This project is a floating house project, A house built on water. The house will have a
modern Architectural look but the foundation will be concrete hull that uses buoyancy force to
float. The concrete hull will be made up of reinforcement bars and water proof concrete. The hull
will be used to displaced a water weight that is greater than the total load of the building
including its self weight.
The Architecture must be a low weight design to reduce the weight imposed on the
foundation. Materials that will fill the house must be balanced at any two opposite sides to
maintain balance. Therefore the design will include furniture selection and balance analysis.
Moreover water wave analysis and wind flow analysis will be done to insure that the
foundation can resist the driving forces. Other medical testing will be done on water to check the
habitability of the water and what treatments we can do for cleaning the dirt if necessary.
Objective
To design a floating house for recreation purpose.
Methodology
Project plan
The project have six phases.
Phase I:- Data collection
Water sample are going to be taken and tested by Bushoftu water supply ..... to check for
safety of habitation.
Phase II:- Data analysis
Analyze the water sample taken for testing by accredited medical officer.
Water wave , wind magnitude and direction determination.
Phase III:- Material Selection and Site selection
Based on the Analysis report Site of construction will be chosen.
The materials used for building the house and foundation will be carefully selected.
Materials will be tested in Laboratory for different variables.
Phase IV:-Design the house
Project Phase
Jan.
2017
Week
1 2 3 4
Feb.201 Mar.2017
Apr.2017
May.2017
June.2017
7
Week
week
week
week
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1
2
3
Data Collection
Data Analysis
Material
Selection
4
Designing
5
Building
Prototype
6
Prepare
Document
Total time
22 weeks
devoted
(5 months and 2 weeks)
Benefits
1. Tourist Attraction
2. Upgrade The Level of Civil Engineering technology in Ethiopia
II.
Beneficiary
1. Ethiopian Truism Biro
2. loge and safari owners
3. DEC for being a leading institute in floating homes technology
Budget
No.
Material
Quantit
y
Total
1.
Water proofing
Admixture
2 bag
2.
PPC (Dangote)
2 bag
250
500
3.
Balsa wood
100
200
4.
Course aggregate
1m
350
350
5.
Fine aggregate
1m
300
300
6.
Gypsum
80
80
1 bag
total