PERHITUNGAN
Luas
Penampang A-A'
OB
BB (m2)
(m2)
312,5
347,38
1875
753,63
5250
1159,88
Luas
Penampang AB
OB
BB (m2)
(m2)
LEVE
SR
1131,2
579,94
5 L
175
2,32
3531m
986,19
150 m
3,60
7343,7
1392,44
5
125 m
4,88
Luas
Penampang BC
OB
BB (m2)
(m2)
3998,4
1118,2
5
150 m
8218,5
1524,45
125 m
13742,
2
1930,7
LEVE
L
175 m
150 m
125 m
LEVE
L
175 m
150 m
125 m
Volume Total
Overburden
(BCM)
897697,5
2056162,5
3690041,25
Cost ($3/BCM)
Pengupasan OB
2693092,5
6168487,5
11070123,75
A
C
Luas
Luas Penampang
Penampang B-B'
C-C'
OB
OB
BB (m2)
BB (m2)
(m2)
(m2)
1950
812,5
6046,9
1423,9
5187 P = 1218,75
11250 = 175
1830,15
Jarak penampang
m
18046,
9437,5
1625
2236,4
9
Volume AB
OB
BB (m2)
(m2)
PROFIT ($)
197968, 101489,
75
5
1170176
172583, SR OPTIMUM
617925
25
-456781,5
128515
243677
6,3
-3509980,25
Volume BC
OB
(m2)
699728,
75
143823
7,5
240488
5
BB (m2)
195685
266778,
75
337872,
5
Volume Total
Tonase Batubara
(Density = 1,3
BCM/Ton)
Batubara (BCM)
Ton
297174,5
439362
581549,5
386326,85
571170,6
756014,35
Revenue
($10/ton)
Penjualan BB
3863268,5
5711706
7560143,5
PROFIT ($)
1170176
-456781,5
-3509980,25
SR
2,32
3,60
4,88
20.00
10.00
0.00
2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50
PROFIT
( X $100000)
-10.00
-20.00
-30.00
-40.00
Stripping Ratio