Professional Documents
Culture Documents
PLANO:
OBRA:
E-01, E-02
"MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE, DIST. DE OMATE PROV. GRAL SANCHEZ CERRO "
Longitud N de
unitaria
N de
element.
veces iguales
ACERO DE REFUERZO
Dim.
Longirud
METRADO
METRADO
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Parcial
PARCIAL
FINAL
0.25
0.58
1.02
1.60
2.25
4.04
(m)
(kg)
(kg)
230.44
1.10
1.10
1.40
1.10
0.90
0.90
5/8
5/8
5/8
5/8
5/8
5/8
"
"
"
"
"
"
35.20
22.00
35.20
35.20
22.00
35.20
80.64
50.40
80.64
52.80
33.00
52.80
5.76
3.60
5.76
5.76
3.60
5.76
441.13
8.60
8.60
1.30
65
14.90
1.00
95
5/8
1/2
3/8
1/2
1/4
"
"
"
"
"
110.08
68.80
110.08
35.09
34.40
35.09
98.02
169.00
98.02
121.58
119.20
121.58
47.50
190.00
47.50
111.21
14.00
2.20
56
3/8 "
3/8 "
32.48
56.00
32.48
71.46
123.20
71.46
Columna-C2
Columna-C3
1435.02
5.00
10
5/8 "
320.00
200.00
320.00
2.00
35
3/8 "
162.40
280.00
162.40
5.00
5/8 "
256.00
160.00
256.00
2.00
35
3/8 "
162.40
280.00
162.40
5.00
5/8 "
96.00
60.00
96.00
E-01, E-02
"MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE, DIST. DE OMATE PROV. GRAL SANCHEZ CERRO "
Longitud N de
unitaria
Columna-C4
Columna-C5
N de
element.
veces iguales
Dim.
ACERO DE REFUERZO
Longirud
METRADO
METRADO
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Parcial
PARCIAL
FINAL
0.25
0.58
1.02
1.60
2.25
4.04
(m)
(kg)
(kg)
1.50
35
3/8 "
60.90
105.00
60.90
5.00
1/2 "
20.40
20.00
20.40
1.00
32
1/4 "
8.00
32.00
8.00
3.60
20
3/8 "
167.04
288.00
167.04
0.80
22
20
1/4 "
88.00
352.00
88.00
723.48
14.90
5/8 "
190.72
119.20
190.72
14.90
1/2 "
60.79
59.60
60.79
1.30
88
3/8 "
132.70
228.80
132.70
8.60
1/2 "
105.26
103.20
105.26
0.90
52
1/4 "
23.40
93.60
23.40
3.50
1/2 "
28.56
28.00
28.56
0.90
22
1/4 "
9.90
39.60
9.90
2.20
1/2 "
17.95
17.60
17.95
0.90
1/4 "
3.15
12.60
3.15
4.70
1/2 "
76.70
75.20
76.70
0.90
30
1/4 "
27.00
108.00
27.00
E-01, E-02
"MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE, DIST. DE OMATE PROV. GRAL SANCHEZ CERRO "
Longitud N de
unitaria
N de
element.
veces iguales
Dim.
ACERO DE REFUERZO
Longirud
METRADO
METRADO
1/4"
3/8"
1/2"
5/8"
3/4"
1"
Parcial
PARCIAL
FINAL
0.25
0.58
1.02
1.60
2.25
4.04
(m)
(kg)
(kg)
En Ingreso
45.43
3.00
3/8 "
17.40
30.00
17.40
1.60
10
3/8 "
18.56
32.00
18.56
2.60
3/8 "
4.52
7.80
4.52
0.60
3/8 "
2.78
4.80
2.78
HOJA
HOJA:
OBRA:
DE
METRADOS
E-1, E-2
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Dimensiones
Und.
Med.
Ubicacin
Cant.
01.00.00
01.01.00
CONSTRUCCIONES PROVISIONALES
01.01.01
Oficina
M2
01.01.02
Almacen
M2
01.01.03
Guardiania
M2
01.01.04
Comedor
01.01.05
Vestuario
01.01.06
01.01.07
3.00
2.50
4.00
2.00
1.20
M2
3.00
2.20
M2
3.00
2.20
Servicios Higienicos
M2
ML
01.01.08
Cartel
UNID
2.00
9.00
1.00
1.00
Cercos
01.02.00
INSTALACIONES PROVISIONALES
01.02.01
GLB
1.00
01.02.02
GLB
1.00
01.03.00
TRABAJOS PRELIMINARES
01.03.01
Limpieza de terreno
M2
5.50
01.03.02
GLB
1.00
01.03.03
01.03.03.01
M2
6.30
3.00
01.03.03.02
M2
6.30
3.00
02.00.00
ESTRUCTURAS
02.01.00
MOVIMIENTO DE TIERRAS
02.01.01
6.15
0.50
2.35
0.50
2.35
0.50
6.15
0.50
6.15
0.35
2.35
0.35
2.35
0.35
6.15
0.35
1.00
12.92
2.50
5.50
-
M3
CC-1
CC-2 y CC-3
02.01.02
Relleno
M3
CC-1
M3
HOJA
HOJA:
OBRA:
03.03.00
03.04.00
03.05.00
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Dimensiones
Und.
Med.
Ubicacin
Cant.
M3
zapata Z1
1.10
1.10
zapata Z2
1.10
1.40
zapata Z3
0.90
0.90
zapata Z1
1.10
1.10
zapata Z2
1.10
1.40
zapata Z3
0.90
0.90
0.50
9.30
0.50
9.30
0.50
1.60
0.50
2.80
0.50
2.90
0.50
0.35
SALN
area
97.50
SSHH DAMAS
area
3.20
SSHH VARONES
area
3.20
ATRIO
area
85.35
M3
M2
M3
zapata Z1
1.10
1.10
zapata Z2
1.10
1.40
zapata Z3
0.90
0.90
0.50
9.30
0.50
9.30
0.50
1.60
0.50
2.80
0.50
2.90
0.50
0.35
zapata Z1
1.10
1.10
zapata Z2
1.10
1.40
zapata Z3
0.90
0.90
0.50
9.30
03.06.00
04.00.00
04.01.00
04.02.00
METRADOS
E-1, E-2
03.02.00
DE
M3
M3
M3
HOJA
HOJA:
OBRA:
04.04.00
04.05.00
04.06.00
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Dimensiones
Und.
Med.
Ubicacin
Cant.
0.50
9.30
0.50
1.60
0.50
2.80
0.50
2.90
0.50
0.35
0.50
9.30
0.50
9.30
0.50
1.60
0.50
2.80
0.50
2.90
0.50
0.35
M3
M2
2.90
0.68
M3
0.15
2.90
0.15
0.68
SALN
area
97.50
SSHH DAMAS
area
3.20
SSHH VARONES
area
3.20
ATRIO
area
85.35
M3
05.00.00
05.01.00
Zapatas
05.01.01
KG
05.01.02
M2
05.01.03
METRADOS
E-1, E-2
04.03.00
DE
zapata Z1
4.40
zapata Z2
5.00
zapata Z3
3.20
M3
zapata Z1
1.10
1.10
zapata Z2
1.10
1.40
zapata Z3
0.90
0.90
05.02.00
Viga de cimentacin
05.02.01
KG
05.02.02
M2
HOJA
HOJA:
OBRA:
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Cant.
14.00
8.00
3.00
M3
0.15
14.00
0.15
8.00
0.15
3.00
05.02.01
KG
05.02.02
M2
14.00
M3
05.03.00
Columnas
05.03.01
KG
05.03.02
M2
0.15
14.00
Columna-C1
2.00
Columna-C2
2.00
Columna-C3
1.50
Columna-C4
1.00
Columna-C5
20
0.80
M3
Columna-C1
area
0.19
Columna-C2
area
0.19
Columna-C3
area
0.13
Columna-C4
area
0.06
Columna-C5
20
area
0.04
05.04.00
Vigas
05.04.01
KG
05.04.02
M2
05.04.03
Ubicacin
Sobrecimiento armado
05.03.03
Dimensiones
Und.
Med.
05.02.00
05.02.03
METRADOS
E-1, E-2
05.02.03
DE
14.00
8.00
1.35
3.00
4.40
11.90
M3
0.25
14.00
HOJA
HOJA:
OBRA:
DE
E-1, E-2
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Dimensiones
Und.
Med.
Ubicacin
Cant.
0.25
8.00
0.15
1.35
0.15
3.00
0.25
4.40
0.15
11.90
05.05.00
Loza de concreto
05.05.01
KG
05.05.02
M2
05.05.03
METRADOS
area
4.80
En SS.HH. Laterales
0.15
1.60
En ingreso
area
1.20
En ingreso laterales
0.15
2.00
1.60
3.00
En ingreso
0.60
2.00
M3
DE
METRADOS
METRADO METRADO
Alto (z)
Parcial
Total
7.50
7.50
10.00
10.00
2.40
2.40
6.60
6.60
6.60
6.60
2.00
2.00
49.50
49.50
1.00
1.00
1.00
1.00
1.00
1.00
49.50
49.50
1.00
1.00
18.90
18.90
18.90
18.90
15.19
1.40
4.31
1.40
3.29
1.40
3.29
1.40
4.31
2.28
0.30
0.65
0.30
0.49
0.30
0.49
0.30
0.65
1.15
14.86
14.86
DE
METRADOS
METRADO METRADO
Alto (z)
Parcial
Total
37.23
2.50
12.10
2.50
23.10
2.50
2.03
1.20
5.81
1.20
11.09
1.20
0.97
0.20
1.86
0.20
1.86
0.20
0.32
0.20
0.56
0.20
0.58
0.20
0.07
23.12
189.25
97.50
3.20
3.20
85.35
62.57
1.30
6.29
1.30
12.01
1.30
1.05
1.10
10.23
1.10
10.23
1.10
1.76
1.10
3.08
1.10
3.19
0.80
0.28
62.57
62.57
10.42
0.70
3.39
0.70
6.47
0.70
0.57
18.38
0.70
6.51
DE
METRADOS
METRADO METRADO
Alto (z)
Parcial
0.70
6.51
0.70
1.12
0.70
1.96
0.70
2.03
0.70
0.25
1.10
5.12
1.10
5.12
1.10
1.76
1.10
3.08
1.10
3.19
0.80
0.28
0.30
3.48
0.30
0.82
0.30
0.26
0.30
0.06
Total
18.54
4.30
0.32
189.25
97.50
3.20
3.20
85.35
230.44
20.32
0.40
7.04
0.40
12.00
0.40
1.28
5.96
0.40
1.94
0.40
3.70
0.40
0.32
441.13
33.60
DE
METRADOS
METRADO METRADO
Alto (z)
Parcial
0.40
22.40
0.40
6.40
0.40
4.80
Total
2.52
0.40
1.68
0.40
0.48
0.40
0.36
111.21
28.00
1.00
28.00
2.10
1.00
2.10
1435.02
141.60
4.50
36.00
4.50
54.00
4.50
13.50
4.50
4.50
2.10
33.60
11.62
4.50
3.42
4.50
5.06
4.50
1.17
4.50
0.28
2.10
1.68
723.48
48.20
0.40
22.40
0.20
6.40
0.30
1.62
0.30
3.60
0.20
7.04
0.15
7.14
0.40
2.80
18.90
DE
METRADOS
METRADO METRADO
Alto (z)
Parcial
0.40
6.40
0.30
0.81
0.30
1.80
0.20
3.52
0.15
3.57
Total
45.43
11.88
9.60
0.48
1.20
0.60
1.62
0.15
1.44
0.15
0.18
HOJA
DE
METRADOS
HOJA:
A-01
OBRA:
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
ARQUITECTURA
06.00.00 MUROS Y TABIQUES
06.01.00 Muros ladrillo KK soga C/M 1:5 x 1.5 cm.
91.24
M2
10.22
2.20
44.97
1.90
2.70
5.13
2.80
2.80
7.84
0.50
2.70
1.35
2.25
2.80
6.30
1.20
2.80
3.36
2.50
2.80
14.00
2.25
2.70
12.15
2.25
2.70
12.15
26.73
M2
199.95
MUROS
Muro (eje A,D entre ejes 1-5)
10.22
2.20
44.97
1.90
2.70
10.26
2.80
2.80
15.68
0.50
2.70
5.40
2.25
2.80
12.60
1.20
2.80
6.72
2.50
2.80
28.00
Columna-C1
0.60
2.70
6.48
Columna-C2
0.60
2.70
6.48
Columna-C3
1.00
2.70
13.50
Columna-C5
19
0.50
2.80
26.60
14.05
0.50
14.05
1.90
0.20
0.76
1.25
0.50
1.25
7.50
0.40
3.00
7.00
0.60
4.20
COLUMNAS
VIGAS
120.32
M2
area
7.20
28.80
area
45.76
91.52
HOJA
DE
METRADOS
HOJA:
A-01
OBRA:
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
25.54
ML
0.95
1.90
3.92
7.84
3.75
7.50
2.00
2.00
2.90
2.90
0.75
1.50
0.90
0.90
1.00
1.00
Total
101.74
M2
SSHH DAMAS
area
4.00
4.00
SSHH VARONES
area
4.00
4.00
SALON
area
75.51
75.51
COCINA
area
9.13
9.13
DEPOSITO
area
9.10
9.10
08.00.00 PISOS
08.01.00 Contrapiso e=48mm, Base 3.8cm Mez. 1:5
101.74
SALN
area
75.51
75.51
SSHH DAMAS
area
4.00
4.00
SSHH VARONES
area
4.00
4.00
COCINA
area
9.13
9.13
DEPOSITO
area
9.10
9.10
101.74
SALN
area
75.51
75.51
SSHH Damas
area
4.00
4.00
SSHH Varones
area
4.00
4.00
COCINA
area
9.13
9.13
DEPOSITO
area
9.10
9.10
09.00.00 ZCALOS
09.01.00 Zocalo de maylica 0.20x0.30 Inc. Tarrajeo primario
26.88
M2
SSHH Damas-Varones
8.40
1.60
26.88
4.78
Ingreso principal
area
4.78
4.78
maseteros
area
1.72
3.44
10.00.00 CONTRAZOCALOS
10.01.00 Contrazocalo de ceramico h=0.10m
ML
75.51
HOJA
DE
METRADOS
HOJA:
A-01
OBRA:
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
N de
Med.
SALN
Dimensiones
Und.
75.51
METRADO METRADO
Alto (z)
Parcial
Total
75.51
28.55
ML
8.00
8.00
14.05
14.05
6.50
6.50
11.00.00 CUBIERTAS
1.00
UND
Ingreso principal
1.00
4.00
M2
2.00
COCINA
1.00
DEPOSITO
1.00
14.00.00 CERRAJERA
14.01.00 Bisagra Tipo Capuchina Aluminizada 3"
12.00
UND
6.00
Cocina
3.00
3.00
Deposito
14.02.00 Bisagra Tipo Capuchina Aluminizada 4"
Ingreso principal
Puerta trasera
14.03.00 Cerradura puerta principal
8.00
8.00
1.00
1.00
UND
Ingreso principal
14.04.00 Cerradura para Bao Bronce
16.00
UND
4.00
UND
2.00
Cocina
1.00
Deposito
1.00
15.00.00 VIDRIOS
15.01.00
UND
2.00
2.00
15.02.00
UND
2.00
2.00
HOJA
DE
METRADOS
HOJA:
A-01
OBRA:
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
15.03.00
UND
2.00
2.00
15.04.00
UND
1.00
1.00
15.05.00
UND
1.00
1.00
16.00.00 PINTURA
16.01.00 Pintura cielorraso Latex 2 manos
101.74
M2
SSHH DAMAS
area
4.00
4.00
SSHH VARONES
area
4.00
4.00
COCINA
area
9.13
9.13
DEPOSITO
area
9.10
9.10
SALON
area
75.51
75.51
225.49
M2
MUROS
Muro (eje A,D entre ejes 1-5)
10.22
2.20
44.97
1.90
2.70
10.26
2.80
2.80
15.68
0.50
2.70
5.40
2.25
2.80
12.60
1.20
2.80
6.72
2.50
2.80
28.00
Columna-C1
0.60
2.70
6.48
Columna-C2
0.60
2.70
6.48
Columna-C3
1.00
2.70
13.50
Columna-C5
19
0.50
2.80
26.60
14.05
0.50
14.05
1.90
0.20
0.76
1.25
0.50
1.25
7.50
0.40
3.00
7.00
0.60
4.20
0.95
1.90
3.92
7.84
3.75
7.50
2.00
2.00
2.90
2.90
0.75
1.50
0.90
0.90
1.00
1.00
COLUMNAS
VIGAS
M2
HOJA
DE
METRADOS
HOJA:
A-01
OBRA:
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
137.31
M2
MUROS
Eje 1 entre ejes A y D
area
19.20
19.20
area
37.81
37.81
area
19.20
19.20
area
38.55
38.55
0.30
8.00
2.40
0.30
14.00
4.20
0.30
6.50
1.95
1.00
14.00
14.00
M2
17.00.00 VARIOS
17.01.00 Vestuario personal obrero
GLB
1.00
1.00
GLB
5.00
5.00
GLB
5.00
5.00
M2
261.57
261.57
GLB
1.00
1.00
GLB
1.00
1.00
area
261.57
HOJA
HOJA:
OBRA:
DE
METRADOS
IS-01
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
INSTALACIONES SANITARIAS
18.00.00 APARATOS Y ACCESORIOS SANITARIOS
18.01.00 Aparatos sanitarios
18.01.01 Inodoro nacional sifon jet blanco
SSHH Damas
SSHH Varones
18.01.02 Lavatorio nacional blanco
SSHH Varones
lavatorio
1.00
1.00
3.00
2.00
1.00
1.00
1.00
PZA
SSHH Varones
18.01.04
1
PZA
SSHH Damas
18.01.03 Urinario nacional modelo cadet
2.00
PZA
1.00
PZA
Cocina
1.00
2.00
UND
SSHH Damas
1.00
SSHH Varones
1.00
2.00
UND
SSHH Damas
1.00
SSHH Varones
1.00
2.00
UND
SSHH Damas
1.00
SSHH Varones
1.00
3.00
UND
SSHH Damas
2.00
SSHH Varones
1.00
2.00
UND
SSHH Damas
1.00
SSHH Varones
1.00
7.00
PZA
SSHH Damas
3.00
SSHH Varones
3.00
Cocina
1.00
10.00
UND
SSHH Damas
5.00
SSHH Varones
5.00
HOJA
HOJA:
OBRA:
DE
METRADOS
IS-01
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
2.00
PTO
SSHH Damas
1.00
SSHH Varones
1.00
Cocina
20.01.02 Salida de desage en PVC de 2"
0.00
7.00
PTO
SSHH Damas
3.00
SSHH Varones
3.00
Cocina
1.00
SSHH Damas
1.00
SSHH Varones
1.00
Cocina
1.00
3.00
PTO
8.50
7.00
7.00
7.00
15.00
15.00
15.00
ML
Cocina
20.03.04 Tubera de PVC sal 2"
8.50
ML
8.50
ML
3.00
ML
Cocina
3.00
3.00
0.00
PZA
bajada de lluvia
20.04.02 Codo PVC sal 2"x90
0.00
7.00
PZA
SSHH Damas
3.00
SSHH Varones
3.00
Cocina
1.00
SSHH Damas-varones
Cocina
20.04.04 Tee PVC sal 4"a 2"
SSHH Damas
2.00
PZA
2.00
0.00
3.00
PZA
1.00
HOJA
HOJA:
OBRA:
DE
METRADOS
IS-01
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
N de
Med.
SSHH Varones
Cocina
20.04.05 Yee PVC sal 2"
Dimensiones
Und.
METRADO METRADO
Alto (z)
Parcial
1.00
1.00
8.00
PZA
SSHH Damas-varones
8.00
0.00
SSHH Damas
1.00
SSHH Varones
1.00
Cocina
0.00
Cocina
20.04.06 Yee reduc. PVC sal 4"-2"
Total
2.00
PZA
3.00
PZA
SSHH Damas
1.00
SSHH Varones
1.00
1.00
Cocina
20.05.02 Registros de bronce de 2"
0.00
PZA
SSHH Damas
0.00
SSHH Varones
0.00
0.00
Cocina
20.05.03 Sombrero ventilacin PVC de 2"
3.00
PZA
SSHH Damas
1.00
SSHH Varones
1.00
Cocina
1.00
3.00
PZA
3.00
7.00
PTO
SSHH Damas
3.00
SSHH Varones
3.00
Cocina
1.00
5.00
Cocina
5.00
5.00
0.00
21.00
Exterior
21.00
21.00
8.00
UND
SSHH Damas
4.00
SSHH Varones
4.00
Cocina
UND
4.00
4.00
HOJA
HOJA:
OBRA:
DE
METRADOS
IS-01
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ
CERRO
DESCRIPCIN DEL ELEMENTO
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
5.00
UND
SSHH Damas
2.00
SSHH Varones
2.00
Cocina
1.00
UND
1.00
1.00
UND
4.00
4.00
UND
3.00
3.00
UND
5.00
5.00
21.04.00 VALVULAS
21.04.01 Vlvula de compuerta de Bronce de 1/2"
HOJA
HOJA:
OBRA:
DE
METRADOS
IE-01
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Dimensiones
Und.
N de
Med.
METRADO
Alto (z)
Parcial
INSTALACIONES ELCTRICAS
22.00.00 INSTALACIONES ELCTRICAS
22.01.00 Salida para centro de luz
PTO
SALN
6.00
SSHH DAMAS
1.00
SSHH VARONES
1.00
COCINA
1.00
DEPOSITO
1.00
SALN
6.00
COCINA
2.00
1.00
8.00
4.00
SS.HH.
2.00
SALON
2.00
COCINA
1.00
DEPOSITO
1.00
EXTERIOR
4.00
1.00
PTO
UND
PTO
SALN-SS.HH.
22.05.00 Artefacto flourescente-RAS-E y lampara de 2x40W.
PTO
SALN
22.06.00 Focos ahorradores de 100 W.
PTO
PTO
SALN
22.08.00 Cable TW N 10, 6 mm
ML
2.04
4.08
circuito C-2
26.61
53.22
circuito C-3
4.00
8.00
62.44
124.88
circuito C-2
53.22
53.22
circuito C-3
8.00
8.00
ML
ML
circuito C-1
22.11.00 Tubera PVC SAP electricas de 20 mm.
ML
HOJA
HOJA:
OBRA:
DE
METRADOS
IE-01
MEJORAMIENTO DE LOS SERVICIOS COMUNITARIOS EN EL ANEXO DE LAJE,DIST. DE OMATE, PROV. GRAL. SANCHEZ CE
Dimensiones
Und.
N de
Med.
circuito C-1
METRADO
Alto (z)
Parcial
124.88
249.76
ML
2.06
UND
1.00
UND
1.00
PTO.
3.00
|
22.12.00 Tubera PVC SAP electricas de 25 mm.
2.06
DE
METRADOS
10.00
8.00
1.00
8.00
4.00
10.00
1.00
4.08
61.22
124.88
310.98
DE
METRADOS
2.06
1.00
1.00
3.00
HOJA
DE
METRADOS
HOJA:
E-01
HECHO
UNIDAD DE ESTUDIOS
OBRA:
FECHA
10/1/2009
Dimensiones
Und.
N de
Med.
METRADO METRADO
Alto (z)
Parcial
Total
OBRAS DE ARTE
25.00.00 OBRAS DE ARTE
25.01.00 VEREDA DE CONCRETO 4"
25.01.01 Excavacin de estructuras
M3
0.30
23.77
M2
1.20
23.77
M2
M2
1.20
23.77
M3
0.30
23.77
23.77
0.20
0.30
0.20
1.43
1.43
28.52
28.52
7.13
7.13
28.52
28.52
1.43
1.78
N de apariciones