You are on page 1of 1

Site Engineering Query (SEQ)

Client:

Subcontractor:

Project No.:

Subcontract/P.O. No.:

SEQ No.: ........

Project Name:
A.

Query (with eventually proposed solution)


Reference document:

Originator
Representing:

(Attachments A1, A2, A3, etc........)

B.

Name
Signature
Date

:
:
:

Reply (To be decided by Site Engineer alone or after consultation with Engineering Department or others. Copies of correspondence
to be attached)

Site Engineer

(Attachments AB, B2, B3, etc........)

Name
Signature
Date

:
:
:

Distribution:
Copy: Originator

Original: Site Engineer

www.red-bag.com
C:\RB_Forms\RBY007A.DOT\

Attachment 1
BN-G-Y007

You might also like