Professional Documents
Culture Documents
MANUAL
31/16 10k Quad B.O.P.
Assemblies:
NE080A31 (Closed Flanges)
NE080A119 (Open Bottom Flange
Nexus Engineering & Machine Inc.
100-175 Clearview Drive
Red Deer, AB T4E 0A1
Phone: 403-314-0607
Fax: 403-347-3393
Website: www.nexusengineering.ca
E-mail: info@nexusengineering.ca
Revision
Description
0
Initial manual
1
Updated
2
Updated BOMs and formatting
ECN2014016: Ram block assembly BOM
3
updates
4
ECN2014031: 3in shear ram screws
5
ECN2013010: Stud callout; BOM numbers
6
BOM fixes, formatting
By
SM
SM
SER
Date
9/1/2011
12/31/2012
4/4/2014
SER
6/12/2014
SER
SER
SER
7/8/2014
12/5/2014
3/31/2015
TechnicalManual
31/1610kQuadB.O.P.
Page1of23
1 Table of Contents
1
2
3
4
5
6
TableofContents.....................................................................................................................................2
Introduction.............................................................................................................................................2
TechnicalData.........................................................................................................................................2
Certification.............................................................................................................................................3
Operation.................................................................................................................................................3
Assembly/DisassemblyProcedures......................................................................................................5
6.1
EqualizingBlocks.............................................................................................................................5
6.1.1 EqualizingBlockBillofMaterial..................................................................................................6
6.2
BlankedEqualizingBlock.................................................................................................................6
6.2.1 BlankedEqualizingBlockBillofMaterials..................................................................................7
6.3
BlindRams.......................................................................................................................................7
6.3.1 BlindRamsBillofMaterials........................................................................................................8
6.4
ShearRams......................................................................................................................................8
6.4.1 ShearRamsBillofMaterials.......................................................................................................9
6.5
SlipRams.......................................................................................................................................10
6.5.1 SlipRamsBillofMaterials........................................................................................................10
6.6
PipeRams......................................................................................................................................11
6.6.1 PipeRamsBillofMaterials.......................................................................................................11
6.7
Body&Actuators..........................................................................................................................12
6.7.1 31/1610KQuadBillofMaterials...........................................................................................14
6.7.2 Actuators..................................................................................................................................14
6.7.3 ShearActuators........................................................................................................................17
7 Maintenance..........................................................................................................................................20
8 SealKits..................................................................................................................................................20
8.1
ActuatorSealKit............................................................................................................................21
8.2
ShearActuatorSealKit..................................................................................................................21
8.3
EqualizingValveSealKit................................................................................................................21
8.4
EqualizingValveBlankSealKit......................................................................................................22
8.5
31/1610KQuadBOPSealKit.....................................................................................................22
9 RamBlockSparePartNumbers.............................................................................................................22
9.1
PipeRams......................................................................................................................................22
9.2
SlipRams.......................................................................................................................................23
2 Introduction
TheNexus31/1610KQuadBOPisdesignedforprotectionagainstblowoutsforcoiltubingoperations.
TheBOPramsareoperatedwithhydraulics.Thereisamanualclosefunctiontolocktheactuatorsclosedorused
toclosetheramsintheincidentofhydraulicfailure.TheBOPalsohasasecondhydraulicsystemdesignthatallows
fordisassemblyoftheactuatorsfromthebody.Thisallowsquickaccesstochangeorservicerams.
NexusEngineering&MachineInc.recommendsusingallappropriatepersonalprotectiveequipmentand
followingallimposedsafetyregulations/procedureswhenusingorservicingthisequipment.
3 Technical Data
WorkingPressure:
10,000psimaximum
Bore:
31/16
TechnicalManual
31/1610kQuadB.O.P.
Page2of23
OperatingTemperature:
40Deg.Fto320Deg.F(40Deg.Cto160Deg.C)
Top&BottomConnection:
10KBx154StuddedFlange
SideInjectionConnection:
10KBx154StuddedFlangex21502Weco
HydraulicPressure:
3,000psimax
ShearActuatorClosingVolume(perset):
85cu.in.(1.4liters)
ShearActuatorOpeningVolume(perset):
86cu.in.(1.4liters)
Blind,Slip&PipeActuatorClosingVolume(perset):
46cu.in.(0.75liters)
Blind,Slip&PipeActuatorOpeningVolume(perset):
48cu.in.(0.79liters)
HydraulicConnections:
NPT
TubingSizes:
1/4"to2
Service:
H2S
Weight:
1380lb.(bothassemblies)
4 Certification
a. TestingAllBOPsarehydrostaticandfunctiontestedasperAPI6A.
b. H2SServiceMaterialsincontactwithpressuredwellfluidsconformtoNACESpecificationMR0175
forH2SService.
c. ArticServiceInadditiontoNACEspecificationsabovemeetsAPI6ACharpyimpactsat50F
5 Operation
InstallationForproperoperationbesuretoinstalltheBOPcorrectly.Ensurethestudboltsinthetop
andbottomflangehavebeentightened.UseB7MorL7studsand2HMnutsforH2Sservice.UsenewBx154ring
gasketsandtorquestudstorecommendedspecifications.
HydraulicConnectionConnectthehydraulichosestoeachactuatorsetonthefrontoftheBOP.Besure
toconnecteachactuatorsetuptoappropriatehosesasindicatedonthecontrolpaneloftheunit.Itis
recommendedtolabeleachhosesetand/orusedifferentcouplersfortheactuatorsets.
RamOpenandCloseTheQuadBOPishydraulicallyoperated,withinternallocksoneachactuator.The
stemscanbeusedtoensuretheramsaremechanicallylockedafterhydraulicallyclosingthem.Also,intheevent
ofhydraulicfailuretheycanbeusedtoclosetherams.Youcannotopentheactuatorswiththemanuallockstems.
Beforeopeningtheramsmakesurethestemsarefullyretracted.
NOTE:Manuallockstemsarenotintendedforshearingapplications.
RamConfigurationTheQuadBOPstandardramconfigurationismadeupoffourramsets.Pleasenote
thattheramconfigurationcanbechangedaspercustomerrequirements.Tochangetheconfiguration,movethe
actuatorsettotherequiredrambore.
a.
BlindRamstopsetoframs.Theseareusedtosealoffwellborepressure.
b.
ShearRams secondsetoframs.Theseareusedtosheartubing.Pipesizerangeis1.00to2.00
TechnicalManual
31/1610kQuadB.O.P.
Page3of23
c.
d.
PipeSlipRamsthirdsetoframs.Theseareusedtogriptubingwhileshearingorareusedinanyother
applicationwherethetubingisrequiredtobeheldinplace.ChangeSlipsforeachpipesize.
PipeSealRamsfourthsetoframs.Theseareusedtosealaroundthetubingtoisolatewellbore
pressurebelowtherams.Changeinnersealandramblockforeachpipesize.
*NOTE:AsperNACEMR0175shearbladesareexemptfromthehardnessrequirementsofSteelasthey
needtobeharderthanthecoilinordertocutit.AsaresulttheyaresusceptibletoStressCorrosionCracking(SCC)
ifexposedtoanH2Senvironmentandshouldbeinspectedoftentocheckforcracking.
EqualizingBlocksEachsealingactuatorsethasanequalizingsystem.Thissystemallowswellbore
pressuretobeequalizedfromthebottomtothetopofthesealingramset.Slipramsetsusuallyhavethe
equalizingsystemblanked.
WhenservicingequipmentabovetheBOP,apressuredifferentialiscreatedbybleedingpressureoffof
thepressureequipmentabovetheBOP.Whentheequipmenthasbeenservicedandyouarereadytocontinuethe
job,theequalizingsystemmustbeusedtopreventapressuresurgewhichwouldbecreatedbyopeningthe
sealingrams.Failuretoequalizemaycausedamagetotheramoractuatorassemblies.
HydraulicActuatorAssemblyOpenandCloseTheQuadBOPisdesignedwithonehydraulicsystem.
ThisislocatedinthefrontoftheBOPandisusedtoopenandclosetherams.Thefollowingstepsareusedwhen
servicingtheramsordisassemblingtheactuators.Werecommendusingahandpump(witha4wayvalve)or
controllingthehydraulicsystemto1500psiwhenfollowingthesesteps.Seriousinjurycanoccurifexcessiveflow
orpressureisused.Toopentheactuatorsfollowthesesteps;
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
Ensurewellboreorhydrotesthasbeenbledoff.
Bleedoffhydraulicpressureforeachactuatorset.
Disconnectthehoseassemblies.
Removethefour1.257UNCactuatorstudbolts.Makesureeachstudiscompletelyunthreaded.You
canusea7/8Allenheadsocketora7/8Allenwrench(hexkeys)toremoveeachstud.
ConnecthydraulichosesandusetheramclosefunctiontoextendtheactuatorassembliesfromtheBOP
body.Disconnecthydraulichosesoncebothactuatorsareextended.
Removeramblock.Ifyouarehavingtroubleorneedtoextendtheramblockfollowthesesteps.
i.
Removeportplugs.Seeassemblybelow.
ii.
Installa3orlongerpipewith1/8NPTconnectionintotheportplugbore
iii.
Usehydraulicadaptertoconverttohydrauliccoupleryouareusing.
iv.
Connecthandpumptothehydrauliccouplers.
v.
Opentheactuatorassemblywithhydraulicpressure.
Serviceorchangeramblock.
Whenreadytoretracttheramblockensuretheramassemblyisorientateduprightandparalleltothe
rampocketontheBOPbody.Preformsteps(i.)to(v.)inreverseorder.Itisrecommendedthattwo
peoplepreformthisstep.Onetooperatethehydraulicsystem,theothertowatchtheramblockretract
andensureitdoessowithoutdamagingtheactuatorflangeorramblock.Whenfinishedreplaceport
plug.
BeforeinstallingtheactuatorassemblymakesurethesurfaceoftheBOPbodyandactuatorflangeare
cleanandfreeofdebris.
Useathreadcompoundoneachactuatorstudandstarteachactuatorstudbyhandbeforetightening.
Tighteneachstudtoaminimumof400ft.lb.
Repeatthesestepsforeachactuatorassembly.
TechnicalManual
31/1610kQuadB.O.P.
Page4of23
InjectionPortOnthesideoftheBOPoppositetheequalizingvalvesisa21502byBx152flange
connectionwhichisusedfordownholeinjection.
InstallOring(4)andbackup(7)totheequalizingvalveplug(2).Threadvalveintotheequalizing
block(1)
Assembletheneedleretainerplate(3)totheequalizingblock(1)usingsocketheadcapscrews(10)
InstallOrings(5&6)andbackups(8&9)totheequalizingblock(1).
InstallassemblytoBOPbodywithsocketheadcapscrews(11)andtightenscrewstoamaximumof
30ft.lb.
ToDisassemble:
a.
ReverseAssemblySteps
TechnicalManual
31/1610kQuadB.O.P.
Page5of23
NE-080-A014-2
DESCRIPTION
Equalizing Block
Equalizing Valve Plug
Needle Retainer Plate
O-Ring
O-Ring
O-Ring
Backup Ring
Backup Ring
Backup Ring
Socket Head Cap Screw
Socket Head Cap Screw
QTY.
1
1
1
1
1
1
1
1
1
2
4
InstallOrings(2&3)andBackups(4&5)toblankedequalizingblock(1).
InstallassemblytoBOPbodywithsocketheadcapscrews(6)andtightenscrewstoamaximumof30
ft.lb.
ToDisassemble:
a.
ReverseAssemblySteps
TechnicalManual
31/1610kQuadB.O.P.
Page6of23
NE-080-A028-2
DESCRIPTION
Equalizing Block Blank
O-Ring
O-Ring
Backup Ring
Backup Ring
Socket Head Cap Screw
QTY
1
1
1
1
1
4
Placeinnerseal(#2)intoramblock(#1).RetainwithScrews(#5).
InstallOuterSeal(#3).
InstallKey(#4),retainwithSHCS(#6).
ToDisassemble:
a.
ReverseAssemblySteps.
TechnicalManual
31/1610kQuadB.O.P.
Page7of23
PlaceShearBlade(#2)intoramblock(#1);holesinbladelineupwiththreadedramblockholes.
Installflatsocketcapscrews(#3).
Installshortalignmentkey(#5)inramblocks.Retainwithsocketheadcapscrews(#4).
ToDisassemble:
a.
ReverseAssemblySteps
b.
Visuallycheckbladesfordamageandcracks*.Replacecomponentsthatshowwearordamage.
*NOTE:AsperNACEMR0175shearbladesareexemptfromthehardnessrequirementsofSteelasthey
needtobeharderthanthecoilinordertocutit.AsaresulttheyaresusceptibletoStressCorrosionCracking(SCC)
ifexposedtoanH2Senvironmentandshouldbeinspectedoftentocheckforcracking.
TechnicalManual
31/1610kQuadB.O.P.
Page8of23
TechnicalManual
31/1610kQuadB.O.P.
Page9of23
Installslip(#2)intoeachramblock(#1)andretainwithscrews(#5).
Installalignmentkey(#3)inramblocks(#1)withsocketheadcapscrews(#4).
ToDisassemble:
a.
ReverseAssemblySteps.
TechnicalManual
31/1610kQuadB.O.P.
Page10of23
Installouterseal(#3)ontoeachramblock(#1).
Placeinnerseal(#4)intoramblock(#1).Installscrews(#2).
Installalignmentkey(#5)inramblocks(#1)withsocketheadcapscrews(#6).
ToDisassemble:
a.
ReverseAssemblySteps.
TechnicalManual
31/1610kQuadB.O.P.
Page11of23
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
SettheMainBody(#1)onapieceofplywoodornonabrasivesurfacewiththebottomconnection
down(Keywaysinramboresshouldbeonthebottomofthebore).Theplywoodornonabrasive
surfaceistopreventdamagetothebottomflange.
InstallBX154topstudsandnuts1B7MorL7(19&18).
InstallBX152sidestudsB7MorL7(#12).
InstallBX152sideflange(#16).UseanewBX152stainlesssteelringgasket(#15),Wecofaceseal
(#14),and2HMNuts(#13).
Installequalizingvalves(#3)andblankvalve(#11).
InstallhydrauliccouplersintoBOPbody.Besuretoinstalleachactuatorsettotheappropriatehoses
asindicatedonthecontrolpaneloftheunit.Itisrecommendedtolabeleachhydraulicsetand/or
usedifferentcouplersfortheactuatorsets.
Assembleoneoftheactuatorsassemblies(#2)locatedatthebottomoftheBOPasdescribed
belowinsection6.7.2.
Continuetoassembleactuatorsincludingshearactuator(#4)untilassemblyiscomplete.See
section6.7.3.
Option:BoltonDeBoosterAssembly(#20)andplumbinwithhighpressuretubing.SeetheDe
Boostermanualforadditionalinformation.
Whenappropriate,installBX154bottomstudsandnuts1B7MorL7(#19).
Whenappropriate,installcorrectrams.
ToDisassemble:
a.
b.
c.
d.
e.
f.
Openallequalizingports.
Ensurethatallramassemblieshavebeenhydraulicallyretracted
MakessurethereisnopressureintheBOPbody
Reverseassemblyproceduresforallactuatorassembles.
Afterdisassemblyinspectallsealingsurfacesforwearsuchaspittingandchecksealsfordamages
suchascuts,nicks,andcracks.
Replacecomponentsthatindicateexcessivewear.
TechnicalManual
31/1610kQuadB.O.P.
Page12of23
TechnicalManual
31/1610kQuadB.O.P.
Page13of23
6.7.2 Actuators
NOTE:Thereisaleftandrightassemblyforeachactuatorassembly.Besuretocheckorientationofthe
partswhenassembling.Thekeywaysintheactuatorflangewillfacedown.
a.
b.
AssembleOrings(9,and12)withbackupring(15)totheactuatorflange(1or1B)asshown.
Installthepackingstackintotheactuatorflange(1or1B,seedrawingbelow).Installfemaleadapter
(1)thenthreemolyrings(2)andthenmaleadapter(3).
TechnicalManual
31/1610kQuadB.O.P.
Page14of23
NE-080-A37
DESCRIPTION QTY.
Male Adapter
1
Moly Ring
3
Female Adapter
1
a.
b.
c.
d.
Installretainingring(19).
AssembleQuadring(13)onthepiston(2).
Greaseinsideofpackingset(18)
Guidethepiston(2)intotheactuatorflange(1or1B)asshownandtapthroughusingarubber
mallet.
e. Usingastrapwrenchsoasnottoodamagethesealingsurface;Screwthepistonretainer(6)ontothe
piston(2),makesureitbottomsout.
f. Installsetscrew(20)intopistonretainer(6)tosecuretopiston(2).
g. Threadthemanualstem(3)intothepiston(2).
h. AssembleOrings(10and11)withbackupring(14)totheendcap(4)asshown.
i. Threadtheendcap(4)ontotheactuatorflange(1or1B).
j. AssembleOrings(7)ontheportplugs(5).
k. Threadportplugs(5)intotheactuatorflange(1or1B)
l. AssembleOrings(8)onthehydraulicportadapters(16).
m. Installthehydraulicportadapters(16)intotheactuatorflange(1or1B).
n. Installgreasezerk(21)inactuatorflange(1or1B).
o. Installappropriateramblockintopistonretainer(seeaboveforramassemblies)
p. InsertactuatorontoBOPmainbodyandthreadin11/4socketheadcapscrews.
q. Assembletheotheractuatorassembliesasdescribedinstepsathrur.Refertodrawingbelow(2or3
frommainBOPassemblyabove).
r. Connecthydraulicsystemtoactuatorsandfunctionthecylinderopen/closethreetofourtimesto
fillthecylinderswithhydraulicoilandremoveair.Alsocheckforleaksatthistime.Ifthereareleaks
reversetheassemblystepstofindtheproblem.
s. Makesurecylindersareinleftintheopenposition.Youcancheckthepistonlocationthroughthe
windowsintheendcap.
TechnicalManual
31/1610kQuadB.O.P.
Page15of23
TechnicalManual
31/1610kQuadB.O.P.
Page16of23
QTY.
1
1
1
1
1
2
1
2
4
2
1
1
1
1
1
1
2
4
1
1
1
1
AssembleOrings(11and13)withbackupring(16)totheactuatorflangeasshown.
Installthepackingstackintotheactuatorflange(1or1B,seedrawingbelow).Installfemaleadapter
(1)thenthreemolyrings(2)andthenmaleadapter(3).
TechnicalManual
31/1610kQuadB.O.P.
Page17of23
NE-080-A35
DESCRIPTION QTY.
Male Adapter
1
Moly Ring
3
Female Adapter
1
a.
b.
c.
d.
Installretainingring(17).
AssembleQuadring(14)onthepiston(3).
Greaseinsideofpackingset(7)
Guidethepiston(3)intotheactuatorflange(1or1B)asshownandtapthroughusingarubber
mallet.
e. Usingastrapwrenchsoasnottoodamagethesealingsurface;Screwtheshearpistonretainer(5)
ontothepiston(3),makesureitbottomsout.
f. Installsetscrew(20)intopistonretainer(5)tosecuretopiston(3).
g. AssembleOrings(9)ontheportplugs(4).
h. Threadportplugs(4)intotheactuatorflange(1or1B)
i. AssembleOrings(8)onthehydraulicportadapters(6).
j. Installthehydraulicportadapters(6)intotheactuatorflange(1or1B).
k. Installgreasezerk(21)inactuatorflange(1or1B).
l. Install11/4stud(18)intoBOPmainbody(1onmainassemblyabove).
m. Installshearramblockintoshearpistonretainer.Seeaboveassemblyforshearram.
n. Insertactuatorflange(1or1B)onto11/14studs(18).
o. AssembleOrings(10and12)withbackupring(15)totheendcap(2)asshown.
p. Insertendcap(2)ontotheactuatorflange(1or1B).
q. Threadthefournuts(19)ontothestuds(18)andtightento400ft.lb.
r. Assembletheotheractuatorassemblyasdescribedinstepsathrus.Refertodrawingbelow(5and6
onmainBOPassembly).
s. Connecthydraulicsystemtoactuatorsandfunctionthecylinderopen/closethreetofourtimesto
fillthecylinderswithhydraulicoilandremoveair.Alsocheckforleaksatthistime.Ifthereareleaks
reversetheassemblystepstofindtheproblem.
t. Makesurecylindersareleftintheopenposition.Youcancheckthepistonlocationthroughthe
windowsintheendcap.
TechnicalManual
31/1610kQuadB.O.P.
Page18of23
TechnicalManual
31/1610kQuadB.O.P.
Page19of23
7 Maintenance
ForthebestperformanceitisrecommendedthattheBOPactuatorsbeopened,cleanedandgreased
aftereveryjob.Anydamagedsealorpartshouldbereplaced.
NOTE:IfyourBOPisassembledwiththeoptionalDeBooster,pleaserefertotheDeBoostermanual.
8 Seal Kits
Belowliststheindividualassemblysealkitsandtheirassociatedpartnumbers.Aswellitlistsacomplete
BOPsealkit.Sealkitsareofferedinavarietyofservices.ThesealkitslistedinthismanualareforH2Sservice.
PleasecontactNexusEngineering&Machineifyourequirekitsnotlistedhere.
TechnicalManual
31/1610kQuadB.O.P.
Page20of23
QTY.
1
1
1
1
1
1
TechnicalManual
31/1610kQuadB.O.P.
Page21of23
QTY.
6
2
2
2
1
TechnicalManual
31/1610kQuadB.O.P.
Page22of23
PIPE SIZE
BLIND
3/4"
1"
1-1/14"
1-1/2"
1-3/4"
2"
ASSEMBLY #
NE-080-A32-BLIND
NE-080-A32-075
NE-080-A32-100
NE-080-A32-125
NE-080-A32-150
NE-080-A32-175
NE-080-A32-200
RAM BLOCK #
NE-080-0137-BLIND
NE-080-0137-075
NE-080-0137-100
NE-080-0137-125
NE-080-0137-150
NE-080-0137-175
NE-080-0137-200
INNER SEAL #
NE-080-300-BLIND
NE-080-300-075
NE-080-300-100
NE-080-300-125
NE-080-300-150
NE-080-300-175
NE-080-300-200
OUTER SEAL #
NE-080-300-OUT
NE-080-300-OUT
NE-080-300-OUT
NE-080-300-OUT
NE-080-300-OUT
NE-080-300-OUT
NE-080-300-OUT
PIPE SIZE
3/4"
1"
1-1/4"
1-1/2"
1-3/4"
2"
ASSEMBLY #
NE-080-A38-075
NE-080-A38-100
NE-080-A38-125
NE-080-A38-150
NE-080-A38-175
NE-080-A38-200
SLIP INSERT #
NE-080-165-075
NE-080-165-100
NE-080-165-125
NE-080-165-150
NE-080-165-175
NE-080-165-200
RAM BLOCK #
NE-080-164
NE-080-164
NE-080-164
NE-080-164
NE-080-164
NE-080-164
TechnicalManual
31/1610kQuadB.O.P.
Page23of23