subdivision
PD 1296
Actual Cost +
10% (profit, overhead & tax)
Consulting Architect
Project Representative
After
______
substantial
completion of contract work, the
architect shall inspect the project
& issue certificate of completion
after certification, the contractor
will finish outstanding work during
period of making good of all
known defect of 60 days.
In methods of compensation, if
the Architect as Project Manager
performs
regular architectural
services for the same project, he
is compensated separately for
these services as stipulated in
what UAP Document?
Affordable Cost
Pre-Design
Burst Node
Project Management
98%
3 months
PD 957
Post-Construction Services
Cost Records
100 meters
City Engineer
Architect
Special Provisions
Performance Bond
Closed Specifications
Combination Specifications
Contractor / 2
Specifications
Open Specifications
Damper
Flash Point
Jumper
Smoke-proof Tower
Dry Standpipe
Plenum
Abatement
PD 1216
Condominium Act.
RA 4726
PD 1152
Bidding Requirements
Agreement (owner-contractor),
performance bond, labor and
materials payment bond,
certificates of insurance.
Contract Forms
BP 220
General conditions.
PD 957
Performance Specification
Prescriptive Specification
Addenda
Modifications
Construction Administration
Shop Drawings
Drawings
Sample
Specifications
Product Data
Change Order
General Conditions
Agreement
Project Closeout
Substantial Completion
Pre-Design
Punch list
Design
Specialized Allied
Design-Build by Administration
Construction Services
PD 1096
Naturally Ventilated
Revised RA 6541.
Post-Construction Services
15 days
Certificate of Occupancy
Mezzanine Floor
Installation in place.
Erection
Addition
Mixed Occupancy
Alteration
10% & 5 %
Renovation
Change in use.
Conversion
Artificially Ventilated
Repair
Socalo
Systematic dismantling.
Secondary building.
Moving
Atrium
Ancillary
Automatic Closing
Minor Construction
Bay or Panel
Soffit
Demolition
Buildable Area
Dispersal Area
Egress System
Non-combustible
Panic Hardware
Construction Cost
Direct Cost
Labor
Indirect Cost
Equipment
Subcontract
Overhead
Overhead
Profit
Escalation
Bar Chart
Gross Profit
Net Profit
15 % of contract amount.
Performance Bond
Materials
Payment Bond
Guarantee Bond
After 65%
After 98%
Effectivity of a Construction
contract from receipt of Notice of
Final Payment
Contractor
Building Permit
7 Days
Adjudication
Mutual Agreement
Bilateral Contract
Unilateral Contract
Expressed Contract
A "promise" or an "agreement"
made of a set of promises. Breach
of this contract is recognized by
the law and legal remedies can be
provided.
One in which the circumstances
imply that parties have reached
an agreement even though they
have not done so expressly.
If no reasonable person hearing
this statement would take it
seriously, it is a puff, and no
action in contract is available if
the statement proves to be wrong.
Contract
Implied Contract
Quasi-Contract
Lumpsum
Cost Estimate
Liquidated Damages
Quantity Survey
Owner
Productivity Estimates
Bill of Materials
Lien
Legally
Value Engineering
Detailed Estimate
General Conditions
Bid Bulletin
Rough Estimate
Instructions to Bidders
Owner
Salary
Force Majeure
Private
PD 1308
UAP
PRC