Compute the total power (kilowatts, kW) saved by upgrading older Tubes to energy
LED replacements
Coding
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
Parameter
Original Tube Set Wattage
Replacement Tube Panel Wattage
Watts Saved per Tube (A3=A1-A2)
Total Old Tubes Set
Total Watts UsedA5=A1*A4
Total Kilowatts Used (A6=A5/1000)
LED Panel Replace
Total Watts SavedA8=A3*A7
Total Kilowatts Saved (A9=A8/1000)
Old Tube Set Removed
Total Watts SavedA11=A1*A10
Total Kilowatts Saved (A12=A11/1000)
Unit
W
W
W
Tubes Quantity
W
KW
Tubes Quantity
W
KW
Tubes Quantity
W
KW
B Compute the total energy (kilowatt hours, kWh) saved annually by performing this u
Coding
B1
B2
B3
B4
B5
Parameter
Total Kilowatts Saved (B1=A6)
Hours of Use per Day
Days of Use per Week
Week of Use per Year
Total kWh Saved per Year (B5=B1*B2*B3*B4)
Unit
KW
hrs/day
day/week
wks/y
KWH/yr
B1 Compute the total energy (kilowatt hours, kWh) saved annually by removing
Coding
B1.1
B2.1
B3.1
B4.1
B5.1
Parameter
Total Kilowatts Saved (B1=A10)
Hours of Use per Day
Days of Use per Week
Week of Use per Year
Total kWh Saved per Year (B5=B1*B2*B3*B4)
Unit
KW
hrs/day
day/week
wks/y
KWH/yr
C Compute the total energy cost savings per year for Replacement
Coding
Parameter
C1
Total kWh Saved per Year (C1=B5)
C2
Your Energy Cost per KWH
C3
Total Energy Cost Savings per Year (C3=C1*C2)
Unit
KWH/yr
AED/KWH
AED/yr
C1 Compute the total energy cost savings per year for Removal
Coding
Parameter
C1.1 Total kWh Saved per Year (C1=B5)
C2.1 Your Energy Cost per KWH
Unit
KWH/yr
AED/KWH
Author:Jack Chen
C3.1
AED/yr
Author:Jack Chen
Parameter
Replacement LED Panel Life
Hours per Year Usage (D2=B2*B3*B4)
Total Energy Cost Savings per Year (D3=C3)
Lifetime Energy Cost Savings (D4=D1/D2*D3)
Unit
hours
hr/yr
AED/yr
AED
Coding
D5
D6
D7
D8
D9
Parameter
Replacement Panel Unit Price
Initial Cost of LED Light Panel (D6=D5*A7)
Total Energy Cost Savings per Year (D7=C3)
Simple Payback on Energy Consumption (D8=D6/D7)
Return on Investment (ROI) D9=1/D8 *100%
Unit
AED/pcs
AED
AED/yr
Years
%
Parameter
Orginal Tube Set Unit Life
Hours per Year Usage (D2.1=B2.1*B3.1*B4.1)
Total Energy Cost Savings per Year (D3.1=C3.1)
Lifetime Energy Cost Savings (D4.1=D1.1/D2.1*D3.1)
Coding
Parameter
D5.1 Replacement Tube Set Unit Price
D6.1 Initial Cost of Tube Light Set (D6.1=D5.1*A10)
D7.1 Total Energy Cost Savings per Year (D7.1=C3.1)
D8.1
D9.1
Unit
hours
hr/yr
AED/yr
AED
Unit
AED/pcs
AED
AED/yr
Years
%
Unit
AED
AED
Author:Jack Chen
ue number).
404.35
Author:Jack Chen
Numerical Value
768.27
5,076.00
Author:Jack Chen
Hours of working
12
Days per week
6
Hours per Year
3754.3