You are on page 1of 2

Newly Constructed

Buildings

Estimat
ed Cost

UEM TWO STOREY BUILDINGS

1,623,2
50.87

MONAPIL TOWNHOUSE

6,350,0
00.00

MEDICAL SCHOOL

15,000,0
00.00

Year

2010
May 30, 2014

Rehabilitated or
Refurbished Buildings
FUNCTION HALL, CREATIVE
WRITERS VILLAGE
CAFETERIA RENOVATION

May 1, 2007
ROBLE HALL

TICAO DORMITORY
PASO OFFICE
HOME ECONOMICS BLDG. 2ND
FLOOR
MARY MARQUIZ SMITH HALL
ROMAN T. YAP HALL
EMILIO T. YAP HALL (MASSCOM)
YAKAL TOWNHOUSE
DORMITORY AT TICAO PROPERTY
NEW ELEMENTARY SCHOOL WEST
WING
UEM 6 UNITS HOUSING
UYTENGSU COMPUTER STUDIES
PORTAL WEST BUILDING
5 UNIT COTTAGE CREATIVE
WRITERS VILLAGE
PAUL T. And EDNA M. LAUBY HALL
(ECS)
WILLIAM BARRY THOMSON HALL

2,500.000.
00
444,4
00.00
5,428,0
00.00
21,900,8
93.53
12,000,0
00.00
11,675,0
00.00
6,458,0
00.00
2,500,0
00.00
27,323,4
20.95
3,040,7
10.00
13,000,0
00.00
65,000,0
00.00
4,306,3
60.35
4,500,0
00.00
22,330,0

September
19, 2015
March 23,
2015
February 7,
2015
October 1,
2007
July 1, 2013
January 1,
2013
November 28,
2014
September
19, 2015
May 4, 2015
2009
November 16,
2007
2012
January 15,
2010
May 1, 2007
July 25, 2013

DOLTZ HALL
KATIPUNAN HALL ( SOUTH WING)
PULIDO HALL GROUND FLOOR
(CAFETERIA)
SUGA TRAINING CENTER
UYTENGSU HALL (ENGINEERING)
ORIENTAL HALL (GENERAL REPAIR)
MARINA MISSION CLINIC
LUCE AUDITORIUM
STUDENT ACCOUNT SECTION (B/F
OFFICE)
SILLIMAN HALL (REPLACEMENT OF
BEAM)
RENOVATION OF SU CHURCH
OFFICE
OVERLAYING OF CAMPUS ROAD
WITH ASPHALT
MAIN BUNGALOW AT TICAO
WOODWARD HALL (GENERAL
REPAIR)
CLASSROOM & BODEGA AT TICAO

Estimat
ed Cost
790,00
0.00
9,925.000.
00

1,230,00
0.00

7,005,00
0.00
10,950,00
0.00
1,740,00
0.00
2,200,00
0.00
7,363,82
3.40
2,500,00
0.00
6,164,70
0.00
14,515,52
7.30
4,180,00
0.00
140,00
0.00
820,00
0.00
17,679,12
6.00
2,450,00
0.00
3,980,73
9.65
1,190,00

Year

2010
2016

February
7, 2015

August 12,
2014
March 6,
2015
September
16, 2014
2011
September
30, 2008
March 7,
2012
April 20,
2009
July 1,
2008
June 29,
2016
2011
2011
2016
Novermber
15, 2013
2011
October

Rebuilt
Buildings

Estimae
d Cost

McKINLEY HALL

10,200,00
0.00

December
15, 2010

JULIO O. SY
GRANDSTAND

14,254,67
9.40

June 2,
2010

4,427,28
7.12

November
26, 2011

6,000,00
0.00

March 7,
2012

COPVA I
(formerly Ilangilang cottage)
COPVA II
(formerly Faculty
Ladies Hall 1)

Year

OLIVIA YANSON HALL


ORIENTAL HALL RAMP

00.00
21,644,1
41.95

August 1,
2009
September
24, 2015
December 5,
2013

650,000,00
1,190,0
00.00
950,0
00.00

May 22, 2014

PALINPINON PROPERTY ROAD

5,929,200.0
0

June 2, 2016

PALINPINON CENTROP
DEVELOPMENT

2,841,000.0
0

January 12,
2016

MASSCOM RAMP
EXIT STAIRS OF EMELIO T. YAP
HALL

CONCRETING OF MONAPIL COURT


CONCRETE BLOCKS OF FOUROT
LANE
SALONGA CENTER

535,554,00
0.60

July 29, 2008

797,000.00

2014

3,426,005.4
3

April 14, 2010

CLINIC, OFFICE AND CHAPEL AT


TICAO
BUNK HOUSE AT TICAO
GYMNASIUM (EXTENSION SHED AT
SOUTH SIDE)
DUHAT COTTAGE RENOVATION
(LABOR ONLY)
CHURCH OFFICE PARTITION,
CANOPY & DOWN SPOUT REPAIR
GUY HALL RENOVATION
EDNA BELL COTTAGE SECOND
FLOOR RENOVATION
SANTOL COTTAGE RENOVATION
SCIENCE COMPLEX (REPLACEMENT
OF ROOF)
PULIDO HALL SECOND FLOOR
HOUSING INTERNATIONAL
STUDENT
RENOVATION OF DISTRIBUTION
LINE
INSTALLATION OF UNDEGROUND
HIGH VOLTAGE CABLE
ANTHROPOLOGY MUSEUM
(HIBBARD HALL)
INSTALLATION OF LED STREET
LIGHTS
INSTALLATION OF LED HIGHBAY
LAMP AT SU GYM
REPLACEMENT OF LED TUBE FROM
FLOURESCENT TUBE
CEMENTING OF TENNIS COURT #3
CONCRETING OF ROAD FROM
DOLTS TO LAGUNA

0.00
1,095,00
0.00
2,500,00
0.00
1,028,32
1.70
350,14
3.20

19, 2013
August 30,
2013
January
22, 2016
2011
2007

296,57
5.00

2011

15,370,39
6.00

ON-GOING

463,77
0.00
2,580,00
0.00

2011
August 22,
2012

1,420,00
0.00

August 12,
2016

2,455,00
0.00
10,088,97
5.67
2,000,00
0.00
3,766,70
0.00
995,75
0.00
1,009,50
0.00
13,170,97
0.00

September
13, 2011
2007
April 6,
2011
2016
June 20,
2016
January 2,
2016
November
9, 2015