Professional Documents
Culture Documents
Pipe Dia
No of Rows
FRL
Invert Level
Chainage
Culvert Type
widening + side
New = 2
Reconstruction = 2
Top depth between pipe top and FRL
Type of bedding
1.200
2.000
326.324
323.823
171.114
m
Nos
m
m
m
2.000 Nos
1.18 m
Grannular
1.500
0.545
0.577
33.056
4.363 Sqm
3.457 Sqm
Mesurement Sheet
Slno
Boq No.
1
Description
Earthwork in excavation
- Headwall
-Pipe
-U/S dry stone apron
Deduct - Sector
Deduct - Triangle
-D/S dry stone apron
Deduct - Sector
Unit
Side
Cum
Cum
Cum
Cum
Cum
Cum
Cum
BHS
Cum
BHS
Cum
Cum
Cum
Cum
BHS
Cum
Cum
Cum
Cum
Cum
BHS
Lm
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Nos
Cum
10
1200
C:\Users\Ravi\Downloads\[bar_bending_schedule_is_v3.2_-_free_lite_version_-_english.xls]bar schedule
D
0.900
1.000
1.200
t
0.100
0.115
0.125
Length of pipe
Gap
h
h
RHS
A
A
Thickness of pipe
Outer dia
D
Width of Bedding
Length of head wall
Bottom Width of head wall
Top width of head wall
Height of head wall
Head wall bottom PCC thickness
PCC offset
Cradle conc thickness
Area of sector
Cos (Theta)
Acos
2.182
Degree
1.729
Area of sector
Area of triangle
16.250
1.000
1.375
2.750
0.125
1.450
3.900
9.600
1.250
0.400
2.700
0.150
0.075
0.545
m
Nos
m
m
m
m
m
m
m
m
m
m
m
m
0.469
1.083
124.066
0.569 Sqm
0.218 Sqm
0.351 Sqm
urement Sheet
Nos
2.000
1.000
1.000
(1.000)
(1.000)
1.000
(1.000)
Length
9.750
13.900
9.600
9.600
Breadth
Chainage
171.114
Width
Quantity Remarks
1.400
3.900
1.500
4.363
3.457
3.000
11.879
0.925
0.285
0.300
0.300
0.300
0.300
0.300
Total
2.000
9.750
1.400
25.253
15.450
4.320
(1.309)
(1.037)
8.640
(3.564)
47.752
0.150
4.095
2.000
-
0.450
14.159
14.159
14.159
0.450
3.900
0.150
0.545
0.351
0.100
4.050
Total
2.000
(4.000)
-
9.600
1.651
14.616
14.616
15.072
0.825
0.817
3.900
1.651
3.900
0.061
4.156
2.700
1.750
0.200
Total
42.768
(5.397)
37.371
mm
32.500
13.900
3.900
0.160
8.674
50.321
0.150
7.548
50.321
0.300
15.096
1.974
5.076
Total
(2.000)
14.675
14.616
3.900
1.651
22.146
2.050
Total
117.327
(48.270)
69.057
2
ish.xls]bar schedule 2
Remarks
Input
Pipe Dia
No of Rows
FRL
Invert Level
Chainage
Culvert Type
widening + side
New = 2
Reconstruction = 2
Top depth between pipe top and FRL
Type of bedding
1.200
2.000
330.744
327.260
172.724
m
Nos
m
m
m
2.000 Nos
2.16 m
Grannular
1.500
0.545
0.577
33.056
4.363 Sqm
3.457 Sqm
Mesurement Sheet
Slno
Boq No.
1
Description
Earthwork in excavation
- Headwall
-Pipe
-U/S dry stone apron
Deduct - Sector
Deduct - Triangle
-D/S dry stone apron
Deduct - Sector
Unit
Side
Cum
Cum
Cum
Cum
Cum
Cum
Cum
BHS
Cum
BHS
Cum
Cum
Cum
Cum
BHS
Cum
Cum
Cum
Cum
Cum
BHS
Lm
Cum
Cum
Cum
Cum
Cum
Cum
Cum
Nos
Cum
10
1200
C:\Users\Ravi\Downloads\[bar_bending_schedule_is_v3.2_-_free_lite_version_-_english.xls]bar schedule
D
0.900
1.000
1.200
t
0.100
0.115
0.125
Length of pipe
Gap
h
h
RHS
A
A
Thickness of pipe
Outer dia
D
Width of Bedding
Length of head wall
Bottom Width of head wall
Top width of head wall
Height of head wall
Head wall bottom PCC thickness
PCC offset
Cradle conc thickness
Area of sector
Cos (Theta)
Acos
2.182
Degree
1.729
Area of sector
Area of triangle
20.000
1.000
1.375
2.750
0.125
1.450
3.900
9.600
1.250
0.400
2.700
0.150
0.075
0.545
m
Nos
m
m
m
m
m
m
m
m
m
m
m
m
0.469
1.083
124.066
0.569 Sqm
0.218 Sqm
0.351 Sqm
urement Sheet
Nos
2.000
1.000
1.000
(1.000)
(1.000)
1.000
(1.000)
Length
9.750
17.350
9.600
9.600
Breadth
Chainage
172.724
Width
Quantity Remarks
1.400
3.900
1.500
4.363
3.457
3.000
11.879
0.925
0.285
0.300
0.300
0.300
0.300
0.300
Total
2.000
9.750
1.400
25.253
19.285
4.320
(1.309)
(1.037)
8.640
(3.564)
51.587
0.150
4.095
2.000
-
0.450
17.909
17.909
17.909
0.450
3.900
0.150
0.545
0.351
0.100
4.050
Total
2.000
(4.000)
-
9.600
1.651
18.366
18.366
18.822
0.825
0.817
3.900
1.651
3.900
0.061
4.156
2.700
1.750
0.200
Total
42.768
(5.397)
37.371
mm
40.000
17.350
3.900
0.160
10.826
50.321
0.150
7.548
50.321
0.300
15.096
1.974
5.076
Total
(2.000)
18.275
18.366
3.900
1.651
22.146
2.050
Total
146.109
(60.655)
85.454
2
ish.xls]bar schedule 2
Remarks