Professional Documents
Culture Documents
INSTRUMENTATION
COKE HANDLING SYSTEM PACKAGE
IREP, BPCL-KOCHI REFINERY
S. No.
PART DESCRIPTION
SECTION: A-4.3
A307-0ID-16-51-SL-1001 Rev A
Page 3 of 4
QUANTITY REQUIRED
3.0
3.1
Installation Material
Instrument
Valves
and
(Prefabricated Hookups)
3.2
Tube Fittings
3.3
3.4
3.5
Tubes
Cables
Junction Boxes (conventional)
3.6
Cable Glands
3.7
Integral manifolds
4.0
4.1
4.2
5.0
6.0
6.1
6.2
6.2
6.3
6.4
6.5
6.6
Valve