND)
UND
0.00
0.00
RASTRILLO DE ASFALTO
UND
1.00
0.00
CHALECO DE SEGURIDAD DE OBRA PARA PERSONAL TECNICO UND
0.00
0.00
CASCO DE SEGURIDAD 3M
UND
0.00
0.00
ZAPATOS DE SEGURIDAD CAT
PAR
0.00
0.00
LENTES DE SEGURIDAD 3M
UND
0.00
0.00
ROPA DE TRABAJO (PANTALON JEAN NACIONAL Y CAMISA CELE JGO
0.00
0.00
GASOLINA 84 OCT.
GLN
0.00
0.00
TONNER RENDIMIENTO 2100 PAG HP 78A CE278A
CJA
1.00
1.00
TONNER RENDIMIENTO 2500PAG 49AQ5949A
CJA
0.00
0.00
TONNER RENDIMIENTO 1600 PAG HP 85A CE285A
CJA
0.00
0.00
DISCO DE CORTE PARA CONCRETO DE 6" KRUPS
UND
0.00
0.00
WINCHA PASACABLE COLA DE RATON TIPO INDUSTRIALD E 50 UND
0.00
0.00
CORTADORA CIRCULAR MANUAL PARA MADERA DE 1400W.
UND
0.00
0.00
WINCHA METALICA DE 5 MT. STANLEY
UND
0.00
0.00
WINCHA METALICA DE 10 MT.
UND
0.00
0.00
WINCHA DE 50 MT. (FIBRA DE VIDRIO) STANLEY
UND
0.00
0.00
HOJA DE SIERRA N 18 (CJA X 50 UND) SANDFLEX
UND
0.00
0.00
ARCO DE SIERRA PARA CORTE DE ACERO STANLEY
UND
0.00
0.00
ALICATE UNIVERSAL STANLEY
UND
2.00
0.00
CIZALLA MANUAL PARA CORTE DE 24" UYUSTOOLS
UND
0.00
0.00
MARTILLOS STANLEY
UND
0.00
0.00
DIABLOS (PATA DE CABRA)
UND
0.00
0.00
CANDADOS GRANDES DE 4"
UND
0.00
0.00
YESO EN BOLSA
BL
0.00
0.00

MATERIAL

UND

143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201

GRIFO DE LAVATORIO DE 1/2" TREBOL


TUBO DE ABASTO PARA LAVATORIO DE 1/2"X1/2"
ACCESORIO DE LAVATORIO (TRAMPA)METUSA
GOMAS PARA URINARIO DE 2"
PERNOS PARA INHODORO Y URINARIO
CINTA TEFLON DE 3/4"
CEMENTO I`P YURA
BIODIESEL B-5 (DIESEL)
MADERA TORNILLO INCLUYE CORTE (TABLAS DE 1X9X12)
MADERA TORNILLO INCLUYE CORTE (TABLAS DE 11/2X9X12)
KARDEX (MODELO DEL GOBIERNO REGIONAL)
REGLA METRICA DE 30 CM ARTESCO
PIONER T/A-4 INPREZA 52MM
(
RODOPLAST DE 8.5MMX1.85
YESO X 20 KG NACIONAL
PRESERVANTE PARA MADERA MARTELL
LIJA N 80 PARA METAL 3M
LIJA N 120 PARA METAL 3M
SELLO POST FIRMA (TRODAT)
TINTA PARA SELLO (COLOR NEGRO-AZUL) TRODAT
AGENDA TECNICA DEL ICG MANUAL DE LA CONSTRUCCION
PAPEL BOND A-3 75 GR (COPIMAX
REGLAS DE ALUMINIO DE 11/2"X3X6MT
PUNTA SDS PLUS PARA ROTOMARTILLO DE E=14MMX30CM
PUNTA SDS PLUS MAX PARA ROTOMARTILLO DE E=18MMX40C
WINCHA PASACABLE COLA DE RATON TIPO INDUSTRIALD E 50
DISCO DIAMANTADO PARA MADERA DE 10"
DISCO DIAMANTADO PARA MADERA DE 12"
DISCO DIAMANTADO PARA MADERA DE 7" CON AGUJERO DE 1"
SACABOCADO DE 21/8"
DISCO DE COPA DE 71/4" (PARA LIJAR MADERA)
DISCO DE COPA DE 4" PARA LIJAR MADERA
ESPATULA DE 6"
ESPATULA DE 4"
BALDES DE PLASTICO VACIOS X 5 GLN
RODILLO DE 9"
RODILLO DE 12"
BATEAS DE PLASTICO PARA PINTURA
ESCOBAS DE PLASTICO
LIJA CIRCULAR DE 7"
PLATO BASE PARA LIJA CIRCULAR DE 7"
CHAPA PERILLA PRIMERA CALIDAD
CHAPA DE TRES GOLPES PRIMERA CALIDAD
CHAPA PICO DE LORO PRIMERA CALIDAD
BISAGRA CAPUCCINA 4" ALUMINIZADA
BISAGRA DE VAIVEN PARA PISO
CUCHILLA CEPILLADORA ELECTRICA DE 12"
PEGAMENTO PARA PVC EN LATA X GALON EDILPLAST
CABLE THW90.1 X 2.5 MM2
JABON EN BARRA
TRAPO INDUSTRIAL NACIONAL
WAYPE INDUSTRIAL (SAMBITO BLANCO) NACIONAL
YESO X 15KG
THINNER ACRILICO
CLAVO DE CEMENTO NEGRO DE 1"
LIJA DE MADERA N 80-ABRALIT
LIJA DE MADERA N 60-ABRALIT
LIJA N 400-ABRALIT

UND
UND
UND
UND
UND
UND
BL
GLN
P2
P2
MLL
UND
UND
UND
BL
GLN
PLG
PLG
UND
UND
UND
PQT
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
JGO
GLN
MT
UND
KG
KG
BL
GLN
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
4.00
0.00
3.00
1.00
6.00
5.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
0.00
5.00
2.00
0.00
0.00
14.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.50
2.50
0.00
0.00
0.00
0.00
500.00
500.00
56.00
0.00
38.00
0.00
0.00
0.00

N
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260

MATERIAL

UND

OCRE ROJO NACIONAL


KG
AMBIENTADORES EN SPRAY SAPOLIO
FCO
BOLSAS DE BASURA DE 80X120X220 POLIET
PQT
FOLDER COLOR AZUL Y VERDE T/A-4 CON FASTENER
PQT
KARDEX
MLL
LAPICEROS TINTA SECA C/AZUL NEGRO, ROJO PILOT
UND
LAPICES BICOLOR
UND
LAPICES CARPINTERO
UND
PILAS RECARGABLES AA
PAR
MEMORIA SD-16 GB
UND
CABLE PARA IMPRESORA USB DE 1.8 MT
UND
CERAMICA ALTO TRANSITO SEVERO 45X45 ANTIDESLIZANTE C M2
CERAMICA PARA PARED 20X30 REREVESTIMIENTO CELIMA orion M2
ALAMBRE N 8
KG
SELLADOR PARA PARED BUENA CALIDAD CPP
BALDE
PASTA MURAL BUENA CALIDAD CPP
BALDE
LACA SELLADORA PARACAS
GLN
BARNIZ MARINO TRIPLE ACCION - PARACAS
GLN
BARNIZ CRISTAL INCLUYE SOLVENTES TEKNO
GLN
PINTURA PARA PARED PARA INTERIORES CPP PATO
GLN
PINTURA PARA PARED PARA EXTERIORES PRIMERA CALIDAD SUP GLN
POLICARBONATO DE 8MM 11.8 MT X 2.10 MT
UND
"H" DE POLICARBONATO CLIC 11.8 MT
UND
"U" DE POLICARBONATO DE 2.10 DE LARGO
UND
BLOCK DE VIDRIO 19X19 CM
UND
CEMENTO PARA BLOCK DE VIDRIO X 10 KG CHEMA
BL
SEPARADOR DE PLASTICO PARA INSTALACION DE BLOCK DE VI BL
INSERTO CRISTEL 25X40
UND
BACKER ROOD 1"
MT
SELLADOR ELASTOPOLIURETANO SIKAFLEX MANGA DE 600 M UND
SIKADUR 31 GEL POR LATA DE 5 KG
KG
BIODIESEL B-5
GLN
CEMENTO YURA
BL
VIBRADOR DE CONCRETO C/ MOTOR HONDA
UND
APISONADORA COMPACTADORA TIPO CANGURO
UND
PINTURA BASE IMPRIMANTE
BL
UNION VITALICA 77X4"
UND
TEE 4" VITALICA
UND
TUBO DE 4" CEDULA 40 RANURADO SCHEDULE
UND
AGUA DE MESA
CJAS
PINTURA BASE SUR
BL
CEMENTO TIPO IP YURA
BL
TRIPLAY LUPUNA 6MM
PCHA
MADERA TORNILLO 2X12X12
P2
TRIPLAY DE CEDRO DE 1.2X2.4X4MM
PCHA
MELAMINE DE 2.44X1-22X18MM
PCHA
TUBO REDONDO DE 31/2X2.5X6M
UND
PLATINA 4X41/2X6M
UND
ANGULO DE 2X2X3/16X6M
UND
PLANCHA LISA DE 1.2X2.4X1/4
UND
TUBO REDONDO DE 2 E=2MMX6M
UND
TUBO REDONDO DE 11/2 E=2MM
UND
TUBO REDONDO DE 1" E= 2MM
UND
TUBO RECTANGULAR DE 100X50X2MMX6M
UND
TUBO RECTANGULAR DE 80X40X2MMX6M
UND
TUBO RECTANGULAR DE 2X1X2MMX6
UND
UNION DE REPARACION UF 75MM NACIONAL
UND
TRANSICION DE PVC UF 75MM - 3 IPS ROSCADO
UND
TUBO DE 3X5MT C-10 C/R NICOLL
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
1.00
0.00
0.00
0.00
9.00
6.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
48.60
0.00
16.41
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
156.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
145.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
16.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

N
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319

MATERIAL
UNION SIMPLE DE 3" PVC IPS NACIONAL
REDUCCION DE 3-21/2 PVC IPS NACIONAL
REDUCCION DE 21/2"-2 PVC IPS
REDUCCION DE 3-1 PVC IPS NACIONAL
UNION SIMPLE 21/2" PVC IPS HIDRO
TEE 3 PVC IPS NACIONAL
TAPON MACHO DE 3" PVC NACIONAL
LLAVE DE PASO DE 1" NACIONAL
UNION UNIVERSAL DE 1" PVC IPS
CODO DE 11/4" PVC IPS NACIONAL
REDUCCION 1-3/4" PVC IPS
CODO DE 3/4" PVC IPS
PRENSA DE BANCO PARA TUBO DE 3" TRUPPER
TARRAJA UNIVERSAL PARA TUBO DE PVC
CINTA TEFLON DE 3/4
FORMADOR DE EMPAQUETADURA ADEX
TUBO DE 160X6M P/ALCANTARILLA COLOR NARANJA
CODO PVC 160X22.5 C/ANILLO DE GOMA
NIPLE DE F G 3" HEMBRA (UNION)
PINTURA ESMALTE SINTETICO COLOR ANIPSA
PINTURA ZINCROMATO ANIPSA
THINNER ACRILICO
MASILLA PLASTICA CON CATALIZADOR VELOZ
DISCO DE POLIFAN DE 41/2" KAMASA
PERNOS EXPANSIVOS 5X5/8 FISHER
PERNOS AUTORROSCANTE 11/4X1/4
DISCO DE CORTE DE METAL 4" INOX
SILICONA TRANSPARENTE SIKA
LIJA N 8O METAL
TRAPO INDUSTRIAL
WAYPE INDUSTRIAL
MASCARA DE SOLDAR FOTOSENSIBLE MIGTIG
CARETA FACIAL DE POLICARBONATO GLUTE
GUANTES DE SOLDAR ACA ALTA DELTA PLUS
ROPA DE CUERO PARA SOLDAORES
LENTES DE SEGURIDAD ANTIREFLEX
ZAPATO DE SEGURIDAD PARA SOLDADORES
ROPA DE PINTOR DESCARTABLE DELTA PLUS
MANDIL DE CUERO NACIONAL
COLA SINTETICA ANIPSA
SOLDADURA CELLOCORD AP 1/8" OERLIKON
SOLDADURA CELLOCORD AP/3/32"
JABON LIQUIDO
LEJIA
PINO DESINFECTANTE
DETERGENTE DE 4KG NACIONAL
B
MASCARILLA ANTIPOLVO SERIE 8511 SEGN NORMA
GUANTES DE OPERARIO DE HILO RECUBIERTO CON JEBE
GUANTES DE BADANA REFORZADO PARA OPERARIO
PROTECTOR AUDITIVO
BLOQUEADOR FPS 70 FCO
UNIFORME DE TRABAJO (PANTALON CAMISA)
LENTES DE SEGURIDAD DE POLICARBONATO
TORNILLO SPACK DE 3" NACIONAL
TORNILLO SPACK DE 2" NACIONAL
TORNILLO SPACK DE 1" NACIONAL
TORNILLO SPACK DE 21/2" NACIONAL
LIJA ESPONJA FINA NACIONAL

SALIDA
SALDO DEL
DEL MES
UND
MES DE
DE
NOVIEMBRE
DICIEMBRE
UND
6.00
0.00
UND
0.00
0.00
UND
1.00
0.00
UND
1.00
0.00
UND
1.00
0.00
UND
4.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
5.00
0.00
UND
6.00
0.00
UND
3.00
0.00
UND
1.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
36.00
22.00
UND
11.00
3.00
UND
0.00
0.00
UND
1.00
0.00
UND
0.00
0.00
GLN
0.00
0.00
GLN
1.00
0.00
GLN
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
10.00
0.00
MLL
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
PLG
0.00
0.00
KG
0.00
0.00
KG
10.00
0.00
UND
0.00
0.00
UND
1.00
1.00
PAR
0.00
0.00
JGO
0.00
0.00
UND
0.00
0.00
PAR
0.00
0.00
UND
4.00
0.00
UND
0.00
0.00
GLN
0.00
0.00
KG
0.00
0.00
KG
0.00
0.00
GLN
2.00
0.00
GLN
1.00
1.00
GLN
1.00
0.00
KG
1.50
0.50
PZAS
0.00
0.00
UND
200.00
0.00
PAR
0.00
0.00
PAR
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
JGO
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00

N
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378

MATERIAL
ADHESIVO EPOXICO SIKADUR 32 GEL ALTA RESISTENCIA
IMPERMEABILIZANTE LIQUIDO PARA CONCRETO
GUANTES DE BADANA REFORZADO PARA OPERARIO
GUANTES DE OPERARIO DE HILO RECUBIERTO CON JEBE
LENTES DE SEGURIDAD
MASCARILLA Y/O RESPIRADOR STEEL PRO
TRIPLAY DE 6MM
PINTURA ZINCROMATO
PINTURA ESMALTE SINTETICO CPP
THINNER ACRILICO
DISCO DE METAL TRONZADORA DE 14" BOSH
DISCO INOX 4" PARA METAL
PUNTERO HEXAGONAL DE 6MM DEWALT
ESPATULA PARA DRIWALL
ESPATULA DE PLANCHA NACIONAL
TRONZADORA DE 2200 W DISCO 14
TORNILLO DE BANCO DE 5"
TALADRO PERCUTOR DE 1/2" 600W BLACK AND DECKER
ESMERIL ANGULAR DE 41/2" 420W DE MANO
PISTOLA DE ALTA PRESION
PISTOLA FULMINANTE SHOCK CALIBRE 22 RONSET
CUTER STANLEY
TORNILLO AUTOPERFORANTE HEXAGONAL DE 6MM
TORNILLO GRABBER GACEL DRILLYNG N 8
TORNILLO GRABBER GACEL DRILLYNG N 6
CLAVO RANZET PARA FIJACION SERIE 1500-1-1/2"
FULMINANTE CALIBRE 22 AMARILLO TIROX TIROX
FULMINANTE CALIBRE 22 VERDE TIROX TIROX
FULMINANTE CALIBRE 22 CAFE TIROX TIROX
PAPEL BOND A-4
LAPICERO TINTA SECA
POS IT X 100 HJAS
LAPIZ CARBON N 2
TUBO REDONDO DE 11/2" E=1.8X6M
TUBO REDONDO DE 1" E=1.8X6M
TUBO RECTANGULAR DE 2X1 E=1.8 MM X6M
PLATINA DE 2X1/8X6M
TUBO CUADRADO DE 11/2" E=1.8MMX6M
PLANCHA ESTRIADA DE 1.2X2.4X1/8
PLANCHA INOXIDABLE BRILLANTE DE 2.4X1.2XE=1.5MM
PLATINA DE 1X1/8X6M
TUBO CUADRADO DE 1" E=1.8MMX6M
TUBO REDONDO DE 2 E=2MMX 6M
PLATINA DE 11/2"X1/8X6M
SOLDADURA CELLOCORD DE 1/8"
SOLDADURA INOX 3/32
CLAVO DE 1" S/C PRODAC
CANTONERA DE ALUMINIO DE 2X11/8X1/8
TOMACORRIENTE DOBLE C/TOMA A TIERRA
INTERRUPTOR UNIPOLAR DE CONMUTACION DE 1 15AM
TOMACORRIENTE DOBLE C/TOMA A TIERRA B TICINO
REFLECTORES DE 500 W
HALOGENOS DE 500W
TERMINALES T/OJO DE 4MM
FAROLAS ESFERICAS DE 70W PHILLIPS
PERNOS DE ENCARNE DE 3"
TAPA CIEGA PARA CAJA OCTAGONAL NACIONAL
TAPA CIEGA PARA CAJA RECTANGULAR NACIONAL
TRIPLAY DE 19MM

SALIDA
SALDO DEL
DEL MES
UND
MES DE
DE
NOVIEMBRE
DICIEMBRE
UND
0.00
0.00
LT
0.00
0.00
PAR
0.00
0.00
PAR
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
PCHA
0.00
0.00
GLN
3.00
0.00
GLN
0.00
0.00
GLN
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
1.00
0.00
UND
0.00
0.00
UND
0.00
0.00
MLL
0.00
0.00
MLL
0.00
0.00
CJA
0.00
0.00
CJA
0.00
0.00
CJA
0.00
0.00
CJA
0.00
0.00
PQT
0.00
0.00
UND
24.00
3.00
PQT
2.00
2.00
UND
6.00
0.00
UND
3.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
0.00
0.00
UND
8.00
0.00
UND
0.00
0.00
UND
0.00
0.00
KG
0.00
0.00
KG
0.00
0.00
KG
497.00
2.00
UND
0.00
0.00
UND
0.00
0.00
UND
1.00
0.00
UND
0.00
0.00
UND
1.00
0.00
UND
5.00
1.00
UND
20.00
20.00
UND
24.00
0.00
UND
0.00
0.00
UND
6.00
6.00
UND
4.00
4.00
PCHA
0.00
0.00

N
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437

SALIDA
SALDO DEL
DEL MES
MATERIAL
UND
MES DE
DE
NOVIEMBRE
DICIEMBRE
LISTONES DE 2X3X12 TORNILLO
UND
0.00
0.00
AGUA DE MESA
CJAS
0.00
0.00
PINTURA ZINCROMATO MAESTRO
GLN
0.50
0.00
PINTURA ESMALTE SINTETICO NEGRO MAESTRO
GLN
0.50
0.00
THINNER ACRILICO MAESTRO
GLN
1.00
0.00
LIJA DE METAL N 400
PLG
0.00
0.00
LIJA DE METAL N120 METALOX
PLG
0.00
0.00
LIJA DE METAL N 80 METALOX
PLG
0.00
0.00
LIJA DE METAL N 100 METALOX
PLG
0.00
0.00
BOMBIN
UND
0.00
0.00
BROCHA DE 2" TUMI
UND
0.00
0.00
BROCHA DE 3" TUMI
UND
0.00
0.00
ALAMBRE N 16
KG
0.00
0.00
CRUZETAS DE 5X5
BL
15.00
0.00
CRUZETAS DE 3X3
BL
10.00
2.00
COLA SINTETICA TEKNO
GLN
5.00
4.00
SIKADUR 32 GEL A+B EN LATA DE 5 KG
GLN
2.00
0.00
ESPONJA DE 11/2" PLAZA
UND
4.00
0.00
PUNTERO ESTRELLA PARA TORNILLO SPACK PZ2
UND
0.00
0.00
PUNTERO ESTRELLA PARA TORNILLO SPACK PZ3
UND
1.00
0.00
DADO HEXAGONAL DE 1/4" PARA PUNTERO SPACK
UND
0.00
0.00
FRESAS PARA ROUTER
JGO
0.00
0.00
MECHAS DE EXPANSION PARA TALADRO DE MANO
JGO
0.00
0.00
ANILLO DE CERA C/COLLARIN PARA INHODORO
UND
11.00
0.00
TUBO REDONDO GALVANIZADO DE 4X2.5MMX6M
UND
3.00
0.00
TUBO REDONDO GALVANIZADO DE 21/2"X2.5MMX6M
UND
1.00
0.00
PLANCHA INOX BRILLANTE DE 2.4X1.2X1.5MM
UND
0.00
0.00
BIODIESEL
GLN
0.00
0.00
COMPRENSORA DE AIRE 2HP 265LT-CAMBEL
UND
0.00
0.00
COLA SINTETICA
GLN
12.00
0.00
DISPENSADOR DE JABON ESPUMA DE 800 ML
UND
9.00
0.00
DISPENSADOR PROFESIONAL DE PAPEL HIGIENICO
UND
11.00
0.00
DISPENSADOR PROFESIONAL PAPEL TOALLA
UND
5.00
0.00
GANCHO METALICO CROMADO
UND
2.00
0.00
JABONERA DE DUCHA
UND
2.00
0.00
WAYPE
KG
2.00
0.00
GABINETE CONTRA INCENDIO
UND
0.00
0.00
CINTA PAPEL PARA DRYWALL P/JUNTA X 100MT ETERNIT
RLLO
0.00
0.00
SUPERBOARD DE 2.44X1.22X8MM ETERNIT
PCHA
2.00
1.00
SUPERBOARD DE 2.44X1.22X6MM ETERNIT
PCHA
15.00
15.00
PARANTE METALICO 90X32MM(35/8X11/4")E=0.90MML=3,00
PZA
0.00
0.00
RIEL METALICO 90X32MM(35/8X11/4")E=0.90MML=3M RECO
PZA
0.00
0.00
ESQUINERO METALICO 32MM(11/4")E=0.45MML=2,4M RECOR PZA
8.00
0.00
DISCO DE DESBASTE DE 41/2" DEWALT
UND
0.00
0.00
DISCO DE CORTE INOX 41/2" NORTON
UND
0.00
0.00
DISCO DE CORTE 41/2" DEWALT 5MM
UND
0.00
0.00
CARBON PARA ESMERIL DE 41/2" NACIONAL
UND
6.00
1.00
PINTURA ESMALTE SINTETICO ANIPSA
UND
0.00
0.00
TUBO DE ACERO S/C A53 CSH-40"X6MT ACEROS AQP
UND
0.00
0.00
SOLDADURA INOX 1/8" SOLDEXA
KG
0.00
0.00
TUBO REDONDO 2" E=2MMX6MT ACEROS AQP
UND
0.00
0.00
TUBO REDONDO 11/2" E=2MMX6MT ACEROS AQP
UND
4.00
0.00
TUBO REDONDO 1" E=2MMX6MT ACEROS AQP
UND
0.00
0.00
SOLDADURA CELLOCORD AP 1/8" SOLDEXA
KG
0.00
0.00
TUBO RECTANGULAR 100X50X2MMX6MT ACEROS AQP
UND
0.00
0.00
TUBO RECTANGULAR 80X40X2MMX6MT ACEROS AQP
UND
2.00
0.00
TUBO RECTANGULAR 2X1X1.5MMX6MT ACEROS AQP
UND
0.00
0.00
RODILLO PARA PINTAR (9")
UND
10.00
2.00
CEMENTO PARA VIDRIO BLOCK DE 25KG NACIONAL
UND
5.00
0.00

MATERIAL

UND

438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496

TAPON DE ACERO CON RANURA 4" CON REDUCCION DE 1/2"


LAVATORIO EN OVALIN TREBOL
FLUXOMETRO DE 1/2" PARA URINARIO NACIONAL
SILICONA NACIONAL
CODOS DE 2" PVC C-10 IPS NACIONAL
PEGAMENTO DE CERAMICA DE 25 KG NACIONAL
FRAGUA BLANCA CELIMA
TELA METAL HABRALOCK #40 (LIJA RESISTENTE A LA TEMPER
TELA METAL HABRALOCK # 80 (LIJA RESISTENTE A LA TEMPER
TELA METAL HABRALOCK # 120 (LIJA RESISTENTE A LA TEMPE
CACHIMBA DE PVC UF UNION DN 200MM A 300MM NACIONAL
CODO DE PVC UF UNION FLEXIBLE DN 200MM A 300MM NACI
TUBO GALVANIZADO CON HILO 3MMX6MMX3" NACIONAL
CODO GALVANIZADO DE 3" X 90
NIPLE DE F GALVANIZADO 3" HEMBRA NACIONAL
CINTA TEFLON DE 3/4" NACIONAL
ADEX FORMADOR DE EMPAQUETADURA EN LATA 3H 130 GRS
BISAGRAS 4X3 PARA MADERA NACIONAL
CODO SCHEDULE TIPO VITAULIC (RANUR.4X90 RADIO CORTO)
CODO SCHEDULE TIPO VITAULIC (RANUR.4X22.5 RADIO CORT
LACA SELLADORA
THINNER ACRILICO NACIONAL
LIJAR AL AGUA N 400 (PARA METAL)NACIONAL
LIJAR AL AGUA N 240 (PARA METAL)NACIONAL
CHAPAS DE 03 GOLPES CANTOL
PICAPORTES DE F DE 1/2" NACIONAL
TORNILLOS SPACK DE 4" NACIONAL
TORNILLOS SPACK DE 30"MM NACIONAL (SEGN MODELO DE
BARNIZ (LATA ROJA) TEKNO
TUBO DE 200X6MT P/ALCANTARILLA C/NARANJA
TUBO DE 160X6MT P/ALCANTARILLA COLOR NARANJA
MADERA TORNILLO DE 1X9X12 (20 TABLAS
GUANTES TIPO BADANA REFORZADO PARA OPERADOR
MASCARILLA Y/O RESPIRADOR PARA POLVO N95 3M
PINO DESINFECTANTE
ALCOHOLO EN GEL 500ML AVAL
PINTURA LATEX SUPERMATE EXTERIOR VENCEDOR
PINTURA LATEX PARA INTERIOR CPP
PINTURA ESMALTE SINTETICO ANIPSA
GUANTES DE HILO NACIONAL
ZAPATO DE SEGURIDAD CON PUNTA DE ACERO DE CUERO
ARNES DE SEGURIDAD ESPECIAL PARA PODA NORMA
OREJERAS PARA CASCO STEEL PRO
GUANTES DE BADANA NACIONAL
BARBIQUEJO NACIONAL
CORTAVIENTO PARA CASCO NACIONAL
MANDILES DE CUERO PARA SOLDADOR NACIONAL
ESCARPINES DE CUERO PARA SOLDADURA NACIONAL
ROPA DE CUERO PARA SOLDADOR (OVEROL CASACA GORRO)
LENTES DE SEGURIDAD ANTIREFLEX PARA SOLDADURA
MASCARILLA Y/O RESPIRADORES PARA PARTICULAS PEQUEAS
LUNAS DE SOLDADURA N11 NACIONAL
LUNA DE SOLDADURA TRANSAPARENTE NACIONAL
CARTUCHO ANTIGASES N95 3M
ACERO CORRUGADO DE 3/8"XP
ACERO CORRUGADO DE 1/2" XP
BIODIESEL
BROCA PARA ROTOMARTILLO DE 1"X45CM KAMASA
BROCA PARA ROTOMARTILLO DE 3/4"X45CM KAMASA

UND
UND
UND
UND
UND
UND
KG
MT
MT
MT
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
GLN
GLN
PLG
PLG
UND
UND
UND
UND
GLN
UND
UND
P2
PAR
UND
GLN
UND
GLN
GLN
GLN
PAR
PAR
UND
UND
PAR
UND
UND
UND
UND
JGO
UND
UND
UND
UND
UND
VLLA
VLLA
GLN
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
1.00
0.00
0.00
0.00
4.00
0.00
20.00
0.00
0.00
0.00
100.00
0.00
7.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
30.00
0.00
4.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
4.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
148.00
86.00
32.00
11.00
46.00
7.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
75.00
75.00
7.00
1.00
4.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00

MATERIAL

UND

497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555

BROCA PARA ROTOMARTILLO DE 5/8"X45CM KAMASA


BROCA PARA ROTOMARTILLO DE 3/8"X45CM KAMASA
BROCA PARA ROTOMARTILLO DE 1/2" KAMASA
DISCO DE CORTE DE CONCRETO 7" PARA DEWALT
LLAVES DE DADOS PRETUL
LLAVES DE BOCA ATANLEY
DESARMADORES MEDIANOS STANLEY
BROCAS DE METAL DE 5/8" KAMASA
BROCAS DE METAL DE 1/2" HELMAS
DISCO PARA CORTE DE CONCRETO DE 41/2" KRUPS
ESCUADRA DE TOPE REGULABLE TRUPPER
ROTOMARTILLO 1500 W MARACA BOSH
DISCO DE DESBASTE 41/2"X1/4" DEWALT
DISCO DE CORTE INOX DE 41/2"X1/20 DEWALT
DISCO DE CORTE 41/2"X1/8" DEWALT
LLANTAS DE BUGUI TRUPPER
CAMARAS PARA LLANTAS DE BUGUI TRUPPER
AROS PARA LLANTAS DE BUGUI CON RODAJE
ALCOHOL EN GEL 500ML
ALCOHOL 250 ML
MOUSE OPTICO GENIUS
UNIONES DE FIERRO GALVANIZADO DE 3" CON ROSCA FG
CINTA TEFLON 3/4" NACIONAL
CODOS DE DESAGUE DE 2X90-PLASTISUR
ADEX FORMADOR DE EMPAQUETADURA EN LATA 3H 130 GRS.
SIKADUR 31 ADHESIVO EPOXICO PARA ANCLAJES Y UNIONES D
LIJAR # 80 ASA/ABRALIT
ESPATULA DE 3" - KAMASA
ESPATULA DE 4" KAMASA
ADITIVO PLASTIFICANTE-SIKA
ENCHUFES PARA ESMERIL-NACIONAL
MARCADORES PARA ACERO TIPO LAPICERO-NACIONAL
CLAVO DE 4" PRODAC
CLAVO DE 2" PRODAC
WINCHA DE 5MT TRUPPER
WINCHA DE 10 MT KAMASA
ARCO DE SIERRA (CON HOJAS DE SIERRA)-STANLEY
HOJA DE SIERRA #24-SANDFLEX
ESPUMA EXPANDIBLE (SIKA BON) SIKA
THINNER ACRILICO MARCA RECONOCIDA JHERON
PLASTICO DE 3.5 MT ALTO-NACIONAL
ACEITE PARA COMPRENSORA-NACIONAL
ACOPLE PARA MANGUERA DE COMPRENSORA-NACIONAL
ARRANCADOR P/COMPRENSORA 40M-F+5% 450V-IMPOR.
MANGUERA DE COMPRENSORA NACIONAL
PLANCHA DE SUPERBOARD DE 2.44X1.22-ETERNIT
ADITIVO PLASTIFICANTE PARA JUNTAS DE SUPERBOARD-SIKA
LUZ DE EMERGENCIA C/BATERIA DE 9HR DURAC. IMPORT.
TAPA CIEGA METALICA NACIONAL para caja octagonal
TORNILLO DE 2" PARA CAJA DE PASO NACIONAL
ESTOBOLES DE 2" CAJA DE PASO NACIONAL
LUMINARIA ADOSADO C/LAMPARA AHORRADOR 2X26W IMP
SUMIDERO DE 2" CROMADO-NACIONAL
LACA PARA ENCOFRADO CHEMA
ESPARRAGOS DE 1/2"X1.20MT-NACIONAL
TUERCA DE 1/2" CON BOLANDAD-NACIONAL
TUBO REDONDO DE 1"X2MMX6MT ACERO
CLAVO DE 11/2" CEMENTO NACIONAL
UNION 77X4" VITALICA CPLG FLEX VITAULIC

UND
UND
UND
UND
KID
KID
KID
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
GLN
UND
UND
KG
KG
UND
UND
UND
UND
UND
GLN
MT
GLN
UND
UND
ML
UND
MAN
UND
UND
UND
UND
UND
UND
GLN
UND
UND
UND
CJA
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
0.00
0.00
1.00
0.00
35.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
4.00
1.00
0.00
0.00
4.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39.00
1.00
39.00
1.00
39.00
1.00
10.00
5.00
8.00
0.00
1.00
0.00
1.00
1.00
30.00
0.00
0.00
0.00
4.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
39.50
5.50
0.00
0.00
1.00
1.00
8.00
0.00
65.00
8.00
24.00
0.00
0.00
0.00
100.00
2.00
3.50
0.75
1.00
1.00
2.00
2.00
50.00
25.00
5.00
2.00
6.00
6.00
2.00
1.00
16.00
7.00
0.00
0.00
88.00
8.00
0.00
0.00
6.00
0.00
39.00
0.00
21.00
0.00
76.00
0.00
0.00
0.00
1.00
1.00
11.00
0.00

MATERIAL

UND

556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614

ROPA TERMICA PARA GUARDIANIA PLUMA DE GANZO


ENGRAPADOR EN FORMA DE ALICATE
PAPEL BOND A-4 - XEROX
LAPIZ 2B-ARTESCO
CORRECTOR LIQUID PAPER MATE-LIQUID PAPER
CUADERNO DE OBRA X 100 F. AUTOCOPIATIVO-UNIVERSAL
GRAPAS DE MEDIDA 23/10,23/15,23/20
AGUA DE MESA SIN GAS DE 20 LT
BIODIESEL
BIODIESEL
MASCARILLAS Y/O RESPIRADORES DE PARTICULAS F720-3M
GUANTES DE HILO PLUTE
CARTUCHOS ANTIGASES 6002-3M
CINTA DE SEGURIDAD (PELIGRO,ADVERTENCIA,RIESGO)
SUMIDERO DE 2" CROMADO-NACIONAL
WINCHA PASACABLE INDUSTRIAL DE 15MM PRAFAFLEX
WINCHA PASACABLE INDUSTRIAL DE 35MM PRAFAFLEX
WINCHA PASACABLE INDUSTRIAL DE 5MM PRAFAFLEX
WINCHA PASACABLE INDUSTRIAL DE 50MM PRAFAFLEX
TOMACORRIENTE A PRUEBA DE AGUA BTICINO
TOMACORRIENTE DOBLE CON PUESTA A TIERRA BTICINO/bipol
TOMACORRIENTE TRIPLE PARA ADOSAR BTICINO
TOMACORRIENTE TRIPLE PARA EMPOTRAR BTICINO
INTERRUPTOR UNIPOLAR SIMPLE BTICINO
INTERRUPTOR UNIPOLAR DOBLE BTICINO
INTERRUPTOR UNIPOLAR DE COMMUTACION BTICINO
INTERRUPTOR UNIPOLAR TRIPLE BTICINO
CAJA RECTANGULAR GALVANIZADA PESADA DE 4X2X1/8 BTICI
CAJA OCTAGONAL GALVANIZADA PESADA DE 4X2X1/8 BTICINO
CAJA CUADRADA DE 100X100X55 BTICINO
INTERRUPTOR TERMOMAGNETICO 2X16A BTICINO
INTERRUPTOR TERMOMAGNETICO 2X25A BTICINO
INTERRUPTOR TERMOMAGNETICO 3X32A BTICINO
INTERRUPTOR TERMOMAGNETICO 3X25A BTICINO
INTERRUPTOR DIFERENCIAL 2X16-30MA BTICINO
INTERRUPTOR DIFERENCIAL 2X25-30MA BTICINO
TOMA PARA RED DE COMPUTO
GASOLINA
BIODIESEL
ALAMBRE N16 MARCA CONFER
ALAMBRE N8 MARCA CONFER
CLAVOS CON CABEZA DE 3" MARCA CONFER
CLAVOS CON CABEZA DE 4" MARCA CONFER
CLAVOS CON CABEZA DE 21/2" MARCA CONFER
CLAVOS CON CABEZA DE 2" MARCA CONFER
CLAVOS CON CABEZA DE 11/2" MARCA CONFER
CLAVOS CON CABEZA DE 1" MARCA CONFER
TUBO CUADRADO DE 2X3X2.5MM
TUBO CUADRADO DE 2X3X2.MM
PLANCHA LISA DE 2.4X1.2MX1/4"
TUBO REDONDO DE 2 E02MM
PLATINA DE 4X1/4"
PLATINA DE 1/2"X1/8"
BIODIESEL
CHALECO DE SEGURIDAD OBRA CON LOGO INSTITUCIONAL
ROPA DE TRABAJO CAMISA AZUL C/LOGO INSTIT.
ROPA DE TRABAJO PANTALON AZUL JEAN PIONER
LENTES DE SEGURIDAD ANTIREFLEX OSCUROS C/CORRECTOR
LENTES DE SEGURIDAD ANTIREFLEX CLAROS C/CORRECTOR M

UND
UND
PQT
UND
UND
UND
UND
CJA
GLN
GLN
UND
PAR
UND
RLLO
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
PZAS
PZAS
PZAS
PZAS
PZAS
PZAS
UND
GLN
GLN
KG
KG
KG
KG
KG
KG
KG
KG
UND
UND
UND
UND
UND
UND
GLN
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
0.00
0.00
0.00
0.00
14.00
10.00
3.00
3.00
5.00
1.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
200.00
84.00
183.00
81.00
20.00
1.00
20.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
21.00
2.00
33.00
18.00
8.00
7.00
16.00
0.00
23.00
1.00
40.00
0.00
15.00
0.00
15.00
0.00
90.00
0.00
97.00
0.00
15.00
0.00
12.00
0.00
12.00
0.00
4.00
1.00
4.00
0.00
4.00
0.00
8.00
4.00
5.00
0.00
0.00
0.00
0.00
0.00
1197.00
161.00
395.00
110.00
129.00
17.00
505.50
35.50
240.00
0.00
90.00
0.00
28.00
4.00
30.00
0.00
0.00
0.00
4.00
0.00
1.00
0.00
2.00
2.00
0.00
0.00
14.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00

N
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673

MATERIAL
PALAS TRAMONTINA
PICOS CON MANGO DE MADERA REFORZADO
BUGUI COMPLETO DE TUBO GALVANIZADO CON RODAJE-LLAN
PLOMADAS PARA CARPINTERO-STANLEY
BROCA DE ACERO DE 1/2" TIPO GUSANO-TITAN
BROCA DE ACERO DE 3/8"-TITAN
DISCO DE CORTE DE 7" PARA CIRCULAR MANUAL DIENTE DI
DISCO DE CORTE DE 10" PARA MADERA -KAMASA
DISCO DE CORTE DE 4" PARA MADERA KAMASA
HOJA DE CARBONO 13MM ANCHO 0,65MM T/Z6 PARA CIERRA C
HOJA DE CARBONO 10MM ANCHO 0,65MM T/Z6 PARA CIERRA C
CUCHILLA PARA GARLOPA DE 4" STANLEY
CUCHILLA PARA GARLOPA DE 7" STANLEY
BROCA DE CONCRETO 1/2" PARA ROTOM. SDS-PLUS KAMASA
BROCA DE CONCRETO 3/8" PARA ROTOM. SDS-PLUS KAMASA
HOJA DE SIERRA #24-18SANDFLEX
TRAPO INDUSTRIAL-NACIONAL
ESPATULA DE 2" STANLEY
ESPATULA DE 3" STANLEY
BROCHA DE 2" TUMI
BROCHA DE 4" TUMI
ENCHUFES NACIONAL
LIJA PARA METAL N 120-ASA/ABRALIT
LIJA PARA METAL N 100-ASA/ABRALIT
LIJA PARA METAL N 80-ASA/ABRALIT
CHAPA DE TRES GOLPES PRIMERA CALIDAD-FORTE
CHAPA PERILLA PRIMERA CALIDAD-FORT
BARNIZ MARINO TRIPLE ACCION-PARACAS
LACA SELLADORA PARACAS
COLA SINTETICA MARTELL
LIJA PARA MADERA N 350-ASA/ABRALIT
LIJA PARA MADERA N 400-ASA/ABRALIT
THINNER ACRILICO NACIONAL
PICAPORTE DORADO 6" DE PIN REDONDO-IMPORTAD
BISAGRA CAPUCCINA DE 3X4 BISA
BASE DE AMOLADORA CIRCULAR PARA LIJA 7"
BASE DE AMOLADORA CIRCULAR PARA LIJA 4"
TORNILLOS SPACK DE 3" IMPORTADO
TORNILLOS SPACK DE 21/2" IMPORTADO
TORNILLOS SPACK DE 2" IMPORTADO
TORNILLOS SPACK DE 11/2" IMPORTADO
TORNILLOS SPACK DE 1" IMPORTADO
PUNTEROS PH2-STANLEY
CINTA MASKENTAPE DE 11/2"X40 YDS
CINTA MASKENTAPE DE 22X40 YDS
TUBO PVC C-10 IPS 3" C/R PARA AGUA FRIA
TUBO PVC SAL 2" PLASTISUR
TUBO PVC SAL 4" PLASTISUR
CODO PVC SAL 2X90 PLASTISUR
CODO PVC SAL 4X90 PLASTISUR
CODO PVC SAL 2X45 PLASTISUR
CODO PVC SAL 4X45 PLASTISUR
TEE 2X2 PVC SAL PLASTISUR
TEE 2X4 PVC SAL PLASTISUR
SOMBRERO DE VENTILACION PVC SAL 2" NACIONAL
UNION SIMPLE PVC SAP C-10 11/4" IPS
UNION SIMPLE PVC SAP C-10 1" IPS
TUBO PVC SAP P/INSTAL. ELECTRICA D=25MM (1")PLASTISUR
TUBO PVC SAP P/INSTAL. ELECTRICA D=20MM (3/4")PLASTISU

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
KG
UND
UND
UND
UND
UND
PLG
PLG
PLG
UND
UND
GLN
GLN
GLN
PLG
PLG
GLN
UND
UND
UND
UND
CTO
CTO
CTO
CTO
CTO
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
9.00
2.00
8.00
4.00
0.00
0.00
5.00
0.00
9.00
0.00
10.00
7.00
31.00
5.00
20.00
3.00
5.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
4.00
5.00
5.00
100.00
0.00
0.00
0.00
5.00
1.00
12.00
0.00
0.00
0.00
1.00
0.00
5.00
5.00
0.00
0.00
68.00
10.00
68.00
34.00
3.00
0.00
30.00
12.00
15.00
2.00
11.00
11.00
15.00
0.00
31.00
11.00
10.00
10.00
0.00
0.00
35.00
14.00
120.00
52.00
0.00
0.00
0.00
0.00
1.50
1.50
1.50
1.50
0.50
0.50
0.00
0.00
0.00
0.00
15.00
15.00
92.00
28.00
30.00
5.00
10.00
0.00
0.00
0.00
25.00
1.00
18.00
18.00
5.00
0.00
10.00
4.00
5.00
0.00
5.00
0.00
5.00
0.00
5.00
0.00
30.00
0.00
10.00
0.00
35.00
0.00
178.00
10.00

MATERIAL

UND

674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732

TUBO PVC SAP P/INSTAL. ELECTRICA D=50MM (2")PLASTISUR


TUBO PVC SAP P/INSTAL. ELECTRICA D=75MM (3")PLASTISUR
CURVA PVC SAP P/INSTAL. ELECTRICAS 25MM (1")
CURVA PVC SAP P/INSTAL. ELECTRICAS 20MM (3/4")
CURVA PVC SAP P/INSTAL. ELECTRICAS 50MM (2")
CURVA PVC SAP P/INSTAL. ELECTRICAS 75MM (3")
TIZA MOLIDA PARA ENCOFRADO NACIONAL
YESO X 16 KG NACIONAL
SOLDADURA DE 3/32 CELLOCORD OERLIKON
ESMALTE SINTETICO-T-COLORS
ZINCROMATO MARTELL
DISCO DE CORTE DE ACERO 41/2" DEWALT INOX
DISCO DE CORTE DE CONCRETO 41/2" DEWALT
DISCO DE DESBASTE 41/2"PARA CONCRETO DEWALT
DISCO POLIFAN DE 41/2 DEWALT
MASILLA PLASTICA AUTOMOTRIZ X 1/4" C/CATALIZADOR ANIP
TUBO DE ABASTO PARA LABATORIO DE 1/2" METUSA
CODO DE FG 3X90 IMPORTADO
TEE ROSCADO FG 3 IMPORTADO
NIPLE (UNION) ROSCADA FG 3" IMPORTADA
CINTA TEFLON NACIONAL
FORMADOR DE EMPAQUETADURA ADEX EN LATA
REGISTRO ROSCADO DE BRONCE DE 4" NACIONAL
LLAVE DE PASO TIPO BOLA DE 11/4" CIM
LLAVE DE PASO TIPO BOLA DE 1/2" CONCISA
CARTUCHOS SILICONA TRANSPARENTE SIKA
PICAPORTE CROMADO CON PASADOR DE 6"
PICAPORTE CROMADO CON PASADOR DE 2.4MT
CINTA AISLANTE 3M
CINTA VULCANIZANTE 3M
INTERCOMUNICADOR T/TELEFONO 2PUNTOS IMPORTADO
CEMENTO PVC OATEY
DOSIS QUIMICA DE TRATAMIENTO DE POZO A TIERRA
VARILLA DE COBRE ELCTROLITICO 5/8"X2.4 MT NACIONAL
CRUZETAS METALICAS PARA ARTEFACTOS ELECTRICOS CON A
ESTOBOL PARA ARTEFACTOS ELECTRICO DE 2" NACIONAL
ESTOBOL PARA ARTEFACTOS ELECTRICO DE 11/2" NACIONAL
DISYUNTOR DE 250AM MERLIN GERIN
TERMINALES TIPO OJO PARA CABLES DE 4MM 2
TERMINALES TIPO OJO PARA CABLES DE 2.5MM2
TERMINALES TIPO OJO PARA CABLES DE 16MM2
TERMINALES TIPO OJO PARA CABLES DE 10MM2
MARCADORES T/CLIP 1-4 X 2.5MM
MARCADORES T/CLIP 1-4 X 16MM
MARCADORES T/CLIP 1-4 X 10MM
MARCADORES T/CLIP 1-10 X 4MM
MARCADORES T/CLIP 1-10 X 2.5MM
ESCALERA TIPO TIJERA X 2.5MT DE ALUMINIO TRUPPER
REDUCCION PVC SAP PARA AGUA CON ROSCA 2"-11/4" IPS
REDUCCION PVC SAP PARA AGUA CON ROSCA 3"-21/2" IPS
REDUCCION PVC SAP PARA AGUA CON ROSCA 21/2"-2" IPS
REDUCCION PVC SAP PARA AGUA CON ROSCA 11/4"-1/2" IPS
CODO PVC SAP PARA AGUA CON ROSCA 11/4"X90 HIDRO
CODO PVC SAP PARA AGUA CON ROSCA 1/2"X90 HIDRO
CODO PVC SAP PARA AGUA CON ROSCA 2"X90 HIDRO
TEE PVC SAP PARA AGUA CON ROSCA 1/2" IPS
TEE PVC SAP PARA AGUA CON ROSCA 11/4" IPS
TEE PVC SAP PARA AGUA CON ROSCA 21/2" IPS
TEE PVC SAP PARA AGUA CON ROSCA 2" IPS

UND
UND
UND
UND
UND
UND
KG
BL
KG
GLN
GLN
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
GLN
KIT
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
22.00
17.00
100.00
0.00
30.00
0.00
60.00
0.00
40.00
0.00
35.00
0.00
18.00
1.00
19.50
9.50
23.50
0.00
12.00
0.00
5.00
0.00
0.00
0.00
5.00
5.00
5.00
5.00
0.00
0.00
10.00
0.00
7.00
0.00
1.00
0.00
10.00
0.00
15.00
0.00
200.00
0.00
10.00
0.00
14.00
0.00
10.00
0.00
6.00
4.00
4.00
1.00
30.00
0.00
2.00
2.00
200.00
0.00
5.00
0.00
1.00
0.00
6.75
0.00
6.00
0.00
3.00
0.00
90.00
6.00
100.00
20.00
38.00
38.00
1.00
0.00
40.00
0.00
40.00
0.00
40.00
0.00
38.00
0.00
12.00
0.00
12.00
0.00
12.00
0.00
24.00
0.00
36.00
0.00
9.00
2.00
2.00
0.00
1.00
0.00
2.00
0.00
25.00
0.00
50.00
0.00
40.00
20.00
2.00
0.00
25.00
0.00
15.00
0.00
5.00
0.00
5.00
0.00

N
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791

MATERIAL
UNION UNIVERSAL PVC SAP 3/4" IPS
UNION UNIVERSAL PVC SAP 1/2" IPS
UNION UNIVERSAL PVC SAP 11/4" IPS
REDUCCION PVC SAL DE 4-2 INYECTOPLAST
YEE PVC SAL 4 PLASTISUR
YEE PVC SAL 2" PLASTISUR
YEE PVC SAL 4-2" PLASTISUR
TUBO PVC C-10IPS PARA AGUA 11/4" C/R HIDRO
TUBERIA PVC C-10IPS PARA AGUA 1" C/R HIDRO
TUBO PVC C-10IPS PARA AGUA 3/4" C/R HIDRO
TUBO PVC C-10IPS PARA AGUA 1/2" C/R HIDRO
TUBO PVC ISO 160MM S-25 PLASTISUR C/NARANJA
HORMIGON
CABLE THW-90 1X4MM-INDECO
CABLE THW-90 1X2.5MM-INDECO
LACA SELLADORA PARACAS
ARENA GRUESA
PIEDRA CHANCADA 3/4"
LACA SELLADORA Y/O CHEMA PARA MADERA
TUBO RECTANGULAR DE 3X2X2X6
PLANCHA LISA DE 1/4"
FIERRO REDONDO DE 5/8"X6MT
PLATINA DE 1X1/8" X6MT
BISAGRA DE 4X3 METALICO
CHAPAS DE 03 GOLPES PARA EXTERIORES CANTOL
DISCO POLIFAN DE 41/2" DEWALT
DISCOS INOX 41/2" NORTON
DISCO DE CORTE DE 14" TROZADORA-DEWALT
SIKADUR 32 GEL X 5 KG-SIKA
SIKADUR 31 GEL X 5 KG-SIKA
LACA PARA ENCOFRADO CHEMA
RODOPLAST DE 8.5MMX1.85-NACIONAL
PEGAMENTO PARA CERAMICO EXTRAFUERTE 25KG-CELIMA
PEGAMENTO PARA PORCELNATO FLEXIBLE X25KG CELIMA
FRAGUA DE COLOR
CRUZETAS PARA CERAMICO DE 3MM
AGUA DE MESA SIN GAS
TABLERO DE DISTRIBUCION METALICO
TABLERO DE DISTRIBUCION METALICA T/GABINETE EMP.
VIDRI BLOCK INCOLORO DE 19X19CM IMPORTADO
CEMENTO PARA VIDRIO BLOCK DE 10KG CELIMA
VENTILADOR DE 3 ALETAS COLOR BLANCO
PINTURA ZINCROMATO ANYPSA
PINTURA ESMALTE SINTETICO ANYPSA
THINNER ACRILICO X 3.75LT
SOLDADURA CELLOCORD AP 3/32 OERLIKON
SOLDADURA CELLOCORD AP 1/8
WAYPE ZAMBITO NACIONAL
TRAPO INDUSTRIAL-NACIONAL
MALLA ARPILLERA X 3MT DE ALTO
TUBO RECTANGULAR DE 2X1X2MMX6MT
TALADRO LECTRICO PORTATIL DE 13MM 800X800 DE 650W
TONNER RENDIMIENTO 2500PAG HP 49A Q5949A
TONNER RENDIMIENTO 2100PAG HP 78A CE278A
UNIFORME DE TRABAJO PANTALON CAMISA
PIEDRA CHANCADA
ARENA GRUESA
PIEDRA CHANCADA
ARENA GRUESA

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
M3
RLLO
RLLO
GLN
M3
M3
GLN
UND
UND
VLLA
VLLA
UND
UND
UND
UND
UND
GLN
GLN
GLN
UND
BL
BL
BL
CTO
CJA
UND
UND
PZA
BL
UND
GLN
GLN
GLN
KG
KG
KG
KG
MT
UND
UND
UND
UND
UND
M3
M3
M3
M3

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
25.00
0.00
25.00
6.00
30.00
0.00
20.00
0.00
6.00
0.00
5.00
0.00
15.00
0.00
15.00
0.00
3.00
0.00
3.00
0.00
0.00
0.00
45.00
0.00
10.63
0.00
1900.00
1141.00
1300.00
0.00
30.00
10.00
0.00
0.00
0.00
0.00
30.00
0.00
8.00
0.00
1.00
0.00
4.00
0.00
4.00
1.00
40.00
0.00
5.00
0.00
32.00
32.00
78.00
78.00
13.00
7.00
5.00
0.00
12.00
0.00
53.00
0.00
190.00
0.00
148.00
18.00
100.00
6.00
150.00
0.00
10.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
290.00
0.00
30.00
0.00
0.00
0.00
22.00
0.00
13.00
10.00
53.00
41.00
105.00
16.00
43.50
15.00
50.00
0.00
41.00
13.00
282.00
30.00
83.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
69.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MATERIAL

UND

792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848

ARENA GRUESA
PIEDRA CHANCADA
PIEDRA CHANCADA
ARENA GRUESA
PIEDRA CHANCADA
BIODIESEL
LLAVE DE 1/2" DE PASO SANKING
LLAVE DE 3/4" DE PASO SANKING
LLAVE DE 11/4" DE PASO PK
LLAVE DE 11/2" DE PASO SANKING
LLAVE DE PASO DE 2" SANKING
TEE DE 11/4" HIDRO IPS
TAPON MACHO DE 1/2" HIDRO IPS
TAPON DE 2" HIDRO IPS MACHO
TAPON DE 11/4" HIDRO IPS MACHO
TAPON DE 1" HIDRO IPS MACHO
TAPON DE 1/2" HIDRO IPS MACHO
REDUCCION DE 2-3/4"- IPS
REDUCCION DE 11/2"-1 IPS
REDUCCION DE 11/4"-1 IPS
REDUCCION DE 11/4"-3/4" IPS
CODO INJERTO DE 1/2" PVC IPS
UNION SIMPLE DE 1/2" IPS
CODO INJERTO DE 3/4" (LLEGO COMO UNION SIMPLE 1/2")
UNION SIMPLE DE 11/2" IPS
UNION UNIVERSAL DE 1/2"-IPS
UNION UNIVERSAL DE 11/4"-IPS
UNION UNIVERSAL DE 11/2"-IPS
SUMIDERO DE BRONCE DE 3"
LLAVE DE 1/2" PARA LAVATORIO ITALGRIF
CEMENTO OATEY PVC
PINTURA SUPERMATE COLOR VENCEDOR
PINTURA SATINADO ANYPSA COLOR
LIJA #80 ABRALIT
LIJA #120 ABRALIT
BALDES DE 20 LT
YESO NACIONAL
BROCHA DE 4" TUMI
BROCHA DE 3" TUMI
BROCHA DE 2" TUMI
CILINDRO DE METAL NACIONAL
DRIZA DE NYLON 3/8X 100MT NACIONAL
ESCOBA DE PLASTICO CLORINDA
LEJIA CLOROX-NACIONAL
KRESO NACIONAL
DETERGENTE INDUSTRIAL SAPOLIO
TRAPO INDUSTRIAL NACIONAL
JABON INDUSTRIAL NACIONAL
TUBOS CON ROSCA DE 2"X5MT C-10-PLASTISUR
UNION DE REPARACION DE 3" NACIONAL
UNION DE REPARACION DE 6" NACIONAL
UNION DE REPARACION DE 8" NACIONAL
TUBO DE 2" PARA DESAGUE-PLASTISUR
TUBO DE 4" PARA DESAGUE-PLASTISUR
TEE DE 4X4 PARA DESAGUE-PLASTISUR
BISAGRA PUERTA VAIVEN ALUMINIZADA ALUMIZADA NACIONA
PLANCHA INOX DE 2.4X1.2X1/32

M3
M3
M3
M3
M3
GLN
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
GLN
GLN
PLG
PLG
UND
UND
UND
UND
UND
UND
MT
UND
GLN
GLN
KG
KG
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
0.00
0.00
0.00
0.00
11.13
0.00
0.32
0.00
407.00
407.00
15.00
0.00
10.00
0.00
10.00
0.00
10.00
0.00
10.00
0.00
4.00
0.00
40.00
10.00
10.00
0.00
8.00
0.00
10.00
0.00
30.00
0.00
10.00
0.00
10.00
0.00
10.00
0.00
10.00
0.00
30.00
6.00
20.00
0.00
20.00
0.00
10.00
0.00
10.00
0.00
10.00
0.00
10.00
0.00
6.00
0.00
4.00
0.00
4.00
0.25
12.00
0.00
11.00
2.00
100.00
0.00
86.00
78.00
28.00
1.00
50.00
0.00
12.00
0.00
8.00
0.00
9.00
3.00
2.00
0.00
65.00
0.00
0.00
0.00
3.00
0.00
1.00
0.00
30.00
0.00
50.00
0.00
12.00
1.00
5.00
1.00
5.00
0.00
5.00
0.00
5.00
0.00
10.00
3.00
18.00
0.00
15.00
0.00
0.00
0.00
4.00
0.00

N
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907

MATERIAL

UND

CUCHILLA DE VUELTAS MANUAL (CARPINTERIA) TRUPPER


UND
PIEDRA PARA ASENTAR KAMASA
UND
JUEGO DE SUJECION PARA REUTER(FRESAS) NACIONAL
UND
CHAPAS PARA VAIVEN PICO DE LORO-TRAVEX
UND
DISCO DE COPA DE 4" NACIONAL
UND
DISCO DE CONCRETO DE 9" KRUPS
UND
DISCOS DE CONCRETO DE 7" KRUPS
UND
BROCA Y/O PUNTA P/ROTOMARTILLO COMPRENSOR 11/4" HECT UND
BROCA Y/O PUNTA CINCEL 1/2" SUPER PLUS ROTOM.-KAMASA UND
DISCO DE CORTE P/ACERO DE 9"X1/8" DEWALT
UND
DISCO DE CORTE P/ACERO DE 7"X1/8" DEWALT
UND
BOMBIN (INFLADOR) NACIONAL
UND
CANDADO GRANDE DE 5" NACIONAL
UND
DISCO DE CORTE PARA ACERO DE 4" DEWALT
UND
PERNOS PARA LLANTA DE BUGUI NACIONAL
UND
MOTOR DE 3HP 18.3A 22V 1440/1730 RPM 50/60HZ
UND
AMOLADORA BOSH DE 2200W 6500RPM 220V
UND
SELLADOR BLANCO PARA MUROS CPP
BALDES
PINTURA PARA EXTERIORES SUPER MATE VENCEDOR
GLN
PINTURA PARA INTERIORES CPP
GLN
BASE IMPRIMANTE EMPASTE X 5KG
BL
TONNER RENDIMIENTO TOSHIBA T-1640
UND
LENTES DE SEGURIDAD ANTIPARRA SEX ANTIEMPAO
UND
ZAPATO DE SEGURIDAD ACOLCHADOS MINER
PAR
PROTECTOR AUDITIVO DESCARTABLE SPRO
UND
CASCO DE SEGURIDAD ANARANJADOS
UND
BIODIESEL
GLN
PIEDRA DE 6-8
M3
PIEDRA DE 4"
M3
ARENA GRUESA
M3
ADOQUIN RECTANGULAR GRIS X 6 MT
UND
ADOQUIN RECTANGULAR GRIS X 4 MT
UND
SOLDADURA INOX 3732
KG
SOLDADURA SUPERCITO 3/32 OERLIKON
KG
THINNER ACRILICO
GLN
PINTURA ZINCROMATO
GLN
ESMALTE SINTETICO ANIPSA
GLN
CLAVO DE CEMENTO DE 3" NACIONAL
KG
CLAVO DE DE CALAMINA
KG
PILOA DE NYLON TORCIDO
RLLO
TRAPO INDUSTRIAL
KG
WAYPE INDUSTRIAL
KG
FRANELA
MT
BIODIESEL
GLN
SILICONA TRANSPARENTE
UND
PASTA MURAL SISTEMA DRYWALL
CJA
TORNILLO DRYWALL DE 3/4" PUNTA BROCA
UND
PERNO WAFER DE 1/2" X8 PUNTA BROCA GYPLAC
MLL
CAPUCHONES DE PERNOS PARA COBERTIZO NACIONAL
UND
TORNILLOS SPACK DE 3/4" IMPORTADO
MLL
APLICADORES DE SILICONA
UND
PLANCHA ETERNIT ONDA 4" DE 3.05X110
PCHA
CUMBRERA DE ETERNIT
PARES
PLANCHA DE ETERNIT ONDA 4 DE 0.91X1.10
PCHA
SUPERBOARD 2.44X1.22X8MM
PCHA
SUPERBOARD 2.44X1.22X6MM
PCHA
CINTA PAPEL PARA DRYWAL PARA JUNTA X 100MT
RLLO
ESQUINERO METALICO X 3MT
UND
SIKADUR 31 GEL X 5 KG
KG

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
4.00
19.00
2.00
10.00
0.00
4.00
0.00
10.00
0.00
38.00
5.00
19.00
2.00
2.00
0.00
5.00
5.00
40.00
25.00
15.00
0.00
0.00
0.00
3.00
3.00
4.00
0.00
34.00
3.00
73.00
16.00
509.00
341.00
1.00
0.00
1.00
0.00
20.00
9.00
90.00
40.00
37.00
6.00
250.00
246.00
11.00
0.00
2.00
0.00
23.00
0.00
22250.00
22250.00
7500.00
7500.00
20.00
0.00
50.00
0.00
42.00
0.00
12.00
0.00
15.00
0.00
5.00
0.00
5.00
0.00
1.00
0.00
50.00
0.00
50.00
0.00
200.00
0.00
50.00
44.50
10.00
0.00
40.00
20.00
1.00
1.00
1.00
1.00
100.00
100.00
1.00
1.00
3.00
2.00
10.00
0.00
20.00
20.00
10.00
0.00
13.00
0.00
10.00
0.00
20.00
0.00
100.00
0.00
20.00
0.00

N
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966

MATERIAL
PERNOS WAFER DE 1/2" N 8 PUNTA BROCA
TORNILLOS DRYWALL 3/4" PUNTA BROCA
TORNILLOS DRYWALL 3/4" PUNTA FINA
SUPERBOARD 2.44X1.22X8MM
RIEL METALICO X 3MT
PARANTE METALICO PARA DRYWALL X 3MT
PASTA MURAL PARA DRYWAL X 20 KG
ENCHUFE DE ESMERIL
SOLDADURA CELLOCORD DE 1/8"
SOLDADURA CELLOCORD DE 3/32
DISCO PARA CIRCULAR MANUAL DE 7" (MADERA)
DISCO DE CORTE DE METAL N 14 INOX
DISCO DE CORTE DE METAL DE 9"
DISCO POLIFAN DE 4"
DISCO DE COPA DE 4" PARA LIJADO DE MADERA
LIJA N 120 AL AGUA
LIJA N 100 AL AGUA ABRALIT
BROCA PARA MADERA DE 3/8" T/TORNILLO
LENTES DE SEGURIDAD
GUANTES DE HILO TEJIDO
GUANTES DE BADANA
THINNER ACRILICO
ESMALTE DE ALTO BRILLO C/ALUMINIO
TEROKAL TEKNO
CARBON PARA AMOLADORA DE 4"
TECNOPORT
GUANTES DE JEBE
CASCO DE SEGURIDAD COLOR NARANJA
CASCO DE SEGURIDAD 3M
DISPENSADOR DE JABON SAPOLIO
DETERGENTE INDUSTRIAL
JABON LIQUIDO
LEJIA CLOROX
BLOQUEADOR
TRIPLAY LUPUNA 6MM INDUSTRIAL 1.22X2.44X6MT
TRIPLAY DE 18MM DE 2.44X1.22
CUADERNO ANILLO DOBLE CUADRICULADO A-4
CHINCHE METALICO CON CABEZA DORADA CJAX100UND
NOTA ADHESIVA VARIOS COLORES T/3X3
ARCHIVADOR DE CARTON CON PALANCA GRANDE
BORRADOR BLANCO
CINTA DE EMBALAJE
CORRECTORES
LAPICERO TINTA SECA
PAPEL LUSTRE
PLUMON INDELEBLE COLORES VARIADOS PUNTA GRUESA
VINIFAN
PAPEL BOND A-4
CUADERNO A-4X100 HJAS
CUADERNO EMPASTADO A-5
CUADERNO DE OBRA
CD
FOLDER FILE A-4
CUTER
LAPIZ CARBON
LAPIZ BICOLOR
LAPIZ CARPINTERO
THUJA DORADA ORNAMENTAL T/PIRAMIDALH=2.2MT
CROTOS MULTICOLOR DE DIFERENTE VARIEDAD H=1MT

UND
MLL
MLL
MLL
PCHA
UND
UND
CJA
UND
KG
KG
UND
UND
UND
UND
UND
PLG
PLG
UND
PARES
PARES
PARES
GLN
GLN
GLN
UND
PCHA
PARES
UND
UND
UND
KG
GLN
GLN
LT
PCHA
PCHA
UND
CJA
UND
UND
UND
UND
UND
UND
PLG
UND
UND
PQT
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

SALIDA
SALDO DEL
DEL MES
MES DE
DE
NOVIEMBRE
DICIEMBRE
4.00
0.00
8.00
0.00
4.00
0.00
22.00
0.00
12.00
0.00
28.00
0.00
4.00
0.00
20.00
2.00
220.00
0.00
132.00
0.00
12.00
0.00
20.00
0.00
20.00
0.00
40.00
15.00
6.00
0.00
50.00
0.00
50.00
0.00
20.00
0.00
200.00
61.00
100.00
0.00
100.00
0.00
40.00
0.00
20.00
0.00
5.00
0.00
20.00
0.00
20.00
6.00
100.00
1.00
60.00
0.00
10.00
0.00
15.00
1.00
10.00
0.00
3.00
0.00
5.00
0.00
10.00
1.00
40.00
36.00
20.00
20.00
10.00
0.00
3.00
0.00
5.00
0.00
20.00
2.00
10.00
0.00
10.00
0.00
15.00
0.00
300.00
0.00
200.00
0.00
12.00
0.00
20.00
0.00
20.00
20.00
10.00
0.00
15.00
0.00
5.00
0.00
100.00
0.00
500.00
0.00
10.00
0.00
24.00
0.00
24.00
0.00
12.00
0.00
22.00
22.00
12.00
12.00

N
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985

MATERIAL
PALMERAS ORNAMENTALES H=4.5MT TIPO BOTELL
HUMUS DE LOMBRIZ X 45 KG
MACETERO DE CONCRETO T/GRANDE
UREA X 50 KG
LAMA DE RIO
AGUA DE MESA SAN LUIS
AGUA DE MESA SAN LUIS
TUBO REDONDO DE 2X2MMX6MT
TUBO REDONDO DE 1X1.8MMX6MT
PLANCHA LISA INOX 2.4X1.2X1/32 PRECOCIDO
PLANCHA LISA INOX 2.4X1.2X3/8 PRECOCIDO
PLATINA 4X1/4"X6MT PRECOR SIDER
PLATINA DE 11/2"X1/4"
ANGULO DE 4X4X1/4 ACEROS AREQUIPA
CERAMICA PARA PARED EN FORMATO 0.2X0.3 CELIMA
ARENA GRUESA
PIEDRA CHANCADA
GRAVILLA
ARENA FINA

SALIDA
SALDO DEL
DEL MES
UND
MES DE
DE
NOVIEMBRE
DICIEMBRE
UND
8.00
8.00
SCO
6.00
6.00
UND
3.00
3.00
SCO
1.00
1.00
M3
6.00
6.00
CJA
50.00
50.00
CJA
30.00
1.00
UND
65.00
21.00
UND
37.00
37.00
PCHA
4.00
0.00
PCHA
2.00
0.00
UND
7.00
5.00
UND
10.00
0.00
UND
60.00
0.00
M2
240.00
68.51
M3
45.00
0.00
M3
45.00
0.00
M3
15.00
0.00
M3
90.00
0.00

COMPRAS POR CAJA CHICA


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

PERNO
TORNILLO SPACK 4X50
TORNILLO SPACK 4X50
BBLO
UNION 1/2" FG
MALLA ZARANDA DE 3/4"
LIJA DE FIERRO N 120
CODO DE 2X90 PARA DESAGUE
BISAGRAS DE 1"
LLAVE DE PASO DE 1/2"
BISAGRAS 1"
CARBONES
CODOS DE 2X90 PARA DESAGUE
BIODIESEL
ALCOHOL INDUSTRIAL
DISCO DE CORTE DE METAL DE 9"
DISCO CORTE NORTON
LIJA
OCRE (ROJO, AMARILLO)
CANTO GRUESO
LIJA ABRALIT

UND
UND
UND
CJA
UND
MT
PLG
UND
UND
UND
UND
JGO
UND
GLN
GLN
UND
UND
MT
KG
MT
MT

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MACEN Y MATERIALES EN OBRA

: DICIEMBRE 2015

ON DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI


ON DE LA INFRAESTRUCTURA DEL INSTIRUTO SUPERIOR TECNOLOGICO PUBLICO JOSE CARLOS MARIATEGUI

SALDO
DEL MES
DE
DICIEMBRE

SALDO 2014
0.00
0.00
6.00
0.00
39.00
7.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2.50
86.00
10.00
0.00
0.00
0.00
0.00
7.00
0.00
0.00
0.00
11.00
0.00
0.00
0.00
6.00
0.00
3.00
4.00
0.00
0.00
6.00
0.00
0.00
2.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
1.00
0.00
2.00
0.00
1.00
4.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
0.00
0.00
0.00
48.00
1.00
1.00
1.00
2.00
0.00
0.00
2.00
0.00
5.00
0.00
2.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
2.00
5.00
9.00
6.00
5.00
35.00
39.00
7.75
9.00
4.00
2.00
0.00
5.00
0.00
0.00
690.00
25.00
0.00
31.00
8.00
0.00
2.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
168.00
0.00
0.00
4.00
0.00
0.50
0.00
2.50
2.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
5.00
2.00
1.00
2.00
12.00
0.00
2.00
4.00
6.00
6.00
3.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
7.00
1.00
1.00
0.00
3.00
10.00
0.00
6.00
21.00
15.00
17.00
19.00
11.00
15.00
20.00
0.00
1.00
3.00
1.00
0.00
1.00
3.00
2.00
0.00
14.00
18.00
31.00
20.00
27.00
0.00
2.00
4.00
9.00
25.00
4.00
0.00
32.00
0.00
49.00
24.00
14.00
3.00
33.00
9.00
12.00
4.00
0.00
7.00
23.00
0.00
6.00
15.00
18.00
0.00
1.00
68.00
19.00
13.00
34.00

SALDO
DEL MES
DE
DICIEMBRE
13.00
18.00
22.00
3.00
4.00
10.00
17.00
24.00
0.00
10.00
18.00
27.00
16.00
5.00
2.00
1.00
4.00
1.00
10.00
1.00
1.00
0.00
27.00
14.00
14.00
0.00
2.00
12.00
6.00
30.00
0.00
4.00
3.00
6.00
1.00
4.00
1.00
1.00
10.00
16.00
2.00
6.00
9.00
92.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
25.00
14.00
14.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1.00
7.00
6.00
0.00
50.00
1.00
2.00
2.00
4.00
0.00
0.00
0.00
0.00
0.00
6.00
11.00
0.00
15.00
10.00
0.00
0.00
0.00
3.00
9.00
3.00
3.00
13.00
0.00
12.00
4.00
34.00
256.00
119.00
181.00
2.00
0.00
1.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
17.00
36.00
45.00
6.00
3.00
0.00
83.00
10.00
1.00
5.80
3.00
1.00
1.00
0.00
9.00
15.00
14.00
1.00
0.00
5.00
2.00
1.00
3.00
7.00
1.00
0.00
3.00
1.00
1.00
22.00
149.50
93.00
14.00
6.00
100.00
86.00
0.00
0.00
101.00
64.00
0.00
39.00
15.00
0.00
46.00
6.00
0.00
0.00
0.00
0.00
13.00
2.00
12.00
0.00
0.00
14.00
8.00
5.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
67.00
7.00
3.00
0.00
0.00
7.00
49.00
731.00
145.00
314.00
719.00
16.00
70.00
0.00
0.00
0.00
0.00
0.00
2.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
41.00
2.00
0.00
0.00
55.00
0.00
0.00
0.00
0.00
21.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
21.00
13.00
37.00
0.00
141.00
0.00
13.00
0.00
0.00
14.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.00
0.00
40.50
114.00
0.00
0.00
5.00
2.00
0.00
0.00
8.00
0.00
0.00
0.00
25.00
9.00
1.00
0.00
0.00
0.00
134.50
0.00
0.00
0.00
24.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
1.00
0.00
2.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
1.00
1.00
4.00
0.00
10.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
8.00
2.00
79.00
0.00
0.00
32.00
0.00
0.00
0.00
40.00
159.00
1.00
450.00
14.00
11.00
0.00
1.00
0.00
2.00
26.00
0.00
0.00
0.00
0.00
0.25
0.00
0.00
257.00
75.00
6.00
0.00
0.00
0.00
0.75
0.00
1.24
0.00
2303.00
9733.00
243.79
215.00
29.50
110.00
0.00
2.00
3.00

SALDO
DEL MES
DE
DICIEMBRE
1.00
18.42
9.50
16.27
0.00
2.00
32.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.00
3.00
0.00
0.00
0.00
25.00
20.00
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00

ERIODO 2015
0.00
0.00
0.00
0.00
0.00
1.00
2.00
0.00
50.00
1.00
0.00
1.00
0.00
2.00
0.00
1.00
4.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
1.00
0.00
2.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.50
4.00
11.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
31.00
0.00
1.00
1.00
0.00
0.00
0.00
0.00
15.00
37.50
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
2.00
0.00
4.00
2.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.00
3.00
0.00
14.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
56.00
38.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
1.00
0.00
3.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
48.60
16.41
0.00
6.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
0.00
156.00
0.00
0.00
0.00
145.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
16.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
6.00
0.00
1.00
1.00
1.00
4.00
0.00
0.00
5.00
6.00
3.00
1.00
0.00
0.00
14.00
8.00
0.00
1.00
0.00
0.00
1.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
0.00
2.00
0.00
1.00
1.00
0.00
200.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.00
0.00
6.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
0.00
495.00
0.00
0.00
1.00
0.00
1.00
4.00
0.00
24.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.50
0.50
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15.00
8.00
1.00
2.00
4.00
0.00
1.00
0.00
0.00
0.00
11.00
3.00
1.00
0.00
0.00
0.00
12.00
9.00
11.00
5.00
2.00
2.00
2.00
0.00
0.00
1.00
0.00
0.00
0.00
8.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
4.00
0.00
0.00
0.00
2.00
0.00
8.00
5.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
1.00
0.00
4.00
20.00
0.00
100.00
7.00
0.00
0.00
1.00
1.00
0.00
0.00
1.00
30.00
4.00
0.00
2.00
0.00
0.00
0.00
0.00
1.00
1.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
62.00
21.00
39.00
0.00
4.00
0.00
0.00
0.00
6.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
1.00
24.00
0.00
0.00
0.00
4.00
3.00
0.00
3.00
0.00
0.00
0.00
0.00
38.00
38.00
38.00
5.00
8.00
1.00
0.00
30.00
0.00
4.00
2.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
34.00
0.00
0.00
8.00
57.00
24.00
0.00
98.00
2.75
0.00
0.00
25.00
3.00
0.00
1.00
9.00
0.00
80.00
0.00
6.00
39.00
21.00
76.00
0.00
0.00
11.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.00
4.00
0.00
4.00
3.00
0.00
0.00
0.00
116.00
102.00
19.00
20.00
0.00
1.00
0.00
1.00
0.00
19.00
15.00
1.00
16.00
22.00
40.00
15.00
15.00
90.00
97.00
15.00
12.00
12.00
3.00
4.00
4.00
4.00
5.00
0.00
0.00
1036.00
285.00
112.00
470.00
240.00
90.00
24.00
30.00
0.00
4.00
1.00
0.00
0.00
14.00
0.00
0.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
7.00
4.00
0.00
5.00
9.00
3.00
26.00
17.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
0.00
4.00
12.00
0.00
1.00
0.00
0.00
58.00
34.00
3.00
18.00
13.00
0.00
15.00
20.00
0.00
0.00
21.00
68.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
64.00
25.00
10.00
0.00
24.00
0.00
5.00
6.00
5.00
5.00
5.00
5.00
30.00
10.00
35.00
168.00

SALDO
DEL MES
DE
DICIEMBRE
5.00
100.00
30.00
60.00
40.00
35.00
17.00
10.00
23.50
12.00
5.00
0.00
0.00
0.00
0.00
10.00
7.00
1.00
10.00
15.00
200.00
10.00
14.00
10.00
2.00
3.00
30.00
0.00
200.00
5.00
1.00
6.75
6.00
3.00
84.00
80.00
0.00
1.00
40.00
40.00
40.00
38.00
12.00
12.00
12.00
24.00
36.00
7.00
2.00
1.00
2.00
25.00
50.00
20.00
2.00
25.00
15.00
5.00
5.00

SALDO
DEL MES
DE
DICIEMBRE
25.00
19.00
30.00
20.00
6.00
5.00
15.00
15.00
3.00
3.00
0.00
45.00
10.63
759.00
1300.00
20.00
0.00
0.00
30.00
8.00
1.00
4.00
3.00
40.00
5.00
0.00
0.00
6.00
5.00
12.00
53.00
190.00
130.00
94.00
150.00
10.00
0.00
1.00
1.00
290.00
30.00
0.00
22.00
3.00
12.00
89.00
28.50
50.00
28.00
252.00
83.00
0.00
0.00
1.00
59.00
0.00
0.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.00
11.13
0.32
0.00
15.00
10.00
10.00
10.00
10.00
4.00
30.00
10.00
8.00
10.00
30.00
10.00
10.00
10.00
10.00
24.00
20.00
20.00
10.00
10.00
10.00
10.00
6.00
4.00
3.75
12.00
9.00
100.00
8.00
27.00
50.00
12.00
8.00
6.00
2.00
65.00
0.00
3.00
1.00
30.00
50.00
11.00
4.00
5.00
5.00
5.00
7.00
18.00
15.00
0.00
4.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.00
0.00
4.00
17.00
10.00
4.00
10.00
33.00
17.00
2.00
0.00
15.00
15.00
0.00
0.00
4.00
31.00
57.00
168.00
1.00
1.00
11.00
50.00
31.00
4.00
11.00
2.00
23.00
0.00
0.00
20.00
50.00
42.00
12.00
15.00
5.00
5.00
1.00
50.00
50.00
200.00
5.50
10.00
20.00
0.00
0.00
0.00
0.00
1.00
10.00
0.00
10.00
13.00
10.00
20.00
100.00
20.00

SALDO
DEL MES
DE
DICIEMBRE
4.00
8.00
4.00
22.00
12.00
28.00
4.00
18.00
220.00
132.00
12.00
20.00
20.00
25.00
6.00
50.00
50.00
20.00
139.00
100.00
100.00
40.00
20.00
5.00
20.00
14.00
99.00
60.00
10.00
14.00
10.00
3.00
5.00
9.00
4.00
0.00
10.00
3.00
5.00
18.00
10.00
10.00
15.00
300.00
200.00
12.00
20.00
0.00
10.00
15.00
5.00
100.00
500.00
10.00
24.00
24.00
12.00
0.00
0.00

SALDO
DEL MES
DE
DICIEMBRE
0.00
0.00
0.00
0.00
0.00
0.00
29.00
44.00
0.00
4.00
2.00
2.00
10.00
60.00
171.49
45.00
45.00
15.00
90.00

AS POR CAJA CHICA


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00