Professional Documents
Culture Documents
Sub Sector
ELECTRICAL POWER
Job Area
Competency
Type
Related Knowledge
i.
ii.
iii.
iv.
v.
vi.
18
Applied Skills
Core
Level
Attitude / Safety /
Environmental
2
Training
Hours
24 hours
Training
Duration
Delivery
Mode
Lecture
576
Credit
Hours
Assessment Criteria
Work Activities
Related Knowledge
vii.
viii.
ix.
19
RCCB/ELCB
Fuse
Types of single phase
wiring
Surface wiring
Conceal wiring
Conduit wiring
Conceal conduit Wiring
Ducting wiring
Trunking/ Casing
Cable tray
Underground
Suitable fitting and
accessories
Switches
Power Point (S/S/ 13A)
Electrical Act & Regulation
and Standard
Energy Commission Act
2001
Electricity Supply Act
1990 (Act 447)
Electrical Regulation
1994
MS 1936: 2006 / IEC
60364
MS 1979: 2007 (COP)
Electrical Installation of
Buildings Code of
practice (COP)
Based on latest
Applied Skills
Attitude / Safety /
Environmental
Training
Hours
Delivery
Mode
Assessment Criteria
Work Activities
Related Knowledge
x.
xi.
Applied Skills
Attitude / Safety /
Environmental
Delivery
Mode
48 hours
Demonstration,
Observation &
Practical
instruction by regulatory
body
Occupational Safety &
Health Act 514 (OSHA)
1994
Authorisation requirement
to access site such as:
Green card
Safety passport
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
Determine procedure to
carry out site visit and
evaluation
Determine location of
the wiring route
Determine types of
wiring
Determine types of
protection devices
Determine types of
conductor
Determine types of
cable
Determine suitable
fitting and accessories
Determine Authorisation
requirement to access site
Attitude:
i.
Meticulous
ii.
Housekeeping
Safety:
i.
Use appropriate
PPE during carry
20
Training
Hours
Assessment Criteria
Work Activities
2. Identify single
phase wiring tools,
equipment and
materials
Related Knowledge
Applied Skills
i.
21
Attitude / Safety /
Environmental
out wiring
practical
ii.
Safety tools &
equipment in
proper order
Training
Hours
Delivery
Mode
20 hours
Lecture
44 hours
Demonstration,
Observation &
Practical
32 hours
Lecture
Assessment Criteria
Attitude:
i.
Handle wiring
tools with care
Safety:
i.
Ensure wiring
tools in good
working condition
i.
Wiring activities
conducted according
to correct procedure
Work Activities
Related Knowledge
Applied Skills
Attitude / Safety /
Environmental
Training
Hours
22
i.
ii.
iii.
iv.
v.
vi.
vii.
Types of earthing
Function of earthing
Earthing procedure
Electrical symbol
Building structure
Electrical hand tools
Electrical equipment &
Assessment Criteria
ii.
i.
Delivery
Mode
48 hours
Installation and
connection wiring
identified
iii.
All the earthing
cable connected to
Demonstration,
frame earthing
Observation &
correctly
Practical
Attitude:
i.
Ensure no
wastage of cable
Safety:
i.
Use appropriate
PPE during
wiring activities
ii.
Ensure safety
tools &
equipment in
proper order
24 hours
Lecture
Work Activities
Related Knowledge
Applied Skills
Attitude / Safety /
Environmental
Training
Hours
materials
viii.
Electrical earthing
accessories & fitting
ix.
Earthing layout
i.
ii.
iii.
iv.
v.
vi.
Determine types of
earting
Determine function of
earthing
Install Distribution Fuse
Board (DFB) consumer unit
to earth rod
Connect main frame
electrical equipment to earth
Test earthing system
Construct earthing
layout
50 hours
Attitude:
i.
Ensure no wastage
of cable
Safety:
i.
Use appropriate
PPE during wiring
activities
Ensure safety tools
& equipment in
proper order
23
Delivery
Mode
Assessment Criteria
Work Activities
Related Knowledge
i.
ii.
iii.
iv.
v.
Applied Skills
Distribution Board
(metallic or insulated)
Tools and equipment for
single phase Distribution
Board (metallic or insulated)
installation
Wiring drawing
Standard Operating
Procedures (SOP) for testing
instrument
Types of electrical
system
testing, such as: Insulation resistance test
Polarity test
Continuity test
i.
ii.
iii.
iv.
v.
24
Attitude / Safety /
Environmental
Attitude:
i.
Housekeeping
working area after
Training
Hours
24 hours
Delivery
Mode
Lecture
50 hours
Demonstration,
Observation &
Practical
Assessment Criteria
i.
Neatness of
wiring checked
ii.
Cable terminated
consumer unit
iii.
Cable terminated
to fitting and
accessories
iv.
Continuity,
polarity, insulation
resistance tested
Work Activities
Related Knowledge
Applied Skills
Attitude / Safety /
Environmental
wiring activities
Safety:
i.
Use appropriate
PPE during carry
out earthing
works
ii.
Safety tools &
equipment in
proper order
i.
25
Attitude:
i.
Housekeeping
working area
after wiring
activities
Safety:
i.
Use appropriate
PPE during carry
out installation
Training
Hours
Delivery
Mode
24 hours
Lecture
52 hours
Demonstration,
Observation &
Practical
Assessment Criteria
i.
Cable terminated
to fitting and
accessories
Work Activities
Related Knowledge
Applied Skills
Attitude / Safety /
Environmental
works
ii.
Ensure safety
tools &
equipment in
proper order
i.
Visual inspection
Wiring drawing according
to SOP
iii.
Wiring connection
16 hours
Lecture
Types of
circuit/connection
ii.
Electrical Testing
Insulation resistance test
(IRT)
Polarity test
Earthing continuity test
Earthing test
o Earth resistance test
o Earth loop
impedance test
iii.
Testing instrument
standard operating
i.
36 hours
Demonstration,
Observation &
Practical
16 hours
Lecture
Visual inspection
conducted
Fault identified
Attitude:
i.
i.
Assessment Criteria
ii.
Execute visual
inspection on wiring system
ii.
Identify fault on visual
inspection
iii.
Carry out housekeeping
activities
26
Delivery
Mode
ii.
i.
Training
Hours
Housekeeping
working area
after wiring
activities
i. Continuity, polarity,
insulation resistance
and earthing tested
Work Activities
Related Knowledge
Applied Skills
Attitude / Safety /
Environmental
Training
Hours
Delivery
Mode
32 hours
Demonstration,
Observation &
Practical
16 hours
Lecture
32 hours
Demonstration,
Observation &
Practical
12 hours
Lecture
Assessment Criteria
procedures (SOP)
iv.
Procedure to interpret
testing result
i.
Determine
circuit/connection
ii.
Execute electrical
testing on wiring system
iii.
Interpret testing result
9. Carry out live
circuit test
i.
ii.
ELCB/RCB functioning
testing
Supply voltage test
i. Determine ELCB/RCB
functioning testing
ii. Test Supply voltage
i.
ii.
iii.
iv.
v.
27
Attitude:
i.
Handle testing
equipment with
care
Procedure to produce
single phase wiring
Procedure to submit
single phase wiring for
approval
As built drawing
preparation
Test result
Regulatory bodies and
tender requirements (Form G
and Form H)
Attitude:
i.
Handle testing
equipment with
care
i. ELCB/RCB
functioning testing
determined
ii. Supply voltage
tested
i.
Procedure to
produce single phase
wiring submitted
ii.
Procedure of
single phase wiring
reported
Work Activities
Related Knowledge
Attitude / Safety /
Environmental
Applied Skills
i.
ii.
iii.
iv.
v.
Determine procedure to
produce single phase wiring
Determine procedure to
submit single phase wiring
for approval to superior
Prepare as built
drawing
Check test result
Follow regulatory
bodies and tender
requirements
Attitude:
i.
Meticulous in
writing report
Employability Skills
Core Abilities
01.01
01.02
02.01
02.04
03.01
03.05
04.02
04.03
06.02
06.01
06.03
28
Social Skills
1.
2.
3.
4.
5.
6.
7.
8.
Communication skills
Conceptual skills
Interpersonal skills
Multitasking and prioritizing
Self-discipline
Teamwork
Learning skills
Leadership skills
Training
Hours
24 hours
Delivery
Mode
Demonstration,
Observation &
Practical
Assessment Criteria
Schematic diagram
Block Diagram
Measuring and Test Instruments
Components/Parts Specification
Distribution Boards
Trunking Tools
Equipment Data Book
Electrical Equipment
Electrical hand tools
Electrical power tools
Electrical Accessories
Electrical Fittings
Electrical Testing Instrument
Double Insulated cable
Wiring lead
Wiring neil
Cables
PVC Tape
Standard Operating Procedure
29
References
REFERENCES
1.
Undang-Undang Malaysia. (2005). Akta Bekalan Elektrik 1990 dan Peraturan-Peraturan Elektrik 1994, Pindaan sehingga 2005. MDC Publisher Sdn Bhd
Malaysia.
2.
Suruhanjaya Tenaga Malaysia. Standard Pendawaian Malaysia (Electrical Installations Of Buildings - MS IEC 60364) Jabatan Standard Malaysia
3.
The Institution of Electrical Engineers. (1998). Peraturan-Peraturan bagi Pemasangan Elektrik, Edisi 16. Golden Books Centre Sdn Bhd
4.
5.
BS 7671: 2001 Requirements for Electrical Installations (IEE Wiring Regulations, Sixteenth Edition) Institution of Electrical Engineers
30