You are on page 1of 1

Record No.

Inspection Record
for Gates
Client:

Subcontractor:

Project No.:

Subcontract P.O. No.:

Project Name:

Gate designation

Reference document:

Subcontractor

Items to inspect

inspected
initials/date
1.0

Model/make

2.0

Fabrication/dimensions

3.0

Painting/finish

4.0

Foundations/gateposts/hinges

5.0

Opening/closing/free width

6.0

Handles, locks, keys

H - Companys presence is mandatory for all activities in section.

Company
Hold
Point

Remarks

inspected*
initials/date

Attachments, No. of pages:

h - Companys presence is mandatory.

Accepted for Subcontractor


Name:

Signature:
Date:

Accepted for Company


Name:

Signature:

Date:

Accepted for Client


Name:

Signature:

Date:

* Company only initials for holdpoint

C:\RB_Forms\RB26J29.DOT\

www.red-bag.com

You might also like