You are on page 1of 21

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Date

Checked

INITIAL DATA
Soil properties
No. Description Unit Wt

1 Sand and
Gravel
2 Slightly
Weathered
Granite
No.
c0
y0

K0

Ka

[kN/m]
20.00 1.50 0.28

Kp

Kac

Kpc

Kr

Earth
pressure
coefficients.
4.80 1.05 4.38 0.00 Calculated

26.00 0.00 0.14 11.78 0.75 6.86 0.00

Calculated

Gradient
E0 Gradient Drained/
of c
of E
[kN/m] [m] [kN/m/m]
[kN/m] [kN/m/m] Undrained
1
0.00 0.00
0.00
55000.
0.00 Drained
2
0.00 0.00
0.00 5.3610E+6
0.00 Drained

Parameters used to calculate Earth pressure coefficients


No.

Phi Delta/Phi Beta Cw/C


[]
Ratio [] Ratio
1 31.00
0.60 0.00 0.00
2 47.00
0.33 0.00 0.00

Soil Strength Partial Factors


Document and case:
tan Phi'
c'
Cu
E
BS8002 (1994)
1.20
1.20
1.50
1.00
Note: Only the parameters in bold have been affected by Partial Factors,
No geometry or other factors have been changed.

Design Soil properties after applying Partial Factors


No. Unit Wt

K0

Ka

Kp

Kac

Kpc

[kN/m]
20.00 1.50 0.33 3.66 1.15 3.83
26.00 0.00 0.18 7.97 0.85 5.65
Gradient
No.
c0
y0
of c
E0
[kN/m] [m] [kN/m/m]
[kN/m]
1
0.00 0.00
0.00
55000.
2
0.00 0.00
0.00 5.3610E+6
1
2

Kr

Earth
pressure
coefficients.
0.00 Calculated
0.00 Calculated
Gradient
of E Drained/
[kN/m/m] Undrained
0.00 Drained
0.00 Drained

Parameters used to calculate design Earth pressure coefficients


No.

Phi Delta/Phi Beta Cw/C


[]
Ratio [] Ratio
1 26.60
0.60 0.00 0.00
2 41.79
0.33 0.00 0.00

Surcharge properties
No.

1
2

Stage
In
1
2

Side Level Pressure Partial Offset Width


Factor
Out
[m]
[kN/m]
[m]
[m]
2 Left 16.00
10.00
1.00
- Left 16.00
10.00
1.00

Ks

Note: Only the parameters in bold have been affected by Partial Factors.

Surcharge Design properties


No.
1
2

Stage
Side Level Pressure Offset Width
In Out
[m] [kN/m]
[m]
[m]
1
2 Left 16.00
10.00
2
- Left 16.00
10.00

Ks

STAGE 0 : INITIAL CONDITION


Geometry
Node Level

1
2
3
4

Soil

Boundary

[m]
Left Right Left Right
16.00
1
2 50.00 50.00
14.98
1
2 50.00 50.00
13.96
1
2 50.00 50.00
12.94
2
2 50.00 50.00

EI below
node
[kNm2/m]
500000.
500000.
500000.
500000.

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
1
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Node Level
[m]

Soil

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Checked

Boundary

Left Right Left

5 11.24
6
9.54
7
7.84
8
6.14
9
5.06
10
4.14
11
3.23
12
2.31
13
1.39
14
0.48
15 -0.44
16 -1.36
17 -2.27
18 -3.19
* 19 -4.11
20 -5.58
21 -7.05
22 -8.53
23 -10.00

Date

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00

EI below
node
Right [kNm2/m]

50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00

500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
0.0
0.0
0.0
0.0
0.0

* Wall toe level: -4.11

Water data on LEFT side


No. Level Pressure
[m]
1 13.45

Unit
wt.
[kN/m] [kN/m]
0.00
10.00

Water data on RIGHT side


No. Level Pressure
[m]
1 13.45

Unit
wt.
[kN/m] [kN/m]
0.00
10.00

Analysis details
SAFE model with redistribution
and without friction at wall/soil interface
Left
Right
E profile Generated
Boundary distances [m] :
50.00
50.00

Convergence control parameters


Maximum number of iterations : 50000
Tolerance for displacement convergence [m] : 0.00
Tolerance for pressure convergence [kN/m] : 0.10
Damping coefficient : 1.00
Maximum incremental displacement [m] : 1.00

RESULTS FOR STAGE 0 : Initial condition


Calculation details
E Profiles assumed for calculation (generated):
On the LEFT: E at ground level = 2.6754E+6
E at bottom node = 7.7698E+6 kN/m
On the RIGHT: E at ground level = 5.3610E+6
E at bottom node = 5.3610E+6 kN/m
Iter
Inc Node
Disp Node
Press Node
no.
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
1
0.0
1 0.0590
2
76.00
22
2
0.1
2 0.0078
3
53.72
18
3
0.1
2 0.0062
2
52.46
3
4
0.1
2 0.0019
5
31.87
17
5
0.1
2 0.0016
14
24.71
16
10
0.1
2 0.0023
12
7.71
19
15
0.1
2 0.0024
12
7.33
13
20
0.1
2 0.0024
12
5.15
16
30
0.1
12 0.0023
12
3.89
12
40
0.1
12 0.0022
12
3.75
12
50
0.1
12 0.0022
12
3.86
8
60
0.1
12 0.0029
17
17.17
18
70
0.1
13 0.0055
21
18.10
21
80
0.1
13 0.0009
11
6.07
11
90
0.1
14 0.0013
11
6.71
11
100
0.1
14 0.0012
11
6.13
11
120
0.1
14 0.0004
12
2.22
12
Program Frew Version 19.1.1.16 Copyright (C) 1997-2013
H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
2
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

140
150
160
180
200
250
261

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
0.1
14 0.0004
12
2.30
12
0.1
14 0.0004
12
2.31
12
0.1
14 0.0004
12
2.31
12
0.1
14 0.0004
12
2.31
12
0.1
14 0.0004
12
2.32
12
0.1
14 0.0001
13
1.00
13
0.1
14 0.0000
15
0.08
17

Ground level left = 16.00

Ground level right = 16.00

Stress
Pore
Pore
Node Level
Disp
Vt
Ve
Pt
Pe Pressure
Pe Pressure
BM
SF
[m]
[m] [kN/m] [kN/m] [kN/m] [kN/m] [kN/m]
[kN/m] [kN/m] [kNm/m] [kN/m]
1 16.00
0.00
5.10
5.10
7.60
7.60
0.00
7.60
0.00
0.00
0.00
2 14.98
0.00
20.40
20.40
30.22
30.22
0.00
30.22
0.00
0.00
0.00
3 13.96
0.00
40.80
40.80
59.64
59.64
0.00
59.64
0.00
0.00
0.00
4 12.94
0.00
64.26
59.16
12.05
6.95
5.10
6.95
5.10
0.00
0.00
5 11.24
0.00 108.45
86.35
33.99
11.90
22.10
11.90
22.10
0.00
0.00
6
9.54
0.00 152.64 113.55
55.93
16.84
39.09
16.84
39.09
0.00
0.00
7
7.84
0.00 196.83 140.74
77.87
21.78
56.09
21.78
56.09
0.00
0.00
8
6.14
0.00 241.01 167.93
99.81
26.73
73.08
26.73
73.08
0.00
0.00
9
5.06
0.00 269.19 185.27 113.79
29.88
83.92
29.88
83.92
0.00
0.00
10
4.14
0.00 293.01 199.93 125.62
32.54
93.08
32.54
93.08
0.00
0.00
11
3.23
0.00 316.84 214.60 137.45
35.21
102.25
35.21
102.25
0.00
0.00
12
2.31
0.00 340.67 229.26 149.28
37.87
111.41
37.87
111.41
0.00
0.00
13
1.39 -0.00 364.50 243.92 163.64
43.06
120.58
43.06
120.58
0.00
0.00
14
0.48 -0.00 388.33 258.59 179.56
49.82
129.74
49.82
129.74
0.00
0.00
15 -0.44 -0.00 412.16 273.25 191.43
52.53
138.91
52.53
138.91
0.00
0.00
16 -1.36 -0.00 435.98 287.91 203.28
55.21
148.07
55.21
148.07
0.00
0.00
17 -2.27 -0.00 459.81 302.58 215.12
57.88
157.24
57.88
157.24
0.00
0.00
18 -3.19 -0.00 483.64 317.24 226.94
60.54
166.40
60.54
166.40
0.00
0.00
19 -4.11 -0.00 507.47 331.90 238.76
63.19
175.56
63.19
175.56
0.00
0.00
20 -5.58 -0.00 545.78 355.48 257.75
67.46
190.30
67.46
190.30
0.00
0.00
21 -7.05
0.00 584.08 379.05 276.77
71.73
205.03
71.73
205.03
0.00
0.00
22 -8.53
0.00 622.39 402.63 295.78
76.01
219.77
76.01
219.77
0.00
0.00
23 -10.00
0.00 660.70 426.20 314.78
80.28
234.50
80.28
234.50
0.00
0.00

Stress
Soil

Vt

Left Right

Ve

Pt

[kN/m] [kN/m] [kN/m]

6.63

6.63

7.60

26.52

26.52

30.22

53.04

53.04

59.64

79.56

74.46

12.05

123.75

101.65

33.99

167.94

128.85

55.93

212.13

156.04

77.87

256.31

183.23

99.81

284.49

200.57

113.79

308.31

215.23

125.62

332.14

229.90

137.45

355.97

244.56

149.28

379.80

259.22

163.64

403.63

273.89

179.56

427.46

288.55

191.43

451.28

303.21

203.28

475.11

317.88

215.12

498.94

332.54

226.94

522.77

347.20

238.76

561.08

370.78

257.75

599.38

394.35

276.77

637.69

417.93

295.78

676.00

441.50

314.78

Printed

30-Aug-2016

NOTE: Displacements from STAGE 0 are disregarded in later stages


Vt, Ve : vertical total and effective stress
Pt, Pe : horizontal total and effective stress

STAGE 1 : INSTALL WALL AND EXCAVATE


Geometry
Program Frew Version 19.1.1.16 Copyright (C) 1997-2013
H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Page
3
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Node Level

Soil

Boundary

[m]
Left Right Left Right
1 16.00
1
0 50.00 50.00
2 14.98
1
0 50.00 50.00
3 13.96
1
0 50.00 50.00
4 12.94
2
0 50.00 50.00
5 11.24
2
0 50.00 50.00
6
9.54
2
0 50.00 50.00
7
7.84
2
0 50.00 50.00
8
6.14
2
0 50.00 50.00
9
5.06
2
0 50.00 50.00
10
4.14
2
2 50.00 50.00
11
3.23
2
2 50.00 50.00
12
2.31
2
2 50.00 50.00
13
1.39
2
2 50.00 50.00
14
0.48
2
2 50.00 50.00
15 -0.44
2
2 50.00 50.00
16 -1.36
2
2 50.00 50.00
17 -2.27
2
2 50.00 50.00
18 -3.19
2
2 50.00 50.00
* 19 -4.11
2
2 50.00 50.00
20 -5.58
2
2 50.00 50.00
21 -7.05
2
2 50.00 50.00
22 -8.53
2
2 50.00 50.00
23 -10.00
2
2 50.00 50.00

Date

Checked

EI below
node
[kNm2/m]
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
0.0
0.0
0.0
0.0
0.0

* Wall toe level: -4.11

Water data on LEFT side


No. Level Pressure
[m]
1 13.45

Unit
wt.
[kN/m] [kN/m]
0.00
10.00

Water data on RIGHT side


No. Level Pressure

[m]
4.60

Unit
wt.
[kN/m] [kN/m]
0.00
10.00

RESULTS FOR STAGE 1 : Install Wall and Excavate


Surcharge or strut changes
Surcharge no. 1 applied at this stage

Calculation details
E Profiles assumed for calculation (generated):
On the LEFT: E at ground level = 2.6754E+6
E at bottom node = 7.7698E+6 kN/m
On the RIGHT: E at ground level = 5.3610E+6
E at bottom node = 5.3610E+6 kN/m
Iter
Inc Node
Disp Node
Press Node
no.
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
1
0.0
1 1.4034
1
2.95
13
2
1.4
1 0.3518
1 104.31
8
3
1.8
1 0.2768
1 102.43
9
4
2.0
1 0.2472
1 102.28
9
5
2.3
1 0.2262
1 100.51
9
10
3.4
1 0.2162
1
87.13
9
15
4.5
1 0.2202
1
79.48
9
20
5.6
1 0.2217
1
78.83
7
30
7.8
1 0.2238
1
77.56
7
40 10.0
1 0.2253
1
76.24
7
50 12.3
1 0.2263
1
75.02
7
60 14.6
1 0.2270
1
73.90
7
70 16.8
1 0.2275
1
72.78
7
80 19.1
1 0.2276
1
71.83
7
90 21.4
1 0.2274
1
71.04
7
100 23.7
1 0.2267
1
70.42
7
120 28.2
1 0.2249
1
69.48
7
140 32.7
1 0.2227
1
68.68
7
150 34.9
1 0.2216
1
68.30
7
160 37.1
1 0.2205
1
67.93
7
Program Frew Version 19.1.1.16 Copyright (C) 1997-2013
H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
4
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

180
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950
2000
2050
2100
2150
2200
2250
2300
2350
2400
2450
2500
2550
2600
2650
2700
2750
2800
2850
2900
2950
3000
3050
3100
3150
3200
3250
3300
3350
3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
41.5
1 0.2183
1
67.20
7
45.8
1 0.2160
1
66.49
7
56.5
1 0.2105
1
64.75
7
66.9
1 0.2051
1
62.95
7
77.0
1 0.1993
1
61.57
7
86.8
1 0.1936
1
60.42
7
96.4
1 0.1885
1
59.30
7
105.7
1 0.1835
1
58.38
9
114.7
1 0.1790
1
57.86
9
123.6
1 0.1752
1
57.00
9
132.3
1 0.1715
1
56.07
9
140.8
1 0.1681
1
55.13
9
149.1
1 0.1648
1
54.17
9
157.2
1 0.1616
1
53.21
9
165.2
1 0.1585
1
52.50
9
173.1
1 0.1552
1
52.25
9
180.8
1 0.1519
1
52.02
9
188.3
1 0.1488
1
51.73
9
195.7
1 0.1459
1
51.37
9
202.9
1 0.1432
1
50.95
9
210.0
1 0.1407
1
50.48
9
217.0
1 0.1383
1
49.98
9
223.8
1 0.1361
1
49.45
9
230.6
1 0.1339
1
48.97
9
237.2
1 0.1317
1
48.69
9
243.7
1 0.1294
1
48.42
9
250.2
1 0.1275
1
47.86
9
256.5
1 0.1257
1
47.20
9
262.7
1 0.1240
1
46.53
9
268.9
1 0.1224
1
45.87
9
275.0
1 0.1207
1
45.22
9
281.0
1 0.1191
1
44.59
9
286.9
1 0.1175
1
43.96
9
292.7
1 0.1159
1
43.34
9
298.5
1 0.1143
1
42.74
9
304.1
1 0.1128
1
42.14
9
309.7
1 0.1113
1
41.55
9
315.3
1 0.1097
1
41.11
9
320.7
1 0.1081
1
40.81
9
326.1
1 0.1064
1
40.56
9
331.4
1 0.1048
1
40.30
9
336.6
1 0.1033
1
40.03
9
341.7
1 0.1019
1
39.75
9
346.8
1 0.1005
1
39.45
9
351.8
1 0.0992
1
39.14
9
356.7
1 0.0979
1
38.82
9
361.5
1 0.0967
1
38.49
9
366.4
1 0.0955
1
38.16
9
371.1
1 0.0944
1
37.82
9
375.8
1 0.0933
1
37.48
9
380.4
1 0.0922
1
37.13
9
385.0
1 0.0912
1
36.78
9
389.6
1 0.0902
1
36.43
9
394.0
1 0.0892
1
36.08
9
398.5
1 0.0882
1
35.73
9
402.9
1 0.0873
1
35.39
9
407.2
1 0.0863
1
35.04
9
411.5
1 0.0854
1
34.70
9
415.7
1 0.0845
1
34.35
9
420.0
1 0.0836
1
34.07
9
424.1
1 0.0826
1
33.85
9
428.2
1 0.0817
1
33.65
9
432.3
1 0.0807
1
33.45
9
436.3
1 0.0798
1
33.25
9
440.3
1 0.0790
1
32.95
9
444.2
1 0.0783
1
32.60
9
448.1
1 0.0776
1
32.24
9
452.0
1 0.0769
1
31.88
9
455.8
1 0.0762
1
31.53
9
459.6
1 0.0755
1
31.18
9
463.3
1 0.0748
1
30.84
9
467.1
1 0.0741
1
30.51
9
470.7
1 0.0734
1
30.18
9
474.4
1 0.0727
1
29.86
9
478.0
1 0.0720
1
29.55
9
481.6
1 0.0713
1
29.24
9

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
5
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

3950
4000
4050
4100
4150
4200
4250
4300
4350
4400
4450
4500
4550
4600
4650
4700
4750
4800
4850
4900
4950
5000
5050
5100
5150
5200
5250
5300
5350
5400
5450
5500
5550
5600
5650
5700
5750
5800
5850
5900
5950
6000
6050
6100
6150
6200
6250
6300
6350
6400
6450
6500
6550
6600
6650
6700
6750
6800
6850
6900
6950
7000
7050
7100
7150
7200
7250
7300
7350
7400
7450
7500
7550
7600
7650
7700

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
485.1
1 0.0706
1
28.93
9
488.7
1 0.0699
1
28.63
9
492.1
1 0.0692
1
28.33
9
495.6
1 0.0685
1
28.04
9
499.0
1 0.0678
1
27.74
9
502.4
1 0.0671
1
27.46
9
505.7
1 0.0665
1
27.17
9
509.0
1 0.0658
1
26.89
9
512.3
1 0.0651
1
26.62
9
515.5
1 0.0645
1
26.34
9
518.7
1 0.0638
1
26.07
9
521.9
1 0.0632
1
25.81
9
525.0
1 0.0626
1
25.54
9
528.2
1 0.0619
1
25.34
9
531.2
1 0.0612
1
25.16
9
534.3
1 0.0605
1
25.01
9
537.3
1 0.0598
1
24.86
9
540.3
1 0.0592
1
24.71
9
543.2
1 0.0585
1
24.56
9
546.1
1 0.0579
1
24.41
9
549.0
1 0.0573
1
24.26
9
551.9
1 0.0568
1
24.10
9
554.7
1 0.0562
1
23.94
9
557.5
1 0.0557
1
23.78
9
560.2
1 0.0552
1
23.62
9
563.0
1 0.0547
1
23.46
10
565.7
1 0.0542
1
23.31
10
568.4
1 0.0537
1
23.16
10
571.1
1 0.0532
1
23.00
10
573.7
1 0.0528
1
22.85
10
576.4
1 0.0523
1
22.69
10
579.0
1 0.0519
1
22.53
10
581.5
1 0.0514
1
22.37
10
584.1
1 0.0510
1
22.21
10
586.6
1 0.0506
1
22.05
10
589.2
1 0.0502
1
21.89
10
591.7
1 0.0498
1
21.73
10
594.1
1 0.0494
1
21.57
10
596.6
1 0.0490
1
21.41
10
599.0
1 0.0486
1
21.26
10
601.5
1 0.0482
1
21.10
10
603.9
1 0.0478
1
20.94
10
606.2
1 0.0474
1
20.78
10
608.6
1 0.0471
1
20.63
10
611.0
1 0.0467
1
20.47
10
613.3
1 0.0463
1
20.32
10
615.6
1 0.0460
1
20.17
10
617.9
1 0.0456
1
20.01
10
620.1
1 0.0453
1
19.86
10
622.4
1 0.0449
1
19.71
10
624.6
1 0.0446
1
19.56
10
626.9
1 0.0442
1
19.41
10
629.1
1 0.0439
1
19.26
10
631.2
1 0.0435
1
19.12
10
633.4
1 0.0432
1
18.97
10
635.6
1 0.0429
1
18.83
10
637.7
1 0.0425
1
18.68
10
639.8
1 0.0422
1
18.54
10
641.9
1 0.0419
1
18.40
10
644.0
1 0.0415
1
18.26
10
646.1
1 0.0412
1
18.12
10
648.1
1 0.0409
1
17.98
10
650.2
1 0.0406
1
17.84
10
652.2
1 0.0403
1
17.70
10
654.2
1 0.0400
1
17.57
10
656.2
1 0.0397
1
17.43
10
658.2
1 0.0394
1
17.30
10
660.1
1 0.0391
1
17.17
10
662.1
1 0.0388
1
17.04
10
664.0
1 0.0385
1
16.91
10
665.9
1 0.0382
1
16.78
10
667.8
1 0.0379
1
16.65
10
669.7
1 0.0376
1
16.52
10
671.6
1 0.0373
1
16.39
10
673.4
1 0.0370
1
16.27
10
675.3
1 0.0367
1
16.15
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
6
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

7750
7800
7850
7900
7950
8000
8050
8100
8150
8200
8250
8300
8350
8400
8450
8500
8550
8600
8650
8700
8750
8800
8850
8900
8950
9000
9050
9100
9150
9200
9250
9300
9350
9400
9450
9500
9550
9600
9650
9700
9750
9800
9850
9900
9950
10000
10050
10100
10150
10200
10250
10300
10350
10400
10450
10500
10550
10600
10650
10700
10750
10800
10850
10900
10950
11000
11050
11100
11150
11200
11250
11300
11350
11400
11450
11500

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
677.1
1 0.0364
1
16.02
10
678.9
1 0.0361
1
15.92
10
680.7
1 0.0358
1
15.86
10
682.5
1 0.0355
1
15.82
10
684.3
1 0.0352
1
15.81
10
686.0
1 0.0349
1
15.79
10
687.8
1 0.0346
1
15.82
10
689.5
1 0.0343
1
15.78
10
691.2
1 0.0340
1
15.72
10
692.9
1 0.0338
1
15.66
10
694.6
1 0.0335
1
15.59
10
696.2
1 0.0333
1
15.51
10
697.9
1 0.0331
1
15.43
10
699.5
1 0.0328
1
15.33
10
701.2
1 0.0326
1
15.19
10
702.8
1 0.0325
1
15.05
10
704.4
1 0.0323
1
14.90
10
706.0
1 0.0321
1
14.76
10
707.6
1 0.0320
1
14.61
10
709.2
1 0.0318
1
14.48
10
710.8
1 0.0316
1
14.34
10
712.4
1 0.0314
1
14.21
10
714.0
1 0.0312
1
14.08
10
715.5
1 0.0310
1
13.96
10
717.1
1 0.0308
1
13.84
10
718.6
1 0.0306
1
13.72
10
720.1
1 0.0304
1
13.60
10
721.6
1 0.0302
1
13.49
10
723.1
1 0.0300
1
13.37
10
724.6
1 0.0298
1
13.26
10
726.1
1 0.0296
1
13.15
10
727.6
1 0.0294
1
13.05
10
729.1
1 0.0292
1
12.94
10
730.5
1 0.0290
1
12.84
10
732.0
1 0.0288
1
12.74
10
733.4
1 0.0285
1
12.63
10
734.8
1 0.0283
1
12.53
10
736.2
1 0.0281
1
12.44
10
737.6
1 0.0279
1
12.34
10
739.0
1 0.0277
1
12.24
10
740.4
1 0.0275
1
12.15
10
741.8
1 0.0273
1
12.05
10
743.1
1 0.0271
1
11.96
10
744.5
1 0.0269
1
11.86
10
745.8
1 0.0267
1
11.77
10
747.2
1 0.0265
1
11.68
10
748.5
1 0.0263
1
11.59
10
749.8
1 0.0261
1
11.50
10
751.1
1 0.0259
1
11.41
10
752.4
1 0.0257
1
11.32
10
753.6
1 0.0255
1
11.24
10
754.9
1 0.0253
1
11.15
10
756.2
1 0.0251
1
11.07
10
757.4
1 0.0249
1
10.98
10
758.7
1 0.0247
1
10.90
10
759.9
1 0.0246
1
10.81
10
761.1
1 0.0244
1
10.73
10
762.3
1 0.0242
1
10.65
10
763.5
1 0.0240
1
10.57
10
764.7
1 0.0238
1
10.49
10
765.9
1 0.0236
1
10.41
10
767.1
1 0.0235
1
10.33
10
768.3
1 0.0233
1
10.25
10
769.4
1 0.0231
1
10.17
10
770.6
1 0.0229
1
10.09
10
771.7
1 0.0227
1
10.01
10
772.9
1 0.0226
1
9.94
10
774.0
1 0.0224
1
9.86
10
775.1
1 0.0222
1
9.79
10
776.2
1 0.0221
1
9.71
10
777.3
1 0.0219
1
9.64
10
778.4
1 0.0217
1
9.56
10
779.5
1 0.0216
1
9.49
10
780.6
1 0.0214
1
9.42
10
781.6
1 0.0212
1
9.35
10
782.7
1 0.0211
1
9.27
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
7
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

11550
11600
11650
11700
11750
11800
11850
11900
11950
12000
12050
12100
12150
12200
12250
12300
12350
12400
12450
12500
12550
12600
12650
12700
12750
12800
12850
12900
12950
13000
13050
13100
13150
13200
13250
13300
13350
13400
13450
13500
13550
13600
13650
13700
13750
13800
13850
13900
13950
14000
14050
14100
14150
14200
14250
14300
14350
14400
14450
14500
14550
14600
14650
14700
14750
14800
14850
14900
14950
15000
15050
15100
15150
15200
15250
15300

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
783.7
1 0.0209
1
9.20
10
784.8
1 0.0208
1
9.13
10
785.8
1 0.0206
1
9.06
10
786.8
1 0.0204
1
8.99
10
787.8
1 0.0203
1
8.93
10
788.9
1 0.0201
1
8.86
10
789.9
1 0.0200
1
8.79
10
790.9
1 0.0198
1
8.72
10
791.8
1 0.0197
1
8.66
10
792.8
1 0.0195
1
8.59
10
793.8
1 0.0194
1
8.52
10
794.8
1 0.0192
1
8.46
10
795.7
1 0.0191
1
8.39
10
796.7
1 0.0189
1
8.33
10
797.6
1 0.0188
1
8.27
10
798.5
1 0.0186
1
8.20
10
799.5
1 0.0185
1
8.14
10
800.4
1 0.0184
1
8.08
10
801.3
1 0.0182
1
8.02
10
802.2
1 0.0181
1
7.96
10
803.1
1 0.0179
1
7.89
10
804.0
1 0.0178
1
7.83
10
804.9
1 0.0177
1
7.77
10
805.8
1 0.0175
1
7.72
10
806.6
1 0.0174
1
7.66
10
807.5
1 0.0173
1
7.60
10
808.4
1 0.0171
1
7.54
10
809.2
1 0.0170
1
7.48
10
810.1
1 0.0169
1
7.42
10
810.9
1 0.0167
1
7.37
10
811.8
1 0.0166
1
7.31
10
812.6
1 0.0165
1
7.26
10
813.4
1 0.0164
1
7.20
10
814.2
1 0.0162
1
7.16
10
815.0
1 0.0161
1
7.12
10
815.8
1 0.0160
1
7.09
10
816.6
1 0.0158
1
7.06
10
817.4
1 0.0157
1
7.03
10
818.2
1 0.0156
1
7.01
10
819.0
1 0.0154
1
6.98
10
819.7
1 0.0153
1
6.95
10
820.5
1 0.0152
1
6.92
10
821.3
1 0.0151
1
6.88
10
822.0
1 0.0150
1
6.85
10
822.8
1 0.0148
1
6.82
10
823.5
1 0.0147
1
6.79
10
824.2
1 0.0146
1
6.75
10
825.0
1 0.0145
1
6.72
10
825.7
1 0.0144
1
6.69
10
826.4
1 0.0143
1
6.65
10
827.1
1 0.0142
1
6.62
10
827.8
1 0.0141
1
6.58
10
828.5
1 0.0140
1
6.55
10
829.2
1 0.0139
1
6.51
10
829.9
1 0.0139
1
6.48
10
830.6
1 0.0138
1
6.44
10
831.3
1 0.0137
1
6.41
10
832.0
1 0.0136
1
6.37
10
832.7
1 0.0135
1
6.34
10
833.3
1 0.0134
1
6.30
10
834.0
1 0.0133
1
6.27
10
834.7
1 0.0133
1
6.23
10
835.3
1 0.0132
1
6.20
10
836.0
1 0.0131
1
6.16
10
836.6
1 0.0130
1
6.13
10
837.3
1 0.0129
1
6.10
10
837.9
1 0.0129
1
6.06
10
838.6
1 0.0128
1
6.03
10
839.2
1 0.0127
1
5.99
10
839.8
1 0.0126
1
5.96
10
840.5
1 0.0125
1
5.92
10
841.1
1 0.0125
1
5.89
10
841.7
1 0.0124
1
5.86
10
842.3
1 0.0123
1
5.82
10
842.9
1 0.0123
1
5.79
10
843.6
1 0.0122
1
5.76
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
8
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

15350
15400
15450
15500
15550
15600
15650
15700
15750
15800
15850
15900
15950
16000
16050
16100
16150
16200
16250
16300
16350
16400
16450
16500
16550
16600
16650
16700
16750
16800
16850
16900
16950
17000
17050
17100
17150
17200
17250
17300
17350
17400
17450
17500
17550
17600
17650
17700
17750
17800
17850
17900
17950
18000
18050
18100
18150
18200
18250
18300
18350
18400
18450
18500
18550
18600
18650
18700
18750
18800
18850
18900
18950
19000
19050
19100

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
844.2
1 0.0121
1
5.72
10
844.8
1 0.0120
1
5.69
10
845.4
1 0.0120
1
5.66
10
846.0
1 0.0119
1
5.62
10
846.6
1 0.0118
1
5.59
10
847.1
1 0.0118
1
5.56
10
847.7
1 0.0117
1
5.53
10
848.3
1 0.0116
1
5.49
10
848.9
1 0.0115
1
5.46
10
849.5
1 0.0115
1
5.43
10
850.0
1 0.0114
1
5.40
10
850.6
1 0.0113
1
5.37
10
851.2
1 0.0113
1
5.34
10
851.7
1 0.0112
1
5.31
10
852.3
1 0.0111
1
5.27
10
852.9
1 0.0111
1
5.24
10
853.4
1 0.0110
1
5.21
10
854.0
1 0.0109
1
5.18
10
854.5
1 0.0109
1
5.15
10
855.0
1 0.0108
1
5.12
10
855.6
1 0.0108
1
5.09
10
856.1
1 0.0107
1
5.06
10
856.7
1 0.0106
1
5.03
10
857.2
1 0.0106
1
5.00
10
857.7
1 0.0105
1
4.97
10
858.2
1 0.0104
1
4.95
10
858.8
1 0.0104
1
4.92
10
859.3
1 0.0103
1
4.89
10
859.8
1 0.0103
1
4.86
10
860.3
1 0.0102
1
4.83
10
860.8
1 0.0101
1
4.80
10
861.3
1 0.0101
1
4.78
10
861.8
1 0.0100
1
4.75
10
862.3
1 0.0100
1
4.72
10
862.8
1 0.0099
1
4.69
10
863.3
1 0.0099
1
4.66
10
863.8
1 0.0098
1
4.64
10
864.3
1 0.0097
1
4.61
10
864.8
1 0.0097
1
4.58
10
865.3
1 0.0096
1
4.56
10
865.7
1 0.0096
1
4.53
10
866.2
1 0.0095
1
4.50
10
866.7
1 0.0095
1
4.48
10
867.2
1 0.0094
1
4.45
10
867.6
1 0.0093
1
4.43
10
868.1
1 0.0093
1
4.40
10
868.6
1 0.0092
1
4.37
10
869.0
1 0.0092
1
4.35
10
869.5
1 0.0091
1
4.32
10
869.9
1 0.0091
1
4.30
10
870.4
1 0.0090
1
4.27
10
870.8
1 0.0090
1
4.25
10
871.3
1 0.0089
1
4.22
10
871.7
1 0.0089
1
4.20
10
872.2
1 0.0088
1
4.17
10
872.6
1 0.0088
1
4.15
10
873.0
1 0.0087
1
4.13
10
873.5
1 0.0087
1
4.10
10
873.9
1 0.0086
1
4.08
10
874.3
1 0.0086
1
4.05
10
874.8
1 0.0085
1
4.03
10
875.2
1 0.0085
1
4.01
10
875.6
1 0.0084
1
3.98
10
876.0
1 0.0084
1
3.96
10
876.4
1 0.0083
1
3.94
10
876.9
1 0.0083
1
3.91
10
877.3
1 0.0082
1
3.89
10
877.7
1 0.0082
1
3.87
10
878.1
1 0.0081
1
3.85
10
878.5
1 0.0081
1
3.82
10
878.9
1 0.0080
1
3.80
10
879.3
1 0.0080
1
3.78
10
879.7
1 0.0079
1
3.76
10
880.1
1 0.0079
1
3.73
10
880.5
1 0.0078
1
3.71
10
880.9
1 0.0078
1
3.69
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
9
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

19150
19200
19250
19300
19350
19400
19450
19500
19550
19600
19650
19700
19750
19800
19850
19900
19950
20000
20050
20100
20150
20200
20250
20300
20350
20400
20450
20500
20550
20600
20650
20700
20750
20800
20850
20900
20950
21000
21050
21100
21150
21200
21250
21300
21350
21400
21450
21500
21550
21600
21650
21700
21750
21800
21850
21900
21950
22000
22050
22100
22150
22200
22250
22300
22350
22400
22450
22500
22550
22600
22650
22700
22750
22800
22850
22900

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
881.3
1 0.0077
1
3.67
10
881.7
1 0.0077
1
3.65
10
882.0
1 0.0077
1
3.63
10
882.4
1 0.0076
1
3.61
10
882.8
1 0.0076
1
3.58
10
883.2
1 0.0075
1
3.56
10
883.6
1 0.0075
1
3.54
10
883.9
1 0.0074
1
3.52
10
884.3
1 0.0074
1
3.50
10
884.7
1 0.0074
1
3.48
10
885.0
1 0.0073
1
3.46
10
885.4
1 0.0073
1
3.44
10
885.8
1 0.0072
1
3.42
10
886.1
1 0.0072
1
3.40
10
886.5
1 0.0071
1
3.38
10
886.8
1 0.0071
1
3.36
10
887.2
1 0.0071
1
3.34
10
887.5
1 0.0070
1
3.32
10
887.9
1 0.0070
1
3.30
10
888.2
1 0.0069
1
3.28
10
888.6
1 0.0069
1
3.26
10
888.9
1 0.0069
1
3.25
10
889.3
1 0.0068
1
3.23
10
889.6
1 0.0068
1
3.21
10
889.9
1 0.0067
1
3.19
10
890.3
1 0.0067
1
3.17
10
890.6
1 0.0067
1
3.15
10
890.9
1 0.0066
1
3.13
10
891.3
1 0.0066
1
3.11
10
891.6
1 0.0065
1
3.10
10
891.9
1 0.0065
1
3.08
10
892.3
1 0.0065
1
3.06
10
892.6
1 0.0064
1
3.04
10
892.9
1 0.0064
1
3.02
10
893.2
1 0.0064
1
3.01
10
893.5
1 0.0063
1
2.99
10
893.8
1 0.0063
1
2.97
10
894.2
1 0.0062
1
2.95
10
894.5
1 0.0062
1
2.94
10
894.8
1 0.0062
1
2.92
10
895.1
1 0.0061
1
2.90
10
895.4
1 0.0061
1
2.89
10
895.7
1 0.0061
1
2.87
10
896.0
1 0.0060
1
2.85
10
896.3
1 0.0060
1
2.84
10
896.6
1 0.0060
1
2.82
10
896.9
1 0.0059
1
2.80
10
897.2
1 0.0059
1
2.79
10
897.5
1 0.0059
1
2.77
10
897.8
1 0.0058
1
2.75
10
898.1
1 0.0058
1
2.74
10
898.4
1 0.0057
1
2.72
10
898.6
1 0.0057
1
2.71
10
898.9
1 0.0057
1
2.69
10
899.2
1 0.0056
1
2.67
10
899.5
1 0.0056
1
2.66
10
899.8
1 0.0056
1
2.64
10
900.0
1 0.0056
1
2.63
10
900.3
1 0.0055
1
2.61
10
900.6
1 0.0055
1
2.60
10
900.9
1 0.0055
1
2.58
10
901.1
1 0.0054
1
2.57
10
901.4
1 0.0054
1
2.55
10
901.7
1 0.0054
1
2.54
10
901.9
1 0.0053
1
2.52
10
902.2
1 0.0053
1
2.51
10
902.5
1 0.0053
1
2.49
10
902.7
1 0.0052
1
2.48
10
903.0
1 0.0052
1
2.46
10
903.3
1 0.0052
1
2.45
10
903.5
1 0.0051
1
2.44
10
903.8
1 0.0051
1
2.42
10
904.0
1 0.0051
1
2.41
10
904.3
1 0.0051
1
2.39
10
904.5
1 0.0050
1
2.38
10
904.8
1 0.0050
1
2.37
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
10
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

22950
23000
23050
23100
23150
23200
23250
23300
23350
23400
23450
23500
23550
23600
23650
23700
23750
23800
23850
23900
23950
24000
24050
24100
24150
24200
24250
24300
24350
24400
24450
24500
24550
24600
24650
24700
24750
24800
24850
24900
24950
25000
25050
25100
25150
25200
25250
25300
25350
25400
25450
25500
25550
25600
25650
25700
25750
25800
25850
25900
25950
26000
26050
26100
26150
26200
26250
26300
26350
26400
26450
26500
26550
26600
26650
26700

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
905.0
1 0.0050
1
2.35
10
905.3
1 0.0049
1
2.34
10
905.5
1 0.0049
1
2.32
10
905.8
1 0.0049
1
2.31
10
906.0
1 0.0049
1
2.30
10
906.3
1 0.0048
1
2.28
10
906.5
1 0.0048
1
2.27
10
906.7
1 0.0048
1
2.26
10
907.0
1 0.0047
1
2.24
10
907.2
1 0.0047
1
2.23
10
907.4
1 0.0047
1
2.22
10
907.7
1 0.0047
1
2.21
10
907.9
1 0.0046
1
2.19
10
908.1
1 0.0046
1
2.18
10
908.4
1 0.0046
1
2.17
10
908.6
1 0.0045
1
2.15
10
908.8
1 0.0045
1
2.14
10
909.1
1 0.0045
1
2.13
10
909.3
1 0.0045
1
2.12
10
909.5
1 0.0044
1
2.10
10
909.7
1 0.0044
1
2.09
10
909.9
1 0.0044
1
2.08
10
910.2
1 0.0044
1
2.07
10
910.4
1 0.0043
1
2.06
10
910.6
1 0.0043
1
2.04
10
910.8
1 0.0043
1
2.03
10
911.0
1 0.0043
1
2.02
10
911.2
1 0.0042
1
2.01
10
911.5
1 0.0042
1
2.00
10
911.7
1 0.0042
1
1.98
10
911.9
1 0.0042
1
1.97
10
912.1
1 0.0041
1
1.96
10
912.3
1 0.0041
1
1.95
10
912.5
1 0.0041
1
1.94
10
912.7
1 0.0041
1
1.93
10
912.9
1 0.0040
1
1.92
10
913.1
1 0.0040
1
1.90
10
913.3
1 0.0040
1
1.89
10
913.5
1 0.0040
1
1.88
10
913.7
1 0.0040
1
1.87
10
913.9
1 0.0039
1
1.86
10
914.1
1 0.0039
1
1.85
10
914.3
1 0.0039
1
1.84
10
914.5
1 0.0039
1
1.83
10
914.7
1 0.0038
1
1.82
10
914.9
1 0.0038
1
1.81
10
915.1
1 0.0038
1
1.80
10
915.2
1 0.0038
1
1.79
10
915.4
1 0.0037
1
1.78
10
915.6
1 0.0037
1
1.77
10
915.8
1 0.0037
1
1.75
10
916.0
1 0.0037
1
1.74
10
916.2
1 0.0037
1
1.73
10
916.4
1 0.0036
1
1.72
10
916.5
1 0.0036
1
1.71
10
916.7
1 0.0036
1
1.70
10
916.9
1 0.0036
1
1.69
10
917.1
1 0.0036
1
1.68
10
917.3
1 0.0035
1
1.67
10
917.4
1 0.0035
1
1.66
10
917.6
1 0.0035
1
1.66
10
917.8
1 0.0035
1
1.65
10
917.9
1 0.0035
1
1.64
10
918.1
1 0.0034
1
1.63
10
918.3
1 0.0034
1
1.62
10
918.5
1 0.0034
1
1.61
10
918.6
1 0.0034
1
1.60
10
918.8
1 0.0034
1
1.59
10
919.0
1 0.0033
1
1.58
10
919.1
1 0.0033
1
1.57
10
919.3
1 0.0033
1
1.56
10
919.5
1 0.0033
1
1.55
10
919.6
1 0.0033
1
1.54
10
919.8
1 0.0032
1
1.53
10
920.0
1 0.0032
1
1.52
10
920.1
1 0.0032
1
1.52
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
11
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

26750
26800
26850
26900
26950
27000
27050
27100
27150
27200
27250
27300
27350
27400
27450
27500
27550
27600
27650
27700
27750
27800
27850
27900
27950
28000
28050
28100
28150
28200
28250
28300
28350
28400
28450
28500
28550
28600
28650
28700
28750
28800
28850
28900
28950
29000
29050
29100
29150
29200
29250
29300
29350
29400
29450
29500
29550
29600
29650
29700
29750
29800
29850
29900
29950
30000
30050
30100
30150
30200
30250
30300
30350
30400
30450
30500

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
920.3
1 0.0032
1
1.51
10
920.4
1 0.0032
1
1.50
10
920.6
1 0.0031
1
1.49
10
920.7
1 0.0031
1
1.48
10
920.9
1 0.0031
1
1.47
10
921.1
1 0.0031
1
1.46
10
921.2
1 0.0031
1
1.46
10
921.4
1 0.0031
1
1.45
10
921.5
1 0.0030
1
1.44
10
921.7
1 0.0030
1
1.43
10
921.8
1 0.0030
1
1.42
10
922.0
1 0.0030
1
1.41
10
922.1
1 0.0030
1
1.40
10
922.3
1 0.0029
1
1.40
10
922.4
1 0.0029
1
1.39
10
922.6
1 0.0029
1
1.38
10
922.7
1 0.0029
1
1.37
10
922.8
1 0.0029
1
1.36
10
923.0
1 0.0029
1
1.36
10
923.1
1 0.0028
1
1.35
10
923.3
1 0.0028
1
1.34
10
923.4
1 0.0028
1
1.33
10
923.6
1 0.0028
1
1.32
10
923.7
1 0.0028
1
1.32
10
923.8
1 0.0028
1
1.31
10
924.0
1 0.0027
1
1.30
10
924.1
1 0.0027
1
1.29
10
924.2
1 0.0027
1
1.29
10
924.4
1 0.0027
1
1.28
10
924.5
1 0.0027
1
1.27
10
924.7
1 0.0027
1
1.26
10
924.8
1 0.0027
1
1.26
10
924.9
1 0.0026
1
1.25
10
925.0
1 0.0026
1
1.24
10
925.2
1 0.0026
1
1.24
10
925.3
1 0.0026
1
1.23
10
925.4
1 0.0026
1
1.22
10
925.6
1 0.0026
1
1.21
10
925.7
1 0.0025
1
1.21
10
925.8
1 0.0025
1
1.20
10
925.9
1 0.0025
1
1.19
10
926.1
1 0.0025
1
1.19
10
926.2
1 0.0025
1
1.18
10
926.3
1 0.0025
1
1.17
10
926.4
1 0.0025
1
1.16
10
926.6
1 0.0024
1
1.16
10
926.7
1 0.0024
1
1.15
10
926.8
1 0.0024
1
1.14
10
926.9
1 0.0024
1
1.14
10
927.1
1 0.0024
1
1.13
10
927.2
1 0.0024
1
1.12
10
927.3
1 0.0024
1
1.12
10
927.4
1 0.0023
1
1.11
10
927.5
1 0.0023
1
1.11
10
927.6
1 0.0023
1
1.10
10
927.8
1 0.0023
1
1.09
10
927.9
1 0.0023
1
1.09
10
928.0
1 0.0023
1
1.08
10
928.1
1 0.0023
1
1.07
10
928.2
1 0.0023
1
1.07
10
928.3
1 0.0022
1
1.06
10
928.4
1 0.0022
1
1.05
10
928.5
1 0.0022
1
1.05
10
928.7
1 0.0022
1
1.04
10
928.8
1 0.0022
1
1.04
10
928.9
1 0.0022
1
1.03
10
929.0
1 0.0022
1
1.02
10
929.1
1 0.0022
1
1.02
10
929.2
1 0.0021
1
1.01
10
929.3
1 0.0021
1
1.01
10
929.4
1 0.0021
1
1.00
10
929.5
1 0.0021
1
0.99
10
929.6
1 0.0021
1
0.99
10
929.7
1 0.0021
1
0.98
10
929.8
1 0.0021
1
0.98
10
929.9
1 0.0021
1
0.97
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
12
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

30550
30600
30650
30700
30750
30800
30850
30900
30950
31000
31050
31100
31150
31200
31250
31300
31350
31400
31450
31500
31550
31600
31650
31700
31750
31800
31850
31900
31950
32000
32050
32100
32150
32200
32250
32300
32350
32400
32450
32500
32550
32600
32650
32700
32750
32800
32850
32900
32950
33000
33050
33100
33150
33200
33250
33300
33350
33400
33450
33500
33550
33600
33650
33700
33750
33800
33850
33900
33950
34000
34050
34100
34150
34200
34250
34300

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
930.0
1 0.0020
1
0.97
10
930.1
1 0.0020
1
0.96
10
930.2
1 0.0020
1
0.95
10
930.3
1 0.0020
1
0.95
10
930.4
1 0.0020
1
0.94
10
930.5
1 0.0020
1
0.94
10
930.6
1 0.0020
1
0.93
10
930.7
1 0.0020
1
0.93
10
930.8
1 0.0019
1
0.92
10
930.9
1 0.0019
1
0.92
10
931.0
1 0.0019
1
0.91
10
931.1
1 0.0019
1
0.91
10
931.2
1 0.0019
1
0.90
10
931.3
1 0.0019
1
0.90
10
931.4
1 0.0019
1
0.89
10
931.5
1 0.0019
1
0.88
10
931.6
1 0.0019
1
0.88
10
931.7
1 0.0018
1
0.87
10
931.8
1 0.0018
1
0.87
10
931.9
1 0.0018
1
0.86
10
932.0
1 0.0018
1
0.86
10
932.1
1 0.0018
1
0.85
10
932.1
1 0.0018
1
0.85
10
932.2
1 0.0018
1
0.84
10
932.3
1 0.0018
1
0.84
10
932.4
1 0.0018
1
0.83
10
932.5
1 0.0018
1
0.83
10
932.6
1 0.0017
1
0.82
10
932.7
1 0.0017
1
0.82
10
932.8
1 0.0017
1
0.82
10
932.8
1 0.0017
1
0.81
10
932.9
1 0.0017
1
0.81
10
933.0
1 0.0017
1
0.80
10
933.1
1 0.0017
1
0.80
10
933.2
1 0.0017
1
0.79
10
933.3
1 0.0017
1
0.79
10
933.3
1 0.0017
1
0.78
10
933.4
1 0.0016
1
0.78
10
933.5
1 0.0016
1
0.77
10
933.6
1 0.0016
1
0.77
10
933.7
1 0.0016
1
0.76
10
933.8
1 0.0016
1
0.76
10
933.8
1 0.0016
1
0.76
10
933.9
1 0.0016
1
0.75
10
934.0
1 0.0016
1
0.75
10
934.1
1 0.0016
1
0.74
10
934.1
1 0.0016
1
0.74
10
934.2
1 0.0015
1
0.73
10
934.3
1 0.0015
1
0.73
10
934.4
1 0.0015
1
0.72
10
934.5
1 0.0015
1
0.72
10
934.5
1 0.0015
1
0.72
10
934.6
1 0.0015
1
0.71
10
934.7
1 0.0015
1
0.71
10
934.8
1 0.0015
1
0.70
10
934.8
1 0.0015
1
0.70
10
934.9
1 0.0015
1
0.70
10
935.0
1 0.0015
1
0.69
10
935.1
1 0.0015
1
0.69
10
935.1
1 0.0014
1
0.68
10
935.2
1 0.0014
1
0.68
10
935.3
1 0.0014
1
0.68
10
935.3
1 0.0014
1
0.67
10
935.4
1 0.0014
1
0.67
10
935.5
1 0.0014
1
0.66
10
935.5
1 0.0014
1
0.66
10
935.6
1 0.0014
1
0.66
10
935.7
1 0.0014
1
0.65
10
935.8
1 0.0014
1
0.65
10
935.8
1 0.0014
1
0.64
10
935.9
1 0.0014
1
0.64
10
936.0
1 0.0013
1
0.64
10
936.0
1 0.0013
1
0.63
10
936.1
1 0.0013
1
0.63
10
936.2
1 0.0013
1
0.63
10
936.2
1 0.0013
1
0.62
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
13
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

34350
34400
34450
34500
34550
34600
34650
34700
34750
34800
34850
34900
34950
35000
35050
35100
35150
35200
35250
35300
35350
35400
35450
35500
35550
35600
35650
35700
35750
35800
35850
35900
35950
36000
36050
36100
36150
36200
36250
36300
36350
36400
36450
36500
36550
36600
36650
36700
36750
36800
36850
36900
36950
37000
37050
37100
37150
37200
37250
37300
37350
37400
37450
37500
37550
37600
37650
37700
37750
37800
37850
37900
37950
38000
38050
38100

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
936.3
1 0.0013
1
0.62
10
936.4
1 0.0013
1
0.62
10
936.4
1 0.0013
1
0.61
10
936.5
1 0.0013
1
0.61
10
936.6
1 0.0013
1
0.60
10
936.6
1 0.0013
1
0.60
10
936.7
1 0.0013
1
0.60
10
936.7
1 0.0013
1
0.59
10
936.8
1 0.0012
1
0.59
10
936.9
1 0.0012
1
0.59
10
936.9
1 0.0012
1
0.58
10
937.0
1 0.0012
1
0.58
10
937.0
1 0.0012
1
0.58
10
937.1
1 0.0012
1
0.57
10
937.2
1 0.0012
1
0.57
10
937.2
1 0.0012
1
0.57
10
937.3
1 0.0012
1
0.56
10
937.3
1 0.0012
1
0.56
10
937.4
1 0.0012
1
0.56
10
937.5
1 0.0012
1
0.55
10
937.5
1 0.0012
1
0.55
10
937.6
1 0.0012
1
0.55
10
937.6
1 0.0011
1
0.54
10
937.7
1 0.0011
1
0.54
10
937.8
1 0.0011
1
0.54
10
937.8
1 0.0011
1
0.53
10
937.9
1 0.0011
1
0.53
10
937.9
1 0.0011
1
0.53
10
938.0
1 0.0011
1
0.53
10
938.0
1 0.0011
1
0.52
10
938.1
1 0.0011
1
0.52
10
938.1
1 0.0011
1
0.52
10
938.2
1 0.0011
1
0.51
10
938.3
1 0.0011
1
0.51
10
938.3
1 0.0011
1
0.51
10
938.4
1 0.0011
1
0.50
10
938.4
1 0.0011
1
0.50
10
938.5
1 0.0011
1
0.50
10
938.5
1 0.0010
1
0.50
10
938.6
1 0.0010
1
0.49
10
938.6
1 0.0010
1
0.49
10
938.7
1 0.0010
1
0.49
10
938.7
1 0.0010
1
0.48
10
938.8
1 0.0010
1
0.48
10
938.8
1 0.0010
1
0.48
10
938.9
1 0.0010
1
0.48
10
938.9
1 0.0010
1
0.47
10
939.0
1 0.0010
1
0.47
10
939.0
1 0.0010
1
0.47
10
939.1
1 0.0010
1
0.46
10
939.1
1 0.0010
1
0.46
10
939.2
1 0.0010
1
0.46
10
939.2
1 0.0010
1
0.46
10
939.3
1 0.0010
1
0.45
10
939.3
1 0.0010
1
0.45
10
939.4
1 0.0009
1
0.45
10
939.4
1 0.0009
1
0.45
10
939.5
1 0.0009
1
0.44
10
939.5
1 0.0009
1
0.44
10
939.6
1 0.0009
1
0.44
10
939.6
1 0.0009
1
0.44
10
939.6
1 0.0009
1
0.43
10
939.7
1 0.0009
1
0.43
10
939.7
1 0.0009
1
0.43
10
939.8
1 0.0009
1
0.43
10
939.8
1 0.0009
1
0.42
10
939.9
1 0.0009
1
0.42
10
939.9
1 0.0009
1
0.42
10
940.0
1 0.0009
1
0.42
10
940.0
1 0.0009
1
0.41
10
940.0
1 0.0009
1
0.41
10
940.1
1 0.0009
1
0.41
10
940.1
1 0.0009
1
0.41
10
940.2
1 0.0009
1
0.40
10
940.2
1 0.0008
1
0.40
10
940.3
1 0.0008
1
0.40
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
14
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

38150
38200
38250
38300
38350
38400
38450
38500
38550
38600
38650
38700
38750
38800
38850
38900
38950
39000
39050
39100
39150
39200
39250
39300
39350
39400
39450
39500
39550
39600
39650
39700
39750
39800
39850
39900
39950
40000
40050
40100
40150
40200
40250
40300
40350
40400
40450
40500
40550
40600
40650
40700
40750
40800
40850
40900
40950
41000
41050
41100
41150
41200
41250
41300
41350
41400
41450
41500
41550
41600
41650
41700
41750
41800
41850
41900

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
940.3
1 0.0008
1
0.40
10
940.3
1 0.0008
1
0.39
10
940.4
1 0.0008
1
0.39
10
940.4
1 0.0008
1
0.39
10
940.5
1 0.0008
1
0.39
10
940.5
1 0.0008
1
0.39
10
940.5
1 0.0008
1
0.38
10
940.6
1 0.0008
1
0.38
10
940.6
1 0.0008
1
0.38
10
940.7
1 0.0008
1
0.38
10
940.7
1 0.0008
1
0.37
10
940.7
1 0.0008
1
0.37
10
940.8
1 0.0008
1
0.37
10
940.8
1 0.0008
1
0.37
10
940.9
1 0.0008
1
0.37
10
940.9
1 0.0008
1
0.36
10
940.9
1 0.0008
1
0.36
10
941.0
1 0.0008
1
0.36
10
941.0
1 0.0008
1
0.36
10
941.1
1 0.0007
1
0.35
10
941.1
1 0.0007
1
0.35
10
941.1
1 0.0007
1
0.35
10
941.2
1 0.0007
1
0.35
10
941.2
1 0.0007
1
0.35
10
941.2
1 0.0007
1
0.34
10
941.3
1 0.0007
1
0.34
10
941.3
1 0.0007
1
0.34
10
941.3
1 0.0007
1
0.34
10
941.4
1 0.0007
1
0.34
10
941.4
1 0.0007
1
0.33
10
941.5
1 0.0007
1
0.33
10
941.5
1 0.0007
1
0.33
10
941.5
1 0.0007
1
0.33
10
941.6
1 0.0007
1
0.33
10
941.6
1 0.0007
1
0.33
10
941.6
1 0.0007
1
0.32
10
941.7
1 0.0007
1
0.32
10
941.7
1 0.0007
1
0.32
10
941.7
1 0.0007
1
0.32
10
941.8
1 0.0007
1
0.32
10
941.8
1 0.0007
1
0.31
10
941.8
1 0.0007
1
0.31
10
941.9
1 0.0007
1
0.31
10
941.9
1 0.0007
1
0.31
10
941.9
1 0.0006
1
0.31
10
942.0
1 0.0006
1
0.30
10
942.0
1 0.0006
1
0.30
10
942.0
1 0.0006
1
0.30
10
942.1
1 0.0006
1
0.30
10
942.1
1 0.0006
1
0.30
10
942.1
1 0.0006
1
0.30
10
942.1
1 0.0006
1
0.29
10
942.2
1 0.0006
1
0.29
10
942.2
1 0.0006
1
0.29
10
942.2
1 0.0006
1
0.29
10
942.3
1 0.0006
1
0.29
10
942.3
1 0.0006
1
0.29
10
942.3
1 0.0006
1
0.28
10
942.4
1 0.0006
1
0.28
10
942.4
1 0.0006
1
0.28
10
942.4
1 0.0006
1
0.28
10
942.5
1 0.0006
1
0.28
10
942.5
1 0.0006
1
0.28
10
942.5
1 0.0006
1
0.27
10
942.5
1 0.0006
1
0.27
10
942.6
1 0.0006
1
0.27
10
942.6
1 0.0006
1
0.27
10
942.6
1 0.0006
1
0.27
10
942.7
1 0.0006
1
0.27
10
942.7
1 0.0006
1
0.26
10
942.7
1 0.0006
1
0.26
10
942.7
1 0.0006
1
0.26
10
942.8
1 0.0005
1
0.26
10
942.8
1 0.0005
1
0.26
10
942.8
1 0.0005
1
0.26
10
942.8
1 0.0005
1
0.26
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
15
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

41950
42000
42050
42100
42150
42200
42250
42300
42350
42400
42450
42500
42550
42600
42650
42700
42750
42800
42850
42900
42950
43000
43050
43100
43150
43200
43250
43300
43350
43400
43450
43500
43550
43600
43650
43700
43750
43800
43850
43900
43950
44000
44050
44100
44150
44200
44250
44300
44350
44400
44450
44500
44550
44600
44650
44700
44750
44800
44850
44900
44950
45000
45050
45100
45150
45200
45250
45300
45350
45400
45450
45500
45550
45600
45650
45700

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
942.9
1 0.0005
1
0.25
10
942.9
1 0.0005
1
0.25
10
942.9
1 0.0005
1
0.25
10
943.0
1 0.0005
1
0.25
10
943.0
1 0.0005
1
0.25
10
943.0
1 0.0005
1
0.25
10
943.0
1 0.0005
1
0.25
10
943.1
1 0.0005
1
0.24
10
943.1
1 0.0005
1
0.24
10
943.1
1 0.0005
1
0.24
10
943.1
1 0.0005
1
0.24
10
943.2
1 0.0005
1
0.24
10
943.2
1 0.0005
1
0.24
10
943.2
1 0.0005
1
0.24
10
943.2
1 0.0005
1
0.23
10
943.3
1 0.0005
1
0.23
10
943.3
1 0.0005
1
0.23
10
943.3
1 0.0005
1
0.23
10
943.3
1 0.0005
1
0.23
10
943.4
1 0.0005
1
0.23
10
943.4
1 0.0005
1
0.23
10
943.4
1 0.0005
1
0.22
10
943.4
1 0.0005
1
0.22
10
943.4
1 0.0005
1
0.22
10
943.5
1 0.0005
1
0.22
10
943.5
1 0.0005
1
0.22
10
943.5
1 0.0005
1
0.22
10
943.5
1 0.0005
1
0.22
10
943.6
1 0.0005
1
0.22
10
943.6
1 0.0005
1
0.21
10
943.6
1 0.0005
1
0.21
10
943.6
1 0.0004
1
0.21
10
943.7
1 0.0004
1
0.21
10
943.7
1 0.0004
1
0.21
10
943.7
1 0.0004
1
0.21
10
943.7
1 0.0004
1
0.21
10
943.7
1 0.0004
1
0.21
10
943.8
1 0.0004
1
0.20
10
943.8
1 0.0004
1
0.20
10
943.8
1 0.0004
1
0.20
10
943.8
1 0.0004
1
0.20
10
943.8
1 0.0004
1
0.20
10
943.9
1 0.0004
1
0.20
10
943.9
1 0.0004
1
0.20
10
943.9
1 0.0004
1
0.20
10
943.9
1 0.0004
1
0.20
10
944.0
1 0.0004
1
0.19
10
944.0
1 0.0004
1
0.19
10
944.0
1 0.0004
1
0.19
10
944.0
1 0.0004
1
0.19
10
944.0
1 0.0004
1
0.19
10
944.1
1 0.0004
1
0.19
10
944.1
1 0.0004
1
0.19
10
944.1
1 0.0004
1
0.19
10
944.1
1 0.0004
1
0.19
10
944.1
1 0.0004
1
0.18
10
944.2
1 0.0004
1
0.18
10
944.2
1 0.0004
1
0.18
10
944.2
1 0.0004
1
0.18
10
944.2
1 0.0004
1
0.18
10
944.2
1 0.0004
1
0.18
10
944.2
1 0.0004
1
0.18
10
944.3
1 0.0004
1
0.18
10
944.3
1 0.0004
1
0.18
10
944.3
1 0.0004
1
0.17
10
944.3
1 0.0004
1
0.17
10
944.3
1 0.0004
1
0.17
10
944.4
1 0.0004
1
0.17
10
944.4
1 0.0004
1
0.17
10
944.4
1 0.0004
1
0.17
10
944.4
1 0.0004
1
0.17
10
944.4
1 0.0004
1
0.17
10
944.4
1 0.0004
1
0.17
10
944.5
1 0.0004
1
0.17
10
944.5
1 0.0003
1
0.16
10
944.5
1 0.0003
1
0.16
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
16
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

45750
45800
45850
45900
45950
46000
46050
46100
46150
46200
46250
46300
46350
46400
46450
46500
46550
46600
46650
46700
46750
46800
46850
46900
46950
47000
47050
47100
47150
47200
47250
47300
47350
47400
47450
47500
47550
47600
47650
47700
47750
47800
47850
47900
47950
48000
48050
48100
48150
48200
48250
48300
48350
48400
48450
48500
48550
48600
48650
48700
48750
48800
48850
48900
48950
49000
49050
49100
49150
49200
49250
49300
49350
49400
49450
49500

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
944.5
1 0.0003
1
0.16
10
944.5
1 0.0003
1
0.16
10
944.6
1 0.0003
1
0.16
10
944.6
1 0.0003
1
0.16
10
944.6
1 0.0003
1
0.16
10
944.6
1 0.0003
1
0.16
10
944.6
1 0.0003
1
0.16
10
944.6
1 0.0003
1
0.16
10
944.7
1 0.0003
1
0.16
10
944.7
1 0.0003
1
0.15
10
944.7
1 0.0003
1
0.15
10
944.7
1 0.0003
1
0.15
10
944.7
1 0.0003
1
0.15
10
944.7
1 0.0003
1
0.15
10
944.7
1 0.0003
1
0.15
10
944.8
1 0.0003
1
0.15
10
944.8
1 0.0003
1
0.15
10
944.8
1 0.0003
1
0.15
10
944.8
1 0.0003
1
0.15
10
944.8
1 0.0003
1
0.15
10
944.8
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
944.9
1 0.0003
1
0.14
10
945.0
1 0.0003
1
0.14
10
945.0
1 0.0003
1
0.14
10
945.0
1 0.0003
1
0.14
10
945.0
1 0.0003
1
0.14
10
945.0
1 0.0003
1
0.14
10
945.0
1 0.0003
1
0.13
10
945.0
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.1
1 0.0003
1
0.13
10
945.2
1 0.0003
1
0.13
10
945.2
1 0.0003
1
0.13
10
945.2
1 0.0003
1
0.13
10
945.2
1 0.0003
1
0.13
10
945.2
1 0.0003
1
0.12
10
945.2
1 0.0003
1
0.12
10
945.2
1 0.0003
1
0.12
10
945.3
1 0.0003
1
0.12
10
945.3
1 0.0003
1
0.12
10
945.3
1 0.0003
1
0.12
10
945.3
1 0.0003
1
0.12
10
945.3
1 0.0003
1
0.12
10
945.3
1 0.0003
1
0.12
10
945.3
1 0.0002
1
0.12
10
945.3
1 0.0002
1
0.12
10
945.4
1 0.0002
1
0.12
10
945.4
1 0.0002
1
0.12
10
945.4
1 0.0002
1
0.12
10
945.4
1 0.0002
1
0.11
10
945.4
1 0.0002
1
0.11
10
945.4
1 0.0002
1
0.11
10
945.4
1 0.0002
1
0.11
10
945.4
1 0.0002
1
0.11
10
945.4
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.5
1 0.0002
1
0.11
10
945.6
1 0.0002
1
0.11
10
945.6
1 0.0002
1
0.11
10

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
17
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Iter
no.

49550
49600
49650
49700
49750
49800
49850
49900
49919

Date

Checked

Inc Node
Disp Node
Press Node
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.6
1 0.0002
1
0.10
10
945.7
1 0.0002
1
0.10
10

Ground level left = 16.00

Ground level right = 4.60

Stress
Pore
Pore
Node Level
Disp
Vt
Ve
Pt
Pe Pressure
Pe Pressure
BM
SF
[m]
[m] [kN/m] [kN/m] [kN/m] [kN/m] [kN/m]
[kN/m] [kN/m] [kNm/m]
[kN/m]
1 16.00
0.95
15.10
15.10
5.03
5.03
0.00
0.00
0.00
0.00
0.00
2 14.98
0.88
30.40
30.40
10.13
10.13
0.00
0.00
0.00
-2.62
7.74
3 13.96
0.81
50.80
50.80
16.93
16.93
0.00
0.00
0.00
-15.78
21.54
4 12.94
0.74
74.26
69.16
17.65
12.55
5.10
0.00
0.00
-46.56
42.17
5 11.24
0.63 118.45
96.35
39.57
17.48
22.10
0.00
0.00 -138.63
87.80
6
9.54
0.52 162.64 123.55
61.49
22.40
39.09
0.00
0.00 -345.01
173.68
7
7.84
0.41 206.83 150.74
83.42
27.33
56.09
0.00
0.00 -729.00
296.83
8
6.14
0.30 251.01 177.93 105.36
32.28
73.08
0.00
0.00 -1353.95
441.02
9
5.06
0.24 279.19 195.27 119.33
35.41
83.92
0.00
0.00 -1911.24
573.99
10
4.14
0.19 303.01 209.93 131.16
38.08
93.08
58.52
4.58 -2491.97
664.85
11
3.23
0.14 326.84 224.60 143.00
40.75
102.25
175.50
13.75 -3129.86
674.84
12
2.31
0.10 350.67 239.26 154.84
43.43
111.41
292.42
22.91 -3728.92
580.11
13
1.39
0.07 374.50 253.92 166.69
46.11
120.58
409.35
32.08 -4193.17
380.67
14
0.48
0.04 398.33 268.59 178.53
48.79
129.74
526.26
41.24 -4426.66
76.53
15 -0.44
0.02 422.16 283.25 190.38
51.47
138.91
643.18
50.41 -4333.45 -332.30
16 -1.36
0.01 445.98 297.91 202.22
54.15
148.07
760.10
59.57 -3817.58 -845.82
17 -2.27
0.00 469.81 312.58 214.06
56.83
157.24
877.02
68.74 -2783.11 -1464.04
18 -3.19 -0.00 493.64 327.24 713.65 547.25
166.40
22.67
77.90 -1134.09 -1518.39
*19 -4.11 -0.00 517.47 341.90 1147.98 972.42
175.56
25.33
87.06
0.00
0.00
20 -5.58
0.00 555.78 365.48 226.74
36.44
190.30
124.94
101.80
0.00
0.00
21 -7.05
0.00 594.08 389.05 245.76
40.73
205.03
129.23
116.53
0.00
0.00
22 -8.53
0.00 632.39 412.63 264.78
45.02
219.77
133.52
131.27
0.00
0.00
23 -10.00
0.00 670.70 436.20 283.80
49.30
234.50
137.80
146.00
0.00
0.00

Stress
Soil

Vt

Left Right

Ve

Pt

[kN/m] [kN/m] [kN/m]

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.91

7.33

63.10

35.74

22.00

189.24

59.57

36.66

315.34

83.40

51.32

441.42

107.23

65.99

567.50

131.06

80.65

693.59

154.88

95.31

819.67

178.71

109.98

945.75

202.54

124.64

100.57

226.37

139.30

112.40

264.68

162.88

226.74

302.98

186.45

245.76

341.29

210.03

264.78

379.60

233.60

283.80

Printed

30-Aug-2016

Vt, Ve : vertical total and effective stress


Pt, Pe : horizontal total and effective stress

* Wall toe level: -4.11

EXTREME values so far


Program Frew Version 19.1.1.16 Copyright (C) 1997-2013
H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Page
18
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Date

Checked

Displacements [m] Moments [kNm/m] Shears [kN/m]


Min
Max
Min
Max
Min
Max
-0.00
0.95 -4426.66
0.00 -1518.39 674.84
Surcharge 1 present in this stage

STAGE 2 : FINAL CONDITION


Geometry
Node Level

Soil

Boundary

[m]
Left Right Left Right
1 16.00
1
0 50.00 50.00
2 14.98
1
0 50.00 50.00
3 13.96
1
0 50.00 50.00
4 12.94
2
0 50.00 50.00
5 11.24
2
0 50.00 50.00
6
9.54
2
0 50.00 50.00
7
7.84
2
0 50.00 50.00
8
6.14
2
0 50.00 50.00
9
5.06
2
1 50.00 50.00
10
4.14
2
2 50.00 50.00
11
3.23
2
2 50.00 50.00
12
2.31
2
2 50.00 50.00
13
1.39
2
2 50.00 50.00
14
0.48
2
2 50.00 50.00
15 -0.44
2
2 50.00 50.00
16 -1.36
2
2 50.00 50.00
17 -2.27
2
2 50.00 50.00
18 -3.19
2
2 50.00 50.00
* 19 -4.11
2
2 50.00 50.00
20 -5.58
2
2 50.00 50.00
21 -7.05
2
2 50.00 50.00
22 -8.53
2
2 50.00 50.00
23 -10.00
2
2 50.00 50.00

EI below
node
[kNm2/m]
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
500000.
0.0
0.0
0.0
0.0
0.0

* Wall toe level: -4.11

RESULTS FOR STAGE 2 : Final Condition


Surcharge or strut changes
Surcharge no. 1 removed at this stage
Surcharge no. 2 applied at this stage

Calculation details
E Profiles assumed for calculation (generated):
On the LEFT: E at ground level = 2.6754E+6
E at bottom node = 7.7698E+6 kN/m
On the RIGHT: E at ground level = 3.5020E+6
E at bottom node = 7.1094E+6 kN/m
Iter
Inc Node
Disp Node
Press Node
no.
max no. error. no.
error no.
displ
[m]
[m]
[kN/m]
1
0.0
1 0.0075
9
3.64
19
2
0.0
9 0.0004
18
2.92
19
3
0.0
9 0.0002
19
16.35
10
4
0.0
9 0.0002
1
1.55
19
5
0.0
9 0.0002
1
1.10
19
10
0.0
9 0.0003
1
0.28
21
15
0.0
9 0.0003
1
0.09
6

Ground level left = 16.00

Ground level right = 5.60

Stress
Pore
Pore
Node Level
Disp
Vt
Ve
Pt
Pe Pressure
Pe Pressure
BM
SF
[m]
[m] [kN/m] [kN/m] [kN/m] [kN/m] [kN/m]
[kN/m] [kN/m] [kNm/m]
[kN/m]
1 16.00
0.95
15.10
15.10
5.03
5.03
0.00
0.00
0.00
0.00
0.00
2 14.98
0.88
30.40
30.40
10.13
10.13
0.00

Stress
Soil

Vt

Left Right

Ve

Pt

[kN/m] [kN/m] [kN/m]

0.00

0.00

0.00

0.00

0.00

0.00

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
19
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Stress
Pore
Pore
Node Level
Disp
Vt
Ve
Pt
Pe Pressure
Pe Pressure
BM
SF
[m]
[kN/m] 7.73
[kN/m] [kN/m] [kN/m] [kN/m]
0.00
0.00 [m]
-2.62
[kN/m]
[kN/m]
3 13.96
0.81[kNm/m]
50.80 [kN/m]
50.80
16.93
16.93
0.00
0.00
0.00
-15.78
21.54
4 12.94
0.74
74.26
69.16
17.64
12.54
5.10
0.00
0.00
-46.56
42.16
5 11.24
0.63 118.45
96.35
39.56
17.46
22.10
0.00
0.00 -138.60
87.77
6
9.54
0.52 162.64 123.55
61.47
22.38
39.09
0.00
0.00 -344.90
173.62
7
7.84
0.41 206.83 150.74
83.43
27.34
56.09
0.00
0.00 -728.75
296.75
8
6.14
0.30 251.01 177.93 107.68
34.60
73.08
0.00
0.00 -1353.60
442.57
9
5.06
0.24 279.19 195.27 128.32
44.40
83.92
16.11
0.00 -1914.32
573.60
10
4.14
0.19 303.01 209.93 134.34
41.26
93.08
57.52
4.58 -2491.43
662.81
11
3.23
0.14 326.84 224.60 142.55
40.30
102.25
174.53
13.75 -3129.21
674.96
12
2.31
0.10 350.67 239.26 153.88
42.47
111.41
291.59
22.91 -3728.58
580.40
13
1.39
0.07 374.50 253.92 166.02
45.44
120.58
408.85
32.08 -4193.04
380.82
14
0.48
0.04 398.33 268.59 178.10
48.36
129.74
525.90
41.24 -4426.60
76.57
15 -0.44
0.02 422.16 283.25 190.05
51.14
138.91
642.92
50.41 -4333.39 -332.32
16 -1.36
0.01 445.98 297.91 201.94
53.87
148.07
759.90
59.57 -3817.47 -845.92
17 -2.27
0.00 469.81 312.58 214.44
57.20
157.24
876.35
68.74 -2782.87 -1463.70
18 -3.19 -0.00 493.64 327.24 715.81 549.41
166.40
26.32
77.90 -1134.59 -1518.26
*19 -4.11 -0.00 517.47 341.90 1152.09 976.52
175.56
28.97
87.06
0.00
0.00
20 -5.58
0.00 555.78 365.48 226.84
36.54
190.30
125.04
101.80
0.00
0.00
21 -7.05
0.00 594.08 389.05 245.84
40.80
205.03
129.30
116.53
0.00
0.00
22 -8.53
0.00 632.39 412.63 264.86
45.09
219.77
133.59
131.27
0.00
0.00
23 -10.00
0.00 670.70 436.20 283.94
49.44
234.50
137.94
146.00
0.00
0.00

Date

Checked

Stress
Soil

Vt

Left Right
1
0

Ve

Pt

[kN/m] [kN/m] [kN/m]


0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.84

10.84

16.11

31.91

27.33

62.10

55.74

42.00

188.28

79.57

56.66

314.50

103.40

71.32

440.93

127.23

85.99

567.14

151.06

100.65

693.32

174.88

115.31

819.47

198.71

129.98

945.08

222.54

144.64

104.22

246.37

159.30

116.04

284.68

182.88

226.84

322.98

206.45

245.84

361.29

230.03

264.86

399.60

253.60

283.94

Printed

30-Aug-2016

Vt, Ve : vertical total and effective stress


Pt, Pe : horizontal total and effective stress

* Wall toe level: -4.11

EXTREME values so far


Displacements [m] Moments [kNm/m] Shears [kN/m]
Min
Max
Min
Max
Min
Max
-0.00
0.95 -4426.66
0.00 -1518.39 674.96
Surcharge 2 present in this stage

Results Envelope
Node Level Displacements [m] Moments [kNm/m]
[m]
Min
Max
Min
Max
1 16.00 0.95
0.95
0.00
0.00
2 14.98 0.88
0.88
-2.62
0.00
3 13.96 0.81
0.81
-15.78
0.00
4 12.94 0.74
0.74
-46.56
0.00
5 11.24 0.63
0.63 -138.63
0.00
6
9.54 0.52
0.52 -345.01
0.00
7
7.84 0.41
0.41 -729.00
0.00
8
6.14 0.30
0.30 -1353.95
0.00
9
5.06 0.24
0.24 -1914.32
0.00
10
4.14 0.19
0.19 -2491.97
0.00
11
3.23 0.14
0.14 -3129.86
0.00
12
2.31 0.10
0.10 -3728.92
0.00
13
1.39 0.07
0.07 -4193.17
0.00
14
0.48 0.04
0.04 -4426.66
0.00

Shears [kN/m]
Min
Max
0.00
0.00
0.00
7.74
0.00 21.54
0.00 42.17
0.00 87.80
0.00 173.68
0.00 296.83
0.00 442.57
0.00 573.99
0.00 664.85
0.00 674.96
0.00 580.40
0.00 380.82
0.00 76.57

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Page
20
Time 16:23

Job No.

Sheet No.

Rev.

P10
Contiguous Bore Pile15082016

Drg. Ref.
Made by
Bard

Node Level
[m]

Displacements [m] Moments [kNm/m]


Min
Max
Min
Max

15 -0.44 0.02
16 -1.36 0.01
17 -2.27 0.00
18 -3.19 -0.00
19 -4.11 -0.00
20 -5.58 0.00
21 -7.05 0.00
22 -8.53 0.00
23 -10.00 0.00

0.02
0.01
0.00
-0.00
-0.00
0.00
0.00
0.00
0.00

-4333.45
-3817.58
-2783.11
-1134.59
0.00
0.00
0.00
0.00
0.00

Date

Checked

Shears [kN/m]
Min
Max

0.00 -332.32
0.00 -845.92
0.00 -1464.04
0.00 -1518.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Program Frew Version 19.1.1.16 Copyright (C) 1997-2013


H:\KERJA\P10 Contractor Calculation\Frew File\Contiguous Bore Pile 3 SLS.fwd\.fwd

Printed

30-Aug-2016

Page
21
Time 16:23

You might also like