You are on page 1of 57

DATE

: March 26, 2014

PROJECT

LOCATION

: MANDUG ROAD, DAVAO CITY

PROPOSED HB1 MANDUG

CONSTRUCT

GENER
G.1

PROJECT DESCRIPTION
G.1.1

G.2

THE WORK SPECIFIED HEREIN IS FOR THE COMPLETION OF THE PROPOSED HB1 MANDUG LOCAT

PROJECT INFORMATION
G.2.1

THE WORK SHALL CONFORM TO THE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS, AL

G.2.2

THE CONTRACTOR SHALL CHECK ALL DRAWINGS FURNISHED UPON RECEIPT AND SHALL PROMPL

SHALL COMPARE ALL DRAWINGS AND VERIFY THE FIGURES BEFORE LAYING OUT THE WORK AND
G.2.3

PHYSICAL DATA:

THE PHYSICAL CONDITIONS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE THE

IT IS EXPRESSLY UNDERSTOOD THAT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTERP
G.3

EXISTING WORK
G.3.1

THE DISASSEMBLING, DISCONNECTING, CUTTING, REMOVAL OR ALTERING IN ANY WAY OF EXIST

INJURY OR DAMAGE TO ALL PORTIONS OF EXISTING WORK, WHETHER THEY ARE TO REMAIN IN P
G.3.2

ALL PORTIONS OF EXISTING WORK WHICH HAVE BEEN CUT, DAMAGED OR ALTERED IN ANY WAY D

WITH KIND TO MATCH THE EXISTING OR THE ADJOINING WORK. ALL WORK OF THIS NATURE SH

AND SHALL BE AS DIRECTED. EXISTING WORK SHALL, AT THE COMPLETION OF ALL OPERATIONS,
G.4

SHOP DRAWINGS
G.4.1

BEFORE STARTING THE FABRICATION OR INSTALLATION OF ANY OF THIS WORK, THE CONTRACT
TECHNICAL SECTIONS OF THIS SPECIFICATIONS

G.4.2

THE CONTRACTOR SHALL PREPARE AND SUBMIT WITH SUCH PROMPTNESS AS TO CAUSE NO DEL

THE SAME BUILDING, IN THREE(3) COPIES IN A3 SIZE OF ALL SHOP DRAWINGS, AS WELL AS SCHE
A.

A.1

MASONRY WORKS
A.1.1

TILES INSTALLATION
A.1.1.1

MATERIALS

A.1.1.1.1 USING 0.30X0.30 NON GLAZED FLOOR TILE IN MARIWASA BRAND WITH
A.1.1.1.2 USING BOSTIK TILE ADHESIVE
A.1.1.1.3 PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION
A.2 CARPENTRY WORKS
A.2.1

DOUBLE DRYWALL FOR OFFICE AND STOCKROOM, DROPWALL WORKS FOR PHARMACY AREA
A.2.1.1

MATERIALS

A.2.1.1.1 USE 4.5MM THICK HARDIFLEX FIBER-REINFORCED CEMENT BOARD BRA


A.2.1.1.2 USE 76MM X 3M WITH A THICKNESS OF 0.50MM METAL STUDS
A.2.1.1.3 USE 76MM X 3M WITH A THICKNESS OF 0.50MM U TRACK
A.2.1.1.4 USE 3/8 SELF TAPPING SCREW
A.2.2.1 PVC DOOR INSTALLATION FOR STOCKROOM
A.2.2.1

MATERIALS
A.2.2.1.1 FOR STOCKROOM: PRETTY DOOR WITH LOUVER CODE VG-A

A.3

GLASS WORKS
A.3.1

A.4

MATERIALS
A.3.1.1

" THICK CLEAR GLASS FOR GLASS DOOR

A.3.1.2

10MM THK CLEAR GLASS FOR FIXED WALL PARTITION

A.3.1.3

GLASS DOOR LOCKSET IN MAX BRAND

A.3.1.4

1/16 THK ALUMINUM TUBULAR

A.3.1.5

TUBULAR 1-3/4 X 4 ANOLOK HEADER AND FIXED GLASS FRAME

A.3.1.6

SAFETY FILM

A.3.1.7

DOW CORNING SILICON SEALANT

A.3.1.8

OTHER ACCESSORIES NEEDED

PAINTING WORKS
A.4.1

PAINTING OF DRYWALL, CEILING, BEAM AND CONCRETE WALL


A.4.1.1

MATERIALS

A.4.1.1.1 USE BOYSEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR
A.4.1.123 OTHER ACCESSORIES
A.4.1.2

PAINT SYSTEM
A.4.1.2.1 1st COAT 100% ACRYLIC LATEX, FLAT UNDERCOAT/PRIMER
A.4.1.2.2 2nd COAT 100% ACRYLIC LATEX, FLAT
A.4.1.2.3 3rd COAT 100% ACRYLIC LATEX, FLAT

A.4.2

PAINTING OF COLUMN AT SELLING AREA


A.4.2.1

MATERIALS

A.4.2.1.1 USE BOYSEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR
A.4.2.1.2 OTHER ACCESSORIES
A.4.2.2

PAINT SYSTEM

A.4.2.2.1 1st COAT 100% ACRYLIX LATEX, SEMI-GLOSS UNDERCOAT/PRIMER WIT


A.4.2.2.2 2nd COAT 100% ACRYLIC LATEX, SEMI GLOSS
A.4.2.2.3 3rd COAT 100% ACRYLIC LATEX, SEMI GLOSS
OSM : PVC DOORS
NOTE: ALL OTHER MATERIALS SHALL BE PROVIDED BY THE OWNER

B.ELEC
B.1

WORK INCLUDED: PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL THE WORK NECESSARY FO

ON THE ELECTRICAL DRAWINGS, AND ON GENERAL CONSTRUCTION DRAWINGS EXCEPT AS OTHERWISE EX

OF THE FOREGOING, SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING PRINCIPAL ITEMS OF WOR
B.1.1

LOW VOLTAGE POWER DISTRIBUTION EQUIPMENT, INCLUDING NORMAL AND EMERGENCY PANEL

B.1.2

A SYSTEM OF LIGHTING AND POWER WIRING, INCLUDING ALL FEEDERS, BRANCH CIRCUITS AND

B.1.3

COMPLETE INSTALLATION OF LIGHTING FIXTURES AS INDICATED IN THE PLANS.

B.1.4

COMPLETE DATA AND TELEPHONE SYSTEM.

B.1.5.

COMPLETE EQUIPMENT GROUNDING SYSTEM.

B.1.6.

COMPLETE TESTING OF ALL ELECTRICAL SYSTEMS.

B.1.7.

PAINTING OF ELECTRICAL WORKS AND EQUIPMENT.

B.1.8.

GROUTING OF OPENINGS IN FLOORS AND WALLS AFTER ALL CONDUITS OR PIPES, OR DUCTS ARE

B.1.9.

THE CONTRACTOR SHALL RECEIVE, UNLOAD, HANDLE TRANSPORT, ASSEMBLE, AND INSTALL THE

RESPONSIBLE FOR BREAKAGES, PILFERAGE, ETC. OF SUCH EQUIPMENT FROM THE TIME HE ACC

B.1.10. COORDINATION WITH COMPANIES/OFFICES INCLUDING HANDLING OF ALL MATTERS RELATED TO


B.2

WORK NOT INCLUDED:THE FOLLOWING PRINCIPAL ITEMS OF WORK WILL BE SUPPLIED AND INSTALLED BY
B.2.1. ALL MOTORS, PUMPS AND THEIR ASSOCIATED CENTRAL EQUIPMENT INCLUDING THE FOLLOWING :
B.2.1.1

ALL ELECTRICAL WORKS FROM THE MOTOR CONTROL CENTER OF MECHANICAL EQ

B.2.1.2

ALL ELECTRICAL WORKS BEYOND THE PULLBOXES OR ENCLOSED CIRCUIT BREAKE


AIRCONDITIONING AND VENTILATION EQUIPMENT.

B.3

B.2.2.

SUPPLY OF LIGHTING FIXTURES AND ELECTRICAL DEVICES (SWITCHES AND OUTLETS).

B.2.3.

SUPPLY AND INSTALLATION OF PABX, DATA SWITCH AND DATA CABINET.

CODES, INSPECTION, PERMITS AND FEES


B.3.1.

B.3.2

THE ELECTRICAL WORKS SHALL BE INSTALLED ACCORDING TO THE LATEST REQUIREMENTS OF T


B.3.1. 1

PHILIPPINE NATIONAL BUILDING CODE

B.3.1. 2

PHILIPPINE ELECTRICAL CODE

B.3.1. 3

DAVAO LIGHT

B.3.1. 4

PHILIPPINE LONG DISTANCE COMPANY

ALL CONSTRUCTION PERMITS REQUIRED FOR THIS WORK SHALL BE OBTAINED BY THE CONTRAC

FURNISH THE ARCHITECT, THE ENGINEERS AND THE OWNER FOR FINAL CERTIFICATES OF INSPEC

AFTER THE COMPLETION OF THE WORK. THE CONTRACTOR SHALL PREPARE ALL SHOP OR WORK
REQUIRED BY THE APPROVING AUTHORITIES.
B.3.3

APPROVAL FROM AUTHORITIES OF ALL PLANS FOR CONSTRUCTION SHALL BE SECURED BY THE

B.3.4

ALL DRAWINGS SHOULD BE SIGNED AND DRY SEALED BY THE CONTRACTOR'S REGISTERED PROFE

B.3.5

ALL DRAWINGS, ETC. SHALL BE SUBMITTED SUFFICIENTLY ONE MONTH IN ADVANCE OF FIELD RE

EXTENSIONS OF THE CONTRACT TIME WILL BE GRANTED THIS CONTRACTOR, BY REASON OF HIS
AND SHALL CONTAIN ALL REQUIRED AND DETAILED INFORMATION.
B.4

BASIC MATERIALS AND METHODS


B.4.1 GENERAL
B.4.1.1

FURNISH ALL CONDUITS, CABLE TROUGHS, WIREWAY, JOINT AND OUTLET BOXES,
SPECIFIED AND SHOWN ON DRAWINGS.

B.4.1.3

PERFORM TESTS AND ADJUSTMENTS AND SUBMIT REPORTS AS SPECIFIED HEREIN.

B.4.2

B.4.3

INTERMEDIATE METAL CONDUIT (IMC)


B.4.2.1

GENERAL ; STANDARD SIZES, UL APPROVED OR EQUIVALENT TO MATSUSHITA AND N

B.4.2.2

MATERIALS ; STEEL, ZINC COATED OUTSIDE, ENAMEL COATED INSIDE.

B.4.2.3

NOMINAL SIZE ; 15MM MINIMUM, 100MM MAXIMUM.

B.4.2.4

FITTING SIZE ; COMPRESSION TYPE WITH PLASTIC INSERT.

B.4.2.5

USE LIMITATIONS ; METER CENTERS, FEEDER RUNS AND RISERS LARGER THAN 50M

B.4.2.6

EXPANSION FITTINGS ; USE FOR RUNS SPANNING EXPANSION JOINTS

B.4.2.7

PAINT FIELD CUTS AND REPAIR DAMAGED PROTECTIVE COATING WITH LEAD OR ZI

ELECTRICAL METALLIC TUBING (EMT)


B.4.3.1

GENERAL ; STANDARD TRADE SIZES, UL APPROVED OR EQUIVALENT TO MATSUSHIT

B.4.3.2

MATERIAL ; STEEL, ZINC COATED OUTSIDE, ENAMEL COATED INSIDE.

B.4.3.3

NOMINAL SIZE ; 15MM MINIMUM, 50MM MAXIMUM.

B.4.3.4

FITTING SIZE ; COMPRESSION TYPE WITH PLASTIC INSERT.

B.4.3.5

LIMITATION ;

B.6.3.5.1 - SHALL BE USED FOR ALL BRANCH CIRCUIT HORIZONTAL RUNS, ALL FE
B.6.3.5.2 - FOR CIRCUITS SPECIFIED IN THE PLANS OR AS APPROVED

B.4.4

B.4.3.6

EXPANSION FITTINGS ; USE FOR RUNS SPANNING EXPANSION JOINTS

B.4.3.7

REPAIR DAMAGED PROTECTIVE COATING WITH RED LEAD OR ZINC CHROMATE.

POLYVINYLCHLORIDE (PVC) CONDUIT :


B.4.4.1

GENERAL ; STANDARD TRADE SIZES, HEAVY WALL, MANUFACTURED TO NEMA TC-2


BRANDS OR APPROVED EQUAL.

B.4.4.2

MATERIAL ; POLYVINYLCHLORIDE, EXTRUDED.

B.4.4.3

NOMINAL SIZE ; 15MM MINIMUM

B.4.4.4

COUPLINGS AND FITTINGS ; STANDARD JOINT BY SOLVENT WELD PROCESS.

B.4.4.5

USE LIMITATIONS ;

B.6.4.5.1 - TELEPHONE SYSTEMS AND HIGH VOLTAGE POWER ENTRANCE SYSTEM


B.6.4.5.2 - NOT PERMITTED WHERE SUBJECT TO MECHANICAL DAMAGE.
B.4.4.6
B.4.5

PULLING HARDWARES ; FLAT FISH TAPE WITH A BALL FLEXIBLE LEADER OR POLYEH

FLEXIBLE GALVANIZED STEEL CONDUIT :

B.4.5.1

GENERAL ; STANDARD TRADE SIZES, UL APPROVED OR EQUIVALENT.

B.4.5.2

MATERIAL ; STEEL, GALVANIZED.

B.4.5.3

SIZE ; 15MM MINIMUM

B.4.5.4

FITTINGS ; STANDARD.

B.4.5.5

USE LIMITATIONS ;

B.4.5.5.1 - BETWEEN MOTOR TERMINAL BOXES OR VIBRATION PRODUCING DEVIC

B.4.5.5.2 - SHORT LENGTHS OF CONCEALED WIRING TO LIGHTING FIXTURES (1.

B.4.5.5.3 - OTHER APPLICATIONS; ONLY WHERE APPROVED OR WHERE SHOWN O


B.4.6

FLEXIBLE METALLIC CONDUIT (LIQUID-TIGHT) :


B.4.6.1

GENERAL ; STANDARD TRADE SIZES, UL APPROVED OR EQUIVALENT.

B.4.6.2

MATERIAL ; STEEL, GALVANIZED WITH OTHER LIQUID-TIGHT PLASTIC JACKET.

B.4.6.3

SIZE ; 15MM MINIMUM

B.4.6.4

FITTINGS ; LIQUID-TIGHT.

B.4.6.5

USE LIMITATIONS ;

B.4.6.5.1 - SHORT LENGTHS TO VIBRATIONS PRODUCING DEVICES SITUATED IN W

B.4.6.5.2 - BETWEEN MOTOR TERMINAL BOXES OR VIBRATION PRODUCING DEVIC

B.4.6.5.3 - OTHER APPLICATIONS ; ONLY WHERE APPROVED OR WHERE SHOWN O


B.4.7

B.4.8

WIREWAY/CABLE TRAY :
B.4.7.1.1

GENERAL ; FURNISH AND INSTALL WIREWAY AS INDICATED ON DRAWINGS.

B.4.7.1.2

SIZE AND ARRANGEMENT ; AS INDICATED ON DRAWINGS.

B.4.7.1.3

CONSTRUCTION ; MINIMUM 16 GAUGE FORMED SHEET STEEL AND REINFORCED SH

B.4.7.1.4

FINISH ; EPOXY PRIMER PAINTED, TOPCOAT WITH ENAMEL.

B.4.7.1.5

PROVIDE ALL NECESSARY SUPPORTS, FITTINGS AND MISCELLANEOUS MATERIALS F

JUNCTION AND OUTLET BOXES :


B.4.8.1

GENERAL ; PROVIDE JUNCTION BOXES FOR PULLING AND SPLICING WIRES AND OU
OR AS SHOWN DRAWINGS.AS A RULE, PROVIDE JUNCTION BOXES IN ALL RUNS OF

AS REQUIRED FOR SPLICING OR PULLING. BOXES SHALL BE IN ACCESSIBLE LOCATI


B.4.8.2

CONSTRUCTION ; STEEL, GALVANIZED FINISH. PROVIDE REMOVABLE COVERS ATTA

B.4.8.3

SUPPORT ; SUPPORT BOXES INDEPENDENTLY OF CONDUITS ENTERING, BY MEANS

BOXES ON THE WEB OF COLUMNS WHEREVER POSSIBLE.

B.4.9

B.4.8.4

ALL BOXES SHALL BE ELECTRICALLY GROUNDED.

B.4.8.5

BOXES SHALL BE GA.16 (MIN.) UL LISTED.

FIELD TEST AND ADJUSTMENTS :


B.4.9.1

TEST REPORTS ; COMPUTERIZE, LISTING EQUIPMENT USED, PERSON OR PERSONS


AND RESULTS OF TESTS.

B.4.9

B.4.9.2

CABLE INSULATION RESISTANCE TEST.

B.4.9.3

EQUIPMENT INSULATION RESISTANCE TESTS.

B.4.9.4

VOLTAGE LEVEL TEST.

B.4.9.5

CONTINUITY TEST.

B.4.9.6

PHASE RELATIONSHIP

B.4.9.7

GROUND ROD RESISTANCE TEST.

B.4.9.8

CORRECTION OF DEFECTS.

GROUNDING
B.4.9.1

MATERIALS
B.4.9.1.1 20MM X 3M COPPER-CLAD GROUND RODS.
B.4.9.1.2 STRANDED SOFT-DRAWN BARE COPPER GROUND BUS AND TAPS.

B.4.9.2

INSTALLATION

B.4.9.2.1 GROUND ALL CONDUIT SYSTEM; USE DOUBLE LOCKNUTS AT ALL PANEL

B.4.9.2.2 GROUND SEPARATELY MOUNTED MOTOR CONTROLLERS,MOTOR FRAME

B.4.9.2.3 BOND GROUNDING SYSTEM TO WATER MAIN PIPE WITH 100MM2 BARE C

B.4.9.2.4 USE EXOTHERMIC PROCESS FOR ALL BONDING CONNECTIONS TO TH

B.4.9.2.5 INSTALL GROUND ROD IN FIRM SOIL AND DRIVE TOP OF ROD TO DEPTH
B.4.9.2.6 GROUND RESISTANCE SHALL NOT BE MORE THAN 5 OHMS.

B.4.9.2.7 BRAND ; CADWELD, THERMOWELD, FURSEWELD OR APPROVED EQUAL


NOTE: ALL OTHER MATERIALS SHALL BE PROVIDED BY THE OWNER

C. MEC

SAN
A.1

PRODUCTS

A.1.1 MATERIALS

ALL MATERIALS TO BE USED SHALL CONFORM WITH THE STANDARDS SPECIFIED. ALL CLASSES LI

ONLY THOSE SPECIFICALLY CALLED FOR UNDER SECTIONS OF THIS DIVISION OR SHOWN SHALL B

REQUIREMENTS IMPOSED ON OTHER SECTIONS OF THIS SPECIFICATION. MATERIALS SHALL BE SU


REQUIRED.
A.1.2 STANDARD SPECIFICATION FOR MATERIALS AND EQUIPMENT
A.

AWWA C50-58 POSITIVE DISPLACEMENT TYPE;


WATER METER (SYNERGY, BADGER, OR APPROVED EQUAL)

B.

ASTM D2729

PVC ORANGE PIPE AND FITTINGS, SERIES 1000, HIGH IMPACT (EMERALD, MOLDEX,
C.

ASTM D2564
SOLVENT CEMENT OR RUBBER 0-RING JOINTING OF uPVC PIPES

D.

DIN 8077/8078
POLYPROPYLENE RANDOM COPOLYMER PIPES (ALFAIDRO)

A.1.3 AIRCON DRAIN PIPE INSULATION

PROVIDE 19mm (3/4) THICK RUBBER TYPE INSULATION FOR ALL CONDENSATE DRAIN PIPES EX
A.1.5 FITTING SEALANT
A.1.5.1 PVC FITTINGS PVC COMPOUND
A.1.5.2 THREADED PIPE TEFLON SEAL TAPE
A.2

EXECUTION

A.2.1 GENERAL

PIPING SHALL BE INSTALLED AS SHOWN ON THE DRAWINGS, AS RECOMMENDED BY THE MANUFA

FORMING RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS AND OTHER PIPES AND NEA
A.

PIPING SHALL BE PROPERLY SUPPORTED OR SUSPENDED ON STANDS, CLAMPS, HA

A MANNER TO PERMIT PIPE FREE FROM EXPANSION AND CONTRACTION WHILE MIN
B.

DO NOT INSTALL PIPES IN A MANNER WHICH INTERFERES WITH OTHER PIPES, DUC

C.

THE ARRANGEMENT, POSITIONS AND CONNECTIONS OF PIPES, DRAINS, VALVES, AN

D.

THE RESPONSIBILTY FOR ACCURATELY LAYING OUT THE WORK AND COORDINATION

LAYOUT INTERFERENCE THAT OCCUR SHALL BE REPORTED IMMEDIATELY TO THE P

F.

ALL PIPES SHALL BE CUT ACCURATELY TO MEASUREMENTS AND SHALL BE WORKED


REDUCING FITTINGS.

G.

ROUGHING-IN FOR PIPES AND FIXTURES SHALL BE CARRIED ALONG WITH THE BUI

WHERE REQUIRED IN THE WALLS AND FLOORS FOR THE PASSAGE OF PIPES. ALL IT
ALL RUST, SCALE, AND PAINT.
H.

PIPES SHALL NOT PASS THROUGH COLUMNS, FOOTINGS, BEAM OR RIBS, EXCEPT W

A.2.2 THREADED PIPE JOINTS


A.2.2.1 ALL GALVANIZED IRON PIPES SHALL BE REAMED BEFORE THREADING. ALL SCREW JOINTS SHALL
TO MALE THREADS ONLY. THREADS SHALL BE FULL OUT AND NOT MORE THAN THREE THREADS

A.2.2.2 CAULKING OF THREADED JOINTS TO STOP OR PREVENT LEAKS WILL NOT BE PERMITTED. USE 3M
THREADED JOINTS.
A.2.3 PIPING GRADES AND SLOPES

A.2.3.1 KEEP ALL HORIZONTAL RUNS OF PIPING, EXCEPT WHERE CONCEALED IN PARTITIONS, AS HIGH A

A.2.3.2 PIPING SHALL BE PROPERLY GRADED OR PITCHED TO INSURE EASY CIRCULATION, DRAINAGE AN

A.2.3.3 COLD WATER SHALL PITCH UP IN THE DIRECTION OF FLOW AT 1 INCH IN 60 FEET HORIZONTAL R

A.2.3.4 MAINTAIN A MINIMUM OF 1% OR 1 INCH IN 8'4 HORIZONTAL RUN FOR ALL SANITARY SOIL, WAST
A.2.4 CLEANING AND PAINTING

A.2.4.1 ALL EXPOSED METAL SURFACES SHALL BE RID OF GREASE, DIRT, OR OTHER FOREIGN MATERIALS

A.2.4.2 CHROME OR NICKEL PLATED PIPINGS, FITTINGS, AND TRIMMINGS SHALL BE POLISHED UPON CO

A.2.4.3 ALL EQUIPMENTS, FIXTURES, VALVES, AND FITTINGS SHALL BE CLEANED OF GREASE AND SLUDG

DAMAGE TO PARTS OF THE BUILDING, ITS FINISH OR FURNISHINGS DUE TO THE SYSTEM SHALL B

A.2.4.4 ALL EXTERIOR SURFACES OF PIPINGS TO BE INSTALLED IN OR THROUGH CONCRETE FLOOR, FILL
PAINT HAVING A BITUMINOUS BASE.

A.2.4.5 PIPE HANGER SUPPORTS AND ALL OTHER IRON WORKS IN CONCEALED SPACES SHALL BE THORO
NOTE: ALL OTHER MATERIALS SHALL BE PROVIDED BY THE OWNER

D. SAFETY G
D.1

WORK SITE ATTIRE


D.1.1

WORKERS SHALL WEAR LONG-SLEEVED T-SHIRTS WITH PRINTED COMPANY NAME/ LOGO

D.1.2

WORKING PANTS SHALL NOT INCLUDE SWEAT PANTS, JOGGING PANTS, SHORT PANTS & TORN PA

D.2

D.1.3

UNIFORMS SHALL BE CHECKED BY THE P.I.C UPON ENTRY INTO WORK PLACE

D.1.4

WORKERS SHALL WEAR STANDARD P.P.E SUCH AS HARD HAT,GLOVES,GOGGLES,SAFETY SHOES E

WORK SITE HOUSEKEEPING


D.2.1

LAY DOWN AREAS FOR THE MATERIALS SHALL BE AT THE DESIGNATED LOCATION OF THE WORKS

D.2.2

TOOLS AND SUPPLIES SHALL BE STORED IN A STURDY METALLIC BOX

D.2.3

IMPLEMENT GOOD HOUSEKEEPING AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMPLETIO
PROJECT, BUT ALWAYS WHILE WORK IS GOING ON.

D.2.4

CONTAINERS OF FLAMMABLE & PAINTING MATERIALS SHALL BE STORED IN AN ENCLOSED LOCAT


WITH BOLD WARNING SIGN AGAINST OPEN FLAME & OTHER SOURCE OF HEAT.

D.3

HOT WORKS
D.3.1

HOT WORKS SUCH AS WELDING AND ACETYLENE WORKS SHALL PROVIDE SUITABLE SIZE OF
FIRE EXTINGUISHER. STRICLY NO FIRE EXTINGUISHER NO HOT WORKS.

D.4

OTHERS
D.4.1

EATING AT WORK SITE AREA IS PROHIBITED

D.4.2

NO SPITTING, URINATING, ETC., IN THE AREA. USE DESIGNATED COMFORT ROOMS WHEN NEEDE
BOARD UP THE WORK AREA PROPERLY (EITHER BY PLYBOARD OR BLUE SACK)

D.4.3

CONSTRUCTION BOARD UP
D.4.3.1

IF APPLICABLE, ALL OPENINGS IN THE BASEMENT, FIRST FLOOR DOORS AND WINDO
ACCESSIBLE

FROM

A PORCH, FIRE ESCAPE OR OTHER POTENTIAL CLIMB

BARRICADED WITH PLYWOOD, 2X4 BRACES, CARRIAGE BOLT SETS, AND


WAFER BOARD, MASONITE, OR OTHER SIMILAR MATERIAL SHALL NOT
BOARDING-UP A BUILDING.
D.4.3.2

IF APPLICABLE, OPENINGS THAT ARE AT LEAST 10' FROM GROUND LEVEL WHICH A
PORCH, FIRE ESCAPE, ROOF, OR OTHER CLIMBING POINT CAN BE SECURED WITH

BRACE, AND EVERY 12" AROUND THE PERIMETER. FOR ALL OPENINGS, THE PLYWO

BE FITTED SO THAT IT RESTS SNUGLY AGAINST THE EXTERIOR FRAME, BUTTING U

ON WOOD FRAME BUILDINGS AND UP TO THE BRICK MOLDING EDGE ON BRICK BUI
D.4.3.3

THE STRUCTURE SHALL BE POSTED WITH A NO TRESPASSING SIGN AT THE COMPLE

E
E.1

BILLING AS PER ACTUAL MEASUREMENT

E.2

LIQUIDATED DAMAGES IS APPLICABLE

PREPARED BY:

D HB1 MANDUG

VAO CITY

CONSTRUCTION SPECIFICATIONS

GENERAL PARAGRAPHS

OR THE COMPLETION OF THE PROPOSED HB1 MANDUG LOCATED IN MANDUG ROAD, DAVAO CITY

HE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS, ALL OF WHICH FORM A PART OF THIS SPECIFICATIONS.

ALL DRAWINGS FURNISHED UPON RECEIPT AND SHALL PROMPLY NOTIFY THE PROJECT MANAGER OF ANY DISCREPANC

ND VERIFY THE FIGURES BEFORE LAYING OUT THE WORK AND WILL BE RESPONSIBLE FOR ANY ERRORS WHICH MAY BE

ATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE THE RESULT OF SITE INVESTIGATIONS BY SURVEYS CONDUC

AT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR CONCLUSION DRAWN THERE FROM.

TING, CUTTING, REMOVAL OR ALTERING IN ANY WAY OF EXISTING WORK SHALL BE CARRIED ON IN SUCH A MANNER AS

ONS OF EXISTING WORK, WHETHER THEY ARE TO REMAIN IN PLACE, REUSED IN THE NEW WORK, OR SALVAGED AND S

WHICH HAVE BEEN CUT, DAMAGED OR ALTERED IN ANY WAY DURING CONSTRUCTION OPERATIONS SHALL BE REPAIRE

NG OR THE ADJOINING WORK. ALL WORK OF THIS NATURE SHALL BE PERFORMED BY THE CONTRACTOR AT NO COST T

TING WORK SHALL, AT THE COMPLETION OF ALL OPERATIONS, BE LEFT IN CONDITION AS GOOD AS EXISTED BEFORE

ON OR INSTALLATION OF ANY OF THIS WORK, THE CONTRACTOR SHALL SUBMIT DRAWINGS AS MAY BE REQUIRED AND

ECIFICATIONS

E AND SUBMIT WITH SUCH PROMPTNESS AS TO CAUSE NO DELAY IN HIS OWN WORK OR IN THAT OF ANY OTHER CONT
COPIES IN A3 SIZE OF ALL SHOP DRAWINGS, AS WELL AS SCHEDULES, REQUIRED CORRECTIONS.
A. CIVIL WORKS

30X0.30 NON GLAZED FLOOR TILE IN MARIWASA BRAND WITH TILE TRIM

OSTIK TILE ADHESIVE

EE ATTACHED PLAN FOR DETAILS AND VERIFICATION

D STOCKROOM, DROPWALL WORKS FOR PHARMACY AREA

MM THICK HARDIFLEX FIBER-REINFORCED CEMENT BOARD BRAND: HARDIFLEX OR PRIMAFLEX

M X 3M WITH A THICKNESS OF 0.50MM METAL STUDS

M X 3M WITH A THICKNESS OF 0.50MM U TRACK

SELF TAPPING SCREW

CKROOM

CKROOM: PRETTY DOOR WITH LOUVER CODE VG-A

ASS FOR GLASS DOOR

LASS FOR FIXED WALL PARTITION

ET IN MAX BRAND

M TUBULAR

4 ANOLOK HEADER AND FIXED GLASS FRAME

ON SEALANT
NEEDED

BEAM AND CONCRETE WALL

SEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR ANY ONE COLOR MUST BE MANUFACTURED IN ONE LOT

CCESSORIES

100% ACRYLIC LATEX, FLAT UNDERCOAT/PRIMER


100% ACRYLIC LATEX, FLAT

100% ACRYLIC LATEX, FLAT


AREA

SEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR ANY ONE COLOR MUST BE MANUFACTURED IN ONE LOT

CCESSORIES

100% ACRYLIX LATEX, SEMI-GLOSS UNDERCOAT/PRIMER WITH WATER BASED PUTTY


100% ACRYLIC LATEX, SEMI GLOSS

100% ACRYLIC LATEX, SEMI GLOSS

ED BY THE OWNER
B.ELECTRICAL WORKS

AND EQUIPMENT AND PERFORM ALL THE WORK NECESSARY FOR THE COMPLETE EXECUTION OF ALL ELECTRICAL WOR

ENERAL CONSTRUCTION DRAWINGS EXCEPT AS OTHERWISE EXCLUDED, AND WHICH WITHOUT EXCLUDING THE GENER

NOT BE LIMITED TO THE FOLLOWING PRINCIPAL ITEMS OF WORK :

ON EQUIPMENT, INCLUDING NORMAL AND EMERGENCY PANELBOARD AND CIRCUIT BREAKERS.

ER WIRING, INCLUDING ALL FEEDERS, BRANCH CIRCUITS AND CONNECTIONS TO ALL LIGHTING AND POWER OUTLETS.

TING FIXTURES AS INDICATED IN THE PLANS.

SYSTEM.

NG SYSTEM.

RICAL SYSTEMS.

AND EQUIPMENT.

RS AND WALLS AFTER ALL CONDUITS OR PIPES, OR DUCTS ARE IN PLACE AND SEALING OF ALL SUCH OPENINGS IF NOT

, UNLOAD, HANDLE TRANSPORT, ASSEMBLE, AND INSTALL THE OWNER SUPPLIED MATERIALS. THIS CONTRACTOR SHA

LFERAGE, ETC. OF SUCH EQUIPMENT FROM THE TIME HE ACCEPTS DELIVERY UNTIL THE OWNER ACCEPTS THE INSTAL

/OFFICES INCLUDING HANDLING OF ALL MATTERS RELATED TO POWER SERVICE, TELEPHONE SERVICES AND PERMITS.

NCIPAL ITEMS OF WORK WILL BE SUPPLIED AND INSTALLED BY OTHERS :

OCIATED CENTRAL EQUIPMENT INCLUDING THE FOLLOWING :

RKS FROM THE MOTOR CONTROL CENTER OF MECHANICAL EQUIPMENT.

RKS BEYOND THE PULLBOXES OR ENCLOSED CIRCUIT BREAKER OF POWER SUPPLY TO THE ACCU AND OTHER MECHAN

ND VENTILATION EQUIPMENT.

ND ELECTRICAL DEVICES (SWITCHES AND OUTLETS).

X, DATA SWITCH AND DATA CABINET.

E INSTALLED ACCORDING TO THE LATEST REQUIREMENTS OF THE FOLLOWING :

L BUILDING CODE

CAL CODE

STANCE COMPANY

UIRED FOR THIS WORK SHALL BE OBTAINED BY THE CONTRACTOR. FEES SHALL BE FOR OWNER'S ACCOUNT. THE CON

GINEERS AND THE OWNER FOR FINAL CERTIFICATES OF INSPECTION AND APPROVAL FROM THE PROPER GOVERNMENT

WORK. THE CONTRACTOR SHALL PREPARE ALL SHOP OR WORKING DRAWINGS, AS-BUILT PLANS, AND ALL OTHER PAPE

THORITIES.

F ALL PLANS FOR CONSTRUCTION SHALL BE SECURED BY THE CONTRACTOR.

D AND DRY SEALED BY THE CONTRACTOR'S REGISTERED PROFESSIONAL ELECTRICAL ENGINEER.

BMITTED SUFFICIENTLY ONE MONTH IN ADVANCE OF FIELD REQUIREMENTS TO ALLOW AMPLE TIME FOR CHECKING AN

IME WILL BE GRANTED THIS CONTRACTOR, BY REASON OF HIS FAILURE IN THIS RESPECT. ALL SUBMITTALS SHALL BE C

D AND DETAILED INFORMATION.

UITS, CABLE TROUGHS, WIREWAY, JOINT AND OUTLET BOXES, CONDUCTOR AND MISCELLANEOUS MATERIALS REQUIRE

WN ON DRAWINGS.

D ADJUSTMENTS AND SUBMIT REPORTS AS SPECIFIED HEREIN.

D SIZES, UL APPROVED OR EQUIVALENT TO MATSUSHITA AND NIKON.

ZINC COATED OUTSIDE, ENAMEL COATED INSIDE.

MM MINIMUM, 100MM MAXIMUM.

PRESSION TYPE WITH PLASTIC INSERT.

ETER CENTERS, FEEDER RUNS AND RISERS LARGER THAN 50MM

S ; USE FOR RUNS SPANNING EXPANSION JOINTS

ND REPAIR DAMAGED PROTECTIVE COATING WITH LEAD OR ZINC CHROMATE.

D TRADE SIZES, UL APPROVED OR EQUIVALENT TO MATSUSHITA AND NIKON.

INC COATED OUTSIDE, ENAMEL COATED INSIDE.

M MINIMUM, 50MM MAXIMUM.

PRESSION TYPE WITH PLASTIC INSERT.

BE USED FOR ALL BRANCH CIRCUIT HORIZONTAL RUNS, ALL FEEDERS AND SUBFEEDERS 50MM AND SMALLER

RCUITS SPECIFIED IN THE PLANS OR AS APPROVED

S ; USE FOR RUNS SPANNING EXPANSION JOINTS

OTECTIVE COATING WITH RED LEAD OR ZINC CHROMATE.

UIT :

D TRADE SIZES, HEAVY WALL, MANUFACTURED TO NEMA TC-2 TYPE 40-RATED FOR 90 DEGREE CELCIUS CABLE. ATLAN

ED EQUAL.

YLCHLORIDE, EXTRUDED.

M MINIMUM

TINGS ; STANDARD JOINT BY SOLVENT WELD PROCESS.

HONE SYSTEMS AND HIGH VOLTAGE POWER ENTRANCE SYSTEM

RMITTED WHERE SUBJECT TO MECHANICAL DAMAGE.

S ; FLAT FISH TAPE WITH A BALL FLEXIBLE LEADER OR POLYEHTYLENE OR MANILA ROPE. USE OF STEEL PULLING CAB

DUIT :

D TRADE SIZES, UL APPROVED OR EQUIVALENT.

GALVANIZED.

EN MOTOR TERMINAL BOXES OR VIBRATION PRODUCING DEVICES AND RIGID CONDUIT

LENGTHS OF CONCEALED WIRING TO LIGHTING FIXTURES (1.5M MAX.)

APPLICATIONS; ONLY WHERE APPROVED OR WHERE SHOWN ON PLANS

UID-TIGHT) :

D TRADE SIZES, UL APPROVED OR EQUIVALENT.

GALVANIZED WITH OTHER LIQUID-TIGHT PLASTIC JACKET.

IGHT.

LENGTHS TO VIBRATIONS PRODUCING DEVICES SITUATED IN WET, POTENTIALLY WET LOCATIONS AND OUTDOORS

EN MOTOR TERMINAL BOXES OR VIBRATION PRODUCING DEVICES AND RIGID CONDUIT.

APPLICATIONS ; ONLY WHERE APPROVED OR WHERE SHOWN ON DRAWINGS.

AND INSTALL WIREWAY AS INDICATED ON DRAWINGS.

ENT ; AS INDICATED ON DRAWINGS.

NIMUM 16 GAUGE FORMED SHEET STEEL AND REINFORCED SHEET STEEL, WITH SCREW FASTENED COVER. PROVIDE W

MER PAINTED, TOPCOAT WITH ENAMEL.

SARY SUPPORTS, FITTINGS AND MISCELLANEOUS MATERIALS FOR A COMPLETE INSTALLATION.

JUNCTION BOXES FOR PULLING AND SPLICING WIRES AND OUTLET BOXES FOR INSTALLATION OF WIRING DEVICES, A

INGS.AS A RULE, PROVIDE JUNCTION BOXES IN ALL RUNS OF GREATER THAN 30 METERS LENGTH. FOR OTHER LENGT

PLICING OR PULLING. BOXES SHALL BE IN ACCESSIBLE LOCATIONS.

EEL, GALVANIZED FINISH. PROVIDE REMOVABLE COVERS ATTACHED WITH ROUND HEAD MACHINE SCREWS.

BOXES INDEPENDENTLY OF CONDUITS ENTERING, BY MEANS OF BOLTS, ROD HANGERS, OR OTHER SUITABLE MEANS.

OF COLUMNS WHEREVER POSSIBLE.

E ELECTRICALLY GROUNDED.

.16 (MIN.) UL LISTED.

MPUTERIZE, LISTING EQUIPMENT USED, PERSON OR PERSONS PERFORMING THE TESTS, DATE TESTED, CIRCUITS TEST

RESISTANCE TEST.

ION RESISTANCE TESTS.

TANCE TEST.

FECTS.

3M COPPER-CLAD GROUND RODS.

ED SOFT-DRAWN BARE COPPER GROUND BUS AND TAPS.

ALL CONDUIT SYSTEM; USE DOUBLE LOCKNUTS AT ALL PANELS.

SEPARATELY MOUNTED MOTOR CONTROLLERS,MOTOR FRAMES,PANELS,SWITCHES AND OUTLETS THROUGH GROUND

ROUNDING SYSTEM TO WATER MAIN PIPE WITH 100MM2 BARE COPPER WIRE.

OTHERMIC PROCESS FOR ALL BONDING CONNECTIONS TO THE GROUNDING LOOP.

GROUND ROD IN FIRM SOIL AND DRIVE TOP OF ROD TO DEPTH BELOW GRADE.
RESISTANCE SHALL NOT BE MORE THAN 5 OHMS.

CADWELD, THERMOWELD, FURSEWELD OR APPROVED EQUAL.

ED BY THE OWNER
C. MECHANICAL WORKS
SANITARY WORKS

CONFORM WITH THE STANDARDS SPECIFIED. ALL CLASSES LISTED ARE NOT NECESSARILY REQUIRED FOR THIS PROJE

D FOR UNDER SECTIONS OF THIS DIVISION OR SHOWN SHALL BE PROVIDED. USE OF MATERIALS SHALL FURTHER BE GO

ER SECTIONS OF THIS SPECIFICATION. MATERIALS SHALL BE SUBJECT TO TEST NECESSARY TO ASCERTAIN THEIR FITNE

AND EQUIPMENT

MENT TYPE;

RGY, BADGER, OR APPROVED EQUAL)

ND FITTINGS, SERIES 1000, HIGH IMPACT (EMERALD, MOLDEX, OR APPROVED EQUAL)

R RUBBER 0-RING JOINTING OF uPVC PIPES

NDOM COPOLYMER PIPES (ALFAIDRO)

BER TYPE INSULATION FOR ALL CONDENSATE DRAIN PIPES EXPOSED INSIDE THE CEILING AND PIPE CHASE (ARMAFLEX

PE

OWN ON THE DRAWINGS, AS RECOMMENDED BY THE MANUFACTURER AND AS DIRECTED DURING INSTALLATION, STRA

LLEL LINES WITH BUILDING WALLS AND OTHER PIPES AND NEARLY SPACED.

OPERLY SUPPORTED OR SUSPENDED ON STANDS, CLAMPS, HANGERS, OR EQUIVALENT OF APPROVED DESIGN. SUPPOR

IT PIPE FREE FROM EXPANSION AND CONTRACTION WHILE MINIMIZING VIBRATION.

ES IN A MANNER WHICH INTERFERES WITH OTHER PIPES, DUCTS, CONDUITS, EQUIPMENT AND ADJACENT STRUCTURE

POSITIONS AND CONNECTIONS OF PIPES, DRAINS, VALVES, AND THE LIKE, INDICATED ON THE DRAWING SHALL BE FO

FOR ACCURATELY LAYING OUT THE WORK AND COORDINATION OF INSTALLATION WITH OTHER CONTRACTS REST WIT

NCE THAT OCCUR SHALL BE REPORTED IMMEDIATELY TO THE PROJECT MANAGER.

CUT ACCURATELY TO MEASUREMENTS AND SHALL BE WORKED INTO PLACE WITHOUT SPRINGING OR FORCING. CHAN

IPES AND FIXTURES SHALL BE CARRIED ALONG WITH THE BUILDING CONSTRUCTION. CORRECTLY LOCATED OPENING

N THE WALLS AND FLOORS FOR THE PASSAGE OF PIPES. ALL ITEMS TO BE EMBEDDED IN THE CONCRETE SHALL BE THO

ND PAINT.

SS THROUGH COLUMNS, FOOTINGS, BEAM OR RIBS, EXCEPT WHERE NOTED ON THE DRAWINGS.

L BE REAMED BEFORE THREADING. ALL SCREW JOINTS SHALL BE MADE WITH GRAPHITE AND OIL OR WITH AN APPROV

S SHALL BE FULL OUT AND NOT MORE THAN THREE THREADS ON THE PIPE SHALL REMAIN EXPOSED.

TO STOP OR PREVENT LEAKS WILL NOT BE PERMITTED. USE 3M PIPE THREAD SEALANT OR EQUIVALENT ON ALL G.I. O

IPING, EXCEPT WHERE CONCEALED IN PARTITIONS, AS HIGH AS POSSIBLE AND CLOSE TO THE WALL.

ED OR PITCHED TO INSURE EASY CIRCULATION, DRAINAGE AND PREVENT WATER HAMMER AND NOISE. SLOPES AS FOL

THE DIRECTION OF FLOW AT 1 INCH IN 60 FEET HORIZONTAL RUN.

NCH IN 8'4 HORIZONTAL RUN FOR ALL SANITARY SOIL, WASTERS AND LEADER LINES.

ALL BE RID OF GREASE, DIRT, OR OTHER FOREIGN MATERIALS.

GS, FITTINGS, AND TRIMMINGS SHALL BE POLISHED UPON COMPLETION.

ES, AND FITTINGS SHALL BE CLEANED OF GREASE AND SLUDGE IN WHICH MAY HAVE ACCUMULATED. ANY STOPPAGE O

NG, ITS FINISH OR FURNISHINGS DUE TO THE SYSTEM SHALL BE REPLACED BY THE CONTRACTOR.

GS TO BE INSTALLED IN OR THROUGH CONCRETE FLOOR, FILL OR TILED FLOOR AND UNDERGROUND SHALL BE GIVEN

E.

OTHER IRON WORKS IN CONCEALED SPACES SHALL BE THOROUGH CLEANED AND PAINTED WITH ONE COAT OR PRIME

ED BY THE OWNER
D. SAFETY GEARS & EQUIPMENTS

EVED T-SHIRTS WITH PRINTED COMPANY NAME/ LOGO

UDE SWEAT PANTS, JOGGING PANTS, SHORT PANTS & TORN PANTS

THE P.I.C UPON ENTRY INTO WORK PLACE


P.P.E SUCH AS HARD HAT,GLOVES,GOGGLES,SAFETY SHOES ETC.

IALS SHALL BE AT THE DESIGNATED LOCATION OF THE WORKSITE

ORED IN A STURDY METALLIC BOX


AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMPLETION OF

WORK IS GOING ON.

INTING MATERIALS SHALL BE STORED IN AN ENCLOSED LOCATION

GAINST OPEN FLAME & OTHER SOURCE OF HEAT.

ND ACETYLENE WORKS SHALL PROVIDE SUITABLE SIZE OF

FIRE EXTINGUISHER NO HOT WORKS.

OHIBITED

N THE AREA. USE DESIGNATED COMFORT ROOMS WHEN NEEDED.

PERLY (EITHER BY PLYBOARD OR BLUE SACK)

OPENINGS IN THE BASEMENT, FIRST FLOOR DOORS AND WINDOWS, AND ANY POINT OF ENTRY
A PORCH, FIRE ESCAPE OR OTHER POTENTIAL CLIMBING

POINT SHALL BE

PLYWOOD, 2X4 BRACES, CARRIAGE BOLT SETS, AND NAILS. PARTICLE BOARD,

ASONITE, OR OTHER SIMILAR MATERIAL SHALL NOT BE USED FOR PURPOSES OF

LDING.

NINGS THAT ARE AT LEAST 10' FROM GROUND LEVEL WHICH ARE NOT ACCESSIBLE FROM A

E, ROOF, OR OTHER CLIMBING POINT CAN BE SECURED WITH NAILS IN EACH

12" AROUND THE PERIMETER. FOR ALL OPENINGS, THE PLYWOOD SHOULD

IT RESTS SNUGLY AGAINST THE EXTERIOR FRAME, BUTTING UP TO THE SIDING

UILDINGS AND UP TO THE BRICK MOLDING EDGE ON BRICK BUILDINGS.

ALL BE POSTED WITH A NO TRESPASSING SIGN AT THE COMPLETION OF THE BOARD-UP.

E. OTHERS

DATE

PROJECT

PROPOSED DEL FIERRO MAUSOLEUM

LOCATION

Calinan Memorial Park, Calinan, Davao City

CONSTRUCTION SPECIFI

GENERAL PARAGRAP
G.1 PROJECT DESCRIPTION
G.1.1

THE WORK SPECIFIED HEREIN IS FOR THE COMPLETION OF THE PROPOSED DEL FIERRO MAUS

G.2 PROJECT INFORMATION


G.2.1

THE WORK SHALL CONFORM TO THE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS

G.2.2

PHYSICAL DATA:

THE PHYSICAL CONDITIONS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE T

IT IS EXPRESSLY UNDERSTOOD THAT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTE

A. CIVIL WORKS
A.1 MASONRY WORKS
A.1.1

A.1.2

TILE INSTALLATION
A.1.1.1

USING 0.40X0.40 GRANITE TILES IN MARIWASA BRAND (GROUNDFLOOR)

A.1.1.2

USING 0.30X0.30 NON-SKD TILES IN MARIWASA BRAND (T & B)

A.1.1.3

USING 0.40X0.40 NON-SKD TILES IN MARIWASA BRAND (SECOND FLOOR)

A.1.1.4

USING 25KG BOSTIK TILE ADHESIVE

A.1.1.5

USING 2KG ABC CEMENT BASE TILE GROUT IN GRAY COLOR

A.1.1.6

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

CHB PILING AT 0.8 METER


A.1.2.1

USE 6" THK. CONCRETE HOLLOW BLOCK

A.1.2.2

USE 10mm DIAMETER FOR VERTICAL BAR SPLICED USING #16 GI TIE WIRE

A.1.2.3

USING CLASS B CONCRETE MORTAR

A.1.3

A.1.4

A.1.5

A.1.6

A.1.7

A.1.2.4

USING CLASS B CONCRETE MIX FOR PLASTERING. PLASTER IN BOTH SIDE @ 12MM T

A.1.2.5

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

CHB PILING WORKS


A.1.3.1

USE 150mm THK. CONCRETE HOLLOW BLOCK

A.1.3.2

USE 10mm DIAMETER FOR VERTICAL BARS SPACED AT 600MM ON CENTER

A.1.3.3

USE 10mm DIAMETER FOR HORIZONTAL BARS SPACED AT EVERY THREE LAYERS OF

A.1.3.4

USE #16 GI TIE WIRE

A.1.3.5

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

CONCRETE COLUMNS (200x200 mm)


A.1.4.1

USE 16mm DIAMETER FOR VERTICAL BARS WITH 10mm TIES SPACED

A.1.4.2

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.4.3

USE #16 GI TIE WIRE

A.1.4.4

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

CONCRETE COLUMNS (200x300 mm)


A.1.5.1

USE 16mm DIAMETER FOR VERTICAL BARS WITH 10mm TIES SPACED AS SHOWN

A.1.5.2

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.5.3

USE #16 GI TIE WIRE

A.1.5.4

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

CONCRETE FOOTING (1000mmx1000mm)


A.1.6.1

USE 16mm DIAMETER FOR VERTICAL BARS

A.1.6.2

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.6.3

USE #16 GI TIE WIRE

A.1.6.4

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

BEAMS AND GIRDER


A.1.7.1

USE 12mm DIAMETER REINFORCEMENT BARS WITH 10mm TIES

A.1.7.2

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.7.3

USE #16 GI TIE WIRE

A.1.7.4
A.1.8

A.1.9

A.1.10

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

CONCRETE SLAB
A.1.8.1

USE 12mm DIAMETER REINFORCEMENT BARS

A.1.8.2

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.8.3

USE #16 GI TIE WIRE

A.1.8.4

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

TWO MAIN VAULT


A.1.9.1

USE 10mm DIAMETER REINFORCEMENT BARS

A.1.9.2

USE 12MM JET BLACK GRANITE

A.1.9.3

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.9.4

USE #16 GI TIE WIRE

A.1.9.5

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

FOUR RESERVE VAULT


A.1.10.1 USE 10mm DIAMETER REINFORCEMENT BARS
A.1.10.2 USE 40 KG HOLCIM PORTLAND CEMENT
A.1.10.3 USE #16 GI TIE WIRE
A.1.10.4 PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

A.1.11

CONCRETE STAIR WITH RAILINGS


A.1.11.1 CONCRETE STRUCTURE
A.1.11.1.1

USE 10mm DIAMETER REINFORCEMENT BARS

A.1.11.1.2

USE 40 KG HOLCIM PORTLAND CEMENT

A.1.11.1.3

USE #16 GI TIE WIRE

A.1.11.1.4

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

A.1.11.2 RAILINGS
A.1.11.2.1

USE TUBULAR 2" x 3" FOR THE HANDRAIL

A.1.11.2.2

USE TUBULAR 1" x 1" FOR THE BALUSTER

A.1.11.2.3

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

A.1.12

BRICK WALL CLADDING


A.1.12.1 USE 2" x 8" STONE WALL CLADDING
A.1.12.2 USING BOSTIK TILE ADHESIVE
A.1.12.3 PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

A.1.13

CONCRETE LEDGE
A.1.13.1 USE 10mm DIAMETER REINFORCEMENT BARS
A.1.13.2 USING BOSTIK TILE ADHESIVE
A.1.13.3 PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

A.3 CARPENTRY WORKS


A.3.1

PVC DOOR INSTALLATION FOR SECOND FLOOR TOILET


A.3.1.1

A.3.2

A.3.3

USE PVC DOOR WITH COMPLETE ACCESSORIES (1 SET)

CEILING INSTALLATION
A.3.2.1

USE 1/4" x 4" x 8" PLYWOOD (ORDINARY)

A.3.2.2

USE 2"x2" GOOD LUMBER

A.3.2.3

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

FORMWORKS & BRACING


A.3.3.1

USE 1/4" x 4" x 8" PLYWOOD (ORDINARY)

A.3.3.2

USE 2"x2" GOOD LUMBER

A.3.3.3

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

A.4 STEEL WORKS


A.4.1

CANOPY INSTALLATION & RAILINGS


A.4.1.1

CANOPY
A.4.1.1.1

USE 2"x4"X3M RECTANGULAR TUBE TRELLIS PAINTED IN BROWN

A.4.1.1.2

USE 2"x4"X3M C-PURLIN PAINTED IN BROWN

A.4.1.1.3

USE POLYCARBONATE ROOF PANELS

A.4.1.1.4

USE SCHEDULE 40 G.I. PIPE 75MM DIA. x 6M

A.4.1.1.5

USE 1/4"x150MMx150MM BASE PLATE WITH 25MM BOLT

A.4.1.2

A.4.2

A.4.1.1.6

USE EPOXY PRIMER

A.4.1.1.7

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

RAILINGS
A.4.1.2.1

USE TUBULAR 2" x 3" FOR THE HANDRAIL IN WOOD FINISH

A.4.1.2.2

USE TUBULAR 1" x 1" FOR THE BALUSTER IN WOOD FINISH

A.4.1.2.3

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

VERTICAL TRELLIS
A.4.2.1

USE TUBULAR 2" x 4" IN WOOD FINISH SPACED IN 100MM

A.4.2.2

PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

A.5 GLASS WORKS


A.5.1

A.5.2

A.5.3

INSTALLATION OF GLASS WINDOW


A.5.1.1

USE 2"x4" ALUMINUM TUBULAR IN ANALOK FINISH

A.5.1.2

USE SNAP-ON ALUMINUM SECTION IN ANALOK FINISH

A.5.1.3

USE 6MM ORDINARY CLEAR GLASS WITH HANITA SAFETY FILM

A.5.1.4

USE GLASS SEALANT

A.5.1.5

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

INSTALLATION OF DOUBLE SWING GLASS DOOR


A.5.2.1

USE 2"x4" ALUMINUM TUBULAR FRAME IN ANALOK FINISH

A.5.2.2

USE 1 3/4"x4" ALUMINUM TUBULAR DOOR FRAME IN ANALOK FINISH

A.5.2.3

USE SNAP-ON ALUMINUM SECTION IN ANALOK FINISH

A.5.2.4

USE 10MM ORDINARY CLEAR GLASS WITH HANITA SAFETY FILM

A.5.2.5

USE GLASS SEALANT

A.5.2.6

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

INSTALLATION OF SINGLE SWING GLASS DOOR


A.5.3.1

USE 2"x4" ALUMINUM TUBULAR FRAME IN ANALOK FINISH

A.5.3.2

USE 1 3/4"x4" ALUMINUM TUBULAR DOOR FRAME IN ANALOK FINISH

A.5.3.3

USE SNAP-ON ALUMINUM SECTION IN ANALOK FINISH

A.5.3.4

USE 10MM ORDINARY CLEAR GLASS WITH HANITA SAFETY FILM

A.5.3.5

USE GLASS SEALANT

A.5.3.6

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

A.6 PAINTING WORKS


A.6.1

A.6.2

A.6.3

CONCRETE WALL PAINTING (EXTERIOR)


A.6.1.1

USE ACRYTEX PRIMER

A.6.1.2

USE BOYSEN SEMI-GLOSS LATEX PAINT BASIC BEIGE COLOR IN SMOOTH PAINT FINIS

A.6.1.3

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

CONCRETE WALL PAINTING (INTERIOR)


A.6.2.1

USE ACRYTEX PRIMER

A.6.2.2

USE BOYSEN SEMI-GLOSS LATEX PAINT ICY GREEN COLOR IN SMOOTH PAINT FINISH

A.6.2.3

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

CONCRETE MOULDING
A.6.3.1

USE ACRYTEX PRIMER

A.6.3.2

USE BOYSEN SEMI-GLOSS LATEX PAINT SHADY GRAY COLOR IN SMOOTH PAINT FINIS

A.6.3.3

PLEASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

B. ELECTRICAL WO
B.1 LIGHTING & POWER LAYOUT
B.1.1

USE PVC PIPE 1/2" FOR LIGHTING AND POWER

B.1.2

WIRING INSTALLTION FOR LIGHTING AND POWER LINE (SEE PLANS FOR DETAILS AND VERIFIC

B.1.3

INSTALLATION OF LIGHTING FIXTURES

B.1.4

B.1.3.1

INSTALLTION OF (STRIP LIGHTS & PHILIPS PINLIGHTS)

B.1.3.2

PLEASE SEE ATTACHED PLAN FOR DETAILS, LOCATION AND VERIFICATION

INSTALLATION OF OUTLETS AND SWITCHES


B.1.4.1

USE 2-GANG 3-PRONG UNIVERSAL (PANASONIC OR TOSHIBA) FOR POWER OUTLET

B.1.4.2

USE PANASONIC OR TOSHIBA FOR LIGHT SWITCHES

B.1.5

TAPPING OF CIRCUIT TO EXISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND VER

B.1.6

TESTING AND COMMISSIONING

C. MICHANICAL WO
C.1 AIRCON INDOOR UNIT DRAIN LINE
C.1.1

PIPING WORKS FOR 1 UNIT WINDOW TYPE AIRCON


C.1.1.1

USING 1/2" PVC BLUE PIPE AND FITTINGS (SEE LAYOUT)

C.1.1.2

USING PVC SOLVENT FOR FITTINGS CONNECTIONS AND VULCASEAL AS SEALANT

C.1.1.3

MAINTAIN 1% TO 2% SLOPE ON PIPE RUNS ON ALL SANITARY AND SOIL PIPES

C.1.1.4

SEE ATTACHED PLAN FOR LOCATION AND DETAILS

C.2 STEEL BRACKET FABRICATIONS AND INSTALLATION FOR WINDOW TYPE AIRCON
C.1.1

USING 1-1/2" x 1-1/2" x 3/16" THK. ANGLE BAR FOR BRACKET IN EPOXY PRIMER GRAY PAINT

C.3 AIRCON DUCTING


C.1.3

FABRICATION AND INSTALLATION OF AIRCON DUCTING


C.1.3.1

USE 25MM THK STYROPOR FOR INULATION

C.1.3.2

USE 40CM x 40CM AIR DIFFUSER

C.1.3.3

SEE ATTACHED PLAN FOR LOCATION AND DETAILS

D. SAFETY GEARS AND EQU


D.1 WORK SITE ATTIRE
D.1.1

WORKERS SHALL WEAR LONG SLEEVED T-SHIRTS

D.1.2

WORKING PANTS SHALL NOT INCLUDE SWEAT PANTS, JOGGING PANTS,SHORTS PANTS AND TORN PANT

D.1.3

WORKERS SHALL WEAR STANDARD PPE SUCH AS HARD HAT, GLOVES, GOOGLES, SAFETY SHOES ETC.

D.2 WORK SITE HOUSEKEEPING


D.2.1

LAY DOWN AREAS FOR THE MATERIALS SHALL BE AT THE DESIGNATED LOCATION OF THE WORKSITE

D.2.2

TOOLS AND SUPPLIES SHALL BE STORED IN A STURDY METALLIC BOX

D.2.3

IMPLEMENT GOOD HOUSKEEPING AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMLPETION OF P

D.2.4

CONTAINERS OF FLAMMABLE & PAINTING MATERIALS SHALL BE STORED IN AN ENCLOSED LOCATION W

D.3 HOT WORKS


D.3.1

HOT WORKS SUCH AS WELDING AND ACETYLENE WORKS SHALL PROVIDE SUITABLE SIZE OF FIRE EXTI

E. OTHERS
E.1 BILLING AS PER ACTUAL MEASUREMENT
E.2 LIQUIDATED DAMAGE IS APPLICABLE

DEL FIERRO MAUSOLEUM

ial Park, Calinan, Davao City

CONSTRUCTION SPECIFICATIONS

GENERAL PARAGRAPHS

REIN IS FOR THE COMPLETION OF THE PROPOSED DEL FIERRO MAUSOLEUM IN CALINAN MEMORIAL PARK, CALINAN, DA

RM TO THE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS, ALL OF WHICH FORM A PART OF THIS SPECIFICAT

NS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE THE RESULT OF SITE INVESTIGATIONS BY SURVEYS

OOD THAT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR CONCLUSION DRAWN THERE FRO
A. CIVIL WORKS

0 GRANITE TILES IN MARIWASA BRAND (GROUNDFLOOR)

0 NON-SKD TILES IN MARIWASA BRAND (T & B)

0 NON-SKD TILES IN MARIWASA BRAND (SECOND FLOOR)

STIK TILE ADHESIVE


CEMENT BASE TILE GROUT IN GRAY COLOR

ACHED PLAN FOR DETAILS AND VERIFICATION

NCRETE HOLLOW BLOCK

METER FOR VERTICAL BAR SPLICED USING #16 GI TIE WIRE

CONCRETE MORTAR

CONCRETE MIX FOR PLASTERING. PLASTER IN BOTH SIDE @ 12MM THK TO SEMI-SMOOTH FINISH

ACHED PLAN FOR DETAILS AND VERIFICATION

K. CONCRETE HOLLOW BLOCK

METER FOR VERTICAL BARS SPACED AT 600MM ON CENTER

METER FOR HORIZONTAL BARS SPACED AT EVERY THREE LAYERS OF CHB

ACHED PLAN FOR DETAILS AND VERIFICATION

0x200 mm)

METER FOR VERTICAL BARS WITH 10mm TIES SPACED

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

0x300 mm)

METER FOR VERTICAL BARS WITH 10mm TIES SPACED AS SHOWN

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

0mmx1000mm)

METER FOR VERTICAL BARS

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

METER REINFORCEMENT BARS WITH 10mm TIES

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

METER REINFORCEMENT BARS

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

METER REINFORCEMENT BARS

BLACK GRANITE

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

METER REINFORCEMENT BARS

CIM PORTLAND CEMENT

ACHED PLAN FOR DETAILS AND VERIFICATION

AILINGS

E 10mm DIAMETER REINFORCEMENT BARS

E 40 KG HOLCIM PORTLAND CEMENT

E #16 GI TIE WIRE

EASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

E TUBULAR 2" x 3" FOR THE HANDRAIL

E TUBULAR 1" x 1" FOR THE BALUSTER

EASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

NE WALL CLADDING

ILE ADHESIVE

ACHED PLAN FOR DETAILS AND VERIFICATION

METER REINFORCEMENT BARS

ILE ADHESIVE

ACHED PLAN FOR DETAILS AND VERIFICATION

FOR SECOND FLOOR TOILET

WITH COMPLETE ACCESSORIES (1 SET)

8" PLYWOOD (ORDINARY)

D LUMBER

ACHED FILE FOR DETAILS AND VERIFICATION

8" PLYWOOD (ORDINARY)

D LUMBER

ACHED FILE FOR DETAILS AND VERIFICATION

RAILINGS

E 2"x4"X3M RECTANGULAR TUBE TRELLIS PAINTED IN BROWN

E 2"x4"X3M C-PURLIN PAINTED IN BROWN

E POLYCARBONATE ROOF PANELS

E SCHEDULE 40 G.I. PIPE 75MM DIA. x 6M

E 1/4"x150MMx150MM BASE PLATE WITH 25MM BOLT

E EPOXY PRIMER

EASE SEE ATTACHED FILE FOR DETAILS AND VERIFICATION

E TUBULAR 2" x 3" FOR THE HANDRAIL IN WOOD FINISH

E TUBULAR 1" x 1" FOR THE BALUSTER IN WOOD FINISH

EASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION

" x 4" IN WOOD FINISH SPACED IN 100MM

ACHED PLAN FOR DETAILS AND VERIFICATION

WINDOW

INUM TUBULAR IN ANALOK FINISH

LUMINUM SECTION IN ANALOK FINISH

ARY CLEAR GLASS WITH HANITA SAFETY FILM

LANT

ACHED FILE FOR DETAILS AND VERIFICATION

E SWING GLASS DOOR

INUM TUBULAR FRAME IN ANALOK FINISH

LUMINUM TUBULAR DOOR FRAME IN ANALOK FINISH

LUMINUM SECTION IN ANALOK FINISH

NARY CLEAR GLASS WITH HANITA SAFETY FILM

LANT

ACHED FILE FOR DETAILS AND VERIFICATION

SWING GLASS DOOR

INUM TUBULAR FRAME IN ANALOK FINISH

LUMINUM TUBULAR DOOR FRAME IN ANALOK FINISH

LUMINUM SECTION IN ANALOK FINISH

NARY CLEAR GLASS WITH HANITA SAFETY FILM

LANT

ACHED FILE FOR DETAILS AND VERIFICATION

G (EXTERIOR)

MI-GLOSS LATEX PAINT BASIC BEIGE COLOR IN SMOOTH PAINT FINISH @ 2 COATS

ACHED FILE FOR DETAILS AND VERIFICATION

G (INTERIOR)

MI-GLOSS LATEX PAINT ICY GREEN COLOR IN SMOOTH PAINT FINISH @ 2 COATS

ACHED FILE FOR DETAILS AND VERIFICATION

MI-GLOSS LATEX PAINT SHADY GRAY COLOR IN SMOOTH PAINT FINISH @ 2 COATS

ACHED FILE FOR DETAILS AND VERIFICATION

B. ELECTRICAL WORKS

GHTING AND POWER


LIGHTING AND POWER LINE (SEE PLANS FOR DETAILS AND VERIFICATION)

NG FIXTURES
(STRIP LIGHTS & PHILIPS PINLIGHTS)

ACHED PLAN FOR DETAILS, LOCATION AND VERIFICATION

TS AND SWITCHES

PRONG UNIVERSAL (PANASONIC OR TOSHIBA) FOR POWER OUTLET


OR TOSHIBA FOR LIGHT SWITCHES

XISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND VERIFICATION

C. MICHANICAL WORKS

T WINDOW TYPE AIRCON


BLUE PIPE AND FITTINGS (SEE LAYOUT)

VENT FOR FITTINGS CONNECTIONS AND VULCASEAL AS SEALANT

O 2% SLOPE ON PIPE RUNS ON ALL SANITARY AND SOIL PIPES

PLAN FOR LOCATION AND DETAILS

D INSTALLATION FOR WINDOW TYPE AIRCON

/16" THK. ANGLE BAR FOR BRACKET IN EPOXY PRIMER GRAY PAINT FINISH

LATION OF AIRCON DUCTING

STYROPOR FOR INULATION

M AIR DIFFUSER

PLAN FOR LOCATION AND DETAILS

D. SAFETY GEARS AND EQUIPMENTS

G SLEEVED T-SHIRTS

T INCLUDE SWEAT PANTS, JOGGING PANTS,SHORTS PANTS AND TORN PANTS

NDARD PPE SUCH AS HARD HAT, GLOVES, GOOGLES, SAFETY SHOES ETC.

MATERIALS SHALL BE AT THE DESIGNATED LOCATION OF THE WORKSITE


BE STORED IN A STURDY METALLIC BOX

PING AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMLPETION OF PROJECT, BUT ALWAYS WHILE WORK IS GONG ON

E & PAINTING MATERIALS SHALL BE STORED IN AN ENCLOSED LOCATION WITH BOLD WARNING SIGN AGAINST OPEN FLAME & OTH

NG AND ACETYLENE WORKS SHALL PROVIDE SUITABLE SIZE OF FIRE EXTINGUISHER.

E. OTHERS

PROJECT

PROPOSED DEL FIERRO MAUSOLEUM

LOCATION

Calinan Memorial Park, Calinan, Davao City

BILL OF QUANTITIES
DESCRIPTION
A. CIVIL WORKS
A.1 CLEANING AND GRUBBING
A.2 EXCAVATION
A.3 BACKFILL
A.4 MASONRY WORKS
A.4.1

A.4.2

TILES INSTALLATION
A.4.1.1

0.4m x 0.4 m GRANITE TILES IN MARIWASA BRAND

A.4.1.2

0.4m x 0.4m NON-SKID CERAMIC FLOOR TILES

A.4.1.3

0.3m x 0.3m VIT. CERAMIC FLOOR TILES

A.4.1.4

0.3m x 0.3m NON-SKID CERAMIC FLOOR TILES

A.4.1.5

BOSTIK TILE ADHESIVE

A.4.1.6

ABC TILE GROUT

CHB PILING AT 0.8 METER


A.4.2.1

150mm CONCRETE HOLLOW BLOCKS

A.4.2.2

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.2.3

#16 GI TIE WIRE

A.4.3

A.4.4

A.4.5

A.4.2.4

40KG HOLCIM PORTLAND CEMENT

A.4.2.5

SAND

CHB PILING WORKS


A.4.3.1

100mm CONCRETE HOLLOW BLOCKS

A.4.3.2

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.3.3

#16 GI TIE WIRE

A.4.3.4

40KG HOLCIM PORTLAND CEMENT

A.4.3.5

SAND

CONCRETE COLUMNS (200x200 mm)


A.4.4.1

40KG HOLCIM PORTLAND CEMENT

A.4.4.2

DEFORMED BAR 12mm x 6m (GRADE 40)

A.4.4.3

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.4.4

SAND

A.4.4.5

GRAVEL

A.4.4.6

#16 GI TIE WIRE

CONCRETE COLUMNS (200x300 mm)


A.4.5.1

40KG HOLCIM PORTLAND CEMENT

A.4.5.2

DEFORMED BAR 12mm x 6m (GRADE 40)

A.4.6

A.4.7

A.4.8

A.4.5.3

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.5.4

SAND

A.4.5.5

GRAVEL

A.4.5.6

#16 GI TIE WIRE

COLUMN FOOTING
A.4.6.1

40KG HOLCIM PORTLAND CEMENT

A.4.6.2

DEFORMED BAR 12mm x 6m (GRADE 40)

A.4.6.3

SAND

A.4.6.4

GRAVEL

A.4.6.5

#16 GI TIE WIRE

BEAM & GIRDER


A.4.7.1

40KG HOLCIM PORTLAND CEMENT

A.4.7.2

DEFORMED BAR 12mm x 6m (GRADE 40)

A.4.7.3

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.7.4

SAND

A.4.7.5

GRAVEL

A.4.7.6

#16 GI TIE WIRE

TWO MAIN VAULT

A.4.9

A.4.8.1

100mm CONCRETE HOLLOW BLOCKS

A.4.8.2

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.8.3

#16 GI TIE WIRE

A.4.8.4

40KG HOLCIM PORTLAND CEMENT

A.4.8.5

SAND

FOUR RESERVE VAULT


A.4.9.1

100mm CONCRETE HOLLOW BLOCKS

A.4.9.2

DEFORMED BAR 10mm x 6m (GRADE 40)

A.4.9.3

#16 GI TIE WIRE

A.4.9.4

40KG HOLCIM PORTLAND CEMENT

A.4.9.5

SAND

A.4.10 CONCRETE STAIR WITH RAILINGS


A.4.10.1 40KG HOLCIM PORTLAND CEMENT
A.4.10.2 DEFORMED BAR 12mm x 6m (GRADE 40)
A.4.10.3 DEFORMED BAR 10mm x 6m (GRADE 40)
A.4.10.4 SAND
A.4.10.5 GRAVEL
A.4.10.6 #16 GI TIE WIRE

A.4.11 BRICK WALL CLADDING


A.4.11.2 DEFORMED BAR 12mm x 6m (GRADE 40)

A.4.12 CONCRETE LEDGE


A.4.12.1 40KG HOLCIM PORTLAND CEMENT
A.4.12.3 DEFORMED BAR 10mm x 6m (GRADE 40)
A.4.12.4 SAND
A.4.12.5 GRAVEL
A.4.12.6 #16 GI TIE WIRE

A.3 CARPENTRY WORKS


A.3.1

PVC DOOR INSTALLATION FOR SECOND FLOOR TOILET

A.3.2

CEILING INSTALLATION

A.3.3
A.4 STEEL WORKS
A.4.1

CANOPY INSTALLATION & RAILINGS

A.4.2

VERTICAL TRELLIS

A.5 GLASS WORKS


A.5.1

INSTALLATION OF GLASS WINDOW

A.5.2

INSTALLATION OF GLASS DOOR

A.6 PAINTING WORKS


A.6.1

CONCRETE WALL PAINTING (EXTERIOR)

A.6.2

CONCRETE WALL PAINTING (INTERIOR)

A.6.3

CONCRETE MOULDING
B. ELECTRICAL WORKS

B.1 LIGHTING & POWER LAYOUT


B.1.1

USE PVC PIPE 1/2" FOR LIGHTING AND POWER

B.1.2

WIRING INSTALLTION FOR LIGHTING AND POWER LINE (SEE PLANS FOR DETAILS AND VERIFICA

B.1.3

INSTALLATION OF LIGHTING FIXTURES

B.1.4

INSTALLATION OF OUTLETS AND SWITCHES

B.1.5

TAPPING OF CIRCUIT TO EXISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND
VERIFICATION

B.1.6

TESTING AND COMMISSIONING


C. MICHANICAL WORKS

C.1 AIRCON INDOOR UNIT DRAIN LINE


C.1.1

PIPING WORKS FOR 1 UNIT WINDOW TYPE AIRCON

C.2 STEEL BRACKET FABRICATIONS AND INSTALLATION FOR WINDOW TYPE AIRCON
C.3 AIRCON DUCTING
C.1.3

FABRICATION AND INSTALLATION OF AIRCON DUCTING

DEL FIERRO MAUSOLEUM

ial Park, Calinan, Davao City

BILL OF QUANTITIES
DESCRIPTION

QUANTITY

UNIT

201

PCS

ON-SKID CERAMIC FLOOR TILES

213

PCS

T. CERAMIC FLOOR TILES

140

PCS

ON-SKID CERAMIC FLOOR TILES

55

PCS

10

BAGS

11

BAGS

A. CIVIL WORKS

RANITE TILES IN MARIWASA BRAND

CONTINGENC

LABOR C

TOTAL C

ETE HOLLOW BLOCKS


10mm x 6m (GRADE 40)

208

PCS

13

PCS

1.5

KG

ORTLAND CEMENT

26

BAGS

CU.M

CONTINGENC

LABOR C

TOTAL C

ETE HOLLOW BLOCKS


10mm x 6m (GRADE 40)

ORTLAND CEMENT

1091

PCS

66

PCS

KG

111

BAGS

11

CU.M

CONTINGENC

LABOR C

TOTAL C

0x200 mm)

ORTLAND CEMENT

17

BAGS

12mm x 6m (GRADE 40)

258

KG

10mm x 6m (GRADE 40)

122

KG

CU.M

CU.M

10

KG

CONTINGENC

LABOR C

TOTAL C

0x300 mm)

ORTLAND CEMENT

BAGS

12mm x 6m (GRADE 40)

75

KG

10mm x 6m (GRADE 40)

45

KG

0.5

CU.M

CU.M

KG

CONTINGENC

LABOR C

TOTAL C

ORTLAND CEMENT

25

BAGS

12mm x 6m (GRADE 40)

100

KG

1.4

CU.M

2.76

CU.M

2.6

KG

CONTINGENC

LABOR C

TOTAL C

ORTLAND CEMENT

18

BAGS

12mm x 6m (GRADE 40)

KG

10mm x 6m (GRADE 40)

KG
1

CU.M

CU.M
KG

CONTINGENC

LABOR C

TOTAL C

ETE HOLLOW BLOCKS


10mm x 6m (GRADE 40)

ORTLAND CEMENT

111

PCS

12

PCS

KG

14

BAGS

1.2

CU.M

CONTINGENC

LABOR C

TOTAL C

ETE HOLLOW BLOCKS


10mm x 6m (GRADE 40)

ORTLAND CEMENT

158

PCS

10

PCS

KG

BAGS

CU.M

CONTINGENC

LABOR C

TOTAL C

AILINGS

ORTLAND CEMENT

BAGS

12mm x 6m (GRADE 40)

KG

10mm x 6m (GRADE 40)

KG
CU.M
CU.M
KG

CONTINGENC

LABOR C

TOTAL C

12mm x 6m (GRADE 40)

KG

CONTINGENC

LABOR C

TOTAL C

ORTLAND CEMENT
10mm x 6m (GRADE 40)

BAGS
KG
CU.M
CU.M
KG

CONTINGENC

LABOR C

TOTAL C

FOR SECOND FLOOR TOILET

RAILINGS

WINDOW

DOOR

G (EXTERIOR)

G (INTERIOR)

B. ELECTRICAL WORKS

GHTING AND POWER


LIGHTING AND POWER LINE (SEE PLANS FOR DETAILS AND VERIFICATION)

NG FIXTURES

TS AND SWITCHES

XISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND

C. MICHANICAL WORKS

T WINDOW TYPE AIRCON

D INSTALLATION FOR WINDOW TYPE AIRCON

LATION OF AIRCON DUCTING

UNIT COST

TOTAL UNIT
COST

150

30150

70

14910

40

5600

40

2200

275

2750
0

CONTINGENCIES

1112.2

LABOR COST

17016.66

TOTAL COST

73738.86

17.5

3640

174

2262

35

52.5

260

6760

500

1500

CONTINGENCIES

284.29

LABOR COST

4349.637

TOTAL COST

18848.427

17.5

19092.5

174

11484

35

245

260

28860

500

5500

CONTINGENCIES

1303.63

LABOR COST

19945.539

TOTAL COST

86430.669

0
0

0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

0
0

0
0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

0
0
0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

0
0
0
0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

0
0
0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

17.5

2765

174

1740

35

35

260

2340

500

500

CONTINGENCIES

147.6

LABOR COST

2258.28

TOTAL COST

9785.88

0
0
0
0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

0
CONTINGENCIES

LABOR COST

TOTAL COST

0
0
0
0
0
CONTINGENCIES

LABOR COST

TOTAL COST

ASSUMED CONSTRUCTION DAYS


DESCRIPTION

NUMBER
OF DAYS

QTY

45
UNIT
COST

DAYS
COST

A.1 CLEANING AND GRUBBING


LABOR

250

500

LABOR COST

500

CONTINGENCIES

150

TOTAL COST

650

A.2 EXCAVATION
CARPENTER

300

300

LABOR

250

750

LABOR COST

1050

CONTINGENCIES

315

TOTAL COST

1365

A.3 BACKFILL
CARPENTER

300

300

LABOR

250

500

LABOR COST

800

CONTINGENCIES

240

TOTAL COST

1040

A.4 TILE INSTALLATION