You are on page 1of 14

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Electrical Transient Analyzer Program


Motor Starting Analysis
Static
Prestart Loading Category (1):

Design

Prestart Generation Category (1) :

Design

Load Diversity Factor:

Number of Buses:

Number of Branches:

Number of Machines:

None

Swing

V-Control

Load

Total

10

11

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

10

Synchronous
Generator

Power
Grid

Synchronous
Motor

Induction
Machines

Total

Method of Solution:

Adaptive Newton-Raphson

Max. No. of Iterations:

99

Precision of Solution:

0.001000 MW and Mvar

System Frequency:

60.00 Hz

Unit System:

English

Project Filename:

Alaska LNG Rev B

Output Filename:

M:\2014043-NGSP_LNG\BD\Calcs\Elec_Controls\ETAP\North_Slope_L
NG_RevC (POWER ISLAND)\MS.MS1

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Adjustments
Apply
Adjustments

Individual
/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Tolerance

Apply
Adjustments

Individual
/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Bus Input Data


Load @ T=0
Bus
ID

Initial Voltage
% Mag.

Ang.

BOP MAIN A BUS

0.480

kV

Sub-sys
1

100.0

0.0

BOP MAIN B BUS

0.480

100.0

0.0

ESS-MCC

0.480

100.0

0.0

LIQUEFACTION MAIN A BUS

0.480

100.0

0.0

LIQUEFACTION MAIN B BUS

0.480

100.0

0.0

LIQUEFACTION-SWG-1A

0.480

11.5

LIQUEFACTION-SWG-1B

0.480

100.0

LVSG-1A

0.480

LVSG-1B

0.480

MTR BUS

4.160

MVSG-1A

4.160

Constant kVA
MW

Mvar

MW

0.265

0.164

0.0

0.380

0.236

0.012

0.007

0.0

0.378

0.234

0.012

0.007

100.0

0.0

0.424

0.263

0.307

0.190

100.0

0.0

0.357

0.221

0.343

0.212

100.0

0.0

100.0

0.0
1.553

0.962

0.938

0.582

kV
4.160

MW

0.009

Generation Bus
ID

Mvar

Constant I

0.014

Total Number of Buses: 11

MVSG-1A

Constant Z

Voltage
Type

Swing

Sub-sys
1

Generation

% Mag.

Angle

100.0

0.0

MW

0.000

Mvar

0.000

Generic

Mvar

0.000

MW

0.000

Mvar Limits
% PF

Max

Min

0.000

Mvar

0.000

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:

Study Case: MS

Filename:

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

2-Winding Transformer Input Data

Transformer
ID

Rating
MVA

Prim. kV

Sec. kV

Z Variation
%Z

X/R

% Tap Setting
Prim.

Sec.

Adjusted

Phase Shift

+ 5%

- 5%

% Tol.

%Z

Type

BOP-SUS-1A

2.500

4.160

0.480

5.75

10.67

7.5

6.1813

Dyn

Angle
0.000

BOP-SUS-1B

2.500

4.160

0.480

5.75

10.67

7.5

6.1813

Dyn

0.000

LIQUEFACTION-SUS-1A

1.000

4.160

0.480

5.75

5.79

7.5

6.1813

Dyn

0.000

LIQUEFACTION-SUS-1B

1.000

4.160

0.480

5.75

5.79

7.5

6.1813

Dyn

0.000

2-Winding Transformer Load Tap Changer (LTC) Settings


Transformer Load Tap Changer Setting
Transformer
ID

Connected Buses ("*" LTC Side)


Primary Bus ID

Secondary Bus ID

% Min.
Tap

% Max.
Tap

% Step

Regulated Bus ID

%V

kV

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Branch Connections
CKT/Branch
ID

Connected Bus ID
Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

BOP-SUS-1A

2W XFMR

MVSG-1A

BOP MAIN A BUS

BOP-SUS-1B

2W XFMR

MVSG-1A

BOP MAIN B BUS

LIQUEFACTION-SUS-1A

2W XFMR

MVSG-1A

LIQUEFACTION MAIN A BUS

LIQUEFACTION-SUS-1B

2W XFMR

MVSG-1A

LIQUEFACTION MAIN B BUS

105.20

BOP MAIN A

Tie Breakr

BOP MAIN A BUS

LVSG-1A

BOP MAIN B

Tie Breakr

BOP MAIN B BUS

LVSG-1B

CB20

Tie Breakr

LVSG-1B

ESS-MCC

CB 25

Tie Breakr

MVSG-1A

MTR BUS

LIQUEFACTION MAIN A

Tie Breakr

LIQUEFACTION MAIN A BUS

LIQUEFACTION-SWG-1A

LIQUEFCTION MAIN B

Tie Breakr

LIQUEFACTION MAIN B BUS

LIQUEFACTION-SWG-1B

23.07

246.17

247.25

23.07

246.17

247.25

105.20

609.11

618.13

609.11

618.13

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Machine Input Data

Machine
ID

Connected Bus
Type

ID

% Impedance
(Machine Base)

Rating
kV

X"

X' *

Gen1

Gen

MVSG-1A

2.059

4.160

1.00

19.00

28.00

Gen2

Gen

MVSG-1A

2.059

4.160

1.00

19.00

28.00

Total Connected Machines ( = 2 ): 4.118 MVA


* Indicates the reactance used for machine representation

MVA

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Switching Motors
Motor
ID
Amine Circulation Pump1

Nameplate

Type

Qty

Ind.

Connected Bus ID
MTR BUS

HP/kW
500.0

kV

RPM

4.160

1800

Locked-Rotor

FLA
60.3

Accel. Time (Sec.)

% PF

% Eff

% LRC

% PF

No Load

Full Load

92.1

93.2

650.00

18.89

0.00

0.00

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

Sequence of Events
Time Event
Name
MS

Switching Load
Time

ID

0.200 Amine Circulation Pump1

Type
Ind. Motor

Action
Start

Category
Normal

% Loading

Load Change
Time

Start

Begin

100.0

Final
100.0

0.00

End
0.00

Motor Load
MW

Mvar

Static Load
MW

Mvar

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

LOAD FLOW REPORT @ T = 0.000Bus


ID

Voltage
kV

% Mag.

Generation

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID

BOP MAIN A BUS

0.480

98.697

-1.0

BOP MAIN B BUS

0.480

98.263

-1.3

ESS-MCC

0.480

98.263

-1.3

0.270

0.167

LIQUEFACTION MAIN A
BUS

0.480

98.050

-1.2

LIQUEFACTION MAIN B
BUS

0.480

98.063

-1.2

MVSG-1A

0.449

1037.9

85.0

1378.8

85.0

LVSG-1B

0.957

0.593

1378.8

85.0

LVSG-1B

-0.270

-0.167

388.4

85.0

MVSG-1A

-0.391

-0.243

564.9

85.0

0.391

0.243

564.9

85.0

-0.389

-0.241

561.1

85.0

LIQUEFACTION-SWG-1B

0.389

0.241

561.1

85.0

-0.391

-0.243

564.9

85.0

-0.389

-0.241

561.1

85.0

-0.724

-0.449

1037.9

85.0

-0.957

-0.593

1378.8

85.0

ESS-MCC

0.270

0.167

388.4

85.0

MVSG-1A

0.000

0.000

0.0

0.0

BOP MAIN A BUS

0.726

0.467

119.8

84.1

BOP MAIN B BUS

0.960

0.626

159.1

83.8

LIQUEFACTION MAIN A
BUS
LIQUEFACTION MAIN B
BUS
MTR BUS

0.394

0.256

65.2

83.8

0.391

0.254

64.7

83.8

MVSG-1A

0.391

0.243

LIQUEFACTION-SWG-1B

0.480

98.063

-1.2

0.389

0.241

LVSG-1A

0.480

98.697

-1.0

0.724

0.449

LIQUEFACTION MAIN A
BUS
LIQUEFACTION MAIN B
BUS
BOP MAIN A BUS

LVSG-1B

0.480

98.263

-1.3

0.688

0.426

BOP MAIN B BUS

4.160

100.000

0.0

0
0

0
0

0
0

85.0

-0.593

-1.2

* MVSG-1A

% PF

1037.9

0.724

98.050

0.0

Amp

-0.449

-0.957

0.480

100.000

Mvar

MVSG-1A

LIQUEFACTION-SWG-1A

4.160

-0.724

LVSG-1A

LIQUEFACTION-SWG-1A

MTR BUS

MW

XFMR

0.000

0.000

0.0

0.0

Gen1

-1.235

-0.801

204.4

83.9

Gen2

-1.235

-0.801

204.4

83.9

* Gen1

4.160

112.701

8.4

1.246

1.096

MVSG-1A

1.246

1.096

204.4

75.1

* Gen2

4.160

112.701

8.4

1.246

1.096

MVSG-1A

1.246

1.096

204.4

75.1

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

10

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

LOAD FLOW REPORT @ T = 0.200+


Bus
ID

Voltage
kV

% Mag.

Generation

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID

BOP MAIN A BUS

0.480

81.402

-3.1

BOP MAIN B BUS

0.480

81.079

-3.3

ESS-MCC

0.480

81.079

-3.3

0.188

0.117

LIQUEFACTION MAIN A
BUS

0.480

80.408

-3.6

LIQUEFACTION MAIN B
BUS

0.480

80.424

-3.6

MVSG-1A

0.389

1091.7

85.0

1343.9

85.0

LVSG-1B

0.770

0.477

1343.9

85.0

LVSG-1B

-0.188

-0.117

328.2

85.0

MVSG-1A

-0.388

-0.240

682.2

85.0

0.388

0.240

682.2

85.0

-0.385

-0.239

677.6

85.0

LIQUEFACTION-SWG-1B

0.385

0.239

677.6

85.0

-0.388

-0.240

682.2

85.0

-0.385

-0.239

677.6

85.0

-0.628

-0.389

1091.7

85.0

-0.770

-0.477

1343.9

85.0

ESS-MCC

0.188

0.117

328.2

85.0

MVSG-1A

-0.365

-1.900

324.4

18.9

BOP MAIN A BUS

0.630

0.409

126.0

83.8

BOP MAIN B BUS

0.773

0.508

155.1

83.6

LIQUEFACTION MAIN A
BUS
LIQUEFACTION MAIN B
BUS
MTR BUS

0.391

0.260

78.7

83.3

0.388

0.258

78.2

83.3

MVSG-1A

0.388

0.240

LIQUEFACTION-SWG-1B

0.480

80.424

-3.6

0.385

0.239

LVSG-1A

0.480

81.402

-3.1

0.628

0.389

LIQUEFACTION MAIN A
BUS
LIQUEFACTION MAIN B
BUS
BOP MAIN A BUS

LVSG-1B

0.480

81.079

-3.3

0.582

0.361

BOP MAIN B BUS

* MVSG-1A

4.160

82.776

-1.8

0
0

0
0

1.900
0

85.0

-0.477

-3.6

0.365

% PF

1091.7

0.628

80.408

-1.8

Amp

-0.389

-0.770

0.480

82.776

Mvar

MVSG-1A

LIQUEFACTION-SWG-1A

4.160

-0.628

LVSG-1A

LIQUEFACTION-SWG-1A

MTR BUS

MW

XFMR

0.365

1.900

324.4

18.9

Gen1

-1.274

-1.668

351.8

60.7

Gen2

-1.274

-1.668

351.8

60.7

* Gen1

4.160

112.701

8.4

1.305

2.542

MVSG-1A

1.305

2.542

351.8

45.7

* Gen2

4.160

112.701

8.4

1.305

2.542

MVSG-1A

1.305

2.542

351.8

45.7

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

11

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

LOAD FLOW REPORT @ T = 3.000+


Bus
ID

Voltage
kV

% Mag.

Generation

Ang.

MW

Load

Mvar

MW

Load Flow
Mvar

ID

BOP MAIN A BUS

0.480

96.905

-2.4

BOP MAIN B BUS

0.480

96.482

-2.8

ESS-MCC

0.480

96.482

-2.8

0.260

0.161

LIQUEFACTION MAIN A
BUS

0.480

96.226

-2.7

LIQUEFACTION MAIN B
BUS

0.480

96.239

-2.7

MVSG-1A

0.442

1041.3

85.0

1373.3

85.0

LVSG-1B

0.936

0.580

1373.3

85.0

LVSG-1B

-0.260

-0.161

382.1

85.0

MVSG-1A

-0.391

-0.242

575.0

85.0

0.391

0.242

575.0

85.0

-0.388

-0.241

571.1

85.0

LIQUEFACTION-SWG-1B

0.388

0.241

571.1

85.0

-0.391

-0.242

575.0

85.0

-0.388

-0.241

571.1

85.0

-0.713

-0.442

1041.3

85.0

-0.936

-0.580

1373.3

85.0

ESS-MCC

0.260

0.161

382.1

85.0

MVSG-1A

-0.400

-0.169

61.4

92.1

BOP MAIN A BUS

0.715

0.460

120.2

84.1

BOP MAIN B BUS

0.939

0.612

158.5

83.8

LIQUEFACTION MAIN A
BUS
LIQUEFACTION MAIN B
BUS
MTR BUS

0.393

0.256

66.3

83.8

0.391

0.254

65.9

83.8

MVSG-1A

0.391

0.242

LIQUEFACTION-SWG-1B

0.480

96.239

-2.7

0.388

0.241

LVSG-1A

0.480

96.905

-2.4

0.713

0.442

LIQUEFACTION MAIN A
BUS
LIQUEFACTION MAIN B
BUS
BOP MAIN A BUS

LVSG-1B

0.480

96.482

-2.8

0.676

0.419

BOP MAIN B BUS

* MVSG-1A

4.160

98.212

-1.4

0
0

0
0

0.169
0

85.0

-0.580

-2.7

0.400

% PF

1041.3

0.713

96.226

-1.4

Amp

-0.442

-0.936

0.480

98.212

Mvar

MVSG-1A

LIQUEFACTION-SWG-1A

4.160

-0.713

LVSG-1A

LIQUEFACTION-SWG-1A

MTR BUS

MW

XFMR

0.400

0.169

61.4

92.1

Gen1

-1.419

-0.876

235.7

85.1

Gen2

-1.419

-0.876

235.7

85.1

* Gen1

4.160

112.701

8.4

1.433

1.269

MVSG-1A

1.433

1.269

235.7

74.9

* Gen2

4.160

112.701

8.4

1.433

1.269

MVSG-1A

1.433

1.269

235.7

74.9

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

12

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

% Alert Settings
Critical

Marginal

Starting Motors/MOV
MOV Terminal Voltage

80.00

90.00(Vmtr, rate)

Motor Terminal Voltage

80.00

90.00(Vmtr, rate)

Failed to Start, Slip Kept

5.00

Generator/Engine/Exciter Rating

Min. Span (Sec.)

Generator Rating

100.00

95.00

0.00

Engine Continuous Rating

100.00

95.00

0.00

Engine Peak Rating

100.00

95.00

0.00

Exciter Peak Rating

100.00

95.00

0.00

Bus Voltage Group

Min. Dip Width (Sec.)

Starting Motor Bus

VBus

80.00

90.00

0.00

Grid/Generator Bus

VBus

92.00

95.00

0.00

HV Bus, kV

VBus

90.00

95.00

0.00

VBus

90.00

95.00

0.00

VBus

90.00

95.00

0.00

10.00

MV Bus, 10.00
LV Bus, kV

kV

1.00

1.00

Critical Report
DeviceID

Type

Alert

Condition

Rating/Limit

Unit

Operating

% Operating

T Begin

Duration

Gen1

Generator

Generator Rating

Over Rating

2.059

MVA

2.098

101.9

0.200

0.000

Gen2

Generator

Generator Rating

Over Rating

2.059

MVA

2.098

101.9

0.200

0.000

BOP MAIN A BUS

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.391

81.4

0.200

0.000

BOP MAIN B BUS

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.389

81.1

0.200

0.000

ESS-MCC

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.389

81.1

0.200

0.000

LIQUEFACTION MAIN A BUS

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.386

80.4

0.200

0.000

LIQUEFACTION MAIN B BUS

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.386

80.4

0.200

0.000

LIQUEFACTION-SWG-1A

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.386

80.4

0.200

0.000

LIQUEFACTION-SWG-1B

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.386

80.4

0.200

0.000

LVSG-1A

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.391

81.4

0.200

0.000

LVSG-1B

LV Bus

Bus Voltage

Under Voltage

0.480

kV

0.389

81.1

0.200

0.000

MTR BUS

MV Bus

Bus Voltage

Under Voltage

4.160

kV

3.443

82.8

0.200

0.000

MVSG-1A

Generator Bus

Bus Voltage

Under Voltage

4.160

kV

3.443

82.8

0.200

0.000

MVSG-1A

MV Bus

Bus Voltage

Under Voltage

4.160

kV

3.443

82.8

0.200

0.000

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

13

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

% Operating

T Begin

Marginal Report
DeviceID

Type

Alert

Condition

Rating/Limit

Unit

Operating

Duration

Amine Circulation Pump1

Motor

Motor Voltage

Under Voltage

4.160

kV

3.443

82.8

0.200

0.000

MTR BUS

Motor Bus

Bus Voltage

Under Voltage

4.160

kV

3.443

82.8

0.200

0.000

ETAP

Project:

12.5.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

Alaska LNG Rev B

Page:

14

Date:

05-05-2015

SN:

KIEWIT-ENG

Revision:

Base

Config.:

MS - Normal

The tabulated plots were not generated because the option of 'Skip Tabulated Plots' in the study case was checked.
To generate tabulated plots, you need to uncheck this option in the Info page of Motor Starting Study Case.