You are on page 1of 4

1.

A)
B)
C)

Acceptable laying temperature of asphalt


100200 C
135175 C
75 100 C D) 175250 C

2. Activity A, Activity B
3 days

A) Activity B starts immediately after 3 days of activity A starts B)


Activity B starts at least 3 days after activity A starts
C) Activity B starts utmost 3 days after activity A starts
D) None of the above
3.
A)
B)
C)
D)

Load carrying and deflection design is known for


Galileo
Arcemedes
EulerBernoulli
None of the above

4.
B)
C)
D)
E)

Strength of the concrete is depend on A) Crushing strength


Vibration
Size of aggregate
Workability
All of the above

5. Measurement in drawing near to 100ft


A) 1:12500 B) 1:11000
C) 1:10000
D) 1:1000
6. What is the required quantity for embankment if 100,000 m3 of
backfilling used, Swell factor = 25%, Shrinkage factor = 10%
A) 110,000 m3
B) 115,000 m3
C) 125,000 m3
D) 120,000 m3

1|Page

7. Question related to Plastic Movement


8. Line connecting the same elevation on the drawing known as A)
Super elevation
B) Grade line
C) Contour line

D)
9.
A)
B)
C)
D)

What is the reaction in the ceiling fan


Bending movement
Shear
Tension
Compression

10.Using concordant cables in prestressed concrete for beams will A)


Initial support for member
B) No initial support for member
C) Cracks of beams
D) Deflection of beam
11.What is the meaning of Fast track project
A) Project include Design + Build B) Project starts before design
completes

12.What is the benefit of Design + Bid + Build type project


A) Duration + Cost of the project known
B) Avoid contact between the tenderers
C) Not remember
D) All above
13.Achimedes principle for buoyancy is based on
A) Area
B) Weight
C) Inertia D) Water
14.CPM used for
A) Find out the duration of the project
B) Relation between the time and activity

2|Page

C) D)
15.What is the slope at point C
A) Zero
B) 30 deg
C) 15.2 deg
D) 60 deg
16.What will be the consequences if contactor is failed to deliver a
project
A) Penalty will be imposed
B) Liquidate the Performance bond
C) Insurance
D) None
17.What is the main factor in highway design
A) Safety
B) Speed C) Traffic

D)
18.Why is the proctor test used for
A) Measure the min. dry density
B) Measure the Max. dry density
C) Measure optimum density
D) None
19.Air entraining in the concrete caused A) Excessive bleeding of
concrete B) Reduce strength of concrete
C) W/C ratio reduces
D) All of the above
20.For the following beam calculate moment distribution at AB
A) 679 B) 6.79
C) 8.43
D) 8.43
21.One of the below is not characteristic of the project
A) Design
B) Complex activities
3|Page

C) Internal use
D) Never done before

22.Which is not acceptable in non performance of project A) Death of


party
B) Destruction of
activity C) Strike of
labor
D) Frustration of object
23.What is the last in process of making OPC concrete A) Silica
B) Calcium sulfite
C) Aggregate
D) Cement
24.Concrete bleed excessively caused due to
A) Water cement ratio B) Possolan

C)
D) All above
25. Concrete bleed excessively caused due to

4|Page