RENEO I.

MANALO
Tramo San Antonio San Pascual
EMPLOYMENT RECORD:
A.

Position
Company

:
:

Project
Date

:
:

Pipe Fitter
Cape East Phils.Inc.
Dili, East Timor-Australia
BAYU UNDAN SHUTDOWN PROJECT (offshore)
April 15,2010-May 21, 2010

Duties and Responsibilities


Secure permit before going to workplace weather its hot permit ,cold
permit or confine space.
Replacement of valve.
Changing of pipe to new ones
Cutting of pipe using pneumatic hacksaw to avoid sparks because of
fumes inside.
Sometimes were assign in structural job,putting supports, stoppers,
drilling of beam using rota broch.
Fit-up of flanges for welding.
Measuring and preparing pipe fabrication and/ or installion.
Putting habitat to cover the location so that spark of grinding and
welding will not be falling.
EMPLOYMENT RECORD:
B.

Position
Company

:
:

Project
Date

:
:

Pipe Fitter
Doosan Babcock Energy Limited
Birmingham New Road,Tipton, West Midland
COCKENZIE POWER STATION (shutdown proj.)
August 26, 2008- January 31, 2009

Duties and Responsibilities


Attend all the safety measure before starting the job
Prepare all the materials take-off
Fit-up a small bore up to big bore
Cutting of pipe using grinder
Sometimes we have been transfer to other project like Grangemouth
and Montrose and we work of changing of valve, size 2 up to 10
Changing of gasket to new one
After the work have been accomplish, clean the area before leaving

C.

Position
Company

:
:

Project
Date

:
:

Mechanical Fitter
Cape East
Dili, East Timor- Australia
BAYU UNDAN SHUTDOWN PROJECT (offshore)
July 5, 2007- October 9, 2007

Duties and Responsibilities


Assign in changing of gasket to new one
Cleaning of facing of flange
Putting of molecout to bolt and knot
Putting of support and stiffeners
Fit- up of beam and angle bar
Cutting using acetylene
Attend all the training before going to offshore
D.

Position
Company

:
:

Project
Date

:
:

Structural Fabricator
Q.G.M.
Dubai
Modular Structure- Ship Building Project
June 6, 2006- May 24, 2007

Duties and Responsibilities


Fit- up of gusset plates, dabbler, angle bar
Cutting and lay-out of gusset plates
Fit- up of rig
Alignment of transverse inside the module
Knowledge in tack welding
E.

Position
Company

:
:

Project

Date

Pipe Fitter/ Structural Fitter


Adanin Works & Engineering SDN BHD
Brunei
OGP Project (Ampa Fairley Rationalization
Project- Onshore Compression Plant)
February 28, 2001- August 30, 2001

Duties and Responsibilities


Assign in pipe rock for aligning of pipes
Fit- up of double- ending, vent, drain
Fit- up of beam, gusset plates
Cutting and tack welding
F.

Position
Company

:
:

Project
Date

:
:

Structural Fitter
New Horizon Ledwood Co.
Jeddah
Platform Project
August 19, 1999- August 30, 2000

Duties and Responsibilities


Assign in Fabricating Platforms, H-beam, T-beam
Lay- out and cutting using radial.
Knowledge of tack welding
Fabricate Handrails
G.

Position
Company

:
:

Project
Date

:
:

Tank Fabricator
FORMOSA HEAVY INDUSTRIES CORP.
Taiwan
Fabricating Vessel
September 30, 1997- May 15, 1998

Duties and Responsibilities


Fit- up of re- roll plate sizes 9 meters
Fit- up of clips, gusset plate, stiffener ring
Tack welding of pad- eye
Hauling of vessel using overhead crane
Pre heating of Cromoly before tacking
H.

Position
Company

:
:

Project
Date

:
:

Structural Fitter
BELLELI SAUDI HEAVY INDUSTRIES, LTD.
Dubai U.A.E.
Desalination Project
June 19, 1995- January 19, 1997

Duties and Responsibilities


Fit up of dummy support
Reinforcing pad plate
Alignment of column using dumper level
Fit up of heavy wall using crane
Fit up of flange neck
Lay- out and cutting
I.

Position
Company
Project
Date

:
:
:
:

Pipe Fitter
Irish International Const. Corp. Ltd.
AGOCO Upgrading of Fire Fighting Systems
November 1, 1993- October 28, 1994

Duties and Responsibilities


Assign in fire fighting protection.
Prepare Materials take off.
Erection of pipe using ter por

J.

Grooving of pipe
Lay- out and cutting
Position
Company

:
:

Project
Date

:
:

Structural Fitter
BELLELI SAUDI HEAVY INDUSTRIES, LTD.
Jubail, K.S.A.
Desalination Project
September 9, 1991- March 10, 1993

Duties and Responsibilities


Fit- up of beam (diff. kinds of beam), fabricate if needed.
Fit- up of angular, channel, lay out and cutting
Fit- up of support, different kinds of supports, fabricate also if needed

K.

Position
Company

:
:

Project
Date

:
:

Pipe Fitter
A.G. &P.
San Roque, Bauan Batangas
Philippines
ONGC BPB Complex Project
October 13, 1987- December 29, 1988

Duties and Responsibilities


Fit- up of small bore to big bore
Fit Up all kinds of fitting required in its isometric drawing
Prepared all tools to be used
Knowledge of tack welding.

EDUCATION:
Machine Shop Practice

Technical Education

Pablo Borbon Institute of Technology


1978- 1980
Bauan High School

High School Education

Bauan, Batangas
1974- 1978
Bauan East Central School
Bauan, Batangas

Elementary Education

1968- 1974

SEMINARS / TRAINING ATTENDED:


Course

Place

Date

1. Awareness Modules Taguig, Metro Manila, Philippines

7-9 Aug.07

2. Toolbox Modules

8-9 Aug07

Metro Manila, Philippines

3. Health, Safety & Environment

Brunei

24 Jan01

PERSONAL DATA:
Age

51 years old

Date of Birth

April 25, 1961

Place of Birth

Bauan, Batangas

Civil Status

Married

Citizenship

Filipino

Height

5 4

Weight

130 lbs.

Religion

Roman Catholic

Passport Number

XX 2719809

Date Issued

19 December 2008

Date Expired

18 December 2013

Place Issued

Manila

I hereby certify to the best of my knowledge and belief that all statements are
true and correct.

Reneo I. Manalo