Dear Sir,

As discussed please find below the APECO (UTS/UTN) field


observations for your information and necessary action.

01
Location : UTN
DWG No : 3-Cs-A5001-G1K-1-N
Joint Nos : FW- 01, 05, 17 & 21 (4 Joints)
Observation: Spool alignment correction by using Local Heating
method.

02
Location : UTS
DWG No : 8-SC-A72005-G1A-3-M, Spl-2
Observation: Vent Line Brazing Missing as per drawing.

03

Location : UTN / UTS


DWG No : No.of Small bore Lines
Observation: Flange surface affected by blasting (Not proper
protection provided while blasting)