III Semester Diploma Examination, Nov./Dec. 2015
SURFACE MINING
Time : 3 Hours ]
Note :
SECTION I
1.
(a)
The excavation at the lowest part of the pit to collect water is called
______.
(ii)
In ______ type of machine formers plough type steel shank mounted with
cutting teeth on a steel beam is arranged.
(iii) The over-size boulders produced during main blasting one handled by
______.
(iv) For efficient utilization of explosive energy and to prevent blown out
shots ______ must be done after charging of blast hole.
(v)
(b)
A flexible plastic tube having 3 mm and 1.5 mm external and internal dia
coated with explore having VOD about 1800 m/sec. are known as ______.
Write a note on how free faces are formed in open cast blasting face. Explain
how they effect the blasting efficiency.
5
SECTION II
2.
3.
(a)
(b)
(a)
What are the factors which govern the height of bench in open cast mining ?
(b)
(c)
5
[Turn over
9MN-32
4.
2322
(a)
List the points to be kept in mind during the construction of haul road to drain
the water properly during designing of haul roads.
10
(b)
SECTION III
5.
6.
7.
(a)
How free faces are formed in the open cast blasting face ?
(b)
What are the main parameters of blasting which command the yield of blasting ? 5
(c)
What are the main merits of concentration of charge in a blast hole ? Discuss
briefly about the deck charging.
5
(a)
(b)
Explain a schematic line diagram of any rope shovel and label its parts.
(a)
(b)
Explain with a schematic line diagram, a drag line under operation and label its
parts.
10
5
10
5
SECTION IV
8.
9.
10.
(a)
(b)
(a)
Explain a layout for a mechanized open cart quarry using dipper shovel,
dumpers and drill combination (Assume your own condition).
10
(b)
(a)
(b)