Planning Two- Extension to the LRT/MRT Project

GENERAL REQUIREMENTS FOR SEPT.1 PRESENTATION, THURSDAY


(SLIDE PRESENTATION PER STATION/ STRETCH)
I. Objectives/ Issues/ Strategies
(Narrative form, short and concise, though its on your way of presenting)
II. Precinct Study
- Define the existing landmarks within the site(Call outs, significance)
- Existing Precinct Boundary
Refer to the image.

-Analysis( Visuals)
Refer to the image.
III.
-

General Rules:
Boundaries per designation:

Solutions
Existing and Proposed Figureground
Existing Land Use and Proposed Land
Use( plan)
Sections (3)
Aerial Perspective

Reference: MRT Station divisions(in between stations)Every station adjacent to each


other should communicate to define the exact boundaries.
- Min. of 2 Blocks per side of the road
( landmarks should be considered first. If an important landmark does not
cover the minimum boundary per side of the road, should you extend your
area.)
Its up to you to make a judgement of how to expand and justify the site)
Standard rendering- white on massings.( Refer to the Adeleide file)
models to be used, (esp for sections, should we use the files in the live folder)