Price List

Ref Code

Trade Heading:
O207

Name : PCK1

Item Description

Unit

Rate

O - Labour Rates

Mark

Supp

Last

Up %

Code

Updated

(Continued)

200mm thick wall

m2

8.50

13/01/2009

Plasterer
O208

External

m2

7.53

13/02/2009

O209

Internal

m2

6.99

13/02/2009

OO28

Plaster including mortar mixer, wheel barrow


and trowelling tools and erection of working
platform to a working height of not more than
3.0m high
19mm thick with wood float or sponge finish
in two (2) coats
Brickwall and concrete surface; externally

m2

8.00

04/12/2008

19mm thick with steel trowelled finish in two


(2) coats
Brickwall and concrete surface; internally

m2

7.00

04/12/2008

OO29

O210
OO30

O211

Door
O212

Lintol Small

no

5.00

27/11/2008

O213

Lintol Big

no

15.00

27/11/2008

O214

Lintol Arch

no

100.00

27/11/2008

OO31

Timber/Metal Frame

O215

Door Frame, SL

no

10.00

24/10/2008

O216

Door Frame, DL

no

15.00

24/10/2008

OO32

Timber window frame fixing

O217

Overall size 300mm x 300mm high

no

10.00

04/12/2008

O218

Overall size 1200mm x 1200mm high

no

13.00

04/12/2008

OO33

Timber door frame fixing

O219

Overall size 900mm x 2100mm high

no

13.00

04/12/2008

O220

Overall size 1800mm x 2100mm high

no

19.00

04/12/2008

OO34

Metal door frame fixing

O221

Overall size 900mm x 2100mm high

no

13.00

04/12/2008

O222

Overall size 1800mm x 2100mm high

no

19.00

04/12/2008

OO35

Timber Leaf Including Ironmongery

O223

Door Leaf including ironmongery, SL

no

15.00

24/10/2008

O224

Door Leaf including ironmongery, DL

no

30.00

24/10/2008

OO36

Fire Leaf Including Ironmongery

O225

Door Leaf including ironmongery, SL

no

40.00

24/10/2008

O226

Door Leaf including ironmongery, DL

no

80.00

24/10/2008

CHEW FU KEONG

Page :

10

of

15

Date of Printing: 21/Jul/11