You are on page 1of 2

B

C
B
A

LEVE
L
175 m
150 m
125 m

LEVE
L
175 m
150 m
125 m

LEVE
L
175 m

PERHITUNGAN

Luas
Penampang A-A'
OB
BB (m2)
(m2)
312,5
347,38
1875
753,63
5250

1159,88

Luas
Penampang AB
OB
BB (m2)
(m2)
LEVE
SR
1131,2
579,94
5 L
175
2,32
3531m
986,19
150 m
3,60
7343,7
1392,44
5
125 m
4,88

Luas
Penampang BC
OB
BB (m2)
(m2)
3998,4
1118,2
5

150 m

8218,5

1524,45

125 m

13742,
2

1930,7

LEVE
L
175 m
150 m
125 m

LEVE
L
175 m
150 m
125 m

Volume Total
Overburden
(BCM)
897697,5
2056162,5
3690041,25

Cost ($3/BCM)
Pengupasan OB
2693092,5
6168487,5
11070123,75

A
C
Luas
Luas Penampang
Penampang B-B'
C-C'
OB
OB
BB (m2)
BB (m2)
(m2)
(m2)
1950
812,5
6046,9
1423,9
5187 P = 1218,75
11250 = 175
1830,15
Jarak penampang
m
18046,
9437,5
1625
2236,4
9

Volume AB
OB
BB (m2)
(m2)
PROFIT ($)
197968, 101489,
75
5
1170176
172583, SR OPTIMUM
617925
25
-456781,5
128515
243677
6,3
-3509980,25

Volume BC
OB
(m2)
699728,
75
143823
7,5
240488
5

BB (m2)
195685
266778,
75
337872,
5

Volume Total

Tonase Batubara
(Density = 1,3
BCM/Ton)

Batubara (BCM)

Ton

297174,5
439362
581549,5

386326,85
571170,6
756014,35

Revenue
($10/ton)
Penjualan BB
3863268,5
5711706
7560143,5

PROFIT ($)
1170176
-456781,5
-3509980,25

SR

2,32
3,60
4,88

20.00

10.00

0.00
2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50

PROFIT

( X $100000)

-10.00

-20.00

-30.00

-40.00

Stripping Ratio