GENERAL PRINCIPLES
OF
CANA LININ
L
G
09-12-2011
NAC, HYDERABAD
CANAL LINING
09-12-2011
NAC, HYDERABAD
09-12-2011
NAC, HYDERABAD
09-12-2011
NAC, HYDERABAD
09-12-2011
NAC, HYDERABAD
FUNCTIONS OF LINING
SEEPAGE CONTROL
PREVENTION OF WATER
LOGGING
INCREASED RESISTANCE
HYDRAULIC
TO EROSION/ABRASION
EFFICIENCY
REDUCTION IN CROSS SECTION AREA
SMALLER STRUCTURES
LOW OPERATION AND MAINTENANCE
COST
09-12-2011
NAC, HYDERABAD
REQUIREMENTS OF LINING
ECONOMY
STRUCTURAL STABILITY
STRENGTH AND DURABILITY
REPAIRABILITY AND EASY
MAINTENANCE MAXIMUM HYDRAULIC
EFFICIENCY IMPERMEABILITY
RESISTANCE TO EROSION
ABILITY TO PREVENT WEED
GROWTH
RESISTANCE AGAINST
BURROWING ANIMALS
REASONABL FLEXIBILITY
E
09-12-2011
NAC, HYDERABAD
TYPES OF LINING
RIGID LINING
STONE PITCHED LINING
BURNT CLAY TILE/BRICK LINING
PRECAST CEMENT CONCRETE
IN-SITU CEMNT CONCRETE LINING
STONE MASONRY LINING
SOIL CEMENT LINING
SHOTCRETE LINING
ASPHALTI CEMENT/CONCRETE LINING
C
09-12-2011
NAC, HYDERABAD
TYPES OF LINING
BITUMINOUS / ASPHALTIC FELT
LINING
FIBRE REINFORCED PLASTIC
TISSUE ASPHALTIC MEMBRANE
COMPOSITE MEMBRANE/RUBBER
LINING FLEXIBLE LINING
GEOMEMBRANE
HDPE
LDPE
PVC
09-12-2011
NAC, HYDERABAD
FREE BOARD
FREE BOARD IS VERTICAL DIFFERNCE
BETWEEN F.S.L OF CANAL AND TOP OF LINING
CANAL DISCHARGE
FREE BOARD
cumecs
metres
> 10
0.75
3 10
0.60
13
0.50
< 1.0
0.30
< 0.1(water courses)
0.15
09-12-2011
NAC, HYDERABAD
10
LIMITING VELOCITY
09-12-2011
NAC, HYDERABAD
11
09-12-2011
NAC, HYDERABAD
12
09-12-2011
NAC, HYDERABAD
13
09-12-2011
NAC, HYDERABAD
14
NAC, HYDERABAD
15
SUB GRADE
Sub grade should be prepared,
dressed and rolled true to level and
according to the cross section of the
canal to form a firm compacted sub
grade for the lining.
09-12-2011
NAC, HYDERABAD
16
of soil
Other
sandy reaches
Sandythan
reaches
09-12-2011
NAC, HYDERABAD
17
NAC, HYDERABAD
18
NAC, HYDERABAD
19
METHODS OF UNDERDRAINAGE
Position of
Water Table
Free Draining
Between C.B.L
And F.S.L.
Above Canal
F.S.L.
09-12-2011
600 thick
Sand/Murram/
Pervious material
600 thick
Sand/Murram/
Pervious material
NAC, HYDERABAD
600 thick
Sand/Murram/
Pervious material
20
NAC, HYDERABAD
21
LONGITUDINAL DRAINS
TRANSVERSE DRAINS
150MM DIA AC/ PVC PIPES
12 DIA HOLES
100HOLES PER METRE
LENGTH
PARALLEL ROW OF HOLES SHALL
BE STAGGERED
SPACING 10m
c/c
PRESSURE RELIEF VALVES AT
SIDES 1 FOR EVERY 100 SqM
09-12-2011
NAC, HYDERABAD
22
09-12-2011
NAC, HYDERABAD
23
SURFACE DRAINAGE
THE TOP OF THE SIDE LINING
CONCRETE SHOULD BE KEYED INTO
THE SUBGRADE BOTH IN CUTTING
AND EMBANKMENT BY TAKING IT
HORIZONTALLY FOR A WIDTH OF
ABOUT 300mm. THIS KEY WOULD
PREVENT DIRECT ENTRY OF
SURFACE RAIN WATER BEHIND THE
LINING.
09-12-2011
NAC, HYDERABAD
24
SEQUENCE OF LINING
IT IS PREFERABLE TO
PLACE CONCRETE ON SIDES
FIRST.
THIS WILL PREVENT THE BED
FROM GETTING SPOILED BY
SUBSEQUENT OPERATIONS
THE PANEL WIDTH SHOULD VARY 2-3
METRES, IN NO CASE IT SHOULD NOT
BE >3M.
09-12-2011
NAC, HYDERABAD
25
CURING
THE LINING SHOULD BE CURED
FOR AT LEAST 28 DAYS,
SUBSEQUENT TO LAYING OF
CONCRETE LINING AFTER A
PERIOD OF 12 HOURS.
09-12-2011
NAC, HYDERABAD
26
NAC, HYDERABAD
27
CNS SOILS
CLAYEY SOILS
SILTY CLAY
SANDY CLAY
GRAVELLY SANDY
CLAY
09-12-2011
NAC, HYDERABAD
28
09-12-2011
NAC, HYDERABAD
29
CONSTRUCTION PROCEDURE
CANAL IN CUTTING
Proper moisture to be added after spreading CNS
material in 150mm thick layers and compacted
and after getting the required thickness, the
surface should be trimmed.
Then canal lining shall be taken up.
In deep cuts, the CNS layer should be provided
upto GL. The thickness above canal prism may
be 150-200mm, 1000mm above F.S.L of canal
09-12-2011
NAC, HYDERABAD
30
CONSTRUCTION PROCEDURE
CANAL IN EMBANKMENT
Proper moisture should be added to CNS soil and
expansive soil surface
Expansive soil and CNS Soil above GL should be
compacted simultaneously in layers with appropriate
equipment to ensure proper density
A rock toe with inverted filters may be provided at either
end of canal bank
The thickness of CNS layer on rear slopes may be
150-200mm provided simultaneously with expansive soil
and proper turfing is to be provided to protect slope
CNS layer below sand blanket at rock toe portion shall be
provided
09-12-2011
NAC, HYDERABAD
31
PERMEABILITY
STRENGTH
OF CONCRETE CORES AT SUITABLE
PLACES FROM THE SIDES OF CANAL
AS WELL AS FROM THE BED CANAL
CONCRETE SHALL BE TAKEN
09-12-2011
NAC, HYDERABAD
32
09-12-2011
NAC, HYDERABAD
33
THANK YOU