Chapter 1
LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT
Notes:
1
2
Sr.
No.
Reference to
MORD
Specifications
1.1
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.50
70.00
35.00
b)
Labour
Machinery
Truck
(ii)
c)
Overheads @ 0% on (a+b)
d)
9.63
86.63
16.00
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
hour
0.25
70.00
17.50
Machinery
Truck
EE.,Dn.I, BMR
c)
Overheads @ 0% on (a+b)
d)
TA to SE Circle BMR
AAO.,Circle, Barmer
4.81
SE.,Circle, Barmer
2
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
43.31
8.00
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
hour
0.25
70.00
17.50
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
4.81
43.31
8.00
b)
Labour
Mate
day
0.005
100.00
0.50
Mazdoor (Unskilled)
day
0.125
80.00
10.00
hour
0.166
70.00
11.62
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
2.77
24.89
EE.,Dn.I, BMR
5.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
3
Sr.
No.
Reference to
MORD
Specifications
Description
(i)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Min
1.00
ii)
Min
7.33
iii)
Min
2.00
Min
10.33
hour
0.172
80.00
13.76
hour
0.122
300.00
36.60
Total
a)
Machinery
(i)
Tipper 10 t capacity
(ii)
b)
Overheads @ 0% on (a)
c)
6.30
56.66
10.00
Min
1.00
ii)
Min
3.30
iii)
Min
2.00
Min
6.30
hour
0.105
Total
a)
Machinery
(i)
EE.,Dn.I, BMR
Tipper 10 t capacity
TA to SE Circle BMR
AAO.,Circle, Barmer
80.00
SE.,Circle, Barmer
8.40
4
Sr.
No.
Reference to
MORD
Specifications
Description
(ii) Front end-loader 1 cum bucket capacity @ 100
cum per hour
b)
Overheads @ 0% on (a)
c)
Unit
Quantity
hour
0.055
Rate
(Rs.)
Amount
(Rs.)
300.00
3.11
28.01
16.50
5.00
Min
1.00
ii)
Min
2.00
iii)
Min
2.00
Min
5.00
hour
0.08
Total
a)
Machinery
Tipper 10 t capacity
1.3
b)
Overheads @ 0% on (a)
c)
80.00
6.40
0.80
7.20
1.00
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
5
Sr.
No.
Reference to
MORD
Specifications
Description
Truck
(ii)
c)
Overheads @ 0% on (a+b)
d)
Unit
Quantity
hour
0.33
Rate
(Rs.)
Amount
(Rs.)
70.00
23.10
5.51
49.61
24.81
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
hour
0.33
70.00
23.10
Machinery
Truck
1.4
c)
Overheads @ 0% on (a+b)
d)
5.51
49.61
24.81
b)
Labour
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.50
80.00
120.00
hour
1.00
70.00
70.00
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
24.50
220.50
EE.,Dn.I, BMR
TA to SE Circle BMR
22.05
AAO.,Circle, Barmer
SE.,Circle, Barmer
6
Sr.
No.
Reference to
MORD
Specifications
Description
(ii)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.50
80.00
120.00
hour
1.00
70.00
70.00
b)
Labour
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
24.50
220.50
22.05
b)
Labour
Mate
day
0.07
100.00
7.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
hour
1.00
70.00
70.00
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
27.63
248.63
24.86
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
7
Sr.
No.
Reference to
MORD
Specifications
Description
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.07
100.00
7.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
hour
1.00
70.00
70.00
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
27.63
248.63
24.86
b)
Labour
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
hour
1.25
70.00
87.50
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
27.69
249.19
24.92
b)
Labour
Mate
day
0.05
100.00
5.00
Mazdoor (Unskilled)
day
1.20
80.00
96.00
hour
1.25
70.00
87.50
Machinery
Truck
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
8
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
c)
Overheads @ 0% on (a+b)
d)
Quantity
Rate
(Rs.)
Amount
(Rs.)
23.56
212.06
100
21.21
b)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.00
70.00
70.00
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
19.25
173.25
34.65
b)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.00
70.00
70.00
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
19.25
173.25
EE.,Dn.I, BMR
TA to SE Circle BMR
34.65
AAO.,Circle, Barmer
SE.,Circle, Barmer
9
Sr.
No.
Reference to
MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
1.50
70.00
105.00
Note: Density of wood has been assumed as 900 kg per cum. If the
density is less the output may be reduced proportionately
1.8
b)
Labour
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
34.13
307.13
55.84
b)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
1.50
70.00
105.00
Machinery
Truck
c)
Overheads @ 0% on (a+b)
d)
34.13
307.13
EE.,Dn.I, BMR
55.84
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
10
Sr.
No.
Reference to
MORD
Specifications
Description
A.
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Truck
hour
0.33
70.00
23.10
Crane
hour
0.33
500.00
165.00
b)
Labour
Machinery
c)
Overheads @ 0% on (a+b)
d)
28.76
258.86
28.76
b)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Truck
hour
0.33
70.00
23.10
Crane
hour
0.33
500.00
165.00
Machinery
c)
Overheads @ 0% on (a+b)
d)
28.76
258.86
17.26
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
11
Sr.
No.
Reference to
MORD
Specifications
Description
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Truck
hour
0.33
70.00
23.10
Crane
hour
0.33
500.00
165.00
Machinery
c)
Overheads @ 0% on (a+b)
d)
28.76
258.86
12.33
b)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
2.00
70.00
140.00
2.00
10.00
20.00
2.00
5.00
10.00
Machinery
Truck
c)
Material
d)
Overheads @ 0% on (a+b+c)
e)
31.75
285.75
57.15
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
12
Sr.
No.
Reference to
MORD
Specifications
Description
b)
Amount
(Rs.)
Quantity
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
2.00
70.00
140.00
2.00
10.00
20.00
2.00
5.00
10.00
Machinery
Truck
c)
Rate
(Rs.)
Unit
Materials
d)
Overheads @ 0% on (a+b+c)
e)
hour
31.75
285.75
47.63
b)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
2.00
70.00
140.00
2.00
10.00
20.00
2.00
5.00
10.00
Machinery
Truck
c)
Materials
d)
Overheads @ 0% on (a+b+c)
e)
hour
31.75
285.75
35.72
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
13
Sr.
No.
Reference to
MORD
Specifications
Description
a)
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Truck
hour
0.20
70.00
14.00
Crane
hour
0.20
500.00
100.00
Labour
Machinery
c)
Overheads @ 0% on (a+b+c)
d)
19.50
175.50
19.50
b)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Truck
hour
0.20
70.00
14.00
Crane
hour
0.20
500.00
100.00
Machinery
c)
Overheads @ 0% on (a+b+c)
d)
19.50
175.50
11.70
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
14
Sr.
No.
Reference to
MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Truck
hour
0.20
70.00
14.00
Crane
hour
0.20
500.00
100.00
c)
Overheads @ 0% on (a+b)
d)
19.50
175.50
8.36
Machinery
Tipper 10 t capacity
Haulage with load
hour
0.25
450.00
112.50
hour
0.18
450.00
81.00
b)
Overheads @ 0% on (a)
c)
24.19
217.69
2.18
Machinery
Tipper 10 t capacity
EE.,Dn.I, BMR
hour
0.33
450.00
148.50
hour
0.25
450.00
112.50
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
15
Sr.
No.
Reference to
MORD
Specifications
Description
b)
Overheads @ 0% on (a)
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
32.63
293.63
2.94
Machinery
i)
Tipper 10 t capacity
Haulage with load
hour
0.66
450.00
297.00
hour
0.50
450.00
225.00
b)
Overheads @ 0% on (a)
c)
65.25
587.25
5.87
b)
Labour
Mate
day
0.048
100.00
4.80
Mazdoor (Unskilled)
day
1.20
80.00
96.00
cum
1.10
45.00
49.50
Material
Supply of quarried stone 150-200 mm size
c)
EE.,Dn.I, BMR
Overheads @ 0% on (a+b)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
16
Sr.
No.
Reference to
MORD
Specifications
Description
d)
Unit
Quantity
Rate
(Rs.)
18.79
Amount
(Rs.)
169.09
b)
Labour
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.50
80.00
120.00
cum
1.10
45.00
49.50
Material
Supply of quarried stone 150-200 mm size
c)
Overheads @ 0% on (a+b)
d)
21.94
197.44
b)
Labour
Mate
day
0.072
100.00
7.20
Mazdoor (Unskilled)
day
1.80
80.00
144.00
cum
1.10
45.00
49.50
Material
Supply of quarried stone 150-200 mm size
c)
Overheads @ 0% on (a+b)
d)
25.09
225.79
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
17
Sr.
No.
Reference to
MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.76
100.00
76.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
Mazdoor (Unskilled)
day
17.00
80.00
1,360.00
cum
800.00
150.00
120,000.00
hour
6.00
13,500.00
81,000.00
hour
20.00
300.00
6,000.00
hour
20.00
450.00
9,000.00
Unit = cum
Taking output = 750 cum at crusher location
a)
b)
Labour
Material
Stone Boulder of size 150 mm and below
c)
Machinery
d)
Overheads @ 0% on (a+b+c)
e)
27,204.50
208,114.43
1.13
277.49
Labour
Mate
EE.,Dn.I, BMR
day
TA to SE Circle BMR
AAO.,Circle, Barmer
0.76
100.00
SE.,Circle, Barmer
76.00
18
Sr.
No.
Reference to
MORD
Specifications
Description
b)
Mazdoor (Skilled)
day
2.00
100.00
200.00
Mazdoor (Unskilled)
day
17.00
80.00
1,360.00
cum
800.00
150.00
120,000.00
hour
6.00
13,500.00
81,000.00
hour
10.00
300.00
3,000.00
hour
10.00
450.00
4,500.00
Material
Machinery
d)
Overheads @ 0% on (a+b+c)
e)
26,267.00
212,762.70
1.14
Amount
(Rs.)
Quantity
Rate
(Rs.)
Unit
285.80
Unit = cum
Taking output = 600 cum at crusher location
a)
b)
Labour
Mate
day
0.76
100.00
76.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
Mazdoor (Unskilled)
day
17.00
80.00
1,360.00
cum
800.00
150.00
120,000.00
Material
Stone Boulder of size 150 mm and below
c)
EE.,Dn.I, BMR
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
19
Sr.
No.
Reference to
MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
hour
6.00
13,500.00
81,000.00
hour
10.00
300.00
3,000.00
hour
10.00
450.00
4,500.00
d)
Overheads @ 0% on (a+b+c)
e)
26,267.00
224,582.85
1.15
355.59
Unit = cum
Taking output = 600 cum at crusher location
a)
b)
Labour
Mate
day
0.76
100.00
76.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
Mazdoor (Unskilled)
day
17.00
80.00
1,360.00
Material
EE.,Dn.I, BMR
cum
800.00
Machinery
150.00
120,000.00
hour
6.00
13,500.00
81,000.00
hour
10.00
300.00
3,000.00
hour
10.00
450.00
4,500.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
20
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
26,267.00
224,582.85
1.16
100
Amount
(Rs.)
374.30
Setting Out
86,207.52
Unit = 1 km
The analysis of rate per km shall account for the following:
(i)
1.00
2,913.32
2,913.32
(ii)
4.00
2,913.32
11,653.30
(iii)
46.00
1,557.41
71,640.90
(iv)
(v)
cum
0.325
75.60
24.57
cum
0.10
1,961.97
196.20
1.
2.
3.
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
21
Sr.
No.
Reference to
MORD
Specifications
Description
As per item No.11.6 III (ii) of Chapter 11
4.
Amount
(Rs.)
Quantity
cum
0.475
1,354.60
643.44
sqm
2.63
726.38
1,910.39
Note:
Rate
(Rs.)
Unit
Add 5 per cent cost of items No.1 to 4 for white washing, lettering
and painting, etc.
138.73
Cost of Benchmark
2,913.32
(vi)
2.
75.60
14.52
cum
0.06
1,961.97
117.72
cum
0.193
1,354.60
261.44
sqm
1.50
726.38
1,089.58
4.
0.192
3.
cum
Add 5 per cent cost of items No.1 to 4 for white washing, lettering
and painting, etc.
Cost of Refernce pillar
74.16
1,557.41
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
22
Sr.
No.
Reference to
MORD
Specifications
Note:
EE.,Dn.I, BMR
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
22
Chapter 2
SITE CLEARANCE
Sr.
No.
Reference to
MORD Specifications
2.1
201
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
1.60
100.00
160.00
Mazdoor (Unskilled)
day
40.00
80.00
3,200.00
Labour
b)
Overheads @ 0% on (a)
0.00
c)
420.00
201
3,780.00
Unit = hectare
Taking output = 1 hectare
(I)
By Manual Means
(A)
b)
Labour
Mate
day
6.00
Mazdoor (Unskilled)
day
150.00
hour
1.00
600.00
80.00 12,000.00
Machinery
Tractor with trolley
EE.,Dn.I,BMR
100.00
TA to SE Circle BMR
AAO.,Circle, Barmer
150.00
SE.,Circle, Barmer
150.00
23
Sr.
No.
Reference to
MORD Specifications
Description
c)
Overheads @ 0% on (a+b)
d)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
1,593.75
14,343.75
b)
Labour
Mate
day
8.00
Mazdoor (Unskilled)
day
200.00
hour
2.00
100.00
80.00 16,000.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
150.00
300.00
0.00
2,137.50
800.00
19,237.50
By Mechanical Means
(A)
b)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
10.00
750.00
7,500.00
hour
1.00
150.00
150.00
Machinery
c)
Overheads @ 0% on (a+b)
d)
0.00
998.25
8,984.25
b)
EE.,Dn.I,BMR
Labour
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
24
Sr.
No.
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
hour
12.00
750.00
9,000.00
hour
1.50
150.00
225.00
c)
Overheads @ 0% on (a+b)
d)
0.00
1,216.13
10,945.13
Note: The top soil removed during clearing and grubbing of site, if
suitable for re-use shall be transported, conserved and stacked
as directed by the Engineer and shall be incidental to the work.
2.3
201
b)
Labour
Mate
day
0.024
100.00
2.40
Mazdoor (Unskilled)
day
0.60
80.00
48.00
hour
0.07
150.00
10.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
7.61
b)
Labour
Mate
day
0.036
100.00
3.60
Mazdoor (Unskilled)
day
0.90
80.00
72.00
hour
0.21
150.00
31.50
Machinery
Tractor with trolley
EE.,Dn.I,BMR
68.51
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
25
Sr.
No.
Reference to
MORD Specifications
Description
c)
Overheads @ 0% on (a+b)
d)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
13.39
120.49
b)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
0.28
150.00
42.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
26.25
236.25
b)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
0.42
150.00
63.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
49.88
b)
Labour
Mate
day
0.32
100.00
32.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
hour
1.00
150.00
150.00
Machinery
Tractor with trolley
EE.,Dn.I,BMR
448.88
c)
Overheads @ 0% on (a+b)
d)
TA to SE Circle BMR
AAO.,Circle, Barmer
0.00
102.75
SE.,Circle, Barmer
26
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
924.75
b)
Labour
Mate
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
25.00
80.00
2,000.00
hour
2.00
150.00
300.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
300.00
2,700.00
b)
Labour
Mate
day
0.024
100.00
2.40
Mazdoor (Unskilled)
day
0.60
80.00
48.00
hour
0.10
150.00
15.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
8.18
b)
Labour
Mate
day
0.036
100.00
3.60
Mazdoor (Unskilled)
day
0.90
80.00
72.00
hour
0.30
150.00
45.00
Machinery
Tractor with trolley
EE.,Dn.I,BMR
73.58
c)
Overheads @ 0% on (a+b)
d)
TA to SE Circle BMR
AAO.,Circle, Barmer
0.00
15.08
SE.,Circle, Barmer
27
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
135.68
b)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
0.40
150.00
60.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
28.50
256.50
b)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
0.60
150.00
90.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
53.25
479.25
b)
Labour
Mate
day
0.32
100.00
32.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
hour
1.20
150.00
180.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
106.50
958.50
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
28
Sr.
No.
Reference to
MORD Specifications
Description
a)
b)
Rate
(Rs.)
Quantity
Mate
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
25.00
80.00
2,000.00
hour
2.50
150.00
375.00
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
309.38
201
Amount
(Rs.)
Unit
2,784.38
Labour
Mate
Mazdoor (Unskilled)
b)
0.016
100.00
1.60
0.40
80.00
32.00
0.018
150.00
2.70
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
4.54
Labour
Mate
Mazdoor (Unskilled)
b)
c)
0.024
100.00
2.40
0.60
80.00
48.00
0.05
150.00
7.50
Machinery
Tractor with trolley
EE.,Dn.I,BMR
40.84
Overheads @ 0% on (a+b)
TA to SE Circle BMR
AAO.,Circle, Barmer
0.00
SE.,Circle, Barmer
29
Sr.
No.
Reference to
MORD Specifications
Description
d)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
7.24
65.14
Labour
Mate
Mazdoor (Unskilled)
b)
0.053
100.00
5.30
1.33
80.00
106.40
0.07
150.00
10.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
15.28
137.48
b)
Labour
Mate
0.11
100.00
11.00
Mazdoor (Unskilled)
2.66
80.00
212.80
0.11
150.00
16.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
30.04
270.34
b)
Labour
Mate
0.21
100.00
21.00
Mazdoor (Unskilled)
5.33
80.00
426.40
0.25
150.00
37.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
60.61
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
545.51
SE.,Circle, Barmer
30
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Labour
Mate
Mazdoor (Unskilled)
b)
0.60
100.00
60.00
15.00
80.00
1,200.00
0.75
150.00
112.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
171.56
1,544.06
Labour
Mate
Mazdoor (Unskilled)
b)
0.016
100.00
1.60
0.40
80.00
32.00
0.025
150.00
3.75
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
4.67
42.02
Labour
Mate
Mazdoor (Unskilled)
b)
0.024
100.00
2.40
0.60
80.00
48.00
0.075
150.00
11.25
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
7.71
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
69.36
SE.,Circle, Barmer
31
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Labour
Mate
Mazdoor (Unskilled)
b)
0.053
100.00
5.30
1.33
80.00
106.40
0.10
150.00
15.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
15.84
142.54
b)
Labour
Mate
0.11
100.00
11.00
Mazdoor (Unskilled)
2.66
80.00
212.80
0.15
150.00
22.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
30.79
277.09
b)
Labour
Mate
0.21
100.00
21.00
Mazdoor (Unskilled)
5.33
80.00
426.40
0.30
150.00
45.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
61.55
553.95
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
32
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Mate
Mazdoor (Unskilled)
b)
Quantity
Rate
(Rs.)
0.60
100.00
60.00
15.00
80.00
1,200.00
1.00
150.00
150.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
176.25
202
Amount
(Rs.)
1,586.25
Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding
wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with
all lifts and lead of 1000 m as per Technical Specification Clause
202.
Unit = cum
Taking output = 1.25 cum
(I) By Manual Means
(A)
Lime Concrete
a)
b)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
15.56
140.06
112.05
EE.,Dn.I,BMR
Labour
Mate
day
0.05
100.00
5.00
Mazdoor (Unskilled)
day
1.25
80.00
100.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
33
Sr.
No.
Reference to
MORD Specifications
Description
b)
Unit
Quantity
hour
0.27
Rate
(Rs.)
Amount
(Rs.)
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
150.00
40.50
0.00
18.19
163.69
130.95
b)
Labour
Mate
day
0.15
100.00
15.00
Blacksmith
day
0.25
120.00
30.00
Mazdoor (Unskilled)
day
3.50
80.00
280.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
43.81
394.31
315.45
Cement Concrete
a)
b)
EE.,Dn.I,BMR
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
0.83
194.00
161.02
0.27
150.00
40.50
Machinery
hour
c)
Overheads @ 0% on (a+b)
d)
0.00
30.44
273.96
219.17
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
34
Sr.
No.
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.05
100.00
5.00
Mazdoor (Unskilled)
day
0.91
80.00
72.80
Blacksmith
day
0.25
120.00
30.00
hour
1.25
194.00
242.50
hour
0.27
150.00
40.50
b)
2.6
202
Labour
Machinery
c)
Overheads @ 0% on (a+b)
d)
0.00
48.85
390.80
312.64
Lime mortar
a)
b)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
(B)
EE.,Dn.I,BMR
c)
Overheads @ 0% on (a+b)
d)
0.00
10.31
92.81
74.25
Cement mortar
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
35
Sr.
No.
Reference to
MORD Specifications
Description
a)
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.03
100.00
3.00
Mazdoor (Unskilled)
day
0.75
80.00
60.00
hour
0.27
150.00
40.50
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
12.94
116.44
Mud Mortar
a)
b)
Labour
Mate
day
0.016
100.00
1.60
Mazdoor (Unskilled)
day
0.40
80.00
32.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
(D)
c)
Overheads @ 0% on (a+b)
0.00
d)
9.26
83.36
66.69
b)
Labour
Mate
day
0.014
100.00
1.40
Mazdoor (Unskilled)
day
0.35
80.00
28.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
EE.,Dn.I,BMR
93.15
c)
Overheads @ 0% on (a+b)
0.00
d)
8.74
78.64
62.91
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
36
Sr.
No.
Reference to
MORD Specifications
2.7
202
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.024
100.00
2.40
Mazdoor (Unskilled)
day
0.60
80.00
48.00
hour
0.27
150.00
40.50
b)
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
11.36
102.26
81.81
b)
Labour
Mate
day
0.03
100.00
3.00
Mazdoor (Unskilled)
day
0.75
80.00
60.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
12.94
116.44
EE.,Dn.I,BMR
93.15
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
37
Sr.
No.
Reference to
MORD Specifications
Description
b)
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.27
150.00
40.50
Machinery
c)
Overheads @ 0% on (a+b)
d)
10.31
92.81
74.25
b)
Labour
Mate
day
0.018
100.00
1.80
Mazdoor (Unskilled)
day
0.45
80.00
36.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
9.79
88.09
70.47
b)
Labour
Mate
day
0.016
100.00
1.60
Mazdoor (Unskilled)
day
0.40
80.00
32.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
EE.,Dn.I,BMR
0.00
a)
(E)
Amount
(Rs.)
Quantity
(D)
Rate
(Rs.)
Unit
c)
Overheads @ 0% on (a+b)
0.00
d)
9.26
83.36
66.69
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
38
Sr.
No.
Reference to
MORD Specifications
Description
(F)
b)
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.27
150.00
40.50
Labour
Machinery
Tractor with trolley
202
Amount
(Rs.)
Quantity
2.8
Rate
(Rs.)
Unit
c)
Overheads @ 0% on (a+b)
d)
0.00
10.31
92.81
74.25
b)
Labour
Mate
day
0.06
100.00
6.00
day
0.50
200.00
100.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
0.27
150.00
40.50
Machinery
Tractor with trolley
2.9
202
c)
Overheads @ 0% on (a+b)
0.00
d)
27.56
248.06
198.45
EE.,Dn.I,BMR
Including dismembering
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
39
Sr.
No.
Reference to
MORD Specifications
Description
a)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.14
100.00
14.00
Blacksmith
day
1.00
120.00
120.00
Mazdoor (Unskilled)
day
2.50
80.00
200.00
Labour
8.35
Machinery
Tractor with trolley
hour
c)
Overheads @ 0% on (a+b)
d)
0.17
150.00
0.00
44.94
404.44
Excluding dismembering
a)
Labour
Mate
day
0.10
100.00
10.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Blacksmith
day
0.50
120.00
60.00
5.75
Machinery
Tractor with trolley
hour
c)
Overheads @ 0% on (a+b)
d)
0.17
150.00
25.50
0.00
31.94
25.50
287.44
EE.,Dn.I,BMR
Labour
Mate
day
0.01
100.00
1.00
Blacksmith
day
0.13
120.00
15.60
Mazdoor (Unskilled)
day
0.13
80.00
10.40
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
40
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Overheads @ 0% on (a)
0.00
c)
3.38
30.38
202
3.04
Labour
Mate
day
0.14
100.00
14.00
Mazdoor (Unskilled)
day
3.50
80.00
280.00
b)
Overheads @ 0% on (a)
0.00
c)
36.75
202
330.75
Labour
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.40
80.00
112.00
b)
Overheads @ 0% on (a)
0.00
c)
14.75
202
132.75
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
41
Sr.
No.
Reference to
MORD Specifications
Description
a)
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
0.32
150.00
48.00
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
48.00
432.00
202
4.32
Unit = m
Taking output = 1m
(A)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.52
80.00
41.60
b)
Overheads @ 0% on (a)
0.00
c)
5.45
49.05
Labour
Mate
day
0.03
100.00
3.00
Mazdoor (Unskilled)
day
0.70
80.00
56.00
b)
Overheads @ 0% on (a)
0.00
c)
7.38
EE.,Dn.I,BMR
66.38
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
42
Sr.
No.
Reference to
MORD Specifications
Description
a)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.05
100.00
5.00
Mazdoor (Unskilled)
day
1.20
80.00
96.00
Labour
b)
Overheads @ 0% on (a)
c)
0.00
12.63
2.14
202
113.63
By Manual Means
(A)
Bituminous Courses
a)
b)
Labour
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.50
80.00
120.00
hour
0.38
150.00
57.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
22.88
205.88
EE.,Dn.I,BMR
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
43
Sr.
No.
Reference to
MORD Specifications
Description
b)
Unit
Quantity
hour
0.33
Rate
(Rs.)
Amount
(Rs.)
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
150.00
0.00
16.69
150.19
By Mechanical Means
(A)
Bituminous Courses
a)
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.30
80.00
24.00
hour
0.38
150.00
57.00
hour
0.016
180.00
2.88
Machinery
c)
Overheads @ 0% on (a+b)
d)
0.00
10.49
202
49.50
94.37
Unit = cum
Taking output = 1 cum
a)
b)
EE.,Dn.I,BMR
Labour
Mate
day
0.03
100.00
3.00
Mazdoor (Semi-skilled)
day
0.50
90.00
45.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
44
Sr.
No.
Reference to
MORD Specifications
Rate
(Rs.)
Amount
(Rs.)
Description
Unit
Quantity
hour
1.00
194.00
194.00
hour
0.40
150.00
60.00
hour
1.00
300.00
300.00
c)
Overheads @ 0% on (a+b)
0.00
d)
80.25
2.16
202
722.25
b)
Labour
Mate
day
0.006
100.00
0.60
Mazdoor (Unskilled)
day
0.15
80.00
12.00
hour
0.05
150.00
7.50
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
2.51
202
22.61
Labour
Mate
EE.,Dn.I,BMR
TA to SE Circle BMR
day
AAO.,Circle, Barmer
0.006
100.00
SE.,Circle, Barmer
0.60
45
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
day
0.15
80.00
12.00
hour
0.20
150.00
30.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
5.33
Cost of 10 m = a+b+c+d
47.93
202
4.79
b)
Labour
Mate
day
0.015
100.00
1.50
Mazdoor (Unskilled)
day
0.225
80.00
18.00
hour
0.30
150.00
45.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
8.06
Cost of 10 m = a+b+c+d
72.56
202
7.26
5th km Stone
Quantity of cement concrete = 0.392 cum
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
46
Sr.
No.
Reference to
MORD Specifications
Description
a)
b)
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.03
100.00
3.00
Mazdoor (Unskilled)
day
0.75
80.00
60.00
hour
0.15
150.00
22.50
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
d)
0.00
10.69
96.19
Ordinary km Stones
Quantity of cement concrete = 0.269 cum
a)
b)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.08
150.00
11.25
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
6.66
59.91
200 m Stones
Quantity of cement concrete = 0.048 cum
a)
b)
Labour
Mate
day
0.004
100.00
0.40
Mazdoor (Unskilled)
day
0.10
80.00
8.00
hour
0.02
150.00
3.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
1.43
EE.,Dn.I,BMR
12.83
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
47
Sr.
No.
Reference to
MORD Specifications
2.20
202
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.15
100.00
15.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
Blacksmith
day
0.75
120.00
90.00
hour
0.15
150.00
22.50
Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing including
posts, foundation concrete, backfilling of pit by manual means
including disposal of dismantled material with all lifts and upto a
lead of 1000 m, stacking serviceable material and unserviceable
material separately as per Technical Specification Clause 202.
Unit = running m
Taking output = 30 m
a)
b)
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
45.94
Cost of 30 m = a+b+c+d
413.44
202
13.78
b)
EE.,Dn.I,BMR
Labour
Mate
day
0.09
100.00
9.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Plumber
day
0.25
150.00
37.50
Truck 10 t capacity
hour
0.25
400.00
100.00
hour
0.50
500.00
250.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
48
Sr.
No.
Reference to
MORD Specifications
Description
c)
Overheads @ 0% on (a+b)
d)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
69.56
626.06
2.22
202
62.61
b)
Labour
Mate
day
0.10
100.00
10.00
Mazdoor (Unskilled)
day
2.50
80.00
200.00
hour
0.30
500.00
150.00
hour
1.00
400.00
400.00
Machinery
c)
Overheads @ 0% on (a+b)
0.00
d)
95.00
855.00
2.23
202
85.50
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
49
Sr.
No.
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit
Quantity
Mate
day
0.48
100.00
48.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Electrician/Lineman
day
2.00
150.00
300.00
hour
1.50
150.00
225.00
Unit = each
Taking output = 30 Nos.
a)
b)
Labour
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
171.63
1,544.63
EE.,Dn.I,BMR
TA to SE Circle BMR
51.49
AAO.,Circle, Barmer
SE.,Circle, Barmer
49
Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Sr.
No.
Reference to
MORD Specifications
3.1
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
1.50
150.00
225.00
Machinery
Tractor with trolley
c)
Overheads @ 0% on (a+b)
0.00
d)
70.13
631.13
6.31
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
50
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
hour
0.25
180.00
45.00
hour
0.30
300.00
90.00
hour
0.68
450.00
306.00
c)
Overheads @ 0% on (a+b)
0.00
d)
57.75
519.75
301.5
5.20
Unit = cum
Taking output = 100 cum
a)
b)
c)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.50
0.00
0.00
hour
0.50
700.00
350.00
hour
2.00
250.00
500.00
hour
1.25
160.00
200.00
kl
12.00
15.00
180.00
Machinery
Material
Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
159.00
1,431.00
EE.,Dn.I, BMR
TA to SE Circle BMR
14.31
AAO.,Circle, Barmer
SE.,Circle, Barmer
51
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Note: In case the earth cutting is done by dozer and pushed for filling in the
embankment, the input of dozer in the cost of embankment shall be
deleted as the same is already provided in the cost of excavation.
However, if the earth is dumped by tippers from roadway cutting, the
input of dozer for spreading is required to be provided.
3.4
301.5
A.
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.67
1,400.00
2,338.00
hour
4.50
450.00
2,025.00
cum
100.00
5.00
500.00
cum
100.00
1.00
100.00
hour
0.50
750.00
375.00
hour
0.50
700.00
350.00
hour
2.00
250.00
500.00
hour
1.25
160.00
200.00
kl
12.00
15.00
180.00
cum
100.00
0.00
0.00
Machinery
Material
Water
Compensation for earth taken from private land
d)
Overheads @ 0% on (a+b+c)
0.00
e)
831.50
7,483.50
EE.,Dn.I, BMR
TA to SE Circle BMR
74.84
AAO.,Circle, Barmer
SE.,Circle, Barmer
52
Sr.
No.
Reference to
MORD Specifications
B.
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
Dozer D-50 for spreading @ 50 cum per hour(cutting with pusing) hour
2.00
750.00
1,500.00
hour
0.50
700.00
350.00
hour
2.00
250.00
500.00
hour
1.25
160.00
200.00
kl
12.00
15.00
180.00
cum
100.00
0.00
0.00
Machinery
Material
Water
Compensation for earth taken from private land
d)
Overheads @ 0% on (a+b+c)
0.00
e)
351.75
3,165.75
3.5
302
31.66
Compensation for earth will vary from place to place and will have to be
assessed realistically as per particular ground situation. In case earth
is available from Govt. land, compensation for earth will not be
required. The position is required to be clearly stated in the cost
estimate.
(i)
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
53
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Mate
day
1.80
100.00
180.00
Mazdoor (Unskilled)
day
45.00
80.00
3,600.00
b)
Overheads @ 0% on (a)
0.00
c)
472.50
4,252.50
35.44
b)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
3.60
750.00
2,700.00
Machinery
Dozer D-50 @ 50 cum per hour (cutting with pushing)
c)
Overheads @ 0% on (a+b)
0.00
d)
358.50
3,226.50
17.93
Unit = cum
Taking output = 360 cum
a)
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
54
Sr.
No.
Reference to
MORD Specifications
Description
b)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
3.60
1,400.00
5,040.00
hour
15.00
450.00
6,750.00
Machinery
c)
Overheads @ 0% on (a+b)
0.00
d)
1,494.75
13,452.75
302.3.6
37.37
Unit = cum
Taking output = 300 cum
a)
b)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Hydraulic excavator 0.90 cum bucket capacity @ 50 cum per hour hour
6.00
1,400.00
8,400.00
12.50
450.00
5,625.00
Machinery
Overheads @ 0% on (a+b)
d)
hour
0.00
1,774.13
15,967.13
302.3.11
EE.,Dn.I, BMR
44.35
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
55
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor
day
2.00
80.00
160.00
hour
3.60
1,400.00
5,040.00
hour
15.00
450.00
6,750.00
Machinery
c)
Overheads @ 0% on (a+b)
0.00
d)
1,494.75
13,452.75
37.37
Note: This item does not include replacement of unsuitable soil by suitable
soil. Replacement, where required, is to be provided and paid
separately under Clause 303.5.2.
3.8
302.3.5
(i)
Labour
Mate
day
2.80
100.00
280.00
Mazdoor (Unskilled)
day
70.00
80.00
5,600.00
b)
Overheads @ 0% on (a)
0.00
c)
735.00
6,615.00
EE.,Dn.I, BMR
TA to SE Circle BMR
55.13
AAO.,Circle, Barmer
SE.,Circle, Barmer
56
Sr.
No.
Reference to
MORD Specifications
Description
(ii)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Mate
day
0.12
100.00
12.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
hour
7.20
750.00
5,400.00
Machinery
Dozer D-50 @ 50% of 30 cum per hour
c)
Overheads @ 0% on (a+b)
0.00
d)
706.50
6,358.50
58.88
Unit = cum
Taking output = 240 cum
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
12.00
11.00
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
hour
1,400.00 16,800.00
450.00
4,950.00
SE.,Circle, Barmer
57
Sr.
No.
Reference to
MORD Specifications
Description
Unit
c)
Overheads @ 0% on (a+b)
d)
Quantity
Rate
(Rs.)
0.00
2,739.75
24,657.75
302.3.5
(i)
Amount
(Rs.)
102.74
b)
c)
Labour
Mate
day
0.22
100.00
22.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
Driller
day
2.00
150.00
300.00
Blaster
day
0.25
150.00
37.50
hour
12.00
hour
6.00
194.00
1,164.00
hour
6.00
300.00
1,800.00
hour
16.00
450.00
7,200.00
kg
70.00
120.00
8,400.00
each
252.00
10.00
2,520.00
cum
90.00
Machinery
Materials
Gelatine 80 per cent
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
-55.00 -4,950.00
0.00
EE.,Dn.I, BMR
1,200.00 14,400.00
3,891.69
35,025.19
AAO.,Circle, Barmer
SE.,Circle, Barmer
58
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
194.58
(ii)
Amount
(Rs.)
Manual Means
Unit = cum
Taking output = 16 cum
a)
b)
Labour
Mate
day
1.64
100.00
164.00
Mazdoor (Unskilled)
day
16.00
80.00
1,280.00
Chiseller
day
24.00
150.00
3,600.00
Blacksmith
day
1.00
120.00
120.00
hour
2.90
450.00
1,305.00
cum
8.00
-55.00
-440.00
Machinery
c)
Overheads @ 0% on (a+b)
d)
EE.,Dn.I, BMR
TA to SE Circle BMR
753.63
6,782.63
0.00
AAO.,Circle, Barmer
423.91
SE.,Circle, Barmer
59
Sr.
No.
Reference to
MORD Specifications
Description
3
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
hour
6.00
1,400.00
8,400.00
hour
6.50
450.00
2,925.00
cum
18.00
-55.00
-990.00
Machinery
c)
Overheads @ 0% on (a+b)
d)
1,396.88
12,571.88
0.00
(iii)
349.22
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
60
Sr.
No.
Reference to
MORD Specifications
Description
b)
c)
Unit
Quantity
Rate
(Rs.)
Mate
day
0.22
100.00
22.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
Driller
day
2.00
150.00
300.00
Blaster
day
0.50
150.00
75.00
hour
12.00
hour
6.00
194.00
1,164.00
hour
6.00
300.00
1,800.00
hour
8.20
450.00
3,690.00
kg
70.00
120.00
8,400.00
Machinery
1,200.00 14,400.00
Materials
Gelatine 80 per cent
Overheads @ 0% on (a+b)
e)
90.00
10.00 10,080.00
-55.00 -4,950.00
0.00
4,402.63
39,623.63
3.10
302.3.2
Amount
(Rs.)
220.13
Labour
Mate
EE.,Dn.I, BMR
day
TA to SE Circle BMR
AAO.,Circle, Barmer
0.20
100.00
SE.,Circle, Barmer
20.00
61
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Mazdoor (Unskilled)
b)
Quantity
Rate
(Rs.)
Amount
(Rs.)
day
5.00
80.00
400.00
hour
0.10
750.00
75.00
Machinery
Dozer D-50 @ 100 cum per hour
495.00
d)
123.75
1,113.75
302.3.2
111.38
b)
Labour
Mate
day
4.00
100.00
400.00
Mazdoor (Unskilled)
day
100.00
80.00
8,000.00
hour
6.00
750.00
4,500.00
Machinery
Dozer D-50 with 100 cum per hour output (Initially stacking and
relaying)
c)
Overheads @ 0% on (a+b)
0.00
d)
1,612.50
14,512.50
309
48.38
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
62
Sr.
No.
Reference to
MORD Specifications
Description
a)
b)
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Labour
Mate
day
0.12
100.00
12.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
hour
6.00
250.00
1,500.00
hour
1.00
150.00
150.00
cum
0.18
200.00
36.00
kl
36.00
15.00
540.00
Machinery
Material
Farmyard manure @ 0.18 cum per 100 sqm at site of work
Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
309.75
2,787.75
310
27.88
b)
c)
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
hour
14.00
250.00
3,500.00
hour
2.40
150.00
360.00
kg
3.60
30.00
108.00
cum
0.43
200.00
86.00
0.052 24,500.00
1,274.00
Machinery
Material
Seeds
Sludge/Farmyard manure @ 0.18 cum per 100 sqm
Bitumen Emulsion
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
63
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
Amount
(Rs.)
sqm
264.00
30.00
7,920.00
kl
84.00
15.00
1,260.00
0.00
1,918.50
17,266.50
303.1
a
71.94
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.67
1,400.00
2,338.00
hour
4.50
450.00
2,025.00
cum
100.00
5.00
500.00
cum
100.00
1.00
100.00
hour
0.50
750.00
375.00
hour
1.00
700.00
700.00
hour
2.00
250.00
500.00
hour
1.43
160.00
228.80
kl
12.00
15.00
180.00
cum
100.00
0.00
0.00
Machinery
Material
Water
Compensation for earth taken from private land
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
0.00
AAO.,Circle, Barmer
878.85
SE.,Circle, Barmer
64
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
7,909.65
79.10
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
Dozer D-50 for spreading @ 50 cum per hour(cutting with pushing hour
2.00
750.00
1,500.00
hour
1.00
700.00
700.00
hour
2.00
250.00
500.00
hour
1.43
160.00
228.80
kl
12.00
15.00
180.00
cum
100.00
0.00
0.00
Machinery
Material
Water
Compensation for earth taken from private land
d)
Overheads @ 0% on (a+b+c)
0.00
e)
399.10
3,591.90
301.4
35.92
Unit = cum
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
65
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Mate
day
0.08
100.00
8.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
6.00
150.00
900.00
hour
7.50
160.00
1,200.00
hour
4.00
250.00
1,000.00
kl
24.00
15.00
360.00
Machinery
Material
Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
453.50
4,081.50
(ii)
6.80
b)
c)
Labour
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
hour
10.00
150.00
1,500.00
hour
6.00
700.00
4,200.00
hour
4.00
250.00
1,000.00
hour
8.60
160.00
1,376.00
kl
24.00
15.00
360.00
Machinery
Material
Water
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
66
Sr.
No.
Reference to
MORD Specifications
Description
Unit
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
1,117.50
10,057.50
301.5.5.1
16.76
b)
c)
Labour
Mate
day
0.28
100.00
28.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
Mazdoor skilled
day
1.00
100.00
100.00
hour
3.00
160.00
480.00
hour
2.00
250.00
500.00
kl
12.00
15.00
180.00
Machinery
Material
Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
221.00
1,989.00
304.3
0.57
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
67
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Taking output = 400 sqm (120 cum considering 300 mm average depth
of excavation over the existing rock face)
a)
b)
c)
Labour
Mate
day
0.60
100.00
60.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
hour
6.00
194.00
1,164.00
hour
12.00
hour
6.00
300.00
1,800.00
hour
11.00
450.00
4,950.00
kg
42.00
120.00
5,040.00
each
672.00
10.00
6,720.00
Machinery
1,200.00 14,400.00
Material
Gelatine 80 per cent
Electric detonators @ 1 detonator for 2 gelatine sticks of 285 gm
each
35,334.00
d)
Overheads @ 0% on (a+b+c)
e)
4,416.75
39,750.75
99.38
Note: In case blasted rock is issued to the Contractor against payment for
construction work, the cost of carriage shall be reduced to that extent.
3.18
306
Unit = cum
Taking output = 360 cum
a)
Labour
Mate
EE.,Dn.I, BMR
day
TA to SE Circle BMR
AAO.,Circle, Barmer
0.16
100.00
SE.,Circle, Barmer
16.00
68
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Mazdoor (Unskilled)
b)
c)
Quantity
Rate
(Rs.)
Amount
(Rs.)
day
4.00
80.00
320.00
hour
6.00
1,400.00
8,400.00
hour
16.00
450.00
7,200.00
cum
360.00
5.00
1,800.00
cum
360.00
1.00
360.00
hour
1.80
750.00
1,350.00
hour
1.80
700.00
1,260.00
hour
9.00
250.00
2,250.00
hour
4.50
160.00
720.00
kl
54.00
15.00
810.00
Machinery
Material
Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
3,060.75
27,546.75
3.19
307
76.52
(i)
Manual Means
a)
Labour
Mate
EE.,Dn.I, BMR
TA to SE Circle BMR
day
AAO.,Circle, Barmer
0.08
100.00
SE.,Circle, Barmer
8.00
69
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Mazdoor (Unskilled)
day
b)
Overheads @ 0% on (a)
c)
Quantity
2.00
Rate
(Rs.)
80.00
Amount
(Rs.)
160.00
0.00
21.00
189.00
18.90
Note: Where lining of drain is provided, quantity shall be worked out based
on approved design and drawing and priced on rate of cement concrete
of approved grade or stone/brick masonary as the case may be.
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
hour
0.04
1,400.00
56.00
Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100
cum per hour
c)
Overheads @ 0% on (a+b)
0.00
d)
9.63
86.63
8.66
Manual Means
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.12
100.00
12.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
Overheads @ 0% on (a)
TA to SE Circle BMR
0.00
AAO.,Circle, Barmer
SE.,Circle, Barmer
70
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
31.50
283.50
28.35
b)
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
hour
0.10
1,400.00
140.00
Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 40 m
per hour
c)
Overheads @ 0% on (a+b)
d)
0.00
22.75
204.75
20.48
3.20
307
Chute Drains
A.
Unit = 1 m
(a)
(b)
0.00
cum
2,177.10
0.00
cum
1,848.00
0.00
EE.,Dn.I, BMR
75.60
(c)
cum
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
71
Sr.
No.
Reference to
MORD Specifications
Description
(d)
Unit
Rate
(Rs.)
sqm
726.38
0.00
119.86
300.96
2.51
Amount
(Rs.)
(e)
Quantity
300.96
Unit = 1 m
(a)
(b)
cum
0.44
75.60
33.26
cum
0.125
1,961.97
245.25
cum
0.18
1,492.03
268.56
P.10 sqm
0.60
726.38
43.58
Sqm
1.00
119.86
119.86
(c)
(d)
(e)
710.51
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
72
Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Sr.
No.
Reference to
MORD Specifications
4.1
401
Description
Unit
Quantity
Rate
(Rs.)
(i)
b)
c)
Labour
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
12.00
180.00
hour
5.00
250.00
cum
192.00
100.00
cum
77.00
85.00
cum
115.00
65.00
kl
30.00
15.00
Machinery
Material
Well graded granular sub-base material as per
Table 400.1
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
73
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
12.00
180.00
hour
5.00
250.00
cum
134.00
90.00
cum
96.00
85.00
cum
153.00
65.00
kl
30.00
15.00
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Machinery
Material
Well graded granular sub-base material as per
Table 400.1
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
74
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
b)
c)
Unit
Quantity
Rate
(Rs.)
day
10.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
12.00
180.00
hour
5.00
250.00
cum
134.00
85.00
cum
48.00
70.00
cum
201.60
65.00
kl
30.00
15.00
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
12.00
180.00
hour
5.00
250.00
Machinery
Material
Well graded granular sub-base material as per
Table 400.1
Water
d)
Overheads @ 0% on (a+b+c)
e)
b)
c)
EE.,Dn.I,BMR
Labour
Machinery
Material
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
75
Sr.
No.
Reference to
MORD Specifications
Description
For granular sub-base material CBR value not less
than 15
Unit
Quantity
Rate
(Rs.)
cum
383.60
65.00
kl
30.00
15.00
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
7.50 4,000.00
hour
4.00
250.00
hour
9.00
300.00
hour
13.60
450.00
hour
4.50
700.00
hour
22.50
160.00
cum
144.00
100.00
Water
d)
Overheads @ 0% on (a+b+c)
e)
(B)
(i)
b)
c)
Labour
Machinery
Material
Well graded granular sub-base material as per
Table 400.1
53 mm to 9.5 mm @ 50 per cent
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
76
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
cum
57.00
85.00
cum
86.40
65.00
kl
24.00
15.00
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
7.50 4,000.00
hour
4.00
250.00
hour
9.00
300.00
hour
13.60
450.00
hour
4.50
700.00
hour
22.50
160.00
cum
100.80
90.00
cum
72.00
85.00
cum
115.20
65.00
kl
24.00
15.00
Water
d)
Overheads @ 0% on (a+b+c)
e)
b)
c)
Labour
Machinery
Material
Well graded granular sub-base material as per
Table 400.1
Water
EE.,Dn.I,BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
77
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
7.50 4,000.00
hour
4.00
250.00
hour
9.00
300.00
hour
13.60
450.00
hour
4.50
700.00
hour
22.50
160.00
cum
100.80
85.00
cum
36.00
70.00
cum
151.20
65.00
kl
24.00
15.00
Machinery
Material
Well graded granular sub-base material as per
Table 400.1
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
402
i)
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
78
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
5.00
250.00
hour
12.00
180.00
cum
134.40
100.00
cum
172.80
95.00
cum
76.80
70.00
kl
30.00
15.00
Machinery
Material
For well graded granular sub-base materials as per Table
400.2
For Grading A Material
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
79
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
5.00
250.00
hour
12.00
180.00
cum
288.00
95.00
cum
96.00
70.00
kl
30.00
15.00
Machinery
Material
For well graded granular sub-base materials as per Table
400.2
For Grading B Material
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
80
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = cum
Taking output = 300 cum
a)
b)
c)
Labour
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
5.00
250.00
hour
12.00
180.00
cum
255.00
85.00
cum
129.00
70.00
kl
30.00
15.00
Machinery
Material
For well graded granular sub-base materials as per Table
400.2
For Grading C Material
Water
d)
Overheads @ 0% on (a+b+c)
e)
403
Unit = cum
Taking output = 300 cum
a)
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
81
Sr.
No.
Reference to
MORD Specifications
Description
b)
c)
Unit
Quantity
Rate
(Rs.)
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
5.00
250.00
hour
12.00
180.00
cum
153.60
70.00
cum
210.40
65.00
kl
30.00
15.00
Mate
day
1.44
100.00
Mazdoor (Skilled)
day
1.00
100.00
Mazdoor (Unskilled)
day
35.00
80.00
Machinery
Material
For well graded granular sub-base materials as per Table
400.3
Water
d)
Overheads @ 0% on (a+b+c)
e)
402
(A)
By Manual Means
Unit = cum
Taking output = 150 cum (263 t)
a)
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
82
Sr.
No.
Reference to
MORD Specifications
Description
b)
c)
Unit
Quantity
Rate
(Rs.)
Machinery
Three wheel 80-100 kN Static roller @ 70 cum per hour
hour
2.15
160.00
hour
3.00
250.00
Material
Lime
Water
kl
18.00
15.00
Mate
day
0.36
100.00
Mazdoor (Skilled)
day
1.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
12.00
180.00
hour
6.00
700.00
hour
4.30
160.00
hour
5.00
250.00
d)
Overheads @ 0% on (a+b+c)
e)
5.26 2,000.00
By Mechanical Means
Unit = cum
Taking output = 300 cum (525 t)
a)
b)
c)
Labour
Machinery
Material
Lime
10.50 2,000.00
Water
kl
30.00
d)
Overheads @ 0% on (a+b+c)
e)
15.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
83
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
403
b)
c)
Labour
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
Machinery
Hydraulic Excavator 0.90 cum bucket capacity
hour
5.00 1,400.00
hour
14.00
450.00
hour
6.00
700.00
hour
4.30
160.00
hour
12.00
180.00
hour
5.00
250.00
Material
Lime
21.00 2,000.00
Water
kl
30.00
d)
Overheads @ 0% on (a+b+c)
e)
15.00
EE.,Dn.I,BMR
404
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
84
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by weight of soil
a)
b)
c)
Labour
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
Machinery
Hydraulic Excavator 0.90 cum bucket capacity
hour
5.00 1,400.00
hour
14.00
450.00
hour
6.00
700.00
hour
4.30
160.00
hour
12.00
180.00
hour
5.00
250.00
Material
Cement at site @ 4% (of 525 t)
21.00 4,000.00
Water
kl
30.00
d)
Overheads @ 0% on (a+b+c)
e)
15.00
405
EE.,Dn.I,BMR
WBM Grading 1
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
85
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
b)
c)
Labour
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
hour
36.00
160.00
hour
24.00
250.00
cum
435.60
145.00
cum
97.20
175.00
cum
28.80
85.00
kl
144.00
15.00
Machinery
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
86
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = cum
Taking output = 360 cum
a)
b)
c)
Labour
Mate
day
0.68
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
hour
7.20
700.00
hour
36.00
160.00
hour
24.00
250.00
cum
435.60
145.00
cum
97.20
175.00
cum
28.80
85.00
kl
144.00
15.00
Machinery
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
2)
WBM Grading 2
A.
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
87
Sr.
No.
Reference to
MORD Specifications
Description
(A)
Unit
Quantity
Rate
(Rs.)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
b)
c)
Labour
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
hour
45.00
160.00
hour
24.00
250.00
435.60
190.00
cum
96.01
150.00
cum
28.80
85.00
kl
144.00
15.00
Machinery
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10
sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Water
d)
Overheads @ 0% on (a+b+c)
e)
By Manual Means
Unit = cum
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
88
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
hour
45.00
160.00
hour
24.00
250.00
435.60
290.00
cum
96.01
150.00
cum
28.80
85.00
kl
144.00
15.00
Machinery
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10
sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Water
d)
Overheads @ 0% on (a+b+c)
e)
b)
EE.,Dn.I,BMR
Labour
Mate
day
0.68
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
Machinery
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
89
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
hour
7.20
700.00
hour
45.00
160.00
hour
24.00
250.00
435.60
190.00
cum
96.01
150.00
cum
28.80
85.00
kl
144.00
15.00
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10
sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Water
d)
Overheads @ 0% on (a+b+c)
e)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
90
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
b)
c)
Unit
Quantity
Rate
(Rs.)
day
250.00
80.00
hour
45.00
160.00
hour
24.00
250.00
cum
435.60
320.00
cum
86.40
150.00
kl
144.00
15.00
Machinery
d)
Overheads @ 0% on (a+b+c)
e)
b)
c)
Labour
Mate
day
0.68
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
hour
7.20
700.00
hour
45.00
160.00
hour
24.00
250.00
cum
435.60
320.00
Machinery
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
91
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10
sqm
cum
86.40
150.00
kl
144.00
15.00
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
hour
36.00
160.00
hour
24.00
250.00
cum
435.60
145.00
cum
108.00
100.00
kl
144.00
15.00
Water
d)
Overheads @ 0% on (a+b+c)
e)
405
WBM Grading 1
Providing, laying, spreading and compacting stone aggregates
(Hand Broken) of specific sizes brought from a lead upto 1 km
to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with three wheel 80100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 1 as per Technical Specification
Clause 405.
(A)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
b)
c)
Labour
Machinery
Water
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
92
Sr.
No.
Reference to
MORD Specifications
Description
d)
Overheads @ 0% on (a+b+c)
e)
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
0.68
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
hour
7.20
700.00
hour
36.00
160.00
hour
24.00
250.00
cum
435.60
145.00
cum
108.00
95.00
kl
144.00
15.00
Machinery
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
WBM Grading 2
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
93
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
b)
c)
Labour
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
hour
45.00
160.00
hour
24.00
250.00
435.60
190.00
cum
105.59
95.00
kl
144.00
15.00
0.68
100.00
Machinery
Water
d)
Overheads @ 0% on (a+b+c)
e)
Labour
Mate
EE.,Dn.I,BMR
TA to SE Circle BMR
day
AAO.,Circle Barmer
SE.,Circle, Barmer
94
Sr.
No.
Reference to
MORD Specifications
Description
b)
c)
Unit
Quantity
Rate
(Rs.)
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
hour
7.20
700.00
hour
45.00
160.00
hour
24.00
250.00
435.60
190.00
cum
105.59
95.00
kl
144.00
15.00
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
Machinery
Water
d)
Overheads @ 0% on (a+b+c)
e)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
b)
EE.,Dn.I,BMR
Labour
Machinery
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
95
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
hour
45.00
160.00
hour
24.00
250.00
435.60
290.00
cum
105.59
95.00
kl
144.00
15.00
Mate
day
10.08
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
250.00
80.00
hour
45.00
160.00
hour
24.00
250.00
Water
d)
Overheads @ 0% on (a+b+c)
e)
By Manual Means
Unit = cum
Taking output = 360 cum
a)
b)
c)
Labour
Machinery
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
96
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
cum
435.60
320.00
cum
105.59
90.00
kl
144.00
15.00
Water
d)
Overheads @ 0% on (a+b+c)
e)
b)
c)
Labour
Mate
day
0.68
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
hour
7.20
700.00
hour
45.00
160.00
hour
24.00
250.00
cum
435.60
320.00
cum
105.59
90.00
kl
144.00
15.00
Machinery
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
406
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
97
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
Labour
Mate
day
0.40
100.00
day
8.00
200.00
Mazdoor (Skilled)
day
2.00
100.00
hour
4.00
300.00
hour
4.00 4,000.00
hour
5.00
450.00
hour
2.00
700.00
hour
1.33
250.00
hour
6.25
160.00
cum
39.90
330.00
cum
53.20
370.00
cum
39.90
115.00
kl
8.00
15.00
Machinery
Material
Water
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I,BMR
407
AAO.,Circle Barmer
SE.,Circle, Barmer
98
Sr.
No.
Reference to
MORD Specifications
Description
A.
Unit
Quantity
Rate
(Rs.)
Earthen Shoulders
The rate as applicable for sub-grade construction may be
adopted.
B.
Hard Shoulders
Rate as applicable for sub-base and/or base may be adopted
as per approved design.
C.
Paved Shoulders
The rates may be adopted as applicable for different layers of
pavement depending upon approved design of paved
shoulders.
4.11
408
(i)
(b)
(c)
Labour
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
12.00
180.00
hour
5.00
250.00
cum
384.00
95.00
kl
30.00
15.00
Machinery
Material
Naturally occurring gravel (Local materials as per Table
400.13)
Quantity as per Item No.4.1 of Chapter 4
Water
(d)
EE.,Dn.I,BMR
Overheads @ 0% on (a+b+c)
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
99
Sr.
No.
Reference to
MORD Specifications
Description
(e)
Unit
Quantity
Rate
(Rs.)
(b)
(c)
Labour
Mate
day
0.40
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
8.00
80.00
hour
6.00
700.00
hour
30.00
160.00
hour
5.00
250.00
hour
12.00
180.00
cum
384.00
95.00
kl
30.00
15.00
Machinery
Material
Soil gravel mixture/quarry waste (Local material as per
Table 400.13)
As per Item No.4.2 of Chapter 4
Water
(d)
Overheads @ 0% on (a+b+c)
(e)
408
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
100
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = cum
Taking output = 360 cum
(a)
(b)
(c)
Labour
Mate
day
0.68
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
15.00
80.00
hour
7.20
700.00
hour
45.00
160.00
hour
24.00
250.00
cum
435.60
95.00
kl
144.00
15.00
Machinery
Material
Low Grade Aggregate such as Kankar, Laterite, Dhandla and
naturally occuring gravels, quarry waste as per Table 400.13
@ 1.21 cum per 10 sqm compacted thickness 100 mm
Water
(d)
Overheads @ 0% on (a+b+c)
(e)
409
Unit = cum
Taking output = 480 cum (720 t, density 1.50 t/cum)
Assumptions made
Total mass taken for analysis = 720 t
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
101
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Lime+Flyash admixture
@ 20% = 0.2 x 720=144 t
Soil = 720-144 = 578 t
(578/1.6 = 360 cum)
Lime + Flyash = 144 t
Ratio Lime 4 : Flyash 16
Lime = 29 t
Flyash = 115 t
a)
Labour
Mate
day
0.28
100.00
Mazdoor (Unskilled)
day
6.00
80.00
day
1.00
100.00
hour
6.00 1,400.00
hour
16.00
450.00
hour
5.50
450.00
hour
3.80
450.00
cum
480.00
5.00
cum
480.00
1.00
hour
6.00
180.00
Motor Grader 110 HP @ 75 per cent 200 cum per hour for
mixing in-place and grading
hour
3.20
700.00
hour
12.00
160.00
hour
12.00
250.00
Mazdoor (Skilled)
b)
c)
Machinery
Material
Lime (Slaked)
EE.,Dn.I,BMR
d)
Overheads @ 0% on (a+b+c)
e)
AAO.,Circle Barmer
29.00 2,000.00
cum
360.00
0.00
kl
72.00
15.00
SE.,Circle, Barmer
102
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
4.14
410
Compensation for earth will vary from place to place and will
have to be assessed realistically as per particular ground
situation.
In case earth is available from Govt. land,
compensation for earth will not be required. The position is
required to be clearly stated in the cost estimate.
Unit = cum
Taking output = 300 cum
(a)
Labour
As per Item No.4.1 of Chapter 4
(b)
Machinery
As per Item No.4.1 of Chapter 4
(c)
Material
Crushed slag as per Clause 410.4.2 (i)
As per Item No.4.2 of Chapter 4
Water
(d)
Overheads @ 0% on (a+b+c)
(e)
cum
384.00
160.00
kl
30.00
15.00
EE.,Dn.I,BMR
410
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
103
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = cum
Taking output = 360 cum
(a)
Labour
As per Item No. 4.7 of Chapter 4
(b)
Machinery
As per Item No.4.7 of Chapter 4
(c)
Material
As per Item No.4.8 (1)(A) of Chapter 4
Crushed slag as per Clause 410.4.2 (ii)
cum
435.60
160.00
Crushable screening
cum
108.00
100.00
kl
144.00
15.00
Water
(d)
Overheads @ 0% on (a+b+c)
(e)
410
Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by wt of granulated blast furnace
slag
(a)
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
104
Sr.
No.
Reference to
MORD Specifications
Description
(b)
(c)
Unit
Quantity
Rate
(Rs.)
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
5.50 cum Tipper for carriage of GBFS add 10 per cent of cost
of carriage of cover cost of loading and unloading
hour
15.00
450.00
hour
6.00
700.00
hour
4.30
160.00
hour
12.00
180.00
hour
7.00
250.00
Machinery
Material
Cement (4%)
21.00 4,000.00
Water
kl
42.00
15.00
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
(d)
Overheads @ 0% on (a+b+c)
(e)
4.17
Note: (i)
(ii)
411
By mix-in-place method
(i)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
105
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
Unit
Quantity
Rate
(Rs.)
day
10.00
80.00
hour
14.00
180.00
hour
6.00
700.00
hour
45.00
160.00
hour
6.00
250.00
63 mm to 45 mm @ 33 per cent
cum
157.46
280.00
cum
151.06
315.00
cum
116.68
125.00
kl
36.00
15.00
Mate
day
0.48
100.00
Mazdoor (Skilled)
day
2.00
100.00
Mazdoor (Unskilled)
day
10.00
80.00
hour
14.00
180.00
hour
6.00
700.00
hour
45.00
160.00
(b) Machinery
(c) Material
Aggregate at site
For 53 mm maximum size
Water
(d) Overheads @ 0% on (a+b+c)
(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
(ii)
(b) Machinery
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
106
Sr.
No.
Reference to
MORD Specifications
Description
Water tanker 6 kl capacity
Unit
Quantity
Rate
(Rs.)
hour
6.00
250.00
cum
24.12
305.00
cum
237.60
315.00
cum
213.48
115.00
kl
36.00
15.00
Mate
day
0.28
100.00
Mazdoor (Skilled)
day
1.00
100.00
Mazdoor (Unskilled)
day
6.00
80.00
hour
6.00 4,000.00
hour
6.00
510.00
hour
6.00
300.00
hour
6.00
700.00
hour
28.13
160.00
Water tanker
hour
3.00
250.00
Tipper
hour
10.00
450.00
(c) Material
Aggregate at site
For 37.5 mm maximum size
Water
(d) Overheads @ 0% on (a+b+c)
(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
B)
(b) Machinery
(c) Material
Aggreate at site
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
107
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
cum
98.40
280.00
cum
94.41
315.00
cum
104.18
125.00
kl
18.00
15.00
Mate
day
0.28
100.00
Mazdoor (Skilled)
day
1.00
100.00
Mazdoor (Unskilled)
day
6.00
80.00
hour
6.00 4,000.00
hour
6.00
510.00
hour
6.00
300.00
hour
6.00
700.00
hour
28.13
160.00
Water tanker
hour
3.00
250.00
Tipper
hour
10.00
450.00
cum
15.06
305.00
cum
148.50
315.00
cum
133.00
115.00
Water
(d) Overheads @ 0% on (a+b+c)
(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 225 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/225
(ii)
(b) Machinery
(c) Material
Aggreate at site
For 37.5 mm maximum size
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
108
Sr.
No.
Reference to
MORD Specifications
Description
Water
Unit
Quantity
Rate
(Rs.)
kl
18.00
15.00
Mate
day
0.52
100.00
Mazdoor (Unskilled)
day
10.00
80.00
day
3.00
180.00
hour
1.00
300.00
Water tanker
hour
1.00
250.00
No.
8,160.00
1.80
No.
1,100.00
1.80
Fine Sand
cum
5.66
110.00
kl
6.00
15.00
412
Brick Soling
Laying brick soling layer on prepared sub-grade with brick on end
edging according to lines, graded and cross-section shown on the
drawing filling joints with sand and earth, spreading 25 mm thick
layer of earth over brick soling, watering and rolliing the same with
three wheel road roller 80-100 kN as per Technical Specification
Clause 412
Unit = sqm
Taking ouput = 150 sqm
(a)
(b)
(c)
Labour
Machinery
Material
Water
(d)
Overheads @ 0% on (a+b+c)
(e)
EE.,Dn.I,BMR
413
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
109
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = sqm
Taking output = 360 sqm
(a)
(b)
(c)
Labour
Mate
day
2.16
100.00
Mazdoor (Unskilled)
day
51.00
80.00
Mason 2nd class for laying sett stone and edge stone
day
13.00
150.00
hour
2.00
160.00
hour
1.00
250.00
cum
0.174
110.00
cum
15.437
190.00
Machinery
Material
(1)
(2)
Coarse sand
96x3.35x0.04x1.20 = 15.437 cum
(3)
5,168.00
20.00
(4)
Nos
464.00
35.00
(5)
6.00
15.00
(d)
Overheads @ 0% on (a+b+c)
(e)
kl
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
110
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Machinery
Tipper 10 t capacity
Haulage with load
hour
0.25
450.00
hour
0.18
450.00
b)
Overheads @ 0% on (a)
c)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
111
Chapter 4
48.00
200.00
800.00
4,200.00
4,800.00
2,160.00
1,250.00
19,200.00
6,545.00
7,475.00
450.00
0.00
5,891.00
53,019.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
112
Amount
(Rs.)
176.73
48.00
200.00
800.00
4,200.00
4,800.00
2,160.00
1,250.00
12,060.00
8,160.00
9,945.00
450.00
0.00
5,509.13
49,582.13
165.27
48.00
200.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
113
Amount
(Rs.)
800.00
4,200.00
4,800.00
2,160.00
1,250.00
11,390.00
3,360.00
13,104.00
450.00
0.00
5,220.25
46,982.25
156.61
48.00
200.00
800.00
4,200.00
4,800.00
2,160.00
1,250.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
114
Amount
(Rs.)
24,934.00
450.00
0.00
4,855.25
43,697.25
145.66
40.00
200.00
640.00
30,000.00
1,000.00
2,700.00
6,120.00
3,150.00
3,600.00
14,400.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
115
Amount
(Rs.)
4,845.00
5,616.00
360.00
0.00
9,083.88
81,754.88
363.36
40.00
200.00
640.00
30,000.00
1,000.00
2,700.00
6,120.00
3,150.00
3,600.00
9,072.00
6,120.00
7,488.00
360.00
0.00
8,811.25
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
116
Amount
(Rs.)
79,301.25
352.45
40.00
200.00
640.00
30,000.00
1,000.00
6,120.00
0.00
3,150.00
3,600.00
8,568.00
2,520.00
9,828.00
360.00
0.00
8,253.25
74,279.25
330.13
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
117
Amount
(Rs.)
40.00
200.00
640.00
4,200.00
4,800.00
1,250.00
2,160.00
13,440.00
16,416.00
5,376.00
450.00
0.00
6,121.50
55,093.50
183.65
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
118
Amount
(Rs.)
40.00
200.00
640.00
4,200.00
4,800.00
1,250.00
2,160.00
27,360.00
6,720.00
450.00
0.00
5,977.50
53,797.50
179.33
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
119
Amount
(Rs.)
40.00
200.00
640.00
4,200.00
4,800.00
1,250.00
2,160.00
21,675.00
9,030.00
450.00
0.00
5,555.63
50,000.63
166.67
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
120
Amount
(Rs.)
40.00
200.00
640.00
4,200.00
4,800.00
1,250.00
2,160.00
10,752.00
13,676.00
450.00
0.00
4,771.00
42,899.00
143.00
144.00
100.00
2,800.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
121
Amount
(Rs.)
344.00
750.00
10,520.00
270.00
0.00
1,866.00
16,794.00
111.96
36.00
100.00
640.00
2,160.00
4,200.00
688.00
1,250.00
21,000.00
450.00
0.00
3,815.50
34,339.50
114.47
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
122
Amount
(Rs.)
48.00
200.00
800.00
7,000.00
6,300.00
4,200.00
688.00
2,160.00
1,250.00
42,000.00
450.00
0.00
8,137.00
73,233.00
244.11
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
123
Amount
(Rs.)
48.00
200.00
800.00
7,000.00
6,300.00
4,200.00
688.00
2,160.00
1,250.00
84,000.00
450.00
0.00
13,387.00
120,483.00
401.61
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
124
Amount
(Rs.)
1,008.00
200.00
20,000.00
5,760.00
6,000.00
63,162.00
17,010.00
2,448.00
2,160.00
0.00
14,718.50
132,466.50
367.96
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
125
Amount
(Rs.)
68.00
200.00
1,200.00
5,040.00
5,760.00
6,000.00
63,162.00
17,010.00
2,448.00
2,160.00
0.00
12,881.00
115,929.00
322.03
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
126
Amount
(Rs.)
1,008.00
200.00
20,000.00
7,200.00
6,000.00
82,764.00
14,401.50
2,448.00
2,160.00
0.00
17,022.69
153,204.19
425.57
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
127
Amount
(Rs.)
1,008.00
200.00
20,000.00
7,200.00
6,000.00
126,324.00
14,401.50
2,448.00
2,160.00
0.00
22,467.69
202,209.19
561.69
68.00
200.00
1,200.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
128
Amount
(Rs.)
5,040.00
7,200.00
6,000.00
82,764.00
14,401.50
2,448.00
2,160.00
0.00
15,185.19
136,666.69
379.63
1,008.00
200.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
129
Amount
(Rs.)
20,000.00
7,200.00
6,000.00
139,392.00
12,960.00
2,160.00
0.00
23,615.00
212,535.00
590.38
68.00
200.00
1,200.00
5,040.00
7,200.00
6,000.00
139,392.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
130
Amount
(Rs.)
12,960.00
2,160.00
0.00
21,777.50
195,997.50
544.44
1,008.00
200.00
20,000.00
5,760.00
6,000.00
63,162.00
10,800.00
2,160.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
131
Amount
(Rs.)
0.00
13,636.25
122,726.25
340.91
68.00
200.00
1,200.00
5,040.00
5,760.00
6,000.00
63,162.00
10,260.00
2,160.00
0.00
11,731.25
105,581.25
293.28
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
132
Amount
(Rs.)
1,008.00
200.00
20,000.00
7,200.00
6,000.00
82,764.00
10,031.05
2,160.00
0.00
16,170.38
145,533.43
404.26
68.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
133
Amount
(Rs.)
200.00
1,200.00
5,040.00
7,200.00
6,000.00
82,764.00
10,031.05
2,160.00
0.00
14,332.88
128,995.93
358.32
1,008.00
200.00
20,000.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
134
Amount
(Rs.)
7,200.00
6,000.00
126,324.00
10,031.05
2,160.00
0.00
21,615.38
194,538.43
540.38
1,008.00
200.00
20,000.00
7,200.00
6,000.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
135
Amount
(Rs.)
139,392.00
9,503.10
2,160.00
0.00
23,182.89
208,645.99
579.57
68.00
200.00
1,200.00
5,040.00
7,200.00
6,000.00
139,392.00
9,503.10
2,160.00
0.00
21,345.39
192,108.49
533.63
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
136
Amount
(Rs.)
40.00
1,600.00
200.00
1,200.00
16,000.00
2,250.00
1,400.00
332.50
1,000.00
13,167.00
19,684.00
4,588.50
120.00
0.00
7,697.75
69,279.75
692.80
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
137
Amount
(Rs.)
48.00
200.00
800.00
4,200.00
4,800.00
2,160.00
1,250.00
36,480.00
450.00
0.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
138
Amount
(Rs.)
6,298.50
56,686.50
188.96
40.00
200.00
640.00
4,200.00
4,800.00
1,250.00
2,160.00
36,480.00
450.00
0.00
6,277.50
56,497.50
188.33
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
139
Amount
(Rs.)
68.00
200.00
1,200.00
5,040.00
7,200.00
6,000.00
41,382.00
2,160.00
0.00
7,906.25
71,156.25
197.66
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
140
Amount
(Rs.)
28.00
480.00
100.00
8,400.00
7,200.00
2,475.00
1,710.00
2,400.00
480.00
1,080.00
2,240.00
1,920.00
3,000.00
58,000.00
0.00
1,080.00
0.00
11,324.13
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
141
Amount
(Rs.)
101,917.13
212.33
1,048.00
12,410.00
61,440.00
450.00
0.00
9,418.50
84,766.50
282.56
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
142
Amount
(Rs.)
21,208.00
11,760.00
69,696.00
10,800.00
2,160.00
0.00
14,453.00
130,077.00
361.33
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
143
Amount
(Rs.)
48.00
200.00
800.00
6,750.00
4,200.00
688.00
2,160.00
1,750.00
84,000.00
630.00
0.00
12,653.25
113,879.25
379.60
48.00
200.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
144
Amount
(Rs.)
800.00
2,520.00
4,200.00
7,200.00
1,500.00
44,088.80
47,583.90
14,585.00
540.00
0.00
15,408.21
138,673.91
385.21
48.00
200.00
800.00
2,520.00
4,200.00
7,200.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
145
Amount
(Rs.)
1,500.00
7,356.60
74,844.00
24,550.20
540.00
0.00
15,469.85
139,228.65
386.75
28.00
100.00
480.00
24,000.00
3,060.00
1,800.00
4,200.00
4,500.80
750.00
4,500.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
146
Amount
(Rs.)
27,552.00
29,739.15
13,022.50
270.00
0.00
14,250.31
128,252.76
570.01
28.00
100.00
480.00
24,000.00
3,060.00
1,800.00
4,200.00
4,500.80
750.00
4,500.00
4,593.30
46,777.50
15,295.00
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
147
Amount
(Rs.)
270.00
0.00
13,794.33
124,148.93
551.77
52.00
540.00
300.00
250.00
14,688.00
1,980.00
622.60
90.00
0.00
2,315.33
20,837.93
138.92
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
148
Amount
(Rs.)
216.00
4,080.00
1,950.00
320.00
250.00
19.14
2,933.03
103,360.00
16,240.00
90.00
0.00
16,182.27
145,640.44
404.56
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
149
Amount
(Rs.)
112.50
78.75
23.91
215.16
4.30
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle Barmer
SE.,Circle, Barmer
109
Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
Sr.
No.
Reference of MORD
Specifications
5.1
502
Unit
Quantity
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
hour
0.50
250.00
125.00
36,260.00
Description
Rate
(Rs.)
Amount
(Rs.)
Prime Coat
(i)
Low porosity
Providing and applying primer coat with bitumen emulsion (SS1) on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 0.70-1.0 kg/sqm
using mechanical means as per Technical Specification Clause
502
Unit = sqm
Taking output = 1750 sqm
a)
b)
c)
Labour
Machinery
Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm
1.48 24,500.00
Water
kl
3.00
d)
Overheads @ 0% on (a+b+c)
e)
15.00
45.00
0.00
4,715.45
42,439.05
24.25
Medium porosity
Providing and applying primer coat with Bitumen emulsion (SS1) on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 0.90- 1.2
kg/sqm using mechanical means as per Technical Specification
Clause 502.
Unit = sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
110
Sr.
No.
Unit
Quantity
Mate
day
0.10
100.00
10.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
hour
0.50
250.00
125.00
44,835.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Bitumen emulsion (SS-1) @ 1.05 kg per sqm
1.83 24,500.00
Water
kl
3.00
d)
Overheads @ 0% on (a+b+c)
e)
15.00
45.00
0.00
5,798.08
52,182.68
29.82
High porosity
Providing and applying primer coat with Bitumen emulsion (SS1) on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 1.2-1.5 kg/sqm
using mechanical means as per Technical Specification Clause
502.
Unit = sqm
Taking output = 1750 sqm
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.12
100.00
12.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
111
Sr.
No.
Reference of MORD
Specifications
Description
Water tanker 6 kl capacity 1 trip per hour
c)
Unit
Quantity
hour
0.50
Rate
(Rs.)
Amount
(Rs.)
250.00
125.00
57,820.00
Material
Bitumen emulsion (SS-1) @ 1.35 kg per sqm
2.36 24,500.00
Water
kl
3.00
d)
Overheads @ 0% on (a+b+c)
e)
15.00
45.00
0.00
7,431.45
66,883.05
503
38.22
Tack Coat
(i)
Unit = sqm
Taking output = 1750 sqm
a)
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
0.39 25,000.00
9,750.00
Machinery
Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm
d)
Overheads @ 0% on (a+b+c)
e)
0.00
1,380.45
12,424.05
EE.,Dn.I, BMR
7.10
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
112
Sr.
No.
Unit
Quantity
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
0.48 25,000.00
12,000.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit = sqm
Taking output = 1750 sqm
a)
b)
c)
Labour
Machinery
Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
d)
Overheads @ 0% on (a+b+c)
e)
0.00
1,661.70
14,955.30
8.55
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
0.48 25,000.00
12,000.00
Machinery
Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm
d)
EE.,Dn.I, BMR
Overheads @ 0% on (a+b+c)
TA to SE.,Circle, BMR
0.00
AAO.,Circle, Barmer
SE.,Circle, Barmer
113
Sr.
No.
Reference of MORD
Specifications
Description
e)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
1,661.70
14,955.30
8.55
Unit = sqm
Taking output = 1750 sqm
a)
b)
c)
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
hour
1.40
170.00
238.00
hour
1.40
194.00
271.60
hour
1.00
700.00
700.00
0.57 25,000.00
14,250.00
Machinery
Material
Bitumen emulsion (RS-1) @ 0.325 kg per sqm
d)
Overheads @ 0% on (a+b+c)
e)
0.00
1,942.95
17,486.55
5.3
9.99
Note: (i)
(ii)
504
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
114
Sr.
No.
Unit
Quantity
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
8,800.00
52,800.00
hour
1.10
170.00
187.00
hour
1.10
194.00
213.40
Paver finisher
hour
6.00
550.00
3,300.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
6.21
450.00
2,794.50
hour
12.00
160.00
1,920.00
hour
6.00
600.00
3,600.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Providing and laying bituminous macadam with hot mix plant using
crushed aggregates of grading as per Table 500.4 premixed with
bituminous binder, transported to site upto a lead of 1000 m laid over
a previously prepared surface with paver finisher to the required
grade, level and alignment and rolled to achieve the desired
compaction as per Technical Specification Clause 504.
Unit = cum
Taking output = 102.5 cum (225 t)
a)
b)
c)
Labour
Machinery
Material
i)
ii)
Aggregate
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
115
Sr.
No.
Description
Unit
Quantity
cum
58.02
370.00
21,467.40
10 5 mm - 40 per cent
cum
58.02
230.00
13,344.60
cum
29.01
140.00
4,061.40
Reference of MORD
Specifications
d)
Overheads @ 0% on (a+b+c)
e)
Rate
(Rs.)
0.00
41,092.23
369,830.03
5.3(ii)
504
Amount
(Rs.)
3,608.10
Labour
b)
Machinery
c)
Material
1,152.00
69,674.90
i)
ii)
Aggregate
cum
58.02
370.00
21,467.40
10 5 mm - 40 per cent
cum
58.02
230.00
13,344.60
cum
29.01
140.00
4,061.40
d)
Overheads @ 0% on (a+b+c)
0.00
e)
5.3 (III)
504
EE.,Dn.I, BMR
43,134.10
388,206.90
3,787.38
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
116
Sr.
No.
Reference of MORD
Specifications
Description
a)
Labour
b)
Machinery
c)
Material
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
1,152.00
69,674.90
i)
ii)
Aggregate
cum
58.02
370.00
21,467.40
10 5 mm - 40 per cent
cum
58.02
230.00
13,344.60
cum
29.01
140.00
4,061.40
d)
Overheads @ 0% on (a+b+c)
0.00
e)
Note:
EE.,Dn.I, BMR
Although the rollers are required only for 3 hours as per norms
of output, but the same have to be available at site for six
hours as the hot mix plant and paver will take six hours for
mixing and paving the output of 225 t considered in these
analysis. To cater for the idle period of these rollers, their
usage rates may be multiplied by a factor of 0.65.
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
46,104.10
414,936.90
4,048.16
SE.,Circle, Barmer
117
Sr.
No.
5.4
Unit
Quantity
Mate
day
5.50
100.00
550.00
Mazdoor (Unskilled)
day
100.50
80.00
8,040.00
Chips spreader
day
10.00
90.00
900.00
Bitumen Sprayer
day
2.50
100.00
250.00
Mazdoor (Semi-Skilled)
day
25.50
90.00
2,295.00
hour
6.00
80.00
480.00
hour
6.00
160.00
960.00
2.40 29,500.00
70,800.00
Reference of MORD
Specifications
505
Description
4
Rate
(Rs.)
Amount
(Rs.)
(A)
By Manual Means
Unit = sqm
Taking output = 800 sqm (60 cum)
b)
c)
Labour
Machinery
Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer
EE.,Dn.I, BMR
80.00
280.00
22,400.00
10.40
290.00
3,016.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
118
Sr.
No.
Reference of MORD
Specifications
Description
Unit
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
13,711.38
123,402.38
154.25
b)
c)
Labour
Mate
day
5.50
100.00
550.00
Mazdoor (Unskilled)
day
100.50
80.00
8,040.00
Chips spreader
day
10.00
90.00
900.00
Bitumen Sprayer
day
2.50
100.00
250.00
Mazdoor (Semi-Skilled)
day
25.50
90.00
2,295.00
hour
6.00
80.00
480.00
hour
6.00
160.00
960.00
2.40 31,700.00
76,080.00
Machinery
Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer
80.00
280.00
22,400.00
10.40
290.00
3,016.00
d)
Overheads @ 0% on (a+b+c)
e)
cum
0.00
14,371.38
129,342.38
161.68
By Mechanical Means
Unit = sqm
Taking output = 3000 sqm (225 cum)
a)
Labour
Mate
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
day
AAO.,Circle, Barmer
0.40
100.00
SE.,Circle, Barmer
40.00
119
Sr.
No.
Unit
Quantity
Mazdoor (Unskilled)
day
8.00
80.00
640.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
750.00
4,500.00
hour
3.43
700.00
2,401.00
hour
10.00
450.00
4,500.00
hour
22.50
160.00
3,600.00
hour
5.00
300.00
1,500.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer
Overheads @ 0% on (a+b+c)
e)
cum
280.00
84,000.00
39.00
290.00
11,310.00
0.00
47,273.88
425,464.88
141.82
506
50 mm thick
Unit = sqm
Taking output = 4500 sqm (225 cum)
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
120
Sr.
No.
Unit
Quantity
Mate
day
0.32
100.00
32.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
750.00
4,500.00
hour
2.57
700.00
1,799.00
hour
10.00
450.00
4,500.00
hour
22.50
160.00
3,600.00
hour
6.00
300.00
1,800.00
Reference of MORD
Specifications
Description
a)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
Machinery
Material
Bitumen @ 1.75 kg per sqm
cum
270.00
240.00
64,800.00
cum
81.00
400.00
32,400.00
d)
Overheads @ 0% on (a+b+c)
0.00
e)
43,284.50
389,560.50
86.57
75 mm thick
Unit = sqm
Taking output = 4500 sqm (337.5 cum)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
121
Sr.
No.
Unit
Quantity
hour
6.00
750.00
4,500.00
hour
2.57
700.00
1,799.00
hour
10.00
450.00
4,500.00
hour
33.75
160.00
5,400.00
hour
6.00
300.00
1,800.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Bitumen @ 2 kg per sqm
cum
405.00
240.00
97,200.00
cum
81.00
400.00
32,400.00
d)
Overheads @ 0% on (a+b+c)
0.00
e)
51,747.38
465,726.38
103.49
b)
c)
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
750.00
4,500.00
hour
2.57
700.00
1,799.00
hour
10.00
450.00
4,500.00
hour
33.75
160.00
5,400.00
hour
6.00
300.00
1,800.00
Machinery
Material
Bitumen @ 2 kg per sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
122
Sr.
No.
Unit
Quantity
cum
405.00
240.00
97,200.00
cum
81.00
400.00
32,400.00
Reference of MORD
Specifications
Description
d)
Overheads @ 0% on (a+b+c)
e)
Rate
(Rs.)
0.00
54,222.38
488,001.38
507
Amount
(Rs.)
108.44
(A)
By Manual Means
Case I: Nominal chipping size 13.2 mm
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 900 sqm
a)
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.25
80.00
180.00
hour
2.25
160.00
360.00
L.S.
b) Machinery
c)
Material
Bitumen (S-90) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
EE.,Dn.I, BMR
27.70
t
cum
0.90 29,500.00
9.00
400.00
26,550.00
3,600.00
Overheads @ 0% on (a+b+c)
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
0.00
SE.,Circle, Barmer
123
Sr.
No.
Reference of MORD
Specifications
Description
e)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
4,532.21
40,789.91
45.32
Bitumen (S-65)
Unit = sqm
Taking output = 900 sqm
a)
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.25
80.00
180.00
hour
2.25
160.00
360.00
L.S.
b) Machinery
c)
27.7
Material
Bitumen (S-65) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
0.90 31,700.00
9.00
400.00
28,530.00
3,600.00
0.00
4,779.71
43,017.41
47.80
EE.,Dn.I, BMR
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
124
Sr.
No.
Unit
Quantity
day
6.00
90.00
540.00
hour
2.25
80.00
180.00
hour
2.25
160.00
360.00
L.S.
Reference of MORD
Specifications
Description
Mazdoor (Semi-Skilled)
Rate
(Rs.)
Amount
(Rs.)
b) Machinery
c)
27.7
Material
Polymer Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
0.90 37,000.00
9.00
400.00
33,300.00
3,600.00
0.00
5,375.96
48,383.66
53.76
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.25
80.00
180.00
hour
2.25
160.00
360.00
L.S.
b) Machinery
c)
Material
Crumb Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
EE.,Dn.I, BMR
27.7
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
t
cum
0.90 34,900.00
9.00
400.00
31,410.00
3,600.00
SE.,Circle, Barmer
125
Sr.
No.
Reference of MORD
Specifications
Description
Unit
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
5,139.71
46,257.41
51.40
b)
c)
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.25
80.00
180.00
hour
2.25
160.00
360.00
L.S.
Machinery
27.70
Material
Natural Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
0.90 36,000.00
9.00
400.00
32,400.00
3,600.00
0.00
5,263.46
47,371.16
52.63
Bitumen (S-90)
Unit = sqm
Taking output = 1000 sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
126
Sr.
No.
Unit
Quantity
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.00
80.00
160.00
hour
2.00
160.00
320.00
0.90 29,500.00
26,550.00
Reference of MORD
Specifications
Description
a)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
Machinery
Material
Bitumen (S-90) @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
8.00
320.00
2,560.00
0.00
4,391.25
39,521.25
39.52
Bitumen (S-65)
Unit = sqm
Taking output = 1000 sqm
a)
b)
c)
EE.,Dn.I, BMR
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.00
80.00
160.00
hour
2.00
160.00
320.00
Machinery
Material
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
127
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Overheads @ 0% on (a+b+c)
e)
t
cum
Quantity
Rate
(Rs.)
0.90 31,700.00
8.00
320.00
Amount
(Rs.)
28,530.00
2,560.00
0.00
4,638.75
41,748.75
41.75
b)
c)
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.00
80.00
160.00
hour
2.00
160.00
320.00
0.90 37,000.00
33,300.00
Machinery
Material
Polymer Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
8.00
320.00
2,560.00
0.00
5,235.00
47,115.00
47.12
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
128
Sr.
No.
Unit
Quantity
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.00
80.00
160.00
hour
2.00
160.00
320.00
0.90 34,900.00
31,410.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Crumb Rubber Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
8.00
320.00
2,560.00
0.00
4,998.75
44,988.75
44.99
b)
c)
Labour
Mate
day
2.60
100.00
260.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.00
80.00
160.00
hour
2.00
160.00
320.00
0.90 36,000.00
32,400.00
Machinery
Material
Natural Rubber Modified Bitumen @ 0.90 kg per sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
129
Sr.
No.
Reference of MORD
Specifications
Description
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
Unit
Quantity
cum
8.00
Rate
(Rs.)
320.00
Amount
(Rs.)
2,560.00
0.00
5,122.50
46,102.50
46.10
By Mechanical Means
Case I: Nominal chipping size 13.2 mm
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a)
b)
c)
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
18.75
160.00
3,000.00
Machinery
Material
Bitumen (S-90) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
t
cum
400.00
30,000.00
0.00
33,824.75
SE.,Circle, Barmer
130
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
304,422.75
40.59
Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a)
b)
c)
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
18.75
160.00
3,000.00
Machinery
Material
Bitumen (S-65) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
30,000.00
0.00
35,887.25
322,985.25
43.06
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
131
Sr.
No.
Unit
Quantity
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
18.75
160.00
3,000.00
Reference of MORD
Specifications
Description
a)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
Machinery
Material
Polymer Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
30,000.00
0.00
40,856.00
367,704.00
49.03
EE.,Dn.I, BMR
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
132
Sr.
No.
Unit
Quantity
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
18.75
160.00
3,000.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Crumb Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
30,000.00
0.00
38,887.25
349,985.25
46.66
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
133
Sr.
No.
Unit
Quantity
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
18.75
160.00
3,000.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Natural Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
30,000.00
0.00
39,918.50
359,266.50
47.90
Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
134
Sr.
No.
Reference of MORD
Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Material
Bitumen (S-90) @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
320.00
19,200.00
0.00
29,634.13
266,707.13
35.56
Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a)
b)
c)
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Machinery
Material
Bitumen (S-65) @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
t
cum
320.00
19,200.00
0.00
31,490.38
SE.,Circle, Barmer
135
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
283,413.38
37.79
b)
c)
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Machinery
Material
Polymer Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
320.00
19,200.00
0.00
35,962.25
323,660.25
43.15
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
136
Sr.
No.
Unit
Quantity
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Reference of MORD
Specifications
Description
a)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
Machinery
Material
Crumb Rubber Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
320.00
19,200.00
0.00
34,190.38
307,713.38
41.03
EE.,Dn.I, BMR
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
137
Sr.
No.
Unit
Quantity
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Natural Rubber Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
320.00
19,200.00
0.00
35,118.50
316,066.50
507
42.14
By Manual Means
Case I: Nominal aggregate size 13.2 mm
Unit = sqm
Taking output = 900 sqm
a)
EE.,Dn.I, BMR
Labour
Mate
day
2.36
100.00
236.00
day
1.00
100.00
100.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
138
Sr.
No.
Unit
Quantity
day
58.00
80.00
4,640.00
hour
2.25
700.00
1,575.00
hour
2.25
160.00
360.00
L.S.
Reference of MORD
Specifications
Description
Mazdoor (Unskilled)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
0.5/100
Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @ 0.010
cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
1.35 25,000.00
9.00
400.00
33,750.00
3,600.00
0.00
5,532.63
49,793.63
55.33
b)
c)
Labour
Mate
day
2.36
100.00
236.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
58.00
80.00
4,640.00
hour
2.00
700.00
1,400.00
hour
2.00
160.00
320.00
1.40 25,000.00
35,000.00
Machinery
Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @ 0.008
cum per sqm
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
t
cum
8.00
320.00
2,560.00
0.00
AAO.,Circle, Barmer
5,532.00
SE.,Circle, Barmer
139
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
49,788.00
49.79
By Mechanical Means
Case I: Nominal chipping size 13.2 mm
Unit = sqm
Taking output = 7500 sqm
a)
b)
c)
Labour
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
18.75
160.00
3,000.00
Machinery
Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @ 0.010
cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
320.00
24,000.00
0.00
40,574.75
365,172.75
48.69
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
140
Sr.
No.
Unit
Quantity
Mate
day
0.44
100.00
44.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
170.00
1,020.00
hour
6.00
194.00
1,164.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @ 0.008
cum per sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
320.00
19,200.00
0.00
37,556.00
338,004.00
5.8
507.2.5
45.07
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
141
Sr.
No.
Unit
Quantity
Mate
day
0.60
100.00
60.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
hour
6.00
80.00
480.00
hour
6.00
400.00
2,400.00
0.48 29,500.00
14,160.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Bitumen (S-90)
a)
b)
c)
Labour
Machinery
Material
Bitumen @1 per cent by weight of chips (30x1.6)/100
d)
Overheads @ 0% on (a+b+c)
e)
0.00
2,287.50
20,587.50
686.25
Bitumen (S-65)
a)
b)
c)
Labour
Mate
day
0.60
100.00
60.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
hour
6.00
80.00
480.00
hour
6.00
400.00
2,400.00
0.48 31,700.00
15,216.00
Machinery
Material
Bitumen @1 per cent by weight of chips (30x1.6)/100
d)
Overheads @ 0% on (a+b+c)
e)
0.00
TA to SE.,Circle, BMR
2,419.50
21,775.50
EE.,Dn.I, BMR
725.85
AAO.,Circle, Barmer
SE.,Circle, Barmer
142
Sr.
No.
Reference of MORD
Specifications
5.9
508
Unit
Quantity
Mate
day
1.08
100.00
108.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
4.00
400.00
1,600.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
4.00
80.00
320.00
hour
2.00
160.00
320.00
0.73 29,500.00
21,535.00
Description
Rate
(Rs.)
Amount
(Rs.)
Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm (10 cum)
a)
b)
c)
Labour
Machinery
Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
400.00
5,400.00
0.00
3,937.88
35,440.88
70.88
Bitumen (S-65)
Unit = sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
143
Sr.
No.
Unit
Quantity
Mate
day
1.08
100.00
108.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
4.00
400.00
1,600.00
hour
4.00
80.00
320.00
hour
2.00
160.00
320.00
0.73 31,700.00
23,141.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
400.00
5,400.00
0.00
4,138.63
37,247.63
74.50
b)
c)
EE.,Dn.I, BMR
Labour
Mate
day
1.08
100.00
108.00
Mazdoor (Skilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
4.00
400.00
1,600.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
4.00
80.00
320.00
hour
2.00
160.00
320.00
Machinery
Material
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
144
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Overheads @ 0% on (a+b+c)
e)
t
cum
Quantity
Rate
(Rs.)
0.73 37,000.00
13.50
400.00
Amount
(Rs.)
27,010.00
5,400.00
0.00
4,622.25
41,600.25
83.20
b)
c)
Labour
Mate
day
1.08
100.00
108.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
4.00
400.00
1,600.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
4.00
80.00
320.00
hour
2.00
160.00
320.00
0.73 34,900.00
25,477.00
Machinery
Material
Crumb Rubber Modified Bitumen @ 14.60 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
13.50
400.00
5,400.00
0.00
4,430.63
39,875.63
79.75
EE.,Dn.I, BMR
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
145
Sr.
No.
Unit
Quantity
Mate
day
1.08
100.00
108.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
4.00
400.00
1,600.00
hour
4.00
80.00
320.00
hour
2.00
160.00
320.00
0.73 36,000.00
26,280.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Natural Rubber Modified Bitumen @ 14.60 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
13.50
400.00
5,400.00
0.00
4,531.00
40,779.00
81.56
Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.64
450.00
1,638.00
Paver finisher
hour
6.00
550.00
3,300.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
146
Sr.
No.
Reference of MORD
Specifications
Description
Three wheel 80-100 kN static roller
c)
Unit
Quantity
hour
16.00
Rate
(Rs.)
160.00
Amount
(Rs.)
2,560.00
Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
43,200.00
0.00
33,273.75
299,463.75
74.87
Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)
b)
c)
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.64
450.00
1,638.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
16.00
160.00
2,560.00
Machinery
Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
43,200.00
0.00
34,879.75
313,917.75
TA to SE.,Circle, BMR
78.48
AAO.,Circle, Barmer
SE.,Circle, Barmer
147
Sr.
No.
Unit
Quantity
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.64
450.00
1,638.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
16.00
160.00
2,560.00
Reference of MORD
Specifications
Description
(III)
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
400.00
43,200.00
0.00
38,748.75
348,738.75
87.18
EE.,Dn.I, BMR
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
148
Sr.
No.
Unit
Quantity
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.64
450.00
1,638.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
16.00
160.00
2,560.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Crumb Rubber Modified Bitumen @ 14.60 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
400.00
43,200.00
0.00
37,215.75
334,941.75
83.74
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.64
450.00
1,638.00
Paver finisher
hour
6.00
550.00
3,300.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
149
Sr.
No.
Reference of MORD
Specifications
Description
Three wheel 80-100 kN static roller
c)
Unit
Quantity
hour
16.00
Rate
(Rs.)
160.00
Amount
(Rs.)
2,560.00
Material
Natural Rubber Modified Bitumen @ 14.60 kg per 10 sqm
t
cum
d)
e)
400.00
43,200.00
0.00
38,018.75
342,168.75
508.2
85.54
b)
c)
Labour
Mate
day
0.80
100.00
80.00
Mazdoor (Unskilled)
day
18.00
80.00
1,440.00
Mazdoor (Skilled)
day
2.00
100.00
200.00
hour
6.00
60.00
360.00
hour
3.60
160.00
576.00
1.94 25,000.00
48,500.00
Machinery
Material
Bitumen emulsion (RS-1) @ 21.50 kg per 10 sqm
Crushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
24.30
400.00
9,720.00
0.00
7,609.50
68,485.50
509
EE.,Dn.I, BMR
76.10
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
150
Sr.
No.
Unit
Quantity
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
1.10 29,500.00
32,450.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
By Manual Means
Type A
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a)
b)
Labour
Machinery
Mixall 6-10 t capacity
c)
hour
Material
Bitumen (S-90) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
230.00
3,105.00
0.00
5,230.63
46,935.63
93.87
Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
151
Sr.
No.
Unit
Quantity
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
1.10 31,700.00
34,870.00
Reference of MORD
Specifications
Description
a)
b)
Amount
(Rs.)
Labour
Machinery
Mixall 6-10 t capacity
c)
Rate
(Rs.)
hour
Material
Bitumen (S-65) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
230.00
3,105.00
0.00
5,533.13
49,658.13
99.32
b)
Labour
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
Machinery
Mixall 6-10 t capacity
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
hour
SE.,Circle, Barmer
152
Sr.
No.
Reference of MORD
Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
1.10 37,000.00
13.50
230.00
40,700.00
3,105.00
0.00
6,261.88
56,216.88
112.43
Unit = sqm
Taking output = 500 sqm
a)
b)
Labour
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
1.10 34,900.00
38,390.00
Machinery
Mixall 6-10 t capacity
c)
Material
Crumb Rubber Modified Bitumen @ 22 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
13.50
230.00
3,105.00
0.00
5,973.13
53,618.13
hour
107.24
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
153
Sr.
No.
Unit
Quantity
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
1.10 36,000.00
39,600.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Machinery
Mixall 6-10 t capacity
c)
hour
Material
Natural Rubber Modified Bitumen @ 22 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
13.50
230.00
3,105.00
0.00
6,124.38
54,979.38
109.96
Type B
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a)
b)
Labour
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
Machinery
Mixall 6-10 t capacity
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
hour
SE.,Circle, Barmer
154
Sr.
No.
Reference of MORD
Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Material
Bitumen (S-90) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
0.95 29,500.00
13.50
230.00
28,025.00
3,105.00
0.00
4,677.50
41,957.50
83.92
Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a)
b)
Labour
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
0.95 31,700.00
30,115.00
Machinery
Mixall 6-10 t capacity
c)
hour
Material
Bitumen (S-65) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
230.00
3,105.00
0.00
4,938.75
44,308.75
88.62
EE.,Dn.I, BMR
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
155
Sr.
No.
Unit
Quantity
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
80.00
480.00
6.00
160.00
960.00
0.95 37,000.00
35,150.00
Reference of MORD
Specifications
Description
b)
Amount
(Rs.)
Machinery
Mixall 6-10 t capacity
c)
Rate
(Rs.)
hour
Material
Polymer Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
230.00
3,105.00
0.00
5,568.13
49,973.13
99.95
b)
Labour
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
100.00
600.00
6.00
160.00
960.00
0.95 34,900.00
33,155.00
Machinery
Mixall 6-10 t capacity
c)
Material
Crumb Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm
d)
EE.,Dn.I, BMR
hour
t
cum
13.50
230.00
3,105.00
Overheads @ 0% on (a+b+c)
TA to SE.,Circle, BMR
0.00
AAO.,Circle, Barmer
SE.,Circle, Barmer
156
Sr.
No.
Reference of MORD
Specifications
Description
e)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
5,333.75
47,863.75
95.73
b)
Labour
Mate
day
1.40
100.00
140.00
Mazdoor (Unskilled)
day
21.00
80.00
1,680.00
Mazdoor (Semi-Skilled)
day
7.00
90.00
630.00
hour
6.00
400.00
2,400.00
Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set
6.00
100.00
600.00
6.00
160.00
960.00
0.95 36,000.00
34,200.00
Machinery
Mixall 6-10 t capacity
c)
hour
Material
Natural Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
13.50
230.00
3,105.00
0.00
5,464.38
49,039.38
98.08
By Mechanical Means
Type A
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)
Labour
Mate
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
day
AAO.,Circle, Barmer
0.52
100.00
SE.,Circle, Barmer
52.00
157
Sr.
No.
Unit
Quantity
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Bitumen (S-90) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
24,840.00
0.00
41,931.50
377,383.50
94.35
Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
158
Sr.
No.
Reference of MORD
Specifications
Description
Three wheel 80-100 kN static roller
c)
Unit
Quantity
hour
18.00
Rate
(Rs.)
160.00
Amount
(Rs.)
2,880.00
Material
Bitumen (S-65) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
24,840.00
0.00
44,351.50
399,163.50
99.79
b)
c)
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Machinery
Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
24,840.00
0.00
50,181.50
451,633.50
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
112.91
AAO.,Circle, Barmer
SE.,Circle, Barmer
159
Sr.
No.
Unit
Quantity
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Reference of MORD
Specifications
Description
(IV)
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Crumb Rubber Modified Bitumen @ 22 kg per 10 sqm
t
cum
d)
e)
230.00
0.00
47,871.50
430,843.50
24,840.00
107.71
EE.,Dn.I, BMR
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
160
Sr.
No.
Unit
Quantity
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
cum
d)
Overheads @ 0% on (a+b+c)
e)
230.00
24,840.00
0.00
49,081.50
441,733.50
110.43
Type B
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
161
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
c)
0.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Material
Bitumen (S-90) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
24,840.00
0.00
37,506.50
337,558.50
84.39
Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)
b)
c)
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Machinery
Material
Bitumen (S-65) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
t
cum
230.00
24,840.00
SE.,Circle, Barmer
162
Sr.
No.
Reference of MORD
Specifications
Description
Unit
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
39,596.50
356,368.50
89.09
b)
c)
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Machinery
Material
Polymer Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
cum
230.00
24,840.00
0.00
44,631.50
401,683.50
100.42
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
163
Sr.
No.
Unit
Quantity
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Reference of MORD
Specifications
Description
a)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
Machinery
Material
Crumb Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
24,840.00
0.00
42,636.50
383,728.50
95.93
b)
Labour
Mate
day
0.52
100.00
52.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Mazdoor (Skilled)
day
3.00
100.00
300.00
hour
6.00
6,200.00
37,200.00
Machinery
HMP of appropriate capacity
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
164
Sr.
No.
Unit
Quantity
hour
6.00
510.00
3,060.00
hour
6.00
300.00
1,800.00
hour
3.60
450.00
1,620.00
Paver finisher
hour
6.00
550.00
3,300.00
hour
18.00
160.00
2,880.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Natural Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
24,840.00
0.00
43,681.50
393,133.50
98.28
510
Seal Coat
Providing and laying seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using Type A,
Type B and Type C as per Technical Specification Clause 510
A.
By Manual Means
Case - I : Type A
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
165
Sr.
No.
Unit
Quantity
hour
2.20
60.00
132.00
hour
2.20
160.00
352.00
1.078 29,500.00
31,801.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
9.90
230.00
2,277.00
0.00
4,634.63
41,711.63
37.92
Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a)
b)
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.20
60.00
132.00
hour
2.20
160.00
352.00
1.078 31,700.00
34,172.60
Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with
spray set
Three wheel 80-100 kN static roller
c)
Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
cum
9.90
230.00
2,277.00
0.00
EE.,Dn.I, BMR
4,931.08
44,379.68
AAO.,Circle, Barmer
SE.,Circle, Barmer
166
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
40.35
b)
c)
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.20
60.00
132.00
hour
2.20
160.00
352.00
1.078 37,000.00
39,886.00
Machinery
Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
9.90
230.00
2,277.00
0.00
5,645.25
50,807.25
46.19
b)
EE.,Dn.I, BMR
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
167
Sr.
No.
Unit
Quantity
hour
2.20
60.00
132.00
hour
2.20
160.00
352.00
1.078 34,900.00
37,622.20
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Crumb Rubber Modified Bitumen @ 9.80 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
9.90
230.00
2,277.00
0.00
5,362.28
48,260.48
43.87
b)
c)
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
hour
2.20
60.00
132.00
hour
2.20
160.00
352.00
1.078 36,000.00
38,808.00
Machinery
Material
Natural Rubber Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
cum
9.90
230.00
2,277.00
0.00
EE.,Dn.I, BMR
5,510.50
49,594.50
AAO.,Circle, Barmer
SE.,Circle, Barmer
168
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
45.09
Case - II : Type B
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a)
b)
c)
Labour
Mate
day
0.85
100.00
85.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
Mazdoor (Semi-Skilled)
day
2.00
90.00
180.00
hour
2.50
400.00
1,000.00
hour
2.50
160.00
400.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.50
80.00
200.00
0.85 29,500.00
25,075.00
Machinery
Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
Crushed sand or grit as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
7.50
125.00
937.50
0.00
3,634.69
32,712.19
26.17
Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.85
100.00
85.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
Mazdoor (Semi-Skilled)
day
2.00
90.00
180.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
169
Sr.
No.
Unit
Quantity
hour
2.50
400.00
1,000.00
hour
2.50
160.00
400.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.50
80.00
200.00
0.85 31,700.00
26,945.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Overheads @ 0% on (a+b+c)
e)
t
cum
7.50
125.00
937.50
0.00
3,868.44
34,815.94
27.85
b)
c)
Labour
Mate
day
0.85
100.00
85.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
Mazdoor (Semi-Skilled)
day
2.00
90.00
180.00
hour
2.50
400.00
1,000.00
hour
2.50
160.00
400.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.50
80.00
200.00
0.85 37,000.00
31,450.00
Machinery
Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm
Crushed sand or grit as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
t
cum
7.50
125.00
937.50
0.00
AAO.,Circle, Barmer
4,431.56
SE.,Circle, Barmer
170
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
39,884.06
31.91
b)
c)
Labour
Mate
day
0.85
100.00
85.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
Mazdoor (Semi-Skilled)
day
2.00
90.00
180.00
hour
2.50
400.00
1,000.00
hour
2.50
160.00
400.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.50
80.00
200.00
0.85 34,900.00
29,665.00
Machinery
Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
7.50
125.00
937.50
0.00
4,208.44
37,875.94
30.30
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.85
100.00
85.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
Mazdoor (Semi-Skilled)
day
2.00
90.00
180.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
171
Sr.
No.
Unit
Quantity
hour
2.50
400.00
1,000.00
hour
2.50
160.00
400.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.50
80.00
200.00
0.85 36,000.00
30,600.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 sqm
t
cum
d)
e)
7.50
125.00
937.50
0.00
4,325.31
38,927.81
31.14
Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a)
b)
c)
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
5.00
90.00
450.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.20
80.00
176.00
hour
2.20
160.00
352.00
0.715 29,500.00
21,092.50
Machinery
Material
Bitumen (S-90) @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100%
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
t
cum
9.90
3,168.00
320.00
0.00
AAO.,Circle, Barmer
3,401.69
SE.,Circle, Barmer
172
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
30,615.19
27.83
Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a)
b)
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
5.00
90.00
450.00
hour
2.20
80.00
176.00
hour
2.20
160.00
352.00
0.715 31,700.00
22,665.50
Machinery
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
Three wheel 80-100 kN static roller
c)
Material
Bitumen (S-65) @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100%
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
9.90
320.00
3,168.00
0.00
3,598.31
32,384.81
29.44
EE.,Dn.I, BMR
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
5.00
90.00
450.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
173
Sr.
No.
Unit
Quantity
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.20
80.00
176.00
hour
2.20
160.00
352.00
0.715 37,000.00
26,455.00
Reference of MORD
Specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100%
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
9.90
320.00
3,168.00
0.00
4,072.00
36,648.00
33.32
b)
c)
EE.,Dn.I, BMR
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
5.00
90.00
450.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.20
80.00
176.00
hour
2.20
160.00
352.00
0.715 34,900.00
24,953.50
Machinery
Material
Crumb Rubber Modified Bitumen @ 6.50 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
9.90
320.00
3,168.00
0.00
AAO.,Circle, Barmer
3,884.31
SE.,Circle, Barmer
174
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
34,958.81
31.78
b)
c)
Labour
Mate
day
1.15
100.00
115.00
Bitumen Sprayer
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Mazdoor (Semi-Skilled)
day
5.00
90.00
450.00
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
hour
2.20
80.00
176.00
hour
2.20
160.00
352.00
0.715 36,000.00
25,740.00
Machinery
Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
9.90
320.00
3,168.00
0.00
3,982.63
35,843.63
32.59
Note: Since seal coat is provided immediately over the bituminous layers,
hydraulic broom for cleaning has not been catered.
B.
By Mechanical Means
Case - I : Type A
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)
Labour
Mate
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
day
AAO.,Circle, Barmer
0.24
100.00
SE.,Circle, Barmer
24.00
175
Sr.
No.
Unit
Quantity
day
6.00
80.00
480.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Reference of MORD
Specifications
Description
Mazdoor (Unskilled)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Machinery
Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
15,525.00
0.00
31,056.75
279,510.75
37.27
Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
176
Sr.
No.
Reference of MORD
Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
15,525.00
0.00
33,078.00
297,702.00
39.69
b)
c)
Labour
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Machinery
Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
15,525.00
0.00
37,947.38
341,526.38
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
45.54
AAO.,Circle, Barmer
SE.,Circle, Barmer
177
Sr.
No.
Unit
Quantity
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Reference of MORD
Specifications
Description
(IV)
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Crumb Rubber Modified Bitumen @ 9.80 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
230.00
15,525.00
0.00
36,018.00
324,162.00
43.22
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
hour
6.00
750.00
4,500.00
hour
6.00
450.00
2,700.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
178
Sr.
No.
Unit
Quantity
hour
6.00
300.00
1,800.00
hour
6.00
700.00
4,200.00
hour
15.00
160.00
2,400.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Natural Rubber Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
230.00
15,525.00
0.00
37,028.63
333,257.63
44.43
Note: Since seal coat is provided immediately over the bituminous layers,
Hydraulic broom for cleaning has not been catered.
510
Case - II : Type B
(I)
Bitumen (S-90)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a)
b)
c)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
Machinery
Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
179
Sr.
No.
Reference of MORD
Specifications
Description
Crushed sand defined as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
d)
Overheads @ 0% on (a+b+c)
e)
Unit
Quantity
cum
30.00
Rate
(Rs.)
125.00
Amount
(Rs.)
3,750.00
0.00
15,214.75
136,932.75
27.39
Bitumen (S-65)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a)
b)
c)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
Machinery
Material
Bitumen (S-65) @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
125.00
3,750.00
0.00
16,149.75
145,347.75
29.07
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
180
Sr.
No.
Unit
Quantity
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
b)
c)
Labour
Machinery
Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
125.00
3,750.00
0.00
18,402.25
165,620.25
33.12
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
181
Sr.
No.
Unit
Quantity
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
125.00
3,750.00
0.00
17,509.75
157,587.75
31.52
b)
c)
EE.,Dn.I, BMR
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
Machinery
Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 sqm
cum
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE.,Circle, BMR
125.00
3,750.00
0.00
AAO.,Circle, Barmer
17,977.25
SE.,Circle, Barmer
182
Sr.
No.
Reference of MORD
Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
161,795.25
32.36
Note: Since seal coat is required to be provided over the premix carpet on
the same day, out of the 6 working hours of the HMP, 4.00 hours are
proposed to be utilised for the premix carpet and the balance 2.00
hours have been considered for this case.
Bitumen (S-90)
Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)
b)
c)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
2.11 29,500.00
62,245.00
Machinery
Material
Bitumen (S-90) @ 4.5% of Mix
Overheads @ 0% on (a+b+c)
e)
cum
30.00
320.00
9,600.00
0.00
11,189.13
100,702.13
EE.,Dn.I, BMR
30.21
Bitumen (S-65)
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
183
Sr.
No.
Unit
Quantity
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
2.11 31,700.00
66,887.00
Reference of MORD
Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)
b)
c)
Labour
Machinery
Material
Bitumen (S-65) @ 4.5% of Mix
Overheads @ 0% on (a+b+c)
e)
cum
30.00
320.00
9,600.00
0.00
11,769.38
105,924.38
31.78
b)
EE.,Dn.I, BMR
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
Machinery
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
184
Sr.
No.
Unit
Quantity
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
2.11 37,000.00
78,070.00
Reference of MORD
Specifications
Description
c)
Rate
(Rs.)
Amount
(Rs.)
Material
Polymer Modified Bitumen @ 4.5% of Mix
Crushed stone chipping of 6.7 mm size 100 per cent
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
Overheads @ 0% on (a+b+c)
e)
t
cum
30.00
320.00
9,600.00
0.00
13,167.25
118,505.25
35.55
b)
c)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
2.11 34,900.00
73,639.00
Machinery
Material
Crumb Rubber Modified Bitumen @ 4.5% of Mix
Crushed stone chipping of 6.7 mm size 100 per cent
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
t
cum
30.00
320.00
9,600.00
SE.,Circle, Barmer
185
Sr.
No.
Reference of MORD
Specifications
Description
Unit
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
12,613.38
113,520.38
34.06
b)
c)
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
2.00
6,200.00
12,400.00
hour
2.00
510.00
1,020.00
hour
2.00
300.00
600.00
hour
1.36
450.00
612.00
Paver finisher
hour
2.00
550.00
1,100.00
hour
10.00
160.00
1,600.00
2.11 36,000.00
75,960.00
Machinery
Material
Natural Rubber Modified Bitumen @ 4.5% of Mix
Crushed stone chipping of 6.7 mm size 100 per cent
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)
e)
Overheads @ 0% on (a+b+c)
Contractors profit @ 12.5% on (a+b+c+d)
t
cum
30.00
320.00
9,600.00
0.00
12,903.50
116,131.50
34.84
Note: Since seal coat is provided immediately over the bituminous layers,
Hydraulic broom for cleaning has not been catered.
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
182
Chapter 6
CEMENT CONCRETE PAVEMENT
Sr.
No.
Reference to
MORD Specifications
6.1
400
Unit
Quantity
Mate
day
7.00
100.00
700.00
day
5.00
180.00
900.00
day
5.00
150.00
750.00
Mazdoor (Unskilled)
day
129.00
80.00
10,320.00
Mazdoor (Skilled)
day
6.00
100.00
600.00
Surveyor
day
2.00
170.00
340.00
Mazdoor (Semi-Skilled)
day
6.00
90.00
540.00
Description
Rate
(Rs.)
Amount
(Rs.)
Granual Sub-base
Rate as per item No.4.1 of Chapter 4
6.2
400
6.3
1500 &
400
By Manual Means
As per item No.4.7 of Chapter 4
(B)
By Mechnical Means
As per item No.4.7 of Chapter 4
6.4
1500
using curing compound (where specified) and water finishing to lines and
grade as per drawing and Technical Specification Clause 1501
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a)
EE.,Dn.I,BMR
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
183
Sr.
No.
Unit
Quantity
Bhisti
day
14.00
90.00
1,260.00
day
1.00
120.00
120.00
hour
36.00
300.00
10,800.00
Needle vibrator
hour
9.00
40.00
360.00
Screed vibrator
hour
9.00
60.00
540.00
Plate vibrator
hour
9.00
40.00
360.00
hour
4.00
300.00
1,200.00
hour
5.00
250.00
1,250.00
hour
2.00
194.00
388.00
Reference to
MORD Specifications
Description
b)
c)
Amount
(Rs.)
Machinery
Material
(i)
cum
67.50
315.00
21,262.50
(ii)
cum
33.75
190.00
6,412.50
(iii)
26.25
(iv)
sqm
412.50
2.70
1,113.75
(v)
117.60
28.00
3,292.80
0.005 24,500.00
122.50
4,000.00 105,000.00
litre
19.00
100.00
1,900.00
90.00
7.00
630.00
90.00
15.00
1,350.00
No.
483.00
4.50
2,173.50
litre
122.00
60.00
7,320.00
litre
131.25
40.00
5,250.00
kl
18.00
15.00
270.00
sqm
3.00
400.00
1,200.00
Formwork @ 3% of (a+b+c)
5,595.77
e)
Overheads @ 0% on (a+b+c+d)
f)
0.00
EE.,Dn.I,BMR
Rate
(Rs.)
TA to SE.,Circle, BMR
24,165.16
217,486.48
AAO.,Circle, Barmer
SE.,Circle, Barmer
184
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
1500
Amount
(Rs.)
2,899.82
Unit = cum
Taking output = 75 cum
a)
Labour
(i)
Mate
day
6.00
100.00
600.00
(ii)
Mazdoor (Unskilled)
day
132.00
80.00
10,560.00
(iii)
day
4.00
180.00
720.00
day
4.00
150.00
600.00
(v)
day
2.00
170.00
340.00
day
14.00
90.00
1,260.00
Surveyor
(vi) Bhisti
b)
c)
EE.,Dn.I,BMR
Machinery
(i)
hour
36.00
300.00
10,800.00
(ii)
hour
6.00
800.00
4,800.00
(iii)
Concrete joint cutting machine for days end work and regular
joint cutting.
hour
6.00
300.00
1,800.00
hour
6.00
250.00
1,500.00
(v)
hour
2.00
194.00
388.00
Material
(i)
cum
67.50
315.00
21,262.50
(ii)
cum
33.75
190.00
6,412.50
(iii)
23.25
4,000.00
93,000.00
0.004 24,500.00
98.00
(v)
90.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
7.00
630.00
SE.,Circle, Barmer
185
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
kg
16.80
100.00
1,680.00
131.25
40.00
5,250.00
day
18.00
15.00
270.00
d)
Formwork @ 2% of (a+b+c)
3,239.42
e)
Overheads @ 0% on (a+b+c+d)
f)
0.00
20,651.30
185,861.72
2,478.16
Note: When curing compound is used 4-days water curing will be done
6.6
1500
cum
16.20
2,899.82
46,977.08
cum
1.35
2,899.82
3,914.76
cum
17.55
TOTAL
a)
Labour
Labour for Manufacturing the Cement Concrete Block :
(i)
Mate
day
3.16
100.00
316.00
(ii)
Mazdoor (Unskilled)
day
76.00
80.00
6,080.00
(iii)
day
11.00
150.00
1,650.00
day
2.60
90.00
234.00
hour
11.00
60.00
660.00
Plate vibrator
hour
22.30
40.00
892.00
hour
3.70
250.00
925.00
cum
14.74
390.00
5,748.60
(iv) Bhisti
b)
c)
Machinery
Material
(i)
EE.,Dn.I,BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
186
Sr.
No.
Reference to
MORD Specifications
Description
(ii)
(iii)
Cement
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
cum
7.37
190.00
1,400.30
7.05
4,000.00
28,200.00
cum
3.200
190.00
608.00
kl
11.00
15.00
165.00
Cost of water
d)
Formwork @ 3% of (a+b+c)
1,406.37
e)
Overheads @ 0% on (a+b+c+d)
f)
0.00
6,035.66
54,320.93
6.7
1500
482.85
i.
ii.
b)
Labour
Mate
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
17.00
80.00
1,360.00
day
8.00
150.00
1,200.00
hour
2.00
250.00
500.00
sqm
225.00
300.00
67,500.00
120.00
400.00
48,000.00
7.23
190.00
1,373.70
Machinery
Water tanker 6 kl capacity
c)
Material
(i)
EE.,Dn.I,BMR
TA to SE.,Circle, BMR
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
187
Sr.
No.
Reference to
MORD Specifications
Description
Unit
= 6.75 cum
Joints = 60x0.08
= 0.48 cum
Overheads @ 0% on (a+b+c)
e)
kl
Quantity
3.00
Rate
(Rs.)
15.00
Amount
(Rs.)
45.00
0.00
15,009.84
135,088.54
600.39
b)
Labour
Mate
day
0.90
100.00
90.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
day
7.00
150.00
1,050.00
hour
2.00
250.00
500.00
sqm
225.00
300.00
67,500.00
120.00
300.00
36,000.00
cum
5.42
190.00
1,029.80
kl
3.00
15.00
45.00
Machinery
Water tanker 6 kl capacity
c)
Material
(i)
(iv) Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
120,841.65
EE.,Dn.I,BMR
537.07
i.
ii.
iii.
13,426.85
The rates for sub-grade, sub-base and base course can be taken
from Chapters 3 and 4
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
188
Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Sr.
No.
Reference to
MORD Specifi-cations
Description
Unit
Quan- Rate
tity
(Rs.)
Amount
(Rs.)
(iii)
cum
(v)
cum
(iv)
cum
cum
Note: Rate as appropriate for the type of soil/rock are to be taken in (i)
7.2
300
Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3
7.3
400
cum
Granular Sub-base
Rate as per item No.4.1 of Chapter 4
7.4
400
cum
7.5
1500
cum
7.6
cum
(ii)
EE.,Dn.I,Barmer
cum
TA to SE Circle, Barmer
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
189
Sr.
No.
Reference to
MORD Specifi-cations
Description
(iii)
7.7
Quan- Rate
tity
(Rs.)
Amount
(Rs.)
Note
Unit
cum
7.8
cum
(ii)
cum
7.9
cum
7.10
EE.,Dn.I,Barmer
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
190
Chapter 8
HILL ROADS
Sr.
No.
Reference to
MORD Specifications
8.1
200
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Site Clearance
As per Chapter 2
8.2
1600
Setting Out
Deleted
Unit = 1km
The analysis of rate per km shall account for the following:
(1)
(2)
(3)
cum
1.2
75.60
90.72
cum
1.2
1,575.01
1,890.01
sqm
4.00
70.61
282.44
113.16
2,376.33
cum
3.6
75.60
EE.,Dn.I,BMR
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
272.16
191
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
cum
3.6
1,575.01
5,670.04
sqm
45.00
72.64
3,268.73
460.55
9,671.48
cum
0.096
75.60
7.26
cum
0.096
1,575.01
151.20
sqm
0.96
72.64
69.73
11.41
(ii)
8.3
239.60
EE.,Dn.I,BMR
Labour
Mate
day
2.40
100.00
240.00
Mazdoor (Unskilled)
day
60.00
80.00
4,800.00
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
192
Sr.
No.
Reference to
MORD Specifications
Description
Unit
b)
Overheads @ 0% on (a)
c)
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
630.00
5,670.00
47.25
Labour
Mazdoor (Unskilled)
(ii)
day
0.55
80.00
44.00
b)
Overheads @ 0% on (a)
0.00
c)
5.50
49.50
4.95
b)
EE.,Dn.I,BMR
Labour
Mate
day
0.80
100.00
80.00
day
20.00
80.00
1,600.00
hour
6.00
750.00
4,500.00
hour
6.00
300.00
1,800.00
Machinery
c)
Overheads @ 0% on (a+b)
d)
TA to SE Circle, Barmer
AAO.,Circle, Barmer
0.00
997.50
SE.,Circle, Barmer
193
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
8,977.50
34.53
Labour
Mazdoor (Unskilled)
Note: (i)
day
0.55
80.00
44.00
b)
Overheads @ 0% on (a)
0.00
c)
5.50
49.50
4.95
(ii)
(iii)
(iii)
Unit = cum
Taking output = 120 cum
a)
Labour
Mate
day
5.28
Mazdoor (Unskilled)
day
132.00
b)
Overheads @ 0% on (a)
c)
TA to SE Circle, Barmer
528.00
80.00 10,560.00
0.00
EE.,Dn.I,BMR
100.00
1,386.00
12,474.00
AAO.,Circle, Barmer
SE.,Circle, Barmer
194
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
103.95
Labour
Mazdoor (Unskilled)
day
0.86
80.00
68.80
b)
Overheads @ 0% on (a)
0.00
c)
8.60
77.40
7.74
b)
Labour
Mate
day
0.68
100.00
68.00
Mazdoor (Unskilled)
day
17.00
80.00
1,360.00
day
9.00
80.00
720.00
hour
12.00
hour
4.25
Machinery
c)
Overheads @ 0% on (a+b)
d)
1,200.00 14,400.00
1,400.00
5,950.00
0.00
2,812.25
25,310.25
EE.,Dn.I,BMR
TA to SE Circle, Barmer
148.88
AAO.,Circle, Barmer
SE.,Circle, Barmer
195
Sr.
No.
Reference to
MORD Specifications
Description
Note: (i)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
(ii)
(v)
b)
c)
Labour
Mate
day
1.36
100.00
136.00
Mazdoor (Unskilled)
day
22.00
80.00
1,760.00
Driller
day
2.00
150.00
300.00
Blaster
day
10.00
150.00
1,500.00
hour
3.00
750.00
2,250.00
hour
5.00
1,400.00
7,000.00
hour
28.00
194.00
5,432.00
kg
67.00
120.00
8,040.00
nos
235.00
10.00
2,350.00
Machinery
Materials
d)
Overheads @ 0% on (a+b+c)
e)
0.00
3,596.00
32,364.00
EE.,Dn.I,BMR
190.38
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
196
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Labour
Mazdoor (Unskilled)
day
b)
Overheads @ 0% on (a)
c)
1.08
80.00
0.00
10.80
97.20
9.72
Note: (1) In case the land on the valley side is barren and there is no
objection for disposing of excavated earth on the valley side,
the provision of front end loader and tipper shall be deleted as
excavated earth shall be disposed off on the valley side.
(2) In case of hill roads, the altitude effect comes into play. The
output of men and machines decreases progressively after
2100 m elevation leading to increase in cost. High altitude
effect has been explained in the basic approach.
(3) The arrangement for igniting the detonator is covered under
overheads
8.4
(ii)
EE.,Dn.I,BMR
cum
(v)
cum
(iv)
cum
(iii)
sqm
TA to SE Circle, Barmer
86.40
AAO.,Circle, Barmer
SE.,Circle, Barmer
197
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
cum
8.5
cum
Deleted
(ii)
1,901.46
0.00
cum
1,327.36
0.00
cum
1,954.25
0.00
Sqm
72.64
0.00
119.86
0.00
(vi)
cum
(v)
0.00
(iv)
75.60
(iii)
cum
EE.,Dn.I,BMR
0.00
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
198
Sr.
No.
8.6
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Deleted
(ii)
8.7
0.00
cum
1,327.36
0.00
cum
1,954.25
0.00
sqm
706.10
0.00
726.38
0.00
Note:
1,901.46
(vi)
cum
(v)
0.00
(iv)
75.60
(iii)
cum
0.00
Deleted
Unit = 1 m
Taking output = 6 m
(i)
EE.,Dn.I,BMR
TA to SE Circle, Barmer
cum
115.00
75.60
8,694.00
1,449.00
AAO.,Circle, Barmer
SE.,Circle, Barmer
199
Sr.
No.
Reference to
MORD Specifications
Description
(ii)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Mate
day
3.80
100.00
380.00
day
38.00
180.00
6,840.00
Mazdoor (Unskilled)
day
57.00
80.00
4,560.00
cum
38.00
160.00
6,080.00
Bond stone
nos
266.00
10.00
2,660.00
Materials
c)
Overheads @ 0% on (a+b)
0.00
d)
2,565.00
23,085.00
3,847.50
b)
Labour
Mate
day
0.72
100.00
72.00
day
6.00
150.00
900.00
Mazdoor (Unskilled)
day
12.00
80.00
960.00
nos
1,335.00
Materials
Corbelling Stones size 300 mm x 150 mm x 150 mm
including wastage
c)
Overheads @ 0% on (a+b)
d)
0.00
4,413.38
39,720.38
25.00 33,375.00
6,620.06
EE.,Dn.I,BMR
Labour
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
200
Sr.
No.
Reference to
MORD Specifications
Description
b)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Mate
day
0.12
100.00
12.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
cum
12.00
100.00
1,200.00
Materials
Loose stone
c)
Overheads @ 0% on (a+b)
0.00
d)
181.50
1,633.50
272.25
8.8
12,188.81
1400, 1700 Construction of RCC guide posts of 250 mm dia M15 grade
& 800
cast-in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC posts not to exceed 1 in 500 as
per drawing and Technical Specification Clause 1608.2
(i)
(ii)
cum
(iii)
cum
(iv)
Note:
EE.,Dn.I,BMR
sqm
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
201
Sr.
No.
Reference to
MORD Specifications
8.9
1600
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Mate
day
0.18
100.00
18.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
day
1.50
150.00
225.00
nos
100.00
20.00
2,000.00
sqm
22.50
44.90
1,010.16
Materials
Stones of size 450 mmx300 mmx100 mm
c)
d)
Overheads @ 0% on (a+b+c)
0.00
e)
436.64
3,929.80
87.33
b)
c)
EE.,Dn.I,BMR
Labour
Mate
day
0.16
100.00
16.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
hour
4.00
250.00
1,000.00
hour
1.00
150.00
150.00
Machinery
Materials
TA to SE Circle, Barmer
AAO.,Circle, Barmer
SE.,Circle, Barmer
202
Sr.
No.
Reference to
MORD Specifications
Quantity
Rate
(Rs.)
Amount
(Rs.)
Description
Unit
cum
0.18
200.00
36.00
kl
24.00
15.00
360.00
Water
d)
Overheads @ 0% on (a+b+c)
0.00
e)
235.25
2,117.25
21.17
b)
c)
Labour
Mate
day
0.60
100.00
60.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
hour
13.00
250.00
3,250.00
hour
2.40
150.00
360.00
kg
3.60
30.00
108.00
cum
0.43
200.00
86.00
0.055 24,500.00
1,347.50
Machinery
Materials
Seeds
Sludge/Farm yard manure @ 0.18 cum per 100 sqm
Bitumen Emulsion
Overheads @ 0% on (a+b+c)
e)
sqm
264.00
30.00
7,920.00
kl
84.00
15.00
1,260.00
0.00
1,948.94
17,540.44
EE.,Dn.I,BMR
TA to SE Circle, Barmer
73.09
AAO.,Circle, Barmer
SE.,Circle, Barmer
203
Chapter 9
PIPE CULVERTS
Sr.
No.
Reference to
MORD Specifica-tions
9.1
Description
Unit
Quan
-tity
Rate
(Rs.)
Amount
(Rs.)
9.2
(ii)
cum
9.3
1100
cum
1200 mm dia
a)
EE.,Dn.I,BMR
Labour
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
204
Sr.
No.
Reference to
MORD Specifica-tions
Description
b)
Unit
Quan
-tity
Rate
(Rs.)
Mate
day
0.14
100.00
14.00
day
0.50
180.00
90.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
cum
0.05
190.00
9.50
280.00
Material
Sand at site
Cement at site
0.07 4,000.00
c)
Overheads @ 0% on (a+b)
0.00
d)
2,985.44
26,868.94
3,582.53
1000 mm dia
a)
b)
Labour
Mate
day
0.09
100.00
9.00
day
0.25
180.00
45.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
cum
0.04
190.00
7.60
120.00
Material
Sand at site
Cement at site
0.03 4,000.00
c)
Overheads @ 0% on (a+b)
0.00
d)
2,386.45
21,478.05
2,863.74
750 mm dia
a)
EE.,Dn.I,BMR
Amount
(Rs.)
Labour
Mate
day
0.05
100.00
5.00
day
0.15
180.00
27.00
Mazdoor (Unskilled)
day
1.20
80.00
96.00
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
205
Sr.
No.
Reference to
MORD Specifica-tions
Description
b)
Unit
Quan
-tity
Rate
(Rs.)
Material
Sand at site
cum
Cement at site
c)
Overheads @ 0% on (a+b)
d)
0.024
190.00
4.56
0.018 4,000.00
72.00
15,417.63
Amount
(Rs.)
2,055.68
600 mm dia
Rate per m = 80% of 750 mm dia pipe
0.80 2,055.68
1,644.55
Note: The labour rate for 600 mm dia Hume pipe may be derived from the
rates for 750 dia by decreasing 20 per cent
(E)
300 mm dia
a)
b)
Labour
Mate
day
0.01
100.00
1.00
day
0.02
180.00
3.60
Mazdoor (Unskilled)
day
0.20
80.00
16.00
cum
0.004
190.00
0.76
0.003 4,000.00
12.00
Material
Sand at site
Cement at site
c)
Overheads @ 0% on (a+b)
d)
7.50
550.00
4,125.00
0.00
519.80
4,678.16
1100
623.75
EE.,Dn.I,BMR
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
206
Sr.
No.
Reference to
MORD Specifica-tions
Description
Unit
Quan
-tity
Rate
(Rs.)
Amount
(Rs.)
1200 mm dia
a)
b)
Labour
Mate
day
0.14
100.00
14.00
day
0.50
180.00
90.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
cum
0.05
190.00
9.50
280.00
Material
Sand at site
Cement at site
0.07 4,000.00
c)
Overheads @ 0% on (a+b)
0.00
d)
3,735.44
33,618.94
4,482.53
1000 mm dia
a)
b)
Labour
Mate
day
0.09
100.00
9.00
day
0.25
180.00
45.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
cum
0.04
190.00
7.60
120.00
Material
Sand at site
c)
EE.,Dn.I,BMR
Cement at site
0.03 4,000.00
Overheads @ 0% on (a+b)
TA to SE.,Circle BMR
0.00
AAO.,Circle, BMR
SE.,Circle, Barmer
207
Sr.
No.
Reference to
MORD Specifica-tions
Description
d)
Unit
Quan
-tity
Rate
(Rs.)
2,948.95
26,540.55
3,538.74
750 mm dia
a)
b)
Labour
Mate
day
0.05
100.00
5.00
day
0.15
180.00
27.00
Mazdoor (Unskilled)
day
1.20
80.00
96.00
cum
0.024
190.00
4.56
0.018 4,000.00
72.00
Material
Sand at site
Cement at site
c)
Overheads @ 0% on (a+b)
d)
18,792.63
Amount
(Rs.)
2,505.68
600 mm dia
Rate per m = 80% of 750 mm dia pipe
0.80 2,505.68
2,004.55
Note: The labour rate for 600 mm dia Hume pipe may be derived from the
rates for 750 dia by decreasing 20 per cent
(E)
300 mm dia
a)
b)
Labour
Mate
day
0.01
100.00
1.00
day
0.02
180.00
3.60
Mazdoor (Unskilled)
day
0.20
80.00
16.00
cum
0.004
190.00
0.76
0.003 4,000.00
12.00
Material
Sand at site
c)
EE.,Dn.I,BMR
Cement at site
7.50
800.00
6,000.00
Overheads @ 0% on (a+b)
TA to SE.,Circle BMR
0.00
AAO.,Circle, BMR
SE.,Circle, Barmer
208
Sr.
No.
Reference to
MORD Specifica-tions
Description
d)
Unit
Quan
-tity
Rate
(Rs.)
Amount
(Rs.)
754.17
6,787.53
1100
905.00
1200 mm dia
a)
b)
Labour
Mate
day
0.34
100.00
34.00
day
1.20
180.00
216.00
Mazdoor (Unskilled)
day
7.20
80.00
576.00
cum
0.11
190.00
20.90
0.14 4,000.00
560.00
Material
Sand at site
Cement at site
c)
Overheads @ 0% on (a+b)
d)
53,895.26
7,186.04
1000 mm dia
a)
b)
Labour
Mate
day
0.22
100.00
22.00
day
0.60
180.00
108.00
Mazdoor (Unskilled)
day
4.80
80.00
384.00
cum
0.08
190.00
15.20
Material
Sand at site
EE.,Dn.I,BMR
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
209
Sr.
No.
Reference to
MORD Specifica-tions
Description
Unit
Cement at site
c)
Overheads @ 0% on (a+b)
d)
Quan
-tity
Rate
(Rs.)
0.06 4,000.00
0.00
4,783.65
43,052.85
5,740.38
750 mm dia
a)
b)
Labour
Mate
day
0.11
100.00
11.00
day
0.30
180.00
54.00
Mazdoor (Unskilled)
day
2.40
80.00
192.00
cum
0.04
190.00
7.60
144.00
Material
Sand at site
Cement at site
0.036 4,000.00
c)
Overheads @ 0% on (a+b)
0.00
d)
3,426.08
30,834.68
9.6
240.00
(C)
Amount
(Rs.)
4,111.29
Note: The labour rate for 600 mm dia Hume pipe should be decreased by
20 per cent
1100
Providing and Laying Reinforced Cement Concrete Pipe NP4 as
per Design in Double Row
Providing and laying reinforced cement concrete pipe NP4 for
culverts on first class bedding of granular material in double row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry
works in head walls and parapets as per Clause 1106.
Unit = m
Taking output = 7.5 m
(6 pipes of 2.5 m length each in two rows)
(A)
1200 mm dia
a)
EE.,Dn.I,BMR
Labour
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
210
Sr.
No.
Reference to
MORD Specifica-tions
Description
b)
Unit
Quan
-tity
Rate
(Rs.)
Mate
day
0.34
100.00
34.00
day
1.20
180.00
216.00
Mazdoor (Unskilled)
day
7.20
80.00
576.00
cum
0.11
190.00
20.90
0.14 4,000.00
560.00
Material
Sand at site
Cement at site
c)
Overheads @ 0% on (a+b)
d)
67,395.26
8,986.04
1000 mm dia
a)
b)
Labour
Mate
day
0.22
100.00
22.00
day
0.60
180.00
108.00
Mazdoor (Unskilled)
day
4.80
80.00
384.00
cum
0.08
190.00
15.20
0.06 4,000.00
240.00
Material
Sand at site
Cement at site
c)
Overheads @ 0% on (a+b)
d)
53,177.85
7,090.38
750 mm dia
a)
EE.,Dn.I,BMR
Amount
(Rs.)
Labour
Mate
day
0.11
100.00
11.00
day
0.30
180.00
54.00
Mazdoor (Unskilled)
day
2.40
80.00
192.00
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
211
Sr.
No.
Reference to
MORD Specifica-tions
Description
b)
Unit
Quan
-tity
Rate
(Rs.)
Amount
(Rs.)
Material
Sand at site
cum
0.04
190.00
7.60
144.00
Cement at site
0.036 4,000.00
c)
Overheads @ 0% on (a+b)
0.00
d)
4,176.08
37,584.68
5,011.29
Note: The labour rate for 600 mm dia Hume pipe should be decreased by
20 per cent
9.7
1100
b)
Labour
Mate
day
0.04
100.00
4.00
day
0.11
180.00
19.80
Mazdoor (Unskilled)
day
0.90
80.00
72.00
cum
0.02
190.00
3.80
40.00
Material
Sand at site
Cement at site
0.01 4,000.00
c)
Overheads @ 0% on (a+b)
0.00
d)
11,969.55
EE.,Dn.I,BMR
TA to SE.,Circle BMR
1,329.95
1,595.94
AAO.,Circle, BMR
SE.,Circle, Barmer
212
Sr.
No.
Reference to
MORD Specifica-tions
Description
Unit
Quan
-tity
Rate
(Rs.)
Amount
(Rs.)
300 mm dia
a)
b)
Labour
Mate
day
0.03
100.00
3.20
day
0.09
180.00
16.20
Mazdoor (Unskilled)
day
0.72
80.00
57.60
cum
0.02
190.00
3.04
32.00
Material
Sand at site
Cement at site
0.01 4,000.00
7.50
c)
Overheads @ 0% on (a+b)
d)
550.00
4,125.00
0.00
529.63
4,766.67
635.56
Note: The labour rate for 300 mm dia shall be decreased by 20 per cent
9.8
1100
b)
Labour
Mate
day
0.04
100.00
4.00
day
0.11
180.00
19.80
Mazdoor (Unskilled)
day
0.90
80.00
72.00
cum
0.02
190.00
3.80
0.01 4,000.00
40.00
Material
Sand at site
Cement at site
EE.,Dn.I,BMR
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
213
Sr.
No.
Reference to
MORD Specifica-tions
Description
Unit
Overheads @ 0% on (a+b)
d)
Quan
-tity
Rate
(Rs.)
Amount
(Rs.)
13,657.05
1,820.94
300 mm dia
a)
b)
Labour
Mate
day
0.03
100.00
3.20
day
0.09
180.00
16.20
Mazdoor (Unskilled)
day
0.72
80.00
57.60
cum
0.02
190.00
3.04
32.00
Material
Sand at site
Cement at site
0.01 4,000.00
7.50
c)
Overheads @ 0% on (a+b)
d)
800.00
6,000.00
0.00
764.01
6,876.05
916.81
Note: The labour rate for 300 mm dia shall be decreased by 20 per cent
9.9
9.10
cum
(B)
EE.,Dn.I,BMR
cum
TA to SE.,Circle BMR
AAO.,Circle, BMR
cum
SE.,Circle, Barmer
214
Sr.
No.
Reference to
MORD Specifica-tions
9.11
Description
Unit
(B)
10
sqm
9.14
10
sqm
9.15
1100, 600,
700 & 1200
cum
EE.,Dn.I,BMR
cum
cum
9.13
Amount
(Rs.)
Rate
(Rs.)
9.12
Quan
-tity
TA to SE.,Circle BMR
AAO.,Circle, BMR
SE.,Circle, Barmer
215
Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Sr.
No.
Reference to
MORD Specifications
10.1
1700
Description
Unit
Quantity
Rate
(Rs.)
b)
Labour
Mate
day
0.12
100.00
day
2.00
150.00
Mazdoor (Unskilled)
day
1.00
80.00
litre
0.70
150.00
Mate
day
0.07
100.00
day
1.25
150.00
Mazdoor
day
0.50
80.00
litre
0.50
150.00
Material
Paint
c)
Overheads @ 0% on (a+b)
d)
b)
Labour
Material
Paint
c)
Overheads @ 0% on (a+b)
d)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
216
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
ii)
cum
0.126
75.60
cum
0.126
1,954.25
sqm
0.887
64.60
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
kg
20.00
33.00
sqm
0.35
4,500.00
hour
0.08
150.00
iii)
b)
Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
217
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.2A(i+ii
+iiia)
kg
20.00
33.00
sqm
0.156
4,500.00
hour
0.08
150.00
kg
20.00
33.00
sqm
0.283
4,500.00
hour
0.08
150.00
kg
20.00
33.00
sqm
0.480
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(i+ii
+iiia)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(i+ii
+iiia)
Machinery
Tractor with trolley
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
218
Sr.
No.
Reference to
MORD Specifications
Description
d)
Overheads @ 0% on (a+b+c)
e)
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.2A(i+ii
+iiia)
kg
20.00
33.00
sqm
0.270
4,500.00
hour
0.08
150.00
kg
20.00
33.00
sqm
0.360
4,500.00
hour
0.08
150.00
kg
20.00
33.00
sqm
0.672
4,500.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(i+ii
+iiia)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(i+ii
+iiia)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
219
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Machinery
Tractor with trolley
hour
0.08
150.00
cum
0.126
75.60
cum
0.126
1,954.25
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
3.00
150.00
sqm
0.35
4,500.00
hour
0.08
150.00
d)
Overheads @ 0% on (a+b+c)
e)
Unit = each
Taking output = one traffic sign
i)
i)
ii)
b)
Material
50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
220
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.2A(2)
(i+iia)
3.00
150.00
sqm
0.156
4,500.00
hour
0.08
150.00
3.00
150.00
sqm
0.283
4,500.00
hour
0.08
150.00
3.00
150.00
sqm
0.480
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(2)
(i+iia)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(2)
(i+iia)
Machinery
Tractor with trolley
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
221
Sr.
No.
Reference to
MORD Specifications
Description
d)
Overheads @ 0% on (a+b+c)
e)
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.2A(2)
(i+iia)
3.00
150.00
sqm
0.270
4,500.00
hour
0.08
150.00
3.00
150.00
sqm
0.360
4,500.00
hour
0.08
150.00
3.00
150.00
sqm
0.672
4,500.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(2)
(i+iia)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
Amount for
Item
No.10.2A(2)
(i+iia)
SE.,Circle, Barmer
222
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Machinery
Tractor with trolley
hour
0.08
150.00
cum
0.126
75.60
cum
0.126
1,954.25
sqm
0.90
64.60
Mate
day
0.01
100.00
Mazdoor
day
0.25
80.00
cum
0.0285
1,880.21
d)
Overheads @ 0% on (a+b+c)
e)
Unit = each
Taking output = one traffic sign
i)
ii)
iii)
b)
Material
RCC M15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel reinforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
t
sqm
0.0077 40,178.25
0.35
4,500.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
223
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Machinery
Tractor with trolley
hour
d)
Overheads @ 0% on (a+b+c)
e)
0.08
150.00
sqm
0.156
4,500.00
hour
0.08
150.00
sqm
0.283
4,500.00
hour
0.08
150.00
0.480
4,500.00
Amount for
Item
No.10.2A(3)
(I to iiib)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(3)
(I to iiib)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(3)
(I to iiib)
sqm
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
224
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Machinery
Tractor with trolley
hour
d)
Overheads @ 0% on (a+b+c)
e)
0.08
150.00
sqm
0.270
4,500.00
hour
0.08
150.00
sqm
0.360
4,500.00
hour
0.08
150.00
0.672
4,500.00
Amount for
Item
No.10.2A(3)
(I to iiib)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(3)
(I to iiib)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2A(3)
(I to iiib)
sqm
EE.,Dn.I, BMR
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
225
Sr.
No.
Reference to
MORD Specifications
Description
Tractor with trolley
Unit
Quantity
Rate
(Rs.)
hour
0.08
150.00
cum
0.126
75.60
cum
0.126
1,954.25
sqm
0.46
64.60
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
kg
12.40
45.00
d)
Overheads @ 0% on (a+b+c)
e)
B.
Unit = Each
Taking output = one traffic sign
(i)
Excavation foundations
As per Item No. 1 to 11.1 of Chapter 11
b)
Material
Support of M.S. Sheet tube
(I)
EE.,Dn.I, BMR
47 mm x 47 mm x 12 SWG Sheet
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
226
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
3050 mm long
(II) Angle iron 50 x 50 x 6 mm for hold fast including 5%
wastage
kg
1.06
33.00
sqm
0.35
1,500.00
hour
0.08
150.00
sqm
0.156
1,500.00
hour
0.08
150.00
sqm
0.283
1,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2B(3)
(I to iiib(ii))
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2B(3)
(I to iiib(ii))
Machinery
Tractor with trolley
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
227
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.2B(3)
(I to iiib(ii))
sqm
0.480
1,500.00
hour
0.08
150.00
sqm
0.270
1,500.00
hour
0.08
150.00
sqm
0.360
1,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2B(3)
(I to iiib(ii))
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Amount for
Item
No.10.2B(3)
(I to iiib(ii))
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
228
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.2B(3)
(I to iiib(ii))
sqm
0.672
1,500.00
hour
0.08
150.00
cum
0.126
75.60
cum
0.126
1,954.25
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
10.3
Any one area of M.S. Sheet given at (i) to (viii) may be adopted
as per site requirement and in accordance with IRC-67.
1700, 800 Direction and Place Identification signs upto 0.9 sqm size board
& 300
A.
Unit = sqm
Taking output = 0.9 sqm
i)
i)
ii)
iii)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
229
Sr.
No.
Reference to
MORD Specifications
Description
Rate as per item No.10.7 of this Chapter
Unit
Quantity
Rate
(Rs.)
sqm
0.887
64.60
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
kg
20.00
33.00
sqm
0.90
4,500.00
hour
0.08
150.00
kg
20.00
33.00
sqm
0.675
4,500.00
hour
0.08
150.00
b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size 0.90 sqm including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley
d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e)
Rate per sqm (for sign having area upto 0.9 sqm) =
(i+ii+iii+a+b+c+d+e)/0.90
ii)
b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
230
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount for
Item
No.10.3A(i)(I
to iiia))
b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
kg
20.00
33.00
sqm
0.540
4,500.00
hour
0.08
150.00
kg
20.00
33.00
sqm
0.3375
4,500.00
hour
0.08
150.00
20.00
33.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
v)
b) Material
Mild steel angle iron 75 x 75 x 6 mm
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
kg
SE.,Circle, Barmer
231
Sr.
No.
Reference to
MORD Specifications
Description
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Unit
Quantity
Rate
(Rs.)
sqm
0.2700
4,500.00
hour
0.08
150.00
cum
0.126
75.60
cum
0.126
1,954.25
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
3.00
150.00
sqm
0.90
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
(ii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on 2 inch dia GI Pipe firmly fixed to the ground by
means of properly designed foundation with M-15 grade cement
concrete 450 x 450 x 600 mm, 600 mm below ground level as
per approved drawing and Tehnical Specification Clause 1701.
Unit = sqm
Taking output = 0.9 sqm
I)
i)
ii)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint
Add 3 per cent of cost of GI Pipe towards cost of
fabrication, drilling holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
232
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 0.9 sqm = a+b+c+d+e
Rate per sqm (for sign having area upto 0.9 sqm) =
(a+b+c+d+e)/0.90
ii)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
3.00
150.00
sqm
0.675
4,500.00
hour
0.08
150.00
3.00
150.00
sqm
0.540
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
233
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
3.00
150.00
sqm
0.3375
4,500.00
hour
0.08
150.00
3.00
150.00
sqm
0.2700
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
v)
b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
234
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
(iii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on RCC Post 100 mm x 100 mm firmly fixed to
the ground by means of properly designed foundation with M-15
grade cement concrete 450 x 450 x 600 mm, 600 mm below
ground level as per approved drawing and Technical
Specification Clause 1701
Unit = sqm
Taking output = 0.9 sqm
i)
i)
ii)
cum
0.126
75.60
cum
0.126
1,901.46
sqm
0.90
64.60
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
cum
0.0285
1,880.21
iii)
b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint
0.0077 37,815.75
sqm
0.90
4,500.00
hour
0.08
150.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
235
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Rate per sqm (for sign having area upto 0.9 sqm) =
(a+b+c+d+e)/0.90
ii)
b) Material
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
sqm
0.675
4,500.00
hour
0.08
150.00
sqm
0.540
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
b) Material
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
b) Material
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
236
Sr.
No.
Reference to
MORD Specifications
Description
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Unit
Quantity
Rate
(Rs.)
sqm
0.3375
4,500.00
hour
0.08
150.00
sqm
0.2700
4,500.00
hour
0.08
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
v)
b) Material
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
The rate for excavation, cement concret M15, RCC M15 in Substructure, steel re-inforcement and painting may be taken from
respective Chapters.
B.
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
237
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Unit = each
Take Output = 0.9 sqm
i)
(i)
(ii)
cum
0.126
75.60
cum
0.126
1,954.25
sqm
0.59
64.60
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
kg
12.40
45.00
kg
1.06
33.00
sqm
0.90
2,000.00
hour
0.08
150.00
(iii)
b)
Materials
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long
Machinery
Tractor with Trolley
EE.,Dn.I, BMR
d)
Overheads @ 0% on (a+b+c)
e)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
238
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
ii)
b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long
kg
12.40
45.00
kg
1.06
33.00
sqm
0.675
2,000.00
hour
0.08
150.00
kg
12.40
45.00
kg
1.06
33.00
sqm
0.540
2,000.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
239
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Machinery
Tractor with trolley
hour
0.08
150.00
kg
12.40
45.00
kg
1.06
33.00
sqm
0.338
2,000.00
hour
0.08
150.00
kg
12.40
45.00
kg
1.06
33.00
d)
Overheads @ 0% on (a+b+c)
e)
b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
v)
b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long
ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
240
Sr.
No.
Reference to
MORD Specifications
Description
iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS
flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.
Unit
Quantity
Rate
(Rs.)
sqm
0.270
2,000.00
hour
0.08
150.00
cum
0.252
75.60
cum
0.252
1,954.25
sqm
1.774
64.60
Mate
day
0.02
100.00
Mazdoor (Unskilled)
day
0.50
80.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Note: Rate for excavation, cement concrete M15 and painting may be taken
from respective Chapters.
10.4
1700, 800 Direction and Place Identification signs with size more than 0.9
& 300
sqm size board
A.
(i)
Unit = sqm
Taking output = 1.50 sqm
i)
ii)
iii)
b) Material
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
241
Sr.
No.
Reference to
MORD Specifications
Description
Mild steel angle iron 75 mm x 75 mm x 6 mm, 2.85 m long,
2 nos. with 5 per cent wastage
Unit
Quantity
Rate
(Rs.)
kg
40.00
33.00
sqm
1.50
4,500.00
hour
0.12
150.00
Each
1.80
6,696.49
cum
0.252
75.60
cum
0.252
1,954.25
Mate
day
0.02
100.00
Mazdoor (Unskilled)
day
0.50
80.00
6.00
150.00
sqm
1.50
4,500.00
Unit = sqm
Taking output = 1.50 sqm
i)
ii)
b)
EE.,Dn.I, BMR
Material
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
242
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Machinery
Tractor with trolley
hour
0.12
150.00
Each
1.80
6,295.64
cum
0.252
75.60
cum
0.252
1,954.25
sqm
1.84
64.60
Mate
day
0.02
100.00
Mazdoor (Unskilled)
day
0.50
80.00
cum
0.057
1,880.21
d)
Overheads @ 0% on (a+b+c)
e)
Unit = sqm
Taking output = 1.50 sqm
i)
ii)
iii)
b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
0.0154 37,815.75
SE.,Circle, Barmer
243
Sr.
No.
Reference to
MORD Specifications
Description
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint
Unit
Quantity
Rate
(Rs.)
sqm
1.50
4,500.00
hour
0.12
150.00
Each
1.80
6,047.32
cum
0.252
75.60
B.
Unit = each
Taking output = 1.5 sqm
(i)
(ii)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
244
Sr.
No.
Reference to
MORD Specifications
Description
As per item No.11.4 of Chapter 11
Unit
Quantity
Rate
(Rs.)
cum
0.252
1,954.25
sqm
0.92
64.60
Mate
day
0.02
100.00
Mazdoor (Unskilled)
day
0.50
80.00
(iii) Painting M.S. tube posts with primer and two coats of
epoxy paint as per specification
As per item No. 10.7 of chapter 10
a) Labour (fox fixing at site)
b) Material
i)
kg
24.80
45.00
ii)
kg
2.12
33.00
iii)
sqm
1.50
2,000.00
hour
0.16
150.00
Each
1.80
3,663.79
Mate
day
0.20
100.00
day
3.00
150.00
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
1700
EE.,Dn.I, BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
245
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
b)
Unit
Quantity
Rate
(Rs.)
day
2.00
80.00
litre
3.00
20.00
litre
6.00
150.00
Mate
day
0.25
100.00
day
0.60
150.00
Mazdoor (Unskilled)
day
0.40
80.00
litre
0.60
80.00
litre
1.25
150.00
Material
Overheads @ 0% on (a+b)
d)
1700
b)
Labour
Material
Overheads @ 0% on (a+b)
d)
1700
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
246
Sr.
No.
Reference to
MORD Specifications
Description
a)
b)
Unit
Quantity
Rate
(Rs.)
Labour
Mate
day
0.25
100.00
day
0.60
150.00
Mazdoor (Unskilled)
day
0.40
80.00
Epoxy primer/Red-oxide
litre
0.60
80.00
Epoxy paint
litre
1.25
300.00
Mate
day
0.09
100.00
day
0.55
150.00
Mazdoor (Unskilled)
day
1.55
80.00
litre
1.48
160.00
Material
Overheads @ 0% on (a+b)
d)
1700
b)
Labour
Material
Road marking paint as per IS:164
c)
Overheads @ 0% on (a+b)
d)
EE.,Dn.I, BMR
1700
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
247
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Painting lines, dashes, arrows, etc. on roads in two coats on old work
with ready mixed road marking paint conforming to IS:164 on
bituminous/concrete surface, including cleaning the surface of all dirt,
dust and other foreign matter, demarcation at site and traffic control
as per drawing and technical specification Clause 1702
b)
Labour
Mate
day
0.06
100.00
day
0.30
150.00
Mazdoor (Unskilled)
day
1.25
80.00
litre
0.90
160.00
cum
2.35
1,880.21
kg
22.08
37.82
cum
1.68
75.60
sqm
9.85
44.90
Material
Road marking paint
c)
Overheads @ 0% on (a+b)
d)
1700
A)
Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone
of standard design as per IRC:8 fixing in position including painting
and printing, etc as per drawing and Technical Specification Clause
1703
i)
b)
c)
d)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
248
Sr.
No.
Reference to
MORD Specifications
Description
As per item No.10.1 of Chapter 10
Unit
per cm
high
per litre
Quantity
Rate
(Rs.)
1,800.00
0.35
g)
Labour
Mate
day
0.26
100.00
day
0.60
180.00
Mazdoor (Unskilled)
day
6.00
80.00
hour
6.00
150.00
cum
3.77
1,880.21
kg
26.32
37.82
cum
2.77
75.60
sqm
11.41
44.90
1,680.00
0.35
Machinery
50 HP Tractor with trolley
h)
Overheads @ 0% on (f+g)
i)
b)
c)
d)
e)
EE.,Dn.I, BMR
per cm
high
per
letter
Labour
Mate
day
0.32
100.00
day
1.00
180.00
Mazdoor (Unskilled)
day
7.00
80.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
249
Sr.
No.
Reference to
MORD Specifications
Description
g)
Unit
Quantity
Rate
(Rs.)
Machinery
50 HP Tractor with trolley
h)
Overheads @ 0% on (f+g)
i)
hour
6.00
150.00
cum
1.58
2,177.10
kg
66.00
37.82
cum
1.39
75.60
sqm
6.27
44.90
330.00
0.35
b)
c)
d)
e)
g)
per cm
per
litreette
r
Labour
Mate
day
0.34
100.00
day
1.50
180.00
Mazdoor (Unskilled)
day
7.00
80.00
hour
6.00
150.00
Machinery
50 HP Tractor with trolley
h)
Overheads @ 0% on (f+g)
i)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
250
Sr.
No.
Reference to
MORD Specifications
B)
Description
Unit
Quantity
Rate
(Rs.)
b)
c)
1.14
5,000.00
cum
1.68
75.60
sqm
9.85
1.40
1,800.0
0.35
d)
cum
per cm
high
per litre
g)
Labour
Mate
day
0.26
100.00
day
0.60
180.00
Mazdoor (Unskilled)
day
6.00
80.00
hour
6.00
150.00
cum
0.68
4,600.00
cum
2.77
0.00
sqm
11.41
44.90
Machinery
50 HP Tractor with trolley
h)
Overheads @ 0% on (f+g)
i)
b)
c)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
251
Sr.
No.
Reference to
MORD Specifications
Description
d)
g)
Quantity
Rate
(Rs.)
f)
Unit
per cm
high
per
letter
1,680.0
0.35
Labour
Mate
day
0.32
100.00
day
1.00
180.00
Mazdoor (Unskilled)
day
7.00
80.00
hour
6.00
150.00
cum
0.32
4,400.00
cum
1.39
0.00
sqm
6.27
44.90
330.00
0.35
Machinery
50 HP Tractor with trolley
h)
Overheads @ 0% on (f+g)
i)
200 m stone
Unit = each
Taking output = 33 Nos.
a)
b)
c)
d)
g)
Labour
Mate
day
0.34
100.00
day
1.50
180.00
Mazdoor (Unskilled)
day
7.00
80.00
hour
6.00
150.00
Machinery
50 HP Tractor with trolley
EE.,Dn.I, BMR
per cm
per
litreette
r
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
252
Sr.
No.
Reference to
MORD Specifications
Description
h)
Overheads @ 0% on (f+g)
i)
Unit
Quantity
Rate
(Rs.)
Note:
10.11
1700
A)
Boundary Pillar
Reinforced cement concrete M15 grade boundary pillars/local stone
of standard design as per IRC:25, fixed in position including finishing
and lettering but excluding painting as per drawing and Technical
Specification Clause 1704
Unit = each
Taking output = 57 Nos.
a)
b)
1,880.21
kg
79.80
37.82
cum
10.72
75.60
2,280.00
0.35
Excavation in soil
As per Item No. 11.1 of Chapter 11
d)
1.25
Steel reinforcement
As per Item No. 12.6 of Chapter 12
c)
cum
per litre
per cm
high
f)
Labour
Mate
day
0.57
100.00
Mazdoor (Unskilled)
day
14.25
80.00
hour
6.00
150.00
cum
11.97
100.00
Machinery
Tractor with trolley
g)
Material
Stone spall
EE.,Dn.I, BMR
h)
Overheads @ 0% on (e+f+g)
i)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
253
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
B).
Unit = each
Taking output = 57 Nos.
a)
b)
cum
1.25
4,400.00
cum
10.72
0.00
2,280.0
0.35
Excavation in soil
c)
d)
per litre
per cm
high
f)
Labour
Mate
day
0.57
100.00
Mazdoor (Unskilled)
day
14.25
80.00
hour
6.00
150.00
cum
11.97
100.00
Machinery
Tractor with trolley
g)
Material
Stone spall
h)
Overheads @ 0% on (e+f+g)
i)
Note:
10.12
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
254
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Providing and fixing 1.2 m high GI barbed wire fencing with 1.8 m
RCC posts 150 mm x 150 mm placed every 3 m centre-to-centre
founded in M15 grade cement concrete, 0.6 m below ground level,
every 15th post, last but one end post and corner post shall be
strutted on both sides and end post on one side only and provided
with 9 horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per Clause
1705.
Unit = per running m
Taking output = 30 m
a)
b)
Labour
Mate
day
0.09
100.00
Blacksmith
day
0.25
120.00
Mazdoor (Unskilled)
day
2.00
80.00
kg
31.42
45.00
cum
0.526
1,880.21
Material
Barbed wire 335 m length @ 9.38 kg per 100 m
R.C.C. Post 150 mm x 150 mm x 1.80 m
M15 Grade concrete
13 x 150 mm x 150 mm x 1.8 m
Rate as per item No.12.5 of Chapter 12
Add 5 per cent extra cost for formwork of M-15
Supply of HYSD Bars including cutting, bending, tying & placing
in position.
10 mm dia HYSD bars for posts
13 x 4 x 1.8 = 93.6 m @ 0.62 kg/mt =
43.60 kg
30.42 kg
74.02 kg
0.074 37,815.75
Add for GI staple binding wire, drilling holes, etc. @ 2 per cent
of the cost of material
c)
Painting
Applying two coats of painting including primer coat on exposed
surface of RCC posts
As per item No.10.5 of this Chapter
d)
Overheads @ 0% on (a+b+c)
e)
sqm
8.14
44.90
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
255
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
b)
Labour
Mate
day
0.12
100.00
Blacksmith
day
0.40
120.00
Mazdoor (Unskilled)
day
2.50
80.00
kg
40.15
45.00
cum
0.702
1,880.21
Material
Barbed wire 428 m length @ 9.38 kg per 100 m
R.C.C. Post 150 mm x 150 mm x 2.4 m
High M-15 Grade
13 x 150 mm x 150 mm x 2.4 m
As per item No.12.5 of Chapter 12
Add 5 per cent extra cost of C.C. for formwork of M-15
Supply of HYSD Bars including cutting, bending, tying & placing
in position.
10 mm dia HYSD bars for posts
13 x 4 x 2.4 =
124.80 m
@ 0.62 kg/mt =
77.38 kg
85.80 m
@ 0.39 kg/m =
33.46 kg
Total
110.84 kg
0.111 37,815.75
Add for GI staple, binding wire, drilling holes etc. @ 2 per cent
of the cost of material
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
256
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Painting
Applying two coats of painting including prime coat on exposed
surface of RCC posts
As per item No.10.5 of this Chapter
d)
Overheads @ 0% on (a+b+c)
e)
sqm
12.10
44.90
cum
1.296
75.600
cum
0.648 1,961.973
1700, 800 Tubular Steel Railing on Medium Weight Steel Channel (ISMC
&300
series) 100 mm x 50 mm
Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows
duly painted on medium weight steel channels (ISMC series) 100 mm
x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete
as per approved drawings Clause 1706
Unit = Running m
Taking output = 10 m
i)
ii)
iii)
Painting of pipe
As per item No.10.6 of this Chapter
iv)
sqm
4.71
43.296
sqm
2.16
43.296
Mate
day
0.01
100.00
Mazdoor (Unskilled)
day
0.25
80.00
Plumber
day
0.01
150.00
30.00
150.00
kg
104.33
33.00
b)
EE.,Dn.I, BMR
Material
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
257
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Machinery
50 HP Tractor with trolley
hour
0.06
150.00
cum
1.296
75.600
cum
0.648 1,961.973
sqm
0.33 2,314.800
sqm
4.71
43.296
Mate
day
0.014
100.00
Mazdoor (Unskilled)
day
0.35
80.00
Plumber
day
0.01
150.00
30.00
150.00
0.032 37,815.75
d)
Overheads @ 0% on (a+b+c)
e)
1700, 800 Tubular Steel Railing on Precast RCC posts, 1.2 m high above
& 300
Ground Level
Providing, fencing and erecting 50 mm dia painted steel pipe railing in
3 rows on precast M-20 grade RCC vertical posts 175 mm x 175 mm
x 1.8 m high (1.2 m above Gl) with 3 holes 50 mm dia for pipe, fixed
2 m centre-to- centre complete as per approved drawings Clause
1706
Unit = Running m
Taking output = 10 m
i)
ii)
iii)
iv)
Painting of pipe
As per item No.10.6 of this Chapter
a)
b)
c)
Labour
Material
Machinery
50 HP Tractor with trolley
d)
EE.,Dn.I, BMR
hour
0.25
150.00
Overheads @ 0% on (a+b+c)
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
258
Sr.
No.
Reference to
MORD Specifications
Description
e)
Unit
Quantity
Rate
(Rs.)
1700
Unit = Each
Taking out put = one typical board
(i)
(ii)
cum
0.252
75.600
cum
0.252 1,961.973
(iii)
iv)
sqm
1.80
64.60
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
259
Sr.
No.
Reference to
MORD Specifications
Description
Total
Quantity
Rate
(Rs.)
a)
Unit
per cm
height
per litre
4,532.50
0.35
day
0.03
100.00
Mazdoor (Unskilled)
day
0.75
80.00
kg
63.15
45.00
kg
4.47
45.00
kg
2.12
33.00
sqm
1.44
900.00
hour
0.24
150.00
Mate
day
0.02
100.00
Mazdoor (Unskilled)
day
0.50
80.00
Nos.
68.00
450.00
b)
Material
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
b)
Labour
Material
Traffic cones with 150 mm reflective sleeve
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
260
Sr.
No.
Reference to
MORD Specifications
Description
c)
Unit
Quantity
Rate
(Rs.)
Machinery
50 HP Tractor with trolley
Hour
0.10
150.00
Mate
day
0.04
100.00
Mazdoor (Unskilled)
day
1.00
80.00
Nos.
50.00
150.00
sqm
0.27
4,500.00
d)
Overheads @ 0% on (a+b+c)
e)
Unit = each
Taking output = 50 Nos.
(a)
(b)
Labour
Material
Aluminium studs 100x100 mm fitted with lense reflectors
Add 10 per cent of cost of material for fixing and installation.
(c)
(d)
10.19
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
261
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
sqm
0.27
1,500.00
cum
0.126
75.60
cum
0.126
1,961.97
sqm
0.887
0.00
day
0.01
100.00
10.22
i)
ii)
iii)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
262
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
b)
Unit
Quantity
Rate
(Rs.)
day
0.25
80.00
kg
20.50
32.00
sqm
0.585
4,500.00
hour
0.08
150.00
cum
0.126
75.60
cum
0.126
1,961.97
sqm
0.887
0.00
day
0.01
100.00
Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Logo
600x600mm=0.36Sqm
Defination Plate 900x250mm=0.225 Sqm
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
Unit = each
i)
ii)
iii)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
263
Sr.
No.
Reference to
MORD Specifications
Description
Mazdoor (Unskilled)
b)
Unit
Quantity
Rate
(Rs.)
day
0.25
80.00
kg
20.50
32.00
sqm
0.585
1,500.00
hour
0.08
150.00
Material
Mild steel angle iron 75 x 75 x 6 mm
2 mm thick MS Sheet framed to angle iron
47x47x12SWG sheet tube on M.S. post of angle iron
size 75x75x6mm 3050mm long duly stove Luminious
orange colour in front and gray colour on back with
reflective border of 65 mm width and required letters
and figures with reflective tape engineering gradeof
required shade and colour with diomond plate
600x600mm, Defination Plate 900x250mm
Machinery
Tractor with trolley
d)
Overheads @ 0% on (a+b+c)
e)
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
264
Chapter 10
12.00
300.00
80.00
105.00
0.00
62.13
559.13
0.35
7.00
187.50
40.00
75.00
0.00
38.69
348.19
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
265
Amount
(Rs.)
0.22
9.53
246.24
57.30
1.00
20.00
660.00
1,575.00
67.05
12.00
0.00
331.01
2,979.13
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
266
Amount
(Rs.)
334.06
660.00
702.00
40.86
12.00
0.00
218.62
1,967.54
334.06
660.00
1,273.50
58.01
12.00
0.00
292.20
2,629.76
334.06
660.00
2,160.00
84.60
12.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
267
Amount
(Rs.)
0.00
406.33
3,656.99
334.06
660.00
1,215.00
56.25
12.00
0.00
284.66
2,561.98
334.06
660.00
1,620.00
68.40
12.00
0.00
336.81
3,031.27
334.06
660.00
3,024.00
110.52
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
268
Amount
(Rs.)
12.00
0.00
517.57
4,658.15
9.53
246.24
1.00
20.00
450.00
1,575.00
60.75
12.00
0.00
296.81
2,671.33
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
269
Amount
(Rs.)
276.76
450.00
702.00
34.56
12.00
0.00
184.42
1,659.74
276.76
450.00
1,273.50
51.71
12.00
0.00
258.00
2,321.96
276.76
450.00
2,160.00
78.30
12.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
270
Amount
(Rs.)
0.00
372.13
3,349.19
276.76
450.00
1,215.00
49.95
12.00
0.00
250.46
2,254.18
276.76
450.00
1,620.00
62.10
12.00
0.00
302.61
2,723.47
276.76
450.00
3,024.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
271
Amount
(Rs.)
104.22
12.00
0.00
483.37
4,350.35
9.53
246.24
58.14
1.00
20.00
53.59
309.37
1,575.00
58.14
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
272
Amount
(Rs.)
12.00
0.00
292.87
2,635.87
697.86
702.00
21.06
12.00
0.00
179.12
1,612.04
697.86
1,273.50
38.21
12.00
0.00
252.70
2,274.26
697.86
2,160.00
64.80
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
273
Amount
(Rs.)
12.00
0.00
366.83
3,301.49
697.86
1,215.00
36.45
12.00
0.00
245.16
2,206.47
697.86
1,620.00
48.60
12.00
0.00
297.31
2,675.77
697.86
3,024.00
90.72
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
274
Amount
(Rs.)
12.00
0.00
478.07
4,302.65
9.53
246.24
29.72
1.00
20.00
558.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
275
Amount
(Rs.)
34.98
525.00
33.54
12.00
0.00
183.75
1,653.75
899.46
234.00
7.02
12.00
0.00
144.06
1,296.54
899.46
424.50
12.74
12.00
0.00
168.59
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
276
Amount
(Rs.)
1,517.28
899.46
720.00
21.60
12.00
0.00
206.63
1,859.69
899.46
405.00
12.15
12.00
0.00
166.08
1,494.68
899.46
540.00
16.20
12.00
0.00
183.46
1,651.11
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
277
Amount
(Rs.)
899.46
1,008.00
30.24
12.00
0.00
243.71
2,193.41
9.53
246.24
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
278
Amount
(Rs.)
57.30
1.00
20.00
660.00
4,050.00
141.30
12.00
0.00
610.54
5,807.90
6,453.22
334.06
660.00
3,037.50
110.93
12.00
0.00
519.31
4,673.80
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
279
Amount
(Rs.)
334.06
660.00
2,430.00
92.70
12.00
0.00
441.10
3,969.86
334.06
660.00
1,518.75
65.36
12.00
0.00
323.77
2,913.95
334.06
660.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
280
Amount
(Rs.)
1,215.00
56.25
12.00
0.00
284.66
2,561.98
9.53
246.24
1.00
20.00
450.00
4,050.00
13.50
12.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
281
Amount
(Rs.)
0.00
568.31
5,370.57
5,967.30
276.76
450.00
3,037.50
104.63
12.00
0.00
485.11
4,366.00
276.76
450.00
2,430.00
86.40
12.00
0.00
406.90
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
282
Amount
(Rs.)
3,662.06
276.76
450.00
1,518.75
59.06
12.00
0.00
289.57
2,606.15
276.76
450.00
1,215.00
49.95
12.00
0.00
250.46
2,254.18
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
283
Amount
(Rs.)
9.53
239.58
58.14
1.00
20.00
53.59
291.18
4,050.00
12.00
0.00
553.47
5,288.49
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
284
Amount
(Rs.)
5,876.10
673.02
3,037.50
12.00
0.00
465.31
4,187.83
673.02
2,430.00
12.00
0.00
389.38
3,504.39
673.02
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
285
Amount
(Rs.)
1,518.75
12.00
0.00
275.47
2,479.24
673.02
1,215.00
12.00
0.00
237.50
2,137.52
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
286
Amount
(Rs.)
9.53
246.24
38.11
1.00
20.00
558.00
34.98
1,800.00
71.79
12.00
0.00
312.22
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
287
Amount
(Rs.)
3,103.87
3,448.74
314.88
558.00
34.98
1,350.00
58.29
12.00
0.00
291.02
2,619.16
314.88
558.00
34.98
1,080.00
50.19
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
288
Amount
(Rs.)
12.00
0.00
256.26
2,306.30
314.88
558.00
34.98
675.00
38.04
12.00
0.00
204.11
1,837.01
314.88
558.00
34.98
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
289
Amount
(Rs.)
540.00
33.99
12.00
0.00
186.73
1,680.58
19.05
492.47
114.60
2.00
40.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
290
Amount
(Rs.)
1,320.00
6,750.00
242.10
18.00
0.00
1,046.51
10,044.74
6,696.49
12,053.68
19.05
492.47
2.00
40.00
900.00
6,750.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
291
Amount
(Rs.)
229.50
18.00
0.00
992.44
9,443.46
6,295.64
11,332.15
19.05
492.47
118.87
2.00
40.00
107.17
582.36
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
292
Amount
(Rs.)
6,750.00
3.22
18.00
0.00
937.84
9,070.98
6,047.32
10,885.18
19.05
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
293
Amount
(Rs.)
492.47
59.43
2.00
40.00
1,116.00
69.96
3,000.00
125.58
24.00
0.00
547.19
5,495.69
3,663.79
6,594.82
20.00
450.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
294
Amount
(Rs.)
160.00
60.00
900.00
6.30
0.00
199.54
1,795.84
44.90
25.00
90.00
32.00
48.00
187.50
2.36
0.00
48.11
432.96
43.30
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
295
Amount
(Rs.)
25.00
90.00
32.00
48.00
375.00
4.23
0.00
71.78
646.01
64.60
9.00
82.50
124.00
236.80
0.00
56.54
508.84
50.88
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
296
Amount
(Rs.)
6.00
45.00
100.00
144.00
0.00
36.88
331.88
33.19
4,418.50
834.97
127.01
442.22
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
297
Amount
(Rs.)
629.02
26.00
108.00
480.00
900.00
0.00
189.25
8,154.97
1,359.16
7,088.40
995.31
209.41
512.26
587.08
32.00
180.00
560.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
298
Amount
(Rs.)
900.00
0.00
209.00
11,273.47
805.25
3,439.82
2,495.84
105.08
281.50
115.32
34.00
270.00
560.00
900.00
0.00
220.50
8,422.06
255.21
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
299
Amount
(Rs.)
5,700.00
127.01
13.79
629.02
26.00
108.00
480.00
900.00
0.00
285.48
8,269.29
1,378.22
3,128.00
0.00
512.26
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
300
Amount
(Rs.)
587.08
32.00
180.00
560.00
900.00
0.00
346.42
6,245.76
446.13
1,408.00
0.00
281.50
115.32
34.00
270.00
560.00
900.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
301
Amount
(Rs.)
0.00
446.10
4,014.92
121.66
2,350.27
3,017.70
810.43
796.75
57.00
1,140.00
900.00
1,197.00
0.00
411.75
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
302
Amount
(Rs.)
10,680.90
187.38
5,500.00
0.00
796.75
57.00
1,140.00
900.00
1,197.00
0.00
1,198.84
10,789.60
189.29
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
303
Amount
(Rs.)
9.00
30.00
160.00
1,413.90
988.99
49.45
2,798.37
365.45
0.00
726.89
6,542.05
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
304
Amount
(Rs.)
218.07
12.00
48.00
200.00
1,806.75
1,319.91
66.00
4,197.55
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
305
Amount
(Rs.)
543.24
0.00
1,024.18
8,957.62
298.59
97.98
1,271.36
203.93
93.52
1.00
20.00
1.50
4,500.00
3,442.89
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
306
Amount
(Rs.)
238.29
9.00
0.00
1,026.58
9,239.26
923.93
97.98
1,271.36
763.88
203.93
1.40
28.00
1.50
4,500.00
1,210.10
37.50
0.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
307
Amount
(Rs.)
722.31
8,837.96
883.80
19.05
494.42
116.28
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
308
Amount
(Rs.)
1,583.90
3.00
60.00
2,841.75
201.15
69.96
1,296.00
132.27
36.00
0.00
580.02
7,433.79
2.00
40.00
30,600.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
309
Amount
(Rs.)
15.00
0.00
3,832.13
34,489.13
507.19
4.00
80.00
7,500.00
750.00
0.00
1,041.75
9,375.75
187.52
1,215.00
36.45
0.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
310
Amount
(Rs.)
156.43
1,407.88
405.00
12.15
0.00
52.14
469.29
9.53
247.21
0.00
1.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
311
Amount
(Rs.)
20.00
656.00
2,632.50
98.66
12.00
0.00
459.61
3,879.77
9.53
247.21
0.00
1.00
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
312
Amount
(Rs.)
20.00
656.00
877.50
46.01
12.00
0.00
233.65
1,846.16
EE.,Dn.I, BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
262
Chapter 11
FOUNDATION
Sr.
No.
Reference to
MORD Specifica - tions
11.1
300
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
I.
Ordinary soil
(i)
Upto 3 m depth
Unit = cum
Taking output = 10 cum
a)
Labour
Mate
day
0.32
100.00
32.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
b)
Overheads @ 0% on (a)
0.00
c)
84.00
756.00
75.60
(ii)
3 m to 6 m depth
Unit = cum
a)
EE.,Dn.I,BMR
Labour
Mate
day
0.38
100.00
38.00
Mazdoor (Unskilled)
day
9.50
80.00
760.00
b)
Overheads @ 0% on (a)
c)
TA to SE Circle BMR
0.00
AAO.,Circle, Barmer
99.75
SE.,Circle, Barmer
263
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Quantity
Rate
(Rs.)
89.78
II.
(Rs.)
897.75
Amount
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
b)
Overheads @ 0% on (a)
0.00
c)
105.00
945.00
94.50
Note: Cost of dewatering upto 10 per cent of labour cost may be added,
where required as per site condition.
III.
b)
Labour
Mate
day
0.53
100.00
53.00
Driller
day
0.84
150.00
126.00
Blaster
day
0.40
150.00
60.00
Mazdoor (Unskilled)
day
12.00
80.00
960.00
hour
1.00
194.00
194.00
kg
3.50
120.00
420.00
Machinery
Air compressor 210 cfm with 2 jack hammers for drilling
c)
Material
Gelatin 80%
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
264
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Detonator electric
Nos.
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
14.00
Rate
(Rs.)
10.00
Amount
(Rs.)
140.00
0.00
244.13
2,197.13
219.71
b)
Labour
Mate
day
0.20
100.00
20.00
Mazdoor (Unskilled)
day
5.00
80.00
400.00
hour
10.00
194.00
1,940.00
Machinery
Air compressor 210 cfm with 2 jack hammers of
pneumatic breaker
c)
Overheads @ 0% on (a+b)
0.00
d)
295.00
2,655.00
265.50
Marshy soil
Unit = cum
Taking output = 10 cum
a)
Labour
Mate
day
0.60
100.00
60.00
Mazdoor (Unskilled)
day
15.00
80.00
1,200.00
b)
Overheads @ 0% on (a)
0.00
c)
1,417.50
EE.,Dn.I,BMR
TA to SE Circle BMR
157.50
141.75
AAO.,Circle, Barmer
SE.,Circle, Barmer
265
Sr.
No.
Reference to
MORD Specifica - tions
Description
Note:
11.2
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Sand filling
Unit = cum
a)
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.30
80.00
24.00
cum
1.20
190.00
228.00
Material
Sand (assuming 20 per cent voids)
c)
Overheads @ 0% on (a+b)
0.00
d)
31.63
284.63
Labour
Mate
day
0.20
100.00
20.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
b)
Overheads @ 0% on (a)
0.00
c)
292.50
EE.,Dn.I,BMR
TA to SE Circle BMR
32.50
48.75
AAO.,Circle, Barmer
SE.,Circle, Barmer
266
Sr.
No.
Reference to
MORD Specifica - tions
Description
Note:
11.3
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Material
Cement
b)
0.275
4,000.00
1,100.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.09
100.00
9.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Labour
c)
Formwork @ 4% on (a+b)
67.08
d)
Overheads @ 0% on (a+b+c)
e)
0.00
218.00
1,961.97
P.C.C grade M 10
(i)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
267
Sr.
No.
Reference to
MORD Specifica - tions
Description
a)
Unit
c)
Rate
(Rs.)
(Rs.)
0.250
4,000.00
1,000.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.576
310.00
178.56
20 mm aggregate
cum
0.288
390.00
112.32
10 mm aggregate
cum
0.096
400.00
38.40
Mate
day
0.08
100.00
8.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity
fitted with water measuring device and preferably
also with load cell.
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
65.01
0.00
211.27
Amount
Material
Cement
b)
Quantity
1,901.46
Material
Cement
b)
EE.,Dn.I,BMR
0.250
4,000.00
1,000.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.576
310.00
178.56
20 mm aggregate
cum
0.288
390.00
112.32
10 mm aggregate
cum
0.096
400.00
38.40
Mate
day
0.09
100.00
9.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
268
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
c)
d)
Overheads @ 0% on (a+b+c)
e)
Quantity
Rate
(Rs.)
(Rs.)
65.27
0.00
212.13
Amount
1,909.18
P.C.C grade M 15
(i)
Material
Cement
b)
c)
0.275
4,000.00
1,100.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.08
100.00
8.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
66.81
0.00
217.14
1,954.25
Material
Cement
EE.,Dn.I,BMR
0.275
4,000.00
1,100.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
269
Sr.
No.
Reference to
MORD Specifica - tions
Description
b)
Unit
Quantity
Rate
(Rs.)
(Rs.)
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.09
100.00
9.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Labour
c)
Formwork @ 4% on (a+b)
d)
Overheads @ 0% on (a+b+c)
e)
67.08
0.00
218.00
Amount
1,961.97
P.C.C. grade M 20
(i)
Material
Cement
b)
c)
0.33
4,000.00
1,320.00
Sand
cum
0.45
190.00
85.50
40 mm aggregate
cum
0.36
310.00
111.60
20 mm aggregate
cum
0.36
390.00
140.40
10 mm aggregate
cum
0.18
400.00
72.00
Mate
day
0.08
100.00
8.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
Formwork @ 4% on (a+b+c)
e)
Overheads @ 0% on (a+b+c+d)
f)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
77.37
0.00
251.45
2,263.01
SE.,Circle, Barmer
270
Sr.
No.
Reference to
MORD Specifica - tions
Description
(ii)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Material
Cement
b)
0.33
4,000.00
1,320.00
Sand
cum
0.45
190.00
85.50
40 mm aggregate
cum
0.36
310.00
111.60
20 mm aggregate
cum
0.36
390.00
140.40
10 mm aggregate
cum
0.18
400.00
72.00
Mate
day
0.09
100.00
9.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Labour
c)
d)
Overheads @ 0% on (a+b+c)
e)
77.63
0.00
252.30
2,270.74
R.C.C grade M 20
Unit = cum
a)
Material
Cement
b)
c)
EE.,Dn.I,BMR
0.35
4,000.00
1,400.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
Labour
Machinery
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
271
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Formwork @ 4% on (a+b+c)
e)
Overheads @ 0% on (a+b+c+d)
f)
hour
Quantity
0.40
Rate
(Rs.)
60.00
(Rs.)
24.00
82.26
0.00
267.33
Amount
2,405.99
R.C.C. grade M 25
Unit = cum
a)
Material
Cement
b)
c)
0.404
4,000.00
1,616.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
85.22
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
294.70
2,652.32
Unit = cum
I.
Material
Brick
Nos.
500.00
1.80
900.00
cum
0.24
2,312.20
554.93
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
272
Sr.
No.
Reference to
MORD Specifica - tions
Description
b)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Labour
Mate
day
0.09
100.00
9.00
day
0.80
190.00
152.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
c)
Overheads @ 0% on (a+b)
0.00
d)
38.38
1,800.30
Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit = cum
a)
Material
Cement
0.51
4,000.00
2,040.00
cum
1.05
180.00
189.00
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
0.90
80.00
72.00
Bhisti
day
0.08
90.00
7.20
Sand
b)
Labour
2,312.20
Material
Brick
Nos.
500.00
1.80
900.00
cum
0.24
1,802.70
432.65
Mate
day
0.09
100.00
9.00
day
0.80
190.00
152.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
c)
EE.,Dn.I,BMR
Labour
Overheads @ 0% on (a+b)
TA to SE Circle BMR
0.00
AAO.,Circle, Barmer
SE.,Circle, Barmer
273
Sr.
No.
Reference to
MORD Specifica - tions
Description
d)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
204.96
1,844.60
Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a)
Material
Cement
0.38
4,000.00
1,520.00
cum
1.05
190.00
199.50
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
0.90
80.00
72.00
Bhisti
day
0.08
90.00
7.20
Sand
b)
Labour
1,802.70
b)
Material
Brick
Nos.
500.00
1.80
900.00
cum
0.24
2,320.00
556.80
Mate
day
0.09
100.00
9.00
day
0.80
190.00
152.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
220.48
1,984.28
Sub-analysis
Cement-lime-mortar 1:0.5:4.5 (1 cement: 0.5 lime putty : 4.5
sand)
Unit = cum
a)
Material
Cement
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
0.38
4,000.00
1,520.00
SE.,Circle, Barmer
274
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Lime putty
Rate
(Rs.)
(Rs.)
0.175
2,000.00
350.00
cum
1.05
190.00
199.50
Mate
day
0.10
100.00
10.00
Mazdoor (Unskilled)
day
2.50
80.00
200.00
Bhisti
day
0.45
90.00
40.50
Labour
Amount
Sand
b)
Quantity
2,320.00
b)
Material
Stone for C.R. masonry 1st sort
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
cum
0.30
2,312.20
693.66
Mate
day
0.14
100.00
14.00
day
1.50
180.00
270.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
194.11
1,746.97
EE.,Dn.I,BMR
Material
Stone for C.R. masonry 1st sort
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
275
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
cum
0.30
1,802.70
540.81
Mate
day
0.14
100.00
14.00
day
1.50
180.00
270.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
175.00
1,575.01
b)
Material
Stone for C.R. masonry 1st sort
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
cum
0.30
2,320.00
696.00
Mate
day
0.14
100.00
14.00
day
1.50
180.00
270.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
194.40
1,749.60
Note: Quantity of required chips has not been provided for separately as it
is assumed that the same will be availble from dressing of stones
II.
Material
Stone for C.R. masonry 2nd sort
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
cum
0.60
250.00
150.00
SE.,Circle, Barmer
276
Sr.
No.
Reference to
MORD Specifica - tions
Description
b)
Unit
Quantity
Rate
(Rs.)
(Rs.)
Nos.
7.00
10.00
70.00
Spalls/blasted rubble
cum
0.50
40.00
20.00
cum
0.33
2,312.20
763.03
Mate
day
0.14
100.00
14.00
day
1.30
180.00
234.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
177.28
Amount
1,595.50
b)
Material
Stone for C.R. masonry 2nd sort
cum
0.60
250.00
150.00
Nos.
7.00
10.00
70.00
Spalls/Blasted rubble
cum
0.50
40.00
20.00
cum
0.33
1,802.70
594.89
Mate
day
0.14
100.00
14.00
day
1.30
180.00
234.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
156.26
1,406.35
Material
Stone for C.R. masonry 2nd sort
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
cum
0.60
250.00
150.00
SE.,Circle, Barmer
277
Sr.
No.
Reference to
MORD Specifica - tions
Description
b)
Unit
Quantity
Rate
(Rs.)
(Rs.)
Nos.
7.00
10.00
70.00
Spalls/blasted rubble
cum
0.50
40.00
20.00
cum
0.33
2,320.00
765.60
Mate
day
0.14
100.00
14.00
day
1.30
180.00
234.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
177.60
Amount
1,598.40
b)
Material
Stone for R.R. masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33
2,312.20
763.03
Mate
day
0.12
100.00
12.00
day
1.20
180.00
216.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
171.53
1,543.75
Material
Stone for R.R. masonry
EE.,Dn.I,BMR
TA to SE Circle BMR
cum
AAO.,Circle, Barmer
1.00
160.00
160.00
SE.,Circle, Barmer
278
Sr.
No.
Reference to
MORD Specifica - tions
Description
b)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Nos.
7.00
10.00
70.00
cum
0.33
1,802.70
594.89
Mate
day
0.12
100.00
12.00
day
1.20
180.00
216.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
150.51
1,354.60
b)
Material
Stone for R.R. masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33
2,320.00
765.60
Mate
day
0.12
100.00
12.00
day
1.20
180.00
216.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
171.85
1,546.65
Note: Quantity of required chips has not been provided for separately as it
is assumed that the same will be availble from dressing of stones
11.7
1000 & 1200 Supplying, fitting and placing HYSD bar reinforcement in
foundation complete as per drawings and technical
specifications Clauses 1000 and 1202
Unit = t
a)
EE.,Dn.I,BMR
Material
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
279
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Quantity
Rate
(Rs.)
(Rs.)
kg
6.00
33.00
198.00
Mate
day
0.40
100.00
40.00
Blacksmith
day
2.00
120.00
240.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
c)
Overheads @ 0% on (a+b)
0.00
d)
4,188.50
Amount
37,696.50
Material
TMT bars including 5 per cent for overlaps and wastage
Binding wire
b)
kg
6.00
33.00
198.00
Mate
day
0.40
100.00
40.00
Blacksmith
day
2.00
120.00
240.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
c)
Overheads @ 0% on (a+b)
0.00
d)
4,451.00
40,059.00
Material
MS bars including 5 per cent for overlaps and wastage
Binding wire
b)
EE.,Dn.I,BMR
t
kg
33.00
198.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
280
Sr.
No.
Reference to
MORD Specifica - tions
Description
Unit
Rate
(Rs.)
Amount
(Rs.)
Mate
day
0.40
100.00
40.00
Blacksmith
day
2.00
120.00
240.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
c)
Overheads @ 0% on (a+b)
0.00
d)
EE.,Dn.I,BMR
Quantity
TA to SE Circle BMR
3,794.75
34,152.75
AAO.,Circle, Barmer
SE.,Circle, Barmer
280
Chapter 12
SUBSTRUCTURE
Sr.
No.
Reference to
MORD Specifications
12.1
600
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
b)
Material
Bricks
Nos. 500.00
1.80
900.00
cum
0.24
2,312.20
554.93
Mate
day
0.09
100.00
9.00
day
0.80
180.00
144.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
Overheads @ 0% on (a+b)
d)
72.75
0.00
228.33
2,055.01
Material
Bricks
Nos. 500.00
1.80
900.00
Cement mortar
(Rate as in item 11.5 II)
b)
EE.,Dn.I, Barmer
cum
0.24
1,802.70
432.65
Mate
day
0.09
100.00
9.00
day
0.80
180.00
144.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
281
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Overheads @ 0% on (a+b)
d)
81.58
0.00
214.15
1,927.38
b)
Material
Bricks 1st class
Nos. 500.00
1.80
900.00
Cement mortar
cum
0.24
1,522.70
365.45
Mate
day
0.09
100.00
9.00
day
0.80
180.00
144.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
Overheads @ 0% on (a+b)
d)
78.22
0.00
205.33
1,848.00
Sub-analysis
Cement mortar 1:5 (1 cement, 5 sand)
a)
Material
Cement
0.31
4,000.00
1,240.00
cum
1.05
190.00
199.50
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
0.90
80.00
72.00
Bhisti
day
0.08
90.00
7.20
Sand
b)
Labour
EE.,Dn.I, Barmer
1,522.70
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
282
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Unit = cum
a)
b)
Material
Brick first class
Nos. 500.00
1.80
900.00
cum
0.24
2,320.00
556.80
Mate
day
0.09
100.00
9.00
day
0.80
190.00
152.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
Overheads @ 0% on (a+b)
d)
88.19
0.00
231.50
600
I.
2,083.49
Material
Cement mortar 1.3 (Rate as in item 11.5. I)
b)
cum
0.03
2,312.20
69.37
Mate
day
0.04
100.00
4.00
day
0.50
190.00
95.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Bhisti
day
0.20
90.00
18.00
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
28.30
254.66
600
II.(a)
EE.,Dn.I, Barmer
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
283
Sr.
No.
Unit
Quantity
cum
0.02
2,312.20
53.18
Mate
day
0.04
100.00
4.00
day
0.50
190.00
95.00
Mazdoor (Unskilled)
day
0.50
80.00
40.00
Bhisti
day
0.20
90.00
18.00
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Unit = 10 sqm
Taking output = 10 sqm
a)
Material
Cement mortar 1.3 (Rate as in item 11.5. I)
b)
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
26.27
236.45
Material
Cement mortar 1.3 (Rate as in item 11.5. I)
b)
cum
0.04
2,312.20
90.18
Mate
day
0.04
100.00
4.00
day
0.70
190.00
133.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
Bhisti
day
0.20
90.00
18.00
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
40.65
365.82
600
I.
EE.,Dn.I, Barmer
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
284
Sr.
No.
Unit
Quantity
cum
0.24
1,802.70
432.65
Mate
day
0.06
100.00
6.00
day
0.60
190.00
114.00
Mazdoor (Unskilled)
day
0.60
80.00
48.00
Bhisti
day
0.30
90.00
27.00
Reference to
MORD Specifications
Description
a)
Amount
(Rs.)
Material
Cement mortar 1:4 (Rate as in item 11.5 II )
b)
Rate
(Rs.)
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
78.46
706.10
Material
Cement mortar 1:4 (Rate as in item 11.5 II )
b)
cum
0.25
1,802.70
450.68
Mate
day
0.06
100.00
6.00
day
0.60
190.00
114.00
Mazdoor (Unskilled)
day
0.60
80.00
48.00
Bhisti
day
0.30
90.00
27.00
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
80.71
EE.,Dn.I, Barmer
726.38
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
285
Sr.
No.
Reference to
MORD Specifications
12.4
700
Unit
Quantity
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
cum
0.30
2,312.20
693.66
Mate
day
0.14
100.00
14.00
day
1.50
190.00
285.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Bhisti
day
0.08
90.00
7.20
Description
Rate
(Rs.)
Amount
(Rs.)
b)
Material
Labour
Overheads @ 0% on (a+b)
d)
78.39
0.00
205.78
1,852.03
b)
EE.,Dn.I, Barmer
Material
Stone for CR masonry 1st sort
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
cum
0.30
1,802.70
540.81
Mate
day
0.14
100.00
14.00
day
1.50
190.00
285.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Labour
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
286
Sr.
No.
Reference to
MORD Specifications
Description
Bhisti
Unit
Quantity
day
0.08
Rate
(Rs.)
Amount
(Rs.)
90.00
7.20
Overheads @ 0% on (a+b)
d)
70.75
0.00
185.72
1,671.48
b)
Material
Stone for CR masonry 1st sort
cum
0.60
300.00
180.00
Nos.
7.00
10.00
70.00
Spalls/blasted rubbles
cum
0.50
40.00
20.00
cum
0.33
1,522.70
502.49
Mate
day
0.14
100.00
14.00
day
1.30
190.00
247.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Labour
Overheads @ 0% on (a+b)
d)
60.03
0.00
157.59
1,418.32
b)
EE.,Dn.I, Barmer
Material
Stone for CR masonry 1st sort
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
cum
0.30
2,320.00
696.00
Labour
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
287
Sr.
No.
Unit
Quantity
Mate
day
0.14
100.00
14.00
day
1.50
190.00
285.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Bhisti
day
0.08
90.00
7.20
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Overheads @ 0% on (a+b)
d)
78.51
0.00
206.09
1,854.80
b)
Material
Stone for CR masonry 2nd sort
cum
0.60
250.00
150.00
Nos.
7.00
10.00
70.00
Spalls/blasted rubbles
cum
0.50
40.00
20.00
cum
0.33
2,312.20
763.03
Mate
day
0.14
100.00
14.00
day
1.30
190.00
247.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Labour
Overheads @ 0% on (a+b)
d)
71.56
0.00
187.85
1,690.64
Material
Stone for CR masonry 2nd sort
EE.,Dn.I, Barmer
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
0.60
250.00
SE.,Circle, Barmer
150.00
288
Sr.
No.
Unit
Quantity
Nos.
7.00
10.00
70.00
Spall/blasted rubble
cum
0.50
40.00
20.00
cum
0.33
1,802.70
594.89
Mate
day
0.14
100.00
14.00
day
1.30
190.00
247.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Reference to
MORD Specifications
Description
b)
Rate
(Rs.)
Amount
(Rs.)
Labour
Overheads @ 0% on (a+b)
d)
63.15
0.00
165.78
1,492.03
b)
Material
Stone for CR masonry 2nd sort
cum
0.60
250.00
150.00
Nos.
7.00
10.00
70.00
Spall/blasted rubble
cum
0.50
40.00
20.00
cum
0.33
1,522.70
502.49
Mate
day
0.14
100.00
14.00
day
1.30
190.00
247.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Labour
Overheads @ 0% on (a+b)
d)
EE.,Dn.I, Barmer
TA to SE Circle, BMR
58.53
0.00
153.65
1,382.88
AAO.,Circle, Barmer
SE.,Circle, Barmer
289
Sr.
No.
Unit
Quantity
cum
0.60
250.00
150.00
Nos.
7.00
10.00
70.00
Spalls/blasted rubbles
cum
0.50
40.00
20.00
cum
0.33
2,320.00
765.60
Mate
day
0.14
100.00
14.00
day
1.30
190.00
247.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.08
90.00
7.20
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
b)
Material
Labour
Overheads @ 0% on (a+b)
d)
71.69
0.00
188.19
1,693.68
b)
EE.,Dn.I, Barmer
Material
Stone for RR masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33
2,312.20
763.03
Mate
day
0.12
100.00
12.00
day
1.20
190.00
228.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
290
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Overheads @ 0% on (a+b)
d)
69.21
0.00
181.68
1,635.12
b)
Material
Stone for RR masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33
1,802.70
594.89
Mate
day
0.12
100.00
12.00
day
1.20
190.00
228.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
Overheads @ 0% on (a+b)
d)
60.80
0.00
159.61
1,436.51
b)
EE.,Dn.I, Barmer
Material
Stone for RR masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33
1,522.70
502.49
Mate
day
0.12
100.00
12.00
day
1.20
190.00
228.00
Labour
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
291
Sr.
No.
Unit
Quantity
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Overheads @ 0% on (a+b)
d)
56.18
0.00
147.48
1,327.36
b)
Material
Stone for RR masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33
2,320.00
765.60
Mate
day
0.12
100.00
12.00
day
1.20
190.00
228.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
Overheads @ 0% on (a+b)
d)
800
69.34
0.00
182.02
1,638.16
P.C.C grade M 15
(i)
EE.,Dn.I, Barmer
Material
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
292
Sr.
No.
Reference to
MORD Specifications
Description
Cement
b)
c)
Unit
Quantity
Rate
(Rs.)
0.275
4,000.00
1,100.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.08
100.00
8.00
day
0.10
190.00
19.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
0.00
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
208.91
Amount
(Rs.)
1,880.21
Material
Cement
b)
EE.,Dn.I, Barmer
0.275
4,000.00
1,100.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.09
100.00
9.00
day
0.10
190.00
19.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Labour
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
293
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
c)
0.00
d)
Overheads @ 0% on (a+b+c)
0.00
e)
209.74
Amount
(Rs.)
1,887.64
P.C.C. grade M 20
(i)
Material
Cement
b)
c)
0.33
4,000.00
1,320.00
Sand
cum
0.45
190.00
85.50
40 mm aggregate
cum
0.36
310.00
111.60
20 mm aggregate
cum
0.36
390.00
140.40
10 mm aggregate
cum
0.18
400.00
72.00
Mate
day
0.08
100.00
8.00
day
0.10
190.00
19.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
0.00
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
241.90
2,177.10
Material
Cement
EE.,Dn.I, Barmer
0.33
4,000.00
1,320.00
Sand
cum
0.45
190.00
85.50
40 mm aggregate
cum
0.36
310.00
111.60
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
294
Sr.
No.
Unit
Quantity
20 mm aggregate
cum
0.36
390.00
140.40
10 mm aggregate
cum
0.18
400.00
72.00
Mate
day
0.09
100.00
9.00
day
0.10
190.00
19.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Reference to
MORD Specifications
Description
b)
Rate
(Rs.)
Labour
c)
0.00
d)
Overheads @ 0% on (a+b+c)
0.00
e)
242.73
Amount
(Rs.)
2,184.53
R.C.C grade M 20
Unit = cum
a)
Material
Cement
b)
c)
0.35
4,000.00
1,400.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
190.00
22.80
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
0.00
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
EE.,Dn.I, Barmer
TA to SE Circle, BMR
257.20
2,314.80
AAO.,Circle, Barmer
SE.,Circle, Barmer
295
Sr.
No.
Reference to
MORD Specifications
Description
IV.
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
R.C.C. grade M 25
Unit = cum
a)
Material
Cement
b)
c)
0.404
4,000.00
1,616.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
190.00
22.80
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
0.00
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
12.6
1000
284.20
2,557.80
b.
EE.,Dn.I, Barmer
Material
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
296
Sr.
No.
Reference to
MORD Specifications
Description
HYSD bars including 5 per cent overlaps and wastage
Binding wire
b)
Unit
t
Quantity
Rate
(Rs.)
kg
6.00
45.00
270.00
Mate
day
0.34
100.00
34.00
Blacksmith
day
2.00
120.00
240.00
Mazdoor (Unskilled)
day
6.50
80.00
520.00
c)
Overheads @ 0% on (a+b)
0.00
d)
4,201.75
1000
Amount
(Rs.)
37,815.75
Material
TMT bars including 5 per cent overlaps and wastage
Binding wire
b)
kg
6.00
45.00
270.00
Mate
day
0.34
100.00
34.00
Blacksmith
day
2.00
120.00
240.00
Mazdoor (Unskilled)
day
6.50
80.00
520.00
c)
Overheads @ 0% on (a+b)
0.00
d)
4,464.25
1000
40,178.25
Material
MS bars including 5 per cent overlaps and wastage
Binding wire
EE.,Dn.I, Barmer
TA to SE Circle, BMR
t
kg
AAO.,Circle, Barmer
45.00
SE.,Circle, Barmer
270.00
297
Sr.
No.
Unit
Quantity
Mate
day
0.34
100.00
34.00
Blacksmith
day
2.00
120.00
240.00
Mazdoor (Unskilled)
day
6.50
80.00
520.00
Reference to
MORD Specifications
Description
b)
Rate
(Rs.)
c)
Overheads @ 0% on (a+b)
0.00
d)
3,808.00
600
Amount
(Rs.)
34,272.00
Material
AC pipe 100 mm dia including wastage @ 5 per cent. Average
length of weep hole is taken as one metre for the purpose of
estimating
b)
12.10
1200
31.50
65.00
2,047.50
MS clamps
Nos.
30.00
20.00
600.00
cum
0.05
2,312.20
115.61
Mate
day
0.03
100.00
3.00
day
0.50
180.00
90.00
Mazdoor (Unskilled)
day
0.25
80.00
20.00
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
359.51
3,235.62
107.85
Unit = cum
Taking output = 10 cum
EE.,Dn.I, Barmer
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
298
Sr.
No.
Unit
Quantity
cum
12.00
95.00
1,140.00
Mate
day
0.28
100.00
28.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Bhisti
day
0.40
90.00
36.00
Reference to
MORD Specifications
Description
I)
Rate
(Rs.)
Amount
(Rs.)
Granular material
a)
Material
Granular material
b)
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
250.50
2,254.50
225.45
Sandy material
Unit = cum
Taking output = 10 cum
a)
Material
Sand
b)
cum
12.00
110.00
1,320.00
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
Bhisti
day
0.40
90.00
36.00
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
274.50
2,470.50
1200
247.05
Unit = cum
EE.,Dn.I, Barmer
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
299
Sr.
No.
Unit
Quantity
cum
12.00
200.00
2,400.00
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
9.00
80.00
720.00
Mazdoor (Skilled)
day
1.00
100.00
100.00
Bhisti
day
0.50
90.00
45.00
Reference to
MORD Specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Material
Filter media as per specification
b)
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
413.13
3,718.13
1200
371.81
b)
Labour
Mate
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
Mazdoor Skilled
day
0.50
100.00
50.00
1.00
7,680.00
7,680.00
Material
EE.,Dn.I, Barmer
TA to SE Circle, BMR
AAO.,Circle, Barmer
78.16
SE.,Circle, Barmer
300
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
c)
Overheads @ 0% on (a+b)
2,368.25
d)
1,282.80
11,545.21
0.60
Note: For such type of manufactured item, the overhead cost is taken as
30 per cent instead of 20 per cent
12.13
600 I).
a.
cum
0.150
2,177.10
b.
326.57
33.00
Cost of sqm = a
326.57
Rate persqm = a
326.57
75 mm thick
Unit = sq m
Taking output = 1 sqm
Assume wall thickness = 345 mm
Projection of the coping will be 25 mm wide on both side of the wall
= 345 + 50 = 395 mm
Quantity = 1 x 0.075 = 0.075
PCC M-20 Grade (1:2:4) Nominal Mix
As per item No. 12.5 (II)(i)
cum
0.075
2,177.10
16.00
Cost of sqm = a
EE.,Dn.I, Barmer
TA to SE Circle, BMR
163.28
163.28
AAO.,Circle, Barmer
SE.,Circle, Barmer
301
Sr.
No.
Reference to
MORD Specifications
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
163.28
cum
0.050
2,177.10
12.14
1200
108.86
11.00
Cost of sqm = a
119.86
119.86
Unit = Nos
a)
Material
AC pipe 100 mm dia i/c wastage of 5 per cent 600 mm long
upto the bottom of levelling course
Filter media base with stone aggregate 0.5 m x 0.5 m area 1 m cum
deep
b)
0.63
65.00
40.95
0.25
200.00
50.00
Labour
Mate
day
0.031
100.00
3.10
day
0.016
180.00
2.88
Mazdoor (Unskilled)
day
0.80
80.00
64.00
c)
Overheads @ 0% on (a+b)
0.00
d)
20.12
EE.,Dn.I, Barmer
TA to SE Circle, BMR
181.05
AAO.,Circle, Barmer
SE.,Circle, Barmer
302
Chapter 13
SUPERSTRUCTURE
Sr.
No.
Reference to
MORD specifications
13.1
800
Unit
Description
Quan tity
Rate
(Rs.)
Amount
(Rs.)
R.C.C grade M 20
(i)
Material
Cement
b)
c)
0.35
4,000.00
1,400.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
0.00
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
257.05
2,313.45
Material
Cement
Coarse aggregate
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
0.35
4,000.00
1,400.00
cum
0.45
190.00
85.50
SE.,Circle, Barmer
303
Sr.
No.
Unit
Quan tity
20 cum aggregates
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.09
100.00
9.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Reference to
MORD specifications
Description
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
0.00
Overheads @ 0% on (a+b+c)
e)
0.00
256.43
2,307.83
Material
Cement
b)
c)
0.33
4,000.00
1,320.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
0.00
SE.,Circle, Barmer
304
Sr.
No.
Reference to
MORD specifications
Unit
Description
e)
Overheads @ 0% on (a+b+c+d)
f)
Quan tity
Rate
(Rs.)
0.00
247.05
Amount
(Rs.)
2,223.45
494.10
R.C.C M 25
Unit =cum
a)
Material
Cement
b)
e)
0.40
4,000.00
1,600.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
0.00
e)
Overheads @ 0% on (a+b+c+d)
0.00
f)
282.05
2,538.45
Note: This analysis will hold good for concrete of nominal mix 1:1:3 also
III.
R.C.C. Grade M 30
Unit =cum
a)
Material
Cement
Sand
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
0.43
4,000.00
1,720.00
cum
0.45
190.00
85.50
SE.,Circle, Barmer
305
Sr.
No.
Unit
Quan tity
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Reference to
MORD specifications
Description
b)
c)
Rate
(Rs.)
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
24.00
0.00
300.05
13.2
1000
Amount
(Rs.)
2,700.45
Material
HYSD bars including 5 per cent for laps and wastage
Binding wire
b)
EE.,Dn.I,BMR
kg
8.00
33.00
264.00
Mate
day
0.44
100.00
44.00
Blacksmith
day
3.00
120.00
360.00
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
306
Sr.
No.
Reference to
MORD specifications
Description
Mazdoor (Unskilled)
c)
Overheads @ 0% on (a+b)
d)
Unit
Quan tity
day
8.00
Rate
(Rs.)
80.00
1000
640.00
0.00
4,232.25
Amount
(Rs.)
38,090.25
Material
TMT bars including 5 per cent for laps and wastage
Binding wire
b)
kg
8.00
33.00
264.00
Mate
day
0.44
100.00
44.00
Blacksmith
day
3.00
120.00
360.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
c)
Overheads @ 0% on (a+b)
0.00
d)
4,494.75
1000
40,452.75
Material
MS bars including 5 per cent for laps and wastage
Binding wire
b)
EE.,Dn.I,BMR
kg
8.00
33.00
264.00
Mate
day
0.44
100.00
44.00
Blacksmith
day
3.00
120.00
360.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
c)
Overheads @ 0% on (a+b)
d)
TA to SE Circle BMR
0.00
AAO.,Circle, Barmer
3,838.50
SE.,Circle, Barmer
307
Sr.
No.
Reference to
MORD specifications
Unit
Description
Quan tity
Rate
(Rs.)
800
Amount
(Rs.)
34,546.50
Unit = cum
a)
Material
Cement
0.43
4,000.00
1,720.00
Sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
0.075 32,550.00
2,441.25
c)
kg
0.01
33.00
0.33
Mate
day
0.10
100.00
10.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
3.00
80.00
240.00
Bhisti
day
0.27
90.00
24.30
Blacksmith
day
0.30
120.00
36.00
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
800
138.05
0.00
636.95
5,732.58
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
308
Sr.
No.
Reference to
MORD specifications
Description
Unit
Quan tity
cum
6.25
Rate
(Rs.)
Amount
(Rs.)
Span = 48 m
a)
M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 =
0.069 sqm
Concrete in vertical posts = 0.069 x28x1.00 = 1.932 cum
Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum
b)
c)
Overheads @ 0% on (a+b)
d)
2,501.21 15,637.58
67,393.77
1,404.04
Material
Cement
b)
c)
0.40
4,000.00
1,600.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.12
180.00
21.60
Mazdoor (Unskilled)
day
1.73
80.00
138.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
EE.,Dn.I,BMR
Formwork @ 12%
TA to SE Circle BMR
244.81
AAO.,Circle, Barmer
SE.,Circle, Barmer
309
Sr.
No.
Reference to
MORD specifications
Unit
Description
Quan tity
Rate
(Rs.)
Total (a+b+c+d)
Note:
13.7
1200
Amount
(Rs.)
2,501.21
b)
Material
1)
IS MC 100=2.806x1.05=2.946 t
2)
3)
MS bars = 0.17x1.05=0.18 t
0.18 28,000.00
5,040.00
4)
0.15 60,000.00
9,000.00
Labour
Mate
day
2.80
100.00
280.00
Blacksmith
day
30.00
120.00
3,600.00
Mazdoor (Unskilled)
day
40.00
80.00
3,200.00
c)
Add 5 per cent of (a) for painting one shop coat with red
oxide primer and three coats of synthetic enamel paint
and consumables @ 5% on (a)
7,232.70
d)
1,446.54
e)
1,446.54
f)
Overheads @ 0% on (a+b+c+d+e)
g)
0.00
20,232.47
1,820.92
Note: A typical drawing for MS railing has been followed for estimate
purpose. Rate may be worked out as per design to be followed
13.8
1200
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
310
Sr.
No.
Reference to
MORD specifications
Unit
Description
Quan tity
Rate
(Rs.)
Amount
(Rs.)
Unit = Running m
Taking output = 2 x 10 m = 20 m
a)
Material
i)
0.13 33,000.00
4,290.00
60.00
180.00 10,800.00
20 x 3 = 60 m
iii)
b)
0.05 60,000.00
Add @ 5 per cent of (a) for painting one shop coat with
red oxide primer and three coats of synthetic enamel
paint and consumables
904.50
180.90
Labour
Mate
day
0.56
100.00
56.00
Blacksmith
day
6.00
120.00
720.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
c)
Overheads @ 0% on (a+b)
0.00
d)
2,573.93
23,165.33
600
3,000.00
1,158.27
b)
EE.,Dn.I,BMR
Material
Bricks
Nos.
500.00
1.80
900.00
cum
0.24
2,312.20
554.93
Mate
day
0.09
100.00
9.00
day
0.80
180.00
144.00
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
311
Sr.
No.
Unit
Quan tity
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Reference to
MORD specifications
Description
c)
Overheads @ 0% on (a+b)
d)
Rate
(Rs.)
0.00
219.24
1200
Amount
(Rs.)
1,973.17
b)
Material
i)
kg
4.00
40.00
160.00
ii)
1.00
200.00
200.00
Mate
day
0.02
100.00
2.00
day
0.02
120.00
2.40
Mazdoor (Unskilled)
day
0.20
80.00
16.00
Mate
day
0.01
100.00
1.00
day
0.01
180.00
1.80
Mazdoor (Unskilled)
day
0.20
80.00
16.00
Labour
For fabrication
1.96
c)
Overheads @ 0% on (a+b)
0.00
d)
50.15
800
451.31
Material
Cement
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
0.275
4,000.00
1,100.00
SE.,Circle, Barmer
312
Sr.
No.
Unit
Quan tity
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.08
100.00
8.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Reference to
MORD specifications
Description
b)
c)
Rate
(Rs.)
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
Overheads @ 0% on (a+b+c)
e)
0.00
208.79
Amount
(Rs.)
1,879.09
Material
Cement
b)
EE.,Dn.I,BMR
0.275
4,000.00
1,100.00
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.48
310.00
148.80
20 mm aggregate
cum
0.24
390.00
93.60
10 mm aggregate
cum
0.08
400.00
32.00
Mate
day
0.09
100.00
9.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
Bhisti
day
0.27
90.00
24.30
Labour
c)
Overheads @ 0% on (a+b)
d)
TA to SE Circle BMR
0.00
AAO.,Circle, Barmer
209.61
SE.,Circle, Barmer
313
Sr.
No.
Reference to
MORD specifications
Unit
Description
Quan tity
Rate
(Rs.)
800
Amount
(Rs.)
1,886.51
Material
Reinforced cement concrete M 25 grade
Rate as per Item 13.1 II
cum
1.00
2,538.45
2,538.45
0.05 38,090.25
1,904.51
HYSD reinforcement
Rate per item 13.2
1200
4,442.96
Unit = Running m
Taking output = 7.5 m
a)
Material
Supply of elastomeric slab seal expansion joint assembly
manufactured by using chloroprene elastomer for elastomeric
slab unit conforming to Clause 915.1 of IRC:83 (Part II)
complete as per approved drawings and specifications. Add 5
per cent of cost of material for anchorage reinforcement,
welding and other incidentals.
b)
EE.,Dn.I,BMR
7.50
7,680.00 57,600.00
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
0.70
80.00
56.00
Mazdoor (skilled)
day
0.40
100.00
40.00
Labour
c)
Overheads @ 0% on (a+b)
17,310.00
d)
9,376.25
84,386.25
11,251.50
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
314
Sr.
No.
Reference to
MORD specifications
Description
Unit
Quan tity
kg
293.00
Rate
(Rs.)
Amount
(Rs.)
Note: For this specialised item, overhead cost is assumed as 30 per cent
13.14
1200
Unit = Running m
Taking ourtput = 7.5 m
a)
Material
Galvanised angle section 100 mm x 100 mm of 12 mm
thickness weldable structural steel as per IS:2062, 2 Nos. of
7.5 m length each @ 17.7 kg/m and 5 per cent wastage.
40.00 11,720.00
Add 5 per cent of cost of above for structural steel for welding
and other incidentals.
Preformed continuous chlorprene elastomer or closed cell
foam sealing element with high tear strength, vulcanised in a
single operation for the full length of a joint to ensure water
tightness.
586.00
m
7.50
100.00
750.00
Add 1 per cent of cost of sealing element for lubricant-cumadhesive and other consumables.
b)
Labour
Mate
day
0.024
100.00
2.40
Mazdoor (Skilled)
day
0.20
100.00
20.00
Mazdoor (Unskilled)
day
0.40
80.00
32.00
c)
Overheads @ 0% on (a+b)
0.00
d)
EE.,Dn.I,BMR
1,967.69
TA to SE Circle BMR
1,639.74
14,757.64
7.50
AAO.,Circle, Barmer
SE.,Circle, Barmer
315
Sr.
No.
Reference to
MORD specifications
13.15
1200
Description
Unit
Quan tity
kg
150.00
Rate
(Rs.)
Amount
(Rs.)
Unit = Running m
Taking output = 7.5 m
a)
Material
Galvanised M.S. plate 200 mm wide 12 mm thick @ 94.20
kg/sqm including 5 per cent wastage.
40.00
6,000.00
60.00
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Skilled)
day
0.25
100.00
25.00
Mazdoor (Unskilled)
day
0.15
80.00
12.00
c)
Overheads @ 0% on (a+b)
0.00
d)
762.25
6,860.25
1200
914.70
Filler Joint
I)
Material
Copper plate - 7.5 m long x 250 mm wide
kg
34.00
350.00 11,900.00
EE.,Dn.I,BMR
Labour
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
316
Sr.
No.
Unit
Quan tity
Mate
day
0.02
100.00
2.00
Mazdoor (Unskilled)
day
0.35
80.00
28.00
Mazdoor (Skilled)
day
0.35
100.00
35.00
Reference to
MORD specifications
Description
Rate
(Rs.)
Amount
(Rs.)
c)
Overheads @ 0% on (a+b)
0.00
d)
1,495.63
13,460.63
1,794.75
Material
20 mm thick compressible fibre board 7.5 m long and sqm
250 mm deep
1.875
400.00
750.00
Labour
For carrying, placing and fixing
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.10
80.00
8.00
Mazdoor (Skilled)
day
0.10
100.00
10.00
c)
Overheads @ 0% on (a+b)
0.00
d)
96.13
865.13
4.61
EE.,Dn.I,BMR
Material
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
317
Sr.
No.
Unit
Quan tity
sqm
2.25
400.00
900.00
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.13
80.00
10.40
Mazdoor (Skilled)
day
0.07
100.00
7.00
Reference to
MORD specifications
Description
Rate
(Rs.)
Amount
(Rs.)
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
114.80
1,033.20
4.59
Material
Sand
cum
0.008
110.00
0.88
0.0007 31,700.00
22.19
Labour
Mate
day
0.02
100.00
2.00
Mazdoor (Skilled)
day
0.50
100.00
50.00
Mazdoor (Unskilled)
day
0.10
80.00
8.00
c)
Overheads @ 0% on (a+b)
0.00
d)
10.38
93.45
12.46
Note: For arriving at the final rate for filler joints per m length and per cm
depth of joint filling compound, the rates of Sr. Nos (i), (ii), (iii) and
(iv) shall be added.
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
318
Sr.
No.
Reference to
MORD specifications
13.17
700
Unit
Description
II.
800
sqm
254.66
sqm
726.38
cum
1,887.64
cum
1,880.21
II.
1200
1,852.03
13.21
cum
13.20
1,635.12
600
cum
13.19
Amount
(Rs.)
600
Rate
(Rs.)
13.18
Quan tity
sqm
ii.
Rate for seal coat Type B as per item No. 5.12 of Chapter 5
sqm
1200
EE.,Dn.I,BMR
cum
ii.
sqm
iii.
sqm
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
319
Sr.
No.
Reference to
MORD specifications
13.23
600
Unit
Quan tity
Nos.
525.00
1.80
945.00
cum
0.24
1,802.70
432.65
Mate
day
0.20
100.00
20.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
day
2.00
180.00
360.00
Bhisti
day
0.08
90.00
7.20
Description
Rate
(Rs.)
Amount
(Rs.)
b)
Material
Labour
c)
d)
Overheads @ 0% on (a+b+c)
e)
2,082.13
0.00
496.87
13.24
700
4,471.85
In case special arch bricks are used, the quantity of bricks per
cum shall be taken as 580 Nos.
Unit = cum
a)
EE.,Dn.I,BMR
Material
Stone for CR masonry 1st sort
cum
1.10
300.00
330.00
Nos.
7.00
10.00
70.00
cum
0.30
1,802.70
540.81
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
320
Sr.
No.
Unit
Quan tity
Mate
day
0.25
100.00
25.00
day
3.00
180.00
540.00
Mazdoor (Unskilled)
day
2.10
80.00
168.00
Bhisti
day
0.08
90.00
7.20
Reference to
MORD specifications
Description
b)
Rate
(Rs.)
Labour
c)
d)
Overheads @ 0% on (a+b+c)
e)
1,681.01
0.00
420.25
13.25
800
Amount
(Rs.)
3,782.27
In case cement mortar 1:3 is used, rate for the same shall be
as per item 11.5 I.
Material
Cement
b)
c)
0.35
4,000.00
1,400.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
310.00
167.40
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.20
180.00
36.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
321
Sr.
No.
Reference to
MORD specifications
Unit
Description
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
Quan tity
Rate
(Rs.)
1,016.60
0.00
381.23
3,431.03
RCC Grade M 25
a)
Material
Cement
b)
c)
0.40
4,000.00
1,616.00
Coarse sand
cum
0.45
190.00
85.50
20 mm aggregate
cum
0.54
390.00
210.60
10 mm aggregate
cum
0.36
400.00
144.00
Mate
day
0.08
100.00
8.00
day
0.20
180.00
36.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Labour
Machinery
Concrete mixer 0.4/0.28 cum capacity
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
13.26
1200
EE.,Dn.I,BMR
Amount
(Rs.)
1,146.20
0.00
429.83
3,868.43
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
322
Sr.
No.
Reference to
MORD specifications
Unit
Description
A)
Quan tity
Rate
(Rs.)
Amount
(Rs.)
Steel section
Unit = quintal
Taking output for a typical 6 m long built up section comprising
of of R.S.Js, with connecting plates with shear connectors
a)
Material
R.S.Js 350 m x 200 mm @ 56.9 kg/m
6.0 m x 56.9 kg = 341.4 kg
Add 5 per cent for wastage = 17.87 kg
Total = 358.47 kg
25 cm wide x 12 mm thick plate
4x6x8.25 = 565.25 kg
Wastage 5 per cent = 28.3 kg
Total = 593.54 kg
Add shear connectors @ 10% = 59 kg
Total = 358.47 +593.5+59 =
1011 kg
Steel fabricated section
10.11
3,300.00 33,363.00
0.454
6,000.00
1,804.35
Labour
Fitter
day
6.00
150.00
900.00
Blacksmith
day
6.00
120.00
720.00
Mazdoor (Unskilled)
day
12.00
80.00
960.00
c)
Overheads @ 0% on (a+b)
0.00
d)
EE.,Dn.I,BMR
2,724.00
TA to SE Circle BMR
5,058.92
45,530.27
AAO.,Circle, Barmer
SE.,Circle, Barmer
323
Sr.
No.
Reference to
MORD specifications
Unit
Description
Quan tity
Rate
(Rs.)
i)
ii)
iii)
Amount
(Rs.)
4,503.49
day
0.01
100.00
1.00
Mazdoor (Skilled)
day
0.06
100.00
6.00
Mazdoor (Unskilled)
day
0.24
80.00
19.20
vii) The provision of 10 per cent for shear connectors in the typical
case is tentative. The quantity shall be worked out as per
design.
viii) The cost of painting can also be analysed in detail in
accordance with item 10.6 of Chapter 10
EE.,Dn.I,BMR
TA to SE Circle BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
324
Chapter 14
PROTECTION WORKS
Sr.
No.
Reference to
MORD specifica- tions
Description
14.1
1300
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Unit = cum
a)
b)
Material
Stone boulder (25 kg minimum)
cum
1.00
150.00
150.00
Stone spalls
cum
0.20
100.00
20.00
Mate
day
0.04
100.00
4.00
day
0.35
180.00
63.00
Mazdoor (Unskilled)
day
0.75
80.00
60.00
Labour
c)
Overheads @ 0% on (a+b)
0.00
d)
37.13
14.2
334.13
Note:
1300
Material
Stone boulder (25 kg minimum)
cum
5.63
150.00
844.50
Stone spalls
cum
1.13
100.00
113.00
kg
64.00
day
0.18
Labour
Mate
EE.,Dn.I, BMR
38.00 2,432.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
100.00
SE.,Circle, Barmer
18.00
325
Sr.
No.
Reference to
MORD specifica- tions
Description
Unit
Quantity
Rate
(Rs.)
day
1.50
100.00
150.00
Mazdoor (Unskilled)
day
3.00
80.00
240.00
Add for labour for weaving the wire crates @ 2 per cent of cost
of GI wire
8.16
c)
Overheads @ 0% on (a+b)
0.00
d)
475.71
4,281.37
14.3
1300
(Rs.)
Mazdoor (Skilled)
Note:
Amount
760.46
Concrete grade M 15
(Rate as per item No 11.4 II (i)
cum
39.09
1300
1,993.34
A)
Deleted
Materials
2nd Class Bamboo 65 mm to 75 mm dia, (1.2 m to 3.0 m) nos.
EE.,Dn.I, BMR
Binding Wire
kg
LS
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
15.00
40.00
600.00
0.15
85.00
12.75
10.00
SE.,Circle, Barmer
326
Sr.
No.
Reference to
MORD specifica- tions
Description
b)
B)
Rate
(Rs.)
Amount
(Rs.)
Labour
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
c)
LS
d)
Overheads @ 0% on (a+b+c)
e)
10.00
0.00
89.59
806.34
268.78
b)
1300
Quantity
Mate
a)
14.5
Unit
nos.
14.00
35.00
490.00
Binding Wire
kg
0.15
33.00
4.95
LS
10.00
Labour
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
c)
Sundries
LS
d)
Overheads @ 0% on (a+b+c)
e)
10.00
0.00
74.87
673.82
224.61
I.
Stone/Boulder
Unit = cum
a)
EE.,Dn.I, BMR
Material
Stone boulder (25 kg minimum)
cum
1.00
150.00
150.00
cum
0.20
100.00
20.00
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
327
Sr.
No.
Reference to
MORD specifica- tions
Description
b)
Unit
Quantity
Rate
(Rs.)
(Rs.)
Labour
Mate
day
0.04
100.00
4.00
day
0.35
180.00
63.00
Mazdoor (Unskilled)
day
0.75
80.00
60.00
c)
Overheads @ 0% on (a+b)
d)
0.00
37.13
Amount
334.13
Concrete grade M 15
(Rate as per item No. 11.4 II (i)except that the size of
aggregate shall be 20 mm & down
cum
39.09
1,993.34
b)
Material
Bricks
Nos. 500.00
1.80
900.00
cum
0.24 1,802.70
432.65
Mate
day
0.10
100.00
10.00
day
0.80
180.00
144.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
c)
Overheads @ 0% on (a+b)
d)
1300
0.00
204.08
1,836.73
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
328
Sr.
No.
Reference to
MORD specifica- tions
Description
a)
Quantity
Rate
(Rs.)
1.20
250.00
300.00
Mate
day
0.05
100.00
5.00
Mazdoor (Skilled)
day
0.25
100.00
25.00
Mazdoor (Unskilled)
day
1.02
80.00
81.60
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
51.45
463.05
Note:
1300
(Rs.)
cum
14.7
Amount
Material
Graded stone aggregate of required size
b)
Unit
Material
i.
cum
0.33 2,312.20
763.03
ii.
cum
b)
iii.
cum
1.00
160.00
160.00
iv.
Stone spalls
cum
0.20
100.00
20.00
Mate
day
0.08
100.00
8.00
day
0.50
180.00
90.00
Mazdoor (Unskilled)
day
1.50
80.00
120.00
Labour
c)
Overheads @ 0% on (i+ii+iii+a+b)
d)
EE.,Dn.I, BMR
27.25
TA to SE.,Circle, BMR
0.00
393.78
3,544.03
AAO.,Circle, Barmer
SE.,Circle, Barmer
329
Sr.
No.
Reference to
MORD specifica- tions
Note:
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
cum
cum
39.09
3,947.59
b.
Material
Bricks
Nos
500.00
1.80
900.00
cum
0.15 2,312.20
346.83
cum
0.25 1,522.70
380.68
Mate
day
0.10
100.00
10.00
day
0.80
180.00
144.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
Labour
c)
Overheads @ 0% on (a+b)
d)
0.00
240.94
1303
2,168.44
b)
EE.,Dn.I, BMR
Material
Stone for rubble flooring 150 mm thick
cum
1.00
160.00
160.00
Stone spalls
cum
0.20
100.00
20.00
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
330
Sr.
No.
Reference to
MORD specifica- tions
Description
Unit
Quantity
Rate
(Rs.)
1300
(Rs.)
Mate
day
0.10
100.00
10.00
day
0.50
180.00
90.00
Mazdoor (Unskilled)
day
1.50
80.00
120.00
2.20
c)
Overheads @ 0% on (a+b)
0.00
d)
50.28
Amount
452.48
II.
cum
cum
cum
Stone boulder
cum
1.00
150.00
150.00
Stone spalls
cum
0.20
100.00
20.00
Mate
day
0.05
100.00
5.00
day
0.25
180.00
45.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
III.
Note:
14.10
1300
b)
EE.,Dn.I, BMR
Material
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
331
Sr.
No.
Reference to
MORD specifica- tions
Description
Unit
Quantity
Rate
(Rs.)
1300
(Rs.)
3.00
c)
Overheads @ 0% on (a+b)
0.00
d)
37.88
Amount
340.88
b)
Material
Stone for RR masonry
cum
1.00
160.00
160.00
Nos.
7.00
10.00
70.00
cum
0.33 1,522.70
502.49
Mate
day
0.12
100.00
12.00
day
1.20
180.00
216.00
Mazdoor (Unskilled)
day
1.80
80.00
144.00
Bhisti
day
0.08
90.00
7.20
Labour
Overheads @ 0% on (a+b)
d)
55.58
0.00
145.91
1,313.18
For height less than 3 m, dry rubble masonry can also be used. In
that case, the sub-item of cement mortar may be omitted in the
analysis.
II.
Material
Brick
Nos. 500.00
cum
1.80
900.00
0.24 1,802.70
432.65
EE.,Dn.I, BMR
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
332
Sr.
No.
Reference to
MORD specifica- tions
Description
b)
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
Labour
Mate
day
0.09
100.00
9.00
day
0.80
180.00
144.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
Bhisti
day
0.20
90.00
18.00
c)
Overheads @ 0% on (a+b)
d)
0.00
203.96
1,835.60
Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a)
Material
Cement
Sand
b)
cum
1.05
190.00
199.50
Mate
day
0.04
100.00
4.00
Mazdoor (Unskilled)
day
0.90
80.00
72.00
Bhisti
day
0.08
90.00
7.20
Labour
1,802.70
I.
P.C.C grade M 20
(i)
Material
Cement
b)
EE.,Dn.I, BMR
Coarse sand
cum
0.48
190.00
91.20
40 mm aggregate
cum
0.576
310.00
178.56
20 mm aggregate
cum
0.288
390.00
112.32
10 mm aggregate
cum
0.096
400.00
38.40
Labour
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
333
Sr.
No.
Reference to
MORD specifica- tions
Description
c)
Quantity
Rate
(Rs.)
Amount
(Rs.)
Mate
day
0.08
100.00
8.00
day
0.10
180.00
18.00
Mazdoor (Unskilled)
day
1.63
80.00
130.40
Bhisti
day
0.27
90.00
24.30
hour
0.40
60.00
24.00
Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity
fitted with water measuring device and preferably
also with load cell.
d)
e)
Overheads @ 0% on (a+b+c+d)
f)
EE.,Dn.I, BMR
Unit
TA to SE.,Circle, BMR
AAO.,Circle, Barmer
65.01
0.00
211.27
1,901.46
SE.,Circle, Barmer
334
Chapter 15
MAINTENANCE OF ROADS
Sr.
No.
Reference to
MORD Specifica
tions
15.1
1900
Unit
Quantity
Mate
day
0.24
100.00
24.00
Mazdoor (Unskilled)
day
6.00
80.00
480.00
hour
3.00
40.00
120.00
cum
7.50
0.00
0.00
Description
Rate
(Rs.)
Amount
(Rs.)
Manual Means
Unit = cum
Taking output = 10 cum
a)
b)
Labour
Machinery
Plate compactor
c)
Materials
Compensation for earth Taken from private land
d)
Overheads @ 0% on (a+b)
e)
0.00
78.00
702.00
70.20
Mechanical Means
Unit = cum
Taking output = 50 cum
a)
b.
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
hour
0.83
1,400.00
1,162.00
Machinery
Hydraulic Excavator 0.9 cum bucket capacty @ 60
cum/h
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
335
Sr.
No.
Reference to
MORD Specifica
tions
Description
Tipper 5.5 cum, 10 t capacity
Unit
Quantity
hour
2.27
Rate
(Rs.)
450.00
Amount
(Rs.)
1,021.50
0.00
hour
15.00
40.00
600.00
cum
37.50
0.00
0.00
Materials
Compensation for earth taken from private land
d.
Overheads @ 0% on (a+b+c)
e.
0.00
452.94
4,076.44
81.53
Note: Only 75% of fresh material has been provided as 25% can be
retrieved from site from earth i.e. flown down the slop in the form of
slurry and deposited at the foot of rain cuts.
15.2
1900
1.
b.
Labour
Mate
day
0.20
100.00
20.00
Mazdoor (Unskilled)
day
5.00
80.00
400.00
hour
0.25
1,400.00
350.00
hour
0.68
450.00
306.00
Machinery
hour
4.00
40.00
160.00
cum
15.00
0.00
0.00
Material
Compensation of earth
EE.,Dn.I, BMR
0.00
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
336
Sr.
No.
Reference to
MORD Specifica
tions
Description
Unit
d.
Overheads @ 0% on (a+b+c)
e.
Quantity
Rate
(Rs.)
Amount
(Rs.)
0.00
154.50
1,390.50
13.91
Unit = sqm
Taking output = 100 sqm
Assuming height of stripping as 75 mm
Quantity of earth cutting involved = 7.5 cum
a.
b.
Labour
Mate
day
0.10
100.00
10.00
Mazdoor (Unskilled)
day
2.50
80.00
200.00
hour
4.00
40.00
160.00
Machinery
Plate compactor
c.
Overheads @ 0% on (a+b)
0.00
d.
46.25
416.25
4.16
1900
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
337
Sr.
No.
Unit
Quantity
Mate
day
0.80
100.00
80.00
Mazdoor (Unskilled)
day
20.00
80.00
1,600.00
hour
4.00
170.00
680.00
hour
2.00
194.00
388.00
hour
4.00
700.00
2,800.00
hour
4.00
400.00
1,600.00
hour
4.00
160.00
640.00
Tonne
0.168 24,500.00
4,116.00
Tonne
0.064 24,500.00
1,568.00
Tonne
Reference to
MORD Specifica
tions
Description
a)
b)
c)
Rate
(Rs.)
Amount
(Rs.)
Labour
Machinery
Material
Primer with bitumen emulsion @ 9 kg/10 sqm 187.5x9 =
168.75 kg.
Tack coat with bitumen emulsion @ 3.0 kg/ 10 sqm
Bottom = 187.5
Sides = 28.27
Total = 215.77
Bitumen for BM @ 3.5% by weight of mix
= 30.94 x 3.5 / 100 = 1.082
Weight of mix (BM) 14.06 cum = (30.94 tonne)
Weight of Bitumen = 1.082
Weight of aggregate 30.94 -1.082 = 29.86
Taking density of aggregate 1.5 t per cum
Volume of aggregate 29.86 / 1.5 = 19.90 cum
Grading (1) (40 mm nominal size)
37.5 - 25 mm 15%
cum
2.985
365.00
1,089.53
25 - 10 mm 45%
cum
8.96
370.00
3,313.35
10 - 5 mm 25%
cum
4.975
230.00
1,144.25
cum
2.99
140.00
417.90
d)
Overheads @ 0% on (a+b+c)
0.00
e)
EE.,Dn.I, BMR
TA to SE Circle,BMR
6,419.50
57,775.53
AAO.,Circle, Barmer
SE.,Circle, Barmer
338
Sr.
No.
Reference to
MORD Specifica
tions
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
4,109.21
b)
c)
Labour
Mate
day
0.64
100.00
256.00
Mazdoor (Unskilled)
day
16.00
80.00
1,280.00
hour
2.00
400.00
800.00
hour
2.00
700.00
1,400.00
hour
4.00
160.00
640.00
Machinery
Material
Bitumen for pre-mix carpet @ 14.60 kg/10 sqm
200x14.60/10 =292 kg
tonne
0.292 29,500.00
8,614.00
tonne
0.04 24,500.00
980.00
tonne
0.136 29,500.00
4,012.00
cum
5.40
305.00
1,647.00
cum
1.20
125.00
150.00
Overheads @ 0% on (a+b+c)
0.00
e)
2,472.38
22,251.38
Rate/sqm = a+b+c+d+e/200
iii.
111.26
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
339
Sr.
No.
Unit
Quantity
Mate
day
0.80
100.00
80.00
Mazdoor (Unskilled)
day
20.00
80.00
1,600.00
hour
2.00
194.00
388.00
hour
2.00
700.00
1,400.00
hour
2.00
400.00
800.00
hour
4.00
160.00
640.00
tonne
0.064 24,500.00
1,568.00
0.29 24,500.00
7,154.00
tonne
0.14 24,500.00
3,332.00
cum
5.40
305.00
1,647.00
cum
1.20
125.00
150.00
Reference to
MORD Specifica
tions
Description
a)
b)
c)
Rate
(Rs.)
Labour
Machinery
Material
Bitumen for tack coat @ 3kg per 10 sqm 200 x 3 / 10 =
60 kg
d)
Overheads @ 0% on (a+b+c)
0.00
e)
2,344.88
21,103.88
Amount
(Rs.)
105.52
Unit = sqm
Taking output = 200 sqm
a)
b)
Labour
Mate
day
0.64
100.00
64.00
Mazdoor (Unskilled)
day
16.00
80.00
1,280.00
hour
2.50
60.00
150.00
Machinery
Concrete mixer 0.4 / 0.28 cum capacity
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
340
Sr.
No.
Unit
Quantity
hour
2.00
194.00
388.00
hour
2.00
700.00
1,400.00
hour
4.00
160.00
640.00
tonne
0.06 24,500.00
1,470.00
tonn
tonn
0.20 24,500.00
4,900.00
cum
5.40
305.00
1,647.00
cum
1.20
125.00
150.00
Reference to
MORD Specifica
tions
Description
c)
Rate
(Rs.)
Materials
d)
Overheads @ 0% on (a+b+c)
0.00
e)
2,828.00
25,452.00
1900
Amount
(Rs.)
127.26
Unit = sqm
Taking out put @ 5% of the area in one km. as affected:
= 1000 x 3.75x0.05 / 100 = 187.5 Sqm
Quantity = 187.5 x 0.15 = 28.12 cum
a)
cum
b)
28.12
176.73
4,969.65
2,484.82
7,454.47
39.76
Note: The cost of 25% retrived material may be deducted from rates.
15.5
1900
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
341
Sr.
No.
Reference to
MORD Specifica
tions
Description
Unit
Quantity
cum
14.06
Rate
(Rs.)
Amount
(Rs.)
b)
590.38
8,300.67
4,150.34
12,451.01
66.41
Note: The cost of 25% retrived material may be deducted from rates.
15.6
1900
Maintenance of Drains
The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains as well as
catch water drains as per technical specification Clause 1907.
Labour
Mate
day
0.32
100.00
32.00
Mazdoor (Unskilled)
day
8.00
80.00
640.00
b)
Overheads @ 0% on (a)
0.00
c)
84.00
756.00
1900
(I)
0.76
Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of Clearing,
Cleaning, Erosion repair, repairs to cracks, parapet wall and
protection work as per drawing and technical specification
Clause 1908
Unit = One No. Hume pipe (1000 mm dia)
Taking output = One No.H.P. Culvert
a)
EE.,Dn.I, BMR
Labour
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
342
Sr.
No.
Unit
Quantity
Mate
day
0.10
100.00
10.00
Mazdoor (Unskilled)
day
1.00
80.00
80.00
day
1.40
150.00
210.00
Reference to
MORD Specifica
tions
Description
b)
Amount
(Rs.)
Material
Cement, Sand, Brick, Boulder etc.
(II)
Rate
(Rs.)
L.S
200.00
c)
Overheads @ 0% on (a)
0.00
d)
62.50
562.50
562.50
b)
Labour
Mate
day
0.20
100.00
20.00
Mazdoor (Unskilled)
day
4.00
80.00
320.00
day
1.00
150.00
150.00
Material
Cement, Sand, Bricks, Stone Boulder etc.
15.8
1900
c)
Overheads @ 0% on (a)
d)
L.S
500.00
0.00
123.75
1,113.75
1,113.75
Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs,
replacing Guide Posts, repair of flood gauges, removal of debris,
providing boulders and protection work and painting as per technical
specification Clause 1909
Unit = One metre
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
343
Sr.
No.
Unit
Quantity
Mate
day
0.80
100.00
80.00
Mazdoor (Unskilled)
day
1.60
80.00
128.00
day
4.00
180.00
720.00
Reference to
MORD Specifica
tions
Description
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Material
Supply of cement, paint, sand, aggregate, boulder etc.
LS
350.00
(LS Rs.350.00)
c)
Overheads @ 0% on (a)
0.00
d)
159.75
1,437.75
1900
28.76
b)
Labour
Mate
day
0.09
100.00
9.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
day
0.125
150.00
18.75
Material
Synthetic Enamel Paint, Engineering grade tape, welding
machine etc. (LS Rs.300)
15.10
1900
EE.,Dn.I, BMR
c)
Overheads @ 0% on (a)
d)
LS
300.00
0.00
60.97
548.72
548.72
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
344
Sr.
No.
Unit
Quantity
Mate
day
0.024
100.00
2.40
Mazdoor (Unskilled)
day
0.30
80.00
24.00
day
0.10
150.00
15.00
Blacksmith
day
0.20
120.00
24.00
0.039 33,000.00
1,287.00
0.001 60,000.00
60.00
Reference to
MORD Specifica
tions
Description
(i)
Rate
(Rs.)
Amount
(Rs.)
b)
Labour
Materials
Mild steel (structural steel)
ISMC = 0.029T
MS plate = 0.01
Nuts and bolts
c)
Machinery
Welding set (LS Rs.100.00)
LS
d)
Overheads @ 0% on (a+b+c)
e)
100.00
0.00
189.05
1,701.45
170.15
Labour
Mate
EE.,Dn.I, BMR
TA to SE Circle,BMR
day
AAO.,Circle, Barmer
0.012
100.00
SE.,Circle, Barmer
1.20
345
Sr.
No.
Unit
Quantity
Mazdoor (Unskilled)
day
0.20
80.00
16.00
day
0.10
180.00
18.00
cum
0.10
2,700.45
270.05
0.013 38,090.25
495.17
Reference to
MORD Specifica
tions
Description
b)
Rate
(Rs.)
Amount
(Rs.)
Materials
M 30 grade cement concrete
Rate as per item no. 13.1 (III) of Chapter 13
Steel bars reinforcement
Rate as per item no.13.2 of Chapter 13
c)
Overheads @ 0% on (a)
0.00
d)
4.40
1900
804.82
(ii)
sqm
1.895
44.90
85.08
220.00
0.35
76.88
a)
EE.,Dn.I, BMR
per cm
height per
letter
Labour
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
346
Sr.
No.
Unit
Quantity
Mate
day
0.024
100.00
2.40
Mazdoor
day
0.50
80.00
40.00
day
0.10
180.00
18.00
Reference to
MORD Specifica
tions
Description
b)
Rate
(Rs.)
Amount
(Rs.)
Materials
Cement, sand, aggregates etc.
LS
100.00
(LS = Rs.100.00)
15.12
1900
c)
Overheads @ 0% on (a+b)
0.00
d)
20.05
342.41
342.41
(ii)
Labour
Mate
day
0.12
100.00
12.00
Mazdoor (Skilled)
day
1.00
100.00
100.00
Mazdoor (Unskilled)
day
2.00
80.00
160.00
b)
Overheads @ 0% on (a)
0.00
c)
34.00
306.00
30.60
Labour
Mate
EE.,Dn.I, BMR
TA to SE Circle,BMR
day
AAO.,Circle, Barmer
0.08
100.00
SE.,Circle, Barmer
8.00
347
Sr.
No.
Reference to
MORD Specifica
tions
Description
Mazdoor (Unskilled)
b)
Overheads @ 0% on (a)
c)
Unit
Quantity
day
2.00
Rate
(Rs.)
80.00
Amount
(Rs.)
160.00
0.00
21.00
189.00
1.89
Labour
Mate
day
0.40
100.00
40.00
Mazdoor (Unskilled)
day
10.00
80.00
800.00
b)
Overheads @ 0% on (a)
0.00
c)
105.00
945.00
1900
0.63
b)
Labour
Mate
day
0.01
100.00
1.00
Mazdoor (Unskilled)
day
0.143
80.00
11.43
White washer
day
0.143
100.00
14.29
quintel
0.045
200.00
9.00
Fevicol adhesive
kg
0.10
120.00
12.00
Indigo
kg
0.013
135.00
1.76
Materials
Lime
EE.,Dn.I, BMR
TA to SE Circle,BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
348
Sr.
No.
Reference to
MORD Specifica
tions
Description
Unit
Quantity
Rate
(Rs.)
Amount
(Rs.)
c)
Overheads @ 0% on (a)
0.00
d)
6.18
55.65
6.18
Note: For analysis of rates for maintenance works bitumen grade S-90 has
been taken. User may modify as per site requirement
15.14
1900
Tack coat
sqm
sqm
as relevant
Or
(iii)
sqm
EE.,Dn.I, BMR
TA to SE Circle,BMR
sqm
AAO.,Circle, Barmer
SE.,Circle, Barmer
349
BASIC RATES
(A) Labour
Sl. No.
Description of Labour
Unit
Rate (Rs.)
L-01
Bhisti
day
90.00
L-02
Bitumen Sprayer
day
100.00
L-03
Blacksmith
day
120.00
L-04
Blaster
day
150.00
L-05
day
200.00
L-06
Chips spreader
day
90.00
L-07
Chiseller
day
150.00
L-08
Dresser (Skilled)
day
200.00
L-09
Driller
day
150.00
L-10
Electrician
day
150.00
L-11
Fitter
day
150.00
L-12
day
180.00
L-13
day
150.00
L-14
Mate
day
100.00
L-15
Mazdoor (Unskilled)
day
80.00
L-16
day
90.00
L-17
Mazdoor (Skilled)
day
100.00
L-18
day
150.00
L-19
Plumber
day
150.00
L-20
Surveyor
day
170.00
L-21
White Washer
day
100.00
Overheads Charges
Please Enter
Please
/ Edit Enter
the Rate of the
Labour
Rate of L
Contractors profit
12.50
Please Enter
Please
/ EditEnter / Edit
the Rate of the
Labour
Rate of Labour
350
BASIC RATES
(C) Material
Sl. No.
Description
M-001
AC pipe 100 mm
M-002
Input
Unit Rates
(Rs.)
m
65.00
cum
315.00
M-003
cum
305.00
M-004
cum
115.00
M-005
cum
315.00
M-006
cum
280.00
M-007
cum
125.00
M-008
cum
230.00
M-009
cum
370.00
M-010
cum
365.00
M-011
cum
140.00
M-012
cum
230.00
M-013
cum
370.00
M-014
cum
140.00
M-015
Aggregate 10 mm
cum
400.00
M-016
Aggregate 20 mm
cum
390.00
M-017
Aggregate 40 mm
cum
310.00
M-018
cum
100.00
M-019
cum
95.00
M-020
cum
90.00
M-021
Aggregate-Grading I 90 mm to 45 mm(H.B.)
cum
145.00
M-022
Aggregate-Grading II 63 mm to 45 mm(H.B.)
cum
190.00
M-023
cum
320.00
M-024
cum
370.00
M-025
cum
330.00
M-025
sqm
4,500.00
M-026
Nos.
150.00
351
Sl. No.
Description
Input
Unit Rates
(Rs.)
M-027
No.
40.00
M-028
No.
50.00
M-028
No.
55.00
M-029
No.
60.00
M-028
No.
35.00
M-029
No.
40.00
M-030
Barbed wire
kg
45.00
M-031
Binding Material
cum
85.00
M-032
Binding wire
kg
33.00
M-033
tonne
34,900.00
M-034
tonne
36,000.00
M-035
tonne
37,000.00
M-036
Bitumen (S-65)
31,700.00
M-037
Bitumen (S-90)
29,500.00
M-038
25,000.00
M-039
24,500.00
M-040
Bituminous sealant
litre
100.00
M-041
Blasted rubble
cum
40.00
M-042
Blasting material
kg
55.00
M-043
No.
10.00
M-044
No.
1.80
M-045
Cement
M-046
Cement Primer
M-047
M-048
cum
M-049
sqm
400.00
M-050
Copper plate
kg
350.00
M-051
No.
25.00
M-052
kg
40.00
4,000.00
litre
20.00
100.00
-
352
Sl. No.
Description
Input
Unit Rates
(Rs.)
M-053
cum
55.00
M-054
hour
5.00
M-055
cum
125.00
M-056
Crushed Slag
cum
160.00
M-057
cum
305.00
M-058
cum
400.00
M-059
Crushed Stone Chipping 6.7 mm size 100% passing 11.2 mm and retained on
2.36 mm
cum
230.00
M-060
Crushed Stone Chipping 6.7 mm size 100% passing 9.5 mm and retained on
2.36 mm
cum
320.00
M-061
cum
320.00
M-062
cum
280.00
M-063
Curing compound
litre
40.00
M-064
Debonding strips
15.00
M-065
No.
20.00
M-066
No.
35.00
M-067
Nos.
7,680.00
M-068
Electric Detonator
each
10.00
M-069
Epoxy Paint
litre
300.00
M-070
Epoxy Primer
litre
250.00
M-071
Farmyard manure
cum
200.00
M-072
Fevicol adhesive
kg
120.00
M-073
Filter media
cum
200.00
M-074
cum
115.00
M-075
Galvanised angle
kg
40.00
M-076
kg
50.00
M-077
kg
120.00
M-078
200.00
M-079
GI Pipe 50 mm dia
150.00
M-080
GI wires
kg
38.00
353
Sl. No.
Description
Input
Unit Rates
(Rs.)
M-081
cum
250.00
M-082
Granular material (Natural occuring, soil gravel mixture / quarry waste, kankar,
laterite, dhandla
cum
95.00
M-083
cum
240.00
M-084
Indigo
kg
135.00
M-085
sqm
300.00
M-086
sqm
400.00
M-087
sqm
400.00
M-088
sqm
30.00
M-089
7.00
M-090
M-091
Lime
2,000.00
M-092
Lime putty
2,200.00
M-093
No.
300.00
M-094
cum
200.00
M-095
Loose stone
cum
100.00
M-096
MS clamps
Nos.
20.00
M-097
M-098
M-099
sqm
1,500.00
M-100
MS Sheet 2 mm thick
sqm
2,000.00
M-101
60,000.00
M-102
litre
150.00
M-103
Plasticizer
litre
60.00
M-104
sqm
2.70
M-105
Polythene Sheething
Nos.
4.50
M-106
cum
45.00
M-107
3,100.00
M-108
2,500.00
cum
t
kg
290.00
33,000.00
45.00
354
Sl. No.
Description
Input
Unit Rates
(Rs.)
M-109
1,800.00
M-110
1,500.00
M-111
1,400.00
M-112
3,900.00
M-113
3,100.00
M-114
2,200.00
M-115
1,700.00
M-116
1,600.00
M-117
Red-oxide Primer
litre
80.00
M-118
litre
160.00
M-119
Sand (Coarse)
cum
190.00
M-120
Sand (Fine)
cum
110.00
M-121
Seeds
kg
30.00
M-122
180.00
M-123
31,000.00
M-124
28,000.00
M-125
33,000.00
M-126
cum
150.00
M-127
cum
400.00
M-128
cum
390.00
M-129
cum
230.00
M-130
cum
300.00
M-131
cum
250.00
M-132
cum
160.00
M-133
No.
20.00
M-134
cum
175.00
M-135
cum
175.00
M-136
cum
150.00
M-137
cum
150.00
355
Sl. No.
Description
Input
Unit Rates
(Rs.)
M-138
Stone spall
cum
100.00
M-139
Traffic cones
No.
450.00
M-140
Water
kl
15.00
M-141
cum
70.00
M-142
cum
95.00
M-143
cum
100.00
M-144
cum
70.00
M-145
cum
95.00
M-146
cum
70.00
M-147
cum
85.00
M-148
cum
65.00
M-149
cum
100.00
M-150
cum
85.00
M-151
cum
65.00
M-152
cum
90.00
M-153
cum
85.00
M-154
cum
65.00
M-155
cum
70.00
M-156
cum
85.00
M-157
No.
10.00
M-158
cum
65.00
M-159
Aggregate-Grading II 63 mm to 45 mm(C.B.)
cum
290.00
M-160
550.00
M-161
800.00
M-162
each
5,000.00
M-163
each
4,600.00
M-164
each
4,400.00
M-165
each
4,400.00
M-166
kg
32.00
356
Sl. No.
Description
M-167
Input
Unit Rates
(Rs.)
sqm
900.00
356
BASIC RATES
(B) USAGE RATES OF PLANT & MACHINERY
Sr. No.
Output of
Machine
Description of
Machine
Activity
Unit
PM-001
Supplying
compressed air
cfm
194.00
PM-002
t/h
8,800.00
PM-003
t/h
6,200.00
PM-004
Heating of bitumen
60.00
litre / h
80.00
sqm/h
700.00
cum/h
60.00
per hour
500.00
Mixing of ingradients
PM-007
Crane upto 8T
Lifting of materials
Dozer D 50
Dozing cutting
PM-008
cum/h
200.00
750.00
per hour
cum/h
100.00
750.00
In Rock cutting
cum/h
30.00
1,200.00
KVA
PM-009
Electricity generation
PM-010
Spraying of Emulsion
Rate
litre / h
PM-006
PM-011
Unit
Heating of bit
1000 litre
PM-005 Bitumen emulsion pressure distributor
Output
Loading Aggregates
cum/h
510.00
per hour
700.00
45.00
300.00
per hour
Loading Soil
cum/h
100.00
300.00
PM-012
Surface cleaning
sqm/h
170.00
PM-013
Excavation
cum/h
1,400.00
Surface Dressing
sqm/h
750.00
cum/h 05. to 1
per hour
170.00
357
Sr. No.
Output of
Machine
Description of
Machine
Activity
Unit
PM-016
Cutting of Joints
per hour
300.00
PM-017
Mixing of bituminous
materials
t/h
400.00
PM-018
Output
Unit
200.00
Motor Grader
cum/h
Rate
700.00
per hour
50.00
700.00
PM-019
Needle vibrator
Vibrating cement
concrete mix
cum/h
40.00
PM-020
Paver finisher
Laying/spreading
t/h
550.00
PM-021
Plate compactor
Compaction
cum/h
per hour
40.00
PM-022
Plate vibrator
Compaction
cum/h
per hour
40.00
PM-023
Screed vibrator
Compaction
cum/h
per hour
60.00
PM-024
cum/h
160.00
Crushing of Spalls
t/h
13,500.00
Compaction/ Rolling
Earth:- Embankment
or sub-grade
160.00
cum/h 80/70
160.00
Sub-base G-I
cum/h
10.00
160.00
Sub-base G-II/G-III
cum/h
8.00
160.00
WMM
cum/h
16.00
160.00
BUSG
cum/h
160.00
BM 50/75 mm
cum/h
12.00
160.00
Premix 20 mm
sqm/h
250.00
160.00
Seal Coat
sqm/h
500.00
160.00
sqm/h
400.00
160.00
358
Sr. No.
Output of
Machine
Description of
Machine
Activity
Unit
Surface Dressing
2ndCoat
sqm/h
Output
Unit
500.00
Rate
160.00
PM-027
Carriage
cum/trip
450.00
PM-028
Pulverisation of soil
cum/h
180.00
Ripping Pavements,
uprooting trees
cum/h
180.00
Transportation of
materials
t/trip
PM-031
Scarifier
PM-032
Truck 10 t capacity
PM-033
Vibratory roller 80-100 kN
3 to 5
per hour
150.00
cum/h
180.00
Carriage
cum/trip
400.00
Compaction of soil
WMM
cum/h
100.00
Compaction of BM
cum/h
60.00
800.00
per hour
600.00
PM-034
Carriage of water
PM-035
Wet Mix
cum/h
4,000.00
PM-036
Carriage
cum/trip
80.00
PM-037
Carriage
cum/trip
70.00
PM-038
Mixing of ingradients
cum/h
300.00
250.00
CONTENTS
Item
No.
Chapter
Description
Carriage of Materials
Preamble
1.1
Loading and unloading of Earth, Sand, Bajri, Lime Moorum, Ballast, Stone
Boulder, Brick ballast, Kankar, Building Rubbish, Manure, crushed slag,
Fly ash, stone for masonry work by manual means
1.2
Loading and unloading of Earth, Sand, Bajri, Lime Moorum, Ballast, Stone
Bulders, Brick ballast, Kankar, Building Rubbish, Manure, Crushed slag,
Fly ash, stone for masonry work by Mechnical Means
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
(i)
(ii)
(iii)
1.13
1.14
1.15
1.16
Setting Out
2.2
2.3
2.4
2.5
Dismantling of Structures
2.6
2.7
2.8
Wood work wrought and planed fixed in frames of trusses upto a height of
5m above plinth level
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
Dismantling of Fencing
2.21
2.22
2.23
3.2
3.3
3.4
3.5
(i)
(ii)
(iii)
3.6
3.7
3.8
(i)
(ii)
(iii)
(i)
(ii)
(iii)
3.9
3.10
3.11
Stripping, storing and re-laying top soil from borrow areas in agricultural
fields
3.12
3.13
3.14
3.15
(i)
(ii)
3.16
3.17
3.18
3.19
(i)
(ii)
(iii)
3.20
4
Chute Drains
4.2
(i)
(ii)
(iii)
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
Construction of Shoulders
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
Brick Soiling
4.19
Prime coat
5.2
Tack coat
5.3
Bituminous Macadam
5.4
5.5
5.6
5.7
5.8
Precoating of chips
5.9
5.10
5.11
5.12
Seal Coat
5.13
6.1
Granual Sub-base
6.2
6.3
6.4
6.5
6.6
6.7
7.2
Preparation of Subgrade
7.3
Granular Sub-base
7.4
7.5
7.6
(i)
Providing and Laying Apron with Stone Boulders as per Drawings &
Technical Specification Clause 1301
(ii)
(iii)
7.7
Guide Posts
7.8
7.9
7.10
Hill Road
Preamble
8.1
Site Clearance
8.2
Setting out
8.3
(ii)
(iii)
(iv)
(v)
8.4
8.5
8.6
8.7
Construction of Scupper
8.8
8.9
8.10
8.11
9
Pipe Culverts
Preamble
10
9.1
9.2
9.3
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
in Single Row
9.4
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design
in Single Row
9.5
9.6
9.7
9.8
9.9
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below
open foundation of Head walls
9.10
9.11
9.12
9.13
9.14
9.15
Providing PCC M-20 architectural coping on the top of wing wall, return
wall, etc. complete as per drawing and technical specification
10.2
Traffic Signs
10.3
Direct and place Identifications signs upto 0.9 sqm size board
10.4
Direct and place Identifications signs with size more than 0.9 sqm size
board
10.5
10.6
10.7
10.8
Painting lines, Dashes, Arrows etc. on Road in Two coats on New Work
10.9
Painting lines, Dashes, Arrows etc. on Roads in Two coats on old work
Foundation
Preamble
11.1
11.2
11.3
11.4
12
11.5
11.6
11.7
11.8
11.9
Substructure
Preamble
12.1
Brick masonry work in cement mortar (1:3) cement mortar (1:4), cement
mortar (1:5) and cement lime mortar (1:0.5.4.5)
12.2
12.3
12.4
Stone masonry work in cement mortar (11:3) cement mortar (1:4) cement
mortar (1:5) & cement lime mortar (1:0.5:4.5)
12.5
12.6
12.7
12.8
12.9
Superstructure
Preamble
13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
13.9
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and
plastering
13.24 Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4)
complete including centering etc.
13.25 Providing & Laying reinforced cement concrete arch
13.26 Providing steel R.S.Js/built-up steel sections
14
Protection works
Preamble
14.1
14.2
14.3
14.4
14.5
Providing and laying pitching on slopes laid over prepared filter media
14.6
14.7
14.8
14.9
Curtain Wall
15
Maintenance
Preamble
15.1
15.2
1.
2.
15.3
15.4
15.5
15.6
Maintenance of Drains
15.7
(I)
Maintenance of Culverts
(II)
15.8
Maintenance of Causeway
15.9
Page
Chapter 1
LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT
Item
No.
Description
1.1
1.2
1.3
EE.,Dn.I,BMR
Unit
(i)
cum
(ii)
cum
cum
cum
cum
(ii)
cum
cum
1000
Nos.
(ii)
1000
Nos.
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
1.4
Description
Loading and Unloading of Cement by Manual Means
(i)
(ii)
1.5
1.6
1.8
1.9
(i)
(ii)
t
t
(ii)
cum
(ii)
cum
EE.,Dn.I,BMR
(ii)
1.7
Unit
TA to SE Circle, BMR
AAO.,Circle, Barmer
per
pipe
SE.,Circle, Barmer
Item
No.
Description
(ii)
B.
C.
Unit
per
pipe
per
pipe
B.
C.
per
pipe
per
pipe
per
pipe
1.10
A.
B.
C.
per
pipe
per
pipe
per
pipe
1.11
1.12
cum
(ii)
cum
cum
EE.,Dn.I,BMR
t.km
t.km
t.km
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
Item
No.
Description
Unit
1.13
1.14
1.15
EE.,Dn.I,BMR
cum
1.16
cum
cum
Setting Out
Construction of referance bench mark (1No.) working bench
mark (4Nos) and near all drainage structure and bridges as
per MORD data book drawing no 2001 and construction of
referance pillars/burgees @ 50m interval on both side of the
formation width in R.R.stone masonry (1:5) with cement
mortar plaster (1:4) 20mm, thick (drawing no 2002) including
marking of center line leveling white washing painting etc as
per MORD specification clause 108
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 2
SITE CLEARANCE
2.1
2.2
hectare
By Manual Means
(A)
hectare
(B)
hectare
2.3
(A)
hectare
(B)
hectare
EE.,Dn.I,BMR
each
(ii)
each
(iii)
each
(iv)
each
(v)
each
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
(vi)
B.
2.4
each
each
(ii)
each
(iii)
each
(iv)
each
(v)
each
(vi)
each
B.
2.5
Unit
each
(ii)
each
(iii)
each
(iv)
each
(v)
each
(vi)
each
each
(ii)
each
(iii)
each
(iv)
each
(v)
each
(vi)
each
Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 m as per
Technical Specification Clause 202.
(I)
EE.,Dn.I,BMR
By Manual Means
(A) Lime Concrete
cum
(B)
cum
Cement Concrete
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
(C)
Unit
cum
2.6
(A)
Cement Concrete
cum
(B)
cum
2.7
cum
cum
cum
cum
as
per
Technical
2.8
EE.,Dn.I,BMR
cum
cum
cum
cum
cum
cum
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
2.9
(C) Extra over Items (A) and (B) for cutting rivets
2.10
2.11
1000
Nos.
cum
2.12
sqm
2.13
2.14
By Manual Means
(A)
Bituminous Courses
cum
(B)
Granular Courses
cum
EE.,Dn.I,BMR
Bituminous Courses
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
2.16
Description
Unit
cum
2.17
2.18
runni
ng m
2.19
runni
ng m
runni
ng m
2.20
Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing
including posts, foundation concrete, backfilling of pit by
manual means including disposal of dismantled material with
all lifts and upto a lead of 1000 m, stacking serviceable
material and unserviceable material separately as per
Technical Specification Clause 202.
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
runni
ng m
SE.,Circle, Barmer
Item
No.
Description
2.21
Unit
2.23
runni
ng m
EE.,Dn.I,BMR
runni
ng m
TA to SE Circle, BMR
AAO.,Circle, Barmer
each
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
3.1
3.2
sqm
3.3
3.4
EE.,Dn.I,BMR
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
cum
SE.,Circle, Barmer
Item
No.
Description
Unit
b.
cum
3.5
(i)
(ii)
cum
cum
3.6
3.7
EE.,Dn.I,BMR
cum
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
3.8
Description
Unit
cum
(i)
(ii)
cum
cum
3.9
(i)
(ii)
EE.,Dn.I,BMR
cum
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Manual Means
Mechanical Means
cum
cum
3.11
3.12
3.13
3.14
EE.,Dn.I,BMR
cum
cum
cum
sqm
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
a.
cum
b.
cum
3.15
Compacting
embankment
original
ground
supporting
3.16
EE.,Dn.I,BMR
cum
3.17
cum
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
3.18
Description
Unit
sqm
3.19
(i)
cum
(ii)
(A)
Manual Means
(B)
Mechanical Means
Manual Means
(B)
Mechanical Means
3.20
EE.,Dn.I,BMR
Chute Drains
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
EE.,Dn.I,BMR
Description
Unit
A.
B.
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
4.1
cum
(ii)
cum
(iii)
cum
(iv)
cum
i)
cum
cum
cum
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
Item
No.
Description
ii)
Unit
iii)
cum
cum
4.3
cum
4.4
4.5
EE.,Dn.I,BMR
cum
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
4.6
Description
Unit
Providing, laying and spreading soil on a prepared subgrade, pulverising, mixing the spread soil in place with
rotavator with 4 per cent slaked lime with minimum content
of 70 per cent of CaO, grading with motor grader and
compacting with the road roller at OMC to achieve atleast
98 per cent of the max dry density to form a layer of subbase as per Technical Specification Clause 403.
cum
4.7
cum
WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates of specific sizes brought from a lead upto 1
km to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling
with three wheel 80-100 kN static roller in stages to
proper grade and camber, applying and brooming,
stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 1 as per
Technical Specification Clause 404.
2)
EE.,Dn.I,BMR
(A)
By Manual Means
cum
(B)
By Mechanical Means
cum
WBM Grading 2
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
A.
B.
(A)
By Manual Means
cum
(B)
By Mechanical Means
cum
(A)
3)
Unit
By Manual Means
cum
WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates (Crusher Borken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening to fill-up the interstices of
coarse aggregate, watering and compacting to the
required density Grading 3 as per Technical
Specification Clause 405.
4.8
EE.,Dn.I,BMR
(A)
By Manual Means
cum
(B)
By Mechanical Means
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
1)
Unit
WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates (Hand Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller in stages to proper grade and camber, applying
and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 1 as per
Technical Specification Clause 405.
(A)
By Manual Means
cum
(B)
By Mechanical Means
cum
(A)
By Manual Means
cum
(B)
By Mechanical Means
cum
(A)
EE.,Dn.I,BMR
By Manual Means
TA to SE Circle, BMR
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
3)
Unit
WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates (Crusher Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller in stages to proper grade and camber, applying
and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 3 as per
Technical Specification Clause 405.
(A)
(B)
4.9
By Manual Means
By Mechanical Means
cum
cum
4.10
Construction
of
Shoulders
Specification Clause 407.
A.
cum
as
per
Technical
Earthen Shoulders
The rate as applicable for sub-grade construction may
be adopted.
B.
Hard Shoulders
Rate as applicable for sub-base and/or base may be
adopted as per approved design.
C.
Paved Shoulders
The rates may be adopted as applicable for different
layers of pavement depending upon approved design of
paved shoulders.
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
4.11
4.12
Unit
(i)
cum
(ii)
cum
using locally
4.13
4.14
EE.,Dn.I,BMR
cum
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
4.15
Description
Unit
cum
4.16
4.17
cum
cum
B)
EE.,Dn.I,BMR
By mix-in-place method
(i)
cum
(ii)
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
4.18
Description
Unit
(i)
cum
(ii)
cum
Brick Soling
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and cross-section
shown on the drawing filling joints with sand and earth,
spreading 25 mm thick layer of earth over brick soling,
watering and rolliing the same with three wheel road roller
80-100 kN as per Technical Specification Clause 412
4.19
4
.
2
0
EE.,Dn.I,BMR
sqm
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
Cum
per
Km
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1
Prime Coat
(i)
Low porosity
Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502
(ii)
sqm
Medium porosity
Providing and applying primer coat with Bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.90- 1.2 kg/sqm using mechanical means
as per Technical Specification Clause 502.
sqm
5.2
EE.,Dn.I,BMR
sqm
Tack Coat
(i)
sqm
(ii)
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
5.3
Description
Unit
sqm
sqm
Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant
using crushed aggregates of grading as per Table 500.4
premixed with bituminous binder, transported to site upto a
lead of 1000 m laid over a previously prepared surface with
paver finisher to the required grade, level and alignment and
rolled to achieve the desired compaction as per Technical
Specification Clause 504.
(I)
(II)
(III)
Bitumen S-90
Bitumen S-65
Bitumen CRMB
5.4
cum
cum
cum
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
5.5
EE.,Dn.I,BMR
Bitumen (S-90)
sqm
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Bitumen (S-90)
sqm
(B) 75 mm thick
5.6
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
(Penetrations
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
EE.,Dn.I,BMR
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
5.7
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
sqm
sqm
5.8
sqm
sqm
Pre-coating Chips
Pre-coating of chips with 1 per cent of paving bitumen by
weight of chips in a suitable mixer duly heated to 160 degree
C as per Technical Specification Clause 507.2.5
(I)
EE.,Dn.I,BMR
Bitumen (S-90)
TA to SE Circle, BMR
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
cum
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
(V)
sqm
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
(V)
sqm
5.10
5.11
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
sqm
SE.,Circle, Barmer
Item
No.
Description
Unit
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
Type B
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
By Mechanical Means
Type A
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
Type B
EE.,Dn.I,BMR
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
5.12
Description
Unit
sqm
sqm
sqm
Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510
A.
By Manual Means
Case - I : Type A
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
Case - II : Type B
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
B.
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
By Mechanical Means
Case - I : Type A
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
Case - II : Type B
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
5.13
(I)
Bitumen (S-90)
sqm
(II)
Bitumen (S-65)
sqm
sqm
sqm
sqm
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
Item
No.
Description
Note:
EE.,Dn.I,BMR
Unit
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 6
CEMENT CONCRETE PAVEMENT
6.1
Granual Sub-base
Rate as per item No.4.1 of Chapter 4
6.2
6.3
6.4
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
6.5
Description
Unit
6.6
6.7
EE.,Dn.I,BMR
cum
sqm
sqm
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
7.1
(ii)
cum
cum
cum
7.2
cum
EE.,Dn.I,BMR
cum
7.5
cum
Granular Sub-base
Rate as per item No.4.1 of Chapter 4
7.4
Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3
7.3
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
Item
No.
7.6
Description
(i)
Unit
(ii)
cum
cum
7.7
cum
Guide Posts
Construction of R.C.C. guide posts of 250 mm dia, M25
grade as per drawing and technical specification Clause
1401.6
Rate as per item No.8.8 of Chapter 8
7.8
cum
(ii)
cum
7.9
cum
7.10
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 8
HILL ROADS
8.1
Site Clearance
8.2
Setting Out
8.3
each
each
each
(ii)
cum
B)
cum
cum
B)
cum
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
A)
cum
B)
cum
(v)
8.4
cum
cum
B)
cum
(ii)
cum
cum
cum
EE.,Dn.I,BMR
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
cum
cum
8.6
8.7
Construction of Scupper
Runni
ng m
(ii)
cum
EE.,Dn.I,BMR
Runni
ng m
8.8
Runni
ng m
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
Item
No.
Description
Unit
sqm
8.9
8.10
8.11
sqm
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
sqm
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 9
PIPE CULVERTS
9.1
9.2
cum
(ii)
cum
9.3
cum
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
9.4
9.5
9.6
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
9.7
9.8
9.9
300 mm dia
300 mm dia
9.10
cum
cum
9.11
cum
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
cum
9.12
cum
9.13
sqm
9.14
sqm
9.15
EE.,Dn.I,BMR
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
10.1
10.2
i)
per cm
height
per letter
ii)
per cm
height
per letter
Traffic Signs
A.
i
ii
iii
iv
v
vi
vii
Note:
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
each
each
each
each
each
each
each
SE.,Circle, Barmer
Item
No.
Description
(2)
i
ii
iii
iv
v
vi
vii
Note:
(3)
Note:
EE.,Dn.I,BMR
each
each
each
each
each
each
each
i
ii
iii
iv
v
vi
vii
B.
Unit
each
each
each
each
each
each
each
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
i
ii
iii
iv
v
vi
vii
Note:
10.3
each
each
each
each
each
each
each
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
Each
Each
Each
Each
Each
SE.,Circle, Barmer
Item
No.
Description
(ii)
(iii)
Each
Each
Each
Each
Each
i)
ii)
iii)
iv)
v)
B.
Unit
Each
Each
Each
Each
Each
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Providing
and erecting direction
and place
identifications of semi reflective sign boards as per
IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour
on back with red reflective border of 70 mm width and
required message, letters, figures with reflective
engineering grade tape as per MORD specifications of
required shade and colour. Supported and welded on
47 mm x 47mm of 12 SWG Square tube of 3050 mm
height duly strengthened by 25 mm x 5 mm M/s flat iron
on edges on back firmly fixed to the ground by means
of properly designed foundations with M-15 grade
cement concrete 450 mm x 450 mm x 600 mm, 600
mm below ground level as per approved drawing and
Technical Specification Clause 1701
i)
ii)
iii)
iv)
v)
10.4
Each
Each
Each
Each
Each
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
Each
SE.,Circle, Barmer
Item
No.
Description
B.
Unit
(ii)
(iii)
10.5
EE.,Dn.I,BMR
Each
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
10.6
Description
Unit
sqm
10.7
10.8
sqm
10.10
sqm
10.9
sqm
sqm
Kilometre Stone
Reinforced cement concrete M15
grade kilometre
stone/local stone of standard design as per IRC:8 fixing in
position including painting and printing, etc as per drawing
and Technical Specification Clause 1703
i)
ii)
iii)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
each
each
each
SE.,Circle, Barmer
Item
No.
Description
Unit
each
each
each
10.11
Boundary Pillar
each
each
10.12
10.13
10.14
EE.,Dn.I,BMR
Runni
ng m
Runni
ng m
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
10.15
10.16
Description
Unit
Runni
ng m
10.17
EE.,Dn.I,BMR
each
Traffic Cone
Provision of red fluorescent with white reflective sleeve traffic
cone made of Low Density Polyethylene (LDPE) material
with a square base of 390 x 390 x 35 mm and a height of
770 mm, 4 kg in weight, placed at 1.5 m interval, all as per
BS:873
10.18
Runni
ng m
each
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Each
10.19
(1)
each
(2)
each
10.2
(1)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
(2)
EE.,Dn.I,BMR
Description
Unit
Each
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 11
FOUNDATION
11.1
II.
11.2
11.3
Ordinary soil
(i)
Upto 3 m depth
cum
(ii)
3 m to 6 m depth
cum
cum
III.
cum
IV.
cum
V.
Marshy soil
cum
Sand filling
cum
II.
cum
11.4
EE.,Dn.I,BMR
cum
P.C.C grade M 10
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
II.
III.
11.5
11.6
(i)
cum
(ii)
cum
P.C.C grade M 15
(i)
cum
(ii)
cum
P.C.C. grade M 20
(i)
cum
(ii)
cum
IV.
R.C.C grade M 20
cum
V.
R.C.C. grade M 25
cum
cum
II.
cum
III.
cum
II.
III.
cum
(ii)
cum
(iii)
cum
cum
(ii)
cum
(iii)
In cement-lime-mortar (1:0.5:4.5)
cum
EE.,Dn.I,BMR
Unit
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
(ii)
cum
(iii)
cum
11.7
11.8
11.9
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 12
SUBSTRUCTURE
12.1
cum
II.
cum
III.
cum
IV.
cum
10
sqm
II
a).
10sq
m
b).
10sq
m
10
sqm
II
10
sqm
12.4
EE.,Dn.I,BMR
cum
(ii)
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
II.
III.
12.5
Unit
(iii)
cum
(iv)
cum
cum
(ii)
cum
(iii)
cum
(iv)
cum
cum
(ii)
cum
(iii)
cum
(iv)
cum
II.
12.6
EE.,Dn.I,BMR
P.C.C grade M 15
(i)
cum
(ii)
cum
P.C.C. grade M 20
(i)
cum
(ii)
cum
III.
R.C.C grade M 20
IV.
R.C.C. grade M 25
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
12.7
12.8
12.9
Nos.
12.10
Granular material
cum
II)
Sandy material
cum
12.11
cum
12.12
cucm
12.13 I.
a).
150mm thick
sqm
b).
75mm thick
sqm
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
II
sqm
12.14
Nos.
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 13
SUPERSTRUCTURE
13.1
R.C.C grade M 20
(i)
cum
(ii)
cum
(iii)
cum
II.
R.C.C M 25
cum
III.
R.C.C. Grade M 30
cum
13.2
13.3
13.4
13.5
cum
13.6
Runni
ng m
13.7
Runni
ng m
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
13.8
Runni
ng m
13.9
cum
13.10
Nos.
13.11
cum
(ii)
cum
13.12
cum
13.13
Runni
ng m
13.14
Runni
ng m
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
13.15
Runni
ng m
13.16
Filler Joint
I)
Runni
ng m
II)
III)
metre
per
cm
depth
metre
per
cm
depth
13.17
Runni
ng m
cum
II.
cum
13.18
10
sqm
13.19
10
sqm
13.20
EE.,Dn.I,BMR
I.
cum
II.
cum
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
13.21
13.22
Description
Unit
sqm
ii.
sqm
cum
ii.
sqm
iii.
sqm
13.23
cum
13.24
cum
13.25
13.26
EE.,Dn.I,BMR
I.
cum
II.
RCC Grade M 25
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
A)
EE.,Dn.I,BMR
Steel section
TA to SE Circle, BMR
Unit
quinta
l
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 14
PROTECTION WORKS
14.1
cum
14.2
cum
14.3
cum
14.4
14.5
EE.,Dn.I,BMR
A)
Runni
ng m
B)
Runni
ng m
Stone/Boulder
II.
TA to SE Circle, BMR
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
a)
III.
Unit
Concrete grade M 15
cum
cum
14.6
14.7
Note:
cum
II.
cum
III.
cum
14.8
14.9
cum
I.
II.
cum
cum
III.
cum
14.10
14.11
cum
I.
cum
II.
cum
III.
EE.,Dn.I,BMR
cum
TA to SE Circle, BMR
cum
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
EE.,Dn.I,BMR
Description
TA to SE Circle, BMR
AAO.,Circle, Barmer
Unit
SE.,Circle, Barmer
Item
No.
Description
Unit
Chapter 15
MAINTENANCE OF ROADS
15.1
15.2
1.
Manual Means
cum
B.
Mechanical Means
cum
2.
15.3
sqm
EE.,Dn.I,BMR
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
cum
SE.,Circle, Barmer
Item
No.
15.4
Description
Unit
ii.
sqm
iii.
sqm
iv.
sqm
15.5
15.6
EE.,Dn.I,BMR
sqm
Maintenance of Drains
The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains as
well as catch water drains as per technical specification
Clause 1907.
15.7
sqm
(I)
Maintenance of Culverts
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
One
No.
Hume
Pipe
15.8
Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs,
replacing Guide Posts, repair of flood gauges, removal of
debris, providing boulders and protection work and painting
as per technical specification Clause 1909
15.9
(ii)
EE.,Dn.I,BMR
km
15.11
15.10
Culve
rt
Runni
ng m
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
Description
Unit
15.12
15.13
(i)
km
(ii)
km
one
tree
(ii)
each
sqm
15.14
Tack coat
Rates as per item 5.2 (ii)
(ii)
sqm
(iii)
EE.,Dn.I,BMR
sqm
sqm
OR
Premix carpet using bitumen Emulsion
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Item
No.
(iv)
Description
Unit
sqm
EE.,Dn.I,BMR
sqm
TA to SE Circle, BMR
AAO.,Circle, Barmer
sqm
SE.,Circle, Barmer
Item
No.
EE.,Dn.I,BMR
Description
TA to SE Circle, BMR
AAO.,Circle, Barmer
Unit
SE.,Circle, Barmer
Item
No.
EE.,Dn.I,BMR
Description
TA to SE Circle, BMR
AAO.,Circle, Barmer
Unit
SE.,Circle, Barmer
Item
No.
EE.,Dn.I,BMR
Description
TA to SE Circle, BMR
AAO.,Circle, Barmer
Unit
SE.,Circle, Barmer
Item
No.
EE.,Dn.I,BMR
Description
TA to SE Circle, BMR
AAO.,Circle, Barmer
Unit
SE.,Circle, Barmer
Chapter 1
16.00
8.00
8.00
5.00
10.00
5.00
1.00
25.00
25.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
22.00
22.00
25.00
25.00
25.00
21.00
35.00
35.00
56.00
56.00
29.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
17.00
12.00
57.00
48.00
36.00
20.00
12.00
8.00
2.20
2.90
6.00
169.00
197.00
226.00
277.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
286.00
356.00
374.00
86,207.52
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 2
SITE CLEARANCE
3,780.00
14,344.00
19,238.00
8,984.00
10,945.00
69.00
120.00
236.00
449.00
925.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
2,700.00
74.00
136.00
257.00
479.00
959.00
2,784.00
41.00
65.00
137.00
270.00
546.00
1,544.00
42.00
69.00
143.00
277.00
554.00
1,586.00
112.00
131.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
315.00
219.00
313.00
74.00
93.00
67.00
63.00
82.00
93.00
74.00
70.00
67.00
74.00
198.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
404.00
287.00
3.00
331.00
133.00
4.00
49.00
66.00
114.00
206.00
150.00
94.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
722.00
23.00
5.00
7.00
96.00
60.00
13.00
14.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
63.00
86.00
51.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 3
6.00
5.20
14.30
75.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
32.00
35.00
18.00
37.00
44.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
37.00
55.00
59.00
103.00
195.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
424.00
349.00
220.00
111.00
48.00
28.00
72.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
79.00
36.00
7.00
17.00
0.60
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
99.00
77.00
18.90
9.00
28.00
20.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
300.96
710.51
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 4
177.00
165.00
157.00
146.00
363.00
352.00
330.00
184.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
179.00
167.00
143.00
112.00
114.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
244.00
402.00
368.00
322.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
426.00
380.00
562.00
590.00
544.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
341.00
293.00
404.00
358.00
540.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
580.00
534.00
693.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
189.00
188.00
198.00
212.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
283.00
361.00
380.00
385.00
387.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
570.00
552.00
139.00
405.00
4.30
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 5
24.30
29.80
38.20
7.10
8.50
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
8.50
10.00
3,608.00
3,787.00
4,048.00
154.00
162.00
142.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
87.00
103.00
108.00
45.30
47.80
53.80
51.40
53.00
39.50
41.70
47.10
45.00
46.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
40.60
43.10
49.00
46.70
48.00
35.60
37.80
43.20
41.00
42.00
55.30
49.80
48.70
45.10
686.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
726.00
70.90
74.50
83.20
79.80
82.00
74.90
78.50
87.20
83.70
86.00
76.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
93.90
99.30
112.40
107.20
110.00
83.90
88.60
99.90
95.70
98.00
94.30
99.80
112.90
107.70
110.00
84.40
89.10
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
100.40
95.90
98.00
37.90
40.30
46.20
43.90
45.00
26.20
27.90
31.90
30.30
31.00
27.80
29.40
33.30
31.80
33.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
37.30
39.70
45.50
43.20
44.00
27.40
29.10
33.10
31.50
32.00
30.20
31.80
35.60
34.10
35.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 6
2,900.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
2,478.00
483.00
600.00
537.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 7
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 8
HILL ROADS
2,376.00
9,671.00
240.00
47.00
5.00
35.00
5.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
104.00
8.00
149.00
190.00
10.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
0.00
12,189.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
87.00
21.00
73.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 9
PIPE CULVERTS
3,583.00
2,864.00
2,056.00
1,645.00
624.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
4,483.00
3,539.00
2,506.00
2,005.00
905.00
7,186.00
5,740.00
4,111.00
8,986.00
7,090.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
5,011.00
1,596.00
636.00
1,821.00
917.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 10
0.35
0.22
2,979.00
1,968.00
2,630.00
3,657.00
2,562.00
3,031.00
4,658.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
2,671.00
1,660.00
2,322.00
3,349.00
2,254.00
2,723.00
4,350.00
2,636.00
1,612.00
2,274.00
3,301.00
2,206.00
2,676.00
4,303.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,654.00
1,297.00
1,517.00
1,860.00
1,495.00
1,651.00
2,193.00
6,453.00
4,674.00
3,970.00
2,914.00
2,562.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
5,967.00
4,366.00
3,662.00
2,606.00
2,254.00
5,876.00
4,188.00
3,504.00
2,479.00
2,138.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
3,449.00
2,619.00
2,306.00
1,837.00
1,681.00
12,054.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
11,332.00
10,885.00
6,595.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
45.00
43.00
65.00
51.00
33.00
1,359.00
805.00
255.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,378.00
446.00
122.00
187.00
189.00
218.00
299.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
924.00
884.00
7,434.00
507.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
188.00
1,408.00
469.00
3,880.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,846.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 11
FOUNDATION
75.60
89.80
95.00
220.00
266.00
142.00
285.00
49.00
1,962.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,901.00
1,909.00
1,954.00
1,962.00
2,263.00
2,271.00
2,406.00
2,652.00
1,800.00
1,845.00
1,984.00
1,747.00
1,575.00
1,750.00
1,596.00
1,406.00
1,598.00
1,544.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,355.00
1,547.00
37,697.00
40,059.00
34,153.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 12
SUBSTRUCTURE
2,055.00
1,927.00
1,848.00
2,083.00
255.00
236.00
366.00
706.00
726.00
1,852.00
1,671.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,418.00
1,855.00
1,691.00
1,492.00
1,383.00
1,694.00
1,635.00
1,437.00
1,327.00
1,638.00
1,880.00
1,888.00
2,177.00
2,185.00
2,315.00
2,558.00
37,816.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
40,178.00
34,272.00
108.00
225.00
247.00
372.00
0.60
327.00
163.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
119.86
181.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 13
SUPERSTRUCTURE
2,313.00
2,308.00
2,223.00
2,538.00
2,700.00
38,090.00
40,453.00
34,547.00
5,733.00
1,404.00
1,821.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,158.00
1,973.00
451.00
1,879.00
1,887.00
4,443.00
11,252.00
1,968.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
915.00
1,795.00
4.60
4.60
12.50
1,635.00
1,852.00
255.00
726.00
1,888.00
1,880.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
4,472.00
3,782.00
3,431.00
3,868.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
4,503.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 14
PROTECTION WORKS
334.00
760.00
1,993.00
269.00
225.00
334.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
1,993.00
1,837.00
463.00
3,544.00
3,948.00
2,168.00
452.00
1,845.00
1,492.00
1,962.00
341.00
1,313.00
1,836.00
1,901.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
Chapter 15
MAINTENANCE OF ROADS
70.00
82.00
14.00
4.20
4,109.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
111.00
106.00
127.00
40.00
66.00
1.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
563.00
1,114.00
29.00
549.00
170.00
805.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
85.00
342.00
31.00
2.00
1.00
6.00
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Rate
(Rs.)
EE.,Dn.I,BMR
TA to SE Circle, BMR
AAO.,Circle, Barmer
SE.,Circle, Barmer
Description of items: The description of items is given briefly and linked with the relevant
Clauses of the Ministry of Rural Developments (MORD) Specifications wherever feasible,
which may be referred for detailed description, provisions and interpretation.
Use of Machinery
2.1.
The Standard Data Book is based on the assumption that Rural Roads in our country
are to be constructed with intermediate technology, i.e., manual means with medium
input of machinery, wherever required to ensure the required quality of work.
2.2.
For rolling, use of static roller has been generally considered. However, use of
vibratory pneumatic tyre roller has been considered wherever required as per
provisions of MORD Specifications.
Working Conditions
3.1.
Rates have been analysed for average working conditions prevailing in the country.
3.2.
Average achievable outputs of machines and labour have been considered taking into
account the job and management factors.
3.3.
However, the output of machineries and labour reduces substantially in hilly areas as
the altitude increases. Therefore, for hilly areas reduced outputs have been
considered as indicated in the preamble of Chapter 8.
Overheads: The overheads are considered as 10 per cent for items of road works and 20
per cent for items of bridge works. This is assumed to include interalia the following
elements:
i.
Site accommodation, setting up plant, access road, water supply, electricity and
general site arrangements.
ii.
iii.
Expenditure on
(a)
(b)
(c)
iv.
Mobilisation/demobilisation of resources.
v.
vi.
vii.
Setting up of laboratories for quality control, field and laboratory testing for control of
quality of various items of work and documentation of test results as per requirements
of the MORD Specifications.
viii.
ix.
Survey instruments and the task of setting out of works including verification of line
and dimensions (but excluding construction of bench marks and reference pillars
which are separate items under setting out).
x.
Taking of trial pits and bore holes, where required as per the MORD Specifications.
xi.
xii.
xiii.
xiv.
Sundries.
xv.
xvi.
Work insurance/compensation.
xvii.
Sales/Turnover tax has been assumed at 4%. In case this tax is more than 4% in
certain States the percentage of overheads should be increased correspondigly.
Contractors Profit: Contractors profit is considered @ 10 per cent uniformly and is added
on Overheads also.
General:
6.1.
The Clause numbers refer to the MORD Specifications for Rural Roads and Cross
Drainage Works.
6.2.
Additional assumptions made for analysing different items have been indicated in
respective Chapters in the form of preamble and notes/footnotes wherever required.
6.3.
6.4.
In the rate analysis of some items, the quantities of sub-items involved in that
analysis, like excavation for foundation, foundation concrete, masonry work, painting,
lettering, etc. have been given. For rate analysis of such sub-items, reference may
be made to relevant Chapters dealing with the sub-items.
6.5.
The sources of all materials and samples of materials are required to be approved by
the Engineer before start of such work.
6.6.
For pipe culverts both NP3 and NP4 pipes have been considered.
6.7.
Basic Inputs
7.1.
The Standard Data Book is based on the requirements of basic inputs of materials,
labour and machineries for various items.
7.2.
The rates for material and labour for the area where the project is located are to be
ascertained from local authorities/enquiries to prepare SOR for the area. However,
the usage charges of machineries shall be considered as given in Chapter 15 of this
Data Book.
7.3.
The basic rates of materials, such as, stone boulders, stone for masonry, stone
ballast (hand broken/machine broken), crushed aggregate, stone dust, moorum,
gravel, lime, manure, sludge, quarry sweep, kankar, bricks, brick ballast, crushed
slag, etc. at quarry/ crusher sites shall be fixed by the respective States for various
zones from time to time.
7.4.
7.5.
The cost of materials should include the cost at source and the cost of their carriage
upto the work site.
7.6.
Although market rates for supply of aggregates at site are generally adopted for
estimation purpose, rates for crushing of aggregates have also been analysed as
most Contractors prefer to crush their own aggregates in case of larger sized projects.
The cost of materials shall be evaluated considering the cost at crushing plants and
its carriage upto the work site. These should be compared with rates for own crushing
and carriage by the construction agency and lesser of the rates should be adopted for
estimation purpose.
Keeping in view the job and managerial factors and the age factor of machines, the
output of plant and equipment is taken approximately 70 per cent of the rated
capacity given by manufacturer under ideal conditions.
8.2.
The requirement of machinery has been worked out assuming working period of 6
hours per shift of 8 hours.
8.3.
Certain equipment, like, road rollers, are required to be available at site for complete
period of the shift, though from the consideration of their output, they may be required
only for 3 to 4 hours. This is necessitated to match with the output of other
associated machines, like, HMP, Pavers, etc. In such cases, the hire charges of road
rollers have been multiplied with a factor of 0.65 to account for the idle period
wherever considered appropriate.
8.4.
Though electrically operated equipment, like, concrete mixers and vibrators have
been provided, diesel operated equipment can be used where electricity is not
available.
8.5.
Wherever electric generator has not been provided to run a plant or equipment, it is
assumed that it is fitted with a diesel engine.
8.6.
For small jobs where loading and unloading is required to be done manually, tractortrolley has been considered for carriage instead of tipper.
8.7.
8.8.
A water tanker of 6 kl capacity which is commonly used at construction sites has been
considered.
8.9.
The usage charges for machines include ownership charges, cost of repair and
maintenance including replacement of tyres and running and operating charges which
includes crew, fuel and lubricants.
Labour:
9.1.
For labour, the general classification is mazdoor, bhisti, etc. for unskilled labour and
mason, fitter, blacksmith, etc. for skilled labour.
10
11
9.2.
One mate has been provided for 25 labours for all items of works.
9.3.
Materials:
10.1.
Quantities of materials considered in the rate analysis are approximate for the
purpose of estimation and include normal wastages. Actual consumption would
depend on mix design.
10.2.
The rates of material should include basic cost at locations of stone crushers/ factory/
rail head and cost of its carriage to the site of work/plant including loading, unloading
and stacking.
10.3.
The supply of materials will be taken either at the location of mixing plant or at the
work site as per requirement of use.
10.4.
10.5.
Credit for Dismantled Material: The dismantled materials should be examined and a
realistic assessment made for credit for such materials, which can be utilized for
works or auctioned.
10.6.
The basic rates should include all octroi charges, toll tax, sale tax, VAT, municipal
taxes and other local taxes, etc.
Items of Culverts:
Items in Chapters 11, 12 & 13 on Foundation, Substructure and Superstructure cover both
minor bridge works as well as slab culverts as per Chapter 1200 of MORD Specifications.
Items of pipe culverts are, however, covered separately in Chapter 9.
12
Concrete Items:
12.1.
For concrete work, the grades of concrete covered by the Data Book in accordance
with MORD Specifications are:i)
PCC M-15 grade to M-25 for structures (For lean concrete under foundation M10 can be used).
ii)
iii)
12.2.
The analysis of rates accounts for input of materials by weight and use of ordinary
mixer.
12.3.
Use of vibrators for all concreting work has been included in the items.
12.4.
Ten per cent extra cement may be provided for concreting under water, where
required.
12.5.
12.6.
Quantities of cement in various grades of cement concrete for structures have been
taken as per IRC:21:2000 & IRC:78:2000.
12.7.
12.8.
As per the MORD Specifications, the type of superstructure envisaged for rural roads
are RCC slabs and box culverts not exceeding 15 m span as well brick/stone
masonry arches and composite girder type of superstructure. RCC arches provided
for in IRC:SP:20 have also been analysed.
13
The MORD Specifications includes specifications for the items of turfing with sods and
seeding and mulching in Chapter 1600 of Hill Road Construction only. However, in view of the
importance of these items for erosion control in all locations, these have also been analysed
in Chapter 3 of this document.
14
Privileged Document: The Standard Data Book in for Department use ONLY. It should not be
produced in any court of law as reference/authority and to that extent it is a privileged
document.