EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins

For
Zawtika Development Project Phase 1C
GAS FILTER COALESCER
TECHNICAL BID EVALUATION FOR INSTRUMENT
PRESSURE VESSELS

DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 62Nos.
nos

EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.

TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

1.0 BIDDER INFORMATION INTEGRALITY AS PER SDRL


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

List of Previous Similar Experience


Vendor / Sub-vendor contact directory
Performance Description (Including Internals)
Outline Drawing
Equipment Datasheets
Weight Datasheets
Performance Guarantee
Mechanical Guarantee
Mechanical Warranty
Quality Management System Certificate
Certificate of Compliance
Inspection and Test Plan
Fabrication/Production Schedule
Recommended Startup / Commissioning Spares List
Recommended Spares for Two year's operation

2.0

STANDARD, EXPERIENCE, QUALITY ASSURANCE


SYSTEM AND SUBVENDOR/ MANUFACTURER

Please see attach


To be advised
Please refer to submitted proposal
Please refer to submitted proposal
To be provided after PO award
To be provided after PO award
To be provided after PO award
Comply
To be provided after PO award
To be provided after PO award
To be provided after PO award
To be provided after PO award
To be provided after PO award
Comply
Comply

Comply

1
2
3
4

Design Code:ASME Section VIII Div 1, Latest Edition


Qualification Certificate of Design and Manufacture
Subvendor / Manufacturers of Plates
Subvendor / Manufacturers of Pipe

To be provided after PO award


To be provided after PO award
To be provided after PO award

Subvendor / Manufacturers of Internals:Inlet Device, Mist


Eliminator(for UG drum), filter element( IG coalescer)

LG Coalescer from approved


manufacturer

Subvendor / Manufacturers of sacrificial anode for Closed


Drain Sump Vessels

3.0 KEY PARAMETERS


3.1 Close Drain Sump Vessel
1

Design Pressure: 8.62 / FV (barg)


Design Temperature: 116 / -29 (C)

Shell /End flange/ Cover Material: SA516 Gr.70 N

Internal Material
Wellded: SA516 Gr.70N
Loosed: SS316L

Internal Coating: Vinyl Ester and Modify Epoxy

3 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 6 Nos.

EQUIPMENT TYPE/QUANTITY
NO.

REQUIREMENT

TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

3.2 Instrument Gas Coalescer


1

Design Pressure: 11 / FV (barg)


Design Temperature: 116 / -29 (C)

Comply

Materia
Shell : SA516 Gr.70 N / SA106 Gr.B
Head : SA516 Gr.70 N / SA234 W PB
End flange : SA105N

Comply

Internal Material
Wellded: SA516 Gr.70N or SA106 Gr.B
Loosed: SA 240 TP316L

Comply

Liquid content in gas outlet shall not exceed 0.005


US gallons/MMscf

Comply

99% removal of particle above 0.3 m size

Comply

Solid content in gas outlet shall be less than 0.1 g/m3


removal of solid particle with 99% of solids larger than 0.3
m.

Comply

Maximum oil/liquid carry over at outlet is 0.008 ppm (w/w)


based on 40 ppm (w/w) inlet feed gas

Comply

Design Margin of 20% on flowrate

Comply

3.3 Utility Gas Knock out Drum


1

Design Pressure: 11 / FV (barg)


Design Temperature: 116 / -29 (C)

Materia
Shell: SA516 Gr.70 N / SA106 Gr.B
Head: SA516 Gr.70 N / SA234 WPB
End flange : SA105N

Internal Material
Wellded: SA516 Gr.70N or SA106 Gr.B
Loosed: SA 240 TP316L

Liquid Carry over at gas outlet- not be more than


0.1US gal / MMscf

Remove 99% of liquid particles larger than 8 m in size

Design Margin of 20% on flowrate

4 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

4.0 TECHNICAL REQUIREMENTS


4.1 Close Drain Sump Vessel
4.1.1 General
1
2
3
4
5

Size: 1300 I.D. / 9200 RF to RF


Software Used (PV Elite, Compress, PVX)
Nozzle Loads & Moments as per PEGS-0710- PVS-001
Design Life - 20 Years
Empty Weight

Weld Overlay on Flanges with Dissimilar Material


Connection

Internal coating system: Vinyl Ester and Modify Epoxy

4.1.2 Mechanical Design & Calculation


1
2
3
4
5

Operating Pressure: 0.1 (barg) + full of water


Operating Temperture: 6.7~100 (C)
Corrosion Allowance: 3 (mm)
Vessel Orientation: Horizontal
Type of Head: End cover plate flanges

Thickness
Shell: 15 (mm) (VTC)
End flange: 99 (mm) (VTC)
Cover Thickness: 70 (mm) (VTC)

Nozzle Reinforcement

Design& calculation of sacrificial anodes


(included anode alloy selection,anode type, design
methodology, protection monitoring)

9
10
11
12
13
14
15

Wind load
Earthquake Load
Transportation Load
Lifting analysis
Earthing Boss
Manhole / Davit
Material of Construction
a) Nozzle Neck(Pipe / Forged): SA106 Gr.B / SA105N
b) Nozzle Flange: SA105N
c) Saddle: SA283 Gr.C / SA36

5 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 6 Nos.

EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.

TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

d) Externals & Reinforcement Pad: SA516 Gr.70N


e) Gaskets for nozzle flange as per PEGS-0710-PIP005&007
f) Gaskets for end cover flange: Compressed synthetic fiber
with non-asbestos binder
g) Bolt/Nuts (External): SA193 B7 / SA194 2H, Zinc-plated
and Xylan 1070 or 1424 coated (Drak Blue RAL 5003)
h) Bolt/Nuts (Internal): SA193 B8M / SA194 8M
i) Name Plate / Bracket: SS316 / SA 516 Gr.70N
j) Earthing Bosses: SS316L
k) Lifting Lug: SA516 Gr.70N
4.1.3 Internals
1
2
3
4
5

Inlet Device: Dip pipe


Weir
Vortex Breaker
Internal Support
Sacrificial Anodes

Internals pass through manway & weight of individual


components less than 15kg

4.2 Instrument Gas Coalescer


4.2.1 General
1
2
3
4
5

Size: 194(VTC)I.D. / 3215(VTC) TL to SL


Software Used (PV Elite, Compress, PVX)
Nozzle Loads & Moments as per PEGS-0710- PVS-001
Design Life-20 Years
Empty Weight

Weld Overlay on Flanges with Dissimilar Material


Connection

We proposed: Case 1 - 5"ID x 120" T/T - at normal conditions:based on inlet liquid loading of 40 ppm (w/w). Case 2 - 10"ID x 120" T/T - at upset condition : 36.78 kg/hr

Comply
Comply
Comply
Approx. 110 kg per vessel
Comply

4.2.2 Mechanical Design & Calculation


1
2
3
4
5
6

Operating Pressure: 8.4~8.8 (barg)


Operating Temperture: 7.8~34.5 (C)
Allowable Pressure Drop: 0.3 (bar) (VTC)
Corrosion Allowance: 6 (mm)
Vessel Orientation: Vertical
Type of Head: 2:1 Ellip. Head (Bottom) / End Flange (Top)

Comply
Comply
Comply
Comply
Comply
Comply

6 of 12

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 6 Nos.

EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.
7
8
9
10
11
12
13
14
15
16

Wall Thickness: 10 (mm) (VTC)


Nozzle Reinforcement
Wind load
Earthquake Load
Transportation Load
Lifting analysis
The total height including the pulling height of internals
Earthing Boss
Manhole / Davit
Material of Construction
a) Nozzle Neck(Pipe / Forged): SA106 Gr.B / SA105N
b) Nozzle Flange: SA105 N
c) Skirt: SA516 Gr.70N / SA283 Gr.C / SA36
d) Externals & Reinforcement Pad: SA516 Gr.70N
e) Gaskets - As Per PEGS-0710-PIP-007
f) Bolt/Nuts (External, except N2): SA193 B7 / SA194 2H
Zinc-plate and Xylan 1070 or 1424 coated (Drak Blue RAL
5003)

TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

TENDER CLARIFICATION

To be advised later
Comply
Comply
Comply
Comply

Comply
Comply
Comply
Comply
Comply
Comply
Comply
Comply

g) Bolt/Nuts (External) for N2: SA193 B8M / SA194 8M Xylan Comply


1070 or 1424 coated (Green RAL 6001)
Comply
h) Bolt/Nuts (Internal): SA193 B8M / SA194 Gr.8M
Comply
i) Name Plate / Bracket: SS316 / SA516 Gr.70N
Comply
j) Earthing Bosses: SS316L
k) Lifting Lug: SA516 Gr.70N

Comply

4.2.3 Internals
1

Filter element /coalescer


(including the information of No.& Type & material&size)

2
3
4

VGS Vane
Bend pipe
Internal Support

Internals pass through manway & weight of individual


components less than 15kg

Seprasol Coalsecer Element, Resin Bonded Polymeric Media, 2.75"OD x 30"L


Not Applicable
Not Applicable
Coalescer Element Standpipe support and adapter, SS 316L
Comply

4.3 Utility Gas Knock out Drum


4.3.1 General
1

Size: 330.6 (VTC) I.D. / 2240 (VTC) TL to SL

7 of 12

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.
2
3
4
5

Software Used (PV Elite, Compress, PVX)


Nozzle Loads & Moments as per PEGS-0710- PVS-001
Design Life-20 Years
Empty Weight

Weld Overlay on Flanges with Dissimilar Material


Connection

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

4.3.2 Mechanical Design & Calculation


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Operating Pressure: 8.6~9.0 (barg)


Operating Temperture: 7.8~34.7 (C)
Allowable Pressure Drop: 0.2 (bar) (VTC)
Corrosion Allowance: 6 (mm)
Vessel Orientation: Vertical
Type of Head: 2:1 Ellip. Head (Bottom) / End Flange (Top)
Wall Thickness: 10 (mm) (VTC)
Nozzle Reinforcement
Wind load
Earthquake Load
Transportation Load
Lifting analysis
Earthing Boss
Manhole / Davit
Material of Construction
a) Nozzle Neck(Pipe / Forged): SA106 Gr.B / SA105N
b) Nozzle Flange: SA105 N
e) Skirt: SA516 Gr.70N / SA283 Gr.C / SA36
f) Externals & Reinforcement Pad: SA516 Gr.70N
g) Gaskets: As Per PEGS-0710-PIP-007
h) Bolt/Nuts (External): SA193 B7 / SA194 2H Zinc-plate and
Xylan 1070 or 1424 coated (Dark Blue RAL 5003)
i) Bolt/Nuts (Internal): SA193 B8M / SA194 8M
g) Name Plate / Bracket: SS316 / SA 516 Gr 70N
k) Earthing Bosses: SS316L
l) Lifting Lug: SA516 Gr.70N

4.3.3 Internals
1
2

Inlet baffle
Mist eliminator

8 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 6 Nos.

EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.
3
4

Bend pipe
Internal Support

Internals pass through manway & weight of individual


components less than 15kg

TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

5.0 INSPECTION AND TESTING


5.1 Close Drain Sump Vessels
1
2
3

Hydrostatc testing
PWHT (if required)
Certification as per BS EN 10204 Type 3.1 for pressure parts

Certification as per BS EN 10204 Type 2.2 for non-pressure


parts

5
6
7
8
9
10
11
12

Air Test on Welded Attachment


Material Verification
Welding Inspection
NDT personnel
Tolerance for Dimensional Check
Welding Document(i.e. WPS, PQR.)
NDT inspection and Procedure
Coating inspection

13

Inspection and Test Plan - To be reviewed /


approved by Purchaser / Company

5.2

Instrument Gas Filter Coalescers & Utility Gas Knock out


Drums

1
2
3

Comply
Hydrostatc testing
Comply
(if required - with cost adder)
PWHT (if required)
Certification as per BS EN 10204 Type 3.1 for pressure parts Comply

Certification as per BS EN 10204 Type 2.2 for non-pressure


parts

Comply

5
6
7
8
9
10
11

Air Test on Welded Attachment


Material Verification
Welding Inspection
NDT personnel
Tolerance for Dimensional Check
Welding Document(i.e. WPS, PQR.)
NDT Inspection and Procedure

Comply
Comply
Comply
Comply
Comply
Comply
Comply

9 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
EQUIPMENT TYPE/QUANTITY
REQUIREMENT

NO.
12

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

Inspection and Test Plan - To be reviewed / approved by


Purchaser / Company

6.0 SCOPE OF SUPPLY


6.1 Close Drain Sump Vessels
1

2 Sets Close Drain Sump Vessel with internal

Nozzles as per datasheet (nozzles with rated blind flange


shall be provided with bolting & gaskets)

Plates for Shell /End flange/ Cover etc. and their


Manufacturers

4
5
6

Vessel Supports(Hanging saddles)


External Clips for Platform, Ladder and Pipe Support
Lifting Lug&Transportation Lugs

Lifting Aid with certificate for Installation, Maintenance and


Operation(If Required)

8
9
10
11

Holding Down Bolts


Earthing Connections (SS316L, min 2 nos. per item)
Nameplate (SS316) with bracket
Design Calculation (PV Elite, Compress, PVX)

12

Mechanical Design and Drawing(general arrangement


drawing and details drawing of vessel and internals complete
with support detail attachments)

13

Design, fabrication, procurement and installation of all


process internals complete with their support / attachments

14
15
16
17

Supply all materials and consumable required for fabrication


Purchase and installation of sacrificial anodes
Complete shop fabrication
Inspection and Testing as per IRT & SPE

18

Start-up, Commissioning Spares and 2 Years


Operational Spare Parts

19

List of Recommended 2 Years Operational Spare


Parts with Unit Price and Estimated Delivery Time

20

Special Tools (If required)

21

Surface Preparation & Protective Coating as per


PEGS-0842-COR-004 (Vinyl Ester and Modify Epoxy) for
Internal surface and PEGS-0842-COR-010 for Exterbal
surface

10 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 6 Nos.

EQUIPMENT TYPE/QUANTITY
NO.

REQUIREMENT

22
23
24
25

Pickling & Passivation - SS surface


Documentation
Preservation and Preparation for Shipment
Mechanical Guarantee / Warranty

26

Any Additional Items Required and Specified on


The Mechanical Datasheet

TENDER CLARIFICATION

Pressure Vessels / 6 Nos.

EVALUATION

6.2 Instrument Gas Coalescer&Utility Gas Knock out Drum


1
2

2 Sets Instrument Gas Filter Coalescers with Internals


2 Sets Utility Gas Knock out Drums with Internals

Nozzles as per datasheet (nozzles with rated blind flange


shall be provided with bolting & gaskets)

Comply

Plates for Shell / End flange/ head etc.and their


Manufacturers

Comply

5
6
7

Vessel Supports(Skirt)
External Clips for Platform, Ladder and Pipe Support
Lifting Lug,tailing lugs&Transportation Lugs

Comply
Comply
Comply

Lifting Aid with certificate for Installation, Maintenance and


Operation (If Required)

Comply (if required - with cost adder)

9
10
11
12

Holding Down Bolts


Earthing Connections(SS316L, min 2 nos. per item)
Nameplate (SS316) with bracket
Design Calculation (PV Elite, Compress, PVX)

Comply (if required - with cost adder)


Comply
Comply
Comply

13

Mechanical Design and Drawing(general arrangement


drawing and details drawing of vessel and internals complete Comply
with support detail attachments)

14

Confirm the vessel sizing, to provide type of internals, liquid


level study & to provide liquid level alarm / trip settings, to
provide gas inlet and outlet nozzle sizing, liquid outlet nozzle
sizing, configuration & orientation for the above nozzles

15

Design, fabrication, procurement and installation of all


process internals complete with their support / attachments

Comply

16
17
18
19

ASME U-Stamped
Supply all materials and consumable required for fabrication
Complete shop fabrication
Inspection and Testing as per IRT & SPE

Comply
Comply

Comply

Comply
Comply

11 of 12

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

EPCI of Wellhead Platforms, Associated Pipelines and Tie-Ins


For
Zawtika Development Project Phase 1C
TECHNICAL BID EVALUATION FOR PRESSURE VESSELS
DOCUMENT NO. :

MM-ZTK-1C-WPX-MEC-TBE-0002

REVISION :

A1

DATE :

13-Jul-16

BIDDER/NATIONALITY
MANUFACTURE/NATIONALITY
Pressure Vessels / 6 Nos.

EQUIPMENT TYPE/QUANTITY

TENDER CLARIFICATION

REQUIREMENT

NO.
20

Start-up, Commissioning Spares and 2 Years


Operational Spare Parts

Comply. Will provide option list

21

List of Recommended 2 Years Operational Spare


Parts with Unit Price and Estimated Delivery Time

Comply. Will option list

22
23

Special Tools (If required)


ASME Authorized Inspection(AI)

Comply

25

Surface Preparation & Painting -External


(As per PEGS-0842-COR-010)

Comply.

26
27
28
29

Documentation
Pickling & Passivation - SS surface
Preservation and Preparation for Shipment
Process Guarantee & Mechanical Guarantee / Warranty

Comply.
Comply.
Comply.

30

Any Additional Items Required and Specified on


The Mechanical Datasheet

Comply. (if required - with cost adder)

EXCEPTIONS AND COMMENTS


(For All The Reference Documents and Applicable
7.0
Standards Listed in Clause 7.0 of Project Particular
Specification for Test Separator with Internals)

Pressure Vessels / 6 Nos.

EVALUATION

TENDER CLARIFICATION

EVALUATION

Pressure Vessels / 6 Nos.


TENDER CLARIFICATION

EVALUATION

Comply

Standard T&C's apply

According to bulk separator vendor, based on an Inlet Liquid Load of 0.1 USG/ MMSCF (per Process Note 21) during normal operation they feel bulk separation stage
is not required. Even during the upset conditions of 36.78 kg/h, the liquid loading to the vessel is still very low at 0.08% Liquid Volume Fraction (LVF).
At this LVF and the small vessel ID, they still do not believe that a bulk separation stage would add any benefit to the application.

8.0 QUESTIONS TO BE CLARIFIED


9.0 CONCLUSION
NOTE:
1

"EVALUATION" SHOULD BE "ACCEPT" OR "NOT ACCEPT".

"CONCLUSION" SHOULD BE "QUALIFIED" OR "UNQUALIFIED"

AS LONG AS ONE KEY TECHNICAL PARAMETER DOES NOT MEET THE REQUIREMENT, THE CONCLUSION SHOULD BE "UNQUALIFIED".

WHEN THERE ARE FIVE OR MORE THAN FIVE "NOT ACCEPT" OCCUR ON THE TECHNICAL PARAMETERS,THE CONCLUSION SHOULD BE "UNQUALIFIED".