You are on page 1of 5

ADDIS ABABA UNIVERSITY

Addis Ababa Institute of Technology


UniversityIndustry Linkage Coordination Office

Monthly Internship Report


Name of student: Daniel Gebreyohannes
Student ID No.:

ATR/3676/05

Mentors name:

Awraris Getachew

School:

Electrical and Computer Engineering

To be filled out by the School:

Submission date: ________________


Accepted by mentor: ________________
(Date, full name and signature)

Comments:

Tel.
(Dir) 251-11-123-2435
(Mob) 251-91-331-5662

..
P.O.Box 385

Fax: 251-11-123-9480

ADDIS ABABA UNIVERSITY


Week No:

Addis Ababa Institute of Technology


UniversityIndustry Linkage Coordination Office

Dates: April 11 to April 15, 2016

Weekday

Activities

Monday

Continue working on reliability of distribution system

Tuesday

Today I started Reading the machines maximum power capacity

Wednesday

Then after I continue working in recording of the entire distribution system their
feeder (cable) size measured with caliper, breaker rating and as well as socket outlet
load of the workshop.

Thursday

Friday

Abstract on activities covered during the:Week One


This week we continued working on our project we mainly read the name plates of different
machines and record there power rating. Then after that we continue working on recording of
the breaker rating and as well as socket outlet load of the workshop and also measured the
feeders cable size.

Tel.
(Dir) 251-11-123-2435
(Mob) 251-91-331-5662

..
P.O.Box 385

Fax: 251-11-123-9480

ADDIS ABABA UNIVERSITY


Addis Ababa Institute of Technology


UniversityIndustry Linkage Coordination Office

Week No:

Dates: April 18 to April 22, 2016

Weekday

Activities

Monday

I try to emphasis on different control system, power factor correction


mechanism & other system

Tuesday

Finalize the recording process

Wednesday

Then from drawing of the distribution system that had been done; using AutoCAD
software I draw the single line diagram & the main source (15kv transformer) is
used.

Thursday
Friday

Abstract on activities covered during the : Week Two


This week we mainly focus on finishing the single line diagram of the factorys distribution
system which consists of
All sub distribution boards contain 3 phase, 380v circuit breakers.
All the boxes going out of the sub distribution contain 3 phase main circuit breaker and
may also contain 1 phase circuit breakers which comes out of the mains
Cable size measurements.

Tel.
(Dir) 251-11-123-2435
(Mob) 251-91-331-5662

..
P.O.Box 385

Fax: 251-11-123-9480

ADDIS ABABA UNIVERSITY


Week No:

Dates: April 25 to

April 29, 2016

Weekday

Monday

Addis Ababa Institute of Technology


UniversityIndustry Linkage Coordination Office

Activities

Gathered feedback from our supervisor about our project.

Tuesday
Then based on the comments we finalize the project.

Wednesday

Submit the project.

Thursday
Friday

Abstract on activities covered during the : Week Three


This week we mainly focus on completing our project report and our supervisor told us some
important topics that we should focus on
Such as
Cable size selection
Protection and Control Device Selection

Tel.
(Dir) 251-11-123-2435
(Mob) 251-91-331-5662

..
P.O.Box 385

Fax: 251-11-123-9480

ADDIS ABABA UNIVERSITY


Addis Ababa Institute of Technology


UniversityIndustry Linkage Coordination Office

Week No:

Dates: May 2

to May 6, 2016

Weekday

Activities

Monday

Tuesday

Wednesday

Thursday

Friday

Abstract on activities covered during the : Week Four


Since most students and our supervisor has gone to his hometown for holiday we had a day off
(From April 27-May 6).

Tel.
(Dir) 251-11-123-2435
(Mob) 251-91-331-5662

..