You are on page 1of 17

KENDARI

COAL FIRED STEAM POWER PLANT


(1 X 10 MW)
Calculation Sheet For Bus Protection Relay Unit 3

00
REV.

DATE

Bus Protection Relay


Unit 3
DESCRIPTION

YG

SJ

SJ

PREP.

CHECK

APPROVAL

PT. PLN (PERSERO)


CONSULTANT :

OWNERS DWG NO :
CONTRACTOR :

PROJECT :

TITLE :

PREPARED
JOB NO.
DOC. NO

TM.22.2011-S-UAC-001

PLTU KENDARI (1 X 10 MW)


KENDARI, SULAWESI TENGGARA
Calculation Sheet of Bus Protection Relay
DATE

SIGNATURE

155
155-HK-E-AD-001

SCALE

SHEET OF

NONE
REV

REV

JOB NO :155

Calculation Sheet For Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

REVISION SHEET
REVISION NO.
0

DATE

DECRIPTION
FOR APPROVAL

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

TABEL OF CONTENT
1.Bus Protection Relay Unit 3 Calculation

1-5

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

6.3 kV MOTOR PROTECTION RELAY CALCULATION


1.

GENERAL

Project

: PLTU KENDARI UNIT 3

Client

: PT.PLN UIP KIT XII

Location

: Kendari, Sulawesi Tenggara, Indonesia

Facility

: Bus Protection Relay unit 3

DESIGN PHILOSOPHY
Bus Protection Relay unit 3 set up to protect all equipment at 70 kV line from
interrupting by setting value at protection equipment
UNIT MEASUREMENT
Unit measurement in design shall be metric system
CODE
IEC 60909
COMPUTER SOFTWARE
-

PCM600 V2.4 ABB

MS-Word

6.3 kV Motor Motor Protection


Bus Bar Differential Protection (87B)
Phase Over Current Protection (50)

3. SETTING SUMMARY

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

Differential Protection Bay Kopel GI NII TANASA


1. BBPB Bay3PH (PTRC,87B)
1.1. Bay_01
-

GT 1_Bay

:Bay01 : - ZB CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

: Ctrl Includes

: 0.2 s

1.2. Bay_02
-

GT 2_Bay

:Bay02 : ZA - CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

: Ctrl Includes

: 0.2 s

1.3. Bay_03

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

Line1_Bay

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

By :

Check. :

Appr. :

YG

SJ

SJ

:Bay03 : ZA - CZ

: Ctrl Includes

: 0.2 s

1.4. Bay_04
-

Line 2_Bay

:Bay04 : - ZB CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

: Ctrl Includes

: 0.2 s

1.5. Bay_05
-

Town_Bay

:Bay05 : - ZB CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

: Ctrl Includes

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

By :

Check. :

Appr. :

YG

SJ

SJ

: 0.2 s

1.6. Bay_06
-

BC A_Bay

:Bay06 : - ZB CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

: Fixed To ZB

: 0.2 s

1.7. Bay_07
-

BC B_Bay

:Bay07 : ZA - CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

: Fix To ZA

: 0.2 s

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

t Invert Current :0.2 s

1.8. Bay_08
-

GT 3_Bay

:Bay08 : - ZB CZ

CT Connection : Connected

Zone Se1

Zone Switching : Conditionally

Check Zone Se1 : Connected

t Trip Pulse

t Zero Current : 0.2 s

t Invert Current :0.2 s

: Ctrl Includes

: 0.2 s

2. BBP Check Zone3PH (PDIF,87B)


2.1. BT CZ
-

Operation

: ON

Oper Level

: 200 A

Slope

: 0.3

3. BBP Zone A 3PH (PDIF,87B)


3.1. BT ZA
-

Operation

: ON

Diff Oper Level : 200 A

Diff Trip Out

: Self reset

Trip Hold

: 0.2 s
6

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

Check Zone

Slow OCTO per : OFF

Fast OCTO per : OFF

OCTO per lev

: 40 A

t Slow OCT

: 20 s

OCT Release lev : 1200 A

Id Alarm lev

: 20 A

t Id Alarm

:0s

I in Alarm lev

: 1200 A

Sens Diff Oper : ON

Sens Oper lev

Sens I in Block : 200 A

t Sens Diff

By :

Check. :

Appr. :

YG

SJ

SJ

: ON

: 200 A

: 0.4 s

4. BBP Zone B 3PH (PDIF, 87B)


4.1. BT ZB
-

5.

Sense I in Block : 100 A

BBP Zone Inter 3PH (GGIO, 87B)


5.1. BT ZI
-

Operation

: OFF

t Alarm

: 300 s

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

6. Switch Status
6.1. SS 01-20
6.1.1. SS 01
-

GT 1

: Open

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

6.1.2.

SS 02

GT 1

: Bad state_11

Oper Mode

: Scheme1_RADSS

t Alarm

: 15 s

6.1.3. SS 03
-

GT 1

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.1.4. SS 04
-

GT 1

: Intermediate_00

Oper Mode

: Scheme1_RADSS

t Alarm

: 15 s

6.1.5. SS 05

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

GT 2

: Open

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

By :

Check. :

Appr. :

YG

SJ

SJ

6.1.6. SS 06
-

GT 2

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.1.7. SS 07
-

Line 1

: Closed

Oper Mode

: Scheme1- RADSS

t Alarm

: 15 s

6.1.8. SS 08
-

Line 1

: Open

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

6.1.9. SS 09
-

Line 1

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

6.1.10. SS 10
-

Line 2

: Open

Oper Mode

: Scheme1_RADSS

t Alarm

: 15 s

6.1.11. SS 11
-

Line 2

: Closed

Oper Mode

: Scheme1- RADSS

t Alarm

: 15 s

6.1.12. SS 12
-

Line 2

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.1.13. SS 13
-

Town

: Open

Oper Mode

: Scheme1- RADSS

t Alarm

: 15 s

10

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

6.1.14. SS 14
-

Town

: Closed

Oper Mode

: Scheme1- RADSS

t Alarm

: 15 s

6.1.15. SS 15
-

Town

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.1.16. SS 16
-

GT 3

: Open

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

6.1.17. SS 17
-

GT 3

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.1.18. SS 18

11

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

Town

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

By :

Check. :

Appr. :

YG

SJ

SJ

6.1.19. SS 19
-

Switch 19

: Intermediate_00

Oper Mode

: Scheme1- RADSS

t Alarm

: 15 s

6.1.20. SS 20
-

Switch 20

: Intermediate_00

Oper Mode

: Scheme1- RADSS

t Alarm

: 15 s

6.2. SS 21-40
6.2.1. SS 21
-

Switch 21

: Closed

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

6.2.2. SS 22
-

Switch 21

: Intermediate_00

Oper Mode

: Scheme1-RADSS

12

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

t Alarm

By :

Check. :

Appr. :

YG

SJ

SJ

: 15 s

6.2.3. SS 23
-

Switch 21

: Intermediate_00

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

6.2.4. SS 24
-

Switch 21

: Intermediate_00

Oper Mode

: Scheme1-RADSS

t Alarm

: 15 s

6.2.5. SS 25
-

Switch 21

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.2.6. SS 26
-

Switch 21

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

13

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

By :

Check. :

Appr. :

YG

SJ

SJ

6.2.7. SS 27
-

Switch 21

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.2.8. SS 28
-

Switch 21

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.2.9. SS 29
-

Switch 21

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.2.10. SS 30
-

Switch 21

: Not Used

Oper Mode

: OFF

t Alarm

: 15 s

6.2.11. SS 31
-

Switch 21

: Not Used

14

REV

JOB NO : 155

Calculation Sheet for Bus Protection Relay unit 3

DOC. NO. : 155-HK-E-AD-001


Date :

Oper Mode

: OFF

t Alarm

: 15 s

By :

Check. :

Appr. :

YG

SJ

SJ

15

You might also like