Software Project
Management
Process overview

What is the full form of COCOMO?

SDLC

(A) Composite Cost Model

Project Team

(B) Constructive Cost Model


(C) Constructive Composite Model
(D) Comprehensive Construction Model
ANSWER: B

Cyclometric complexity of a flow graph G


with n vertices and e edges is defined as:

Work Breakdown Structure


Sizing of software and
reuse estimating
Estimating duration and
cost
Project roles and skills
Project schedule

(A) V(G) = e+n2


(B) V(G) = en+2

Requirement management

(C) V(G) = e+n+2

UML Interview

(D) V(G) = en2


UML FAQs

ANSWER: B

A good software design must have the


following attribute.
(A) High module coupling, high module cohesion.
(B) High module coupling, low module cohesion.
(C) Low module coupling, high module cohesion.
(D) Low module coupling, low module cohesion.

Designing business
solutions
Gathering analyzing
information
Envisioning the Solution
Requirement elicitation
Conceptual design

Physical design

ANSWER: C
Presentation Layer

While estimating the cost of software,


Lines Of Code (LOC) and Function Points
(FP) are used to measure which one of the
following?
(A) Length of code
(B) Size of software
(C) Functionality of software
(D) None of the above
ANSWER: B

Match the correct code regarding the


software:
a. Good quality--------i. Program does not fail for a specified
time in a given environment
b. Correctness---------ii. Meets the functional requirements of
software
c. Predictable----------iii. Meets both functional and nonfunctional requirements of software

Software Design Patterns


Designing the data layer
Designing security
specifications
Stabilizing and deploying
the solution
Software Engineering
Interview

d. Reliable-------------iv. Process is under statistical control


Codes:
(A) a - iii, b - ii, c - iv, d - i
(B) a - ii, b - iii, c - iv, d - i
(C) a - i, b - ii, c - iv, d - iii
(D) a - i, b - ii, c - iii, d - iv
ANSWER: A

Which process model that removes


defects before software get into trouble?
(A) Incremental model?
(B) Spiral model
(C) Clean room software engineering
(D) Agile model
ANSWER: C

The given below line are three golden


rules. Choose the correct answer from
A,B,C and D:
(i) Place the user in control.
(ii) Reduce the users memory load.
(iii) Make the interface consistent.
(A) User satisfaction
(B) Good interface design
(C) Saving systems resources
(D) None of these
ANSWER: B

Which Software safety activity that


focuses on the identification and
assessment of potential hazards that may
affect software negatively and cause an
entire system to fail?

(A) Risk mitigation, monitoring and management


(B) Software quality assurance
(C) Software cost estimation
(D) Defect removal efficiency
ANSWER: B

The Software Maturity Index (SMI) is


defined as SMI = [MT (Fa + Fc + Fd)] /
MT Where
MT = the number of modules in the
current release.
Fa = the number of modules in the current
release that have been added.
Fc = the number of modules in the current
release that have been changed.
Fd = the number of modules in the current
release that have been deleted.
The product begins to stabilize when
(A) SMI approaches 2
(B) SMI approaches 0
(C) SMI approaches 1
(D) SMI approaches 1
ANSWER: D

Consider the following characteristics and


choose one option that is true for a good
SRS (Software Requirement
Specification).
(i) Correct and unambiguous
(ii) Complete and consistent
(iii) Ranked for importance and/or stability
and verifiable
(iv) Modifiable and Traceable

(A) (i), (ii) and (iii)


(B) (i), (iii) and (iv)
(C) (ii), (iii) and (iv)
(D) All of the above
ANSWER: D

The relationship of data elements in a


module is called
(A) Data Coupling
(B) Modularity
(C) Cohesion
(D) Module Binding
ANSWER: C

Software Configuration Management is


the discipline for systematically
controlling
(A) The changes due to the evolution of work products as the
project proceeds.
(B) The changes due to defects (bugs) being found and then
fixed.
(C) The changes due to requirement changes
(D) all of the above
ANSWER: D

Which one of the following is not a step of


requirement engineering?
(A) Requirement elicitation
(B) Requirement analysis
(C) Requirement design
(D) Requirement documentation.
ANSWER: C

Given a flow graph with 10 nodes, 13


edges and one connected components,

the number of regions and the number of


predicate (decision) nodes in the flow
graph will be
(A) 4, 5
(B) 5, 4
(C) 3, 1
(D) 13, 8
ANSWER: B

A process that have the following four


primary objectives are:
1. To identify all items that collectively
defines the software configuration.
2. To manage changes to one or more of
these items.
3. To facilitate the construction of
different versions of an application.
4. To ensure that software quality is
maintained as the configuration evolves
over time.
Identify that process and choose one
option.
(A) Software Quality Management Process
(B) Software Configuration Management Process
(C) Software Version Management Process
(D) Software Change Management Process
ANSWER: B

Read List-1 and List-2 and Match the


following:
List I --------------------------------------- List
II

a. Data coupling--------------------------- i.
Module A and Module B have shared data
b. Stamp coupling------------------------- ii.
Dependency between modules is based
on the fact they communicate by only
passing of data
c. Common coupling--------------------- iii.
When complete data structure is passed
from one module to another
d. Content coupling ---------------------- iv.
When the control is passed from one
module to the middle of anotherCodes :
(A) a - iii, b - ii, c - i, d - iv
(B) a - ii, b - iii, c - i, d - iv
(C) a - ii, b - iii, c - iv, d - i
(D) a - iii, b - ii, c - iv, d - i
ANSWER: B
In an examination a candidate has to
score minimum of 25 marks in order to
clear the exam. The maximum that he can
score is 50 marks. Identify the Valid
Equivalence values if the student clears
the exam.
a) 22, 23, 26
b) 21, 39, 40
c) 29, 30, 31
d) 0, 15, 22
ANSWER: C

Which one of the following is not a


software myth?

(A) Once we write the program and get it to work, our job is
done.
(B) Project requirements continually change, but change can
be easily accommodated because software is flexible.
(C) If we get behind schedule, we can add more programmers
and catch up.
(D) If an organization does not understand how to control
software projects internally, it will invariably struggle when it
outsources software projects.
ANSWER: D

Match the following style rules for


reusability:
List I ----------------------------------------------------- List II
a. Keep methods coherent -------------------------- i. Write a method to get the element of a
list
b. Keep methods small ------------------------------ ii. Maintain parallel structure when
possible
c. Keep methods consistent ------------------------ iii. Do not break a method into smaller
parts
d. Provide uniform coverage ------------------------ iv. Performs a single function or a
group of closely related functions.
Codes :
(A) a - iv, b - iii, c - ii, d - i
(B) a - ii, b - i, c - iv, d - iii
(C) a - iii, b - iv, c - ii, d - i
(D) None of the above
ANSWER: D

Coding phase of software product


development life cycle essentially
involves:
(A) Integration of hardware and software
(B) Integration of feasibility study
(C) Integration of maintenance stage
(D) Integration of system engineering stage
ANSWER: A

What is the customers responsibility


during the software development
process? Choose the correct one.
Jobs

(A) Planning, monitoring and control

? Ask

(B) Providing functional requirements


(C) Providing the product design

Interview
Aptitude

Current affairs

(D) All of the above


English

Exam

Online test

Engineering

MCA

MBA

Login

ANSWER: B

In a software project management,


product life cycle is related to:
(A) Business plan
(B) Monitoring plan
(C) Control plan
(D) Execution plan
ANSWER: A

The main attribute of Spiral model for


software development is:
(A) Software reuse
(B) Prototyping
(C) Prototyping & software reuse
(D) Combination of parallel and sequential phases
ANSWER: C

GD

Placement papers

HR

Post your comment

Interview
Aptitude

Current affairs
English

Exam

Online test

Jobs

? Ask

Engineering

MCA

MBA

GD

Placement papers

HR

Login

Latest MCQs
General awareness - Banking

ASP.NET

PL/SQL

Mechanical Engineering

IAS Prelims GS

Java

Programming Language

Electrical Engineering

English

C++

Software Engineering

Electronic Engineering

Quantitative Aptitude

Oracle

English

Finance

Home

About us

Sitemap

Contact us

Terms of use

Follow us on Facebook!

Copyright 2016. All Rights Reserved.

Interview
Aptitude

Current affairs
English

Exam

Online test

Jobs

? Ask

Engineering

MCA

Login

MBA

GD

Placement papers

HR

You might also like