TS 1
Revion U
No
Audited Item
Open Item
Remark
Status
Close
have checked the
(17032011)
function and added in the
report
will be checked
- Ground contact
will be showed to HC
update of document
(17032011)
clarification in the
document
(24032011)
- Some test only have Test Record, not yet for the
Test Procedure
will be created
The maximum difference of wheel loads of one wheel Repeat for the weight test
set in leveled track more than 4% in relation to the
average wheel loads for empty vehicles. The
maximum differences between wheel loads of two
related bogies shall not be more than 2%
10
Not yet checked, will describe which lubrication must will be checked
be checked
(22032011)
11
(17032011)
12
13
(17032011)
14
(21032011)
15
will be added
(17032011)
16
TCMS
335433966.xls
Page 1 of 7
(24032011)
(16022012)
existing
(04042011)
(26092011)
(22112012)
22.11.2012
No
Audited Item
Open Item
Remark
Status
Close
17 March 2011
17
List of drawing
18
19
Curve test
20
will be installed
21
Door leaves
22
23
24
25
26
to be reduced.
will install
(16022012)
(22112012)
have touch up
(22032011)
have touch up
(22032011)
(22032011)
27
will be cleaned
(16022012)
28
(07062011)
29
(07092011)
30
Flexible hose
(07062011)
31
Co-masinis chair
is installed
(21032011)
22 March 2011
32
Door
Safety relevant
33
Door
335433966.xls
Page 2 of 7
(24032011)
(09082011)
update
maintenance
manual later
22.11.2012
No
34
Audited Item
Test Record car body shell
Open Item
Remark
on TS3
move to TS3
Status
Close
(22032011)
23 March 2011
35
36
De-railment
- Procedure of re-alignment
37
Braking software
38
TCMS
39
TCMS
40
(09082011)
update
maintenance
manual later
clarified
Standard Operating Procedure how to update
software from Bombardier to Customer
(28032011)
(25032011)
Clarification by BT
(10082011)
Clarification by BT
(10082011)
TCMS
Clarification by BT
(22112012)
41
TCMS
Clarification by BT
(22112012)
42
TCMS
Clarification by BT
(22112012)
43
TCMS
(10082011)
44
TCMS
(10082011)
45
TCMS
Clarification by BT
(10082011)
46
TCMS
Clarification by BT
(10082011)
47
TCMS
Clarification by BT
(22112012)
48
(09082011)
49
(09082011)
50
(22112012)
24 March 2011
51
(09082011)
update
maintenance
manual later
25 March 2011
52
335433966.xls
Page 3 of 7
(28032011)
22.11.2012
No
Audited Item
Open Item
Remark
53
54
55
Status
Close
(28032011)
28 March 2011
56
List of standard
(09082011)
57
protection against
unauthorized installed
according to PT INKA Door
proposal
(07092011)
58
(07062011)
59
60
(09082011)
will add the list to the
folder type test
(22112012)
definition of solution
(07092011)
29 March 2011
61
62
63
correction of installation
(07062011)
(22112012)
responsible by PT. KA
n.a.
30 March 2011
64
Automatic Coupler
65
n.a.
(04042011)
31 March 2011
66
67
completion and
identification of the change
request
(16022012)
68
Ground contact
(09082011)
69
Battery Box
70
71
335433966.xls
(16022012)
(07062011)
adjustment
Page 4 of 7
redesign
(07062011)
modified
(12052011)
22.11.2012
No
Audited Item
Open Item
Remark
installed
Status
Close
(12052011)
72
73
Driver's desk
(12052011)
74
- Isolated stick
(07092011)
75
- Isolated stick
(09082011)
01 April 2011
76
(04042011)
04 April 2011
77
78
Roof : M2, M1
- Brake resistor
repainted (surface
preparation with sand
blasting according to the
surface sample)
(07092011)
79
Roof
- AC units
(07092011)
(21092012)
06 April 2011
80
Door TC2
81
Air Conditioner
requirement of changing
request by Konvekta
Engineering
Articulation area M1 - M2
(07092011)
83
Emergency light
(16022012)
84
(21092012)
85
335433966.xls
Page 5 of 7
22.11.2012
No
Audited Item
Handrails and connection pieces of
the stanchion
86
Open Item
Remark
Status
Close
(16022012)
(03052012)
monitoring during dynamic
test (see point 105)
88
Implementation in to the
type test procedure,
carrying out and
evaluation.
(07092011)
89
Implementation in to the
type test procedure,
carrying out and
evaluation.
(07092011)
21 May 2011
90
Under frame area near the
movable step.
(07092011)
91
Movable Step
(07092011)
92
PI-295-003-002, rev. B
(09082011)
(07092011)
Investigation of the
function (check in
procedure testing)
(09082011)
Automatic Coupler
94
95
96
97
98
Passenger room
Passenger door
99
100
101
Passenger room
Passenger room
Windows
102
103
Driver Cabs
Door handle
104
105
106
Cable isolation
Baggage rack
Change
repainting
(16022012)
(22112012)
monitoring, investigation
(repair or change)
(16022012)
(16022012)
(07092011)
(16022012)
(21092012)
repainting
Change screw and washer
(16022012)
(21092012)
Add screw
Monitoring and Repainting
(07092011)
(07092011)
(07092011)
Repair
(07092011)
Cable protection
335433966.xls
22.11.2012
No
Audited Item
Open Item
Remark
Status
Missing paint
exchange / repair
roughness and re-painting
Close
(07092011)
(07092011)
110
Ground contact
03 August 2011
111
destination indicator (Tc1& TC2)
Modification
(16022012)
112
113
114
116
108
109
Cable brackets
Roof driver's cab
(07092011)
tested on TS3
(07092011)
installation according
specification
(22112012)
Complete Train
(16022012)
117
submit preventive
maintenance schedule
(11082011)
118
maintenance records
submit existing
maintenance records
(07092011)
(03052012)
(07092011)
defect
replace
04 November 2011
119
carbody TC2 and drivers cab
120
122
Open Item
Train Open Item
TOTAL Open Item
closed/deleted open items
335433966.xls
(07092011)
122
69
191
117
Page 7 of 7
22.11.2012