LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT
Notes:
1

Rates are for net quantities after deduction of voids.

2
Sr.
No.

Reference to
MORD
Specifications

1.1

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

hour

0.50

70.00

35.00

Loading and Unloading of Lime, Aggregate, Stone Boulder,


Brick Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by Manual Means
(i)

Loading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone
for Masonry Work by manual means including a lead upto
30 m
Unit = cum
Taking output = 5.5 cum
a)

b)

Labour

Machinery
Truck

(ii)

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

9.63

Cost for 5.5 cum = a+b+c+d

86.63

Rate per cum = (a+b+c+d)/5.5

16.00

Loading of Earth, Sand, Moorum, Manure, Flyash by


manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

hour

0.25

70.00

17.50

Machinery
Truck

EE.,Dn.I, BMR

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

TA to SE Circle BMR

AAO.,Circle, Barmer

4.81

SE.,Circle, Barmer

2
Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Cost for 5.5 cum = a+b+c+d

43.31

Rate per cum = (a+b+c+d)/5.5


(iii)

8.00

Unloading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone
for Masonry Work by manual means including a lead upto
30 m
Unit = cum
Taking output = 5.5 cum
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

hour

0.25

70.00

17.50

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

4.81

Cost for 5.5 cum = a+b+c+d

43.31

Rate per cum = (a+b+c+d)/5.5


(iv)

8.00

Unloading of Earth, Sand, Moorum, Manure, Flyash by


manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a)

b)

Labour
Mate

day

0.005

100.00

0.50

Mazdoor (Unskilled)

day

0.125

80.00

10.00

hour

0.166

70.00

11.62

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

2.77

Cost for 5.5 cum = a+b+c+d

24.89

Rate per cum = (a+b+c+d)/5.5


1.2

EE.,Dn.I, BMR

5.00

Loading and Unloading Lime, Aggregate, Stone Boulder,


Brick Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by Mechanical Means

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

3
Sr.
No.

Reference to
MORD
Specifications

Description
(i)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Loading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone
for Masonry Work by mechanical means including a lead
upto 30 m
Placing tipper at loading point, loading with front end loader
excluding time for haulage and return trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i)

Positioning of tipper at loading point

Min

1.00

ii)

Loading by front end loader 1 cum bucket capacity @


45 cum per hour

Min

7.33

iii)

Waiting time, unforeseen contingencies, etc.

Min

2.00

Min

10.33

hour

0.172

80.00

13.76

hour

0.122

300.00

36.60

Total
a)

Machinery
(i)

Tipper 10 t capacity

(ii) Front end-loader 1 cum bucket capacity @ 45


cum per hour

(ii)

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

6.30

Cost for 5.5 cum = a+b+c

56.66

Rate per cum = (a+b+c) /5.5

10.00

Loading of Earth, Sand, Moorum, Manure, Flyash by


mechanical means including a lead upto 30 m.
Placing tipper at loading point, loading with front end loader
excluding time for haulage and return trip.
Unit = cum
Taking output = 5.5 cum
Time required for
i)

Positioning of tipper at loading point

Min

1.00

ii)

Loading by front end loader 1 cum bucket capacity @


100 cum per hour

Min

3.30

iii)

Waiting time, unforeseen contingencies, etc.

Min

2.00

Min

6.30

hour

0.105

Total
a)

Machinery
(i)

EE.,Dn.I, BMR

Tipper 10 t capacity

TA to SE Circle BMR

AAO.,Circle, Barmer

80.00

SE.,Circle, Barmer

8.40

4
Sr.
No.

Reference to
MORD
Specifications

Description
(ii) Front end-loader 1 cum bucket capacity @ 100
cum per hour
b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

Unit

Quantity

hour

0.055

Rate
(Rs.)

Amount
(Rs.)

300.00

3.11

Cost for 5.5 cum = a+b+c

28.01

Rate per cum = (a+b+c)/5.5


(iii)

16.50

5.00

Unloading of Earth, Sand, Lime, Moorum, Aggregate, Stone


Boulder, Brick Aggregate, Kankar, Building Rubbish,
Manure, Crushed Slag, Flyash, Stone for Masonry Work by
mechanical means.
Unit = cum
Taking output = 5.5 cum
Placing tipper at unloading point excluding time for haulage
and return trip
Time required for
i)

Positioning of tipper at unloading point

Min

1.00

ii)

Manoeuvering, reversing, dumping and turning for


return

Min

2.00

iii)

Waiting time, unforeseen contingencies, etc.

Min

2.00

Min

5.00

hour

0.08

Total
a)

Machinery
Tipper 10 t capacity

1.3

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

80.00

6.40
0.80

Cost for 5.5 cum = a+b+c

7.20

Rate per cum = (a+b+c)/5.5

1.00

Loading, Unloading and Stacking of Bricks by Manual


Means
(i)

Loading of Bricks by manual means including a lead upto


30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

5
Sr.
No.

Reference to
MORD
Specifications

Description
Truck

(ii)

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Unit

Quantity

hour

0.33

Rate
(Rs.)

Amount
(Rs.)

70.00

23.10
5.51

Cost for 2000 Nos. = a+b+c+d

49.61

Rate for 1000 bricks = (a+b+c+d)/2

24.81

Unloading and Stacking of Bricks by manual means


including a lead upto 30 m
Unit = 1000 Nos.
Taking output = 2000 Nos.
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

hour

0.33

70.00

23.10

Machinery
Truck

1.4

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

5.51

Cost for 2000 Nos. = a+b+c+d

49.61

Rate for 1000 bricks = (a+b+c+d)/2

24.81

Loading and Unloading of Cement by Manual Means


(i)

Loading of Cement by manual means including a lead upto


30 m
Unit = t
Taking output = 10 t
a)

b)

Labour
Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.50

80.00

120.00

hour

1.00

70.00

70.00

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 t = a+b+c+d

24.50
220.50

Rate per tonnes = (a+b+c+d)/10

EE.,Dn.I, BMR

TA to SE Circle BMR

22.05

AAO.,Circle, Barmer

SE.,Circle, Barmer

6
Sr.
No.

Reference to
MORD
Specifications

Description
(ii)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.50

80.00

120.00

hour

1.00

70.00

70.00

Unloading of Cement by manual means including a lead


upto 30 m
Unit = t
Taking output = 10 t
a)

b)

Labour

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

24.50

Cost for 10 t = a+b+c+d

220.50

Rate per tonne = (a+b+c+d)/10


1.5

22.05

Loading and Unloading of Structural Steel and Steel Bars by


manual means
(i)

Loading of Structural Steel, Steel Bars by manual means


including a lead upto 30 m
Unit = t
Taking output = 10 t
a)

b)

Labour
Mate

day

0.07

100.00

7.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

hour

1.00

70.00

70.00

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 t = a+b+c+d

27.63
248.63

Rate per tonnes = (a+b+c+d)/10


(ii)

24.86

Unloading of Structural Steel, Steel Bars by manual means


including a lead upto 30 m
Unit = t
Taking output = 10 t
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

7
Sr.
No.

Reference to
MORD
Specifications

Description

b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.07

100.00

7.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

hour

1.00

70.00

70.00

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

27.63

Cost for 10 t = a+b+c+d

248.63

Rate per t = (a+b+c+d)/10


1.6

24.86

Loading and Unloading of Bitumen Drums by Manual Means


(i)

Loading of Bitumen Drums by manual means including a


lead upto 30 m
Unit = t
Taking output = 10 t
a)

b)

Labour
Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

hour

1.25

70.00

87.50

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

27.69

Cost for 10 t = a+b+c+d

249.19

Rate per tonnes = (a+b+c+d)/10


(ii)

24.92

Unloading of Bitumen Drums by Manual Means including a


lead upto 30 m
Unit = t
Taking output = 10 t
a)

b)

Labour
Mate

day

0.05

100.00

5.00

Mazdoor (Unskilled)

day

1.20

80.00

96.00

hour

1.25

70.00

87.50

Machinery
Truck

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

8
Sr.
No.

Reference to
MORD
Specifications

Description

Unit

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Quantity

Rate
(Rs.)

Amount
(Rs.)
23.56

Cost for 10 t = a+b+c+d

212.06

Rate per t = (a+b+c+d)/10


Note:
1.7

100

21.21

The rate is inclusive of the self weight of drum


Loading and Unloading of Timber by Manual Means
(i)

Loading of Timber by manual means including a lead upto


30 m
Unit = t
Taking output = 5 t
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

1.00

70.00

70.00

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

19.25

Cost for 5 t = a+b+c+d

173.25

Rate per t = (a+b+c+d)/5


(ii)

34.65

Unloading of Timber by manual means including a lead


upto 30 m
Unit = t
Taking output = 5 t
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

1.00

70.00

70.00

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 5 t = a+b+c+d

19.25
173.25

Rate per t = (a+b+c+d)/5

EE.,Dn.I, BMR

TA to SE Circle BMR

34.65

AAO.,Circle, Barmer

SE.,Circle, Barmer

9
Sr.
No.

Reference to
MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

hour

1.50

70.00

105.00

Note: Density of wood has been assumed as 900 kg per cum. If the
density is less the output may be reduced proportionately
1.8

Loading and Unloading of C.C. Blocks, Kerb, etc.


(i)

Loading with care C.C. Blocks, km Stone, 200 m Stone,


Boundary Pillar, Kerb, Channel, Bond Stone, etc. by
manual means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a)

b)

Labour

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

34.13

Cost for 5.5 cum = a+b+c+d

307.13

Rate per cum = (a+b+c+d)/5.5


(ii)

55.84

Unloading with care C.C. Blocks, km Stone, 200 m Stone,


Boundary Pillar, Kerb, Channel, Bond Stone, etc. by manual
means including a lead upto 30 m
Unit = cum
Taking output = 5.5 cum
a)

b)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

hour

1.50

70.00

105.00

Machinery
Truck

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 5.5 cum = a+b+c+d

34.13
307.13

Rate per cum = (a+b+c+d)/5.5


1.9

Loading and Unloading of Hume Pipes


(i)

EE.,Dn.I, BMR

55.84

Loading of RCC Hume pipes by mechanical means


including a lead upto 30 m

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

10
Sr.
No.

Reference to
MORD
Specifications

Description
A.

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Truck

hour

0.33

70.00

23.10

Crane

hour

0.33

500.00

165.00

1000 / 1200 mm dia Hume pipe


Unit = per pipe
Taking output = 9 pipes
a)

b)

Labour

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

28.76

Cost for 9 pipes = a+b+c+d

258.86

Rate per pipe = (a+b+c+d)/9


B.

28.76

750 mm dia Hume pipe


Unit = per pipe
Taking output = 15 pipes
a)

b)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Truck

hour

0.33

70.00

23.10

Crane

hour

0.33

500.00

165.00

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 15 pipes = a+b+c+d

28.76
258.86

Rate per pipe = (a+b+c+d)/15


C.

17.26

600/450 mm dia Hume pipe


Unit = per pipe
Taking output = 21 pipe
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

11
Sr.
No.

Reference to
MORD
Specifications

Description

b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Truck

hour

0.33

70.00

23.10

Crane

hour

0.33

500.00

165.00

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

28.76

Cost for 21 pipes = a+b+c+d

258.86

Rate per pipe = (a+b+c+d)/21


(ii)

12.33

Unloading of RCC Hume pipe by manual means including a


lead upto 30 m
A.

1000/1200 mm dia RCC Hume pipes


Unit = per pipe
Taking output = 5 pipes
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

2.00

70.00

140.00

Wooden sleepers 250mm x 250mm x125mm hire hour


charges 3 nos sleeper

2.00

10.00

20.00

Crow bars 2 nos not less than 40 mm dia (hire- hour


charges)

2.00

5.00

10.00

Machinery
Truck

c)

Material

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)


Cost for 5 pipes = a+b+c+d+e/5

31.75
285.75

Rate per pipe = (a+b+c+d+e)


B.

57.15

750 mm dia Hume pipe


Unit = per pipe
Taking output = 6 pipes
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

12
Sr.
No.

Reference to
MORD
Specifications

Description

b)

Amount
(Rs.)

Quantity

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

2.00

70.00

140.00

Wooden sleepers 250mm x250mm x 125mm hire hour


charges 3 nos. sleeper

2.00

10.00

20.00

Crow bars 2 nos not less than 40 mm dia

2.00

5.00

10.00

Machinery
Truck

c)

Rate
(Rs.)

Unit

Materials

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

hour

31.75

Cost for 6 pipes = a+b+c+d+e

285.75

Rate per pipe = (a+b+c+d+e)/6


C.

47.63

600/450 mm dia Hume pipe


Unit = per pipe
Taking output = 8 pipes
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

2.00

70.00

140.00

Wooden sleepers 250mm x 250mm x 125mm hour


hire charges 3 nos. sleeper

2.00

10.00

20.00

Crow bars 2 nos not less than 40 mm dia

2.00

5.00

10.00

Machinery
Truck

c)

Materials

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

hour

Cost for 8 pipes = a+b+c+d+e

31.75
285.75

Rate per pipe = (a+b+c+d+e)/8


(iii)

35.72

Unloading of RCC Hume pipes by mechanical means


including a lead upto 30 m
A.

1000/1200 mm dia Hume pipe


Unit = per pipe
Taking output = 9 pipes

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

13
Sr.
No.

Reference to
MORD
Specifications

Description
a)

b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Truck

hour

0.20

70.00

14.00

Crane

hour

0.20

500.00

100.00

Labour

Machinery

c)

Overheads @ 0% on (a+b+c)

d)

Contractors profit @ 12.5% on (a+b+c)

19.50

Cost for 9 pipes = a+b+c+d

175.50

Rate per pipe = (a+b+c+d)/9


B.

19.50

750 mm dia Hume pipe


Unit = per pipe
Taking output = 15 pipes
a)

b)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Truck

hour

0.20

70.00

14.00

Crane

hour

0.20

500.00

100.00

Machinery

c)

Overheads @ 0% on (a+b+c)

d)

Contractors profit @ 12.5% on (a+b+c)

19.50

Cost for 15 pipes = a+b+c+d

175.50

Rate per pipe = (a+b+c+d)/15


C.

11.70

600/450 mm dia Hume pipe


Unit = per pipe
Taking output = 21 pipes
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

14
Sr.
No.

Reference to
MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Truck

hour

0.20

70.00

14.00

Crane

hour

0.20

500.00

100.00

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

19.50

Cost for 21 pipes = a+b+c+d

175.50

Rate per pipe = (a+b+c+d)/21


1.10

8.36

Haulage excluding Loading & Unloading


Haulage of materials by tipper excluding cost of loading,
unloading and stacking.
Unit = t.km
Taking output 10 t load and lead 10 km = 100 t.km
Case-I : Surfaced Road
Speed with load: 40 km per hour
Speed while returning empty: 55 km per hour
a)

Machinery
Tipper 10 t capacity
Haulage with load

hour

0.25

450.00

112.50

Empty return trip

hour

0.18

450.00

81.00

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

24.19

Cost for 100 t.km = a+b+c

217.69

Rate per t.km = (a+b+c)/100

2.18

Note: In case of carriage of Hume pipes, output of truck be taken as 8 t


and the rate for t is to be divided by number of pipes of different
diameters as indicated in item 1.9 to get the rate per pipe.
Case-II: Unsurfaced Gravel Road
Speed with load: 30 km/hour
Speed for empty return trip: 40 km/hour
a)

Machinery
Tipper 10 t capacity

EE.,Dn.I, BMR

Haulage with load

hour

0.33

450.00

148.50

Empty return trip

hour

0.25

450.00

112.50

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

15
Sr.
No.

Reference to
MORD
Specifications

Description
b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)
32.63

Cost for 100 t.km = a+b+c

293.63

Rate per t.km = (a+b+c)/100

2.94

Note: In case of carriage of Hume pipes, output of truck be taken as 8 t


and the rate per t is to be divided by number of pipes of different
diameters as indicated in item 1.9 to get the rate per pipe.
Case-III:

Katcha Track and Track in River Bed/Nallah Bed


and Choe Bed

Speed with load: 15 km per hour


Speed while returning empty: 20 km per hour
a)

Machinery
i)

Tipper 10 t capacity
Haulage with load

hour

0.66

450.00

297.00

Empty return trip

hour

0.50

450.00

225.00

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

65.25

Cost for 100 t.km = a+b+c

587.25

Rate per t.km = (a+b+c)/100

5.87

Note: In case of carriage of Hume pipes, output of truck be taken as 8 t


and the cost for 8 t is to be divided by number of pipes of
different diameters as indicated in item 1.9 to get the rate per
pipe.
1.11

Supply of Quarried stone and hand breaking


(i)

Supply of quarried stone and hand breaking into coarse


aggregate to Grading 1 (90 mm to 45 mm) as per Table
400.8 of Technical Specifications.
Unit = cum
Taking output = 1 cum
a)

b)

Labour
Mate

day

0.048

100.00

4.80

Mazdoor (Unskilled)

day

1.20

80.00

96.00

cum

1.10

45.00

49.50

Material
Supply of quarried stone 150-200 mm size

c)

EE.,Dn.I, BMR

Overheads @ 0% on (a+b)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

16
Sr.
No.

Reference to
MORD
Specifications

Description
d)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c)

18.79

Rate per cum = a+b+c+d


(ii)

Amount
(Rs.)

169.09

Supply of quarried stone and hand breaking into coarse


aggregate to Grading 2 (63 mm to 45 mm) as per Table
400.8 of Technical Specifications.
Unit = cum
Taking output = 1 cum
a)

b)

Labour
Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.50

80.00

120.00

cum

1.10

45.00

49.50

Material
Supply of quarried stone 150-200 mm size

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

21.94

Rate per cum = a+b+c+d


(iii)

197.44

Supply of quarried stone and hand breaking into coarse


aggregate to Grading 3 (53 mm to 22.4 mm) as per Table
400.8 of Technical Specifications.
Unit = cum
Taking output = 1 cum
a)

b)

Labour
Mate

day

0.072

100.00

7.20

Mazdoor (Unskilled)

day

1.80

80.00

144.00

cum

1.10

45.00

49.50

Material
Supply of quarried stone 150-200 mm size

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per cum = a+b+c+d


1.12

25.09
225.79

Crushing of Stone Aggregates 100 per cent passing through


53 mm sieve as per Table 500.6 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone
crushing unit of 200 t/h capacity comprising of primary and
secondary crushing units, belt conveyor and vibrating screens to
obtain stone aggregates 100 per cent passing through 53 mm
sieve as per Table 500.6 of Technical Specifications including the
cost of stone.

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

17
Sr.
No.

Reference to
MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.76

100.00

76.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Mazdoor (Unskilled)

day

17.00

80.00

1,360.00

cum

800.00

150.00

120,000.00

Integrated stone crusher of 200 t/h including belt conveyor


and vibrating screens

hour

6.00

13,500.00

81,000.00

Front end loader 1 cum bucket capacity

hour

20.00

300.00

6,000.00

Tipper 5.5 cum capacity

hour

20.00

450.00

9,000.00

Unit = cum
Taking output = 750 cum at crusher location
a)

b)

Labour

Material
Stone Boulder of size 150 mm and below

c)

Machinery

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

27,204.50

Cost for 750 cum = (a+b+c+d+e) x 0.85

208,114.43

Rate per cum =[ (a+b+c+d+e) x 0.85]/ 750


Note:

1.13

277.49

800 cum of stone boulders are needed to get 750 cum of


stone aggregates.

85 per cent of above cost will be attributed to the production


of 750 cum of stone aggregates of 40 mm size and balance
15 per cent will be for smaller size aggregates and stone
dust which comes out as a by-product.

The integrated stone crusher includes primary and


secondary crushing units.

Crushing of Stone Aggregates 100 per cent passing through


22.4 mm sieve as per Table 500.6 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone
crushing unit of 200 t/h capacity comprising of primary and
secondary crushing units, belt conveyor and vibrating screens to
obtain stone aggregates 100 per cent passing through 22.4 mm
sieve as per Table 500.6 of Technical Specifications including the
cost of stone.
Unit = cum
Taking output = 670 cum at crusher location
a)

Labour
Mate

EE.,Dn.I, BMR

day

TA to SE Circle BMR

AAO.,Circle, Barmer

0.76

100.00

SE.,Circle, Barmer

76.00

18
Sr.
No.

Reference to
MORD
Specifications

Description

b)

Mazdoor (Skilled)

day

2.00

100.00

200.00

Mazdoor (Unskilled)

day

17.00

80.00

1,360.00

cum

800.00

150.00

120,000.00

Integrated stone crusher of 200 t/h including belt conveyor


and vibrating screens

hour

6.00

13,500.00

81,000.00

Front end loader 1 cum bucket capacity

hour

10.00

300.00

3,000.00

Tipper 5.5 cum capacity

hour

10.00

450.00

4,500.00

Material

Machinery

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

26,267.00

Cost for 670 cum = (a+b+c+d+e) x 0.90

212,762.70

Rate per cum = [(a+b+c+d+e) x 0.90]/ 670


Note:

1.14

Amount
(Rs.)

Quantity

Stone boulder of size 150 mm and below


c)

Rate
(Rs.)

Unit

800 cum of stone boulders are needed to get 670 cum of


stone chips of required size.

90 per cent of above cost will be attributed to the production


of 670 cum of stone aggregate and balance 10 per cent will
be for smaller size aggregates and stone dust which comes
out as a by-product.

The integrated stone crusher includes primary and


secondary crushing units.

285.80

Crushing of Stone Aggregates Nominal Size 13.2 mm as per


Table 500.9 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone
crushing unit of 200 t/h capacity comprising of primary and
secondary crushing units, belt conveyor and vibrating screens to
obtain stone aggregates of 13.2 mm nominal size as per Table
500.9 of Technical Specifications including the cost of stone.

Unit = cum
Taking output = 600 cum at crusher location
a)

b)

Labour
Mate

day

0.76

100.00

76.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Mazdoor (Unskilled)

day

17.00

80.00

1,360.00

cum

800.00

150.00

120,000.00

Material
Stone Boulder of size 150 mm and below

c)

EE.,Dn.I, BMR

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

19
Sr.
No.

Reference to
MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Integrated stone crusher of 200 t/h including belt conveyor


and vibrating screens

hour

6.00

13,500.00

81,000.00

Front end loader 1 cum bucket capacity

hour

10.00

300.00

3,000.00

Tipper 5.5 cum capacity

hour

10.00

450.00

4,500.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

26,267.00

Cost for 600 cum = (a+b+c+d+e) x 0.95

224,582.85

Rate per cum = [(a+b+c+d+e) x 0.95]/ 600


Note:

1.15

800 cum of stone boulders are needed to get 600 cum of


stone chips of size 13.2 mm and 125 cum stone dust.

95 per cent of above cost will be attributed to the production


of 600 cum of stone chips of 13.2 mm size and balance 5
per cent to the production of stone dust which comes out as
a by-product.

The integrated stone crusher includes primary and


secondary crushing units.

The analysis for curshing of stone chips of size 11.2 mm will


be same as for 13.2 mm

355.59

Crushing of Stone Aggregates 9.5 mm Nominal Size as per


Table 500.9 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated stone
crushing unit of 200 t/h capacity comprising of primary and
secondary crushing units, belt conveyor and vibrating screens to
obtain stone aggregates of 9.5 mm nominal size as per Table
500.9 of Technical Specifications including the cost of stone.

Unit = cum
Taking output = 600 cum at crusher location
a)

b)

Labour
Mate

day

0.76

100.00

76.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Mazdoor (Unskilled)

day

17.00

80.00

1,360.00

Material

Stone Boulder of size 150 mm and below


c)

EE.,Dn.I, BMR

cum

800.00

Machinery

150.00

120,000.00

Integrated stone crusher of 200 t/h including belt conveyor


and vibrating screens

hour

6.00

13,500.00

81,000.00

Front end loader 1 cum bucket capacity

hour

10.00

300.00

3,000.00

Tipper 5.5 cum capacity

hour

10.00

450.00

4,500.00

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

20
Sr.
No.

Reference to
MORD
Specifications

Description

Unit

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

26,267.00

Cost for 600 cum = (a+b+c+d+e) x 0.95

224,582.85

Rate per cum = [(a+b+c+d+e) x 0.95]/ 600


Note:

1.16

100

Amount
(Rs.)

374.30

800 cum of stone boulders are needed to get 600 cum of


stone chips of size 9.5 mm and 125 cum stone dust.

95 per cent of above cost will be attributed to the production


of 600 cum of stone chips of 9.5 mm size and balance 5 per
cent to the production of stone dust which comes out as a
by-product.

The integrated stone crusher includes primary and


secondary crushing units.

Cost of crushing of stone chips of size 6.7 mm will be 10


per cent extra over that of 9.5 mm size.

Setting Out

86,207.52

Unit = 1 km
The analysis of rate per km shall account for the following:
(i)

Reference benchmark one no.

1.00

2,913.32

2,913.32

(ii)

Working benchmark 4 nos. per km and near all drainage


structure and bridges

4.00

2,913.32

11,653.30

(iii)

Reference Pillars/Burjees @ 50 m interval on both sides of


the formation width

46.00

1,557.41

71,640.90

(iv)

The marking of centre line setting out curves and recording


of levels, etc. by the surveyor will be incidental to the work
and no extra payment shall be made for the same

(v)

The rate analysis for a typical benchmark as per Drawing


200.1

cum

0.325

75.60

24.57

cum

0.10

1,961.97

196.20

1.

Excavation for structure earthwork in excavation for


foundations as per drawing and technical specification
including dressing of sides and bottom and backfilling
in ordinary soil.
As per item No.11.1 of Chapter 11

2.

Plain cement concrete M10 (1:3:6) nominal mix in


levelling course below open foundation as per drawing
and technical specification.
As per item No.11.4 of Chapter 11

3.

EE.,Dn.I, BMR

Stone masonry work in cement mortar 1:4 in


foundation complete excluding pointing and plastering
as per drawing and technical specification.

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

21
Sr.
No.

Reference to
MORD
Specifications

Description
As per item No.11.6 III (ii) of Chapter 11
4.

Amount
(Rs.)

Quantity

cum

0.475

1,354.60

643.44

sqm

2.63

726.38

1,910.39

Plastering with cement mortar 1:4, 20 mm thick


cement plaster on masonry work as per technical
specifications.
As per item No.12.3 of Chapter 12

Note:

Rate
(Rs.)

Unit

Add 5 per cent cost of items No.1 to 4 for white washing, lettering
and painting, etc.

138.73

Cost of Benchmark

2,913.32

Refer to Figure 200.1. of Standard Data Book

(vi)

The rate analysis for a typical reference pillar as per


Drawing 200.2
1.

Excavation for structure earthwork in excavation for


foundations as per drawing and technical specification
including dressing of sides and bottom and backfilling
in ordinary soil.
As per item No.11.1 of Chapter 11

2.

75.60

14.52

cum

0.06

1,961.97

117.72

cum

0.193

1,354.60

261.44

sqm

1.50

726.38

1,089.58

Stone masonry work in cement mortar 1:4 in


foundation complete excluding pointing and plastering
as per drawing and technical specification.
As per item No.11.6 III (ii) of Chapter 11

4.

0.192

Plain cement concrete M10 (1:3:6) nominal mix in


levelling course below open foundation as per drawing
and technical specification.
As per item No.11.4 of Chapter 11

3.

cum

Plastering with cement mortar 1:4, 20 mm thick


cement plaster on masonry work as per technical
specifications.
As per item No.12.3 of Chapter 12

Add 5 per cent cost of items No.1 to 4 for white washing, lettering
and painting, etc.
Cost of Refernce pillar

74.16
1,557.41

Refer to Figure 200.2 of Standard Data Book

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

22
Sr.
No.

Reference to
MORD
Specifications

Note:

EE.,Dn.I, BMR

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

The cross-section height and material for the Reference


Benchmark, Working Benchmark and Reference Pillars shall be
decided depending upon site conditions and availability of
construction material. The cost thereof shall be worked out based
on rates of relevant items of work to be picked up from relevant
chapters of this book

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

22

Chapter 2
SITE CLEARANCE
Sr.
No.

Reference to
MORD Specifications

2.1

201

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

1.60

100.00

160.00

Mazdoor (Unskilled)

day

40.00

80.00

3,200.00

Clearing Grass and Removal of Rubbish


Clearing grass and removal of rubbish up to a distance of 30 m
outside the periphery of the area as per Technical Specification
Clause 201.
By Manual Means
Unit = hectare
Taking output = 1 hectare
a)

Labour

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

420.00

Rate per hectare = a+b+c


2.2

201

3,780.00

Clearing and Grubbing Road Land


Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth
upto 300 mm, removal of stumps of such trees cut earlier and
disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil not exceeding 150 mm in
thickness as per Technical Specification Clause 201.

Unit = hectare
Taking output = 1 hectare
(I)

By Manual Means
(A)

In area of non-thorny jungle


a)

b)

Labour
Mate

day

6.00

Mazdoor (Unskilled)

day

150.00

hour

1.00

600.00

80.00 12,000.00

Machinery
Tractor with trolley

EE.,Dn.I,BMR

100.00

TA to SE Circle BMR

AAO.,Circle, Barmer

150.00

SE.,Circle, Barmer

150.00

23

Sr.
No.

Reference to
MORD Specifications

Description
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
1,593.75

Rate per hectare = a+b+c+d

14,343.75

(B) In area of thorny jungle


a)

b)

Labour
Mate

day

8.00

Mazdoor (Unskilled)

day

200.00

hour

2.00

100.00

80.00 16,000.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

150.00

300.00
0.00
2,137.50

Rate per hectare = a+b+c+d


(II)

800.00

19,237.50

By Mechanical Means
(A)

In area of non-thorny jungle


a)

b)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

Dozer D 50 with attachment or suitable


machinery for removal of trees & stumps

hour

10.00

750.00

7,500.00

Tractor with Trolley

hour

1.00

150.00

150.00

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
998.25

Rate per hectare = a+b+c+d

8,984.25

(B) In area of thorny jungle


a)

b)

EE.,Dn.I,BMR

Labour
Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

24

Sr.
No.

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Dozer D 50 with attachment for removal of trees


& stumps

hour

12.00

750.00

9,000.00

Tractor with trolley

hour

1.50

150.00

225.00

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
1,216.13

Rate per hectare = a+b+c+d

10,945.13

Note: The top soil removed during clearing and grubbing of site, if
suitable for re-use shall be transported, conserved and stacked
as directed by the Engineer and shall be incidental to the work.

2.3

201

Cutting of Trees including Cutting of Trunks, Branches and


Removal of Stumps
Cutting of trees, including cutting of trunks, branches and removal
of stumps & roots, refilling, compaction of backfilling and stacking
of serviceable material by manual means with all lifts as per
Technical Specification Clause 201.
A.

Lead upto 100 m


Unit = each
(i)

Girth above 300 mm to 600 mm


a)

b)

Labour
Mate

day

0.024

100.00

2.40

Mazdoor (Unskilled)

day

0.60

80.00

48.00

hour

0.07

150.00

10.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

7.61

Rate for each tree = a+b+c+d


(ii)

Girth above 600 mm to 900 mm


a)

b)

Labour
Mate

day

0.036

100.00

3.60

Mazdoor (Unskilled)

day

0.90

80.00

72.00

hour

0.21

150.00

31.50

Machinery
Tractor with trolley

EE.,Dn.I,BMR

68.51

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

25

Sr.
No.

Reference to
MORD Specifications

Description
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
13.39

Rate for each tree = a+b+c+d

120.49

(iii) Girth above 900 mm to 1800 mm


a)

b)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

hour

0.28

150.00

42.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
26.25

Rate for each tree = a+b+c+d

236.25

(iv) Girth above 1800 mm to 2700 mm


a)

b)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

hour

0.42

150.00

63.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
49.88

Rate for each tree = a+b+c+d


(v)

Girth above 2700 mm to 4500 mm


a)

b)

Labour
Mate

day

0.32

100.00

32.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

hour

1.00

150.00

150.00

Machinery
Tractor with trolley

EE.,Dn.I,BMR

448.88

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

TA to SE Circle BMR

AAO.,Circle, Barmer

0.00
102.75

SE.,Circle, Barmer

26

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rate for each tree = a+b+c+d

924.75

(vi) Girth above 4500 mm


a)

b)

Labour
Mate

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

25.00

80.00

2,000.00

hour

2.00

150.00

300.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
300.00

Rate for each tree = a+b+c+d


B.

2,700.00

Lead upto 1000 m


Unit = each
(i) Girth above 300 mm to 600 mm
a)

b)

Labour
Mate

day

0.024

100.00

2.40

Mazdoor (Unskilled)

day

0.60

80.00

48.00

hour

0.10

150.00

15.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

8.18

Rate for each tree = a+b+c+d


(ii)

Girth above 600 mm to 900 mm


a)

b)

Labour
Mate

day

0.036

100.00

3.60

Mazdoor (Unskilled)

day

0.90

80.00

72.00

hour

0.30

150.00

45.00

Machinery
Tractor with trolley

EE.,Dn.I,BMR

73.58

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

TA to SE Circle BMR

AAO.,Circle, Barmer

0.00
15.08

SE.,Circle, Barmer

27

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rate for each tree = a+b+c+d

135.68

(iii) Girth above 900 mm to 1800 mm


a)

b)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

hour

0.40

150.00

60.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
28.50

Rate for each tree = a+b+c+d

256.50

(iv) Girth above 1800 mm to 2700 mm


a)

b)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

hour

0.60

150.00

90.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
53.25

Rate for each tree = a+b+c+d


(v)

479.25

Girth above 2700 mm to 4500 mm


a)

b)

Labour
Mate

day

0.32

100.00

32.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

hour

1.20

150.00

180.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
106.50

Rate for each tree = a+b+c+d

958.50

(vi) Girth above 4500 mm

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

28

Sr.
No.

Reference to
MORD Specifications

Description
a)

b)

Rate
(Rs.)

Quantity

Mate

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

25.00

80.00

2,000.00

hour

2.50

150.00

375.00

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
309.38

Rate for each tree = a+b+c+d


2.4

201

Amount
(Rs.)

Unit

2,784.38

Uprooting and Removing Stumps & Roots


Uprooting and Removing Stumps & roots, compaction of
backfilling and stacking of servicable material by manual means
as per Technical Specification Clause 201.
A.

Lead upto 100 m


Unit = each
(i)

Girth above 300 mm to 600 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

0.016

100.00

1.60

0.40

80.00

32.00

0.018

150.00

2.70

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4.54

Rate for each stump & root = a+b+c+d


(ii)

Girth above 600 mm to 900 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

c)

0.024

100.00

2.40

0.60

80.00

48.00

0.05

150.00

7.50

Machinery
Tractor with trolley

EE.,Dn.I,BMR

40.84

Overheads @ 0% on (a+b)

TA to SE Circle BMR

AAO.,Circle, Barmer

0.00

SE.,Circle, Barmer

29

Sr.
No.

Reference to
MORD Specifications

Description
d)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Contractors profit @ 12.5% on (a+b+c)

7.24

Rate for each stump & root = a+b+c+d

65.14

(iii) Girth above 900 mm to 1800 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

0.053

100.00

5.30

1.33

80.00

106.40

0.07

150.00

10.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
15.28

Rate for each stump & root = a+b+c+d

137.48

(iv) Girth above 1800 mm to 2700 mm


a)

b)

Labour
Mate

0.11

100.00

11.00

Mazdoor (Unskilled)

2.66

80.00

212.80

0.11

150.00

16.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
30.04

Rate for each stump & root = a+b+c+d


(v)

270.34

Girth above 2700 mm to 4500 mm


a)

b)

Labour
Mate

0.21

100.00

21.00

Mazdoor (Unskilled)

5.33

80.00

426.40

0.25

150.00

37.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
60.61

Rate for each stump & root = a+b+c+d

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

545.51

SE.,Circle, Barmer

30

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

(vi) Girth above 4500 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

0.60

100.00

60.00

15.00

80.00

1,200.00

0.75

150.00

112.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
171.56

Rate for each stump & root = a+b+c+d


B.

1,544.06

Lead upto 1000 m


Unit = each
(i)

Girth above 300 mm to 600 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

0.016

100.00

1.60

0.40

80.00

32.00

0.025

150.00

3.75

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4.67

Rate for each stump & root = a+b+c+d


(ii)

42.02

Girth above 600 mm to 900 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

0.024

100.00

2.40

0.60

80.00

48.00

0.075

150.00

11.25

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

7.71

Rate for each stump & root = a+b+c+d

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

69.36

SE.,Circle, Barmer

31

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

(iii) Girth above 900 mm to 1800 mm


a)

Labour
Mate
Mazdoor (Unskilled)

b)

0.053

100.00

5.30

1.33

80.00

106.40

0.10

150.00

15.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
15.84

Rate for each stump & root = a+b+c+d

142.54

(iv) Girth above 1800 mm to 2700 mm


a)

b)

Labour
Mate

0.11

100.00

11.00

Mazdoor (Unskilled)

2.66

80.00

212.80

0.15

150.00

22.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
30.79

Rate for each stump & root = a+b+c+d


(v)

277.09

Girth above 2700 mm to 4500 mm


a)

b)

Labour
Mate

0.21

100.00

21.00

Mazdoor (Unskilled)

5.33

80.00

426.40

0.30

150.00

45.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
61.55

Rate for each stump & root = a+b+c+d

553.95

(vi) Girth above 4500 mm


a)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

32

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Mate
Mazdoor (Unskilled)
b)

Quantity

Rate
(Rs.)

0.60

100.00

60.00

15.00

80.00

1,200.00

1.00

150.00

150.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
176.25

Rate for each stump & root = a+b+c+d


2.5

202

Amount
(Rs.)

1,586.25

Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding
wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with
all lifts and lead of 1000 m as per Technical Specification Clause
202.
Unit = cum
Taking output = 1.25 cum
(I) By Manual Means
(A)

Lime Concrete
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
15.56

Cost for 1.25 cum = a+b+c+d

140.06

Rate per cum = (a+b+c+d)/1.25

112.05

(B) Cement Concrete


a)

EE.,Dn.I,BMR

Labour
Mate

day

0.05

100.00

5.00

Mazdoor (Unskilled)

day

1.25

80.00

100.00

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

33

Sr.
No.

Reference to
MORD Specifications

Description
b)

Unit

Quantity

hour

0.27

Rate
(Rs.)

Amount
(Rs.)

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

150.00

40.50
0.00
18.19

Cost for 1.25 cum = a+b+c+d

163.69

Rate per cum = (a+b+c+d)/1.25

130.95

(C) Reinforced Cement Concrete


a)

b)

Labour
Mate

day

0.15

100.00

15.00

Blacksmith

day

0.25

120.00

30.00

Mazdoor (Unskilled)

day

3.50

80.00

280.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
43.81

Cost for 1.25 cum = a+b+c+d

394.31

Rate per cum = (a+b+c+d)/1.25

315.45

(II) By Mechanical Means


(A)

Cement Concrete
a)

b)

EE.,Dn.I,BMR

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Air compressor 210 cfm with 2 leads of hour


pneumatic breaker @1.5 cum per hour

0.83

194.00

161.02

Tractor with trolley

0.27

150.00

40.50

Machinery

hour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
30.44

Cost for 1.25 cum = a+b+c+d

273.96

Rate per cum = (a+b+c+d)/1.25

219.17

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

34

Sr.
No.

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.05

100.00

5.00

Mazdoor (Unskilled)

day

0.91

80.00

72.80

Blacksmith

day

0.25

120.00

30.00

Air compressor 170-210 cfm working with 2 Jack


Hammers simultaneously @1.00 cum per hour

hour

1.25

194.00

242.50

Tractor with trolley

hour

0.27

150.00

40.50

(B) Reinforced Cement Concrete


a)

b)

2.6

202

Labour

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
48.85

Cost for 1.25 cum = a+b+c+d

390.80

Rate per cum = (a+b+c+d)/1.25

312.64

Dismantling Brick/Tile Work


Dismantling of existing structures like culverts, bridges, retaining
walls and other structures comprising of brick masonry, including
disposal of unserviceable material and stacking the serviceable
material with all lift and lead of 1000 m as per Technical
Specification Clause 202.
Unit = cum
Taking output = 1.25
(A)

Lime mortar
a)

b)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

(B)

EE.,Dn.I,BMR

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
10.31

Cost for 1.25 cum = a+b+c+d

92.81

Rate per cum = (a+b+c+d) /1.25

74.25

Cement mortar

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

35

Sr.
No.

Reference to
MORD Specifications

Description
a)

b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.03

100.00

3.00

Mazdoor (Unskilled)

day

0.75

80.00

60.00

hour

0.27

150.00

40.50

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
12.94

Cost for 1.25 cum = a+b+c+d

116.44

Rate per cum = (a+b+c+d)/1.25


(C)

Mud Mortar
a)

b)

Labour
Mate

day

0.016

100.00

1.60

Mazdoor (Unskilled)

day

0.40

80.00

32.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

(D)

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

9.26

Cost for 1.25 cum = a+b+c+d

83.36

Rate per cum = (a+b+c+d)/1.25

66.69

Dry Brick Pitching or Brick Soling


a)

b)

Labour
Mate

day

0.014

100.00

1.40

Mazdoor (Unskilled)

day

0.35

80.00

28.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

EE.,Dn.I,BMR

93.15

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

8.74

Cost for 1.25 cum = a+b+c+d

78.64

Rate per cum = (a+b+c+d)/1.25

62.91

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

36

Sr.
No.

Reference to
MORD Specifications

2.7

202

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.024

100.00

2.40

Mazdoor (Unskilled)

day

0.60

80.00

48.00

hour

0.27

150.00

40.50

Dismantling Stone Masonry as per Technical Specification


Clause 202.
Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of stone masonry, including
disposal of unserviceable material and stacking the serviceable
material with all lift and lead of 1000 m as per Technical
Specification Clause 202.
Unit = cum
Taking ouput = 1.25 cum
(A)

Rubble Stone Masonry in Lime Mortar


a)

b)

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
11.36

Cost for 1.25 cum = a+b+c+d

102.26

Rate per cum = (a+b+c+d)/1.25


(B)

81.81

Rubble Stone Masonry in Cement Mortar


a)

b)

Labour
Mate

day

0.03

100.00

3.00

Mazdoor (Unskilled)

day

0.75

80.00

60.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
12.94

Cost for 1.25 cum = a+b+c+d

116.44

Rate per cum = (a+b+c+d)/1.25


(C)

Rubble Stone Masonry in Mud Mortar


a)

EE.,Dn.I,BMR

93.15

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

37

Sr.
No.

Reference to
MORD Specifications

Description

b)

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

hour

0.27

150.00

40.50

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

10.31
92.81

Rate per cum = (a+b+c+d)/1.25

74.25

Dry Rubble Masonry

b)

Labour
Mate

day

0.018

100.00

1.80

Mazdoor (Unskilled)

day

0.45

80.00

36.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

9.79

Cost for 1.25 cum = a+b+c+d

88.09

Rate per cum = (a+b+c+d)/1.25

70.47

Dismantling Stone Pitching / Dry Stone Spalls


a)

b)

Labour
Mate

day

0.016

100.00

1.60

Mazdoor (Unskilled)

day

0.40

80.00

32.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

EE.,Dn.I,BMR

0.00

Cost for 1.25 cum = a+b+c+d

a)

(E)

Amount
(Rs.)

Quantity

Tractor with trolley

(D)

Rate
(Rs.)

Unit

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

9.26

Cost for 1.25 cum = a+b+c+d

83.36

Rate per cum = (a+b+c+d)/1.25

66.69

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

38

Sr.
No.

Reference to
MORD Specifications

Description
(F)

b)

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

hour

0.27

150.00

40.50

Labour

Machinery
Tractor with trolley

202

Amount
(Rs.)

Quantity

Dismantling boulders laid in wire crates including


opening of crates and stacking dismantled materials
a)

2.8

Rate
(Rs.)

Unit

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
10.31

Cost for 1.25 cum = a+b+c+d

92.81

Rate per cum = (a+b+c+d)/1.25

74.25

Dismantling Wood Work Wrought and Planed Fixed in


Frames of Trusses upto a height of 5 m above Plinth Level as
per Technical Specification Clause 202.
Unit = cum
Taking output = 1.25 cum
a)

b)

Labour
Mate

day

0.06

100.00

6.00

Carpenter 1st Class

day

0.50

200.00

100.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

hour

0.27

150.00

40.50

Machinery
Tractor with trolley

2.9

202

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

27.56

Cost for 1.25 cum = a+b+c+d

248.06

Rate per cum = (a+b+c+d)/1.25

198.45

Dismantling Steel Work in all Types of Sections upto a height


of 5 m above Plinth Level excluding Cutting of rivet as per
Technical Specification Clause 202.
Unit = t
Taking output = 1
(A)

EE.,Dn.I,BMR

Including dismembering

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

39

Sr.
No.

Reference to
MORD Specifications

Description
a)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.14

100.00

14.00

Blacksmith

day

1.00

120.00

120.00

Mazdoor (Unskilled)

day

2.50

80.00

200.00

Labour

Add 2.5 per cent of cost of labour for gas cutting,


ropes, pulleys, etc.
b)

8.35

Machinery
Tractor with trolley

hour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.17

150.00

0.00
44.94

Rate per t = a+b+c+d


(B)

404.44

Excluding dismembering
a)

Labour
Mate

day

0.10

100.00

10.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Blacksmith

day

0.50

120.00

60.00

Add 2.5 per cent of cost of labour for gas cutting,


ropes, pulleys, etc.
b)

5.75

Machinery
Tractor with trolley

hour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.17

150.00

25.50
0.00
31.94

Rate per t = a+b+c+d


(C)

25.50

287.44

Extra over Items (A) and (B) for cutting rivets


Unit = each
Taking output = 10 rivets
a)

EE.,Dn.I,BMR

Labour
Mate

day

0.01

100.00

1.00

Blacksmith

day

0.13

120.00

15.60

Mazdoor (Unskilled)

day

0.13

80.00

10.40

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

40

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

3.38

Cost for 10 rivets = a+b+c

30.38

Rate for each rivet = (a+b+c) /10


2.10

202

3.04

Scraping of bricks dismantled from brick work including


stacking as per Technical Specification Clause 202.
Unit = Nos.
Taking output = 1000 Nos.
In Lime/ Cement Mortar
a)

Labour
Mate

day

0.14

100.00

14.00

Mazdoor (Unskilled)

day

3.50

80.00

280.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

36.75

Rate per 1000 Nos. = a+b+c


2.11

202

330.75

Scraping of Stone from Dismantled Stone Masonry as per


Technical Specification Clause 202.
Unit = cum
Taking output = 1 cum
In Cement or Lime Mortar
a)

Labour
Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.40

80.00

112.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

14.75

Rate per cum = a+b+c


2.12

202

132.75

Scraping Plaster in Lime or Cement Mortar from Brick / Stone


Masonry as per Technical Specification Clause 202.
Unit = sqm
Taking ouput = 100 sqm

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

41

Sr.
No.

Reference to
MORD Specifications

Description
a)

b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

hour

0.32

150.00

48.00

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

48.00

Cost for 100 sqm = a+b+c+d

432.00

Rate per sqm = (a+b+c+d)/100


2.13

202

4.32

Removing all types of Hume pipes and stacking within a lead


of 1000 m including Earthwork and Dismantling of Masonry
Works as per Technical Specification Clause 202.

Unit = m
Taking output = 1m
(A)

Upto 600 mm dia Hume pipe


a)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.52

80.00

41.60

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

5.45

Rate per m = a+b+c


(B)

49.05

Above 600 mm to 900 mm dia Hume pipe


a)

Labour
Mate

day

0.03

100.00

3.00

Mazdoor (Unskilled)

day

0.70

80.00

56.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

7.38

Rate per m = a+b+c


(C)

EE.,Dn.I,BMR

66.38

Above 900 mm dia Hume pipe

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

42

Sr.
No.

Reference to
MORD Specifications

Description
a)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.05

100.00

5.00

Mazdoor (Unskilled)

day

1.20

80.00

96.00

Labour

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

0.00
12.63

Rate per m = a+b+c


Note:

2.14

202

113.63

The excavation of earth, dismantling of stone masonry work


in head walls and protection works is not included which is
to be measured and paid separately.

Credit for retrieved stone from masonry work may be taken


as per actual availability.

Dismantling of Flexible Pavements


Dismantling of flexible pavements and disposal of dismantled
materials upto a lead of 100 m, stacking serviceable and
unserviceable materials separately as per Technical Specification
Clause 202
Unit = cum
Taking output = 1 cum
(I)

By Manual Means
(A)

Bituminous Courses
a)

b)

Labour
Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.50

80.00

120.00

hour

0.38

150.00

57.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
22.88

Rate per cum = a+b+c+d

205.88

(B) Granular Courses


a)

EE.,Dn.I,BMR

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

43

Sr.
No.

Reference to
MORD Specifications

Description
b)

Unit

Quantity

hour

0.33

Rate
(Rs.)

Amount
(Rs.)

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

150.00

0.00
16.69

Rate per cum = a+b+c+d


(II)

150.19

By Mechanical Means
(A)

Bituminous Courses
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.30

80.00

24.00

Tractor with trolley

hour

0.38

150.00

57.00

Tractor with ripper @ 60 cum per hour

hour

0.016

180.00

2.88

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
10.49

Rate per cum = a+b+c+d


2.15

202

49.50

94.37

Dismantling of Cement Concrete Pavements as per Technical


Specification Clause 202.
Dismantling of cement concrete pavements by mechanical
means using pneumatic tools breaking to pieces not exceeding
0.02 cum in volume and stock piling at designated locations and
disposal of dismantled materials upto a lead of 1000 m, stacking
serviceable and unserviceable materials separately

Unit = cum
Taking output = 1 cum
a)

b)

EE.,Dn.I,BMR

Labour
Mate

day

0.03

100.00

3.00

Mazdoor (Semi-skilled)

day

0.50

90.00

45.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

44

Sr.
No.

Reference to
MORD Specifications

Rate
(Rs.)

Amount
(Rs.)

Description

Unit

Quantity

Air compressor 210 cfm with two leads for pneumatic


cutters / hammers @ 1 cum per hour

hour

1.00

194.00

194.00

Tractor with trolley

hour

0.40

150.00

60.00

Joint Cutting Machine with 2-3 blades

hour

1.00

300.00

300.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

80.25

Rate per cum = a+b+c+d


Note:

2.16

202

722.25

The above analysis is for removal of complete pavement. In case


full depth repair work is required to be done after dismantling,
provision of a concrete saw cutter may be added for 0.25h.
Dismantling Guard Rails
Dismantling guard rails by manual means and disposal of
dismantled material with all lifts and upto a lead of 1000 m,
stacking serviceable materials and unserviceable materials
separately as per Technical Specification Clause 202.
Unit = running m
Taking Output = 1 m
a)

b)

Labour
Mate

day

0.006

100.00

0.60

Mazdoor (Unskilled)

day

0.15

80.00

12.00

hour

0.05

150.00

7.50

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

2.51

Rate per m = a+b+c+d


2.17

202

22.61

Dismantling Kerb Stones


Dismantling kerb stones by manual means and disposal of
dismantled material with all lifts and upto a lead of 1000 m as per
Technical Specification Clause 202.
Unit = running m
Taking output = 10 m
a)

Labour
Mate

EE.,Dn.I,BMR

TA to SE Circle BMR

day

AAO.,Circle, Barmer

0.006

100.00

SE.,Circle, Barmer

0.60

45

Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)
b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

day

0.15

80.00

12.00

hour

0.20

150.00

30.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

5.33

Cost of 10 m = a+b+c+d

47.93

Rate per m = (a+b+c+d)/10


2.18

202

4.79

Dismantling Kerb Stone Channels


Dismantling kerb stone channels by manual means and disposal
of dismantled material with all lifts and upto a lead of 1000 m as
per Technical Specification Clause 202.
Unit = running m
Taking output = 10 m
a)

b)

Labour
Mate

day

0.015

100.00

1.50

Mazdoor (Unskilled)

day

0.225

80.00

18.00

hour

0.30

150.00

45.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

8.06

Cost of 10 m = a+b+c+d

72.56

Rate per m = (a+b+c+d)/10


2.19

202

7.26

Dismantling Kilometre Stones


Dismantling of kilometre stones including cutting of earth,
foundation and disposal of dismantled material with all lifts and
lead upto 1000 m and backfilling of pit as per Technical
Specification Clause 202.
Unit = each
Taking output = 1 km stone
(A)

5th km Stone
Quantity of cement concrete = 0.392 cum

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

46

Sr.
No.

Reference to
MORD Specifications

Description
a)

b)

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.03

100.00

3.00

Mazdoor (Unskilled)

day

0.75

80.00

60.00

hour

0.15

150.00

22.50

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
10.69

Rate for one 5th km stone = a+b+c+d


(B)

96.19

Ordinary km Stones
Quantity of cement concrete = 0.269 cum
a)

b)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

hour

0.08

150.00

11.25

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

6.66

Rate for one ordinary km stone = a+b+c+d


(C)

59.91

200 m Stones
Quantity of cement concrete = 0.048 cum
a)

b)

Labour
Mate

day

0.004

100.00

0.40

Mazdoor (Unskilled)

day

0.10

80.00

8.00

hour

0.02

150.00

3.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

1.43

Rate for one 200 m stone = a+b+c+d


Note:

EE.,Dn.I,BMR

12.83

Rate for boundary pillar will be same as that of 200 m stone

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

47

Sr.
No.

Reference to
MORD Specifications

2.20

202

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.15

100.00

15.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Blacksmith

day

0.75

120.00

90.00

hour

0.15

150.00

22.50

Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing including
posts, foundation concrete, backfilling of pit by manual means
including disposal of dismantled material with all lifts and upto a
lead of 1000 m, stacking serviceable material and unserviceable
material separately as per Technical Specification Clause 202.
Unit = running m
Taking output = 30 m
a)

b)

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

45.94

Cost of 30 m = a+b+c+d

413.44

Rate per m = (a+b+c+d)/30


2.21

202

13.78

Dismantling of CI Water Pipe Line


Dismantling of CI water pipe line 600 mm dia including disposal
with all lifts and lead upto 1000 m and stacking of serviceable
material and unserviceable material separately under supervision
of concerned department as per Technical Specification Clause
202.
Unit = running m
Taking output = 10 m
a)

b)

EE.,Dn.I,BMR

Labour
Mate

day

0.09

100.00

9.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Plumber

day

0.25

150.00

37.50

Truck 10 t capacity

hour

0.25

400.00

100.00

Crane upto 8 t capacity

hour

0.50

500.00

250.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

48

Sr.
No.

Reference to
MORD Specifications

Description
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c+d)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
69.56

Cost for 10 m = a+b+c+d

626.06

Rate per m = (a+b+c+d)/10


Note:

2.22

202

62.61

The rate analysis does not include any excavation in earth or


dismantling of masonry works which are to be measured and paid
separately.
Removal of Cement Concrete Pipe of Sewer Gutter
Removal of cement concrete pipe of sewer gutter 1500 mm dia
under the supervision of concerned department including
disposal with all lifts and upto a lead of 1000 m and stacking of
serviceable and unserviceable material separately but excluding
earth excavation and dismantling of masonry works as per
Technical Specification Clause 202.
Unit = running m
Taking output = 10 m
a)

b)

Labour
Mate

day

0.10

100.00

10.00

Mazdoor (Unskilled)

day

2.50

80.00

200.00

Crane upto 8 t capacity

hour

0.30

500.00

150.00

Truck flat body 10 t

hour

1.00

400.00

400.00

Machinery

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

95.00

Cost for 10 m = a+b+c+d

855.00

Rate per m = (a+b+c+d)/10


Note:

2.23

202

85.50

The rate analysis does not include any excavation in earth or


dismantling of masonry works which are to be measured and paid
separately.
Removal of Telephone/Electric Poles and Lines
Removal of telephone/electric poles with wires including
excavation and dismantling of foundation concrete and lines
under the supervision of concerned department, disposal with all
lifts and upto a lead of 1000 m and stacking the serviceable and
unserviceable material separately as per Technical Specification
Clause 202.

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

49

Sr.
No.

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit

Quantity

Mate

day

0.48

100.00

48.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Electrician/Lineman

day

2.00

150.00

300.00

hour

1.50

150.00

225.00

Unit = each
Taking output = 30 Nos.
a)

b)

Labour

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 30 poles = a+b+c+d

171.63
1,544.63

Rate per pole = (a+b+c+d)/30

EE.,Dn.I,BMR

TA to SE Circle BMR

51.49

AAO.,Circle, Barmer

SE.,Circle, Barmer

49

Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Sr.
No.

Reference to
MORD Specifications

3.1

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Preparation of Foundation for Embankment


301.4

Scarifying Existing Granular Surface to a Depth of 50 mm by


Manual Means
Scarifying existing granular surface to a depth of 50 mm and disposal
of scarified material with a lift upto 3 m and leads upto 1000 m as per
Technical Specification Clause 301.4.
Unit = sqm
Taking output = 100 sqm
a)

b)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

hour

1.50

150.00

225.00

Machinery
Tractor with trolley

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

70.13

Cost for 100 sqm = a+b+c+d

631.13

Rate per sqm = (a+b+c+d)/100

6.31

Note: In case material is to be reused at site, transportation cost catered


above (Sub-item b) for disposal shall be deleted.
3.2

Preparation of Foundation for Embankment


301.4

Scarifying Existing Bituminous Surface to a Depth of 150 mm by


Mechanical Means
Scarifying the existing bituminous road surface to a depth of 150 mm
and disposal of scarified material with a lift upto 3 m and lead upto
1000 m as per Technical Specification Clause 301.4.
Unit = sqm
Taking output = 100 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

50

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Tractor with ripper attachment @ 60 cum per hour

hour

0.25

180.00

45.00

Front end loader 1 cum bucket capacity @ 50 cum per hour

hour

0.30

300.00

90.00

Tipper 5.5 cum capacity, 4 trips per hour

hour

0.68

450.00

306.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

57.75

Cost for 100 sqm = a+b+c+d

519.75

Rate per sqm = (a+b+c+d)/100


3.3

301.5

5.20

Construction of Embankment with Material Obtained from


Roadway Cutting
Construction of embankment with approved materials deposited at site
from roadway cutting and excavation from drain and foundation of other
structures graded and compacted to meet requirement of Tables 300.1
and 300.2 as per Technical Specification Clause 301.5

Unit = cum
Taking output = 100 cum
a)

b)

c)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Dozer D-50 for spreading @ 200 cum per hour

hour

0.50

0.00

0.00

Motor grader for grading @ 200 cum per hour

hour

0.50

700.00

350.00

Water tanker 6 kl capacity

hour

2.00

250.00

500.00

Three wheel 80-100 kN Static Roller

hour

1.25

160.00

200.00

kl

12.00

15.00

180.00

Machinery

Material
Water

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate for 100 cum = a+b+c+d+e

159.00
1,431.00

Rate per cum = (a+b+c+d+e)/100

EE.,Dn.I, BMR

TA to SE Circle BMR

14.31

AAO.,Circle, Barmer

SE.,Circle, Barmer

51

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Note: In case the earth cutting is done by dozer and pushed for filling in the
embankment, the input of dozer in the cost of embankment shall be
deleted as the same is already provided in the cost of excavation.
However, if the earth is dumped by tippers from roadway cutting, the
input of dozer for spreading is required to be provided.

3.4

301.5

Construction of Embankment with Material Obtained from Borrow


Pits

A.

Construction of embankment with approved material obtained from


borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading
to required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 1000 m as per Technical Specification
Clause 301.5
Unit = cum
Taking output = 100 cum
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum per hour

hour

1.67

1,400.00

2,338.00

Tipper 5.5 cum with 10 t capacity

hour

4.50

450.00

2,025.00

Loading of earth as per item 1.2 (ii)

cum

100.00

5.00

500.00

Unloading of earth as per item 1.2 (iv)

cum

100.00

1.00

100.00

Dozer D-50 for spreading @ 200 cum per hour

hour

0.50

750.00

375.00

Motor grader for grading @ 200 cum per hour

hour

0.50

700.00

350.00

Water tanker 6 kl capacity

hour

2.00

250.00

500.00

Three wheel 80-100 kN Static Roller @ 80 cum per hour

hour

1.25

160.00

200.00

kl

12.00

15.00

180.00

cum

100.00

0.00

0.00

Machinery

Material
Water
Compensation for earth taken from private land

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 100 cum = a+b+c+d+e

831.50
7,483.50

Rate per cum = (a+b+c+d+e)/100

EE.,Dn.I, BMR

TA to SE Circle BMR

74.84

AAO.,Circle, Barmer

SE.,Circle, Barmer

52

Sr.
No.

Reference to
MORD Specifications

B.

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Construction of embankment with approved material obtained from


borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading
to required slope and compacting to meet requirement of Tables 300.1
and 300.2 with a lead upto 100 m as per Technical Specification Clause
301.5
Unit = cum
Taking output = 100 cum
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Dozer D-50 for spreading @ 50 cum per hour(cutting with pusing) hour

2.00

750.00

1,500.00

Motor grader for grading @ 200 cum per hour

hour

0.50

700.00

350.00

Water tanker 6 kl capacity

hour

2.00

250.00

500.00

Three wheel 80-100 kN Static Roller @ 80 cum per hour

hour

1.25

160.00

200.00

kl

12.00

15.00

180.00

cum

100.00

0.00

0.00

Machinery

Material
Water
Compensation for earth taken from private land

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 100 cum = a+b+c+d+e

351.75
3,165.75

Rate per cum = (a+b+c+d+e)/100


Note:

3.5

302

31.66

Compensation for earth will vary from place to place and will have to be
assessed realistically as per particular ground situation. In case earth
is available from Govt. land, compensation for earth will not be
required. The position is required to be clearly stated in the cost
estimate.
(i)

Excavation in Cutting in Soil by manual means with lead


upto 50 m(Restricted for petty works , Qty. upto 100 Cum)
Excavation for roadway in soil using manual means for carrying
of cut earth to embankment site with a lift upto 1.5 m and lead
upto 50 m as per Technical Specification Clause 302.3
Unit = cum
Taking output = 120 cum
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

53

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Mate

day

1.80

100.00

180.00

Mazdoor (Unskilled)

day

45.00

80.00

3,600.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

472.50

Cost of 120 cum = a+b+c

4,252.50

Rate per cum = (a+b+c)/120


(ii)

35.44

Excavation in Soil with Dozer with lead upto 100 m


Excavation for roadway in soil by mechanical means including
cutting and pushing the earth to site of embankment upto a
distance of 100 m, including trimming bottom and side slopes in
accordance with requirements of lines, grades and crosssections.
Unit = cum
Taking output = 180 cum
a)

b)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

hour

3.60

750.00

2,700.00

Machinery
Dozer D-50 @ 50 cum per hour (cutting with pushing)

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 180 cum = a+b+c+d

358.50
3,226.50

Rate per cum = (a+b+c+d)/180


(iii)

17.93

Excavation in Soil using Hydraulic Excavator and Tippers


with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9
cum bucket capacity including cutting and loading in tippers,
trimming bottom and side slopes, in accordance with
requirements of lines, grades and cross-sections, and
transporting to the embankment location with a lift upto 1.5 m and
lead upto 1000 m as per Technical Specification Clause 302.3

Unit = cum
Taking output = 360 cum
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

54

Sr.
No.

Reference to
MORD Specifications

Description

b)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Hydraulic excavator 0.9 cum bucket capacity @ 100 cum


per hour

hour

3.60

1,400.00

5,040.00

Tipper 5.5 cum capacity, 4 trips per hour

hour

15.00

450.00

6,750.00

Machinery

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

1,494.75

Cost for 360 cum = a+b+c+d

13,452.75

Rate per cum = (a+b+c+d)/360


3.6

302.3.6

37.37

Excavation in Marshy Soil


Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum
bucket capacity including cutting and loading in tippers and disposal
with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and
side slopes in accordance with requirements of lines, grades and crosssections as per Technical Specification Clause 302.3.6.

Unit = cum
Taking output = 300 cum
a)

b)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Hydraulic excavator 0.90 cum bucket capacity @ 50 cum per hour hour

6.00

1,400.00

8,400.00

12.50

450.00

5,625.00

Machinery

Tipper 5.5 cum capacity, 4 trips per hour.


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

hour

0.00

Cost for 300 cum = a+b+c+d

1,774.13
15,967.13

Rate per cum = (a+b+c+d)/300


3.7

302.3.11

EE.,Dn.I, BMR

44.35

Removal of Unsuitable Soil with Disposal upto 1000 m

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

55

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Removal of unsuitable soil including excavation, loading and disposal


upto 1000 m lead but excluding compaction ground supporting
embankment subgrade replacement by suitable soil, which shall be
paid separately as per Clause 303.5.2 as per Technical Specification
Clause 302.3.11
Unit = cum
Taking output = 360 cum
a)

b)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor

day

2.00

80.00

160.00

Excavator 0.90 cum bucket capacity @ 100 cum per hour

hour

3.60

1,400.00

5,040.00

Tipper 5.5 cum capacity, 4 trips per hour

hour

15.00

450.00

6,750.00

Machinery

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

1,494.75

Cost for 360 cum = a+b+c+d

13,452.75

Rate per cum = (a+b+c+d)/360

37.37

Note: This item does not include replacement of unsuitable soil by suitable
soil. Replacement, where required, is to be provided and paid
separately under Clause 303.5.2.
3.8

302.3.5

(i)

Excavation in ordinary Rock by manual means


Excavation in ordinary rock using manual means including
loading in a truck and carrying of excavated material to
embankment site with a lift upto 1.5 m and lead upto 50 m as per
Technical Specification Clause 302.3.5.
Unit = cum
Taking output = 120 cum
a)

Labour
Mate

day

2.80

100.00

280.00

Mazdoor (Unskilled)

day

70.00

80.00

5,600.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

Cost for 120 cum = a+b+c

735.00
6,615.00

Rate per cum = (a+b+c)/120

EE.,Dn.I, BMR

TA to SE Circle BMR

55.13

AAO.,Circle, Barmer

SE.,Circle, Barmer

56

Sr.
No.

Reference to
MORD Specifications

Description
(ii)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Excavation in Ordinary Rock with Dozer with lead upto 100 m


Excavation for roadway in ordinary rock by deploying a dozer D50 including cutting and pushing the cut earth to site of
embankment upto a distance of 100 m (average lead 50 m),
trimming bottom and side slopes in accordance with the
requirements of lines, grades and cross-sections with lift upto 1.5
m.
Unit = cum
Taking output = 108 cum
a)

b)

Labour
Mate

day

0.12

100.00

12.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

hour

7.20

750.00

5,400.00

Machinery
Dozer D-50 @ 50% of 30 cum per hour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

706.50

Cost for 108 cum = a+b+c+d

6,358.50

Rate per cum = (a+b+c+d)/108


(iii)

58.88

Excavation in Ordinary Rock using Hydraulic Excavator and


Tippers with disposal upto 1000 m
Excavation for roadway in ordinary rock with hydraulic excavator
of 0.9 cum bucket capacity including cutting and loading in
tippers, transporting to embankment site with a lift upto 1.5 m and
lead upto 1000 m, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross-sections
as per Technical Specification Clause 302.3.5

Unit = cum
Taking output = 240 cum
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Hydraulic Excavator 0.90 cum bucket capacity @ 50% of 40 hour


cum per hour

12.00

Tipper 5.5 cum capacity, 4 trips per hour.

11.00

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

hour

1,400.00 16,800.00
450.00

4,950.00

SE.,Circle, Barmer

57

Sr.
No.

Reference to
MORD Specifications

Description

Unit

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Quantity

Rate
(Rs.)

0.00
2,739.75

Cost for 240 cum = a+b+c+d

24,657.75

Rate per cum = (a+b+c+d)/240


3.9

302.3.5

(i)

Amount
(Rs.)

102.74

Excavation in Hard Rock (requiring blasting) with disposal


upto 1000 m
Excavation for roadway in hard rock (requiring blasting) by
drilling, blasting and breaking, trimming of bottom and side slopes
in accordance with requirements of lines, grades and crosssections, loading and disposal of cut rock with a lift upto 1.5 m
and leads upto 1000 m as per Technical Specification Clause
302.3.5
Unit = cum
Taking 0utput = 180 cum
a)

b)

c)

Labour
Mate

day

0.22

100.00

22.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Driller

day

2.00

150.00

300.00

Blaster

day

0.25

150.00

37.50

Dozer D-50 @ 50 %of 30 cum per hour

hour

12.00

Air compressor, 210 cfm with 2 jack hammers

hour

6.00

194.00

1,164.00

Front end loader 1 cum bucket capacity @ 30 cum per hour

hour

6.00

300.00

1,800.00

Tipper 5.5 cum capacity, 2 trips per hour

hour

16.00

450.00

7,200.00

kg

70.00

120.00

8,400.00

Electric Detonators @ 1 detonator for 2 gelatine sticks of


285 gm each

each

252.00

10.00

2,520.00

Credit for excavated rock found suitable for use @ 50


per cent quantity blasted

cum

90.00

Machinery

Materials
Gelatine 80 per cent

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE Circle BMR

-55.00 -4,950.00
0.00

Cost for 180 cum = a+b+c+d+e

EE.,Dn.I, BMR

1,200.00 14,400.00

3,891.69
35,025.19

AAO.,Circle, Barmer

SE.,Circle, Barmer

58

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per cum = (a+b+c+d+e)/180


Note:

194.58

The quality and availability of rock shall be checked before


affording credit.

In case some rock is issued to the contractor at site, the item of


carriage shall be reduced/restricted to that extent.

Credit for useful material received as per site conditions shall be


taken into account. This has been assumed to be 50 per cent for
the purpose of analysis.

(ii)

Amount
(Rs.)

Excavation in Hard Rock (blasting prohibited)


Excavation for roadway in hard rock (blasting prohibited) with
rock breakers including breaking rock, loading in tippers and
disposal with a lift upto 1.5 m and lead upto 1000 metres,
trimming bottom and side slopes in accordance with
requirements of lines, grades and cross- sections as per
Technical Specification Clause 302.3.5
(A)

Manual Means
Unit = cum
Taking output = 16 cum
a)

b)

Labour
Mate

day

1.64

100.00

164.00

Mazdoor (Unskilled)

day

16.00

80.00

1,280.00

Chiseller

day

24.00

150.00

3,600.00

Blacksmith

day

1.00

120.00

120.00

Tipper 5.5 cum capacity, 1 trip per hour

hour

2.90

450.00

1,305.00

Credit for excavated rock found suitable for use @


50 per cent of excavated quantity

cum

8.00

-55.00

-440.00

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 16 cum = a+b+c+d

EE.,Dn.I, BMR

Credit is considered for 50 per cent of quantity of work.

Loading for disposal will be done manually, being small quantity.

TA to SE Circle BMR

753.63
6,782.63

Rate per cum = (a+b+c+d)/16


Note:

0.00

AAO.,Circle, Barmer

423.91

SE.,Circle, Barmer

59

Sr.
No.

Reference to
MORD Specifications

Description
3

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

In case some rock is issued to contractor at site, the item of


carriage shall be omitted to the extent of quantity issued to the
Contractor.
(B) Mechanical Means
Unit = cum
Taking output = 36 cum
a)

b)

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Hydraulic excavator 0.9 cum with rock breaker


attachment @ 6 cum per hour

hour

6.00

1,400.00

8,400.00

Tipper 5.5 cum capacity tipper, 1 trip per hour

hour

6.50

450.00

2,925.00

Credit for excavated rock found suitable for use @


50 per cent of excavated quantity

cum

18.00

-55.00

-990.00

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 36 cum = a+b+c+d

1,396.88
12,571.88

Rate per cum = (a+b+c+d)/36


Note:

0.00

The quality and availability of rock shall be checked before


affording credit.

In case some rock is issued to the contractor at site, the item of


carriage shall be restricted/reduced to that extent.

Being small quantity, manual loading will be economical in this


case and has been provided accordingly.

(iii)

Excavation in Hard Rock (controlled blasting) with disposal


upto 1000 m

349.22

Excavation for roadway in hard rock with controlled blasting by


drilling, blasting and breaking, trimming of bottom and side slopes
in accordance with requirements of lines, grades and crosssections, loading and disposal of cut rock with a lift upto 1.5 m
and leads upto 1000 m as per Technical Specification Clause
302.3.5
Unit = cum
Taking output = 180 cum
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

60

Sr.
No.

Reference to
MORD Specifications

Description

b)

c)

Unit

Quantity

Rate
(Rs.)

Mate

day

0.22

100.00

22.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Driller

day

2.00

150.00

300.00

Blaster

day

0.50

150.00

75.00

Dozer D-50 @ 50% of 30 cum per hour

hour

12.00

Air compressor, 210 cfm with 2 jack hammers

hour

6.00

194.00

1,164.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 cum capacity, 2 trips per hour

hour

8.20

450.00

3,690.00

kg

70.00

120.00

8,400.00

Machinery
1,200.00 14,400.00

Materials
Gelatine 80 per cent

Electric detonators @ 1 detonator for 2 gelatine stick of 285 each 1,008.00


gm each
Credit for excavated rock found suitable for use @ 50 cum
per cent quantity blasted
d)

Overheads @ 0% on (a+b)

e)

Contractors profit @ 12.5% on (a+b+c)

90.00

10.00 10,080.00
-55.00 -4,950.00
0.00
4,402.63

Cost for 180 cum =a+b+c+d+e

39,623.63

Rate per cum = (a+b+c+d+e)/180


Note:

3.10

302.3.2

Amount
(Rs.)

220.13

Credit is considered for 50 per cent of quantity of blasted rock, if


found suitable for construction.

In case some rock is issued to the Contractor at site, the item of


carriage shall be reduced to that extent.

Stripping, Storing and Relaying Top Soil from Right-of-Way


(R.O.W)
Stripping, storing and preservation of top soil by keeping it damp in
stock piles and keep wet till it is used by road side at 15 m internal and
re-application on embankment slopes, cut slopes and other areas in
localities where the available embankment material is not conducive to
plant growth as per Technical Specification Clause 302.3.2
Unit = cum
Taking output = 10 cum
a)

Labour
Mate

EE.,Dn.I, BMR

day

TA to SE Circle BMR

AAO.,Circle, Barmer

0.20

100.00

SE.,Circle, Barmer

20.00

61

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Mazdoor (Unskilled)
b)

Quantity

Rate
(Rs.)

Amount
(Rs.)

day

5.00

80.00

400.00

hour

0.10

750.00

75.00

Machinery
Dozer D-50 @ 100 cum per hour

495.00
d)

Contractors profit @ 12.5% on (a+b+c)

123.75

Cost for 10 cum = (a+b+c+d)

1,113.75

Rate per cum = (a+b+c+d)/10


3.11

302.3.2

111.38

Stripping, Storing and Relaying Top Soil from Borrow Areas in


Agricultural Fields
Stripping of top soil from borrow areas located in agriculture fields,
storing at a suitable place, spreading and relaying after taking the
borrow earth to maintain fertility of the agricultural field, finishing it to
the required levels to the satisfaction of the farmer/land owner as per
Technical Specification Clause 302.3.2.
Unit = cum
Taking output = 300 cum
a)

b)

Labour
Mate

day

4.00

100.00

400.00

Mazdoor (Unskilled)

day

100.00

80.00

8,000.00

hour

6.00

750.00

4,500.00

Machinery
Dozer D-50 with 100 cum per hour output (Initially stacking and
relaying)

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 300 cum = a+b+c+d

1,612.50
14,512.50

Rate per sqm = (a+b+c+d)/300


3.12

309

48.38

Turfing with Sods


Furnishing and laying of the live sods of perennial turf forming grass on
embankment slope, verges or other locations shown on the drawing or
as directed by the Engineer including preparation of ground, fetching of
sods and watering as per Technical Specification Clause 309.
Unit = sqm
Talking output = 100 sqm

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

62

Sr.
No.

Reference to
MORD Specifications

Description
a)

b)

c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Labour
Mate

day

0.12

100.00

12.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Water tanker including watering for 3 months

hour

6.00

250.00

1,500.00

Tractor with Trolley

hour

1.00

150.00

150.00

cum

0.18

200.00

36.00

kl

36.00

15.00

540.00

Machinery

Material
Farmyard manure @ 0.18 cum per 100 sqm at site of work
Water

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

309.75

Cost for 100 sqm = a+b+c+d+e

2,787.75

Rate per sqm = (a+b+c+d+e)/100


3.13

310

27.88

Seeding and Mulching


Preparation of seed bed on previously laid top soil, furnishing and
placing of seeds, fertilizer, mulching material, applying bituminous
emulsion @ 0.23 litre per sqm and laying and fixing jute netting,
including watering for 3 months all as per Technical Specification
Clause 310.
Unit = sqm
Taking output = 240 sqm
a)

b)

c)

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Water tanker 6 kl capacity including watering for 3 months

hour

14.00

250.00

3,500.00

Tractor with Trolley

hour

2.40

150.00

360.00

kg

3.60

30.00

108.00

cum

0.43

200.00

86.00

0.052 24,500.00

1,274.00

Machinery

Material
Seeds
Sludge/Farmyard manure @ 0.18 cum per 100 sqm
Bitumen Emulsion

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

63

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Jute netting, open weave, 25 mm square opening


Water for 3 months
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

Amount
(Rs.)

sqm

264.00

30.00

7,920.00

kl

84.00

15.00

1,260.00
0.00
1,918.50

Cost for 240 sqm = a+b+c+d+e

17,266.50

Rate per sqm = (a+b+c+d+e)/240


3.14

303.1
a

71.94

Construction of Subgrade and Earthen Shoulders


Construction of subgrade and earthen shoulders with approved
material obtained from borrow pits with all lifts and leads, transporting
to site, spreading, grading to required slope and compacted to meet
requirement of Table 300.2 with lead upto 1000 m as per Technical
Specification Clause 303.1.
Unit = cum
Taking output = 100 cum
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic excavator 0.9 cum bucket capacity @ 60cum per hour

hour

1.67

1,400.00

2,338.00

Tipper 5.5 cum capacity, 4 trips per hour

hour

4.50

450.00

2,025.00

Add rate for loading as per item 1.2 (ii)

cum

100.00

5.00

500.00

Add rate for unloading as per item 1.2 (iv)

cum

100.00

1.00

100.00

Dozer D-50 for spreading @ 200 cum per hour

hour

0.50

750.00

375.00

Motor grader for grading @ 100 cum per hour

hour

1.00

700.00

700.00

Water tanker with 6 kl capacity

hour

2.00

250.00

500.00

Three wheel 80-100 kN Static Roller @ 70 cum per hour

hour

1.43

160.00

228.80

kl

12.00

15.00

180.00

cum

100.00

0.00

0.00

Machinery

Material
Water
Compensation for earth taken from private land

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE Circle BMR

0.00

AAO.,Circle, Barmer

878.85

SE.,Circle, Barmer

64

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost for 100 cum = a+b+c+d+e

Amount
(Rs.)
7,909.65

Rate per cum = (a+b+c+d+e)/100


b.

79.10

Construction of subgrade and earthen shoulders with approved


material obtained from borrow pits with all lifts and leads, transporting
to site, spreading, grading to required slope and compacted to meet
requirement of Table 300.2 with lead upto 100 m as per Technical
Specification Clause 303.1.
Unit = cum
Taking output = 100 cum
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Dozer D-50 for spreading @ 50 cum per hour(cutting with pushing hour

2.00

750.00

1,500.00

Motor grader for grading @ 100 cum per hour

hour

1.00

700.00

700.00

Water tanker with 6 kl capacity

hour

2.00

250.00

500.00

Three wheel 80-100 kN Static Roller @ 70 cum per hour

hour

1.43

160.00

228.80

kl

12.00

15.00

180.00

cum

100.00

0.00

0.00

Machinery

Material
Water
Compensation for earth taken from private land

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 100 cum = a+b+c+d+e

399.10
3,591.90

Rate per cum = (a+b+c+d+e)/100


3.15

301.4

35.92

Compacting Original Ground


(i)

Compacting original ground supporting embankment


Loosening, Levelling and Compacting original ground supporting
embankment to facilitate placement of first layer of embankment,
scarified to a depth of 150 mm, mixed with water at OMC and
then compacted by rolling so as to achieve minimum dry density
as given in Tables 300.1 and 300.2 for embankment construction
as per Technical Specification Clause 301.4.1.

Unit = cum

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

65

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Taking output = 600 cum


a)

b)

c)

Labour
Mate

day

0.08

100.00

8.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Tractor with ripper attachment

hour

6.00

150.00

900.00

Three wheel 80-100 kN Static Roller

hour

7.50

160.00

1,200.00

Water tanker 6 kl capacity

hour

4.00

250.00

1,000.00

kl

24.00

15.00

360.00

Machinery

Material
Water

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

453.50

Cost for 600 cum = a+b+c+d+e

4,081.50

Rate per sqm = (a+b+c+d+e)/600


303

(ii)

6.80

Compacting original ground supporting subgrade


Loosening of the ground upto a level of 300 mm below the
subgrade level, watered, graded and compacted in layers to meet
requirement of Tables 300.1 and 300.2 for subgrade construction
as per Technical Specification Clause 303.5.2.
Unit = cum
Taking output = 600 cum
a)

b)

c)

Labour
Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Tractor with ripper attachment

hour

10.00

150.00

1,500.00

Motor grader for grading

hour

6.00

700.00

4,200.00

Water tanker 6 kl capacity

hour

4.00

250.00

1,000.00

Three wheel 80-100 kN Static Roller @ 70 cum per hour

hour

8.60

160.00

1,376.00

kl

24.00

15.00

360.00

Machinery

Material
Water

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

66

Sr.
No.

Reference to
MORD Specifications

Description

Unit

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
1,117.50

Cost for 600 cum = a+b+c+d+e

10,057.50

Rate per cum = (a+b+c+d+e)/600


3.16

301.5.5.1

16.76

Repairs of damages caused by rain/spillage of water


Preparation and surface treatment of formation by removing mud and
slurry, watering to the extent needed to maintain the desired moisture
content, trimming to the required line, grade, profile and rolling with
three wheel 80-100 kN static roller, complete as per Technical
Specification Clause 301.5.5.1
Unit = sqm
Taking output = 3500 sqm
a)

b)

c)

Labour
Mate

day

0.28

100.00

28.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Mazdoor skilled

day

1.00

100.00

100.00

Three wheel static roller 80-100 kN

hour

3.00

160.00

480.00

Water tanker 6 kl, one trip per hour

hour

2.00

250.00

500.00

kl

12.00

15.00

180.00

Machinery

Material
Water

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 3500 sqm = a+b+c+d+e

221.00
1,989.00

Rate per sqm = (a+b+c+d+e)/3500


3.17

304.3

0.57

Presplitting Rock Excavation Slopes


Carrying out excavation in hard rock to achive a specified slope of the
rock face by controlled use of explosives and blasting accessories in
properly aligned and spaced drill holes, collection of the excavated rock
by a D-50 dozer, loading in tipper by a front end loader and disposing
of the material with a lift upto 1.5 m and lead upto 1000 m as per
Technical Specification Clause 304.3
Unit = sqm

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

67

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Taking output = 400 sqm (120 cum considering 300 mm average depth
of excavation over the existing rock face)
a)

b)

c)

Labour
Mate

day

0.60

100.00

60.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Air compressor 210 cfm with 2 leads @ 20 cum per hour

hour

6.00

194.00

1,164.00

Dozer D-50 @ 50% of 30 cum per hour

hour

12.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 cum capacity 2 trip per hour

hour

11.00

450.00

4,950.00

kg

42.00

120.00

5,040.00

each

672.00

10.00

6,720.00

Machinery

1,200.00 14,400.00

Material
Gelatine 80 per cent
Electric detonators @ 1 detonator for 2 gelatine sticks of 285 gm
each

35,334.00
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

4,416.75

Cost for 400 sqm = a+b+c+d+e

39,750.75

Rate per sqm = (a+b+c+d+e)/400

99.38

Note: In case blasted rock is issued to the Contractor against payment for
construction work, the cost of carriage shall be reduced to that extent.
3.18

306

Construction of Embankment with Flyash/Pond ash available from


Coal or Lignite Burning Thermal Plants as Waste Material
Construction of embankment with flyash conforming to Table 1 of
IRC:SP:58 obtained from coal or lignite burning thermal power stations
as waste material, spread and compacted in layer of 200 mm thickness
each at OMC, all as specified in IRC:SP:58 and as per approved plans
with lead upto 1000 m as per Technical Specification Clause 306.

Unit = cum
Taking output = 360 cum
a)

Labour
Mate

EE.,Dn.I, BMR

day

TA to SE Circle BMR

AAO.,Circle, Barmer

0.16

100.00

SE.,Circle, Barmer

16.00

68

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Mazdoor (Unskilled)
b)

c)

Quantity

Rate
(Rs.)

Amount
(Rs.)

day

4.00

80.00

320.00

Hydraulic excavator 0.9 cum bucket capacity @ 60 cum per hour

hour

6.00

1,400.00

8,400.00

Tipper 5.5 cum capacity, flyash 360 x 1.2 = 432 t

hour

16.00

450.00

7,200.00

Loading as per item 1.2 (ii)

cum

360.00

5.00

1,800.00

Unloading as per item 1.2 (iv)

cum

360.00

1.00

360.00

Dozer D-50 for spreading @ 200 cum per hour

hour

1.80

750.00

1,350.00

Motor grader for grading @ 200 cum per hour

hour

1.80

700.00

1,260.00

Water tanker 6 kl capacity

hour

9.00

250.00

2,250.00

Three wheel 80-100 kN Static Roller

hour

4.50

160.00

720.00

kl

54.00

15.00

810.00

Machinery

Material
Water

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

3,060.75

Cost for 360 cum = a+b+c+d+e

27,546.75

Rate per cum = (a+b+c+d+e)/360


Note:

3.19

307

76.52

As flyash is available free of cost as waste material from Thermal


Plants, cost of material has not been added.

The earthcover on sides and intermediate layers of earth


sandwiching the flyash have not been included in this analysis.
The same are required to be provided as per approved design
and priced seperately as embankment construction.

(i)

Surface Drains in Soil


Construction of unlined surface drains of average cross-sectional
area 0.40 sqm in soil to specified lines, grades, levels and
dimensions. Excavated material to be used in embankment with
a lift upto 3m and lead of 50 m (average lead 25 m) as per
Technical Specification Clause 307.
Unit = m
Taking output = 10 m
(A)

Manual Means
a)

Labour
Mate

EE.,Dn.I, BMR

TA to SE Circle BMR

day

AAO.,Circle, Barmer

0.08

100.00

SE.,Circle, Barmer

8.00

69

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Mazdoor (Unskilled)

day

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

Quantity
2.00

Rate
(Rs.)
80.00

Amount
(Rs.)
160.00
0.00
21.00

Cost for 10 m = a+b+c

189.00

Rate per m = (a+b+c)/10

18.90

Note: Where lining of drain is provided, quantity shall be worked out based
on approved design and drawing and priced on rate of cement concrete
of approved grade or stone/brick masonary as the case may be.

(B) Mechanical Means


a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

hour

0.04

1,400.00

56.00

Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100
cum per hour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

9.63

Cost for 10 m = a+b+c+d

86.63

Rate per m = (a+b+c+d)/10


(ii)

8.66

Surface Drains in Ordinary Rock


Construction of unlined surface drain of average cross-sectional
area 0.4 sqm in ordinary rock to specified lines, grades, levels
and dimensions as per approved design and Technical
Specification Clause 307. Excavated material to be used in
embankment at site.
Unit = m
Taking output = 10 m
(A)

Manual Means
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.12

100.00

12.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Overheads @ 0% on (a)

TA to SE Circle BMR

0.00

AAO.,Circle, Barmer

SE.,Circle, Barmer

70

Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Contractors profit @ 12.5% on (a+b)

31.50

Cost for 10 m = a+b+c

283.50

Rate per m = (a+b+c)/10

28.35

(B) Mechanical Means


a)

b)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

hour

0.10

1,400.00

140.00

Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 40 m
per hour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
22.75

Cost for 10 m = a+b+c+d

204.75

Rate per m = (a+b+c+d)/10


(iii)

20.48

Surface Drains in Hard Rock


Rate per m may be worked out based on quantity of hard rock as
per design.
For rate of hard rock cutting, refer relevant item in this Chapter

3.20

307

Chute Drains
A.

Providing chute drains across embankment slopes in


approches of bridges and on horizontal curves as per
drawings.

Unit = 1 m
(a)

Earthwork in excavation for foundations of structures as per


drawings and technical specifications Clause 307 including
setting out construction of shoring and bracing deleterious matter,
dressings of sides and bottom and backfilling with approved
material (By manual means).
Rate as per item No.11.1 of Chapter 11.

(b)

0.00

cum

2,177.10

0.00

cum

1,848.00

0.00

Brick Masonry in cement mortar 1:5.


Rate as per item No. 12.1(III) of Chapter 12.

EE.,Dn.I, BMR

75.60

Providing and laying plain cement concrete M15 grade.


Rate as per item No.12.5 of Chapter 12.

(c)

cum

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

71

Sr.
No.

Reference to
MORD Specifications

Description
(d)

Unit

Rate
(Rs.)

sqm

726.38

0.00

119.86

300.96

Providing P.C.C. M.20 coping on the top of chute walls.


As per item No. 12.13 of Chapter 12.

2.51

Rate per m = a+b+c+d+e


B.

Amount
(Rs.)

Plastering with cement mortar 1:4.


Rate as per item No. 12.3 of Chapter 12.

(e)

Quantity

300.96

Providing chute drains across embankment slopes in


approches of bridges and on horizontal curves as per
drawings.

Unit = 1 m
(a)

Earthwork in excavation for foundations of structures as per


drawings and technical specifications Clause 307 including
setting out construction of shoring and bracing deleterious matter,
dressings of sides and bottom and backfilling with approved
material (By manual means).
Rate as per item No.11.1 of Chapter 11.

(b)

cum

0.44

75.60

33.26

cum

0.125

1,961.97

245.25

cum

0.18

1,492.03

268.56

P.10 sqm

0.60

726.38

43.58

Sqm

1.00

119.86

119.86

Providing and laying plain cement concrete M15 grade.


Rate as per item No.12.5 of Chapter 12.

(c)

Coursed rubble stone masonry (2nd Sort) in cement mortar 1:4


Rate as per item No. 12.4 II (ii) of Chapter 12.

(d)

Plastering with cement mortar 1:4.


Rate as per item No. 12.3 of Chapter 12.

(e)

Providing P.C.C. M.20 coping on the top of chute walls.


As per item No. 12.13 of Chapter 12.

Rate per m = a+b+c+d+e

710.51

Note: Quantities are to be taken as per the designs and drawings.


0.28
0.22

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

72

Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Sr.
No.

Reference to
MORD Specifications

4.1

401

Description

Unit

Quantity

Rate
(Rs.)

Granular Sub-base with Well Graded Material (Table 400.1)


(A)

By Mix in Place Method


Construction of granular sub-base by providing well graded
material brought from a lead upto 1 km , spreading in uniform
layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with
smooth wheel roller to achieve the desired density, complete
as per Technical Specification Clause 401.

(i)

For Grading I Material


Unit = cum
Taking output = 300 cum
a)

b)

c)

Labour
Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Motor Grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

30.00

160.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

53 mm to 9.5 mm @ 50 per cent

cum

192.00

100.00

9.5 mm to 2.36 mm @ 20 per cent

cum

77.00

85.00

2.36 mm below @ 30 per cent

cum

115.00

65.00

kl

30.00

15.00

Machinery

Material
Well graded granular sub-base material as per
Table 400.1

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

73
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per cum = (a+b+c+d+e)/300


(ii)

For Grading II Material


Unit = cum
Taking output = 300 cum
a)

b)

c)

Labour
Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Motor Grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

30.00

160.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

26.5 mm to 9.5 mm @ 35 per cent

cum

134.00

90.00

9.5 mm to 2.36 mm @ 25 per cent

cum

96.00

85.00

2.36 mm below @ 40 per cent

cum

153.00

65.00

kl

30.00

15.00

Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Machinery

Material
Well graded granular sub-base material as per
Table 400.1

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
(iii) For Grading III Material
Unit = cum
Taking output = 300 cum
a)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

74
Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)
b)

c)

Unit

Quantity

Rate
(Rs.)

day

10.00

80.00

Motor Grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

30.00

160.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

9.5 mm to 4.75 mm @ 35 per cent

cum

134.00

85.00

4.75 mm to 2.36 mm @ 12.5 per cent

cum

48.00

70.00

2.36 mm below @ 52.5 per cent

cum

201.60

65.00

kl

30.00

15.00

Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Motor Grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

30.00

160.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

Machinery

Material
Well graded granular sub-base material as per
Table 400.1

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
(iii) For GSB Material of CBR value not less than 15
Unit = cum
Taking output = 300 cum
a)

b)

c)

EE.,Dn.I,BMR

Labour

Machinery

Material

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

75
Sr.
No.

Reference to
MORD Specifications

Description
For granular sub-base material CBR value not less
than 15

Unit

Quantity

Rate
(Rs.)

cum

383.60

65.00

kl

30.00

15.00

Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Wet mix plant @ 60 t capacity per hour

hour

7.50 4,000.00

Water tanker 6 kl capacity 5 km lead with one trip


per hour

hour

4.00

250.00

Front end loader 0.9 cum bucket capacity 25 cum


per hour

hour

9.00

300.00

Tipper 5.5 cum @ 3 trips per hour

hour

13.60

450.00

Motor grader 110 HP @ 50 cum per hour

hour

4.50

700.00

Three wheel 80-100 kN static roller 10 cum per hour

hour

22.50

160.00

cum

144.00

100.00

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
401

(B)

Plant Mix Method


Construction of granular sub-base by providing well graded
material, mixing in a mechanical mix plant at OMC, carriage of
mixed material to work site upto lead of 1000 m spreading in
uniform layers with motor grader on prepared surface and
compacting with smooth wheel roller to achieve the desired
density, complete as per Technical Specification Clause 401

(i)

For Grading I Material


Unit = cum
Taking output = 225 cum (450 t)
a)

b)

c)

Labour

Machinery

Material
Well graded granular sub-base material as per
Table 400.1
53 mm to 9.5 mm @ 50 per cent

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

76
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

9.5 mm to 2.36 mm @ 20 per cent

cum

57.00

85.00

2.36 mm below @ 30 per cent

cum

86.40

65.00

kl

24.00

15.00

Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Wet mix plant @ 60 t capacity per hour

hour

7.50 4,000.00

Water tanker 6 kl capacity 5 km lead with one trip


per hour

hour

4.00

250.00

Front end loader 0.9 cum bucket capacity 25 cum


per hour

hour

9.00

300.00

Tipper 5.5 cum, 3 trips per hour

hour

13.60

450.00

Motor grader 110 HP @ 50 cum per hour

hour

4.50

700.00

Three wheel 80-100 kN static roller 10 cum output

hour

22.50

160.00

26.5 mm to 9.5 mm @ 35 per cent

cum

100.80

90.00

9.5 mm to 2.36 mm @ 25 per cent

cum

72.00

85.00

2.36 mm below @ 40 per cent

cum

115.20

65.00

kl

24.00

15.00

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 225 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/225
(ii)

For Grading II Material


Unit = cum
Taking output = 225 cum (450 t)
a)

b)

c)

Labour

Machinery

Material
Well graded granular sub-base material as per
Table 400.1

Water

EE.,Dn.I,BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

77
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost for 225 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/225
(iii) For Grading III Material
Unit = cum
Taking output = 225 cum (450 t)
a)

b)

c)

Labour
Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Wet mix plant @ 60 t capacity per hour

hour

7.50 4,000.00

Water tanker 6 kl capacity 5 km lead with one trip


per hour

hour

4.00

250.00

Front end loader 0.9 cum bucket capacity 25 cum


per hour

hour

9.00

300.00

Tipper 5.5 cum, 3 trips per hour

hour

13.60

450.00

Motor grader 110 HP @ 50 cum per hour

hour

4.50

700.00

Three wheel 80-100 kN static roller 10 cum output

hour

22.50

160.00

9.5 mm to 4.75 mm @ 35 per cent

cum

100.80

85.00

4.75 mm to 2.36 mm @ 12.5 per cent

cum

36.00

70.00

2.36 mm below @ 52.5 per cent

cum

151.20

65.00

kl

24.00

15.00

Machinery

Material
Well graded granular sub-base material as per
Table 400.1

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 225 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/225
4.2

EE.,Dn.I,BMR

402

i)

Gravel/Soil-Aggregate Base (Table 400.2) Grading A

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

78
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Construction of gravel/soil-aggregate base by providing well


graded material brought from a lead upto 1 km, spreading in
uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator
at OMC, and
compacting with three wheel 80-100 kN static roller to
achieve the desired density, complete as per Technical
Specifications Clause 402
Unit = cum
Taking output = 300 cum
a)

b)

c)

Labour
Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per hour

hour

30.00

160.00

Water tanker 6 kl capacity

hour

5.00

250.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

53 mm to 26.5 mm @ 35 per cent

cum

134.40

100.00

26.5 mm to 4.75 mm @ 45 per cent

cum

172.80

95.00

2.36 mm below @ 20 per cent

cum

76.80

70.00

kl

30.00

15.00

Machinery

Material
For well graded granular sub-base materials as per Table
400.2
For Grading A Material

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
ii)

EE.,Dn.I,BMR

Gravel/Soil-Aggregate Base (Table 400.2) Grading B

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

79
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Construction of granular sub-base by providing well graded


material brought from a lead upto 1 km, spreading in uniform
layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with
three wheel 80-100 kN static roller capacity to achieve the
desired density, complete as per Technical Specification
Clause 402
Unit = cum
Taking output = 300 cum
a)

b)

c)

Labour
Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per hour

hour

30.00

160.00

Water tanker 6 kl capacity

hour

5.00

250.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

26.5 mm to 4.75 mm @ 75 per cent

cum

288.00

95.00

2.36 mm below @ 25 per cent

cum

96.00

70.00

kl

30.00

15.00

Machinery

Material
For well graded granular sub-base materials as per Table
400.2
For Grading B Material

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
iii)

Gravel/Soil-Aggregate Base (Table 400.2) Grading C


Construction of granular sub-base by providing well graded
material brought from a lead upto 1 km, spreading in uniform
layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with
three wheel 80-100 kN static roller capacity to achieve the
desired density, complete as per Technical Specification
Clause 402

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

80
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Unit = cum
Taking output = 300 cum
a)

b)

c)

Labour
Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per hour

hour

30.00

160.00

Water tanker 6 kl capacity

hour

5.00

250.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

9.5 mm to 4.75 mm @ 66 per cent

cum

255.00

85.00

2.36 mm below @ 34 per cent

cum

129.00

70.00

kl

30.00

15.00

Machinery

Material
For well graded granular sub-base materials as per Table
400.2
For Grading C Material

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
4.3

403

Gravel/Soil-Aggregate Surface Course (Table 400.3)


Construction of granular surface course by providing well graded
material brought from a lead upto 1 km, spreading in uniform layers
with motor grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with three wheel
80-100 kN static roller capacity to achieve the desired density,
complete as per Technical Specification Clause 402

Unit = cum
Taking output = 300 cum
a)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

81
Sr.
No.

Reference to
MORD Specifications

Description

b)

c)

Unit

Quantity

Rate
(Rs.)

Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 10 cum per hour

hour

30.00

160.00

Water tanker 6 kl capacity

hour

5.00

250.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

4.75 to 2.36 mm 40 per cent

cum

153.60

70.00

2.36 mm below @ 60 per cent

cum

210.40

65.00

kl

30.00

15.00

Mate

day

1.44

100.00

Mazdoor (Skilled)

day

1.00

100.00

Mazdoor (Unskilled)

day

35.00

80.00

Machinery

Material
For well graded granular sub-base materials as per Table
400.3

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
4.4

402

Lime Stabilisation for Improving Subgrade


Laying and spreading available soil in the subgrade on a prepared
surface, pulverising, mixing the spread soil in place with rotavator
with 2 per cent slaked lime having minimum 70 per cent of contents
of CaO, grading with motor grader and compacting with the smooth
wheel road roller at OMC to the desired density to form a layer of
improved Sub-grade as per Technical Specification Cluase 403.

(A)

By Manual Means
Unit = cum
Taking output = 150 cum (263 t)
a)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

82
Sr.
No.

Reference to
MORD Specifications

Description
b)

c)

Unit

Quantity

Rate
(Rs.)

Machinery
Three wheel 80-100 kN Static roller @ 70 cum per hour

hour

2.15

160.00

Water tanker 6 kl capacity

hour

3.00

250.00

Material
Lime

Water

kl

18.00

15.00

Mate

day

0.36

100.00

Mazdoor (Skilled)

day

1.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Tractor with ripper and rotavator attachments @ 60 cum


per hour for ripping and 25 cum per hour for mixing

hour

12.00

180.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 70 cum per hour

hour

4.30

160.00

Water tanker 6 kl capacity

hour

5.00

250.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

5.26 2,000.00

Cost for 150 cum = a+b+c+d+e


Rate per cum = ( a+b+c+d+e)/150
(B)

By Mechanical Means
Unit = cum
Taking output = 300 cum (525 t)
a)

b)

c)

Labour

Machinery

Material
Lime

10.50 2,000.00

Water

kl

30.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

15.00

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

83
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Note: The exact quantity of lime shall be as per design.


4.5

403

Lime Treated Soil for Sub-Base


Providing, laying and spreading soil on a prepared sub-grade,
pulverising, mixing the spread soil in place with rotavator with 4 per
cent slaked lime with minimum content of 70 per cent of CaO,
grading with motor grader and compacting with the road roller at
OMC to achieve atleast 98 per cent of the max dry density to form a
layer of sub-base as per Technical Specification Clause 403.
Unit = cum
Taking output = 300 cum (525 t)
a)

b)

c)

Labour
Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Machinery
Hydraulic Excavator 0.90 cum bucket capacity

hour

5.00 1,400.00

Tipper 5.5 cum 4 trips per hour

hour

14.00

450.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN Static roller @ 70 cum per hour

hour

4.30

160.00

Tractor with rotavator and blade @ 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

Material
Lime

21.00 2,000.00

Water

kl

30.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

15.00

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
Note: The exact quantity of lime shall be as per design.
4.6

EE.,Dn.I,BMR

404

Cement Treated Soil Sub-Base/Base

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

84
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing, laying and spreading soil on a prepared sub-grade,


pulverising, adding the designed quantity of cement to the spread
soil, mixing in place with rotavator, grading with the motor grader and
compacting with the road roller at OMC to achieve the desired
unconfined compressive strength and to form a layer of subbase/base as per Technical Specification Clause 404.

Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by weight of soil
a)

b)

c)

Labour
Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Machinery
Hydraulic Excavator 0.90 cum bucket capacity

hour

5.00 1,400.00

Tipper 5.5 cum

hour

14.00

450.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 70 cum per hour

hour

4.30

160.00

Tractor with rotavator and blade @ 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

Material
Cement at site @ 4% (of 525 t)

21.00 4,000.00

Water

kl

30.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

15.00

Cost for 300 cum = a+b+c+d+e


Rate per cum =(a+b+c+d+e)/300
Note: The exact quantity of cement shall be as per design.
4.7

405

Water Bound Macadam Sub-base/base


1)

EE.,Dn.I,BMR

WBM Grading 1

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

85
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing, laying, spreading and compacting stone aggregates


of specific sizes brought from a lead upto 1 km to water bound
macadam specification including spreading in uniform
thickness, hand packing, rolling with three wheel 80-100 kN
static roller in stages to proper grade and camber, applying
and brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 1 as per Technical Specification
Clause 404.
(A)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

36.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

cum

435.60

145.00

cum

97.20

175.00

cum

28.80

85.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per 10
sqm for compacted thickness of 100 mm
Stone Screenings
Type A 13.2 mm for Grading-1 @ 0.27 cum per 10
sqm
Binding Material
Binding Material @ 0.08 cum per 10 sqm for
grading 1 material
Water

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

86
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

0.68

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Motor grader 110 HP @ 50 cum per hour for


spreading

hour

7.20

700.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

36.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

cum

435.60

145.00

cum

97.20

175.00

cum

28.80

85.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate
Grading 1 90 mm to 45 mm @ 1.21 cum per 10
sqm for compacted thickness of 100 mm
Stone Screening
Type A 13.2 mm for Grading-1 @ 0.27 cum per 10
sqm
Binding Material
Binding Material @ 0.08 cum per 10 sqm for
Grading 2 material
Water

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360

EE.,Dn.I,BMR

2)

WBM Grading 2

A.

Providing, laying, spreading and compacting stone aggregates


of specific sizes brought from a lead upto 1 km to water bound
macadam specification including spreading in uniform
thickness, hand packing, rolling with smooth wheel roller 80100 kN in stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density grading 2 as per Technical Specification
Clause 405.

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

87
Sr.
No.

Reference to
MORD Specifications

Description
(A)

Unit

Quantity

Rate
(Rs.)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum


for compacted thickness of 75 mm

435.60

190.00

cum

96.01

150.00

cum

28.80

85.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10
sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
B.

Providing, laying, spreading and compacting stone


aggregates(Crusher Broken) of specific sizes brought from a
lead upto 1 km to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate, watering
and compacting to the required density grading 2 as per
Technical Specification Clause 405.
(A)

By Manual Means
Unit = cum

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

88
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Taking output = 360 cum


a)

b)

c)

Labour
Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum


for compacted thickness of 75 mm

435.60

290.00

cum

96.01

150.00

cum

28.80

85.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10
sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means (HB)
Unit = cum
Taking output = 360 cum
a)

b)

EE.,Dn.I,BMR

Labour
Mate

day

0.68

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Machinery

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

89
Sr.
No.

Reference to
MORD Specifications

Description

c)

Unit

Quantity

Rate
(Rs.)

Motor grader 110 HP @ 50 cum per hour for


spreading

hour

7.20

700.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum


for compacted thickness of 75 mm

435.60

190.00

cum

96.01

150.00

cum

28.80

85.00

kl

144.00

15.00

Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Stone Screening
Type B 11.2 mm for Grading 2 @ 0.20 cum per 10
sqm
Binding Material
Binding Material @ 0.06 cum per 10 sqm for
Grading 2 material
Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
Note: Type A Screening can be used in Grading 2
3)

WBM Grading 3 (Crusher Broken)


Providing, laying, spreading and compacting stone aggregates
(Crusher Borken) of specific sizes brought from a lead upto 1
km to water bound macadam specification including spreading
in uniform thickness, hand packing, rolling with smooth wheel
roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 3 as per Technical Specification
Clause 405.
(A)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

90
Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)
b)

c)

Unit

Quantity

Rate
(Rs.)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

cum

435.60

320.00

cum

86.40

150.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10
sqm for compacted thickness of 75 mm
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10
sqm
Water

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

0.68

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Motor grader 110 HP @ 50 cum per hour for


spreading

hour

7.20

700.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

cum

435.60

320.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10
sqm for compacted thickness of 75 mm

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

91
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10
sqm

cum

86.40

150.00

kl

144.00

15.00

Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

36.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 1 90 mm to 45 mm @ 1.21 cum per 10


sqm for compacted thickness of 100 mm

cum

435.60

145.00

Crushable type such as moorum or Gravel for


grading 1 @ 0.30 cum per 10 sqm

cum

108.00

100.00

kl

144.00

15.00

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
4.8

405

Water Bound Macadam with Crushable Screenings


1)

WBM Grading 1
Providing, laying, spreading and compacting stone aggregates
(Hand Broken) of specific sizes brought from a lead upto 1 km
to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with three wheel 80100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 1 as per Technical Specification
Clause 405.
(A)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Water

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

92
Sr.
No.

Reference to
MORD Specifications

Description
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Unit

Quantity

Rate
(Rs.)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

0.68

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Motor grader 110 HP @ 50 cum per hour for


spreading

hour

7.20

700.00

Three wheel 80-100 kN static roller @ 10 cum per


hour

hour

36.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 1 90 mm to 45 mm @ 1.21 cum per 10


sqm for compacted thickness of 100 mm

cum

435.60

145.00

Crushable type such as Moorum or gravel for


Grading 2 @ 0.30 cum per 10 sqm

cum

108.00

95.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
2a)

EE.,Dn.I,BMR

WBM Grading 2

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

93
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing, laying, spreading and compacting stone aggregates


(Hand Broken) of specific sizes brought from a lead upto 1 km
to water bound macadam specification including spreading in
uniform thickness, hand packing, rolling with three wheel 80100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 2 as per Technical Specification
Clause 405.
(A)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum


for compacted thickness of 75 mm

435.60

190.00

Crushable type such as Moorum or gravel for


Grading 2 @ 0.22 cum per 10 sqm

cum

105.59

95.00

kl

144.00

15.00

0.68

100.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a)

Labour
Mate

EE.,Dn.I,BMR

TA to SE Circle BMR

day

AAO.,Circle Barmer

SE.,Circle, Barmer

94
Sr.
No.

Reference to
MORD Specifications

Description

b)

c)

Unit

Quantity

Rate
(Rs.)

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Motor grader 110 HP @ 50 cum per hour for


spreading

hour

7.20

700.00

Three wheel 80-100 kN @ static roller 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum


for compacted thickness of 75 mm

435.60

190.00

Crushable type such as Moorum or gravel for


Grading 2 @ 0.22 cum per 10 sqm

cum

105.59

95.00

kl

144.00

15.00

Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
2b)

WBM Grading 2 (Crusher Broken)


Providing, laying, spreading and compacting stone aggregates
(Crusher Broken) of specific sizes brought from a lead upto 1
km to water bound macadam specification including spreading
in uniform thickness, hand packing, rolling with three wheel
80-100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 2 as per Technical Specification
Clause 405.
(A)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

b)

EE.,Dn.I,BMR

Labour

Machinery

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

95
Sr.
No.

Reference to
MORD Specifications

Description

c)

Unit

Quantity

Rate
(Rs.)

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm cum


for compacted thickness of 75 mm

435.60

290.00

Crushable type such as Moorum or gravel for


Grading 2 @ 0.22 cum per 10 sqm

cum

105.59

95.00

kl

144.00

15.00

Mate

day

10.08

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

250.00

80.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
3)

WBM Grading 3 (Crusher Broken)


Providing, laying, spreading and compacting stone aggregates
(Crusher Broken) of specific sizes brought from a lead upto 1
km to water bound macadam specification including spreading
in uniform thickness, hand packing, rolling with three wheel
80-100 kN static roller in stages to proper grade and camber,
applying and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and compacting to
the required density Grading 3 as per Technical Specification
Clause 405.
(A)

By Manual Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

96
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10


sqm for compacted thickness of 75 mm

cum

435.60

320.00

Crushable type such as Moorum or gravel for


Grading 3 @ 0.22 cum per 10 sqm

cum

105.59

90.00

kl

144.00

15.00

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
(B) By Mechanical Means
Unit = cum
Taking output = 360 cum
a)

b)

c)

Labour
Mate

day

0.68

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Motor grader 110 HP @ 50 cum per hour for


spreading

hour

7.20

700.00

Three wheel 80-100 kN @ Static roller 8 cum per


hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10


sqm for compacted thickness of 75 mm

cum

435.60

320.00

Crushable type such as Moorum or gravel for


Grading 3 @ 0.22 cum per 10 sqm

cum

105.59

90.00

kl

144.00

15.00

Machinery

Material (Refer Tables 400.7, 8, 9 and 10)


Aggregate

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
4.9

EE.,Dn.I,BMR

406

Wet Mix Macadam

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

97
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing, laying, spreading and compacting graded stone aggregate


to wet mix macadam specification including premixing the material
with water at OMC in mechanical mixer (Pug Mill), carriage of mixed
material by tipper to site, laying in uniform layers in sub-base/base
course on a well prepared sub-base and compacting with smooth
wheel roller of 80 to 100kN weight to achieve the desired density
including lighting, barricading and maintenance of diversion, etc as
per Tables 400.11 & 400.12 and Technical Specification Clause 406.

By Mechanical Means with 1 km lead


Unit = cum
Taking output = 100 cum
a)

b)

c)

Labour
Mate

day

0.40

100.00

Dresser (Skilled) for alignment

day

8.00

200.00

Mazdoor (Skilled)

day

2.00

100.00

Front end loader 1 cum capacity

hour

4.00

300.00

Wet mix plant (Pug Mill)

hour

4.00 4,000.00

Tipper/Dumper (10-t) capacity

hour

5.00

450.00

Motor Grader @ 50 cum per hour

hour

2.00

700.00

Water tanker 6 kl capacity

hour

1.33

250.00

Three wheel 80-100 kN static roller @ 16 cum per hour

hour

6.25

160.00

Coarse aggregate 45 mm to 22.4 mm @ 30 per cent

cum

39.90

330.00

Aggregates 22.4 mm to 2.36 mm @ 40 per cent

cum

53.20

370.00

Fine aggregate/Crushed sand 2.36 mm to 75 micron @ 30 per


cent

cum

39.90

115.00

kl

8.00

15.00

Machinery

Material

Water
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 100 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/100
4.10

EE.,Dn.I,BMR

407

Construction of Shoulders as per Technical Specification


Clause 407.
TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

98
Sr.
No.

Reference to
MORD Specifications

Description
A.

Unit

Quantity

Rate
(Rs.)

Earthen Shoulders
The rate as applicable for sub-grade construction may be
adopted.

B.

Hard Shoulders
Rate as applicable for sub-base and/or base may be adopted
as per approved design.

C.

Paved Shoulders
The rates may be adopted as applicable for different layers of
pavement depending upon approved design of paved
shoulders.

4.11

408

Granular sub-base/base/surface course with local materials


(Table 400.13) by mix in place method normal Construction of
granular sub-base by providing local material spreading in
uniform layers with motor grader on prepared surface, mixing
by mix in place method with rotavator at once and compacting
with smooth wheel roller to achieve the desired density
complete as per Clause 401.4 as per Technical Specification
Clause 408.

(i)

Using naturally occuring gravel


Unit = cum
Taking output = 300 cum
(a)

(b)

(c)

Labour
Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Motor grader 110 HP 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @10 cum per hour

hour

30.00

160.00

Tractor with rotavator 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

5.00

250.00

cum

384.00

95.00

kl

30.00

15.00

Machinery

Material
Naturally occurring gravel (Local materials as per Table
400.13)
Quantity as per Item No.4.1 of Chapter 4
Water

(d)
EE.,Dn.I,BMR

Overheads @ 0% on (a+b+c)

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

99
Sr.
No.

Reference to
MORD Specifications

Description
(e)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = a+b+c+d+e/300
(ii)

Using Gravel mix soil using


Unit = cum
Taking output = 300 cum
(a)

(b)

(c)

Labour
Mate

day

0.40

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

8.00

80.00

Motor grader 110 HP 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @10 cum per hour

hour

30.00

160.00

Water tanker 6 kl capacity

hour

5.00

250.00

Tractor with Rotavator 25 cum per hour

hour

12.00

180.00

cum

384.00

95.00

kl

30.00

15.00

Machinery

Material
Soil gravel mixture/quarry waste (Local material as per
Table 400.13)
As per Item No.4.2 of Chapter 4
Water

(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
4.12

408

Construction of Water Bound Macadam using locally available


material (Table 400.13)
Providing, laying spreading and compacting local material in block or
large discrete particles, such as kankar, Laterite, Dhandla etc. as per
Table 400.13 to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling with three
wheel 80-100 kN static roller in stages to proper grade and camber,
applying and brooming requisite type of screening /binding materials
to fill-up the interstices of laid material watering and compacting to
the required density as per Clause 405.3 and Technical Specification
Cluase 408.

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

100
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Unit = cum
Taking output = 360 cum
(a)

(b)

(c)

Labour
Mate

day

0.68

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

15.00

80.00

Motor grader 110 H.P @ 50 cum/hr for spreading

hour

7.20

700.00

Three wheel 80-100 kN @ static roller 8 cum per hour

hour

45.00

160.00

Water tanker 6 kl capacity

hour

24.00

250.00

cum

435.60

95.00

kl

144.00

15.00

Machinery

Material
Low Grade Aggregate such as Kankar, Laterite, Dhandla and
naturally occuring gravels, quarry waste as per Table 400.13
@ 1.21 cum per 10 sqm compacted thickness 100 mm
Water

(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
4.13

409

Lime-Flyash Stablised Soil Sub-base


Construction of sub-base using lime-flyash admixture with granular
soil, free from organic matter/deleterious material or clayey silts and
low plasticity clays having PI between 5 and 20 and liquid limit less
than 25 and commercial dry lime, slaked at site or pre-slaked with
CaO content not less than 50 per cent, flyash to conform to
gradation as per Clause 4.3 of IRC:SP:20, lime+flyash content
ranging between 10 to 30 per cent, the minimum un-confined
compressive strength and CBR value after 28-days curing and 4days soaking to be 0.75 MPa and 25 per cent respectively, all as
specified in IRC:88 including a lead upto 1000 m as per Technical
Specification Cluase 409.

Unit = cum
Taking output = 480 cum (720 t, density 1.50 t/cum)
Assumptions made
Total mass taken for analysis = 720 t

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

101
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Lime+Flyash admixture
@ 20% = 0.2 x 720=144 t
Soil = 720-144 = 578 t
(578/1.6 = 360 cum)
Lime + Flyash = 144 t
Ratio Lime 4 : Flyash 16
Lime = 29 t
Flyash = 115 t
a)

Labour
Mate

day

0.28

100.00

Mazdoor (Unskilled)

day

6.00

80.00

day

1.00

100.00

Hydraulic Excavator 0.90 cum bucket capacity @ 60 cum per


hour for 360 cum soil

hour

6.00 1,400.00

Tipper 10 t capacity for carriage of soil 578 t

hour

16.00

450.00

Tipper 10 t capacity for carriage of 115 t flyash

hour

5.50

450.00

Tipper 10 t capacity for carriage of 29 t of lime from store to


work site

hour

3.80

450.00

Loading as per item 1.2 (ii)

cum

480.00

5.00

Unloading as per item 1.2 (iv)

cum

480.00

1.00

Tractor with disc harrows for pulverisation

hour

6.00

180.00

Motor Grader 110 HP @ 75 per cent 200 cum per hour for
mixing in-place and grading

hour

3.20

700.00

Three wheel 80-100 kN static roller

hour

12.00

160.00

Water tanker 6 kl capacity

hour

12.00

250.00

Mazdoor (Skilled)
b)

c)

Machinery

Material
Lime (Slaked)

Compensation for earth taken from private source


Water

EE.,Dn.I,BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)


TA to SE Circle BMR

AAO.,Circle Barmer

29.00 2,000.00

cum

360.00

0.00

kl

72.00

15.00

SE.,Circle, Barmer

102
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost for 480 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/480
Note:

4.14

410

Compensation for earth will vary from place to place and will
have to be assessed realistically as per particular ground
situation.
In case earth is available from Govt. land,
compensation for earth will not be required. The position is
required to be clearly stated in the cost estimate.

Cost of flyash has not been considered as same will be


available free of cost. Only carriage of flyash has been
provided.

Lime + Flyash has been taken as 20 per cent of total mass


and ratio of lime and flyash as 1:4 for estimating purposes.
Total quantities will be as per approved design.

Construction of Sub-base/Course Using Crushed Slag as per


Table 400.19
Construction of Sub-base by providing crushed slag spreading in
uniform layer with motor grader on prepared surface mixing by mixin-place method with Rotavator @ OMC, and compacting with three
wheel 80-100 kN static roller to achieve the desired density complete
as per Technical Specifications Cluase 402.4 and 410.3.2

Unit = cum
Taking output = 300 cum
(a)

Labour
As per Item No.4.1 of Chapter 4

(b)

Machinery
As per Item No.4.1 of Chapter 4

(c)

Material
Crushed slag as per Clause 410.4.2 (i)
As per Item No.4.2 of Chapter 4
Water

(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

cum

384.00

160.00

kl

30.00

15.00

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300
4.15

EE.,Dn.I,BMR

410

Water Bound Macadam using crushed slag

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

103
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing, laying, spreading and compacting crushed slag to water


Bound Macadam specification including spreading in uniform
thickness, hand packing rolling with smooth wheel roller 80-100 kN
in stages to proper grade and camber, applying and brooming
requisite type of screening/binding materials to fill up the interstees
of crushed slag watering and compacting to the required density as
per Clause 405.3 and Technical Specification Cluase 410.3.2.

Unit = cum
Taking output = 360 cum
(a)

Labour
As per Item No. 4.7 of Chapter 4

(b)

Machinery
As per Item No.4.7 of Chapter 4

(c)

Material
As per Item No.4.8 (1)(A) of Chapter 4
Crushed slag as per Clause 410.4.2 (ii)

cum

435.60

160.00

Crushable screening

cum

108.00

100.00

kl

144.00

15.00

Water
(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 360 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/360
4.16

410

Cement Bound Granular Material sub-base/base


Providing laying and spreading granulated blast furnace slag on a
prepared sub-grade pulverising adding the designed quantitity of
cement to the spread granulated blast furnace slag mixing in place
with rotavator grading with the mortar grader and compacting with
smooth wheel roller 80-100 kN at OMC to achieve the desired
unconfined compressive strength and to form a layer of subbase/base as per Technical Specification Clauses 404.3 and
410.4.2.

Unit = cum
Taking output = 300 cum (525 t)
For 4 per cent quantity of cement by wt of granulated blast furnace
slag
(a)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

104
Sr.
No.

Reference to
MORD Specifications

Description

(b)

(c)

Unit

Quantity

Rate
(Rs.)

Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

5.50 cum Tipper for carriage of GBFS add 10 per cent of cost
of carriage of cover cost of loading and unloading

hour

15.00

450.00

Motor grader 110 HP @ 50 cum per hour

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 70 cum per hour

hour

4.30

160.00

Tractor with rotavator and blade @ 25 cum per hour

hour

12.00

180.00

Water tanker 6 kl capacity

hour

7.00

250.00

Machinery

Material
Cement (4%)

21.00 4,000.00

Water

kl

42.00

15.00

Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 300 cum = a+b+c+d+e


Rate per cum = (a+b+c+d+e)/300

4.17

Note: (i)

The exact quantity of cement shall be as per design

(ii)

Granulated ballast slag will be available free of cost

411

Crusher Run Macadam Base


Providing crushed run stone aggregate brought from a lead upto 1
km ,greading conforming to table 400.20 depositing on a prepared
surface by hauling vehicles, spreading and mixing with a motor
grader, watering and compacting with a three wheel 80-100 kN
static roller as per Technical Specification Clause 411 to form a layer
of sub-base/base
A)

By mix-in-place method
(i)

With 53 mm maximum size of aggregates


Unit = cum
Taking output = 360 cum
(a) Labour

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

105
Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)

Unit

Quantity

Rate
(Rs.)

day

10.00

80.00

Tractor attached with rotavator @ 25 cum per hour

hour

14.00

180.00

Motor-Grader 110 H.P

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 8 cum per


hour
Water tanker 6 kl capacity

hour

45.00

160.00

hour

6.00

250.00

63 mm to 45 mm @ 33 per cent

cum

157.46

280.00

22.5 mm to 5.6 mm @ 32 per cent

cum

151.06

315.00

Below 5.6 mm @ 35 per cent

cum

116.68

125.00

kl

36.00

15.00

Mate

day

0.48

100.00

Mazdoor (Skilled)

day

2.00

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Tractor attached with rotavator @ 25 cum per hour

hour

14.00

180.00

Motor-Grader 110 H.P

hour

6.00

700.00

Three wheel 80-100 kN static roller @ 8 cum per


hour

hour

45.00

160.00

(b) Machinery

(c) Material
Aggregate at site
For 53 mm maximum size

Water
(d) Overheads @ 0% on (a+b+c)
(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
(ii)

With 37.5 mm maximum size of aggregates


Unit = cum
Taking output = 360 cum
(a) Labour

(b) Machinery

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

106
Sr.
No.

Reference to
MORD Specifications

Description
Water tanker 6 kl capacity

Unit

Quantity

Rate
(Rs.)

hour

6.00

250.00

45 mm to 22.5 mm @ 5 per cent

cum

24.12

305.00

22.4 mm to 5.6 mm @ 50 per cent

cum

237.60

315.00

Below 5.6 mm @ 45 per cent

cum

213.48

115.00

kl

36.00

15.00

Mate

day

0.28

100.00

Mazdoor (Skilled)

day

1.00

100.00

Mazdoor (Unskilled)

day

6.00

80.00

Wet mix plant @ 75 t per hour

hour

6.00 4,000.00

Electric generator set, 125 KVA

hour

6.00

510.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

Motor grader 110 HP

hour

6.00

700.00

Three wheel roller 80-100 kN @ 8 cum per hour

hour

28.13

160.00

Water tanker

hour

3.00

250.00

Tipper

hour

10.00

450.00

(c) Material
Aggregate at site
For 37.5 mm maximum size

Water
(d) Overheads @ 0% on (a+b+c)
(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 360 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/360
B)

By mixing plant method


(i)

With 53 mm maximum size of aggregates


Unit = cum
Taking output = 225 cum (450 t)
(a) Labour

(b) Machinery

(c) Material
Aggreate at site

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

107
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

For 53 mm maximum size


63 mm to 45 mm @ 33 per cent

cum

98.40

280.00

22.4 mm to 5.6 mm @ 32 per cent

cum

94.41

315.00

Below 5.6 mm @ 35 per cent

cum

104.18

125.00

kl

18.00

15.00

Mate

day

0.28

100.00

Mazdoor (Skilled)

day

1.00

100.00

Mazdoor (Unskilled)

day

6.00

80.00

Wet mix plant @ 75 t per hour

hour

6.00 4,000.00

Electric generator set, 125 KVA

hour

6.00

510.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

Mortar grader 110 HP

hour

6.00

700.00

Three wheel roller 80-100 kN @ 8 cum per hour

hour

28.13

160.00

Water tanker

hour

3.00

250.00

Tipper

hour

10.00

450.00

45 mm to 22.5 mm @ 5 per cent

cum

15.06

305.00

22.4 mm to 5.6 mm @ 50 per cent

cum

148.50

315.00

Below 5.6 mm @ 45 per cent

cum

133.00

115.00

Water
(d) Overheads @ 0% on (a+b+c)
(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 225 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/225
(ii)

With 37.5 mm maximum size of aggregates


Unit = cum
Taking output = 225 cum (450 t)
(a) Labour

(b) Machinery

(c) Material
Aggreate at site
For 37.5 mm maximum size

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

108
Sr.
No.

Reference to
MORD Specifications

Description
Water

Unit

Quantity

Rate
(Rs.)

kl

18.00

15.00

Mate

day

0.52

100.00

Mazdoor (Unskilled)

day

10.00

80.00

Mason 1st Class

day

3.00

180.00

Three wheel 80-100 kN static roller

hour

1.00

300.00

Water tanker

hour

1.00

250.00

Brick 1st Class

No.

8,160.00

1.80

Brick 1st Class on edging

No.

1,100.00

1.80

Fine Sand

cum

5.66

110.00

kl

6.00

15.00

(d) Overheads @ 0% on (a+b+c)


(e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 225 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/225
4.18

412

Brick Soling
Laying brick soling layer on prepared sub-grade with brick on end
edging according to lines, graded and cross-section shown on the
drawing filling joints with sand and earth, spreading 25 mm thick
layer of earth over brick soling, watering and rolliing the same with
three wheel road roller 80-100 kN as per Technical Specification
Clause 412

Unit = sqm
Taking ouput = 150 sqm
(a)

(b)

(c)

Labour

Machinery

Material

Water
(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 150 sqm = a+b+c+d+e


Rate per sqm = (a+b+c+d+e)/150
4.19

EE.,Dn.I,BMR

413

Stone Set Pavement

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

109
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing and laying stone set pavement on prepared surface with


sub-base 100 mm thick compacted Granular Sub-base as per
Clause 401.4 and base 75 mm thick compacted water bound
macadam grading 2 as per Clause 405.3. The 150 mm thick
hammer desired stones are laid in the herring one or stretched bond
pattern. The stones are compacted into the bedding sand of 40 mm
over the WBM base bounded by edge stone using suitable
compacting device. The gaps are filled with fine sand stone dust as
per Technical Specification Clause 413.4

Unit = sqm
Taking output = 360 sqm
(a)

(b)

(c)

Labour
Mate

day

2.16

100.00

Mazdoor (Unskilled)

day

51.00

80.00

Mason 2nd class for laying sett stone and edge stone

day

13.00

150.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

Water tanker 6 kl capacity

hour

1.00

250.00

cum

0.174

110.00

cum

15.437

190.00

Machinery

Material
(1)

Collection of fine sand


3.4x0.285x0.150x1.20 = 0.174

(2)

Coarse sand
96x3.35x0.04x1.20 = 15.437 cum

(3)

Collection of stone sett stone


Nos

5,168.00

20.00

(4)

300 mmx200 mmx150 mm


17x304 = 5168 nos.
Collection of edge stone

Nos

464.00

35.00

(5)

450 mmx200 mmx350 mm


2x232 = 464 nos.
Water

6.00

15.00

(d)

Overheads @ 0% on (a+b+c)

(e)

Contractors profit @ 12.5% on (a+b+c+d)

kl

Cost of 360 sqm = a+b+c+d+e


Rate per sqm = (a+b+c+d+e)/360
4.20

EE.,Dn.I,BMR

Haulage excluding Loading & Unloading

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

110
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Add extra over item no.4.1,4.2,4.3,4.7,4.8,4.9,4.17 for additional


lead ( compacted Qty.to be measured) from Quarry/Crusher/Plant
Beyond 1 Km lead
Haulage of materials by tipper excluding cost of loading, unloading
and stacking.
Unit =Cum.km
Taking output 5 Cum(10 t load) and lead 10 km = 50 Cum.km
Case-I : Surfaced Road
Speed with load: 40 km per hour
Speed while returning empty: 55 km per hour
a)

Machinery
Tipper 10 t capacity
Haulage with load

hour

0.25

450.00

Empty return trip

hour

0.18

450.00

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

Cost for 50 Cum.km = a+b+c


Rate per Cum per km = (a+b+c)/50

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

111

Chapter 4

ASES, BASES (NON-BITUMINOUS) AND SHOULDERS


Amount
(Rs.)

48.00
200.00
800.00

4,200.00
4,800.00
2,160.00
1,250.00

19,200.00
6,545.00
7,475.00
450.00
0.00
5,891.00
53,019.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

112
Amount
(Rs.)
176.73

48.00
200.00
800.00

4,200.00
4,800.00
2,160.00
1,250.00

12,060.00
8,160.00
9,945.00
450.00
0.00
5,509.13
49,582.13
165.27

48.00
200.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

113
Amount
(Rs.)
800.00

4,200.00
4,800.00
2,160.00
1,250.00

11,390.00
3,360.00
13,104.00
450.00
0.00
5,220.25
46,982.25
156.61

48.00
200.00
800.00

4,200.00
4,800.00
2,160.00
1,250.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

114
Amount
(Rs.)
24,934.00
450.00
0.00
4,855.25
43,697.25
145.66

40.00
200.00
640.00

30,000.00
1,000.00
2,700.00
6,120.00
3,150.00
3,600.00

14,400.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

115
Amount
(Rs.)
4,845.00
5,616.00
360.00
0.00
9,083.88
81,754.88
363.36

40.00
200.00
640.00

30,000.00
1,000.00
2,700.00
6,120.00
3,150.00
3,600.00

9,072.00
6,120.00
7,488.00
360.00
0.00
8,811.25
EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

116
Amount
(Rs.)
79,301.25
352.45

40.00
200.00
640.00

30,000.00
1,000.00
6,120.00
0.00
3,150.00
3,600.00

8,568.00
2,520.00
9,828.00
360.00
0.00
8,253.25
74,279.25
330.13

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

117
Amount
(Rs.)

40.00
200.00
640.00

4,200.00
4,800.00
1,250.00
2,160.00

13,440.00
16,416.00
5,376.00
450.00
0.00
6,121.50
55,093.50
183.65

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

118
Amount
(Rs.)

40.00
200.00
640.00

4,200.00
4,800.00
1,250.00
2,160.00

27,360.00
6,720.00
450.00
0.00
5,977.50
53,797.50
179.33

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

119
Amount
(Rs.)

40.00
200.00
640.00

4,200.00
4,800.00
1,250.00
2,160.00

21,675.00
9,030.00
450.00
0.00
5,555.63
50,000.63
166.67

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

120
Amount
(Rs.)
40.00
200.00
640.00

4,200.00
4,800.00
1,250.00
2,160.00

10,752.00
13,676.00
450.00
0.00
4,771.00
42,899.00
143.00

144.00
100.00
2,800.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

121
Amount
(Rs.)

344.00
750.00

10,520.00
270.00
0.00
1,866.00
16,794.00
111.96

36.00
100.00
640.00

2,160.00
4,200.00
688.00
1,250.00

21,000.00
450.00
0.00
3,815.50
34,339.50
114.47

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

122
Amount
(Rs.)

48.00
200.00
800.00

7,000.00
6,300.00
4,200.00
688.00
2,160.00
1,250.00

42,000.00
450.00
0.00
8,137.00
73,233.00
244.11

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

123
Amount
(Rs.)

48.00
200.00
800.00

7,000.00
6,300.00
4,200.00
688.00
2,160.00
1,250.00

84,000.00
450.00
0.00
13,387.00
120,483.00
401.61

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

124
Amount
(Rs.)

1,008.00
200.00
20,000.00

5,760.00
6,000.00

63,162.00

17,010.00

2,448.00
2,160.00
0.00
14,718.50
132,466.50
367.96

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

125
Amount
(Rs.)

68.00
200.00
1,200.00

5,040.00
5,760.00
6,000.00

63,162.00

17,010.00

2,448.00
2,160.00
0.00
12,881.00
115,929.00
322.03

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

126
Amount
(Rs.)

1,008.00
200.00
20,000.00

7,200.00
6,000.00

82,764.00

14,401.50

2,448.00
2,160.00
0.00
17,022.69
153,204.19
425.57

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

127
Amount
(Rs.)

1,008.00
200.00
20,000.00

7,200.00
6,000.00

126,324.00

14,401.50

2,448.00
2,160.00
0.00
22,467.69
202,209.19
561.69

68.00
200.00
1,200.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

128
Amount
(Rs.)
5,040.00
7,200.00
6,000.00

82,764.00

14,401.50

2,448.00
2,160.00
0.00
15,185.19
136,666.69
379.63

1,008.00
200.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

129
Amount
(Rs.)
20,000.00

7,200.00
6,000.00

139,392.00

12,960.00
2,160.00
0.00
23,615.00
212,535.00
590.38

68.00
200.00
1,200.00

5,040.00
7,200.00
6,000.00

139,392.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

130
Amount
(Rs.)

12,960.00
2,160.00
0.00
21,777.50
195,997.50
544.44

1,008.00
200.00
20,000.00

5,760.00
6,000.00

63,162.00
10,800.00
2,160.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

131
Amount
(Rs.)
0.00
13,636.25
122,726.25
340.91

68.00
200.00
1,200.00

5,040.00
5,760.00
6,000.00

63,162.00
10,260.00
2,160.00
0.00
11,731.25
105,581.25
293.28

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

132
Amount
(Rs.)

1,008.00
200.00
20,000.00

7,200.00
6,000.00

82,764.00
10,031.05
2,160.00
0.00
16,170.38
145,533.43
404.26

68.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

133
Amount
(Rs.)
200.00
1,200.00

5,040.00
7,200.00
6,000.00

82,764.00
10,031.05
2,160.00
0.00
14,332.88
128,995.93
358.32

1,008.00
200.00
20,000.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

134
Amount
(Rs.)
7,200.00
6,000.00

126,324.00
10,031.05
2,160.00
0.00
21,615.38
194,538.43
540.38

1,008.00
200.00
20,000.00

7,200.00
6,000.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

135
Amount
(Rs.)
139,392.00
9,503.10
2,160.00
0.00
23,182.89
208,645.99
579.57

68.00
200.00
1,200.00

5,040.00
7,200.00
6,000.00

139,392.00
9,503.10
2,160.00
0.00
21,345.39
192,108.49
533.63

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

136
Amount
(Rs.)

40.00
1,600.00
200.00

1,200.00
16,000.00
2,250.00
1,400.00
332.50
1,000.00

13,167.00
19,684.00
4,588.50
120.00
0.00
7,697.75
69,279.75
692.80

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

137
Amount
(Rs.)

48.00
200.00
800.00

4,200.00
4,800.00
2,160.00
1,250.00

36,480.00
450.00
0.00
EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

138
Amount
(Rs.)
6,298.50
56,686.50
188.96

40.00
200.00
640.00

4,200.00
4,800.00
1,250.00
2,160.00

36,480.00
450.00
0.00
6,277.50
56,497.50
188.33

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

139
Amount
(Rs.)

68.00
200.00
1,200.00

5,040.00
7,200.00
6,000.00

41,382.00

2,160.00
0.00
7,906.25
71,156.25
197.66

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

140
Amount
(Rs.)

28.00
480.00
100.00

8,400.00
7,200.00
2,475.00
1,710.00
2,400.00
480.00
1,080.00
2,240.00
1,920.00
3,000.00

58,000.00
0.00
1,080.00
0.00
11,324.13
EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

141
Amount
(Rs.)
101,917.13
212.33

1,048.00

12,410.00

61,440.00
450.00
0.00
9,418.50
84,766.50
282.56

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

142
Amount
(Rs.)

21,208.00

11,760.00

69,696.00
10,800.00
2,160.00
0.00
14,453.00
130,077.00
361.33

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

143
Amount
(Rs.)
48.00
200.00
800.00

6,750.00
4,200.00
688.00
2,160.00
1,750.00

84,000.00
630.00
0.00
12,653.25
113,879.25
379.60

48.00
200.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

144
Amount
(Rs.)
800.00

2,520.00
4,200.00
7,200.00
1,500.00

44,088.80
47,583.90
14,585.00
540.00
0.00
15,408.21
138,673.91
385.21

48.00
200.00
800.00

2,520.00
4,200.00
7,200.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

145
Amount
(Rs.)
1,500.00

7,356.60
74,844.00
24,550.20
540.00
0.00
15,469.85
139,228.65
386.75

28.00
100.00
480.00

24,000.00
3,060.00
1,800.00
4,200.00
4,500.80
750.00
4,500.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

146
Amount
(Rs.)

27,552.00
29,739.15
13,022.50
270.00
0.00
14,250.31
128,252.76
570.01

28.00
100.00
480.00

24,000.00
3,060.00
1,800.00
4,200.00
4,500.80
750.00
4,500.00

4,593.30
46,777.50
15,295.00

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

147
Amount
(Rs.)
270.00
0.00
13,794.33
124,148.93
551.77

52.00

540.00

300.00
250.00

14,688.00
1,980.00
622.60
90.00
0.00
2,315.33
20,837.93
138.92

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

148
Amount
(Rs.)

216.00
4,080.00
1,950.00

320.00
250.00

19.14

2,933.03

103,360.00

16,240.00
90.00
0.00
16,182.27
145,640.44
404.56

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

149
Amount
(Rs.)

112.50
78.75
23.91
215.16
4.30

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle Barmer

SE.,Circle, Barmer

109

Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
Sr.
No.

Reference of MORD
Specifications

5.1

502

Unit

Quantity

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Bitumen emulsion pressure distributor @ 1750 sqm per


hour

hour

1.00

700.00

700.00

Water tanker 6 kl capacity 1 trip per hour

hour

0.50

250.00

125.00

36,260.00

Description

Rate
(Rs.)

Amount
(Rs.)

Prime Coat
(i)

Low porosity
Providing and applying primer coat with bitumen emulsion (SS1) on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 0.70-1.0 kg/sqm
using mechanical means as per Technical Specification Clause
502
Unit = sqm
Taking output = 1750 sqm
a)

b)

c)

Labour

Machinery

Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm

1.48 24,500.00

Water

kl

3.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

15.00

45.00
0.00

Cost of 1750 sqm = a+b+c+d+e

4,715.45
42,439.05

Rate per sqm = (a+b+c+d+e)/1750


(ii)

24.25

Medium porosity
Providing and applying primer coat with Bitumen emulsion (SS1) on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 0.90- 1.2
kg/sqm using mechanical means as per Technical Specification
Clause 502.
Unit = sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

110

Sr.
No.

Unit

Quantity

Mate

day

0.10

100.00

10.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Bitumen emulsion pressure distributor @ 1750 sqm per


hour

hour

1.00

700.00

700.00

Water tanker 6 kl capacity 1 trip per hour

hour

0.50

250.00

125.00

44,835.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 1750 sqm


a)

b)

c)

Labour

Machinery

Material
Bitumen emulsion (SS-1) @ 1.05 kg per sqm

1.83 24,500.00

Water

kl

3.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

15.00

45.00
0.00
5,798.08

Cost of 1750 sqm = a+b+c+d+e

52,182.68

Rate per sqm = (a+b+c+d+e)/1750


(iii)

29.82

High porosity
Providing and applying primer coat with Bitumen emulsion (SS1) on prepared surface of granular base including cleaning of
road surface and spraying primer at the rate of 1.2-1.5 kg/sqm
using mechanical means as per Technical Specification Clause
502.
Unit = sqm
Taking output = 1750 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.12

100.00

12.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Bitumen emulsion pressure distributor @ 1750 sqm per


hour

hour

1.00

700.00

700.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

111

Sr.
No.

Reference of MORD
Specifications

Description
Water tanker 6 kl capacity 1 trip per hour
c)

Unit

Quantity

hour

0.50

Rate
(Rs.)

Amount
(Rs.)

250.00

125.00

57,820.00

Material
Bitumen emulsion (SS-1) @ 1.35 kg per sqm

2.36 24,500.00

Water

kl

3.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

15.00

45.00
0.00
7,431.45

Cost of 1750 sqm = (a+b+c+d+e)

66,883.05

Rate per sqm = a+b+c+d+e/1750


5.2

503

38.22

Tack Coat
(i)

Providing and applying tack coat with Bitumen emulsion (RS-1)


using emulsion distributor at the rate of 0.20 to 0.25 kg per
sqm on the prepared bituminous surface cleaned with
Hydraulic broom as per Technical Specification Clause 503.

Unit = sqm
Taking output = 1750 sqm
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Emulsion pressure distributor @1750 sqm per hour

hour

1.00

700.00

700.00

0.39 25,000.00

9,750.00

Machinery

Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00

Cost of 1750 sqm = a+b+c+d+e

1,380.45
12,424.05

Rate per sqm = (a+b+c+d+e)/1750


(ii)

EE.,Dn.I, BMR

7.10

Providing and applying tack coat with Bitumen emulsion (RS-1)


using emulsion distributor at the rate of 0.25 to 0.30 kg per
sqm on the prepared dry and hungry bituminous surface
cleaned with Hydraulic broom as per Technical Specification
Clause 503.

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

112

Sr.
No.

Unit

Quantity

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Emulsion pressure distributor @1750 sqm per hour

hour

1.00

700.00

700.00

0.48 25,000.00

12,000.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit = sqm
Taking output = 1750 sqm
a)

b)

c)

Labour

Machinery

Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
1,661.70

Cost of 1750 sqm = a+b+c+d+e

14,955.30

Rate per sqm = (a+b+c+d+e)/1750


(iii)

8.55

Providing and applying tack coat with Bitumen emulsion (RS-1)


using emulsion distributor at the rate of 0.25 to 0.30 kg per
sqm on the prepared granular surfaces treated with primer &
cleaned with Hydraulic broom as per Technical Specification
Clause 503.
Unit = sqm
Taking output = 1750 sqm
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Emulsion pressure distributor @1750 sqm per hour

hour

1.00

700.00

700.00

0.48 25,000.00

12,000.00

Machinery

Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm

d)

EE.,Dn.I, BMR

Overheads @ 0% on (a+b+c)

TA to SE.,Circle, BMR

0.00

AAO.,Circle, Barmer

SE.,Circle, Barmer

113

Sr.
No.

Reference of MORD
Specifications

Description
e)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c+d)

Amount
(Rs.)
1,661.70

Cost of 1750 sqm = a+b+c+d+e

14,955.30

Rate per sqm = (a+b+c+d+e)/1750


(iv)

8.55

Providing and applying tack coat with Bitumen emulsion (RS-1)


using emulsion pressure distributor at the rate of 0.30 to 0.35
kg per sqm on the prepared non-bituminous surfaces (cement
concrete pavement) cleaned with Hydraulic broom as per
Technical Specification Clause 503.

Unit = sqm
Taking output = 1750 sqm
a)

b)

c)

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Hydraulic broom @ 1250 sqm per hour

hour

1.40

170.00

238.00

Air compressor 210 cfm

hour

1.40

194.00

271.60

Emulsion pressure distributor @1750 sqm per hour

hour

1.00

700.00

700.00

0.57 25,000.00

14,250.00

Machinery

Material
Bitumen emulsion (RS-1) @ 0.325 kg per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00

Cost of 1750 sqm = a+b+c+d+e

1,942.95
17,486.55

Rate per sqm = (a+b+c+d+e) / 1750

5.3

9.99

Note: (i)

An output of 1750 sqm has been considered in case of tack


coat which can be covered by bituminous courses on the same
day.

(ii)

The use of cutback bitumen (Medium Curing grade) as per


IS:217 shall be restricted only for sites at sub-zero temperature
or for emergency applications as directed by the Engineer.

504

EE.,Dn.I, BMR

Bituminous Macadam (Bitumen S-90)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

114

Sr.
No.

Unit

Quantity

Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

Batch mix HMP 40-60 THP @ 40 t per hour actual output

hour

6.00

8,800.00

52,800.00

Hydraulic broom @ 1250 sqm per hour

hour

1.10

170.00

187.00

Air compressor 210 cfm

hour

1.10

194.00

213.40

Paver finisher

hour

6.00

550.00

3,300.00

Generator 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 cum, 10 t capacity

hour

6.21

450.00

2,794.50

Three wheel 80-100 kN static roller for intial break down


rolling, final and finishing rolling

hour

12.00

160.00

1,920.00

Vibratory roller 80-100 kN for intermediate rolling

hour

6.00

600.00

3,600.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Providing and laying bituminous macadam with hot mix plant using
crushed aggregates of grading as per Table 500.4 premixed with
bituminous binder, transported to site upto a lead of 1000 m laid over
a previously prepared surface with paver finisher to the required
grade, level and alignment and rolled to achieve the desired
compaction as per Technical Specification Clause 504.

Unit = cum
Taking output = 102.5 cum (225 t)
a)

b)

c)

Labour

Machinery

Material
i)

Bitumen @ 3.3 per cent of mix


(Weight of mix = 102.5 x 2.2 = 225 t)

ii)

Aggregate

7.425 29,500.00 219,037.50

Total weight of mix = 225 t


Weight of bitumen = 7.425 t
Weight of aggregate = 225 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

115

Sr.
No.

Description

Unit

Quantity

25 -10 mm - 40 per cent

cum

58.02

370.00

21,467.40

10 5 mm - 40 per cent

cum

58.02

230.00

13,344.60

5 mm and below - 20 per cent

cum

29.01

140.00

4,061.40

Reference of MORD
Specifications

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate
(Rs.)

0.00
41,092.23

Cost of 102.5 cum = a+b+c+d+e

369,830.03

Rate per cum = a+b+c+d+e/102.5

5.3(ii)

504

Amount
(Rs.)

3,608.10

Bituminous Macadam (Bitumen S-65)


a)

Labour

b)

Machinery

c)

Material

1,152.00
69,674.90

i)

Bitumen @ 3.3 per cent of mix


(Weight of mix = 102.5 x 2.2 = 225 t)

ii)

Aggregate

7.425 31,700.00 235,372.50

Total weight of mix = 225 t


Weight of bitumen = 7.425 t
Weight of aggregate = 225 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)
25 -10 mm - 40 per cent

cum

58.02

370.00

21,467.40

10 5 mm - 40 per cent

cum

58.02

230.00

13,344.60

5 mm and below - 20 per cent

cum

29.01

140.00

4,061.40

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)


Cost of 102.5 cum = a+b+c+d+e
Rate per cum = a+b+c+d+e/102.5

5.3 (III)

504

EE.,Dn.I, BMR

43,134.10
388,206.90
3,787.38

Bituminous Macadam (Bitumen S-65)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

116

Sr.
No.

Reference of MORD
Specifications

Description
a)

Labour

b)

Machinery

c)

Material

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)
1,152.00
69,674.90

i)

Bitumen @ 3.3 per cent of mix


(Weight of mix = 102.5 x 2.2 = 225 t)

ii)

Aggregate

7.425 34,900.00 259,132.50

Total weight of mix = 225 t


Weight of bitumen = 7.425 t
Weight of aggregate = 225 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
(19 mm nominal size)
25 -10 mm - 40 per cent

cum

58.02

370.00

21,467.40

10 5 mm - 40 per cent

cum

58.02

230.00

13,344.60

5 mm and below - 20 per cent

cum

29.01

140.00

4,061.40

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)


Cost of 102.5 cum = a+b+c+d+e
Rate per cum = a+b+c+d+e/102.5

Note:

EE.,Dn.I, BMR

Although the rollers are required only for 3 hours as per norms
of output, but the same have to be available at site for six
hours as the hot mix plant and paver will take six hours for
mixing and paving the output of 225 t considered in these
analysis. To cater for the idle period of these rollers, their
usage rates may be multiplied by a factor of 0.65.

Quantity of bitumen has been taken for analysis purpose. The


actual quantity will depend upon job mix formula.

Labour for traffic control, watch and ward and other


miscellaneous duties at site, including sundries have been
included in administrative overheads of the contractor.

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

46,104.10
414,936.90
4,048.16

SE.,Circle, Barmer

117

Sr.
No.

5.4

Unit

Quantity

Mate

day

5.50

100.00

550.00

Mazdoor (Unskilled)

day

100.50

80.00

8,040.00

Chips spreader

day

10.00

90.00

900.00

Bitumen Sprayer

day

2.50

100.00

250.00

Mazdoor (Semi-Skilled)

day

25.50

90.00

2,295.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

6.00

80.00

480.00

Three wheel 80-100 kN static Roller

hour

6.00

160.00

960.00

2.40 29,500.00

70,800.00

Reference of MORD
Specifications

505

Description
4

In case BM is laid over freshly laid tack coat, provision of


Hydraulic broom and 2 mazdoor for the same shall be
detected as the same has been included in the cost of tack
coat.

Analysis is based on 1000 m lead of mixed material. Cost of


additional cartage may be added as per site requirements.

Rate
(Rs.)

Amount
(Rs.)

Built-Up Spray Grout


Providing, laying and rolling of built-up spray grout layer over
prepared base consisting of a two layer composite construction of
crushed coarse aggregates using motor grader for aggregates. Key
stone chips spreader may be used with application of bituminous
binder after each layer, and with key aggregates placed on top of the
second layer to serve as a base, conforming to the line, grades and
cross-section specified, the compacted layer thickness being 75 mm
as per Technical Specification Clause 505.

(A)

By Manual Means
Unit = sqm
Taking output = 800 sqm (60 cum)

(I) Bitumen (S-90)


a)

b)

c)

Labour

Machinery

Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer

EE.,Dn.I, BMR

Crushed stone coarse aggregate passing 53 mm and


cum
retained on 2.8 mm sieve @ 0.5 cum per 10 sqm for each
layer

80.00

280.00

22,400.00

Key aggregates passing 22.4 mm and retained on 2.8


mm sieve @ 0.13 cum per 10 sqm

10.40

290.00

3,016.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

118

Sr.
No.

Reference of MORD
Specifications

Description

Unit

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
13,711.38

Cost of 800 sqm = a+b+c+d+e

123,402.38

Rate per sqm = (a+b+c+d+e)/800

154.25

(II) Bitumen (S-65)


a)

b)

c)

Labour
Mate

day

5.50

100.00

550.00

Mazdoor (Unskilled)

day

100.50

80.00

8,040.00

Chips spreader

day

10.00

90.00

900.00

Bitumen Sprayer

day

2.50

100.00

250.00

Mazdoor (Semi-Skilled)

day

25.50

90.00

2,295.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

6.00

80.00

480.00

Three wheel 80-100 kN static Roller

hour

6.00

160.00

960.00

2.40 31,700.00

76,080.00

Machinery

Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer

Crushed stone coarse aggregate passing 53 mm and


cum
retained on 2.8 mm sieve @ 0.5 cum per 10 sqm for each
layer

80.00

280.00

22,400.00

Key aggregates passing 22.4 mm and retained on 2.8


mm sieve @ 0.13 cum per 10 sqm

10.40

290.00

3,016.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

cum

0.00
14,371.38

Cost of 800 sqm = a+b+c+d+e

129,342.38

Rate per sqm = (a+b+c+d+e)/800


(B)

161.68

By Mechanical Means
Unit = sqm
Taking output = 3000 sqm (225 cum)
a)

Labour
Mate

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

day

AAO.,Circle, Barmer

0.40

100.00

SE.,Circle, Barmer

40.00

119

Sr.
No.

Unit

Quantity

Mazdoor (Unskilled)

day

8.00

80.00

640.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic self propelled chip spreader both for


aggregates and key aggregates @ 1500 sqm per hour for
3000 x 3 sqm

hour

6.00

750.00

4,500.00

Bitumen presssure distributor for 3000x 2 sqm @ 1750


sqm per hour

hour

3.43

700.00

2,401.00

Tipper 5.5 cum capacity

hour

10.00

450.00

4,500.00

Three wheel 80-100 kN Static Roller @ 10 cum per hour

hour

22.50

160.00

3,600.00

Front end loader 1 cum bucket capacity

hour

5.00

300.00

1,500.00

Reference of MORD
Specifications

Description

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each
layer

Crushed stone coarse aggregate passing 53 mm and


cum
retained on 2.8 mm sieve @ 0.5 cum per 10 sqm for each
layer
Key aggregates passing 22.4 mm and retained on 2.8
mm sieve @ 0.13 cum per 10 sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

cum

9.00 29,500.00 265,500.00


300.00

280.00

84,000.00

39.00

290.00

11,310.00

0.00

Cost of 3000 sqm = a+b+c+d+e

47,273.88
425,464.88

Rate per sqm = (a+b+c+d+e)/3000

141.82

Note: 2 tippers will be needed to match the capacity of hydraulic chip


spreader and front end loader.
5.5

506

Modified Penetration Macadam


Construction of penetration macadam over prepared base by
providing a layer of compacted crushed coarse aggregate using
chips spreader with alternate applications of bituminous binder and
key aggregates and rolling with a three wheel 80-100 kN static roller
to achieve the desired degree of compaction as per Technical
Specification Clause 506.
(A)

50 mm thick
Unit = sqm
Taking output = 4500 sqm (225 cum)

(I) Bitumen (S-90)


EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

120

Sr.
No.

Unit

Quantity

Mate

day

0.32

100.00

32.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic self propelled chip spreader both for


aggregates and key aggregates @ 1500 sqm per hour for
4500 x 2 sqm = 9000 sqm

hour

6.00

750.00

4,500.00

Bitumen pressure distributor for @ 1750 sqm per hour

hour

2.57

700.00

1,799.00

Tipper 5.5 cum capacity for carriage of aggregates from


stockpile to chip spreader

hour

10.00

450.00

4,500.00

Three wheel 80-100 kN Static Roller

hour

22.50

160.00

3,600.00

Front end loader 1 cum bucked capacity

hour

6.00

300.00

1,800.00

Reference of MORD
Specifications

Description
a)

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

Machinery

Material
Bitumen @ 1.75 kg per sqm

7.87 29,500.00 232,165.00

40 mm size hand broken metal @ 0.06 cum per sqm

cum

270.00

240.00

64,800.00

12 mm size stone chips @ 0.018 cum per sqm

cum

81.00

400.00

32,400.00

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

43,284.50

Cost of 4500 sqm = a+b+c+d+e

389,560.50

Rate per sqm = (a+b+c+d+e)/4500


(B)

86.57

75 mm thick
Unit = sqm
Taking output = 4500 sqm (337.5 cum)

(I) Bitumen (S-90)


a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

121

Sr.
No.

Unit

Quantity

Hydraulic self propelled chips spreader both for


aggregates and key aggregates @ 1500 sqm per hour for
4500 x 2 sqm

hour

6.00

750.00

4,500.00

Bitumen presssure distributor for @ 1750 sqm per hour

hour

2.57

700.00

1,799.00

Tipper 5.5 cum capacity for carriage of aggregates from


stockpile to chip spreader

hour

10.00

450.00

4,500.00

Three wheel 80-100 kN static roller

hour

33.75

160.00

5,400.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Bitumen @ 2 kg per sqm

9.00 29,500.00 265,500.00

40 mm size hand broken metal @ 0.09 cum per sqm

cum

405.00

240.00

97,200.00

12 mm size stone chips @ 0.018 cum per sqm

cum

81.00

400.00

32,400.00

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

51,747.38

Cost of 4500 sqm = a+b+c+d+e

465,726.38

Rate per sqm = (a+b+c+d+e)/4500

103.49

(II) Bitumen (S-65)


a)

b)

c)

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic self propelled chips spreader both for


aggregates and key aggregates @ 1500 sqm per hour for
4500 x 2 sqm

hour

6.00

750.00

4,500.00

Bitumen presssure distributor for @ 1750 sqm per hour

hour

2.57

700.00

1,799.00

Tipper 5.5 cum capacity for carriage of aggregates from


stockpile to chip spreader

hour

10.00

450.00

4,500.00

Three wheel 80-100 kN static roller

hour

33.75

160.00

5,400.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Machinery

Material
Bitumen @ 2 kg per sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

9.00 31,700.00 285,300.00

SE.,Circle, Barmer

122

Sr.
No.

Unit

Quantity

40 mm size hand broken metal @ 0.09 cum per sqm

cum

405.00

240.00

97,200.00

12 mm size stone chips @ 0.018 cum per sqm

cum

81.00

400.00

32,400.00

Reference of MORD
Specifications

Description

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate
(Rs.)

0.00
54,222.38

Cost of 4500 sqm = a+b+c+d+e

488,001.38

Rate per sqm = (a+b+c+d+e)/4500


5.6

507

Amount
(Rs.)

108.44

Surface Dressing using Bituminous (Penetrations grade /


modified bitumen) Binder
Providing and laying surface dressing as wearing course consisting
of a layer of bituminous binder laid on the prepared surface, followed
by a cover of crushed stone aggregates of specified size and rolling
with three wheel 80-100 kN static roller including cleaning the road
surface as per Technical Specification Clause 507.

(A)

By Manual Means
Case I: Nominal chipping size 13.2 mm
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 900 sqm
a)

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.25

80.00

180.00

Three wheel 80-100 kN static roller

hour

2.25

160.00

360.00

Add: 0.5 per cent of (a) Labour for sundries

L.S.

b) Machinery

c)

Material
Bitumen (S-90) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

EE.,Dn.I, BMR

27.70

t
cum

0.90 29,500.00
9.00

400.00

26,550.00
3,600.00

Overheads @ 0% on (a+b+c)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

0.00

SE.,Circle, Barmer

123

Sr.
No.

Reference of MORD
Specifications

Description
e)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c+d)

Amount
(Rs.)
4,532.21

Cost of 900 sqm = a+b+c+d+e

40,789.91

Rate per sqm = (a+b+c+d+e)/900


(II)

45.32

Bitumen (S-65)
Unit = sqm
Taking output = 900 sqm
a)

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.25

80.00

180.00

Three wheel 80-100 kN static roller

hour

2.25

160.00

360.00

Add: 0.5 per cent of (a) Labour for sundries

L.S.

b) Machinery

c)

27.7

Material
Bitumen (S-65) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

0.90 31,700.00
9.00

400.00

28,530.00
3,600.00
0.00
4,779.71

Cost of 900 sqm = a+b+c+d+e

43,017.41

Rate per sqm = (a+b+c+d+e)/900

47.80

(III) Polymer Modified Bitumen


Unit = sqm
Taking output = 900 sqm
a)

EE.,Dn.I, BMR

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

124

Sr.
No.

Unit

Quantity

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.25

80.00

180.00

Three wheel 80-100 kN static roller

hour

2.25

160.00

360.00

Add: 0.5 per cent of (a) Labour for sundries

L.S.

Reference of MORD
Specifications

Description
Mazdoor (Semi-Skilled)

Rate
(Rs.)

Amount
(Rs.)

b) Machinery

c)

27.7

Material
Polymer Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

0.90 37,000.00
9.00

400.00

33,300.00
3,600.00
0.00
5,375.96

Cost of 900 sqm = a+b+c+d+e

48,383.66

Rate per sqm = (a+b+c+d+e)/900

53.76

(IV) Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 900 sqm
a)

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.25

80.00

180.00

Three wheel 80-100 kN static roller

hour

2.25

160.00

360.00

Add: 0.5 per cent of (a) Labour for sundries

L.S.

b) Machinery

c)

Material
Crumb Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

EE.,Dn.I, BMR

27.7

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

t
cum

0.90 34,900.00
9.00

400.00

31,410.00
3,600.00

SE.,Circle, Barmer

125

Sr.
No.

Reference of MORD
Specifications

Description

Unit

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
5,139.71

Cost of 900 sqm = a+b+c+d+e

46,257.41

Rate per sqm = (a+b+c+d+e)/900


(V)

51.40

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 900 sqm
a)

b)

c)

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.25

80.00

180.00

Three wheel 80-100 kN static roller

hour

2.25

160.00

360.00

Add: 0.5 per cent of (a) Labour for sundries

L.S.

Machinery

27.70

Material
Natural Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost of 900 sqm = a+b+c+d+e

t
cum

0.90 36,000.00
9.00

400.00

32,400.00
3,600.00
0.00
5,263.46
47,371.16

Rate per sqm = (a+b+c+d+e)/900

52.63

Case II: Nominal chipping size 9.5 mm


(I)

Bitumen (S-90)
Unit = sqm
Taking output = 1000 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

126

Sr.
No.

Unit

Quantity

Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.00

80.00

160.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.90 29,500.00

26,550.00

Reference of MORD
Specifications

Description
a)

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

Machinery

Material
Bitumen (S-90) @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

8.00

320.00

2,560.00
0.00
4,391.25

Cost of 1000 sqm = a+b+c+d+e

39,521.25

Rate per sqm = (a+b+c+d+e)/1000


(II)

39.52

Bitumen (S-65)
Unit = sqm
Taking output = 1000 sqm
a)

b)

c)

EE.,Dn.I, BMR

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.00

80.00

160.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

Machinery

Material

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

127

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Bitumen (S-65) @ 0.90 kg per sqm


Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

Quantity

Rate
(Rs.)

0.90 31,700.00
8.00

320.00

Amount
(Rs.)
28,530.00
2,560.00
0.00
4,638.75

Cost of 1000 sqm = a+b+c+d+e

41,748.75

Rate per sqm = (a+b+c+d+e)/1000

41.75

(III) Polymer Modified Bitumen


Unit = sqm
Taking output = 1000 sqm
a)

b)

c)

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.00

80.00

160.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.90 37,000.00

33,300.00

Machinery

Material
Polymer Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost of 1000 sqm = a+b+c+d+e

t
cum

8.00

320.00

2,560.00
0.00
5,235.00
47,115.00

Rate per sqm = (a+b+c+d+e)/1000

47.12

(IV) Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 1000 sqm
a)
EE.,Dn.I, BMR

Labour

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

128

Sr.
No.

Unit

Quantity

Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.00

80.00

160.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.90 34,900.00

31,410.00

Reference of MORD
Specifications

Description

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Crumb Rubber Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

8.00

320.00

2,560.00
0.00
4,998.75

Cost of 1000 sqm = a+b+c+d+e

44,988.75

Rate per sqm = (a+b+c+d+e)/1000


(V)

44.99

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 1000 sqm
a)

b)

c)

Labour
Mate

day

2.60

100.00

260.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.00

80.00

160.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.90 36,000.00

32,400.00

Machinery

Material
Natural Rubber Modified Bitumen @ 0.90 kg per sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

129

Sr.
No.

Reference of MORD
Specifications

Description
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Unit

Quantity

cum

8.00

Rate
(Rs.)
320.00

Amount
(Rs.)
2,560.00
0.00
5,122.50

Cost of 1000 sqm = a+b+c+d+e

46,102.50

Rate per sqm = (a+b+c+d+e)/1000


(B)

46.10

By Mechanical Means
Case I: Nominal chipping size 13.2 mm
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a)

b)

c)

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

18.75

160.00

3,000.00

Machinery

Material
Bitumen (S-90) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

t
cum

7.50 29,500.00 221,250.00


75.00

400.00

30,000.00
0.00
33,824.75

SE.,Circle, Barmer

130

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 7500 sqm = a+b+c+d+e

Amount
(Rs.)
304,422.75

Rate per sqm = (a+b+c+d+e)/7500


(II)

40.59

Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a)

b)

c)

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

18.75

160.00

3,000.00

Machinery

Material
Bitumen (S-65) @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost of 7500 sqm = a+b+c+d+e

t
cum

7.50 31,700.00 237,750.00


75.00

400.00

30,000.00
0.00
35,887.25
322,985.25

Rate per sqm = (a+b+c+d+e)/7500

43.06

(III) Polymer Modified Bitumen


Unit = sqm
Taking output = 7500 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

131

Sr.
No.

Unit

Quantity

Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

18.75

160.00

3,000.00

Reference of MORD
Specifications

Description
a)

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

Machinery

Material
Polymer Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.50 37,000.00 277,500.00


75.00

400.00

30,000.00
0.00
40,856.00

Cost of 7500 sqm = a+b+c+d+e

367,704.00

Rate per sqm = (a+b+c+d+e)/7500

49.03

(IV) Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 7500 sqm
a)

EE.,Dn.I, BMR

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

132

Sr.
No.

Unit

Quantity

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

18.75

160.00

3,000.00

Reference of MORD
Specifications

Description
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Crumb Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.50 34,900.00 261,750.00


75.00

400.00

30,000.00
0.00
38,887.25

Cost of 7500 sqm = a+b+c+d+e

349,985.25

Rate per sqm = (a+b+c+d+e)/7500


(V)

46.66

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 7500 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

133

Sr.
No.

Unit

Quantity

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

18.75

160.00

3,000.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Natural Rubber Modified Bitumen @ 1.00 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @
0.010 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.50 36,000.00 270,000.00


75.00

400.00

30,000.00
0.00
39,918.50

Cost of 7500 sqm = a+b+c+d+e

359,266.50

Rate per sqm = (a+b+c+d+e)/7500

47.90

Case II: Nominal chipping size 9.5 mm


(I)

Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chips spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chips spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor @ 1750 sqm per hour

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

15.00

160.00

2,400.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

134

Sr.
No.

Reference of MORD
Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Material
Bitumen (S-90) @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

6.75 29,500.00 199,125.00


60.00

320.00

19,200.00
0.00
29,634.13

Cost of 7500 sqm = a+b+c+d+e

266,707.13

Rate per sqm = (a+b+c+d+e)/7500


(II)

35.56

Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a)

b)

c)

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chips spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chips spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor @ 1750 sqm per hour

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

15.00

160.00

2,400.00

Machinery

Material
Bitumen (S-65) @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

t
cum

6.75 31,700.00 213,975.00


60.00

320.00

19,200.00

0.00
31,490.38

SE.,Circle, Barmer

135

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 7500 sqm = a+b+c+d+e

Amount
(Rs.)
283,413.38

Rate per sqm = (a+b+c+d+e)/7500

37.79

(III) Polymer Modified Bitumen


Unit = sqm
Taking output = 7500 sqm
a)

b)

c)

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chips spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chips spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor @ 1750 sqm per hour

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

15.00

160.00

2,400.00

Machinery

Material
Polymer Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost of 7500 sqm = a+b+c+d+e

t
cum

6.75 37,000.00 249,750.00


60.00

320.00

19,200.00
0.00
35,962.25
323,660.25

Rate per sqm = (a+b+c+d+e)/7500

43.15

(IV) Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 7500 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

136

Sr.
No.

Unit

Quantity

Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chips spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chips spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor @ 1750 sqm per hour

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

15.00

160.00

2,400.00

Reference of MORD
Specifications

Description
a)

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

Machinery

Material
Crumb Rubber Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

6.75 34,900.00 235,575.00


60.00

320.00

19,200.00

0.00
34,190.38

Cost of 7500 sqm = a+b+c+d+e

307,713.38

Rate per sqm = (a+b+c+d+e)/7500


(V)

41.03

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 7500 sqm
a)

EE.,Dn.I, BMR

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

137

Sr.
No.

Unit

Quantity

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chips spreader @ 1500 sqm


per hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips


from stockpile on road side to chips spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor @ 1750 sqm per hour

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller weight

hour

15.00

160.00

2,400.00

Reference of MORD
Specifications

Description
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Natural Rubber Modified Bitumen @ 0.90 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @
0.008 cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

6.75 36,000.00 243,000.00


60.00

320.00

19,200.00
0.00
35,118.50

Cost of 7500 sqm = a+b+c+d+e

316,066.50

Rate per sqm = (a+b+c+d+e)/7500


5.7

507

42.14

Surface Dressing using Bitumen Emulsion


Providing and laying surface dressing as wearing course consisting
of a layer of bitumen emulsion laid on the prepared surface, followed
by a cover of crushed stone chippings of specified size and rolling
with 80-100 kN roller including cleaning the road surface as per
Technical Specification Clause 507.
(A)

By Manual Means
Case I: Nominal aggregate size 13.2 mm
Unit = sqm
Taking output = 900 sqm
a)

EE.,Dn.I, BMR

Labour
Mate

day

2.36

100.00

236.00

Bitumen Emulsion Sprayer

day

1.00

100.00

100.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

138

Sr.
No.

Unit

Quantity

day

58.00

80.00

4,640.00

Emulsion sprayer, capacity 1000 litre fitted with spray set

hour

2.25

700.00

1,575.00

Three wheel 80-100 kN static roller

hour

2.25

160.00

360.00

Add: 0.5 per cent of (a) Labour for sundries

L.S.

Reference of MORD
Specifications

Description
Mazdoor (Unskilled)
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

0.5/100

Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @ 0.010
cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

1.35 25,000.00
9.00

400.00

33,750.00
3,600.00
0.00
5,532.63

Cost of 900 sqm = a+b+c+d+e

49,793.63

Rate per sqm = (a+b+c+d+e)/900

55.33

Case II: Nominal chipping size 9.5 mm


Unit = sqm
Taking output = 1000 sqm
a)

b)

c)

Labour
Mate

day

2.36

100.00

236.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

58.00

80.00

4,640.00

Emulsion sprayer, capacity 1000 litre fitted with spray set

hour

2.00

700.00

1,400.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

1.40 25,000.00

35,000.00

Machinery

Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @ 0.008
cum per sqm

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

t
cum

8.00

320.00

2,560.00

0.00

AAO.,Circle, Barmer

5,532.00

SE.,Circle, Barmer

139

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 1000 sqm = a+b+c+d+e

Amount
(Rs.)
49,788.00

Rate per sqm = (a+b+c+d+e)/1000


(B)

49.79

By Mechanical Means
Case I: Nominal chipping size 13.2 mm
Unit = sqm
Taking output = 7500 sqm
a)

b)

c)

Labour
Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm per


hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips from


stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen Emulsion pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

18.75

160.00

3,000.00

Machinery

Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm
Crushed stone chipping, 13.2 mm nominal size @ 0.010
cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

11.25 25,000.00 281,250.00


75.00

320.00

24,000.00
0.00

Cost of 7500 sqm = a+b+c+d+e

40,574.75
365,172.75

Rate per sqm = (a+b+c+d+e)/7500

48.69

Case II: Nominal chipping size 9.5 mm


Unit = sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

140

Sr.
No.

Unit

Quantity

Mate

day

0.44

100.00

44.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Hydraulic broom @ 1250 sqm per hour

hour

6.00

170.00

1,020.00

Air compressor 210 cfm

hour

6.00

194.00

1,164.00

Hydraulic self propelled chip spreader @ 1500 sqm per


hour

hour

6.00

750.00

4,500.00

Tipper 5.5 10 t capacity for carriage of stone chips from


stockpile on road side to chip spreader

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen emulsion pressure distributor @ 1750 sqm per


hour

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

15.00

160.00

2,400.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 7500 sqm


a)

b)

c)

Labour

Machinery

Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm
Crushed stone chipping, 9.5 mm nominal size @ 0.008
cum per sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

10.50 25,000.00 262,500.00


60.00

320.00

19,200.00
0.00

Cost of 7500 sqm = a+b+c+d+e

37,556.00
338,004.00

Rate per sqm = (a+b+c+d+e)/7500


Note:

5.8

507.2.5

45.07

Where the proposed aggregate fails to pass the stripping value


test, an approved adhesion agent may be added to the binder
as per Clause 507.24. Alternatively, chips may be pre-coated
as per Clause 507.25.
Pre-coating Chips
Pre-coating of chips with 1 per cent of paving bitumen by weight of
chips in a suitable mixer duly heated to 160 degree C as per
Technical Specification Clause 507.2.5
Unit = cum

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

141

Sr.
No.

Unit

Quantity

Mate

day

0.60

100.00

60.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Bitumen boiler oil fired, capacity 1000 litre itre

hour

6.00

80.00

480.00

Mixall 6-10 t capacity

hour

6.00

400.00

2,400.00

0.48 29,500.00

14,160.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 30 cum


(I)

Bitumen (S-90)
a)

b)

c)

Labour

Machinery

Material
Bitumen @1 per cent by weight of chips (30x1.6)/100

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
2,287.50

Cost of 30 cum = a+b+c+d+e

20,587.50

Rate per cum = (a+b+c+d+e)/30


(II)

686.25

Bitumen (S-65)
a)

b)

c)

Labour
Mate

day

0.60

100.00

60.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Bitumen boiler oil fired, capacity 1000 litre itre

hour

6.00

80.00

480.00

Mixall 6-10 t capacity

hour

6.00

400.00

2,400.00

0.48 31,700.00

15,216.00

Machinery

Material
Bitumen @1 per cent by weight of chips (30x1.6)/100

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00

Cost of 30 cum = a+b+c+d+e

TA to SE.,Circle, BMR

2,419.50
21,775.50

Rate per cum = (a+b+c+d+e)/30

EE.,Dn.I, BMR

725.85

AAO.,Circle, Barmer

SE.,Circle, Barmer

142

Sr.
No.

Reference of MORD
Specifications

5.9

508

Unit

Quantity

Mate

day

1.08

100.00

108.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Mixall 6/10 t capacity

hour

4.00

400.00

1,600.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

4.00

80.00

320.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.73 29,500.00

21,535.00

Description

Rate
(Rs.)

Amount
(Rs.)

20mm thick Open-Graded Premix Carpet using Bituminous


(penetration grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of 20 mm
thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to required line, grade and
level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required level and
grades to be followed by seal coat of either Type A or Type B or Type
C as per Technical Specification Clause 508.

Case - I By Manual Means


(I)

Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm (10 cum)
a)

b)

c)

Labour

Machinery

Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

400.00

5,400.00
0.00

Cost of 500 sqm = a+b+c+d+e

3,937.88
35,440.88

Rate per sqm = (a+b+c+d+e)/500


(II)

70.88

Bitumen (S-65)
Unit = sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

143

Sr.
No.

Unit

Quantity

Mate

day

1.08

100.00

108.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Mixall 6/10 t capacity

hour

4.00

400.00

1,600.00

Bitumen boiler oil fired1000 litre capacity fitted with spray


set

hour

4.00

80.00

320.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.73 31,700.00

23,141.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 500 sqm (10 cum)


a)

b)

c)

Labour

Machinery

Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

400.00

5,400.00
0.00
4,138.63

Cost of 500 sqm = a+b+c+d+e

37,247.63

Rate per sqm = (a+b+c+d+e)/500


(III)

74.50

Polymer Modified Bitumen


Unit = sqm
Taking output = 500 sqm (10 cum)
a)

b)

c)

EE.,Dn.I, BMR

Labour
Mate

day

1.08

100.00

108.00

Mazdoor (Skilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Mixall 6/10 t capacity

hour

4.00

400.00

1,600.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

4.00

80.00

320.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

Machinery

Material

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

144

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Polymer Modified Bitumen @ 14.60 kg per 10 sqm


Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

Quantity

Rate
(Rs.)

0.73 37,000.00
13.50

400.00

Amount
(Rs.)
27,010.00
5,400.00
0.00
4,622.25

Cost of 500 sqm = a+b+c+d+e

41,600.25

Rate per sqm = (a+b+c+d+e)/500


(IV)

83.20

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 500 sqm (10 cum)
a)

b)

c)

Labour
Mate

day

1.08

100.00

108.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Mixall 6/10 t capacity

hour

4.00

400.00

1,600.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

4.00

80.00

320.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.73 34,900.00

25,477.00

Machinery

Material
Crumb Rubber Modified Bitumen @ 14.60 kg per 10 sqm

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum


per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

13.50

400.00

5,400.00
0.00

Cost of 500 sqm = a+b+c+d+e

4,430.63
39,875.63

Rate per sqm = (a+b+c+d+e)/500


(V)

79.75

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 500 sqm (10 cum)
a)

EE.,Dn.I, BMR

Labour

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

145

Sr.
No.

Unit

Quantity

Mate

day

1.08

100.00

108.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Mixall 6/10 t capacity

hour

4.00

400.00

1,600.00

Bitumen boiler oil fired1000 litre capacity fitted with spray


set

hour

4.00

80.00

320.00

Three wheel 80-100 kN static roller

hour

2.00

160.00

320.00

0.73 36,000.00

26,280.00

Reference of MORD
Specifications

Description

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Natural Rubber Modified Bitumen @ 14.60 kg per 10 sqm

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum


per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

13.50

400.00

5,400.00
0.00
4,531.00

Cost of 500 sqm = a+b+c+d+e

40,779.00

Rate per sqm = (a+b+c+d+e)/500

81.56

Case - II By Mechanical Means


(I)

Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP 30/40 t per hour

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.64

450.00

1,638.00

Paver finisher

hour

6.00

550.00

3,300.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

146

Sr.
No.

Reference of MORD
Specifications

Description
Three wheel 80-100 kN static roller
c)

Unit

Quantity

hour

16.00

Rate
(Rs.)
160.00

Amount
(Rs.)
2,560.00

Material
Bitumen (S-90) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

5.84 29,500.00 172,280.00


108.00

400.00

43,200.00
0.00
33,273.75

Cost of 4000 sqm = a+b+c+d+e

299,463.75

Rate per sqm = (a+b+c+d+e)/4000


(II)

74.87

Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

c)

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP 30/40 t per hour

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.64

450.00

1,638.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

16.00

160.00

2,560.00

Machinery

Material
Bitumen (S-65) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

5.84 31,700.00 185,128.00


108.00

400.00

43,200.00
0.00

Cost of 4000 sqm = a+b+c+d+e

34,879.75
313,917.75

Rate per sqm = (a+b+c+d+e)/4000


EE.,Dn.I, BMR

TA to SE.,Circle, BMR

78.48
AAO.,Circle, Barmer

SE.,Circle, Barmer

147

Sr.
No.

Unit

Quantity

Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor skilled for checking line and levels

day

3.00

100.00

300.00

HMP 30/40 t per hour

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.64

450.00

1,638.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

16.00

160.00

2,560.00

Reference of MORD
Specifications

Description
(III)

Rate
(Rs.)

Amount
(Rs.)

Polymer Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

c)

Labour

Machinery

Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

5.84 37,000.00 216,080.00


108.00

400.00

43,200.00
0.00
38,748.75

Cost of 4000 sqm = a+b+c+d+e

348,738.75

Rate per sqm = (a+b+c+d+e)/4000


(IV)

87.18

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

EE.,Dn.I, BMR

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

148

Sr.
No.

Unit

Quantity

HMP 30/40 t per hour

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.64

450.00

1,638.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

16.00

160.00

2,560.00

Reference of MORD
Specifications

Description
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Crumb Rubber Modified Bitumen @ 14.60 kg per 10 sqm

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum


per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

5.84 34,900.00 203,816.00


108.00

400.00

43,200.00
0.00
37,215.75

Cost of 4000 sqm = a+b+c+d+e

334,941.75

Rate per sqm = (a+b+c+d+e)/4000


(V)

83.74

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP 30/40 t per hour

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.64

450.00

1,638.00

Paver finisher

hour

6.00

550.00

3,300.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

149

Sr.
No.

Reference of MORD
Specifications

Description
Three wheel 80-100 kN static roller
c)

Unit

Quantity

hour

16.00

Rate
(Rs.)
160.00

Amount
(Rs.)
2,560.00

Material
Natural Rubber Modified Bitumen @ 14.60 kg per 10 sqm

t
cum

d)

Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum


per 10 sqm
Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

5.84 36,000.00 210,240.00


108.00

400.00

43,200.00
0.00
38,018.75

Cost of 4000 sqm = a+b+c+d+e

342,168.75

Rate per sqm = (a+b+c+d+e)/4000


5.10

508.2

85.54

20 mm thick Open Graded Premix Carpet using Bitumen


Emulsion as per Technical Specification Clause 508.2
Unit = sqm
Taking output = 900 sqm (24.3 cum)
a)

b)

c)

Labour
Mate

day

0.80

100.00

80.00

Mazdoor (Unskilled)

day

18.00

80.00

1,440.00

Mazdoor (Skilled)

day

2.00

100.00

200.00

Concrete mixer 0.4/0.28 cum capacity

hour

6.00

60.00

360.00

Three wheel 80-100 kN static roller

hour

3.60

160.00

576.00

1.94 25,000.00

48,500.00

Machinery

Material
Bitumen emulsion (RS-1) @ 21.50 kg per 10 sqm
Crushed stone aggregates 13.2 mm to 5.6 mm @ 0.27 cum
per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

24.30

400.00

9,720.00
0.00

Cost of 900 sqm = a+b+c+d+e

7,609.50
68,485.50

Rate per sqm = (a+b+c+d+e)/900


5.11

509

EE.,Dn.I, BMR

76.10

Mix Seal Surfacing

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

150

Sr.
No.

Unit

Quantity

Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

1.10 29,500.00

32,450.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Providing, laying and rolling of close-graded premix surfacing


material of 20 mm thickness composed of 11.2 mm to 0.9 mm (TypeA) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration
grade bitumen to required line, grade and level to serve as wearing
course on a previously prepared base, including mixing in a suitable
plant, laying and rolling with a three wheel 8-10 kN static roller and
finishing to required level and grades as per Technical Specification
Clause 509

By Manual Means
Type A
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a)

b)

Labour

Machinery
Mixall 6-10 t capacity

c)

hour

Material
Bitumen (S-90) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

230.00

3,105.00
0.00

Cost of 500 sqm = a+b+c+d+e

5,230.63
46,935.63

Rate per sqm = (a+b+c+d+e)/500


(II)

93.87

Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

151

Sr.
No.

Unit

Quantity

Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

1.10 31,700.00

34,870.00

Reference of MORD
Specifications

Description
a)

b)

Amount
(Rs.)

Labour

Machinery
Mixall 6-10 t capacity

c)

Rate
(Rs.)

hour

Material
Bitumen (S-65) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

230.00

3,105.00
0.00
5,533.13

Cost of 500 sqm = a+b+c+d+e

49,658.13

Rate per sqm = (a+b+c+d+e)/500


(III)

99.32

Polymer Modified Bitumen


Unit = sqm
Taking output = 500 sqm
a)

b)

Labour
Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

Machinery
Mixall 6-10 t capacity

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

hour

SE.,Circle, Barmer

152

Sr.
No.

Reference of MORD
Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

1.10 37,000.00
13.50

230.00

40,700.00
3,105.00
0.00
6,261.88

Cost of 500 sqm = a+b+c+d+e

56,216.88

Rate per sqm = (a+b+c+d+e)/500


(IV)

112.43

Crumb Rubber Modified Bitumen

Unit = sqm
Taking output = 500 sqm
a)

b)

Labour
Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

1.10 34,900.00

38,390.00

Machinery
Mixall 6-10 t capacity

c)

Material
Crumb Rubber Modified Bitumen @ 22 kg per 10 sqm

Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27


cum per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

13.50

230.00

3,105.00
0.00

Cost of 500 sqm = a+b+c+d+e

5,973.13
53,618.13

Rate per sqm = (a+b+c+d+e)/500


(V)

hour

107.24

Natural Rubber Modified Bitumen


Unit = sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

153

Sr.
No.

Unit

Quantity

Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

1.10 36,000.00

39,600.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 500 sqm


a)

b)

Labour

Machinery
Mixall 6-10 t capacity

c)

hour

Material
Natural Rubber Modified Bitumen @ 22 kg per 10 sqm

Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27


cum per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

13.50

230.00

3,105.00
0.00
6,124.38

Cost of 500 sqm = a+b+c+d+e

54,979.38

Rate per sqm = (a+b+c+d+e)/500

109.96

Type B
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a)

b)

Labour
Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

Machinery
Mixall 6-10 t capacity

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

hour

SE.,Circle, Barmer

154

Sr.
No.

Reference of MORD
Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Material
Bitumen (S-90) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

0.95 29,500.00
13.50

230.00

28,025.00
3,105.00
0.00
4,677.50

Cost of 500 sqm = a+b+c+d+e

41,957.50

Rate per sqm = (a+b+c+d+e)/500


(II)

83.92

Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a)

b)

Labour
Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

0.95 31,700.00

30,115.00

Machinery
Mixall 6-10 t capacity

c)

hour

Material
Bitumen (S-65) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

230.00

3,105.00
0.00

Cost of 500 sqm = a+b+c+d+e

4,938.75
44,308.75

Rate per sqm = (a+b+c+d+e)/500


(III)

88.62

Polymer Modified Bitumen


Unit = sqm
Taking output = 500 sqm
a)

EE.,Dn.I, BMR

Labour
TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

155

Sr.
No.

Unit

Quantity

Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

80.00

480.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

0.95 37,000.00

35,150.00

Reference of MORD
Specifications

Description

b)

Amount
(Rs.)

Machinery
Mixall 6-10 t capacity

c)

Rate
(Rs.)

hour

Material
Polymer Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

230.00

3,105.00
0.00
5,568.13

Cost of 500 sqm = a+b+c+d+e

49,973.13

Rate per sqm = (a+b+c+d+e)/500


(IV)

99.95

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 500 sqm
a)

b)

Labour
Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

100.00

600.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

0.95 34,900.00

33,155.00

Machinery
Mixall 6-10 t capacity

c)

Material
Crumb Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm

d)

EE.,Dn.I, BMR

hour

t
cum

13.50

230.00

3,105.00

Overheads @ 0% on (a+b+c)

TA to SE.,Circle, BMR

0.00

AAO.,Circle, Barmer

SE.,Circle, Barmer

156

Sr.
No.

Reference of MORD
Specifications

Description
e)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c+d)

Amount
(Rs.)
5,333.75

Cost of 500 sqm = a+b+c+d+e

47,863.75

Rate per sqm = (a+b+c+d+e)/500


(V)

95.73

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 500 sqm
a)

b)

Labour
Mate

day

1.40

100.00

140.00

Mazdoor (Unskilled)

day

21.00

80.00

1,680.00

Mazdoor (Semi-Skilled)

day

7.00

90.00

630.00

hour

6.00

400.00

2,400.00

Oil fired bitumen boiler 1000 litre capacity fitted with spray hour
set

6.00

100.00

600.00

Three wheel 80-100 kN static roller

6.00

160.00

960.00

0.95 36,000.00

34,200.00

Machinery
Mixall 6-10 t capacity

c)

hour

Material
Natural Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @
0.27cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

13.50

230.00

3,105.00
0.00
5,464.38

Cost of 500 sqm = a+b+c+d+e

49,039.38

Rate per sqm = (a+b+c+d+e)/500

98.08

By Mechanical Means
Type A
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

Labour
Mate

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

day

AAO.,Circle, Barmer

0.52

100.00

SE.,Circle, Barmer

52.00

157

Sr.
No.

Unit

Quantity

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Reference of MORD
Specifications

Description

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Bitumen (S-90) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

8.80 29,500.00 259,600.00


108.00

230.00

24,840.00
0.00
41,931.50

Cost of 4000 sqm = a+b+c+d+e

377,383.50

Rate per sqm = (a+b+c+d+e)/4000


(II)

94.35

Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

158

Sr.
No.

Reference of MORD
Specifications

Description
Three wheel 80-100 kN static roller
c)

Unit

Quantity

hour

18.00

Rate
(Rs.)
160.00

Amount
(Rs.)
2,880.00

Material
Bitumen (S-65) @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

8.80 31,700.00 278,960.00


108.00

230.00

24,840.00
0.00
44,351.50

Cost of 4000 sqm = a+b+c+d+e

399,163.50

Rate per sqm = (a+b+c+d+e)/4000


(III)

99.79

Polymer Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

c)

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Machinery

Material
Polymer Modified Bitumen @ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

8.80 37,000.00 325,600.00


108.00

230.00

24,840.00
0.00

Cost of 4000 sqm = a+b+c+d+e

50,181.50
451,633.50

Rate per sqm = (a+b+c+d+e)/4000

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

112.91

AAO.,Circle, Barmer

SE.,Circle, Barmer

159

Sr.
No.

Unit

Quantity

Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Reference of MORD
Specifications

Description
(IV)

Rate
(Rs.)

Amount
(Rs.)

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

c)

Labour

Machinery

Material
Crumb Rubber Modified Bitumen @ 22 kg per 10 sqm

t
cum

d)

Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27


cum per 10 sqm
Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

8.80 34,900.00 307,120.00


108.00

230.00

0.00
47,871.50

Cost of 4000 sqm = a+b+c+d+e

430,843.50

Rate per sqm = (a+b+c+d+e)/4000


(V)

24,840.00

107.71

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

EE.,Dn.I, BMR

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

160

Sr.
No.

Unit

Quantity

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Reference of MORD
Specifications

Description
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material

* Natural Rubber Modified Bitumen @ 22 kg per 10 sqm

Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27


cum per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

8.80 36,000.00 316,800.00


108.00

230.00

24,840.00
0.00
49,081.50

Cost of 4000 sqm = a+b+c+d+e

441,733.50

Rate per sqm = (a+b+c+d+e)/4000

110.43

Type B
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

161

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Add 10 per cent of cost of carriage to cover cost of


loading and unloading

c)

0.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Material
Bitumen (S-90) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.60 29,500.00 224,200.00


108.00

230.00

24,840.00

0.00
37,506.50

Cost of 4000 sqm = a+b+c+d+e

337,558.50

Rate per sqm = (a+b+c+d+e)/4000


(II)

84.39

Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

c)

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Machinery

Material
Bitumen (S-65) @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

t
cum

7.60 31,700.00 240,920.00


108.00

230.00

24,840.00

SE.,Circle, Barmer

162

Sr.
No.

Reference of MORD
Specifications

Description

Unit

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
39,596.50

Cost of 4000 sqm = a+b+c+d+e

356,368.50

Rate per sqm = (a+b+c+d+e)/4000


(III)

89.09

Polymer Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

c)

Labour

Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Machinery

Material
Polymer Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

cum

7.60 37,000.00 281,200.00


108.00

230.00

24,840.00
0.00

Cost of 4000 sqm = a+b+c+d+e

44,631.50
401,683.50

Rate per sqm = (a+b+c+d+e)/4000


(IV)

100.42

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

163

Sr.
No.

Unit

Quantity

Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

HMP of appropriate capacity

hour

6.00

6,200.00

37,200.00

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Reference of MORD
Specifications

Description
a)

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

Machinery

Material
Crumb Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.60 34,900.00 265,240.00


108.00

230.00

24,840.00
0.00
42,636.50

Cost of 4000 sqm = a+b+c+d+e

383,728.50

Rate per sqm = (a+b+c+d+e)/4000


(V)

95.93

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 4000 sqm (80 cum)
a)

b)

Labour
Mate

day

0.52

100.00

52.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Mazdoor (Skilled)

day

3.00

100.00

300.00

hour

6.00

6,200.00

37,200.00

Machinery
HMP of appropriate capacity

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

164

Sr.
No.

Unit

Quantity

Electric generator set 125 KVA

hour

6.00

510.00

3,060.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Tipper 5.5 10 t capacity

hour

3.60

450.00

1,620.00

Paver finisher

hour

6.00

550.00

3,300.00

Three wheel 80-100 kN static roller

hour

18.00

160.00

2,880.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Natural Rubber Modified Bitumen @ 19 kg per 10 sqm
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27
cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.60 36,000.00 273,600.00


108.00

230.00

24,840.00

0.00
43,681.50

Cost of 4000 sqm = a+b+c+d+e

393,133.50

Rate per sqm = (a+b+c+d+e)/4000

98.28

* Any one of the above alternatives may be adopted.


5.12

510

Seal Coat
Providing and laying seal coat sealing the voids in a bituminous
surface laid to the specified levels, grade and cross fall using Type A,
Type B and Type C as per Technical Specification Clause 510

A.

By Manual Means

Case - I : Type A
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

165

Sr.
No.

Unit

Quantity

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.20

60.00

132.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

1.078 29,500.00

31,801.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

9.90

230.00

2,277.00

0.00
4,634.63

Cost of 1100 sqm = a+b+c+d+e

41,711.63

Rate per sqm = (a+b+c+d+e)/1100


(II)

37.92

Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a)

b)

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

hour

2.20

60.00

132.00

hour

2.20

160.00

352.00

1.078 31,700.00

34,172.60

Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with
spray set
Three wheel 80-100 kN static roller

c)

Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

cum

9.90

230.00

2,277.00

0.00

Cost of 1100 sqm = a+b+c+d+e

EE.,Dn.I, BMR

4,931.08
44,379.68

AAO.,Circle, Barmer

SE.,Circle, Barmer

166

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rate per sqm = (a+b+c+d+e)/1100


(III)

40.35

Polymer Modified Bitumen


Unit = sqm
Taking output = 1100 sqm
a)

b)

c)

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.20

60.00

132.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

1.078 37,000.00

39,886.00

Machinery

Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

9.90

230.00

2,277.00

0.00
5,645.25

Cost of 1100 sqm = a+b+c+d+e

50,807.25

Rate per sqm = (a+b+c+d+e)/1100


(IV)

46.19

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 1100 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

167

Sr.
No.

Unit

Quantity

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.20

60.00

132.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

1.078 34,900.00

37,622.20

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Crumb Rubber Modified Bitumen @ 9.80 kg per 10 sqm

Crushed stone chipping of 6.7 mm size 100 per cent


passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

9.90

230.00

2,277.00

0.00
5,362.28

Cost of 1100 sqm = a+b+c+d+e

48,260.48

Rate per sqm = (a+b+c+d+e)/1100


(V)

43.87

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 1100 sqm
a)

b)

c)

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Bitumen boiler oil fired, capacity 1000 litre fitted with


spray set

hour

2.20

60.00

132.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

1.078 36,000.00

38,808.00

Machinery

Material
Natural Rubber Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

cum

9.90

230.00

2,277.00

0.00

Cost of 1100 sqm = a+b+c+d+e

EE.,Dn.I, BMR

5,510.50
49,594.50

AAO.,Circle, Barmer

SE.,Circle, Barmer

168

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rate per sqm = (a+b+c+d+e)/1100

45.09

Case - II : Type B
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a)

b)

c)

Labour
Mate

day

0.85

100.00

85.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Mazdoor (Semi-Skilled)

day

2.00

90.00

180.00

Mixall 6/10 t capacity

hour

2.50

400.00

1,000.00

Three wheel 80-100 kN static roller

hour

2.50

160.00

400.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.50

80.00

200.00

0.85 29,500.00

25,075.00

Machinery

Material
Bitumen (S-90) @ 6.80 kg per 10 sqm
Crushed sand or grit as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.50

125.00

937.50

0.00
3,634.69

Cost of 1250 sqm = a+b+c+d+e

32,712.19

Rate per sqm = (a+b+c+d+e)/1250


(II)

26.17

Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.85

100.00

85.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Mazdoor (Semi-Skilled)

day

2.00

90.00

180.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

169

Sr.
No.

Unit

Quantity

Mixall 6/10 t capacity

hour

2.50

400.00

1,000.00

Three wheel 80-100 kN static roller

hour

2.50

160.00

400.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.50

80.00

200.00

0.85 31,700.00

26,945.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material

Bitumen (S-65) @ 6.80 kg per 10 sqm


Crushed sand or grit as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.50

125.00

937.50

0.00
3,868.44

Cost of 1250 sqm = a+b+c+d+e

34,815.94

Rate per sqm = (a+b+c+d+e)/1250


(III)

27.85

Polymer Modified Bitumen


Unit = sqm
Taking output = 1250 sqm
a)

b)

c)

Labour
Mate

day

0.85

100.00

85.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Mazdoor (Semi-Skilled)

day

2.00

90.00

180.00

Mixall 6/10 t capacity

hour

2.50

400.00

1,000.00

Three wheel 80-100 kN static roller

hour

2.50

160.00

400.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.50

80.00

200.00

0.85 37,000.00

31,450.00

Machinery

Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm
Crushed sand or grit as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

t
cum

7.50

125.00

937.50

0.00

AAO.,Circle, Barmer

4,431.56

SE.,Circle, Barmer

170

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 1250 sqm = a+b+c+d+e

Amount
(Rs.)
39,884.06

Rate per sqm = (a+b+c+d+e)/1250


(IV)

31.91

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 1250 sqm
a)

b)

c)

Labour
Mate

day

0.85

100.00

85.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Mazdoor (Semi-Skilled)

day

2.00

90.00

180.00

Mixall 6/10 t capacity

hour

2.50

400.00

1,000.00

Three wheel 80-100 kN static roller

hour

2.50

160.00

400.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.50

80.00

200.00

0.85 34,900.00

29,665.00

Machinery

Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 sqm

Crushed sand or grit as passing 2.36 mm sieve and


retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

7.50

125.00

937.50

0.00
4,208.44

Cost of 1250 sqm = a+b+c+d+e

37,875.94

Rate per sqm = (a+b+c+d+e)/1250


(V)

30.30

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 1250 sqm
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.85

100.00

85.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Mazdoor (Semi-Skilled)

day

2.00

90.00

180.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

171

Sr.
No.

Unit

Quantity

Mixall 6/10 t capacity

hour

2.50

400.00

1,000.00

Three wheel 80-100 kN static roller

hour

2.50

160.00

400.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.50

80.00

200.00

0.85 36,000.00

30,600.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 sqm

t
cum

d)

Crushed sand or grit as passing 2.36 mm sieve and


retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

7.50

125.00

937.50
0.00
4,325.31

Cost of 1250 sqm = a+b+c+d+e

38,927.81

Rate per sqm = (a+b+c+d+e)/1250

31.14

Case - III : Type C


(I)

Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a)

b)

c)

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled) for carrying of chips & spraying

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

5.00

90.00

450.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.20

80.00

176.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

0.715 29,500.00

21,092.50

Machinery

Material
Bitumen (S-90) @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100%
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

t
cum

9.90

3,168.00
320.00
0.00

AAO.,Circle, Barmer

3,401.69

SE.,Circle, Barmer

172

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 1100 sqm = a+b+c+d+e

Amount
(Rs.)
30,615.19

Rate per sqm = (a+b+c+d+e)/1100


(II)

27.83

Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a)

b)

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

5.00

90.00

450.00

hour

2.20

80.00

176.00

hour

2.20

160.00

352.00

0.715 31,700.00

22,665.50

Machinery
Bitumen boiler oil fired 1000 litre capacity fitted with spray
set
Three wheel 80-100 kN static roller

c)

Material
Bitumen (S-65) @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100%
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

9.90

320.00

3,168.00

0.00
3,598.31

Cost of 1100 sqm = a+b+c+d+e

32,384.81

Rate per sqm = (a+b+c+d+e)/1100


(III)

29.44

Polymer Modified Bitumen


Unit = sqm
Taking output = 1100 sqm
a)

EE.,Dn.I, BMR

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

5.00

90.00

450.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

173

Sr.
No.

Unit

Quantity

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.20

80.00

176.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

0.715 37,000.00

26,455.00

Reference of MORD
Specifications

Description
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100%
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

9.90

320.00

3,168.00

0.00
4,072.00

Cost of 1100 sqm = a+b+c+d+e

36,648.00

Rate per sqm =(a+b+c+d+e)/1100


(IV)

33.32

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 1100 sqm
a)

b)

c)

EE.,Dn.I, BMR

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

5.00

90.00

450.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.20

80.00

176.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

0.715 34,900.00

24,953.50

Machinery

Material
Crumb Rubber Modified Bitumen @ 6.50 kg per 10 sqm

Crushed stone chipping of 6.7 mm size defined as 100%


passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

9.90

320.00

3,168.00

0.00

AAO.,Circle, Barmer

3,884.31

SE.,Circle, Barmer

174

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 1100 sqm = a+b+c+d+e

Amount
(Rs.)
34,958.81

Rate per sqm = (a+b+c+d+e)/1100


(V)

31.78

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 1100 sqm
a)

b)

c)

Labour
Mate

day

1.15

100.00

115.00

Bitumen Sprayer

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Mazdoor (Semi-Skilled)

day

5.00

90.00

450.00

Bitumen boiler oil fired 1000 litre capacity fitted with spray
set

hour

2.20

80.00

176.00

Three wheel 80-100 kN static roller

hour

2.20

160.00

352.00

0.715 36,000.00

25,740.00

Machinery

Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 sqm

Crushed stone chipping of 6.7 mm size defined as 100%


passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum.

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

9.90

320.00

3,168.00

0.00
3,982.63

Cost of 1100 sqm = a+b+c+d+e

35,843.63

Rate per sqm = (a+b+c+d+e)/1100

32.59

Note: Since seal coat is provided immediately over the bituminous layers,
hydraulic broom for cleaning has not been catered.
B.

By Mechanical Means

Case - I : Type A
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)

Labour
Mate

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

day

AAO.,Circle, Barmer

0.24

100.00

SE.,Circle, Barmer

24.00

175

Sr.
No.

Unit

Quantity

day

6.00

80.00

480.00

Hydraulic self propelled chips spreader

hour

6.00

750.00

4,500.00

Tipper 5.5 cum capacity

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

15.00

160.00

2,400.00

Reference of MORD
Specifications

Description
Mazdoor (Unskilled)
b)

c)

Rate
(Rs.)

Amount
(Rs.)

Machinery

Material
Bitumen (S-90) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.35 29,500.00 216,825.00


67.50

230.00

15,525.00

0.00
31,056.75

Cost of 7500 sqm = a+b+c+d+e

279,510.75

Rate per sqm = (a+b+c+d+e)/7500


(II)

37.27

Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Hydraulic self propelled chips spreader

hour

6.00

750.00

4,500.00

Tipper 5.5 cum capacity

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

15.00

160.00

2,400.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

176

Sr.
No.

Reference of MORD
Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Material
Bitumen (S-65) @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.35 31,700.00 232,995.00


67.50

230.00

15,525.00

0.00
33,078.00

Cost of 7500 sqm = a+b+c+d+e

297,702.00

Rate per sqm = (a+b+c+d+e)/7500


(III)

39.69

Polymer Modified Bitumen


Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)

b)

c)

Labour
Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Hydraulic self propelled chips spreader

hour

6.00

750.00

4,500.00

Tipper 5.5 cum capacity

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

15.00

160.00

2,400.00

Machinery

Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.35 37,000.00 271,950.00


67.50

230.00

15,525.00

0.00

Cost of 7500 sqm = a+b+c+d+e

37,947.38
341,526.38

Rate per sqm = (a+b+c+d+e)/7500

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

45.54

AAO.,Circle, Barmer

SE.,Circle, Barmer

177

Sr.
No.

Unit

Quantity

Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Hydraulic self propelled chips spreader

hour

6.00

750.00

4,500.00

Tipper 5.5 cum capacity

hour

6.00

450.00

2,700.00

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

15.00

160.00

2,400.00

Reference of MORD
Specifications

Description
(IV)

Rate
(Rs.)

Amount
(Rs.)

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)

b)

c)

Labour

Machinery

Material
Crumb Rubber Modified Bitumen @ 9.80 kg per 10 sqm

Crushed stone chipping of 6.7 mm size 100 per cent


passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

7.35 34,900.00 256,515.00


67.50

230.00

15,525.00

0.00

36,018.00

Cost of 7500 sqm = a+b+c+d+e

324,162.00

Rate per sqm = (a+b+c+d+e)/7500


(V)

43.22

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Hydraulic self propelled chips spreader

hour

6.00

750.00

4,500.00

Tipper 5.5 cum capacity

hour

6.00

450.00

2,700.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

178

Sr.
No.

Unit

Quantity

Front end loader 1 cum bucket capacity

hour

6.00

300.00

1,800.00

Bitumen pressure distributor

hour

6.00

700.00

4,200.00

Three wheel 80-100 kN static roller

hour

15.00

160.00

2,400.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Natural Rubber Modified Bitumen @ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100 per cent
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

7.35 36,000.00 264,600.00


67.50

230.00

15,525.00

0.00
37,028.63

Cost of 7500 sqm = a+b+c+d+e

333,257.63

Rate per sqm = (a+b+c+d+e)/7500

44.43

Note: Since seal coat is provided immediately over the bituminous layers,
Hydraulic broom for cleaning has not been catered.

510

Case - II : Type B
(I)

Bitumen (S-90)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a)

b)

c)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

Machinery

Material
Bitumen (S-90) @ 6.80 kg per 10 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

3.40 29,500.00 100,300.00

SE.,Circle, Barmer

179

Sr.
No.

Reference of MORD
Specifications

Description
Crushed sand defined as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Unit

Quantity

cum

30.00

Rate
(Rs.)
125.00

Amount
(Rs.)
3,750.00

0.00
15,214.75

Cost of 5000 sqm = a+b+c+d+e

136,932.75

Rate per sqm = (a+b+c+d+e)/5000


(II)

27.39

Bitumen (S-65)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a)

b)

c)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

Machinery

Material
Bitumen (S-65) @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

3.40 31,700.00 107,780.00


30.00

125.00

3,750.00

0.00

Cost of 5000 sqm = a+b+c+d+e

16,149.75
145,347.75

Rate per sqm = (a+b+c+d+e)/5000


(III)

29.07

Polymer Modified Bitumen


Unit = sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

180

Sr.
No.

Unit

Quantity

Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 5000 sqm (30 cum)


a)

b)

c)

Labour

Machinery

Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm
Crushed sand defined as passing 2.36 mm sieve and
retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

3.40 37,000.00 125,800.00


30.00

125.00

3,750.00

0.00
18,402.25

Cost of 5000 sqm = a+b+c+d+e

165,620.25

Rate per sqm = (a+b+c+d+e)/5000


(IV)

33.12

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 5000 sqm (30 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30 / 40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

181

Sr.
No.

Unit

Quantity

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 sqm

Crushed sand defined as passing 2.36 mm sieve and


retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

3.40 34,900.00 118,660.00


30.00

125.00

3,750.00

0.00
17,509.75

Cost of 5000 sqm = a+b+c+d+e

157,587.75

Rate per sqm = (a+b+c+d+e)/5000


(V)

31.52

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 5000 sqm (30 cum)
a)

b)

c)

EE.,Dn.I, BMR

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

Machinery

Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 sqm

Crushed sand defined as passing 2.36 mm sieve and


retained on 180 micron sieve applied @ 0.06 cum per 10
sqm

cum

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE.,Circle, BMR

3.40 36,000.00 122,400.00


30.00

125.00

3,750.00

0.00

AAO.,Circle, Barmer

17,977.25

SE.,Circle, Barmer

182

Sr.
No.

Reference of MORD
Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost of 5000 sqm = a+b+c+d+e

Amount
(Rs.)
161,795.25

Rate per sqm = (a+b+c+d+e)/5000

32.36

Note: Since seal coat is required to be provided over the premix carpet on
the same day, out of the 6 working hours of the HMP, 4.00 hours are
proposed to be utilised for the premix carpet and the balance 2.00
hours have been considered for this case.

Case - III : Type C


(I)

Bitumen (S-90)
Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)

b)

c)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

2.11 29,500.00

62,245.00

Machinery

Material
Bitumen (S-90) @ 4.5% of Mix

Crushed stone chipping of 6.7 mm size 100 per cent


passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

cum

30.00

320.00

9,600.00

0.00

Cost of 3333.3333 sqm = a+b+c+d+e

11,189.13
100,702.13

Rate per sqm = (a+b+c+d+e)/3333.3333


(II)

EE.,Dn.I, BMR

30.21

Bitumen (S-65)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

183

Sr.
No.

Unit

Quantity

Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

2.11 31,700.00

66,887.00

Reference of MORD
Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)

b)

c)

Labour

Machinery

Material
Bitumen (S-65) @ 4.5% of Mix

Crushed stone chipping of 6.7 mm size 100 per cent


passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

cum

30.00

320.00

9,600.00

0.00
11,769.38

Cost of 3333.3333 sqm = a+b+c+d+e

105,924.38

Rate per sqm = (a+b+c+d+e)/3333.3333


(III)

31.78

Polymer Modified Bitumen


Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)

b)

EE.,Dn.I, BMR

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Machinery

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

184

Sr.
No.

Unit

Quantity

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

2.11 37,000.00

78,070.00

Reference of MORD
Specifications

Description

c)

Rate
(Rs.)

Amount
(Rs.)

Material
Polymer Modified Bitumen @ 4.5% of Mix
Crushed stone chipping of 6.7 mm size 100 per cent
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

t
cum

30.00

320.00

9,600.00

0.00
13,167.25

Cost of 3333.3333 sqm = a+b+c+d+e

118,505.25

Rate per sqm = (a+b+c+d+e)/3333.3333


(IV)

35.55

Crumb Rubber Modified Bitumen


Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)

b)

c)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30 / 40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

2.11 34,900.00

73,639.00

Machinery

Material
Crumb Rubber Modified Bitumen @ 4.5% of Mix
Crushed stone chipping of 6.7 mm size 100 per cent
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

t
cum

30.00

320.00

9,600.00

SE.,Circle, Barmer

185

Sr.
No.

Reference of MORD
Specifications

Description

Unit

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
12,613.38

Cost of 3333.3333 sqm = a+b+c+d+e

113,520.38

Rate per sqm = (a+b+c+d+e)/3333.3333


(V)

34.06

Natural Rubber Modified Bitumen


Unit = sqm
Taking output = 3333.3333 sqm (30 cum)
a)

b)

c)

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

HMP of 30/40 t per hour

hour

2.00

6,200.00

12,400.00

Electric generator set 125 KVA

hour

2.00

510.00

1,020.00

Front end loader 1 cum bucket capacity

hour

2.00

300.00

600.00

Tipper 5.5 10 t capacity

hour

1.36

450.00

612.00

Paver finisher

hour

2.00

550.00

1,100.00

Three wheel 80-100 kN static roller

hour

10.00

160.00

1,600.00

2.11 36,000.00

75,960.00

Machinery

Material
Natural Rubber Modified Bitumen @ 4.5% of Mix
Crushed stone chipping of 6.7 mm size 100 per cent
passing 9.5 mm sieve and retained on 2.36 mm sieve
applied @ 0.09 cum per 10 sqm

d)
e)

Overheads @ 0% on (a+b+c)
Contractors profit @ 12.5% on (a+b+c+d)

Cost of 3333.3333 sqm = a+b+c+d+e


Rate per sqm = (a+b+c+d+e)/3333.3333

t
cum

30.00

320.00

9,600.00

0.00
12,903.50
116,131.50
34.84

Note: Since seal coat is provided immediately over the bituminous layers,
Hydraulic broom for cleaning has not been catered.

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

182

Chapter 6
CEMENT CONCRETE PAVEMENT
Sr.
No.

Reference to
MORD Specifications

6.1

400

Unit

Quantity

Mate

day

7.00

100.00

700.00

Mason (1st class)

day

5.00

180.00

900.00

Mason (2nd class)

day

5.00

150.00

750.00

Mazdoor (Unskilled)

day

129.00

80.00

10,320.00

Mazdoor (Skilled)

day

6.00

100.00

600.00

Surveyor

day

2.00

170.00

340.00

Mazdoor (Semi-Skilled)

day

6.00

90.00

540.00

Description

Rate
(Rs.)

Amount
(Rs.)

Granual Sub-base
Rate as per item No.4.1 of Chapter 4

6.2

400

Lime Treated Soil


Rate as per item No.4.5 of Chapter 4

6.3

1500 &
400

Water Bound Macadam (WBM) - Sub-base


(A)

By Manual Means
As per item No.4.7 of Chapter 4

(B)

By Mechnical Means
As per item No.4.7 of Chapter 4

6.4

1500

Cement Concrete Pavement


Construction of un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness as per
design, over a prepared sub base, with 43 grade cement or any other
type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS:383, maximum size of coarse aggregate not exceeding
25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and
appropriate weigh batcher using approved mix design, laid in approved
fixed side formwork (steel channel, laying and fixing of 125 micron thick
polythene film, wedges, steel plates including levelling the formwork as
per drawing), spreading the concrete with shovels, rakes, compacted
using needle, screed and plate vibrators and finished in continuous
operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars, near
approaches to bridge/culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14-days,

using curing compound (where specified) and water finishing to lines and
grade as per drawing and Technical Specification Clause 1501
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a)

EE.,Dn.I,BMR

Labour

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

183

Sr.
No.

Unit

Quantity

Bhisti

day

14.00

90.00

1,260.00

Blacksmith for cutting of dowel bars including removal of burrs,


fabrications & fixing of dowel bars.

day

1.00

120.00

120.00

Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh


batcher and suitable capacity calibrated water tank

hour

36.00

300.00

10,800.00

Needle vibrator

hour

9.00

40.00

360.00

Screed vibrator

hour

9.00

60.00

540.00

Plate vibrator

hour

9.00

40.00

360.00

Concrete joint cutting machine for initial & final cuts

hour

4.00

300.00

1,200.00

Water tanker 6 kl capacity

hour

5.00

250.00

1,250.00

Air Compressor (1 hour initial + 1 hour final)

hour

2.00

194.00

388.00

Reference to
MORD Specifications

Description

b)

c)

Amount
(Rs.)

Machinery

Material
(i)

Crushed stone coarse aggregates, grading will be as per


Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90
cum/cum of concrete

cum

67.50

315.00

21,262.50

(ii)

Sand as per IS:383 and conforming to Clause 1500.2.4.2 @


0.45 cum/cum of concrete

cum

33.75

190.00

6,412.50

(iii)

Cement @ 310 kg/cum of concrete

26.25

(iv)

Polythene sheet 125 micron

sqm

412.50

2.70

1,113.75

(v)

Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long


20 Nos. at culvert/bridge slab and at construction joint
including 5 per cent wastage.
kg

117.60

28.00

3,292.80

0.005 24,500.00

122.50

(4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per m


= 117.6 kg.

4,000.00 105,000.00

Bitumen primer @ 200 ml per joint for 23 joints

Bituminous sealant 800 ml per joint for 23 joints

litre

19.00

100.00

1,900.00

Jute rope 12 mm dia including 5 per cent wastage

90.00

7.00

630.00

Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm


(thick) cut-out of rubber filler board or similar material including
5 per cent wastage

90.00

15.00

1,350.00

Polythene sheathing, covering 2/3rd dowel bars (20x23) and


tight fit including 5 per cent wastage

No.

483.00

4.50

2,173.50

Plasticizer 0.5 per cent by weight of cement

litre

122.00

60.00

7,320.00

Curing compound (if used) @ 0.33 litre per sqm

litre

131.25

40.00

5,250.00

kl

18.00

15.00

270.00

sqm

3.00

400.00

1,200.00

Water for curing


Joint filler board 20 mm thick as per IS:1838
(4 x 3.75 x 0.200 = 3 sqm)
d)

Formwork @ 3% of (a+b+c)

5,595.77

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

0.00

Cost for 75 cum = a+b+c+d+e+f

EE.,Dn.I,BMR

Rate
(Rs.)

TA to SE.,Circle, BMR

24,165.16
217,486.48

AAO.,Circle, Barmer

SE.,Circle, Barmer

184

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per cum = (a+b+c+d+e+f)/75


6.5

1500

Amount
(Rs.)
2,899.82

Roller Compacted Concrete Pavement


Construction of Roller Compacted Concrete Pavement (RCCP) with
coarse and fine aggregates conforming to IS:383, the size of coarse
aggregate not exceeding 25 mm with minimum aggregate cement ratio of
5:1 mm and with minimum cemnt content of 310 kg per cum, aggregate
gradation to be as per Table 602.2 after blending, mixing in concrete
mixer at optimum moisture content, transporting to site, laying with wheel
barrows or steel pans or with mechanical paver, compacting with 80-100
kN smooth wheel, tandem vibratory roller, to achieve, the designed
flexural strength, finishing and curing as per drawings and Technical
Specification Clause 1502

Unit = cum
Taking output = 75 cum
a)

Labour
(i)

Mate

day

6.00

100.00

600.00

(ii)

Mazdoor (Unskilled)

day

132.00

80.00

10,560.00

(iii)

Mason (1st class)

day

4.00

180.00

720.00

(iv) Mason (2nd class)

day

4.00

150.00

600.00

(v)

day

2.00

170.00

340.00

day

14.00

90.00

1,260.00

Surveyor

(vi) Bhisti
b)

c)

EE.,Dn.I,BMR

Machinery
(i)

Concrete mixer 0.28 / 0.04 cum capacity (6 mixers) with weigh


batcher and suitable capacity calibrated water tank

hour

36.00

300.00

10,800.00

(ii)

Vibratory/80-100 kN Static Roller

hour

6.00

800.00

4,800.00

(iii)

Concrete joint cutting machine for days end work and regular
joint cutting.

hour

6.00

300.00

1,800.00

(iv) Water tanker 6 kl capacity

hour

6.00

250.00

1,500.00

(v)

hour

2.00

194.00

388.00

Air compressor (1 hour initial + 1 hour final)

Material
(i)

Crushed stone coarse aggregates grading as per Clause


1501.2.4.1 (Table 1500.3) @ 0.90 cum/cum of concrete
conforming to Clause 600.4.4

cum

67.50

315.00

21,262.50

(ii)

Sand as per IS:383 and conforming to Clause 1501.2.4.2 @


0.45 cum/cum of concrete

cum

33.75

190.00

6,412.50

(iii)

Cement @ 310 kg/cum of concrete

23.25

4,000.00

93,000.00

(iv) Bitminous primer @ 200 ml per joint for 21 joints

0.004 24,500.00

98.00

(v)

90.00

Jute rope 10 mm dia including 5 per cent wastage

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

7.00

630.00

SE.,Circle, Barmer

185

Sr.
No.

Reference to
MORD Specifications

Description

Unit

(vi) Bituminous sealant @ 800 ml per joint for 21 joints

Quantity

Rate
(Rs.)

Amount
(Rs.)

kg

16.80

100.00

1,680.00

(vii) Curing compound @ 0.33 litre per sqm

131.25

40.00

5,250.00

(viii) Water for mixing and curing for 14-days

day

18.00

15.00

270.00

d)

Formwork @ 2% of (a+b+c)

3,239.42

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

0.00
20,651.30

Cost for 75 cum = a+b+c+d+e+f

185,861.72

Rate per cum = (a+b+c+d+e+f)/75

2,478.16

Note: When curing compound is used 4-days water curing will be done
6.6

1500

Rectangular Concrete Block Pavement


Manufacturing, laying of cement concrete blocks of size 0.450 m x 0.300
m x 0.15 m of Cement Concrete (C.C.) M30 garde and spreading 25 mm
thick sand under neath and filling joints with sand on existing W.B.M.
base as per Technical Specification Clause 1503.
Unit = sqm
Taking output = 112.5 sqm
Concrete M30 grade for block, 800 x (0.450 x 0.300 x 0.150)

cum

16.20

2,899.82

46,977.08

Concrete M30 for edge block, 2 x 50 x (0.300 x 0.300 x 0.150)

cum

1.35

2,899.82

3,914.76

cum

17.55

TOTAL
a)

Labour
Labour for Manufacturing the Cement Concrete Block :
(i)

Mate

day

3.16

100.00

316.00

(ii)

Mazdoor (Unskilled)

day

76.00

80.00

6,080.00

(iii)

Mason (2nd class)

day

11.00

150.00

1,650.00

day

2.60

90.00

234.00

Concrete mixer 0.28 / 0.4 cum

hour

11.00

60.00

660.00

Plate vibrator

hour

22.30

40.00

892.00

Water tanker 6 kl capacity

hour

3.70

250.00

925.00

cum

14.74

390.00

5,748.60

(iv) Bhisti
b)

c)

Machinery

Material
(i)

EE.,Dn.I,BMR

Coarse aggregates (17.55 x 0.84)

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

186

Sr.
No.

Reference to
MORD Specifications

Description
(ii)

Sand (17.55 x 0.42)

(iii)

Cement

(iv) Sand as per Table 1500.5

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

cum

7.37

190.00

1,400.30

7.05

4,000.00

28,200.00

cum

3.200

190.00

608.00

kl

11.00

15.00

165.00

Bed = 60*0.025 = 1.5 cum


Joints = 1.5*0.15 = 0.225 cum
(v)

Cost of water

d)

Formwork @ 3% of (a+b+c)

1,406.37

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

0.00
6,035.66

Cost for 112.5 sqm = a+b+c+d+e+f

54,320.93

Rate per sqm = (a+b+c+d+e+f)/112.5


Note:

6.7

1500

482.85

i.

In case curing compound is used in places where there is scarcity


of water, the water curing will be used for 4-days and rate analysis
will be amended accordingly

ii.

Carriage of C.C. block to site of is payable seperately as per


Chapter of carriage of material from manufacturing site to the site of
work.

Interlocking Concrete Block Pavement


(1) Providing and Laying of Interlocking Concrete Block
Pavements having thickness 80 mm as per drawings and
Technical Specification Clause 1504.
Unit = sqm
Taking output = 225 sqm
a)

b)

Labour
Mate

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

17.00

80.00

1,360.00

Mason (2nd class)

day

8.00

150.00

1,200.00

hour

2.00

250.00

500.00

sqm

225.00

300.00

67,500.00

120.00

400.00

48,000.00

7.23

190.00

1,373.70

Machinery
Water tanker 6 kl capacity

c)

Material
(i)

Providing inter-locking blocks of approved shape,


thickness and size.

(ii) Interlocking Edge blocks 60 mx2


(iii) Sand as per Table 1500.5

EE.,Dn.I,BMR

TA to SE.,Circle, BMR

cum

AAO.,Circle, Barmer

SE.,Circle, Barmer

187

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Bed = 603x75x 0.03

= 6.75 cum

Joints = 60x0.08

= 0.48 cum

(iv) Water for wetting of bedding sand


d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

kl

Quantity

3.00

Rate
(Rs.)

15.00

Amount
(Rs.)

45.00
0.00
15,009.84

Cost for 225 sqm = a+b+c+d+e

135,088.54

Rate per sqm = (a+b+c+d+e)/225

600.39

(2) Providing and Laying of Interlocking Concrete Blcok


Pavements having thickness 60 mm as per drawing and
Technical Specification Clause 1504
Unit = sqm
Taking output = 225 sqm
a)

b)

Labour
Mate

day

0.90

100.00

90.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Mason (2nd class)

day

7.00

150.00

1,050.00

hour

2.00

250.00

500.00

sqm

225.00

300.00

67,500.00

(ii) Interlocking Edge blocks

120.00

300.00

36,000.00

(iii) Sand as per Table 1500.5

cum

5.42

190.00

1,029.80

kl

3.00

15.00

45.00

Machinery
Water tanker 6 kl capacity

c)

Material
(i)

Providing inter-locking blocks

(iv) Water
d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 225 sqm = a+b+c+d+e

120,841.65

Rate per sqm = (a+b+c+d+e)/225


Note:

EE.,Dn.I,BMR

537.07

i.

Carriage of interlocking blocks is payable seperately as per Chapter


of carriage of material from manufacturing site to the site of work.

ii.

Edge blocks may be cast-in-situ. Brick masonry toe wall or CC


block 300 mm x 300 mm x 150 mm or any other shape can also be
used and their cost shall be analysed/included accordingly

iii.

13,426.85

The rates for sub-grade, sub-base and base course can be taken
from Chapters 3 and 4

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

188

Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Sr.
No.

Reference to
MORD Specifi-cations

Description

Unit

Quan- Rate
tity
(Rs.)

Amount
(Rs.)

7.1 1400, 300, 600 Construction of Cut-off Walls/Head Walls


700 & 800
(i)
Earthwork in excavation for structures as per drawing and
technical specification Clause 305.
Rate as per item No.11.1 of Chapter 11
(ii)

Plain cement concrete M15 grade


Rate as per item No.11.4 (ii) of Chapter 11

(iii)

cum

Stone masonry in cement mortar 1:4


Rate as per item No.11.6 (ii) of Chapter 11

(v)

cum

Brick masonry in cement mortar 1:4


Rate as per item No.11.5 (ii) of Chapter 11

(iv)

cum

cum

Providing P.C.C M20 architectural coping on top of wall


Rate as per item No.12.13 of Chapter 12

Note: Rate as appropriate for the type of soil/rock are to be taken in (i)
7.2

300

Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3

7.3

400

cum

Granular Sub-base
Rate as per item No.4.1 of Chapter 4

7.4

400

cum

W.B.M. Base Course


Rate as per item No.4.7 of Chapter 4

7.5

1500

cum

Cement Concrete Slab


Rate as per item No.6.4 of Chapter 6

7.6

1400 & 1300 (i)

cum

Providing and Laying Apron with Stone Boulders as per


Drawings & Technical Specification Clause 1301
Rate as per item No.14.1 of Chapter 14

(ii)

Providing and Laying of Boulder Apron Laid in Wire Crates


as per Drawing and Technnical Specification Clause 1301
Rate as per item No.14.2 of Chapter 14

EE.,Dn.I,Barmer

cum

TA to SE Circle, Barmer

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

189

Sr.
No.

Reference to
MORD Specifi-cations

Description
(iii)

7.7

Quan- Rate
tity
(Rs.)

Amount
(Rs.)

Providing and Laying of Apron with Cement Concrete


Blocks as per Drawing and Technical Specification Clause
1301
Rate as per item No.14.3 of Chapter 14

Note

Unit

cum

Any one of the items appropriate may be taken

1400 & 1600 Guide Posts


Construction of R.C.C. guide posts of 250 mm dia, M25 grade as per
drawing and technical specification Clause 1401.6
Rate as per item No.8.8 of Chapter 8

7.8

cum

1400, 1100 & Bedding for Causeway


800
(i)

Type A (concrete cradle) Bedding Clause 1402.5


As per item No.9.2 of Chapter 9

(ii)

cum

Type B (first class) Bedding Clause 1402.5


As per item No.9.2 of Chapter 9

7.9

1400 & 1100

cum

Laying Reinforced Cement Concrete Pipe NP3 as per drawing


and technical specification Clause 1402.6
As per item No.9.3 of Chapter 9

7.10

1400 & 1100

Laying Reinforced Cement Concrete Pipe NP4 as per technical


specification Clause 1402.6
As per item No.9.4 of Chapter 9

EE.,Dn.I,Barmer

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

190

Chapter 8
HILL ROADS
Sr.
No.

Reference to
MORD Specifications

8.1

200

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Site Clearance
As per Chapter 2

8.2

1600

Setting Out

Deleted

Unit = 1km
The analysis of rate per km shall account for the following:
(1)

Construction of reference pillars (burjee) @ 20 m on both


sides as per Fig. 1600.1 (b) and @ 8.33 m interval on curves

(2)

Construction of back pillars in front of each reference pillar as


per Fig. 1600.1 (c )

(3)

Construction of job pillars as per Fig. 1600.1 (d)


(1)

Construction of reference pillars as per Fig. 1600.1 (b) as


per drawing and Technical Specification Clause 1602.1
(a) Earthwork in excavation for foundation as per
drawing and technical specifications.
Rate as per item No.11.1 of Chapter 11

cum

1.2

75.60

90.72

cum

1.2

1,575.01

1,890.01

sqm

4.00

70.61

282.44

(b) Stone masonry work in cement mortar 1:4 in


foundation complete as per drawing and technical
specifications
Rate as per item No.11.6 of Chapter 11
(c) Plaster with cement mortar 1:4 as per technical
specifications
Rate as per item No.12.3 of Chapter 12
Add 5% of (a+b+c) for white washing, lettering and
painting, etc.

113.16

Total Cost for each Reference Pillar


(2)

2,376.33

Construction of back piller as per Fig. 1600.1( c) as per


drawing and Technical Specification Clause 1602.3
(a) Earthwork in excavation for foundation as per
drawing and technical specifications
Rate as per item No. 11.1 of Chapter 11

cum

3.6

75.60

(b) Stone masonary work in cement mortar 1:4 in


foundation complete as per drawing and technical
specifications

EE.,Dn.I,BMR

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

272.16

191

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Rate as per itme No. 11.6 Chapter 11

Quantity

Rate
(Rs.)

Amount
(Rs.)

cum

3.6

1,575.01

5,670.04

sqm

45.00

72.64

3,268.73

(c) Plaster with cement mortar 1:4 as per technical


specifications
Rate as per item No. 12.3 of Chapter 12
Add 5% of (a+b+c) for white washing, lettering and
painting, etc.

460.55

Total Cost for each back Pillar


(3)

9,671.48

Construction of Job pillers as per Fig. 1600.1 (d) and


Technical Specification Clause 1602.4
(a) Earthwork in excavation for foundation as per
drawing and technical specification
Rate as per item No.11.1 of Chapter

cum

0.096

75.60

7.26

cum

0.096

1,575.01

151.20

sqm

0.96

72.64

69.73

(b) Stone masonary work in cement mortar in


foundation complete as per drawing and technical
specification
Rate as per item No. 11.6 of Chapter 11
(c) Plaster with cement mortar 1:4 as per drawing and
technical specification
Rate as per Item No.12.3 of Chapter 12
Add 5% of (a+b+c) for white washing, lettering and
painting, etc.

11.41

Total Cost for each Job Pillar


Note: (i)

(ii)

8.3

239.60

The dimensions of reference pillars, back pillars and job pillars


are as per figure/site conditions. The above items are covered
under different Chapters of MORD Specifications for payment.
The marking of centre line, setting out, curves, recording of
levels, etc. by the surveyor will be incidental to work and no
extra payment shall be made for the same.

1600 & 300 Earthwork in Hill Road


(i)

Excavation in Hilly Areas in Soil by manual means.


A)

Excavation in soil in Hilly Area by manual means


including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m
and a lead upto 20 m as per drawing and Technical
Specification Clause 1603.1
Unit = cum
Taking output = 120 cum
a)

EE.,Dn.I,BMR

Labour
Mate

day

2.40

100.00

240.00

Mazdoor (Unskilled)

day

60.00

80.00

4,800.00

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

192

Sr.
No.

Reference to
MORD Specifications

Description

Unit

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
630.00

Cost for 120 cum = (a+b+c)

5,670.00

Rate per cum = (a+b+c)/120


B)

47.25

Extra for Every Additional Lift of 1.5 m or Part thereof


Excavation in Soil
Unit = cum
Taking output = 10 cum
a)

Labour
Mazdoor (Unskilled)

(ii)

day

0.55

80.00

44.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

5.50

Cost for 10 cum = (a+b+c)

49.50

Rate per cum = (a+b+c)/10

4.95

Excavation in Hilly Areas in Soil by mechanical means


A)

Excavation in soil in Hilly Area by mechanical means


including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m
and a lead upto 20 m as per Technical Specification
Clause 1603.1
Unit = cum
Taking output = 260 cum
a)

b)

EE.,Dn.I,BMR

Labour
Mate

day

0.80

100.00

80.00

Mazdoor (Unskilled) for trimming slopes and helping


in excavation, etc.

day

20.00

80.00

1,600.00

Dozer D-50 @ 43.28 cum per hour

hour

6.00

750.00

4,500.00

Front end loader

hour

6.00

300.00

1,800.00

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

TA to SE Circle, Barmer

AAO.,Circle, Barmer

0.00
997.50

SE.,Circle, Barmer

193

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost for 260 cum = a+b+c+d

Amount
(Rs.)
8,977.50

Rate per cum = (a+b+c+d)/260


B)

34.53

Extra for Every Additional Lift of 1.5 m or Part thereof


Excavation in Soil
Unit = cum
Taking output = 10 cum
a)

Labour
Mazdoor (Unskilled)

Note: (i)

day

0.55

80.00

44.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

5.50

Cost for 10 cum = (a+b+c)

49.50

Rate per cum = (a+b+c)/10

4.95

In case the land on the valley side is barren and there is no


objection for disposing of excavated earth on the valley side,
the provision of front end loader and tipper shall be deleted as
excavated earth shall be disposed off on the valley side.

(ii)

For disposal of excavated surplus earth beyond 20 m, the


relevant items of carriage be followed

(iii)

In case, alternative machine like hydraulic excavator 0.9 cum


bucket capacity is necessited because of site conditions, the
same can be used.

(iii)

Excavation in Hilly Area in Ordinary Rock by manual


means
A)

Excavation in ordinary rock using manual means


including loading in a truck and carrying of
excavated material to embankment site with a lift
upto 1.5 m and lead upto 20 m as per Clause 1603.2.

Unit = cum
Taking output = 120 cum
a)

Labour
Mate

day

5.28

Mazdoor (Unskilled)

day

132.00

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

TA to SE Circle, Barmer

528.00

80.00 10,560.00
0.00

Cost for 120 cum = a+b+c

EE.,Dn.I,BMR

100.00

1,386.00
12,474.00

AAO.,Circle, Barmer

SE.,Circle, Barmer

194

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rate per cum = (a+b+c)/120


B)

103.95

Extra for Every Additional Lift of 1.5 m or Part thereof


For Ordinary Rock
Unit = cum
Taking output = 10 cum
a)

Labour
Mazdoor (Unskilled)

day

0.86

80.00

68.80

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

8.60

Cost for 10 cum = a+b+c

77.40

Rate per cum = (a+b+c)/10


(iv)

7.74

Excavation in Hilly Areas in Ordinary Rock by mechanical


means not requiring blasting
Excavation in hilly area in ordinary rock not requiring blasting
by mechanical means including cutting and trimming of slopes
and disposal of cut material with a lift upto 1.5 m and lead upto
20 m as per Clause 1603.2.
Unit = cum
Taking output = 170 cum
a)

b)

Labour
Mate

day

0.68

100.00

68.00

Mazdoor (Unskilled)

day

17.00

80.00

1,360.00

Mazdoor for disposing of earth upto 20 m

day

9.00

80.00

720.00

Dozer D-50 @ 50% of 28.32 cum per hour

hour

12.00

Hydraulic Excavator 0.9 cum bucket capacity @ 40 cum


per hour

hour

4.25

Machinery

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

1,200.00 14,400.00
1,400.00

5,950.00
0.00

Cost for 170 cum = a+b+c+d

2,812.25
25,310.25

Rate per cum = (a+b+c+d)/170

EE.,Dn.I,BMR

TA to SE Circle, Barmer

148.88

AAO.,Circle, Barmer

SE.,Circle, Barmer

195

Sr.
No.

Reference to
MORD Specifications

Description

Note: (i)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

In case the land on the valley side is barren and there is no


objection for disposing of excavated earth on the valley side,
the provision of front end loader and tipper shall be deleted as
excavated earth shall be disposed off on the valley side.

(ii)

In case, alternative machine like hydraulic excavator 0.9 cum


bucket capacity is necessited because of site conditions, the
same can be used.

(v)

Excavation in Hilly Areas in Hard Rock requiring blasting


A)

Excavation in hilly areas in hard rock requiring


blasting, by mechanical means, lift upto 1.5 m and
disposal of excavated rock upto a lead of 20 m as per
Clause 1603.2.
Unit = cum
Taking output = 170 cum
a)

b)

c)

Labour
Mate

day

1.36

100.00

136.00

Mazdoor (Unskilled)

day

22.00

80.00

1,760.00

Driller

day

2.00

150.00

300.00

Blaster

day

10.00

150.00

1,500.00

Dozer D-50 @ 56.67 cum per hour (blasted rock)

hour

3.00

750.00

2,250.00

Hydraulic Excavator 0.9 cum bucket capacity @ 34


cum per hour

hour

5.00

1,400.00

7,000.00

Air compressor 210 cfm with two jack hammer @ 6


cum per hour

hour

28.00

194.00

5,432.00

Gelatine 80 per cent

kg

67.00

120.00

8,040.00

Electric detonators @ 1 detonator for 1 Gelatine


stick of 285 gm each

nos

235.00

10.00

2,350.00

Machinery

Materials

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 170 cum = a+b+c+d+e

0.00
3,596.00
32,364.00

Rate per cum = (a+b+c+d+e)/170


B)

EE.,Dn.I,BMR

190.38

Extra for Every Additional Lift of 1.5 m or Part thereof

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

196

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

For Hard Rock


Unit = cum
Taking output = 10 cum
a)

Labour
Mazdoor (Unskilled)

day

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

1.08

80.00

0.00
10.80

Cost for 10 cum = a+b+c

97.20

Rate per cum = (a+b+c)/10

9.72

Note: (1) In case the land on the valley side is barren and there is no
objection for disposing of excavated earth on the valley side,
the provision of front end loader and tipper shall be deleted as
excavated earth shall be disposed off on the valley side.

(2) In case of hill roads, the altitude effect comes into play. The
output of men and machines decreases progressively after
2100 m elevation leading to increase in cost. High altitude
effect has been explained in the basic approach.
(3) The arrangement for igniting the detonator is covered under
overheads
8.4

1600, 600 Retaining Walls / Breast Walls


& 700
Construction of retaining walls/breast walls in cement mortar 1:5 as
per drawing and technical specifications Clause 1604
(i)

Earthwork in excavation for structures


Rate as per item No.11.1 of Chapter 11

(ii)

EE.,Dn.I,BMR

cum

Pointing with cement mortar 1:3


Rate as per item No.12.2 of Chapter 12

(v)

cum

Stone masonry in cement mortar 1:5


Rate as per item No. 12.4 (III) (iii) of Chapter 12

(iv)

cum

Plain cement concrete M 10 grade


Rate as per item No.11.4 of Chapter 11

(iii)

sqm

Providing P.C.C. M 20 architectural coping on top of


retaining wall/breast wall

TA to SE Circle, Barmer

86.40

AAO.,Circle, Barmer

SE.,Circle, Barmer

197

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Rate as per item No.12.13 of Chapter 12


(vi)

Quantity

Rate
(Rs.)

Amount
(Rs.)

Filter material behind retaining wall / breast wall as per


Specification 1204.3.8 in a width of 600 m
Rate as per item No. 12.11 of Chapter 12

cum

(vii) Back filling behind retaining wall/breast wall


Rate as per item No. 12.10 of Chapter 12
Note:

8.5

Quantities of material/work shall be as per design and


drawings

Earth work in excavation may be taken as per site conditions.


It may comprise of a number of sub-items depending upon the
type of soil/rock encountered.

cum

1600, 700, Construction of Hill Side Drain


300 & 800

Deleted

Construction of hill side drain in accordance with the requirement of


specifications true to lines and grades. Dimesions and other
particulars as per drawing and Technical Specification Clause
1606.1
Unit = 1 m
(i)

Earthwork in excavation for structures as per drawing and


technical specification
Rate as per item No.11.1 of Chapter 11

(ii)

1,901.46

0.00

cum

1,327.36

0.00

cum

1,954.25

0.00

Sqm

72.64

0.00

119.86

0.00

Cement plaster 15 mm thick 1:4 on stone masonry


Rate as per item No.12.3 of Chapter 12

(vi)

cum

Plain cement concrete M15 grade


Rate as per item No.11.4 of Chapter 11

(v)

0.00

Stone masonry in cement mortar 1:5


Rate as per item No.12.4 (III) (iii) of Chapter 12

(iv)

75.60

Plain cement concrete M10 grade


Rate as per item No.11.4 of Chapter 11

(iii)

cum

Providing P.C.C. M20 architectural coping on top of wall


Rate as per item No.12.13 of Chapter 12

Rate per m length (i+ii+iii+iv+v+vi)


Note:

EE.,Dn.I,BMR

0.00

Quantities of material/work shall be as per design and


drawings

Earth work in excavation may be taken as per site conditions.


It may comprise of a number of sub-items depending upon the
type of soil/rock encountered.

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

198

Sr.
No.
8.6

Reference to
MORD Specifications

Description

Unit

Quantity

1600, 300, Construction of Catch Water / Intercepting Drain


700 & 800

Rate
(Rs.)

Amount
(Rs.)

Deleted

Construction of catch water/intercepting drain in random rubble


masonry in 1:5 cement mortar true to the specified lines grades
levels and dimensions as per the requirement of the specifications
Clause 1606.2
Unit = 1 m
(i)

Earthwork in excavation for structures as per drawing and


technical specification
Rate as per item No.11.1 of Chapter 11

(ii)

Rate per m length

8.7

0.00

cum

1,327.36

0.00

cum

1,954.25

0.00

sqm

706.10

0.00

726.38

0.00

Providing P.C.C. M 20 architectural coping on top of wall


Rate as per item No.12.13 of Chapter 12

Note:

1,901.46

Cement plaster 15 mm thick 1:4 on stone masonry


Rate as per item No. 12.3 of Chapter 12

(vi)

cum

Plain cement concrete M15 grade


Rate as per item No.11.4 of Chapter 11

(v)

0.00

Stone masonry in cement mortor 1:5


Rate as per item No.12.4 (III) (iii) of Chapter 12

(iv)

75.60

Plain cement concrete M10 grade


Rate as per item No.11.4 of Chapter 11

(iii)

cum

Quantities of material/work shall be as per design and


drawings

Earth work in excavation may be taken as per site conditions.


It may comprise of a number of sub-items depending upon the
type of soil/rock encountered.

0.00

1600, 300 Construction of Scupper


& 700
Construction of scupper with dry stone masonry as per drawing and
technical specifications as per Clause 1606.5.

Deleted

Unit = 1 m
Taking output = 6 m
(i)

Earthwork in excavation for structures as per drawing and


technical specifications
Quantity for 6 m formation width of hill side rock cutting and
foundation as per plate No. 7.27 of Rural Road Manual
Rate as per item No.11.1 of Chapter 11
Rate per m = a/6

EE.,Dn.I,BMR

TA to SE Circle, Barmer

cum

115.00

75.60

8,694.00
1,449.00

AAO.,Circle, Barmer

SE.,Circle, Barmer

199

Sr.
No.

Reference to
MORD Specifications

Description
(ii)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Random rubble dry stone masonry


Quantity for 6 m formation width = 38 cum
a)

b)

Labour
Mate

day

3.80

100.00

380.00

Mason (1st Class)

day

38.00

180.00

6,840.00

Mazdoor (Unskilled)

day

57.00

80.00

4,560.00

Stone for RR masonary

cum

38.00

160.00

6,080.00

Bond stone

nos

266.00

10.00

2,660.00

Materials

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

2,565.00

Cost for 6 m = a+b+c+d

23,085.00

Rate per m = (a+b+c+d)/6


(iii)

3,847.50

Random course rubble dry stone masonry in corbelling


Quantity for 6 m formation width = 9 cum
a)

b)

Labour
Mate

day

0.72

100.00

72.00

Mason (2nd class)

day

6.00

150.00

900.00

Mazdoor (Unskilled)

day

12.00

80.00

960.00

nos

1,335.00

Materials
Corbelling Stones size 300 mm x 150 mm x 150 mm
including wastage

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00

Cost for 6 m = a+b+c+d

4,413.38
39,720.38

Rate per m = (a+b+c+d)/6


(iv)

25.00 33,375.00

6,620.06

Stone filling in foundation trenches as per drawing and


technical specification
Quantity for 6 m formation width = 10 cum
a)

EE.,Dn.I,BMR

Labour

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

200

Sr.
No.

Reference to
MORD Specifications

Description

b)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Mate

day

0.12

100.00

12.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

cum

12.00

100.00

1,200.00

Materials
Loose stone

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

181.50

Cost for 6 m = a+b+c+d

1,633.50

Rate per m = (a+b+c+d)/6

272.25

Rate per m length= (i + ii + iii + iv)


Note:

8.8

12,188.81

Quantities of parapet are not included in the quantities of


scupper.

The above analysis is based on plate No.7.27 of Rural Roads


Manual.

Rates for earth work are to be taken appropriate to the type of


soil/rock

1400, 1700 Construction of RCC guide posts of 250 mm dia M15 grade
& 800
cast-in-situ with 20 mm nominal size aggregate, true to line and
grade, tolerance of vertical RCC posts not to exceed 1 in 500 as
per drawing and Technical Specification Clause 1608.2
(i)

Earth work in excavation for structures


Unit = cum
Rates as per item No. 11.1 of Chapter 11

(ii)

cum

RCC M15 grade


Unit = cum
Rate as per item No. 11.4 of Chapter 11

(iii)

cum

HYSD steel bars


Unit = t
Rate as per item No. 12.6 of Chapter 12

(iv)

Painting two coats including prime coat on new concrete


surface
Unit = sqm
Rate as per item No.10.5 of Chapter 10

Note:

EE.,Dn.I,BMR

sqm

Quantities are to be taken as per drawing

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

201

Sr.
No.

Reference to
MORD Specifications

8.9

1600

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Providing edge stones on valley side of formation as per


drawing and Technical Specification Clause 1608.2.6
Unit = 1 m
Taking Output = 45 m (100 no of edge stones of size 450 mm x 300
mm x 100 mm)
a)

b)

Labour
Mate

day

0.18

100.00

18.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Mason (2nd class)

day

1.50

150.00

225.00

nos

100.00

20.00

2,000.00

sqm

22.50

44.90

1,010.16

Materials
Stones of size 450 mmx300 mmx100 mm

c)

Painting two coats including priming coat on new


concrete/stone surfaces
45 x 0.500 = 22.50
Rate as per item No.10.5 of Chapter 10

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

436.64

Cost for 45 m = a+b+c+d+e

3,929.80

Rate per m = (a+b+c+d+e)/45


8.10

87.33

1600 & 309 Turfing with Sods


Furnishing and laying of the live sods of perennial turf forming grass
on embankment slope, verges or other locations shown on the
drawing or as directed by the Engineer including preparation of
ground, stacking the sods and watering as per Clause 309
Unit = sqm
Taking output = 100 sqm
a)

b)

c)

EE.,Dn.I,BMR

Labour
Mate

day

0.16

100.00

16.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

Water tanker including watering for 3 months

hour

4.00

250.00

1,000.00

Tractor with Trolley

hour

1.00

150.00

150.00

Machinery

Materials

TA to SE Circle, Barmer

AAO.,Circle, Barmer

SE.,Circle, Barmer

202

Sr.
No.

Reference to
MORD Specifications

Quantity

Rate
(Rs.)

Amount
(Rs.)

Description

Unit

Farmyard manure @ 0.18 cum per 100 sqm at site of work

cum

0.18

200.00

36.00

kl

24.00

15.00

360.00

Water
d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

235.25

Cost for 100 sqm = a+b+c+d+e

2,117.25

Rate per sqm = (a+b+c+d+e)/100


8.11

21.17

1600 & 300 Seeding and Mulching


Preparation of seed bed on previously laid top soil, furnishing and
placing of seeds, fertilizer, multching material, applying bituminous
emulsion at the rate of 0.23 l per sqm and laying and fixing jute
netting, including watering for 3 months all as per Clause 310.
Unit = sqm
Taking output = 240 sqm
a)

b)

c)

Labour
Mate

day

0.60

100.00

60.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

Water tanker 6 kl capacity including watering for 3 months (for


one hour per week)

hour

13.00

250.00

3,250.00

Tractor with Trolley

hour

2.40

150.00

360.00

kg

3.60

30.00

108.00

cum

0.43

200.00

86.00

0.055 24,500.00

1,347.50

Machinery

Materials
Seeds
Sludge/Farm yard manure @ 0.18 cum per 100 sqm
Bitumen Emulsion

Jute netting, open weave, 25 mm square opening


Water for 3 months
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

sqm

264.00

30.00

7,920.00

kl

84.00

15.00

1,260.00
0.00

Cost for 240 sqm = a+b+c+d+e

1,948.94
17,540.44

Rate per sqm = (a+b+c+d+e)/240

EE.,Dn.I,BMR

TA to SE Circle, Barmer

73.09

AAO.,Circle, Barmer

SE.,Circle, Barmer

203

Chapter 9
PIPE CULVERTS
Sr.
No.

Reference to
MORD Specifica-tions

9.1

1100 & 300

Description

Unit

Quan
-tity

Rate
(Rs.)

Amount
(Rs.)

Excavation for Structures


Earthwork in excavation for foundation of structures upto 3 m depth
as per drawing and technical specification Clause 1104 includding
setting out, construction of shoring and bracing, removal of stumps
and other deleterious matter, dressing of sides and bottom and
backfilling with approved material.
Unit = cum
Rate as per item No.11.1 of Chapter 11
Rate as applicable for the type of soil/rock are to be taken

9.2

1100 & 800

Bedding for Pipe


(i)

Type A (Concrete Cradle) Bedding


Laying concrete cradle bedding with M15 Grade Cement
Concrete as per Clause 1105 (i)
Unit = cum
Rate as per Item No.11.4 (II)(i) of Chapter 11

(ii)

cum

Type B (First Class) Bedding


Laying (First Class) bedding on well compacted sand, moorum
or approved granular material as per Clause 1105 (ii)
Unit = cum
Rate as per Item No.11.2 of Chapter 11

9.3

1100

cum

Providing and Laying Reinforced Cement Concrete Pipe NP3 as


per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for
culverts on first class bedding of granular material in single row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry
works in head walls and parapets Clause 1106.
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
(A)

1200 mm dia
a)

EE.,Dn.I,BMR

Labour

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

204

Sr.
No.

Reference to
MORD Specifica-tions

Description

b)

Unit

Quan
-tity

Rate
(Rs.)

Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

0.50

180.00

90.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

cum

0.05

190.00

9.50
280.00

Material
Sand at site
Cement at site

0.07 4,000.00

RCC pipe NP3 pipe including collar at site

7.50 3,100.00 23,250.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

2,985.44

Cost for 7.5 m = a+b+c+d

26,868.94

Rate per m = (a+b+c+d)/7.5


(B)

3,582.53

1000 mm dia
a)

b)

Labour
Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.25

180.00

45.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

cum

0.04

190.00

7.60
120.00

Material
Sand at site
Cement at site

0.03 4,000.00

RCC pipe NP3 concrete pipe including collar at site

7.50 2,500.00 18,750.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

2,386.45

Cost for 7.5 m = a+b+c+d

21,478.05

Rate per m = (a+b+c+d)/7.5


(C)

2,863.74

750 mm dia
a)

EE.,Dn.I,BMR

Amount
(Rs.)

Labour
Mate

day

0.05

100.00

5.00

Mason (1st Class)

day

0.15

180.00

27.00

Mazdoor (Unskilled)

day

1.20

80.00

96.00

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

205

Sr.
No.

Reference to
MORD Specifica-tions

Description
b)

Unit

Quan
-tity

Rate
(Rs.)

Material
Sand at site

cum

Cement at site

RCC pipe NP3 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.024

190.00

4.56

0.018 4,000.00

72.00

7.50 1,800.00 13,500.00


0.00
1,713.07

Cost for 7.5 m = a+b+c+d

15,417.63

Rate per m = (a+b+c+d)/7.5


(D)

Amount
(Rs.)

2,055.68

600 mm dia
Rate per m = 80% of 750 mm dia pipe

0.80 2,055.68

1,644.55

Note: The labour rate for 600 mm dia Hume pipe may be derived from the
rates for 750 dia by decreasing 20 per cent
(E)

300 mm dia
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mason (1st Class)

day

0.02

180.00

3.60

Mazdoor (Unskilled)

day

0.20

80.00

16.00

cum

0.004

190.00

0.76

0.003 4,000.00

12.00

Material
Sand at site
Cement at site

RCC pipe NP3 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

7.50

550.00

4,125.00
0.00

Cost for 7.5 m = a+b+c+d

519.80
4,678.16

Rate per m = (a+b+c+d)/7.5


9.4

1100

623.75

Providing and Laying Reinforced Cement Concrete Pipe NP4 as


per design in Single Row
Providing and laying reinforced cement concrete pipe NP4 for
culverts on first class bedding of granular material in single row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry
works in head walls and parapets Clause 1106.
Unit = m

EE.,Dn.I,BMR

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

206

Sr.
No.

Reference to
MORD Specifica-tions

Description

Unit

Quan
-tity

Rate
(Rs.)

Amount
(Rs.)

Taking output = 7.5 m


(3 pipes of 2.5 m length each)
(A)

1200 mm dia
a)

b)

Labour
Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

0.50

180.00

90.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

cum

0.05

190.00

9.50
280.00

Material
Sand at site
Cement at site

0.07 4,000.00

RCC pipe NP4 pipe including collar at site

7.50 3,900.00 29,250.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

3,735.44

Cost for 7.5 m = a+b+c+d

33,618.94

Rate per m = (a+b+c+d)/7.5


(B)

4,482.53

1000 mm dia
a)

b)

Labour
Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.25

180.00

45.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

cum

0.04

190.00

7.60
120.00

Material
Sand at site

c)

EE.,Dn.I,BMR

Cement at site

0.03 4,000.00

RCC pipe NP4 concrete pipe including collar at site

7.50 3,100.00 23,250.00

Overheads @ 0% on (a+b)

TA to SE.,Circle BMR

0.00

AAO.,Circle, BMR

SE.,Circle, Barmer

207

Sr.
No.

Reference to
MORD Specifica-tions

Description
d)

Unit

Quan
-tity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c)

2,948.95

Cost for 7.5 m = a+b+c+d

26,540.55

Rate per m = (a+b+c+d)/7.5


(C)

3,538.74

750 mm dia
a)

b)

Labour
Mate

day

0.05

100.00

5.00

Mason (1st Class)

day

0.15

180.00

27.00

Mazdoor (Unskilled)

day

1.20

80.00

96.00

cum

0.024

190.00

4.56

0.018 4,000.00

72.00

Material
Sand at site
Cement at site

RCC pipe NP4 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

7.50 2,200.00 16,500.00


0.00
2,088.07

Cost for 7.5 m = a+b+c+d

18,792.63

Rate per m = (a+b+c+d)/7.5


(D)

Amount
(Rs.)

2,505.68

600 mm dia
Rate per m = 80% of 750 mm dia pipe

0.80 2,505.68

2,004.55

Note: The labour rate for 600 mm dia Hume pipe may be derived from the
rates for 750 dia by decreasing 20 per cent
(E)

300 mm dia
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mason (1st Class)

day

0.02

180.00

3.60

Mazdoor (Unskilled)

day

0.20

80.00

16.00

cum

0.004

190.00

0.76

0.003 4,000.00

12.00

Material
Sand at site

c)

EE.,Dn.I,BMR

Cement at site

RCC pipe NP3 concrete pipe including collar at site

7.50

800.00

6,000.00

Overheads @ 0% on (a+b)

TA to SE.,Circle BMR

0.00

AAO.,Circle, BMR

SE.,Circle, Barmer

208

Sr.
No.

Reference to
MORD Specifica-tions

Description
d)

Unit

Quan
-tity

Rate
(Rs.)

Amount
(Rs.)

Contractors profit @ 12.5% on (a+b+c)

754.17

Cost for 7.5 m = a+b+c+d

6,787.53

Rate per m = (a+b+c+d)/7.5


9.5

1100

905.00

Providing and Laying Reinforced Cement Concrete Pipe NP3 as


per Design in Double Row
Providing and laying reinforced cement concrete pipe NP3 for
culverts on first class bedding of granular material in double row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry
works in head walls and parapets as per Clause 1106.
Unit = m
Taking output = 7.5 m
(6 pipes of 2.5 m length each in two rows)
(A)

1200 mm dia
a)

b)

Labour
Mate

day

0.34

100.00

34.00

Mason (1st Class)

day

1.20

180.00

216.00

Mazdoor (Unskilled)

day

7.20

80.00

576.00

cum

0.11

190.00

20.90

0.14 4,000.00

560.00

Material
Sand at site
Cement at site

RCC pipe NP3 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

15.00 3,100.00 46,500.00


0.00
5,988.36

Cost for 7.5 m = a+b+c+d

53,895.26

Rate per m = (a+b+c+d)/7.5


(B)

7,186.04

1000 mm dia
a)

b)

Labour
Mate

day

0.22

100.00

22.00

Mason 1st Class

day

0.60

180.00

108.00

Mazdoor (Unskilled)

day

4.80

80.00

384.00

cum

0.08

190.00

15.20

Material
Sand at site

EE.,Dn.I,BMR

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

209

Sr.
No.

Reference to
MORD Specifica-tions

Description

Unit

Cement at site

RCC pipe NP3 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Quan
-tity

Rate
(Rs.)

0.06 4,000.00

0.00
4,783.65
43,052.85

Rate per m = (a+b+c+d)/7.5

5,740.38

750 mm dia
a)

b)

Labour
Mate

day

0.11

100.00

11.00

Mason 1st Class

day

0.30

180.00

54.00

Mazdoor (Unskilled)

day

2.40

80.00

192.00

cum

0.04

190.00

7.60
144.00

Material
Sand at site
Cement at site

0.036 4,000.00

RCC pipe NP3 pipe including collar at site

15.00 1,800.00 27,000.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 7.5 m = a+b+c+d

3,426.08
30,834.68

Rate per m = (a+b+c+d)/7.5

9.6

240.00

15.00 2,500.00 37,500.00

Cost for 7.5 m = a+b+c+d

(C)

Amount
(Rs.)

4,111.29

Note: The labour rate for 600 mm dia Hume pipe should be decreased by
20 per cent
1100
Providing and Laying Reinforced Cement Concrete Pipe NP4 as
per Design in Double Row
Providing and laying reinforced cement concrete pipe NP4 for
culverts on first class bedding of granular material in double row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry
works in head walls and parapets as per Clause 1106.
Unit = m
Taking output = 7.5 m
(6 pipes of 2.5 m length each in two rows)
(A)

1200 mm dia
a)

EE.,Dn.I,BMR

Labour

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

210

Sr.
No.

Reference to
MORD Specifica-tions

Description

b)

Unit

Quan
-tity

Rate
(Rs.)

Mate

day

0.34

100.00

34.00

Mason (1st Class)

day

1.20

180.00

216.00

Mazdoor (Unskilled)

day

7.20

80.00

576.00

cum

0.11

190.00

20.90

0.14 4,000.00

560.00

Material
Sand at site
Cement at site

RCC pipe NP4 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

15.00 3,900.00 58,500.00


0.00
7,488.36

Cost for 7.5 m = a+b+c+d

67,395.26

Rate per m = (a+b+c+d)/7.5


(B)

8,986.04

1000 mm dia
a)

b)

Labour
Mate

day

0.22

100.00

22.00

Mason 1st Class

day

0.60

180.00

108.00

Mazdoor (Unskilled)

day

4.80

80.00

384.00

cum

0.08

190.00

15.20

0.06 4,000.00

240.00

Material
Sand at site
Cement at site

RCC pipe NP4 concrete pipe including collar at site

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

15.00 3,100.00 46,500.00


0.00
5,908.65

Cost for 7.5 m = a+b+c+d

53,177.85

Rate per m = (a+b+c+d)/7.5


(C)

7,090.38

750 mm dia
a)

EE.,Dn.I,BMR

Amount
(Rs.)

Labour
Mate

day

0.11

100.00

11.00

Mason 1st Class

day

0.30

180.00

54.00

Mazdoor (Unskilled)

day

2.40

80.00

192.00

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

211

Sr.
No.

Reference to
MORD Specifica-tions

Description
b)

Unit

Quan
-tity

Rate
(Rs.)

Amount
(Rs.)

Material
Sand at site

cum

0.04

190.00

7.60
144.00

Cement at site

0.036 4,000.00

RCC pipe NP4 pipe including collar at site

15.00 2,200.00 33,000.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4,176.08

Cost for 7.5 m = a+b+c+d

37,584.68

Rate per m = (a+b+c+d)/7.5

5,011.29

Note: The labour rate for 600 mm dia Hume pipe should be decreased by
20 per cent
9.7

1100

Laying Cement Concrete Pipe NP3 (burried conduits) on first


class bedding of granular material including fixing collar with
cement sand mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonary work in head wall
and parapets
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mason (1st Class)

day

0.11

180.00

19.80

Mazdoor (Unskilled)

day

0.90

80.00

72.00

cum

0.02

190.00

3.80
40.00

Material
Sand at site
Cement at site

0.01 4,000.00

RCC pipe NP3 concrete pipe including collar at site

7.50 1,400.00 10,500.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 7.5 m = a+b+c+d

11,969.55

Rate per m = (a+b+c+d)/7.5

EE.,Dn.I,BMR

TA to SE.,Circle BMR

1,329.95

1,595.94

AAO.,Circle, BMR

SE.,Circle, Barmer

212

Sr.
No.

Reference to
MORD Specifica-tions

Description

Unit

Quan
-tity

Rate
(Rs.)

Amount
(Rs.)

300 mm dia
a)

b)

Labour
Mate

day

0.03

100.00

3.20

Mason (1st Class)

day

0.09

180.00

16.20

Mazdoor (Unskilled)

day

0.72

80.00

57.60

cum

0.02

190.00

3.04
32.00

Material
Sand at site
Cement at site

0.01 4,000.00

RCC pipe NP3 concrete pipe including collar at site

7.50

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

550.00

4,125.00
0.00
529.63

Cost for 7.5 m = a+b+c+d

4,766.67

Rate per m = (a+b+c+d)/7.5

635.56

Note: The labour rate for 300 mm dia shall be decreased by 20 per cent
9.8

1100

Laying Cement Concrete Pipe NP4 (burried conduits) on first


class bedding of granular material including fixing collar with
cement sand mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonary work in head wall
and parapets
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a)

b)

Labour
Mate

day

0.04

100.00

4.00

Mason (1st Class)

day

0.11

180.00

19.80

Mazdoor (Unskilled)

day

0.90

80.00

72.00

cum

0.02

190.00

3.80

0.01 4,000.00

40.00

Material
Sand at site
Cement at site

EE.,Dn.I,BMR

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

213

Sr.
No.

Reference to
MORD Specifica-tions

Description

Unit

RCC pipe NP4 concrete pipe including collar at site


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Quan
-tity

Rate
(Rs.)

Amount
(Rs.)

7.50 1,600.00 12,000.00


0.00
1,517.45

Cost for 7.5 m = a+b+c+d

13,657.05

Rate per m = (a+b+c+d)/7.5

1,820.94

300 mm dia
a)

b)

Labour
Mate

day

0.03

100.00

3.20

Mason (1st Class)

day

0.09

180.00

16.20

Mazdoor (Unskilled)

day

0.72

80.00

57.60

cum

0.02

190.00

3.04
32.00

Material
Sand at site
Cement at site

0.01 4,000.00

RCC pipe NP4 concrete pipe including collar at site

7.50

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

800.00

6,000.00
0.00
764.01

Cost for 7.5 m = a+b+c+d

6,876.05

Rate per m = (a+b+c+d)/7.5

916.81

Note: The labour rate for 300 mm dia shall be decreased by 20 per cent
9.9

1100 & 800

Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling


course below open foundation of Head walls as per drawings &
Technical Specification Clause 1109
Rate as per item No.11.4 of Chapter 11

9.10

1100 & 600

cum

Brick Masonry Work in cement mortar in foundation of Head


walls complete exculding pointing and plastering as per
drawing and technical specification Clause 1109
(A)

Brick Masonry in 1:4 cement mortar


Rate as per item No.11.5 (ii) Chapter 11

(B)

Brick Masonry in cement-lime mortar (1:0.5:4.5)


Rate as per item No.11.5 (iii) Chapter 11

EE.,Dn.I,BMR

cum

TA to SE.,Circle BMR

AAO.,Circle, BMR

cum

SE.,Circle, Barmer

214

Sr.
No.

Reference to
MORD Specifica-tions

9.11

1100 & 700

Description

Unit

(B)

10
sqm

Plastering with Cement Mortar (1:4), 15 mm thick on brickwork


in substructure as per technical specification
Rate as per item No.12.3 of Chapter 12

9.14

1100 & 300

10
sqm

Backfilling in Foundation Trenches as per drawing and


technical specification Clause 1108
Rate as per Item No.11.2 of Chapter 11

9.15

1100, 600,
700 & 1200

cum

Providing PCC M20 Architectural Coping on the top of wing


wall, return wall etc. complete as per drawing and technical
specification Clause 615
Rate as per Item No.12.13 of Chapter 12

EE.,Dn.I,BMR

cum

Pointing with Cement Mortar (1:3) on brickwork as per technical


specification Clause 613.3
Rate as per item No.12.2 of Chapter 12

1100 & 600

cum

In cement-lime mortar (1:0.5:4.5)


Rate as per item No.11.6 (II) (iii) Chapter 11

9.13

Amount
(Rs.)

In 1:4 cement mortar


Rate as per item No.11.6 (II) (ii) Chapter 11

1100 & 600

Rate
(Rs.)

Stone Masonry Work in cement mortar in foundation of Head


walls complete as per drawing and technical specification
Clasue 1109
(A)

9.12

Quan
-tity

TA to SE.,Circle BMR

AAO.,Circle, BMR

SE.,Circle, Barmer

215

Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Sr.
No.

Reference to
MORD Specifications

10.1

1700

Description

Unit

Quantity

Rate
(Rs.)

Printing New Letters and Figures of any Shade


Printing new letter and figures of any shade with synthetic enamel
paint black or any other approved colour to give an even shade as per
drawings and Technical Specification Clause 1701
i)

Hindi (Matras commas and the like not to be measured and


paid for. Half letters shall be counted as half only)
Details for 100 letters of 160 mm height, i.e., 1600 cm
Unit = per cm height per letter
a)

b)

Labour
Mate

day

0.12

100.00

Painter 1st Class

day

2.00

150.00

Mazdoor (Unskilled)

day

1.00

80.00

litre

0.70

150.00

Mate

day

0.07

100.00

Painter Ist class

day

1.25

150.00

Mazdoor

day

0.50

80.00

litre

0.50

150.00

Material
Paint

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 1600 cm = a+b+c+d


Rate per cm height per letter = (a+b+c+d)/1600
ii)

English and Roman


Hyphens, commas and the like not to be measured and paid for.
Detail for 100 letters of 160 mm height, i.e., 1600 cm
Unit = per cm height per letter
a)

b)

Labour

Material
Paint

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 1600 cm = a+b+c+d

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

216
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per cm height per letter = (a+b+c +d)/1600


10.2

1700, 300, Traffic Signs


800
A.
Retro-reflectorised Traffic Signs
(1) Providing and fixing of retro-reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3 fixed over
aluminium sheeting, 1.5 mm thick supported on a mild steel
angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the
ground by means of properly designed foundation with M15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm
below ground level as per drawings and Technical Specification
Clause 801

i) 900 mm equilateral triangle


Unit = each
Taking output = one traffic sign
i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

cum

0.126

75.60

cum

0.126

1,954.25

sqm

0.887

64.60

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

kg

20.00

33.00

sqm

0.35

4,500.00

hour

0.08

150.00

Cement concrete M15 grade


As per item No.11.4 of Chapter 11

iii)

Painting Angle Iron Post with Primer and two coats of


Epoxy Paint as per specifications
As per item No.10.7 of this Chapter
a)

b)

labour (For fixing at site)

Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.

c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

217
Sr.
No.

Reference to
MORD Specifications

Description

ii) 600 mm equilateral triangle


Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Unit

Quantity

Rate
(Rs.)

Amount for
Item
No.10.2A(i+ii
+iiia)

kg

20.00

33.00

sqm

0.156

4,500.00

hour

0.08

150.00

kg

20.00

33.00

sqm

0.283

4,500.00

hour

0.08

150.00

kg

20.00

33.00

sqm

0.480

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iii) 600 mm circular

Amount for
Item
No.10.2A(i+ii
+iiia)

Mild steel angle iron 75 x 75 x 6 mm


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) 800mm x 600m rectangular


Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(i+ii
+iiia)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

218
Sr.
No.

Reference to
MORD Specifications

Description
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Unit

Quantity

Rate
(Rs.)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v) 600mm x 450mm rectangular


Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(i+ii
+iiia)

kg

20.00

33.00

sqm

0.270

4,500.00

hour

0.08

150.00

kg

20.00

33.00

sqm

0.360

4,500.00

hour

0.08

150.00

kg

20.00

33.00

sqm

0.672

4,500.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vi) 600mm x 600mm square


Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(i+ii
+iiia)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vii) 900mm side octagon


Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(i+ii
+iiia)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

219
Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Machinery
Tractor with trolley

hour

0.08

150.00

cum

0.126

75.60

cum

0.126

1,954.25

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

3.00

150.00

sqm

0.35

4,500.00

hour

0.08

150.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)


(2) Providing and fixing of retro-reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm thick supported on GI pipe 50 mm
dia firmly fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 mm x 450 mm
x 600 mm, 600 mm below ground level as per drawings and
Technical Specification Clause 1701

Unit = each
Taking output = one traffic sign

i)

Size 900mm equilaterla triangle

i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M15 grade


As per item No.11.4 of Chapter 11
a)

b)

Labour (For fixing at site)

Material
50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.

c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

220
Sr.
No.

Reference to
MORD Specifications

Description

ii) 600 mm equilateral triangle


50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Unit

Quantity

Rate
(Rs.)

Amount for
Item
No.10.2A(2)
(i+iia)

3.00

150.00

sqm

0.156

4,500.00

hour

0.08

150.00

3.00

150.00

sqm

0.283

4,500.00

hour

0.08

150.00

3.00

150.00

sqm

0.480

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iii) 600 mm circular

Amount for
Item
No.10.2A(2)
(i+iia)

50 mm dia GI Pipe 2.85 m long including 5 per cent


wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) 800mm x 600m rectangular


50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(2)
(i+iia)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

221
Sr.
No.

Reference to
MORD Specifications

Description
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Unit

Quantity

Rate
(Rs.)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v) 600mm x 450mm rectangular


50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(2)
(i+iia)

3.00

150.00

sqm

0.270

4,500.00

hour

0.08

150.00

3.00

150.00

sqm

0.360

4,500.00

hour

0.08

150.00

3.00

150.00

sqm

0.672

4,500.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vi) 600mm x 600mm square


50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(2)
(i+iia)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vii) 900mm side octagon


50 mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

Amount for
Item
No.10.2A(2)
(i+iia)

SE.,Circle, Barmer

222
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

hour

0.08

150.00

cum

0.126

75.60

cum

0.126

1,954.25

sqm

0.90

64.60

Mate

day

0.01

100.00

Mazdoor

day

0.25

80.00

cum

0.0285

1,880.21

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)


(3) Providing and fixing of retro-reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm thick supported on RCC Post 100
mm x 100 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 450 mm
x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing Clause 1701

Unit = each
Taking output = one traffic sign
i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M15 grade


As per item No.11.4 of Chapter 11

iii)

Painting two coats including prime coat on concrete


surface with Epoxy Paint as per specifications
As per item No.10.7 of this Chapter
a)

b)

labour (For fixing at site)

Material
RCC M15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel reinforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

t
sqm

0.0077 40,178.25
0.35

4,500.00

Add 3 per cent of cost of RCC Post towards cost of


drilling holes, nuts, bolts, etc.

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

223
Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Machinery
Tractor with trolley

hour

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.08

150.00

sqm

0.156

4,500.00

hour

0.08

150.00

sqm

0.283

4,500.00

hour

0.08

150.00

0.480

4,500.00

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

ii) 600 mm equilateral triangle


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(3)
(I to iiib)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

Amount for
Item
No.10.2A(3)
(I to iiib)

iii) 600 mm circular


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) 800mm x 600m rectangular


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(3)
(I to iiib)

sqm

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

224
Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Machinery
Tractor with trolley

hour

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.08

150.00

sqm

0.270

4,500.00

hour

0.08

150.00

sqm

0.360

4,500.00

hour

0.08

150.00

0.672

4,500.00

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v) 600mm x 450mm rectangular


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(3)
(I to iiib)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vi) 600mm x 600mm square


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(3)
(I to iiib)

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vii) 900mm side octagon


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2A(3)
(I to iiib)

sqm

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

EE.,Dn.I, BMR

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

225
Sr.
No.

Reference to
MORD Specifications

Description
Tractor with trolley

Unit

Quantity

Rate
(Rs.)

hour

0.08

150.00

cum

0.126

75.60

cum

0.126

1,954.25

sqm

0.46

64.60

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

kg

12.40

45.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)


Note:

Any one area of aluminium sheeting given at (i) to (vii) may be


adopted as per site requirement and in accordance with IRC:67.

The rate for excavation, cement concrete M-15, RCC M-15 in


Sub-structure, steel re-inforcement and painting may be taken
from respective Chapters.

The depth of foundation and quantity of cement concrete in the


foundation are indicative. These may be increased for areas
having higher wind velocities like in coastal areas. This is
applicable to all road signs and directions boards.

B.

Semi Reflective Traffic Signs


Providing and fixing of semi reflective cautionary, mandatory
and informatory sign board as per IRC:67 made of 1.5 mm thick
MS Sheet duly stove white colour in front and gray colour on
back with red reflective border of 65 mm width and required
letters and figures with reflective tape engineering grade as per
Clause 1701.3.9 of MORD for Rural Roads of required shade
and colour supported and welded on 47mm x 47 mm x 12 SWG
sheet tube firmly fixed to the ground by mean of properly
designed foundations with M-15 grade cement concrete
450x450x600 mm, 600 mm below ground level as per approved
drawing Clause 1701.2.2

Unit = Each
Taking output = one traffic sign
(i)

Excavation foundations
As per Item No. 1 to 11.1 of Chapter 11

(ii) Cement concrete M-15 Grade


As per item no. 11.4 of Chapter 11
(iii) Painting steel tube posts with primer and two coats of
epoxy paint as per specifications
As per item no 10.7 of Chapter 11
a)

b)

Labour (For fixing at site)

Material
Support of M.S. Sheet tube
(I)

EE.,Dn.I, BMR

47 mm x 47 mm x 12 SWG Sheet

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

226
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

3050 mm long
(II) Angle iron 50 x 50 x 6 mm for hold fast including 5%
wastage

kg

1.06

33.00

(III) 1.5 mm thick M.S. Sheet duly painted with stove


enamelled paint including lettering, signs, border,
message with reflective tape of engineering grade
required size, shade and colour as per Technical
Specifications

sqm

0.35

1,500.00

hour

0.08

150.00

sqm

0.156

1,500.00

hour

0.08

150.00

sqm

0.283

1,500.00

hour

0.08

150.00

Add 3% cost of MS Sheet tube 12 SWG and angle


irons towards the cost of fabrication, drilling holes,
nuts and bolts etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

ii) 600 mm equilateral triangle


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2B(3)
(I to iiib(ii))

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

Amount for
Item
No.10.2B(3)
(I to iiib(ii))

iii) 600 mm circular


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

227
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) 800mm x 600m rectangular


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2B(3)
(I to iiib(ii))

sqm

0.480

1,500.00

hour

0.08

150.00

sqm

0.270

1,500.00

hour

0.08

150.00

sqm

0.360

1,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v) 600mm x 450mm rectangular


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2B(3)
(I to iiib(ii))

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

vi) 600mm x 600mm square


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Amount for
Item
No.10.2B(3)
(I to iiib(ii))

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

228
Sr.
No.

Reference to
MORD Specifications

Description

vii) 900mm side octagon


Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Unit

Quantity

Rate
(Rs.)

Amount for
Item
No.10.2B(3)
(I to iiib(ii))

sqm

0.672

1,500.00

hour

0.08

150.00

cum

0.126

75.60

cum

0.126

1,954.25

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)


Note:

10.3

Any one area of M.S. Sheet given at (i) to (viii) may be adopted
as per site requirement and in accordance with IRC-67.

The rate for excavation, cement concrete M-15, and painting


may be taken from respective Chapters.

The depth of foundation and quantity of cement in the


foundation are indicative. These may be increased for areas
having higher wind velocities like in coastal area. This is
applicable to all road signs and direction boards.

1700, 800 Direction and Place Identification signs upto 0.9 sqm size board
& 300
A.

Retro-reflectorised Traffic Signs


(i) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on a mild steel single angle iron post 75 x 75 x 6
mm firmly fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 x 450 x 600
mm, 600 mm below ground level as per approved drawing and
Technical Specification Clause 1701

Unit = sqm
Taking output = 0.9 sqm

i)

Size 120cm x 75cm

i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M-15 grade


As per item No.11.4 of Chapter 11

iii)

EE.,Dn.I, BMR

Painting Angle Iron Post with Primer and two coats of


Epoxy Paint as per specifications

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

229
Sr.
No.

Reference to
MORD Specifications

Description
Rate as per item No.10.7 of this Chapter

Unit

Quantity

Rate
(Rs.)

sqm

0.887

64.60

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

kg

20.00

33.00

sqm

0.90

4,500.00

hour

0.08

150.00

kg

20.00

33.00

sqm

0.675

4,500.00

hour

0.08

150.00

a) Labour (For fixing at site)

b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size 0.90 sqm including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley
d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e)
Rate per sqm (for sign having area upto 0.9 sqm) =
(i+ii+iii+a+b+c+d+e)/0.90

ii)

Size 90cm x 75cm


Amount for
Item
No.10.3A(i)(I
to iiia))

b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iii) Size 90cm x 60cm


EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

230
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount for
Item
No.10.3A(i)(I
to iiia))

b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

kg

20.00

33.00

sqm

0.540

4,500.00

hour

0.08

150.00

kg

20.00

33.00

sqm

0.3375

4,500.00

hour

0.08

150.00

20.00

33.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) Size 75cm x 45cm


Amount for
Item
No.10.3A(i)(I
to iiia))

b) Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v)

Size 60cm x 45cm


Amount for
Item
No.10.3A(i)(I
to iiia))

b) Material
Mild steel angle iron 75 x 75 x 6 mm

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

kg

SE.,Circle, Barmer

231
Sr.
No.

Reference to
MORD Specifications

Description
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Unit

Quantity

Rate
(Rs.)

sqm

0.2700

4,500.00

hour

0.08

150.00

cum

0.126

75.60

cum

0.126

1,954.25

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

3.00

150.00

sqm

0.90

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

(ii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on 2 inch dia GI Pipe firmly fixed to the ground by
means of properly designed foundation with M-15 grade cement
concrete 450 x 450 x 600 mm, 600 mm below ground level as
per approved drawing and Tehnical Specification Clause 1701.

Unit = sqm
Taking output = 0.9 sqm

I)

Size 120cm x 75cm

i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M-15 grade


As per item No.11.4 of Chapter 11
a) Labour (For fixing at site)

b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint
Add 3 per cent of cost of GI Pipe towards cost of
fabrication, drilling holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

232
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 0.9 sqm = a+b+c+d+e
Rate per sqm (for sign having area upto 0.9 sqm) =
(a+b+c+d+e)/0.90

ii)

Size 90cm x 75cm


Amount for
Item
No.10.3A(ii)
(I to ii))

b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

3.00

150.00

sqm

0.675

4,500.00

hour

0.08

150.00

3.00

150.00

sqm

0.540

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iii) Size 90cm x 60cm


Amount for
Item
No.10.3A(ii)
(I to ii))

b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

233
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) Size 75cm x 45cm


Amount for
Item
No.10.3A(ii)
(I to ii))

b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

3.00

150.00

sqm

0.3375

4,500.00

hour

0.08

150.00

3.00

150.00

sqm

0.2700

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v)

Size 60cm x 45cm


Amount for
Item
No.10.3A(ii)
(I to ii))

b) Material
50mm dia GI Pipe 2.85 m long including 5 per cent
wastage
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

234
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

(iii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area not exceeding 0.9
sqm supported on RCC Post 100 mm x 100 mm firmly fixed to
the ground by means of properly designed foundation with M-15
grade cement concrete 450 x 450 x 600 mm, 600 mm below
ground level as per approved drawing and Technical
Specification Clause 1701

Unit = sqm
Taking output = 0.9 sqm

i)

Size 120cm x 75cm

i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

cum

0.126

75.60

cum

0.126

1,901.46

sqm

0.90

64.60

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

cum

0.0285

1,880.21

Cement concrete M-15 grade


As per item No.11.4 of Chapter 11

iii)

Painting two coats including prime coat on concrete


surface with Epoxy Paint as per specifications
As per item No.10.7 of Chapter 10

a) Labour (For fixing at site)

b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint

0.0077 37,815.75

sqm

0.90

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of RCC Post towards cost of drilling


holes, nuts, bolts etc.
c) Machinery
Tractor with trolley
d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 0.9 sqm = a+b+c+d+e

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

235
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per sqm (for sign having area upto 0.9 sqm) =
(a+b+c+d+e)/0.90

ii)

Size 90cm x 75cm


Amount for
Item
No.10.3A(iii)
(I to iii))

b) Material
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

sqm

0.675

4,500.00

hour

0.08

150.00

sqm

0.540

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iii) Size 90cm x 60cm


Amount for
Item
No.10.3A(iii)
(I to iii))

b) Material
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) Size 75cm x 45cm


Amount for
Item
No.10.3A(iii)
(I to iii))

b) Material
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

236
Sr.
No.

Reference to
MORD Specifications

Description
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

Unit

Quantity

Rate
(Rs.)

sqm

0.3375

4,500.00

hour

0.08

150.00

sqm

0.2700

4,500.00

hour

0.08

150.00

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v)

Size 60cm x 45cm


Amount for
Item
No.10.3A(iii)
(I to iii))

b) Material
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)


Note:

Lettering and arrow markings on sign board to be provided


separately as per actual requirement. Rates for these items
have been analysed separately.

The rate for excavation, cement concret M15, RCC M15 in Substructure, steel re-inforcement and painting may be taken from
respective Chapters.

The depth of foundation and quantity of cement concrete in the


foundation are indicative. These may be increased for areas
having higher wind velocities like in coastal areas. This is
applicable to all road signs and directions boards.

B.

Semi-Reflective Traffic signs


Direction and place indentification signs up to 0.9 sqm size
board

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

237
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing and erecting direction and place identifications of


semi reflective sign boards as per IRC:67 made of 2 mm thick
M.S. Sheet duly stove enameled paint in white colour in front
and grey colour on back with red reflective border of 70 mm
width and required message, letters, figures with reflective
engineering grade tape as per MORD specifications of required
shade and colour. Supported and welded on 47 mm x 47mm of
12 SWG Square tube of 3050 mm height duly strengthened by
25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the
ground by means of properly designed foundations with M-15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm
below ground level as per approved drawing and Technical
Specification Clause 1701

Unit = each
Take Output = 0.9 sqm

i)
(i)

Size 120cm x 75cm

Excavation for foundations


As per Item No. 11.1 of Chapter 11

(ii)

cum

0.126

75.60

cum

0.126

1,954.25

sqm

0.59

64.60

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

kg

12.40

45.00

ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage

kg

1.06

33.00

iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS


flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.

sqm

0.90

2,000.00

hour

0.08

150.00

Cement Concrete M-15 grade


As per Item No. 11.4 of Chapter 11

(iii)

Painting on M.S. tube post with primer and two coat of


epoxy paint as per specifications
As per item No.10.7 of Chapter 10
a)

b)

Labour (For fixing at site)

Materials
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long

Add 3% cost of MS sheet angle iron towards the cost of


fabrications, drilling, holes, nuts, bolts, etc.
c)

Machinery
Tractor with Trolley

EE.,Dn.I, BMR

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

238
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost for 0.9 sqm = (i+ii+iii+a+b+c+d+e)


Rate per sqm = (i+ii+iii+a+b+c+d+e) / 0.9

ii)

Size 90cm x 75cm


Amount for
Item
No.10.3A(iii)
(I to iiia))

b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long

kg

12.40

45.00

ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage

kg

1.06

33.00

iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS


flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.

sqm

0.675

2,000.00

hour

0.08

150.00

kg

12.40

45.00

ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage

kg

1.06

33.00

iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS


flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.

sqm

0.540

2,000.00

Add 3% cost of MS sheet angle iron towards the cost of


fabrications, drilling, holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iii) Size 90cm x 60cm


Amount for
Item
No.10.3A(iii)
(I to iiia))

b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long

Add 3% cost of MS sheet angle iron towards the cost of


fabrications, drilling, holes, nuts, bolts, etc.

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

239
Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Machinery
Tractor with trolley

hour

0.08

150.00

kg

12.40

45.00

ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage

kg

1.06

33.00

iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS


flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.

sqm

0.338

2,000.00

hour

0.08

150.00

kg

12.40

45.00

kg

1.06

33.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

iv) Size 75cm x 45cm


Amount for
Item
No.10.3A(iii)
(I to iiia))

b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long

Add 3% cost of MS sheet angle iron towards the cost of


fabrications, drilling, holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

v)

Size 60cm x 45cm


Amount for
Item
No.10.3A(iii)
(I to iiia))

b) Material
i) Support of MS sheet tube
47 mm x 47 mm of 12 SWG sheet 3050 mm long
ii) Angle iron 50 x 50 x 6 mm for lugs including 5% wastage

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

240
Sr.
No.

Reference to
MORD Specifications

Description
iii) 2 mm thick MS sheet strengthened by 25 mm x 5 mm MS
flat iron & painted with stove enameled paint including
lettering, signs, message, border with reflective tape of
engineering grade of required shade and colour as per
Technical Specifications.

Unit

Quantity

Rate
(Rs.)

sqm

0.270

2,000.00

hour

0.08

150.00

cum

0.252

75.60

cum

0.252

1,954.25

sqm

1.774

64.60

Mate

day

0.02

100.00

Mazdoor (Unskilled)

day

0.50

80.00

Add 3% cost of MS sheet angle iron towards the cost of


fabrications, drilling, holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

Note: Rate for excavation, cement concrete M15 and painting may be taken
from respective Chapters.
10.4

1700, 800 Direction and Place Identification signs with size more than 0.9
& 300
sqm size board
A.

Retro-reflectorised Traffic Signs

(i)

Providing and erecting direction and place identification


retro-\reflectorised sign as per IRC:67 made of encapsulated
lens type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm
supported on mild steel angle iron posts 75 mm x 75 mm x 6
mm, 2 Nos. firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete 450 mm
x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701

Unit = sqm
Taking output = 1.50 sqm
i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M-15 grade


As per item No.11.4 of Chapter 11

iii)

Painting Angle Iron Post with Primer and two coats of


Epoxy Paint specifications
As per item No.10.7 of Chapter 10

a) Labour (For fixing at site)

b) Material

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

241
Sr.
No.

Reference to
MORD Specifications

Description
Mild steel angle iron 75 mm x 75 mm x 6 mm, 2.85 m long,
2 nos. with 5 per cent wastage

Unit

Quantity

Rate
(Rs.)

kg

40.00

33.00

sqm

1.50

4,500.00

hour

0.12

150.00

Each

1.80

6,696.49

cum

0.252

75.60

cum

0.252

1,954.25

Mate

day

0.02

100.00

Mazdoor (Unskilled)

day

0.50

80.00

50 mm dia GI Pipe 2.85 m long including 5 per cent


wastage

6.00

150.00

Aluminium sheeting fixed with encapsulated lens


type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint

sqm

1.50

4,500.00

Aluminium sheeting fixed with encapsulated lens type


reflective sheeting of size including lettering and signs as
applicable background with epoxy paint
Add 3 per cent of cost of angle iron towards cost of
fabrication, drilling holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley
d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 1.5 sqm = i+ii+iii+a+b+c+d+e
Rate per sqm (for sign having area more than 0.9 sqm) =
(i+ii+iii+a+b+c+d+e)/1.50
Size 150cm x 120cm
(ii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens type
reflective sheeting vide Clause 1701.2.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported
on dia GI Pipe firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete 450 mm
x 450 mm x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause 1701

Unit = sqm
Taking output = 1.50 sqm
i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M15 grade


As per item No.11.4 of Chapter 11
a)

b)

EE.,Dn.I, BMR

Labour (For fixing at site)

Material

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

242
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Add 3 per cent of cost of GI Pipe towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

hour

0.12

150.00

Each

1.80

6,295.64

cum

0.252

75.60

cum

0.252

1,954.25

sqm

1.84

64.60

Mate

day

0.02

100.00

Mazdoor (Unskilled)

day

0.50

80.00

cum

0.057

1,880.21

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 1.50 sqm = i+ii+a+b+c+d+e


Rate per sqm ( for sign having area more than 0.9
sqm) = (i+ii+a+b+c+d+e)/1.50
Size 150cm x 120cm
(iii) Providing and erecting direction and place identification retroreflectorised sign as per IRC:67 made of encapsulated lens
type reflective sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm
supported on RCC Posts 100 mm x 100 mm firmly fixed to the
ground by means of properly designed foundation with M 15
grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm
below ground level as per approved drawing and Technical
Specification Clause 1701

Unit = sqm
Taking output = 1.50 sqm
i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M15 grade


As per item No.11.4 of Chapter 11

iii)

Painting two coats including prime coat on concrete


surface with Epoxy Paint as per specifications
As per item No.10.7 of Chapter 10

a) Labour (For fixing at site)

b) Material
RCC M-15 Grade in Sub-structure
As per item No.12.5 of Chapter 12
Steel re-inforcement HYSD bars
As per item No.12.6 of Chapter 12

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

0.0154 37,815.75

SE.,Circle, Barmer

243
Sr.
No.

Reference to
MORD Specifications

Description
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint

Unit

Quantity

Rate
(Rs.)

sqm

1.50

4,500.00

hour

0.12

150.00

Each

1.80

6,047.32

cum

0.252

75.60

Add 3 per cent of cost of RCC Post towards cost of drilling


holes, nuts, bolts, etc.
c) Machinery
Tractor with trolley
d) Overheads @ 0% on (a+b+c)
e) Contractors profit @ 12.5% on (a+b+c+d)
Cost for 1.5 sqm = a+b+c+d+e
Rate per sqm (for sign having area more than 0.9 sqm) =
(a+b+c+d+e)/1.50
Size 150cm x 120cm
Note:

Lettering and arrow markings on sign boards to be provided


separately as per actual requirement. Rates for these items
have been analysed separately.

The rate for excavation, cement concrete M15, RCC M15 in


Sub-structure, steel re-inforcement and painting may be taken
from respective Chapters.

The depth of foundation and quantity of cement concrete in the


foundation are indicative. These may be increased for areas
having higher wind velocities like in coastal areas. This is
applicable to all road signs and directions boards.

B.

Semi-Reflective Traffic signs


Direction and place identification signs more than 0.90 sqm
sign board
Providing and erecting direction and place identification of semi
reflective sign boards as per IRC-67 made of 2 mm thick M.S.
Sheet duly stove enameled paint white colour in front and grey
colour on back with reflective border of 70 mm width and
required message, letters, figures with reflective tape of
engineering grade as per MORD specifications of required
shade and colour. Supported and welded on two nos. 47 mm x
47 mm of 12 SWG square tube of 3050 mm height duly
strengthened by 25 mm x 5 mm MS flat iron on edges on back
firmly fixed to the ground by means of properly designed
foundations with M-15 grade cement concrete 450 mm x 450
mm x 600 mm, 600 mm below ground level as per approved
drawing and Technical Specification Clause 1701

Unit = each
Taking output = 1.5 sqm
(i)

Excavation for foundations as


As per item no. 11.1 Chapter 11

(ii)

EE.,Dn.I, BMR

Cement Concrete M15 grade

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

244
Sr.
No.

Reference to
MORD Specifications

Description
As per item No.11.4 of Chapter 11

Unit

Quantity

Rate
(Rs.)

cum

0.252

1,954.25

sqm

0.92

64.60

Mate

day

0.02

100.00

Mazdoor (Unskilled)

day

0.50

80.00

(iii) Painting M.S. tube posts with primer and two coats of
epoxy paint as per specification
As per item No. 10.7 of chapter 10
a) Labour (fox fixing at site)

b) Material
i)

Support of MS Sheet tubes 47 mm x 47 mm x 12


SWG sheet 3050 mm long

kg

24.80

45.00

ii)

Angle iron 50 mm x 50 mm x 6 mm for lugs

kg

2.12

33.00

iii)

2 mm thick MS Sheet strengthened by 25 mm x 5


mm M.S. flat iron and painted with stove enameled
paint including lettering, signs, messages, border
with reflective tape of engineering grade of required
size, shade and colour as per MORD specifications

sqm

1.50

2,000.00

hour

0.16

150.00

Each

1.80

3,663.79

Mate

day

0.20

100.00

Painter (1st Class)

day

3.00

150.00

Add 3% cost of MS sheet and angle iron towards the


cost of fabrications, drilling, holes, nuts, bolts etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 1.5 sqm board = (i+ii+iii+a+b+c+d+e)


Rate per sqm = (i+ii+iii+a+b+c+d+e) / 1.5
Size 150cm x 120cm
Note: Rate for excavation cement concrete M15 and painting may be taken
from respective chapter
10.5

1700

Painting Two Coats on New Concrete Surfaces


Painting two coats including primer coat after filling the surface with
synthetic enamel paint in all shades on new, plastered / concrete
surfaces as per drawing and Technical Specification Clause 1701
Unit = sqm
Taking output = 40 sqm
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

245
Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)
b)

Unit

Quantity

Rate
(Rs.)

day

2.00

80.00

Cement Primer as per specifications

litre

3.00

20.00

Paint conforming to requirement of Clause 1701.3.8

litre

6.00

150.00

Mate

day

0.25

100.00

Painter (1st Class)

day

0.60

150.00

Mazdoor (Unskilled)

day

0.40

80.00

Red-oxide Primer as per specifications

litre

0.60

80.00

Paint ready mixed approved brand

litre

1.25

150.00

Material

Add for scaffolding @ 1 per cent of labour cost where required


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 40 sqm = a+b+c+d


Rate per sqm = (a+b+c+d)/40
10.6

1700

Painting on Steel Surfaces


Providing and applying two coats of ready mix paint including primer
coat of approved brand on steel surface after through cleaning of
surface to give an even shade as per drawing and Technical
Specification Clause 1701
Unit = sqm
Taking output = 10 sqm
a)

b)

Labour

Material

Add @ 1 per cent on cost of material for scaffolding wherever


required
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 sqm = a+b+c+d


Rate per sqm = (a+b+c+d)/10
10.7

1700

Painting on Concrete/Steel Surfaces with Epoxy


Painting two coats including prime coat with epoxy paint of approved
brand on concrete/steel surfaces after through cleaning of surface to
give an even shade as per drawing and Technical Specification
Clause 1701
Unit = sqm
Taking output = 10 sqm

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

246
Sr.
No.

Reference to
MORD Specifications

Description
a)

b)

Unit

Quantity

Rate
(Rs.)

Labour
Mate

day

0.25

100.00

Painter (1st Class)

day

0.60

150.00

Mazdoor (Unskilled)

day

0.40

80.00

Epoxy primer/Red-oxide

litre

0.60

80.00

Epoxy paint

litre

1.25

300.00

Mate

day

0.09

100.00

Painter 1st Class

day

0.55

150.00

Mazdoor (Unskilled)

day

1.55

80.00

litre

1.48

160.00

Material

Add @ 1 per cent on cost of material for scaffolding wherever


required
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 sqm = (a+b+c+d)


Rate per sqm = (a+b+c+d)/10
10.8

1700

Painting lines, Dashes, Arrows, etc. on Road in Two Coats on


New Work
Painting lines, dashes, arrows, etc. on roads in two coats on new
work with ready mixed road marking paint conforming to IS:164 on
bituminous/concrete surface, including cleaning the surface of all dirt,
dust and other foreign matter, demarcation at site and traffic control
as per drawing and Technical Specification Clause 1702

Assuming 100 mm width


Unit = sqm
Taking output = 10 sqm
a)

b)

Labour

Material
Road marking paint as per IS:164

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 sqm = a+b+c+d


Rate per sqm = (a+b+c+d)/10
10.9

EE.,Dn.I, BMR

1700

Painting lines, Dashes, Arrows, etc. on Roads in Two Coats on


Old Work

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

247
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Painting lines, dashes, arrows, etc. on roads in two coats on old work
with ready mixed road marking paint conforming to IS:164 on
bituminous/concrete surface, including cleaning the surface of all dirt,
dust and other foreign matter, demarcation at site and traffic control
as per drawing and technical specification Clause 1702

Assuming 100 cm width


Unit = sqm
Taking output = 10 sqm
a)

b)

Labour
Mate

day

0.06

100.00

Painter (Ist class)

day

0.30

150.00

Mazdoor (Unskilled)

day

1.25

80.00

litre

0.90

160.00

cum

2.35

1,880.21

kg

22.08

37.82

cum

1.68

75.60

sqm

9.85

44.90

Material
Road marking paint

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 sqm = a+b+c+d


Rate per sqm = (a+b+c+d)/10
10.10

1700
A)

Kilometre Stone
Reinforced cement concrete M15 grade kilometre stone/local stone
of standard design as per IRC:8 fixing in position including painting
and printing, etc as per drawing and Technical Specification Clause
1703
i)

5th Kilometre Stone (precast)


Unit = each
Taking output = 6 Nos.
a)

M-15 grade of concrete


As per item No.12.5 of Chapter 12

b)

Steel reinforcement @ 5 kg per sqm


As per item No.12.6 of Chapter 12

c)

Excavation in soil for foundation


As per item No.11.1 of Chapter 11

d)

Painting two coats on concrete surface


As per item No.10.5 of Chapter 10

e)

EE.,Dn.I, BMR

lettering on km post (average 30 letters of 10 cm height


each)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

248
Sr.
No.

Reference to
MORD Specifications

Description
As per item No.10.1 of Chapter 10

Unit
per cm
high
per litre

Quantity

Rate
(Rs.)

1,800.00

0.35

Transportation and fixing


f)

g)

Labour
Mate

day

0.26

100.00

Mason (1st Class)

day

0.60

180.00

Mazdoor (Unskilled)

day

6.00

80.00

hour

6.00

150.00

cum

3.77

1,880.21

kg

26.32

37.82

cum

2.77

75.60

sqm

11.41

44.90

1,680.00

0.35

Machinery
50 HP Tractor with trolley

h)

Overheads @ 0% on (f+g)

i)

Contractors profit @ 12.5% on (f+g+h)

Cost for 6 Nos. 5th km stone = a+b+c+d+e+f+g+h+i


Rate for each 5th km stone = (a+b+c+d+e+f+g+h+i)/6
ii)

Ordinary Kilometer Stone (Precast)


Unit = each
Taking output = 14 Nos.
a)

M15 grade of concrete


As per item No.12.5 of Chapter 12

b)

Steel reinforcement @ 5 kg per sqm


As per item No.12.6 of Chapter 12

c)

Excavation in soil for foundation


As per item No.11.1 of Chapter 11

d)

Painting two coats on concrete surface


As per item No.10.5 of Chapter 10

e)

lettering on km post (average 12 letters of 10 cm height


each)
As per item No.10.1 of Chapter 10

Transportation and fixing


f)

EE.,Dn.I, BMR

per cm
high
per
letter

Labour
Mate

day

0.32

100.00

Mason (1st Class)

day

1.00

180.00

Mazdoor (Unskilled)

day

7.00

80.00

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

249
Sr.
No.

Reference to
MORD Specifications

Description
g)

Unit

Quantity

Rate
(Rs.)

Machinery
50 HP Tractor with trolley

h)

Overheads @ 0% on (f+g)

i)

Contractors profit @ 12.5% on (f+g+h)

hour

6.00

150.00

cum

1.58

2,177.10

kg

66.00

37.82

cum

1.39

75.60

sqm

6.27

44.90

330.00

0.35

Cost for 14 Nos. ordinary km stone = (a+b+c+d+e+f+g+h+I)


Rate for each ordinary km stone = (a+b+c+d+e+f+g+h+i)/14
iii)

200 m stone (precast)


Unit = each
Taking output = 33 Nos.
a)

M15 grade of concrete


As per item No.12.5 of Chapter 12

b)

Steel reinforcement @ 5 kg per sqm


As per item No.12.6 of Chapter 12

c)

Excavation in soil for foundation


As per item No.11.1 of Chapter 11

d)

Painting two coats on concrete surface


As per item No.10.5 of Chapter 10

e)

lettering on km post (average 1 letter of 10 cm height


each)
As per item No. 10.1 of Chapter 10

Transportation and fixing


f)

g)

per cm
per
litreette
r

Labour
Mate

day

0.34

100.00

Mason (1st Class)

day

1.50

180.00

Mazdoor (Unskilled)

day

7.00

80.00

hour

6.00

150.00

Machinery
50 HP Tractor with trolley

h)

Overheads @ 0% on (f+g)

i)

Contractors profit @ 12.5% on (f+g+h)

Cost for 33 Nos. 200 m stone = (a+b+c+d+e+f+g+h+I)


Rate for each 200 m stone = (a+b+c+d+e+f+g+h+i)/33

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

250
Sr.
No.

Reference to
MORD Specifications

B)

Description

Unit

Quantity

Rate
(Rs.)

Cut Stone kilometre stone/local stone of standard design as per IRC:8


fixing in position including painting and printing, etc as per drawing
and Technical Specification Clause 1703
i)

5th Kilometre Stone


Unit = each
Taking output = 6 Nos.
a)

Cut stone (Three line Dressed)

b)

Excavation in soil for foundation


As per item No.11.1 of Chapter 11

c)

1.14

5,000.00

cum

1.68

75.60

sqm

9.85

1.40

1,800.0

0.35

Painting two coats on concrete surface


As per item No.10.5 of Chapter 10

d)

cum

lettering on km post (average 30 letters of 10 cm height


each)
As per item No.10.1 of Chapter 10

per cm
high
per litre

Transportation and fixing


f)

g)

Labour
Mate

day

0.26

100.00

Mason (1st Class)

day

0.60

180.00

Mazdoor (Unskilled)

day

6.00

80.00

hour

6.00

150.00

cum

0.68

4,600.00

cum

2.77

0.00

sqm

11.41

44.90

Machinery
50 HP Tractor with trolley

h)

Overheads @ 0% on (f+g)

i)

Contractors profit @ 12.5% on (f+g+h)

Cost for 6 Nos. 5th km stone = a+b+c+d+e+f+g+h+i


Rate for each 5th km stone = (a+b+c+d+e+f+g+h+i)/6
ii)

Ordinary Kilometer Stone )


Unit = each
Taking output = 14 Nos.
a)

Cut stone (Three line Dressed)

b)

Excavation in soil for foundation


As per item No.11.1 of Chapter 11

c)

Painting two coats on concrete surface


As per item No.10.5 of Chapter 10

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

251
Sr.
No.

Reference to
MORD Specifications

Description
d)

Transportation and fixing

g)

Quantity

Rate
(Rs.)

lettering on km post (average 12 letters of 10 cm height


each)
As per item No.10.1 of Chapter 10

f)

Unit

per cm
high
per
letter

1,680.0

0.35

Labour
Mate

day

0.32

100.00

Mason (1st Class)

day

1.00

180.00

Mazdoor (Unskilled)

day

7.00

80.00

hour

6.00

150.00

cum

0.32

4,400.00

cum

1.39

0.00

sqm

6.27

44.90

330.00

0.35

Machinery
50 HP Tractor with trolley

h)

Overheads @ 0% on (f+g)

i)

Contractors profit @ 12.5% on (f+g+h)

Cost for 14 Nos. ordinary km stone = (a+b+c+d+e+f+g+h+I)


Rate for each ordinary km stone = (a+b+c+d+e+f+g+h+i)/14
iii)

200 m stone
Unit = each
Taking output = 33 Nos.
a)

Cut stone (Three line Dressed)

b)

Excavation in soil for foundation


As per item No.11.1 of Chapter 11

c)

Painting two coats on concrete surface


As per item No.10.5 of Chapter 10

d)

lettering on km post (average 1 letter of 10 cm height


each)
As per item No. 10.1 of Chapter 10

Transportation and fixing


f)

g)

Labour
Mate

day

0.34

100.00

Mason (1st Class)

day

1.50

180.00

Mazdoor (Unskilled)

day

7.00

80.00

hour

6.00

150.00

Machinery
50 HP Tractor with trolley

EE.,Dn.I, BMR

per cm
per
litreette
r

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

252
Sr.
No.

Reference to
MORD Specifications

Description
h)

Overheads @ 0% on (f+g)

i)

Contractors profit @ 12.5% on (f+g+h)

Unit

Quantity

Rate
(Rs.)

Cost for 33 Nos. 200 m stone = (a+b+c+d+e+f+g+h+I)


Rate for each 200 m stone = (a+b+c+d+e+f+g+h+i)/33

Note:

10.11

1700
A)

The rate for excavation, cement concrete, steel reinforcement,


painting and lettering may be taken from respective Chapters.

In case local stone is to be used in place of precast RCC


stones, then rate of cement concrete and steel reinforcement
may be deleted.

Boundary Pillar
Reinforced cement concrete M15 grade boundary pillars/local stone
of standard design as per IRC:25, fixed in position including finishing
and lettering but excluding painting as per drawing and Technical
Specification Clause 1704
Unit = each
Taking output = 57 Nos.
a)

M-15 grade of Concrete


As per Item No. 12.5 of Chapter 12

b)

1,880.21

kg

79.80

37.82

cum

10.72

75.60

2,280.00

0.35

Excavation in soil
As per Item No. 11.1 of Chapter 11

d)

1.25

Steel reinforcement
As per Item No. 12.6 of Chapter 12

c)

cum

lettering, each 10 cm high


As per Item No. 10.1 of Chapter 10

per litre
per cm
high

Transportation and fixing


e)

f)

Labour
Mate

day

0.57

100.00

Mazdoor (Unskilled)

day

14.25

80.00

hour

6.00

150.00

cum

11.97

100.00

Machinery
Tractor with trolley

g)

Material
Stone spall

EE.,Dn.I, BMR

h)

Overheads @ 0% on (e+f+g)

i)

Contractors profit @ 12.5% on (e+f+g+h)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

253
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Cost for 57 Nos. boundary pillar = a+b+c+d+e+f+g+h+i


Rate for each boundary pillar = (a+b+c+d+e+f+g+h+i)/57

B).

Cut Stone boundary pillars/local stone of standard design as per


IRC:25, fixed in position including finishing and lettering but excluding
painting as per drawing and Technical Specification Clause 1704

Unit = each
Taking output = 57 Nos.
a)

Cut stone (Three line Dressed)

b)

M-15 grade of Concrete

cum

1.25

4,400.00

cum

10.72

0.00

2,280.0

0.35

Excavation in soil
c)

As per Item No. 11.1 of Chapter 11


lettering, each 10 cm high

d)

As per Item No. 10.1 of Chapter 10

per litre
per cm
high

Transportation and fixing


e)

f)

Labour
Mate

day

0.57

100.00

Mazdoor (Unskilled)

day

14.25

80.00

hour

6.00

150.00

cum

11.97

100.00

Machinery
Tractor with trolley

g)

Material
Stone spall

h)

Overheads @ 0% on (e+f+g)

i)

Contractors profit @ 12.5% on (e+f+g+h)

Cost for 57 Nos. boundary pillar = a+b+c+d+e+f+g+h+i


Rate for each boundary pillar = (a+b+c+d+e+f+g+h+i)/57

Note:

10.12

EE.,Dn.I, BMR

In case of soft ground, a proper foundation may be provided as


per approved design. In case foundation is required to be
provided, the items of excavation and foundation concrete are
required to be measured and paid separately.

In case local stone is to be used in place of precast RCC


stones, then rate of cement concrete and steel reinforcement
may be deleted.

1700, 800 G.I Barbed Wire Fencing 1.2 m high


& 300

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

254
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Providing and fixing 1.2 m high GI barbed wire fencing with 1.8 m
RCC posts 150 mm x 150 mm placed every 3 m centre-to-centre
founded in M15 grade cement concrete, 0.6 m below ground level,
every 15th post, last but one end post and corner post shall be
strutted on both sides and end post on one side only and provided
with 9 horizontal lines and 2 diagonals interwoven with horizontal
wires, fixed with GI staples, turn buckles etc. complete as per Clause
1705.
Unit = per running m
Taking output = 30 m
a)

b)

Labour
Mate

day

0.09

100.00

Blacksmith

day

0.25

120.00

Mazdoor (Unskilled)

day

2.00

80.00

kg

31.42

45.00

cum

0.526

1,880.21

Material
Barbed wire 335 m length @ 9.38 kg per 100 m
R.C.C. Post 150 mm x 150 mm x 1.80 m
M15 Grade concrete
13 x 150 mm x 150 mm x 1.8 m
Rate as per item No.12.5 of Chapter 12
Add 5 per cent extra cost for formwork of M-15
Supply of HYSD Bars including cutting, bending, tying & placing
in position.
10 mm dia HYSD bars for posts
13 x 4 x 1.8 = 93.6 m @ 0.62 kg/mt =

43.60 kg

8 mm dia HYSD bars for rings


13 x 10 x 0.6 = 78 m @ 0.39 kg/mt =
Total

30.42 kg
74.02 kg

As per item No.12.6 of Chapter 12

0.074 37,815.75

Add for GI staple binding wire, drilling holes, etc. @ 2 per cent
of the cost of material
c)

Painting
Applying two coats of painting including primer coat on exposed
surface of RCC posts
As per item No.10.5 of this Chapter

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

sqm

8.14

44.90

Cost for 30 m fencing = a+b+c+d+e


EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

255
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Rate per m = (a+b+c+d+e)/30


Note: Cost of excavation for foundation and foundation concrete to be
added separately in the cost estimate as per approved design. The
rate for these items may be taken from respective Chapters.
10.13

1700, 800 G.I Barbed Wire Fencing 1.8 m high


& 300
Providing and fixing 1.8 m high GI barbed wire fencing with 2.4 m
RCC M15 grade 150 mm x 150 mm concrete post placed every 3 m
centre-to-centre founded in M15 grade cement concrete, 0.6 m below
ground level, every 15th post, last but one end post and corner post
shall be strutted on both sides and end post on one side only and
provided with 12 horizontal lines and 2 diagonals interwoven with
horizontal wires, fixed with GI staples, turn buckles etc. complete as
per Clause 1705.
Unit = per running m
Taking output = 30 m
a)

b)

Labour
Mate

day

0.12

100.00

Blacksmith

day

0.40

120.00

Mazdoor (Unskilled)

day

2.50

80.00

kg

40.15

45.00

cum

0.702

1,880.21

Material
Barbed wire 428 m length @ 9.38 kg per 100 m
R.C.C. Post 150 mm x 150 mm x 2.4 m
High M-15 Grade
13 x 150 mm x 150 mm x 2.4 m
As per item No.12.5 of Chapter 12
Add 5 per cent extra cost of C.C. for formwork of M-15
Supply of HYSD Bars including cutting, bending, tying & placing
in position.
10 mm dia HYSD bars for posts
13 x 4 x 2.4 =

124.80 m

@ 0.62 kg/mt =

77.38 kg

8 mm dia HYSD bars for rings


13 x 11 x 0.6 =

85.80 m

@ 0.39 kg/m =

33.46 kg

Total

110.84 kg

As per item No.12.6 of Chapter 12

0.111 37,815.75

Add for GI staple, binding wire, drilling holes etc. @ 2 per cent
of the cost of material

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

256
Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Painting
Applying two coats of painting including prime coat on exposed
surface of RCC posts
As per item No.10.5 of this Chapter

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

sqm

12.10

44.90

cum

1.296

75.600

cum

0.648 1,961.973

Cost for 30 m fencing = a+b+c+d+e


Rate per m fencing = (a+b+c+d+e)/30
Note: Cost of excavation for foundation and foundation concrete to be
added separately in the cost estimate as per approved design. The
rate for these items may be taken from respective Chapters.
10.14

1700, 800 Tubular Steel Railing on Medium Weight Steel Channel (ISMC
&300
series) 100 mm x 50 mm
Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows
duly painted on medium weight steel channels (ISMC series) 100 mm
x 50 mm, 1.2 m high above ground, 2 m centre-to-centre, complete
as per approved drawings Clause 1706
Unit = Running m
Taking output = 10 m
i)

Excavation for foundation (6 Nos.) 6 x 0.6 x 0.6 x 0.6


As per item No.11.1 of Chapter 11

ii)

Foundation concrete M-15 grade PCC 6 x 0.6 x 0.6 x 0.3


As per item No. 11.4 of Chapter 11

iii)

Painting of pipe
As per item No.10.6 of this Chapter

iv)

sqm

4.71

43.296

sqm

2.16

43.296

Mate

day

0.01

100.00

Mazdoor (Unskilled)

day

0.25

80.00

Plumber

day

0.01

150.00

Steel pipe 50 mm external dia as per IS:1239

30.00

150.00

Medium weight steel channel (ISMC series) 100 mm x 50


mm, 10.8 m length @ 9.2 kg per m including 5 per cent
wastage

kg

104.33

33.00

Painting of channel section (6 nos.)


1.8 m each 0.2 x 1.8 x 1.6 = 2.16
As per item No.10.6 of this Chapter
a)

b)

EE.,Dn.I, BMR

labour (For fixing at site)

Material

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

257
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Add for drilling holes @ 3 per cent of cost of channels


c)

Machinery
50 HP Tractor with trolley

hour

0.06

150.00

cum

1.296

75.600

cum

0.648 1,961.973

sqm

0.33 2,314.800

sqm

4.71

43.296

Mate

day

0.014

100.00

Mazdoor (Unskilled)

day

0.35

80.00

Plumber

day

0.01

150.00

Steel pipe 50 mm dia as per IS:1239

30.00

150.00

HYSD steel bars as per item No.12.6 of Chapter 12

0.032 37,815.75

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 10 m = a+b+c+d+e


Rate per m = (a+b+c+d+e)/10
10.15

1700, 800 Tubular Steel Railing on Precast RCC posts, 1.2 m high above
& 300
Ground Level
Providing, fencing and erecting 50 mm dia painted steel pipe railing in
3 rows on precast M-20 grade RCC vertical posts 175 mm x 175 mm
x 1.8 m high (1.2 m above Gl) with 3 holes 50 mm dia for pipe, fixed
2 m centre-to- centre complete as per approved drawings Clause
1706
Unit = Running m
Taking output = 10 m
i)

Excavation for foundation (6 Nos.) 6 x 0.6 x 0.6 x 0.6


As per item No.11.1 of Chapter 11

ii)

Foundation concrete M15 grade PCC 6 x 0.6 x 0.6 x 0.3


As per item No. 11.4 of Chapter 11

iii)

RCC M20 for precast posts (6 nos.) of 1.8 m each


As per item No.12.5 of Chapter 12

iv)

Painting of pipe
As per item No.10.6 of this Chapter
a)

b)

c)

Labour

Material

Machinery
50 HP Tractor with trolley

d)
EE.,Dn.I, BMR

hour

0.25

150.00

Overheads @ 0% on (a+b+c)

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

258
Sr.
No.

Reference to
MORD Specifications

Description
e)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 10 m = a+b+c+d+e


Rate per m = (a+b+c+d+e)/10
10.16

1700

Providing and Fixing 'Logo' of PMGSY Project


Providing and fixing of typical PMGSY informatory sign board with
Logo as per MORD specifications and drawing. Three MS Plates of
1.6 mm thick, top and middle plate duly welded with MS flat iron
25mm x 5m size on back on edges. The lower plate will be welded
with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron
frame of the lower most plate and flat iron frame of middle plate will
be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts
duly embedded in cement concrete M-15 grade blocks of 450mm x
450mm x 600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by 47mm x 47mm of 12
SWG steel plate tube. All M.S. will be stove enameled on both sides.
Lettering and printing arrows, border etc. will be painted with ready
mixed synthetic enamel paint of superior quality in required shade and
colour. All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing Clause 1701 and
Annexure 1700.1

Unit = Each
Taking out put = one typical board
(i)

Excavation for foundations


As per item No. 11.1 of Chapter 11

(ii)

cum

0.252

75.600

cum

0.252 1,961.973

Cement Concrete M15 grade


As per item No. 11.4 of Chapter 11

(iii)

Painting on MS Steel tubes with primer and two coats of


epoxy paint
2x2.05x.30 = 1.23
1x1.10x188 = 0.21
As per item no. 10.7 of Chapter 10

iv)

sqm

1.80

64.60

Printing new letters and figures of any shade with synthetic


enamel paint black or any other approved colour to give an
even shade.
Logo Border 60x4x5 = 1200 per cm height per letter
Figure 60x10 = 600 per cm height per letter
Middle plate words 28x5 = 140 per cm height per letter
Bottom plate border 150x2x5 = 1500 per cm height per letter
Bottom plate border 60x2x5 = 600 per cm height per letter
Words 101x2.5 = 252.5
Words 80x3 = 240.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

259
Sr.
No.

Reference to
MORD Specifications

Description
Total

Quantity

Rate
(Rs.)

4532.5 per cm height per letter

As per item No.10.1 of Chapter 10

a)

Unit

per cm
height
per litre

4,532.50

0.35

Labour (for fixing at site)


Mate

day

0.03

100.00

Mazdoor (Unskilled)

day

0.75

80.00

2 nos. MS tubes 75mx75mm of 12 SWG sheet 2650 mm


long

kg

63.15

45.00

1 No. MS tube 47mm x 47mm of 12 SWG 1100 mm long

kg

4.47

45.00

Angle iron 50mm x 50mm x 5 mm for lugs

kg

2.12

33.00

sqm

1.44

900.00

hour

0.24

150.00

Mate

day

0.02

100.00

Mazdoor (Unskilled)

day

0.50

80.00

Nos.

68.00

450.00

b)

Material

1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat


iron on logo and middle plate angle iron 25mm x 25mm x
5mm on bottom plate painting with stove enameled paint
on both sides as per MORD specifications

Add 3% cost of MS tube and angle iron towards the cost of


fabrications, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for one Board= (i+ii+iii+iv+a+b+c+d+e)


Note: Printing and lettering for blank spaces on the lower plate will be
written as required and paid seperately.
10.17 Suggestiv Traffic Cone
e
Provision of red fluorescent with white reflective sleeve traffic cone
made of Low Density Polyethylene (LDPE) material with a square
base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight,
placed at 1.5 m interval, all as per BS:873
Unit = Each
Taking output = 68 Nos.
a)

b)

Labour

Material
Traffic cones with 150 mm reflective sleeve

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

260
Sr.
No.

Reference to
MORD Specifications

Description
c)

Unit

Quantity

Rate
(Rs.)

Machinery
50 HP Tractor with trolley

Hour

0.10

150.00

Mate

day

0.04

100.00

Mazdoor (Unskilled)

day

1.00

80.00

Nos.

50.00

150.00

sqm

0.27

4,500.00

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost for 68 Nos. = a+b+c+d+e


Rate for each cone = (a+b+c+d+e)/68
10.18 Suggestiv Road Markers/Road Stud with Lens Reflector
e
Providing and fixing of road stud 100 x 100 mm die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors,
installed in concrete or asphaltic surface by drilling holes 30 mm upto
a depth of 600 mm and bedded in a suitable bituminous grout or
epoxy mortar, all as per BS:873 (Part 4) 1973.

Unit = each
Taking output = 50 Nos.
(a)

(b)

Labour

Material
Aluminium studs 100x100 mm fitted with lense reflectors
Add 10 per cent of cost of material for fixing and installation.

(c)

Contractors profit @ 0% on (a+b+c)

(d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 50 studs = a+b+c+d


Rate per stud = (a+b+c+d)/50

10.19

Defination plate on curve Board


(1) Providing and fixing of retro-reflectorised Defination Plate made
of Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size including lettering and signs as
applicable background with epoxy paint 1.5 mm thick with
25mm x5mm flat firmy fixed to angle of board by nuts &bolt
etc.Of size 450x600mm

Aluminium sheeting fixed with encapsulated lens


type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Add 3 per cent towards cost of fabrication, drilling
holes, nuts, bolts, etc.
Overheads @ 0% on (a+b+c)

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

261
Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c+d)

(2) Providing and fixing of retro-reflectorised Defination Plate made


of semi reflective sign boards made of 2 mm thick M.S. Sheet
duly stove enameled paint white colour in front and grey colour
on back with reflective border of 25 mm width and required
message, letters, figures with reflective tape of engineering
grade as per MORD specifications of required shade and
colour. Supported and welded strenthened by 25 mm x 5 mm
MS flat iron.Of size 450x600mm

2 mm thick M.S. Sheet duly stove enameled paint


white colour in front and grey colour on back with
reflective border of 25 mm width and required
message, letters, figures with reflective tape of
engineering grade as per MORD specifications of
required shade and colour. Supported and welded
duly strengthened by 25 mm x 5 mm MS flat iron

sqm

0.27

1,500.00

cum

0.126

75.60

cum

0.126

1,961.97

sqm

0.887

0.00

day

0.01

100.00

Add 3 per cent of cost of towards cost of fabrication,


drilling holes, nuts, bolts, etc.
Overheads @ 0% on (a+b+c)
Contractors profit @ 12.5% on (a+b+c+d)

10.22

PMGSY LOGO Board


A.

Retro-reflectorised Traffic Signs


(1) Providing and fixing of retro-reflectorised PMGSY logo with
Defination plate(as per MORD design /Drawing) made of
encapsulated lens type reflective sheeting vide Clause 1701.2.3
fixed over aluminium sheeting, 1.5 mm thick supported on a
mild steel angle iron post 75 mm x 75 mm x 6 mm,Size of
Diamond plate 600x600mm,Defination Plate 900x250mm firmly
fixed to the ground by means of properly designed foundation
with M15 grade cement concrete 450 mm x 450 mm x 600 mm,
600 mm below ground level as per drawings and Technical
Specification Clause 801
Unit = each

i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M15 grade


As per item No.11.4 of Chapter 11

iii)

Painting Angle Iron Post with Primer and two coats of


Epoxy Paint as per specifications
As per item No.10.7 of this Chapter
a)

labour (For fixing at site)


Mate

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

262
Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)
b)

Unit

Quantity

Rate
(Rs.)

day

0.25

80.00

kg

20.50

32.00

sqm

0.585

4,500.00

hour

0.08

150.00

cum

0.126

75.60

cum

0.126

1,961.97

sqm

0.887

0.00

day

0.01

100.00

Material
Mild steel angle iron 75 x 75 x 6 mm
Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and
signs as applicable background with epoxy paint
Logo
600x600mm=0.36Sqm
Defination Plate 900x250mm=0.225 Sqm

Add 3 per cent of cost of angle iron towards cost of


fabrication, drilling holes, nuts, bolts, etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)


B.

Semi Reflective Traffic Signs


(1) Providing and fixing of semi reflective PMGSY LOGO with
Defination Plate (as per MORD design/Drawing )made of 2 mm
thick MS Sheet framed to angle iron 47x47x12SWG sheet tube
on M.S. post of angle iron size 75x75x6mm 3050mm long duly
stove Luminious orange colour in front and gray colour on back
with reflective border of 65 mm width and required letters and
figures with reflective tape engineering grade as per Clause
1701.3.9 of MORD for Rural Roads of required shade and
colour with diomond plate 600x600mm, Defination Plate
900x250mm firmly fixed to the ground by mean of properly
designed foundations with M-15 grade cement concrete
450x450x600 mm, 600 mm below ground level as per approved
drawing Clause 1701.2.2

Unit = each

i)

Excavation for foundation


As per item No.11.1 of Chapter 11

ii)

Cement concrete M15 grade


As per item No.11.4 of Chapter 11

iii)

Painting Angle Iron Post with Primer and two coats of


Epoxy Paint as per specifications
As per item No.10.7 of this Chapter
a)

labour (For fixing at site)


Mate

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

263
Sr.
No.

Reference to
MORD Specifications

Description
Mazdoor (Unskilled)
b)

Unit

Quantity

Rate
(Rs.)

day

0.25

80.00

kg

20.50

32.00

sqm

0.585

1,500.00

hour

0.08

150.00

Material
Mild steel angle iron 75 x 75 x 6 mm
2 mm thick MS Sheet framed to angle iron
47x47x12SWG sheet tube on M.S. post of angle iron
size 75x75x6mm 3050mm long duly stove Luminious
orange colour in front and gray colour on back with
reflective border of 65 mm width and required letters
and figures with reflective tape engineering gradeof
required shade and colour with diomond plate
600x600mm, Defination Plate 900x250mm

Add 3% cost of MS Sheet tube 12 SWG and angle


irons towards the cost of fabrication, drilling holes,
nuts and bolts etc.
c)

Machinery
Tractor with trolley

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per traffic sign = (i+ii+iii+a+b+c+d+e)

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

264

Chapter 10

, MARKINGS AND OTHER ROAD APPURTENANCES


Amount
(Rs.)

12.00
300.00
80.00

105.00
0.00
62.13
559.13
0.35

7.00
187.50
40.00

75.00
0.00
38.69
348.19

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

265
Amount
(Rs.)
0.22

9.53

246.24

57.30

1.00
20.00

660.00
1,575.00

67.05

12.00
0.00
331.01
2,979.13

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

266
Amount
(Rs.)

334.06
660.00
702.00

40.86

12.00
0.00
218.62
1,967.54

334.06
660.00
1,273.50

58.01

12.00
0.00
292.20
2,629.76

334.06
660.00
2,160.00

84.60

12.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

267
Amount
(Rs.)
0.00
406.33
3,656.99

334.06
660.00
1,215.00

56.25

12.00
0.00
284.66
2,561.98

334.06
660.00
1,620.00

68.40

12.00
0.00
336.81
3,031.27

334.06
660.00
3,024.00

110.52

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

268
Amount
(Rs.)

12.00
0.00
517.57
4,658.15

9.53

246.24

1.00
20.00

450.00
1,575.00

60.75

12.00
0.00
296.81
2,671.33

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

269
Amount
(Rs.)
276.76
450.00
702.00

34.56

12.00
0.00
184.42
1,659.74

276.76
450.00
1,273.50

51.71

12.00
0.00
258.00
2,321.96

276.76
450.00
2,160.00

78.30

12.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

270
Amount
(Rs.)
0.00
372.13
3,349.19

276.76
450.00
1,215.00

49.95

12.00
0.00
250.46
2,254.18

276.76
450.00
1,620.00

62.10

12.00
0.00
302.61
2,723.47

276.76
450.00
3,024.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

271
Amount
(Rs.)
104.22

12.00
0.00
483.37
4,350.35

9.53

246.24

58.14

1.00
20.00

53.59

309.37
1,575.00

58.14

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

272
Amount
(Rs.)

12.00
0.00
292.87
2,635.87

697.86
702.00

21.06

12.00
0.00
179.12
1,612.04

697.86
1,273.50

38.21

12.00
0.00
252.70
2,274.26

697.86
2,160.00

64.80

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

273
Amount
(Rs.)

12.00
0.00
366.83
3,301.49

697.86
1,215.00

36.45

12.00
0.00
245.16
2,206.47

697.86
1,620.00

48.60

12.00
0.00
297.31
2,675.77

697.86
3,024.00

90.72

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

274
Amount
(Rs.)
12.00
0.00
478.07
4,302.65

9.53

246.24

29.72

1.00
20.00

558.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

275
Amount
(Rs.)

34.98
525.00

33.54

12.00
0.00
183.75
1,653.75

899.46
234.00

7.02

12.00
0.00
144.06
1,296.54

899.46
424.50

12.74

12.00
0.00
168.59
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

276
Amount
(Rs.)
1,517.28

899.46
720.00

21.60

12.00
0.00
206.63
1,859.69

899.46
405.00

12.15

12.00
0.00
166.08
1,494.68

899.46
540.00

16.20

12.00
0.00
183.46
1,651.11

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

277
Amount
(Rs.)
899.46
1,008.00

30.24

12.00
0.00
243.71
2,193.41

9.53

246.24

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

278
Amount
(Rs.)
57.30

1.00
20.00

660.00
4,050.00

141.30

12.00
0.00
610.54
5,807.90
6,453.22

334.06

660.00
3,037.50

110.93

12.00
0.00
519.31
4,673.80

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

279
Amount
(Rs.)
334.06

660.00
2,430.00

92.70

12.00
0.00
441.10
3,969.86

334.06

660.00
1,518.75

65.36

12.00
0.00
323.77
2,913.95

334.06

660.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

280
Amount
(Rs.)
1,215.00

56.25

12.00
0.00
284.66
2,561.98

9.53

246.24

1.00
20.00

450.00
4,050.00

13.50

12.00
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

281
Amount
(Rs.)
0.00
568.31
5,370.57
5,967.30

276.76

450.00
3,037.50

104.63

12.00
0.00
485.11
4,366.00

276.76

450.00
2,430.00

86.40

12.00
0.00
406.90
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

282
Amount
(Rs.)
3,662.06

276.76

450.00
1,518.75

59.06

12.00
0.00
289.57
2,606.15

276.76

450.00
1,215.00

49.95

12.00
0.00
250.46
2,254.18

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

283
Amount
(Rs.)

9.53

239.58

58.14

1.00
20.00

53.59

291.18
4,050.00

12.00
0.00
553.47
5,288.49

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

284
Amount
(Rs.)
5,876.10

673.02

3,037.50

12.00
0.00
465.31
4,187.83

673.02

2,430.00

12.00
0.00
389.38
3,504.39

673.02

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

285
Amount
(Rs.)
1,518.75

12.00
0.00
275.47
2,479.24

673.02

1,215.00

12.00
0.00
237.50
2,137.52

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

286
Amount
(Rs.)

9.53

246.24

38.11

1.00
20.00

558.00
34.98
1,800.00

71.79

12.00
0.00
312.22
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

287
Amount
(Rs.)
3,103.87
3,448.74

314.88

558.00
34.98
1,350.00

58.29

12.00
0.00
291.02
2,619.16

314.88

558.00
34.98
1,080.00

50.19

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

288
Amount
(Rs.)

12.00
0.00
256.26
2,306.30

314.88

558.00
34.98
675.00

38.04

12.00
0.00
204.11
1,837.01

314.88

558.00
34.98

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

289
Amount
(Rs.)
540.00

33.99

12.00
0.00
186.73
1,680.58

19.05

492.47

114.60

2.00
40.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

290
Amount
(Rs.)
1,320.00
6,750.00

242.10

18.00
0.00
1,046.51
10,044.74
6,696.49
12,053.68

19.05

492.47

2.00
40.00

900.00
6,750.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

291
Amount
(Rs.)
229.50

18.00
0.00
992.44
9,443.46
6,295.64
11,332.15

19.05

492.47

118.87

2.00
40.00

107.17

582.36

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

292
Amount
(Rs.)
6,750.00

3.22

18.00
0.00
937.84
9,070.98
6,047.32
10,885.18

19.05

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

293
Amount
(Rs.)
492.47

59.43

2.00
40.00

1,116.00
69.96
3,000.00

125.58

24.00
0.00
547.19
5,495.69
3,663.79
6,594.82

20.00
450.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

294
Amount
(Rs.)
160.00

60.00
900.00
6.30
0.00
199.54
1,795.84
44.90

25.00
90.00
32.00

48.00
187.50
2.36
0.00
48.11
432.96
43.30

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

295
Amount
(Rs.)

25.00
90.00
32.00

48.00
375.00
4.23
0.00
71.78
646.01
64.60

9.00
82.50
124.00

236.80
0.00
56.54
508.84
50.88

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

296
Amount
(Rs.)

6.00
45.00
100.00

144.00
0.00
36.88
331.88
33.19

4,418.50

834.97

127.01

442.22

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

297
Amount
(Rs.)
629.02

26.00
108.00
480.00

900.00
0.00
189.25
8,154.97
1,359.16

7,088.40

995.31

209.41

512.26

587.08

32.00
180.00
560.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

298
Amount
(Rs.)

900.00
0.00
209.00
11,273.47
805.25

3,439.82

2,495.84

105.08

281.50

115.32

34.00
270.00
560.00

900.00
0.00
220.50
8,422.06
255.21

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

299
Amount
(Rs.)

5,700.00

127.01

13.79

629.02

26.00
108.00
480.00

900.00
0.00
285.48
8,269.29
1,378.22

3,128.00

0.00

512.26

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

300
Amount
(Rs.)

587.08

32.00
180.00
560.00

900.00
0.00
346.42
6,245.76
446.13

1,408.00

0.00

281.50

115.32

34.00
270.00
560.00

900.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

301
Amount
(Rs.)
0.00
446.10
4,014.92
121.66

2,350.27

3,017.70

810.43

796.75

57.00
1,140.00

900.00

1,197.00
0.00
411.75

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

302
Amount
(Rs.)
10,680.90
187.38

5,500.00

0.00

796.75

57.00
1,140.00

900.00

1,197.00
0.00
1,198.84
10,789.60
189.29

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

303
Amount
(Rs.)

9.00
30.00
160.00

1,413.90

988.99
49.45

2,798.37

365.45
0.00
726.89
6,542.05
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

304
Amount
(Rs.)
218.07

12.00
48.00
200.00

1,806.75

1,319.91
66.00

4,197.55

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

305
Amount
(Rs.)

543.24
0.00
1,024.18
8,957.62
298.59

97.98

1,271.36

203.93

93.52

1.00
20.00
1.50

4,500.00
3,442.89

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

306
Amount
(Rs.)
238.29

9.00
0.00
1,026.58
9,239.26
923.93

97.98

1,271.36

763.88

203.93

1.40
28.00
1.50

4,500.00
1,210.10

37.50
0.00
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

307
Amount
(Rs.)
722.31
8,837.96
883.80

19.05

494.42

116.28

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

308
Amount
(Rs.)

1,583.90

3.00
60.00

2,841.75
201.15
69.96
1,296.00

132.27

36.00
0.00
580.02
7,433.79

2.00
40.00

30,600.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

309
Amount
(Rs.)

15.00
0.00
3,832.13
34,489.13
507.19

4.00
80.00

7,500.00
750.00
0.00
1,041.75
9,375.75
187.52

1,215.00

36.45
0.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

310
Amount
(Rs.)
156.43
1,407.88

405.00

12.15
0.00
52.14
469.29

9.53

247.21

0.00

1.00
EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

311
Amount
(Rs.)
20.00

656.00
2,632.50

98.66

12.00
0.00
459.61
3,879.77

9.53

247.21

0.00

1.00

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

312
Amount
(Rs.)
20.00

656.00
877.50

46.01

12.00
0.00
233.65
1,846.16

EE.,Dn.I, BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

262

Chapter 11
FOUNDATION
Sr.
No.

Reference to
MORD Specifica - tions

11.1

300

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Excavation for Structures


Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material.

I.

Ordinary soil
(i)

Upto 3 m depth
Unit = cum
Taking output = 10 cum
a)

Labour
Mate

day

0.32

100.00

32.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

84.00

Cost for 10 cum = a+b+c

756.00

Rate per cum = (a+b+c)/10


Note:

75.60

Cost of dewatering may be added, where required, up to 10


per cent of labour cost. Assessment for dewatering shall be
made as per site conditions.

The cost of shoring and shuttering, where needed, may be


added @ 3 per cent on cost of excavation for open foundation.

The excavated earth if found suitable, can be used partly for


backfilling in trenches & partly for road work. Hence cost of
disposal has not been added except for marshy soil. This note
is common to all cases of item 11.1 excluding 11.1 V

(ii)

3 m to 6 m depth
Unit = cum
a)

EE.,Dn.I,BMR

Labour
Mate

day

0.38

100.00

38.00

Mazdoor (Unskilled)

day

9.50

80.00

760.00

b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

TA to SE Circle BMR

0.00

AAO.,Circle, Barmer

99.75

SE.,Circle, Barmer

263

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

Quantity

Rate
(Rs.)

Cost for 10 cum = a+b+c

89.78

Cost of dewatering may be added, when needed, up to 15 per


cent of labour cost.

Cost of shoring and shuttering, where needed, may be taken


@ 10 per cent on cost of excavation for open foundation.

II.

(Rs.)
897.75

Rate per cum = (a+b+c)/10


Note:

Amount

Ordinary rock (not requiring blasting)


Upto 3 m depth
Unit = cum
Taking output = 10 cum
a)

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

105.00

Cost for 10 cum = a+b+c

945.00

Rate per cum = (a+b+c)/10

94.50

Note: Cost of dewatering upto 10 per cent of labour cost may be added,
where required as per site condition.
III.

Hard rock (requiring blasting)


Upto 3 m depth including 1.5 m depth in hard rock
Unit = cum
Taking output = 10 cum
a)

b)

Labour
Mate

day

0.53

100.00

53.00

Driller

day

0.84

150.00

126.00

Blaster

day

0.40

150.00

60.00

Mazdoor (Unskilled)

day

12.00

80.00

960.00

hour

1.00

194.00

194.00

kg

3.50

120.00

420.00

Machinery
Air compressor 210 cfm with 2 jack hammers for drilling

c)

Material
Gelatin 80%

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

264

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

Detonator electric

Nos.

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity
14.00

Rate
(Rs.)
10.00

Amount
(Rs.)
140.00
0.00
244.13

Cost for 10 cum = a+b+c+d+e

2,197.13

Rate per cum = (a+b+c+d+e)/10

219.71

Note: Cost of dewatering @ 10 per cent of (a+b) may be added, where


required as per site condition.
IV.

Hard rock (blasting prohibited)


Upto 3 m depth including 1.5 m depth in hard rock
Unit = cum
Taking output = 10 cum
a)

b)

Labour
Mate

day

0.20

100.00

20.00

Mazdoor (Unskilled)

day

5.00

80.00

400.00

hour

10.00

194.00

1,940.00

Machinery
Air compressor 210 cfm with 2 jack hammers of
pneumatic breaker

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

295.00

Cost for 10 cum = a+b+c+d

2,655.00

Rate per cum = a+b+c+d/10

265.50

Note: Cost of dewatering up to 10 per cent of (a+b) may be added, where


required as per site conditions.
V.

Marshy soil
Unit = cum
Taking output = 10 cum
a)

Labour
Mate

day

0.60

100.00

60.00

Mazdoor (Unskilled)

day

15.00

80.00

1,200.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

Cost for 10 cum = a+b+c

1,417.50

Rate per cum = (a+b+c)/10

EE.,Dn.I,BMR

TA to SE Circle BMR

157.50

141.75

AAO.,Circle, Barmer

SE.,Circle, Barmer

265

Sr.
No.

Reference to
MORD Specifica - tions

Description

Note:

11.2

300 & 1200

Unit

Cost of dewatering @ 30 per cent of (a) may be added.

Shoring and shuttering @ 15 per cent of (a) may be added


where required.

Since marshy soil cannot be used in filling in trenches, it shall


be removed and replaced by approved quality of soil. The
labour cost includes labour input for disposal of marshy soil
from excavated pit with a lead upto 50 m lead.

Marshy soil is generaly available upto 3 m depth. The rate


has, therefore, been done upto 3 m depth of excavation. For
deeper excavation refer analysis in item 11.1.

Quantity

Rate
(Rs.)

Amount
(Rs.)

Fillling in foundation trenches as per drawing and technical


specification Clause 305.3.9
I.

Sand filling
Unit = cum
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.30

80.00

24.00

cum

1.20

190.00

228.00

Material
Sand (assuming 20 per cent voids)

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

31.63

Rate per cum = a+b+c+d


II.

284.63

Earth filling (For marshy soil)


Unit = cum
Taking output = 6 cum
a)

Labour
Mate

day

0.20

100.00

20.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

Cost for 6 cum = a+b+c

292.50

Rate per cum = (a+b+c)/6

EE.,Dn.I,BMR

TA to SE Circle BMR

32.50

48.75

AAO.,Circle, Barmer

SE.,Circle, Barmer

266

Sr.
No.

Reference to
MORD Specifica - tions

Description

Note:

11.3

300 & 1200

Unit

Cost of transportation of good quality earth has not been


included. Only labour for carrying carted earth with a lead of
50 m to the foundation pits has been taken in the rate. The
cost of carted earth may be worked out separately if the same
is not available from the adjoining area.

Backfilling of foundation trenches shall normally be done with


excavated earth. The cost of this operation is included in item
11.1. Only in case the excavated earth is not of suitable
quality, sand filling or backfilling with carted earth may be
resorted to

Quantity

Rate
(Rs.)

Amount
(Rs.)

Filling annular space around footing in rock as per technical


specification Clause 1203.4.3.
Unit = cum
P.C.C grade M 15
Nominal mix 1:2.5:5
Unit = cum
a)

Material
Cement

b)

0.275

4,000.00

1,100.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Labour

c)

Formwork @ 4% on (a+b)

67.08

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Rate per cum = a+b+c+d+e


11.4

800 & 1200

0.00
218.00
1,961.97

Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
I.

P.C.C grade M 10
(i)

Nominal mix 1:3:6


Unit = cum

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

267

Sr.
No.

Reference to
MORD Specifica - tions

Description
a)

Unit

c)

Rate
(Rs.)

(Rs.)

0.250

4,000.00

1,000.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.576

310.00

178.56

20 mm aggregate

cum

0.288

390.00

112.32

10 mm aggregate

cum

0.096

400.00

38.40

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity
fitted with water measuring device and preferably
also with load cell.

d)

Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

65.01
0.00
211.27

Rate per cum = a+b+c+d+e+f


(ii)

Amount

Material
Cement

b)

Quantity

1,901.46

Nominal mix 1:3.6 (Hand mixing)


Unit = cum
a)

Material
Cement

b)

EE.,Dn.I,BMR

0.250

4,000.00

1,000.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.576

310.00

178.56

20 mm aggregate

cum

0.288

390.00

112.32

10 mm aggregate

cum

0.096

400.00

38.40

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

268

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

c)

Formwork @ 4% on cost of material (a) and


labour (b)

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

Quantity

Rate
(Rs.)

(Rs.)
65.27
0.00
212.13

Rate per cum = a+b+c+d+e


II.

Amount

1,909.18

P.C.C grade M 15
(i)

Nominal mix (1:2.5:5)


Unit = cum
a)

Material
Cement

b)

c)

0.275

4,000.00

1,100.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.08

100.00

8.00

Mason (1st Class0

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

66.81
0.00
217.14

Rate per cum = a+b+c+d+e+f


(ii)

1,954.25

Nominal mix 1:2.5:5 (Hand mixing)


Unit = cum
a)

Material
Cement

EE.,Dn.I,BMR

0.275

4,000.00

1,100.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

269

Sr.
No.

Reference to
MORD Specifica - tions

Description

b)

Unit

Quantity

Rate
(Rs.)

(Rs.)

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Labour

c)

Formwork @ 4% on (a+b)

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

67.08
0.00
218.00

Rate per cum = a+b+c+d+e


III.

Amount

1,961.97

P.C.C. grade M 20
(i)

Nominal mix (1:2:4)


Unit = cum
a)

Material
Cement

b)

c)

0.33

4,000.00

1,320.00

Sand

cum

0.45

190.00

85.50

40 mm aggregate

cum

0.36

310.00

111.60

20 mm aggregate

cum

0.36

390.00

140.40

10 mm aggregate

cum

0.18

400.00

72.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 4% on (a+b+c)

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Rate per cum = a+b+c+d+e+f

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

77.37
0.00
251.45
2,263.01

SE.,Circle, Barmer

270

Sr.
No.

Reference to
MORD Specifica - tions

Description
(ii)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Nominal mix 1:2:4 (Hand mixed)


Unit = cum
a)

Material
Cement

b)

0.33

4,000.00

1,320.00

Sand

cum

0.45

190.00

85.50

40 mm aggregate

cum

0.36

310.00

111.60

20 mm aggregate

cum

0.36

390.00

140.40

10 mm aggregate

cum

0.18

400.00

72.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Labour

c)

Formwork @ 4% out of material and labour (a+b)

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

77.63
0.00
252.30

Rate per cum = a+b+c+d+e


IV.

2,270.74

R.C.C grade M 20
Unit = cum
a)

Material
Cement

b)

c)

EE.,Dn.I,BMR

0.35

4,000.00

1,400.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

Labour

Machinery

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

271

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

Concrete mixer 0.4/0.28 cum capacity


d)

Formwork @ 4% on (a+b+c)

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

hour

Quantity
0.40

Rate
(Rs.)
60.00

(Rs.)
24.00
82.26
0.00
267.33

Rate per cum = (a+b+c+d+e+f)


V.

Amount

2,405.99

R.C.C. grade M 25
Unit = cum
a)

Material
Cement

b)

c)

0.404

4,000.00

1,616.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 3.75% on (a+b+c)

85.22

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

294.70

Rate per cum = a+b+c+d+e+f


11.5

600 & 1200

2,652.32

Brick masonry work in cement mortar in foundation complete


excluding pointing and plastering as per drawing and technical
specifications Clauses 600, 1202 & 1203

Unit = cum
I.

Brick masonry in 1:3 cement mortar


a)

Material
Brick

Nos.

500.00

1.80

900.00

Cement mortar 1:3

cum

0.24

2,312.20

554.93

(Rate as per Sub-analysis)

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

272

Sr.
No.

Reference to
MORD Specifica - tions

Description
b)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Labour
Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.80

190.00

152.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

38.38

Rate per cum = a+b+c+d

1,800.30

Sub-analysis
Cement mortar 1:3 (1 cement : 3 sand)
Unit = cum
a)

Material
Cement

0.51

4,000.00

2,040.00

cum

1.05

180.00

189.00

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

0.90

80.00

72.00

Bhisti

day

0.08

90.00

7.20

Sand
b)

Labour

Total material and labour = (a+b)


II.

2,312.20

Brick masonry in 1:4 cement mortar


Unit = cum
a)

Material
Brick

Nos.

500.00

1.80

900.00

Cement mortar 1:4

cum

0.24

1,802.70

432.65

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.80

190.00

152.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Rates as per sub-analysis


b)

c)

EE.,Dn.I,BMR

Labour

Overheads @ 0% on (a+b)

TA to SE Circle BMR

0.00

AAO.,Circle, Barmer

SE.,Circle, Barmer

273

Sr.
No.

Reference to
MORD Specifica - tions

Description
d)

Unit

Quantity

Rate
(Rs.)

Contractors profit @ 12.5% on (a+b+c)

Amount
(Rs.)
204.96

Rate per cum = a+b+c

1,844.60

Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a)

Material
Cement

0.38

4,000.00

1,520.00

cum

1.05

190.00

199.50

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

0.90

80.00

72.00

Bhisti

day

0.08

90.00

7.20

Sand
b)

Labour

Total material and labour = (a+b)


III.

1,802.70

Brick masonry in cement-lime-mortar (1:0.5:4.5)


Unit = cum
a)

b)

Material
Brick

Nos.

500.00

1.80

900.00

Cement lime mortar rates as per sub-analysis

cum

0.24

2,320.00

556.80

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.80

190.00

152.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

220.48

Rate per cum = a+b+c+d

1,984.28

Sub-analysis
Cement-lime-mortar 1:0.5:4.5 (1 cement: 0.5 lime putty : 4.5
sand)
Unit = cum
a)

Material
Cement

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

0.38

4,000.00

1,520.00

SE.,Circle, Barmer

274

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

Lime putty

Rate
(Rs.)

700 & 1200

(Rs.)

0.175

2,000.00

350.00

cum

1.05

190.00

199.50

Mate

day

0.10

100.00

10.00

Mazdoor (Unskilled)

day

2.50

80.00

200.00

Bhisti

day

0.45

90.00

40.50

Labour

Total material and labour = (a+b)


11.6

Amount

Sand
b)

Quantity

2,320.00

Stone masonry work in cement mortar in foundation complete


as per drawing and technical specifications Clauses 702, 704,
1202 & 1203.
Unit = cum
I.

Coursed rubble masonry (1st sort)


(i)

In 1:3 cement mortar


Unit = cum
a)

b)

Material
Stone for C.R. masonry 1st sort

cum

1.10

300.00

330.00

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Cement mortar (1:3) (Rate as in item 11.5 I)

cum

0.30

2,312.20

693.66

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.50

180.00

270.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
194.11

Rate per cum = a+b+c+d


(ii)

1,746.97

In 1:4 cement mortar


Unit = cum
a)

EE.,Dn.I,BMR

Material
Stone for C.R. masonry 1st sort

cum

1.10

300.00

330.00

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

275

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

Cement mortar 1:4 (Rate as in item 11.5 II)


b)

Quantity

Rate
(Rs.)

Amount
(Rs.)

cum

0.30

1,802.70

540.81

Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

1.50

180.00

270.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
175.00

Rate per cum = (a+b+c+d)

1,575.01

(iii) In cement-lime-sand mortar (1:0.5:4.5)


Unit = cum
a)

b)

Material
Stone for C.R. masonry 1st sort

cum

1.10

300.00

330.00

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Cement lime mortar (Rate as in item 11.5 III)

cum

0.30

2,320.00

696.00

Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

1.50

180.00

270.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
194.40

Rate per cum = a+b+c+d

1,749.60

Note: Quantity of required chips has not been provided for separately as it
is assumed that the same will be availble from dressing of stones

II.

Coursed rubble masonry (2nd sort)


(i)

In 1:3 cement mortar


Unit = cum
a)

Material
Stone for C.R. masonry 2nd sort

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

cum

0.60

250.00

150.00

SE.,Circle, Barmer

276

Sr.
No.

Reference to
MORD Specifica - tions

Description

b)

Unit

Quantity

Rate
(Rs.)

(Rs.)

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Spalls/blasted rubble

cum

0.50

40.00

20.00

Cement mortar (Rate as in item 11.5 I.)

cum

0.33

2,312.20

763.03

Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

1.30

180.00

234.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
177.28

Rate per cum = a+b+c+d


(ii)

Amount

1,595.50

In 1:4 cement mortar


Unit = cum
a)

b)

Material
Stone for C.R. masonry 2nd sort

cum

0.60

250.00

150.00

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Spalls/Blasted rubble

cum

0.50

40.00

20.00

Cement mortar (Rate as in item 11.5 II)

cum

0.33

1,802.70

594.89

Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

1.30

180.00

234.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
156.26

Rate per cum = a+b+c+d

1,406.35

(iii) In cement-lime-mortar (1:0.5:4.5)


Unit = cum
a)

Material
Stone for C.R. masonry 2nd sort

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

cum

0.60

250.00

150.00

SE.,Circle, Barmer

277

Sr.
No.

Reference to
MORD Specifica - tions

Description

b)

Unit

Quantity

Rate
(Rs.)

(Rs.)

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Spalls/blasted rubble

cum

0.50

40.00

20.00

Cement-lime-mortar (Rate as in item 11.5 III)

cum

0.33

2,320.00

765.60

Mate

day

0.14

100.00

14.00

Mason (1st Class)

day

1.30

180.00

234.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
177.60

Rate per cum = a+b+c+d


III.

Amount

1,598.40

Random Rubble Masonry


(i)

In 1:3 cement mortar


Unit = cum
a)

b)

Material
Stone for R.R. masonry

cum

1.00

160.00

160.00

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Cement mortar (1:3) (Rate as in item 11.5 I)

cum

0.33

2,312.20

763.03

Mate

day

0.12

100.00

12.00

Mason (1st Class)

day

1.20

180.00

216.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
171.53

Rate per cum = a+b+c+d


(ii)

1,543.75

In cement mortar 1:4


a)

Material
Stone for R.R. masonry

EE.,Dn.I,BMR

TA to SE Circle BMR

cum

AAO.,Circle, Barmer

1.00

160.00

160.00

SE.,Circle, Barmer

278

Sr.
No.

Reference to
MORD Specifica - tions

Description

b)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Cement mortar (1:4) (Rate as in item 11.5 II)

cum

0.33

1,802.70

594.89

Mate

day

0.12

100.00

12.00

Mason (1st Class)

day

1.20

180.00

216.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
150.51

Rate per cum = a+b+c+d

1,354.60

(iii) In cement lime mortar (1:0.5:4.5)


Unit = cum
a)

b)

Material
Stone for R.R. masonry

cum

1.00

160.00

160.00

Through bond stone (7 nos 0.24 x 0.24 x 0.39 = 0.16


cum)

Nos.

7.00

10.00

70.00

Cement lime mortar (Rate as in item 11.5 III)

cum

0.33

2,320.00

765.60

Mate

day

0.12

100.00

12.00

Mason (1st Class)

day

1.20

180.00

216.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per cum = a+b+c+d

0.00
171.85
1,546.65

Note: Quantity of required chips has not been provided for separately as it
is assumed that the same will be availble from dressing of stones

11.7

1000 & 1200 Supplying, fitting and placing HYSD bar reinforcement in
foundation complete as per drawings and technical
specifications Clauses 1000 and 1202
Unit = t
a)

EE.,Dn.I,BMR

Material

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

279

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

HYSD bars including 5 per cent for overlaps and wastage


Binding wire
b)

Quantity

Rate
(Rs.)

(Rs.)

1.05 31,000.00 32,550.00

kg

6.00

33.00

198.00

Mate

day

0.40

100.00

40.00

Blacksmith

day

2.00

120.00

240.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Labour for cutting, bending, shifting to site, tying and


placing in position

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4,188.50

Rate per t = a+b+c+d


11.8

Amount

37,696.50

1000 & 1200 Supplying, fitting and placingTMT bar reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202
Unit = t
a)

Material
TMT bars including 5 per cent for overlaps and wastage
Binding wire

b)

1.05 33,000.00 34,650.00

kg

6.00

33.00

198.00

Mate

day

0.40

100.00

40.00

Blacksmith

day

2.00

120.00

240.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

Labour for cutting, bending, shifting to site, tying and


placing in position

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4,451.00

Rate per t = a+b+c+d


11.9

40,059.00

1000 & 1200 Supplying, fitting and placing MS bar reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202
Unit = t
a)

Material
MS bars including 5 per cent for overlaps and wastage
Binding wire

b)

EE.,Dn.I,BMR

t
kg

1.05 28,000.00 29,400.00


6.00

33.00

198.00

Labour for cutting, bending, shifting to site, tying and


placing in position

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

280

Sr.
No.

Reference to
MORD Specifica - tions

Description

Unit

Rate
(Rs.)

Amount
(Rs.)

Mate

day

0.40

100.00

40.00

Blacksmith

day

2.00

120.00

240.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per t = a+b+c+d

EE.,Dn.I,BMR

Quantity

TA to SE Circle BMR

3,794.75
34,152.75

AAO.,Circle, Barmer

SE.,Circle, Barmer

280

Chapter 12
SUBSTRUCTURE
Sr.
No.

Reference to
MORD Specifications

12.1

600

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Brick masonry work in cement mortar in substructure complete


excepting pointing and plastering, as per drawing and technical
specification Clauses 602, 603, 604, 1202 & 1204
I.

In 1:3 cement mortar


Unit = cum
a)

b)

Material
Bricks

Nos. 500.00

1.80

900.00

Cement mortar (Rate as in item 11.5 I)

cum

0.24

2,312.20

554.93

Mate

day

0.09

100.00

9.00

Mason 1st Class

day

0.80

180.00

144.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

Add for scaffolding @ 5 per cent of cost of materials and


labour (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

72.75
0.00
228.33

Rate per cum = a+b+c+d


II.

2,055.01

In 1:4 Cement mortar


Unit = cum
a)

Material
Bricks

Nos. 500.00

1.80

900.00

Cement mortar
(Rate as in item 11.5 II)
b)

EE.,Dn.I, Barmer

cum

0.24

1,802.70

432.65

Mate

day

0.09

100.00

9.00

Mason 1st Class

day

0.80

180.00

144.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

281

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Add for scaffolding @ 5 per cent of cost of materials and


labour (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

81.58
0.00
214.15

Rate per cum = a+b+c+d


III.

1,927.38

In 1:5 cement mortar


Unit = cum
a)

b)

Material
Bricks 1st class

Nos. 500.00

1.80

900.00

Cement mortar

cum

0.24

1,522.70

365.45

Mate

day

0.09

100.00

9.00

Mason 1st Class

day

0.80

180.00

144.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

Add for scaffolding @ 5 per cent of cost of materials and


labour (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

78.22
0.00
205.33

Rate per cum = a+b+c+d

1,848.00

Sub-analysis
Cement mortar 1:5 (1 cement, 5 sand)
a)

Material
Cement

0.31

4,000.00

1,240.00

cum

1.05

190.00

199.50

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

0.90

80.00

72.00

Bhisti

day

0.08

90.00

7.20

Sand
b)

Labour

Total material and labour = (a+b)


IV.

EE.,Dn.I, Barmer

1,522.70

In cement lime mortar (1:0.5:4.5)

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

282

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Unit = cum
a)

b)

Material
Brick first class

Nos. 500.00

1.80

900.00

Cement lime mortar (Rate as in item 11.5 III)

cum

0.24

2,320.00

556.80

Mate

day

0.09

100.00

9.00

Mason 1st Class

day

0.80

190.00

152.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

Add for scaffolding @ 5 per cent of cost of materials and


labour (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

88.19
0.00
231.50

Rate per cum = a+b+c+d


12.2

600

I.

2,083.49

Pointing with cement mortar (1:3) on brickwork as per drawing


and technical specification Clauses 613.3 and 1204
Unit = 10 sqm
Taking output = 10 sqm
a)

Material
Cement mortar 1.3 (Rate as in item 11.5. I)

b)

cum

0.03

2,312.20

69.37

Mate

day

0.04

100.00

4.00

Mason 1st Class

day

0.50

190.00

95.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Bhisti

day

0.20

90.00

18.00

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

28.30

Rate per 10 sqm = (a+b+c+d)

254.66

600

Pointing with cement mortar (1:3) on stone masonry as per


drawing and technical specification Clauses 613.3 and 1204

II.(a)

Flush and Rulled Type

EE.,Dn.I, Barmer

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

283

Sr.
No.

Unit

Quantity

cum

0.02

2,312.20

53.18

Mate

day

0.04

100.00

4.00

Mason 1st Class

day

0.50

190.00

95.00

Mazdoor (Unskilled)

day

0.50

80.00

40.00

Bhisti

day

0.20

90.00

18.00

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Unit = 10 sqm
Taking output = 10 sqm
a)

Material
Cement mortar 1.3 (Rate as in item 11.5. I)

b)

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

26.27

Rate per 10 sqm = (a+b+c+d)


II.(b)

236.45

Raised Cut Type


Unit = 10 sqm
Taking output = 10 sqm
a)

Material
Cement mortar 1.3 (Rate as in item 11.5. I)

b)

cum

0.04

2,312.20

90.18

Mate

day

0.04

100.00

4.00

Mason 1st Class

day

0.70

190.00

133.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Bhisti

day

0.20

90.00

18.00

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

40.65

Rate per 10 sqm = (a+b+c+d)

365.82

Note: Scaffolding is already included in item 12.1


12.3

600

I.

Plastering with cement mortar (1:4), 15 mm thick on brickwork


in substructure as per technical specification Clauses 613.4 &
1204
Unit = 10 sqm
Taking output = 10 sqm

EE.,Dn.I, Barmer

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

284

Sr.
No.

Unit

Quantity

cum

0.24

1,802.70

432.65

Mate

day

0.06

100.00

6.00

Mason 1st Class

day

0.60

190.00

114.00

Mazdoor (Unskilled)

day

0.60

80.00

48.00

Bhisti

day

0.30

90.00

27.00

Reference to
MORD Specifications

Description
a)

Amount
(Rs.)

Material
Cement mortar 1:4 (Rate as in item 11.5 II )

b)

Rate
(Rs.)

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

78.46

Rate per 10 sqm = a+b+c+d


II.

706.10

Plastering with cement mortar (1:4), 20 mm thick on stone


masonry work in substructure as per technical specification
Clauses 613.4 & 1204
Unit = 10 sqm
Taking output = 10 sqm
a)

Material
Cement mortar 1:4 (Rate as in item 11.5 II )

b)

cum

0.25

1,802.70

450.68

Mate

day

0.06

100.00

6.00

Mason 1st Class

day

0.60

190.00

114.00

Mazdoor (Unskilled)

day

0.60

80.00

48.00

Bhisti

day

0.30

90.00

27.00

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

80.71

Rate per 10 sqm = a+b+c+d


Note:

EE.,Dn.I, Barmer

726.38

Scaffolding is already included in item 12.1

Though cement mortar of leaner mix has been included in item


12.1, for cement plaster mix of 1:4 has been proposed for
better finishing

If cement plaster 12 mm or 18 mm thick is required elsewhere


only the quantity of cement mortar may be changed on prorata
basis without any change in the labour.

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

285

Sr.
No.

Reference to
MORD Specifications

12.4

700

Unit

Quantity

Stone for CR masonry 1st sort

cum

1.10

300.00

330.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate as in item 11.5. I)

cum

0.30

2,312.20

693.66

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.50

190.00

285.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Bhisti

day

0.08

90.00

7.20

Description

Rate
(Rs.)

Amount
(Rs.)

Stone masonry in cement mortar for substructure complete as


per drawing & technical specification Clauses 702, 704, 1202
and 1204
I.

Coursed rubble masonry (1st sort)


(i)

In 1:3 cement mortar


Unit = cum
a)

b)

Material

Labour

Add for scaffolding @ 5 per cent of cost of material


(a) and labour (b) (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

78.39
0.00
205.78

Rate per cum = a+b+c+d


(ii)

1,852.03

In 1:4 cement mortar


Unit = cum
a)

b)

EE.,Dn.I, Barmer

Material
Stone for CR masonry 1st sort

cum

1.10

300.00

330.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate as in item 11.5 II)

cum

0.30

1,802.70

540.81

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.50

190.00

285.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Labour

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

286

Sr.
No.

Reference to
MORD Specifications

Description
Bhisti

Unit

Quantity

day

0.08

Rate
(Rs.)

Amount
(Rs.)

90.00

7.20

Add for scaffolding @ 5 per cent of cost of material


(a) and labour (b) 5% on (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

70.75
0.00
185.72

Rate per cum = a+b+c+d

1,671.48

(iii) In cement mortar (1:5)


Unit = cum
a)

b)

Material
Stone for CR masonry 1st sort

cum

0.60

300.00

180.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Spalls/blasted rubbles

cum

0.50

40.00

20.00

Cement mortar (Rate same as in item 12.1 III)

cum

0.33

1,522.70

502.49

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.30

190.00

247.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Labour

As for scaffolding @ 5% on (a+b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

60.03
0.00
157.59

Rate per cum = a+b+c+d

1,418.32

(iv) In cement lime mortar (1:0.5:4.5)


Unit = cum
a)

b)

EE.,Dn.I, Barmer

Material
Stone for CR masonry 1st sort

cum

1.10

300.00

330.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement lime mortar (Rate as in item 11.5. III)

cum

0.30

2,320.00

696.00

Labour

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

287

Sr.
No.

Unit

Quantity

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.50

190.00

285.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Bhisti

day

0.08

90.00

7.20

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Add for scaffolding @ 5% of (a) and (b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

78.51
0.00
206.09

Rate per cum = a+b+c+d


II.

1,854.80

Coursed Rubble masonry (2nd sort)


(i)

In cement mortar (1:3)


Unit = cum
a)

b)

Material
Stone for CR masonry 2nd sort

cum

0.60

250.00

150.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Spalls/blasted rubbles

cum

0.50

40.00

20.00

Cement mortar (Rate as in item 11.5 I)

cum

0.33

2,312.20

763.03

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.30

190.00

247.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Labour

Add for scaffolding @ 5 per cent of cost of material


(a) and labour (b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

71.56
0.00
187.85

Rate per cum = a+b+c+d


(ii)

1,690.64

In 1:4 cement mortar


Unit = cum
a)

Material
Stone for CR masonry 2nd sort

EE.,Dn.I, Barmer

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

0.60

250.00

SE.,Circle, Barmer

150.00

288

Sr.
No.

Unit

Quantity

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Spall/blasted rubble

cum

0.50

40.00

20.00

Cement mortar (Rate same as in item 11.5 II)

cum

0.33

1,802.70

594.89

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.30

190.00

247.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Reference to
MORD Specifications

Description

b)

Rate
(Rs.)

Amount
(Rs.)

Labour

Add for scaffolding @ 5 per cent of cost of material


(a) and labour (b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

63.15
0.00
165.78

Rate per cum = a+b+c+d

1,492.03

(iii) In cement mortar (1:5)


Unit = cum
a)

b)

Material
Stone for CR masonry 2nd sort

cum

0.60

250.00

150.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Spall/blasted rubble

cum

0.50

40.00

20.00

Cement mortar (Rate same as in item 12.1 III)

cum

0.33

1,522.70

502.49

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.30

190.00

247.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Labour

Add for scaffolding @ 5 per cent on (a+b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per cum = a+b+c+d

EE.,Dn.I, Barmer

TA to SE Circle, BMR

58.53
0.00
153.65
1,382.88

AAO.,Circle, Barmer

SE.,Circle, Barmer

289

Sr.
No.

Unit

Quantity

Stone for CR masonry 2nd sort

cum

0.60

250.00

150.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Spalls/blasted rubbles

cum

0.50

40.00

20.00

Cement lime mortar (Rate as in item 11.5 III)

cum

0.33

2,320.00

765.60

Mate

day

0.14

100.00

14.00

Mason 1st Class

day

1.30

190.00

247.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.08

90.00

7.20

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

(iv) In cement lime mortar (1:0.5:4.5)


Unit = cum
a)

b)

Material

Labour

Add for scaffolding @ 5 per cent on (a+b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

71.69
0.00
188.19

Rate per cum = a+b+c+d


III.

1,693.68

Random rubble masonry


(i)

In cement mortar (1:3)


Unit = cum
a)

b)

EE.,Dn.I, Barmer

Material
Stone for RR masonry

cum

1.00

160.00

160.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate as in item 11.5 I)

cum

0.33

2,312.20

763.03

Mate

day

0.12

100.00

12.00

Mason 1st Class

day

1.20

190.00

228.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

290

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Add for scaffolding @ 5 per cent of cost of material


(a) and labour (b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

69.21
0.00
181.68

Rate per cum = a+b+c+d


(ii)

1,635.12

In 1:4 cement mortar


Unit = cum
a)

b)

Material
Stone for RR masonry

cum

1.00

160.00

160.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate same as in item 11.5 II)

cum

0.33

1,802.70

594.89

Mate

day

0.12

100.00

12.00

Mason 1st Class

day

1.20

190.00

228.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

Add for scaffolding @ 5 per cent of cost of material


(a) and labour (b) 5% on (a+b)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

60.80
0.00
159.61

Rate per cum = a+b+c+d

1,436.51

(iii) In cement mortar (1:5)


Unit = cum
a)

b)

EE.,Dn.I, Barmer

Material
Stone for RR masonry

cum

1.00

160.00

160.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate same as in item 12.1 III)

cum

0.33

1,522.70

502.49

Mate

day

0.12

100.00

12.00

Mason 1st Class

day

1.20

190.00

228.00

Labour

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

291

Sr.
No.

Unit

Quantity

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Add for scaffolding @ 5 per cent on (a+b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

56.18
0.00
147.48

Rate per cum = a+b+c+d

1,327.36

(iv) In cement lime mortar (1:0.5:4.5)


Unit = cum
a)

b)

Material
Stone for RR masonry

cum

1.00

160.00

160.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement lime mortar (Rate as in item 11.5 III)

cum

0.33

2,320.00

765.60

Mate

day

0.12

100.00

12.00

Mason 1st Class

day

1.20

190.00

228.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

Add for scaffolding @ 5 per cent on (a+b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per cum = a+b+c+d


12.5

800

69.34
0.00
182.02
1,638.16

Plain/reinforced cement concrete in substructure complete as


per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 ans 1204
For height upto 5 m
Unit = cum
I.

P.C.C grade M 15
(i)

Nominal mix (1:2.5:5)


Unit = cum
a)

EE.,Dn.I, Barmer

Material

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

292

Sr.
No.

Reference to
MORD Specifications

Description
Cement

b)

c)

Unit

Quantity

Rate
(Rs.)

0.275

4,000.00

1,100.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.08

100.00

8.00

Mason (1st Class0

day

0.10

190.00

19.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 10% on cost of material, labour and


machinery (a+b+c)

0.00

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

208.91

Rate per cum = a+b+c+d+e+f


(ii)

Amount
(Rs.)

1,880.21

Nominal mix 1:2.5:5 (Hand mixing)


Unit = cum
a)

Material
Cement

b)

EE.,Dn.I, Barmer

0.275

4,000.00

1,100.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

190.00

19.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Labour

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

293

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

c)

Formwork @ 10% on (a+b)

0.00

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

209.74

Rate per cum = a+b+c+d+e


II.

Amount
(Rs.)

1,887.64

P.C.C. grade M 20
(i)

Nominal mix (1:2:4)


Unit = cum
a)

Material
Cement

b)

c)

0.33

4,000.00

1,320.00

Sand

cum

0.45

190.00

85.50

40 mm aggregate

cum

0.36

310.00

111.60

20 mm aggregate

cum

0.36

390.00

140.40

10 mm aggregate

cum

0.18

400.00

72.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.10

190.00

19.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 10% on (a+b+c)

0.00

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

241.90

Rate per cum = a+b+c+d+e+f


(ii)

2,177.10

Nominal mix 1:2:4 (Hand mixed)


Unit = cum
a)

Material
Cement

EE.,Dn.I, Barmer

0.33

4,000.00

1,320.00

Sand

cum

0.45

190.00

85.50

40 mm aggregate

cum

0.36

310.00

111.60

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

294

Sr.
No.

Unit

Quantity

20 mm aggregate

cum

0.36

390.00

140.40

10 mm aggregate

cum

0.18

400.00

72.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

190.00

19.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Reference to
MORD Specifications

Description

b)

Rate
(Rs.)

Labour

c)

Formwork @ 10% out of material and labour


(a+b)

0.00

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

242.73

Rate per cum = a+b+c+d+e


III.

Amount
(Rs.)

2,184.53

R.C.C grade M 20
Unit = cum
a)

Material
Cement

b)

c)

0.35

4,000.00

1,400.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

190.00

22.80

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 10% on (a+b+c)

0.00

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Rate per cum = (a+b+c+d+e+f)

EE.,Dn.I, Barmer

TA to SE Circle, BMR

257.20
2,314.80

AAO.,Circle, Barmer

SE.,Circle, Barmer

295

Sr.
No.

Reference to
MORD Specifications

Description
IV.

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

R.C.C. grade M 25
Unit = cum
a)

Material
Cement

b)

c)

0.404

4,000.00

1,616.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

190.00

22.80

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 10% on (a+b+c)

0.00

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Rate per cum = a+b+c+d+e+f


Note:

12.6

1000

284.20
2,557.80

For height above 5 m upto 10 m same as above with following


changes:
a.

Add 2 per cent of cost of material, labour and machinery


to cater for extra lift.

b.

The provision of formwork shall be 12 per cent instead of


10 per cent of cost of material, labour and machinery

The cost of formwork has been increased for more height to


account for cost of side support to formwork.

Extra expenditure on structures which are more than 5 m


height is to cater for cost involved for approaching the work
spot by providing ramp for use by labour.

Supplying, fitting and placing HYSD bar reinforcement (Fe 415)


in substructrue complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202
Unit = t
a)

EE.,Dn.I, Barmer

Material

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

296

Sr.
No.

Reference to
MORD Specifications

Description
HYSD bars including 5 per cent overlaps and wastage
Binding wire
b)

Unit
t

Quantity

Rate
(Rs.)

1.05 31,000.00 32,550.00

kg

6.00

45.00

270.00

Mate

day

0.34

100.00

34.00

Blacksmith

day

2.00

120.00

240.00

Mazdoor (Unskilled)

day

6.50

80.00

520.00

Labour for cutting, bending, shifting to site, tying, and


placing in position

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4,201.75

Rate per t = a+b+c+d


12.7

1000

Amount
(Rs.)

37,815.75

Supplying, fitting and placing TMT bar reinforcement (Fe 415) in


substructrue complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202
Unit = t
a)

Material
TMT bars including 5 per cent overlaps and wastage
Binding wire

b)

1.05 33,000.00 34,650.00

kg

6.00

45.00

270.00

Mate

day

0.34

100.00

34.00

Blacksmith

day

2.00

120.00

240.00

Mazdoor (Unskilled)

day

6.50

80.00

520.00

Labour for cutting, bending, shifting to site, tying, and


placing in position

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4,464.25

Rate per t = a+b+c+d


12.8

1000

40,178.25

Supplying, fitting and placing with MS bar reinforcement (Fe


415) in substructrue complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202
Unit = t
a)

Material
MS bars including 5 per cent overlaps and wastage
Binding wire

EE.,Dn.I, Barmer

TA to SE Circle, BMR

t
kg

AAO.,Circle, Barmer

1.05 28,000.00 29,400.00


6.00

45.00

SE.,Circle, Barmer

270.00

297

Sr.
No.

Unit

Quantity

Mate

day

0.34

100.00

34.00

Blacksmith

day

2.00

120.00

240.00

Mazdoor (Unskilled)

day

6.50

80.00

520.00

Reference to
MORD Specifications

Description
b)

Rate
(Rs.)

Labour for cutting, bending, shifting to site, tying, and


placing in position

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

3,808.00

Rate per t = a+b+c+d


12.9

600

Amount
(Rs.)

34,272.00

Providing weepholes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7
Unit = Nos
Taking output = 30 Nos
a)

Material
AC pipe 100 mm dia including wastage @ 5 per cent. Average
length of weep hole is taken as one metre for the purpose of
estimating

b)

12.10

1200

31.50

65.00

2,047.50

MS clamps

Nos.

30.00

20.00

600.00

Cement mortar 1:3 (For rate refer to item 11.5 I)

cum

0.05

2,312.20

115.61

Mate

day

0.03

100.00

3.00

Mason 1st Class

day

0.50

180.00

90.00

Mazdoor (Unskilled)

day

0.25

80.00

20.00

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

359.51

Cost for 30 Nos = (a+b+c+d)

3,235.62

Rate per No = (a+b+c+d)/30

107.85

Backfilling behind abutment, wing wall and return wall complete


as per drawings & technical specification Clause 1204.3.8

Unit = cum
Taking output = 10 cum

EE.,Dn.I, Barmer

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

298

Sr.
No.

Unit

Quantity

cum

12.00

95.00

1,140.00

Mate

day

0.28

100.00

28.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Bhisti

day

0.40

90.00

36.00

Reference to
MORD Specifications

Description
I)

Rate
(Rs.)

Amount
(Rs.)

Granular material
a)

Material
Granular material

b)

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
250.50

Cost for 10 cum of granular backfill = a+b+c+d

2,254.50

Rate per cum = (a+b+c+d)/10


II)

225.45

Sandy material
Unit = cum
Taking output = 10 cum
a)

Material
Sand

b)

cum

12.00

110.00

1,320.00

Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

Bhisti

day

0.40

90.00

36.00

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10 cum of sand backfill = a+b+c+d

0.00
274.50
2,470.50

Rate per cum = (a+b+c+d)/10


12.11

1200

247.05

Providing and laying filter media with granular crushed


aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted to
firm condition complete as per drawing and technical
specification Clause 1204.3.8

Unit = cum

EE.,Dn.I, Barmer

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

299

Sr.
No.

Unit

Quantity

cum

12.00

200.00

2,400.00

Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

9.00

80.00

720.00

Mazdoor (Skilled)

day

1.00

100.00

100.00

Bhisti

day

0.50

90.00

45.00

Reference to
MORD Specifications

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 10 cum


a)

Material
Filter media as per specification

b)

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

413.13

Cost for 10 cum of filter media = a+b+c+d

3,718.13

Rate per cum = (a+b+c+d)/10


12.12

1200

371.81

Supplying, fitting and fixing in position true to line and level


elastomeric bearing conforming to IRC:83 (Part-II) Section IX
complete, including all accessories as per drawings and
technical specification Clause 1207.1
Unit = cubic centimetre
Considering an elastomeric bearing of size 500 x 400 x 96 mm for
this analysis,
Overall volume = 19200 cu.cm
Volume of 6 Nos 488x388x4 mm size reinforcing steel plates = 4545
cu.cm.
Hence volume of elastomer = 14655 cu. cm.
a)

b)

Labour
Mate

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Mazdoor Skilled

day

0.50

100.00

50.00

Elastomeric bearing assembly consisting of 7 internal layers of Nos.


elastomer bonded to 6 nos. internal reinforcing steel laminates
by the process of vulcanisation, complete with all components
as per drawing and technical specification

1.00

7,680.00

7,680.00

Material

Add for anchorage bolts if required and consumables @ 1 per


cent on (a+b)

EE.,Dn.I, Barmer

TA to SE Circle, BMR

AAO.,Circle, Barmer

78.16

SE.,Circle, Barmer

300

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

c)

Overheads @ 0% on (a+b)

2,368.25

d)

Contractors profit @ 12.5% on (a+b+c)

1,282.80

Cost for 19200 cu.cm. of elastomeric bearing = a+b+c+d

11,545.21

Rate per cu.cm of elastomeric bearing = (a+b+c+d)/19200

0.60

Note: For such type of manufactured item, the overhead cost is taken as
30 per cent instead of 20 per cent
12.13

600 I).

a.

Providing PCC M-20 architectural coping on the top of wing


wall, return wall etc. complete as per drawing and technical
specification Clauses 615, 710 and 1204.3.11
150 mm thick
Unit = sq m
Taking output = 1 sqm
Assume wall thickness = 345 mm
Projection of the coping will be 25 mm wide on both side of the wall
= 345 + 50 = 395 mm
Quantity = 1 x 0.150 = 0..15
PCC M-20 Grade (1:2:4) Nominal Mix
As per item No. 12.5 (II)(i)

cum

0.150

2,177.10

Add 10 per cent extra of cost of (a) being architectural coping

b.

326.57
33.00

Cost of sqm = a

326.57

Rate persqm = a

326.57

75 mm thick
Unit = sq m
Taking output = 1 sqm
Assume wall thickness = 345 mm
Projection of the coping will be 25 mm wide on both side of the wall
= 345 + 50 = 395 mm
Quantity = 1 x 0.075 = 0.075
PCC M-20 Grade (1:2:4) Nominal Mix
As per item No. 12.5 (II)(i)

cum

0.075

2,177.10

Add 10 per cent extra of cost of (a) being architectural coping

16.00

Cost of sqm = a

EE.,Dn.I, Barmer

TA to SE Circle, BMR

163.28

163.28

AAO.,Circle, Barmer

SE.,Circle, Barmer

301

Sr.
No.

Reference to
MORD Specifications

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Rate per sqm = a


II.

163.28

Providing PCC M-20 50mm thick coping 20mm nominal size


aggregate on the top of wing wall, return wall etc. with rounding
of edges etc. complete as per drawing and technical
specification Clauses 615, 710 and 1204.3.11
Unit = sq m
Taking output = 1 sqm
Assume wall thickness = 345 mm
Projection of the coping will be 25 mm wide on both side of the wall
= 345 + 50 = 395 mm
Quantity = 1 x 0.05 = 0.05
PCC M-20 Grade (1:2:4) Nominal Mix
As per item No. 12.5 (II)(i)

cum

0.050

2,177.10

Add 10 per cent extra of cost of (a) being rounding of edges

12.14

1200

108.86
11.00

Cost of sqm = a

119.86

Rate per sqm = a

119.86

Providing pressure relief pipes 100 mm dia in bottom slab of


box cell on a filter media base of 500 mm x 500 mm as per
drawing and technical specification Clause 1205.5.7

Unit = Nos
a)

Material
AC pipe 100 mm dia i/c wastage of 5 per cent 600 mm long
upto the bottom of levelling course

Filter media base with stone aggregate 0.5 m x 0.5 m area 1 m cum
deep
b)

0.63

65.00

40.95

0.25

200.00

50.00

Labour
Mate

day

0.031

100.00

3.10

Mason 1st Class

day

0.016

180.00

2.88

Mazdoor (Unskilled)

day

0.80

80.00

64.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

20.12

Rate per No = (a+b+c+d)

EE.,Dn.I, Barmer

TA to SE Circle, BMR

181.05

AAO.,Circle, Barmer

SE.,Circle, Barmer

302

Chapter 13
SUPERSTRUCTURE
Sr.
No.

Reference to
MORD specifications

13.1

800

Unit

Description

Quan tity

Rate
(Rs.)

Amount
(Rs.)

Providing and laying reinforced cement concrete in


superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5
I.

R.C.C grade M 20
(i)

For nominal mix 1:2:4


Unit = cum
a)

Material
Cement

b)

c)

0.35

4,000.00

1,400.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Add for formwork and staging


Height upto 5 m @ 20% of (a+b+c)

0.00

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

257.05

Rate per cum = a+b+c+d+e+f


(ii)

2,313.45

For nominal mix 1:2:4 (Hand mixed)


Unit = cum
a)

Material
Cement
Coarse aggregate

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

0.35

4,000.00

1,400.00

cum

0.45

190.00

85.50

SE.,Circle, Barmer

303

Sr.
No.

Unit

Quan tity

20 cum aggregates

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Reference to
MORD specifications

Description

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

For formwork and staging add the following


percentage of (a+b)
Height upto 5 m @ 20 per cent of (a+b)

0.00

Height from 5 m to 10 m @ 25 per cent of (a+b)


Height above 10 m @ 30 per cent of (a+b)
d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
256.43

Rate per cum = a+b+c+d+e

2,307.83

(iii) For design mix RCC M 20


a)

Material
Cement

b)

c)

0.33

4,000.00

1,320.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

For formwork and staging add the following


percentage of (a+b+c):
Height upto 5 m @ 20 per cent

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

0.00

SE.,Circle, Barmer

304

Sr.
No.

Reference to
MORD specifications

Unit

Description

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Quan tity

Rate
(Rs.)

0.00
247.05

Rate per cum = a+b+c+d+e+f


Note:

Amount
(Rs.)

2,223.45

Height from 5 m to 10 m @ 25 per cent

494.10

Height above 10 m @ 30 per cent


II.

R.C.C M 25
Unit =cum
a)

Material
Cement

b)

e)

0.40

4,000.00

1,600.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

For formwork and staging refer to sub-item (c) of I (ii)


above

0.00

e)

Overheads @ 0% on (a+b+c+d)

0.00

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

282.05

Rate per cum = a+b+c+d+e+f

2,538.45

Note: This analysis will hold good for concrete of nominal mix 1:1:3 also
III.

R.C.C. Grade M 30
Unit =cum
a)

Material
Cement
Sand

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

0.43

4,000.00

1,720.00

cum

0.45

190.00

85.50

SE.,Circle, Barmer

305

Sr.
No.

Unit

Quan tity

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Reference to
MORD specifications

Description

b)

c)

Rate
(Rs.)

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

For formwork and staging refer to sub-item (d) of I (II)


above

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

24.00
0.00
300.05

Rate per cum = a+b+c+d+e+f


Note:

13.2

1000

Amount
(Rs.)

2,700.45

Quantity of cement provided for various components of the


superstructure is for estimating purpose only. Actual quantity of
cement will be as per approved mix design. Similarly quantity
for corase and fine aggregates is for estimating purpose and
the exact quantity shall be as per the mix design use of design
mix in place of nominal mix of concrete of M 20 and higher
grader shall be prepared. Nominal mix of grades M 20 and M
25 is to be used with adequate supervision and quality control
requirements Clause 803 technical specificatiosn

For higher grades like M 25 and M 30, if adopted, design mix


is recommended.

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202
Unit = t
a)

Material
HYSD bars including 5 per cent for laps and wastage
Binding wire

b)

EE.,Dn.I,BMR

1.05 31,000.00 32,550.00

kg

8.00

33.00

264.00

Mate

day

0.44

100.00

44.00

Blacksmith

day

3.00

120.00

360.00

Labour for cutting, bending, tying and placing in position

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

306

Sr.
No.

Reference to
MORD specifications

Description

Mazdoor (Unskilled)
c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Unit

Quan tity

day

8.00

Rate
(Rs.)
80.00

1000

640.00
0.00
4,232.25

Rate per t = a+b+c+d


13.3

Amount
(Rs.)

38,090.25

Supplying, fitting, and placing TMT bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202
Unit = t
a)

Material
TMT bars including 5 per cent for laps and wastage
Binding wire

b)

1.05 33,000.00 34,650.00

kg

8.00

33.00

264.00

Mate

day

0.44

100.00

44.00

Blacksmith

day

3.00

120.00

360.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

Labour for cutting, bending, tying and placing in position

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4,494.75

Rate per t = a+b+c+d


13.4

1000

40,452.75

Supplying, fitting, and placing MS bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202
Unit = t
a)

Material
MS bars including 5 per cent for laps and wastage
Binding wire

b)

EE.,Dn.I,BMR

1.05 28,000.00 29,400.00

kg

8.00

33.00

264.00

Mate

day

0.44

100.00

44.00

Blacksmith

day

3.00

120.00

360.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

Labour for cutting, bending, tying and placing in position

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

TA to SE Circle BMR

0.00

AAO.,Circle, Barmer

3,838.50

SE.,Circle, Barmer

307

Sr.
No.

Reference to
MORD specifications

Unit

Description

Quan tity

Rate
(Rs.)

Rate per t = a+b+c+d


13.5

800

Amount
(Rs.)
34,546.50

Providing and laying cement concrete wearing course M 30


grade including reinforcement complete as per drawing and
technical specifications Clauses 800 and 1206.3

Unit = cum
a)

Material
Cement

0.43

4,000.00

1,720.00

Sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

0.075 32,550.00

2,441.25

HYSD bar reinforcement (Rate as per item 13.2)


Binding Wire
b)

c)

kg

0.01

33.00

0.33

Mate

day

0.10

100.00

10.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Bhisti

day

0.27

90.00

24.30

Blacksmith

day

0.30

120.00

36.00

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Formwork @ 3% of cost of concrete

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

800

138.05
0.00

Rate per cum = a+b+c+d+e+f


13.6

636.95
5,732.58

Construction of R.C.C. railing of M 25 grade in cast-in-situ with


20 mm nominal size aggregate, true to line and grade, tolerance
of vertical railing post not to exceed 1 in 500, centre-to-centre
spacing between vertical posts not to exceed 2000 mm as per
drawing and technical specifications Clauses 800, 900 and
1208.3
Unit = Runing m
Taking output = 4x12 m

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

308

Sr.
No.

Reference to
MORD specifications

Description

Unit

Quan tity

cum

6.25

Rate
(Rs.)

Amount
(Rs.)

Span = 48 m
a)

M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 =
0.069 sqm
Concrete in vertical posts = 0.069 x28x1.00 = 1.932 cum
Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum

b)

HYSD bar reinforcement (Rate as per item 13.2)

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

2,501.21 15,637.58

1.36 32,550.00 44,268.00


0.00
7,488.20

Cost for 48 m = (a+b+c+d)

67,393.77

Rate per m = (a+b+c+d)/48

1,404.04

Sub Analysis for Rate of Concrete


a)

Material
Cement

b)

c)

0.40

4,000.00

1,600.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.12

180.00

21.60

Mazdoor (Unskilled)

day

1.73

80.00

138.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

EE.,Dn.I,BMR

Formwork @ 12%

TA to SE Circle BMR

244.81

AAO.,Circle, Barmer

SE.,Circle, Barmer

309

Sr.
No.

Reference to
MORD specifications

Unit

Description

Quan tity

Rate
(Rs.)

Total (a+b+c+d)
Note:

13.7

1200

Amount
(Rs.)
2,501.21

48 m length is the total linear length adding both sides of 2x12


m span

Quantities of material have been adopted from standard plans


of MORTH vide drawing No SD/202

Providing fitting and fixing mild steel railing complete as per


drawing and technical specifications Clause 1208.2
Unit = Runing m
Taking output = 100 m
a)

b)

Material
1)

IS MC 100=2.806x1.05=2.946 t

2.946 33,000.00 97,218.00

2)

MS Flats = 0.964x1.05 =1.012 t

1.012 33,000.00 33,396.00

3)

MS bars = 0.17x1.05=0.18 t

0.18 28,000.00

5,040.00

4)

MS bolts, nuts and washers

0.15 60,000.00

9,000.00

Labour
Mate

day

2.80

100.00

280.00

Blacksmith

day

30.00

120.00

3,600.00

Mazdoor (Unskilled)

day

40.00

80.00

3,200.00

c)

Add 5 per cent of (a) for painting one shop coat with red
oxide primer and three coats of synthetic enamel paint
and consumables @ 5% on (a)

7,232.70

d)

Add for cost of concrete for fixing vertical post in the


preformed recess @ 1 per cent of (a)

1,446.54

e)

Add for electricity charges, welding and drilling


equipment, electrodes and other consumables @ 1 per
cent of (a)

1,446.54

f)

Overheads @ 0% on (a+b+c+d+e)

g)

Contractors profit @ 12.5% on (a+b+c+d+e+f)

Rate per m = (a+b+c+d+e+f+g)/100

0.00
20,232.47
1,820.92

Note: A typical drawing for MS railing has been followed for estimate
purpose. Rate may be worked out as per design to be followed
13.8

1200

EE.,Dn.I,BMR

Providing and fixing in position pipe railing consisting of IS


Rolled steel joist posts designation IS MB 100 (100x75) at 2.5 m
interval and three rows of 50 mm dia steel pipes (light)
including fixing in position on bridge deck complete as per
drawing and technical specifications Clause 1208.2

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

310

Sr.
No.

Reference to
MORD specifications

Unit

Description

Quan tity

Rate
(Rs.)

Amount
(Rs.)

Unit = Running m
Taking output = 2 x 10 m = 20 m
a)

Material
i)

Steel posts IS MB 100 (100 x 75)

0.13 33,000.00

4,290.00

5 x 2 x 11.5 x 1.1 x 1.05 = 130 kg


ii)

50 mm dia steel pipes

60.00

180.00 10,800.00

20 x 3 = 60 m
iii)

b)

M.S Bolts, nuts and washers

0.05 60,000.00

Add @ 5 per cent of (a) for painting one shop coat with
red oxide primer and three coats of synthetic enamel
paint and consumables

904.50

Add for electricity charges, welding and drilling


equipment, electrodes and other consumables @ 1 per
cent of (a)

180.90

Labour
Mate

day

0.56

100.00

56.00

Blacksmith

day

6.00

120.00

720.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

2,573.93

Cost for 20 m steel railing = a+b+c+d

23,165.33

Rate per metre = (a+b+c+d)/20


13.9

600

3,000.00

1,158.27

Brick masonry work in cement mortar 1:3 in parapet excluding


pointing and plastering as per drawing and technical
specifications Clauses 600, 900 and 1208.4
Unit = cum
a)

b)

EE.,Dn.I,BMR

Material
Bricks

Nos.

500.00

1.80

900.00

Cement mortar (Rate as in item 11.5 I)

cum

0.24

2,312.20

554.93

Mate

day

0.09

100.00

9.00

Mason 1st Class

day

0.80

180.00

144.00

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

311

Sr.
No.

Unit

Quan tity

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Reference to
MORD specifications

Description

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate
(Rs.)

0.00
219.24

Rate per cum = a+b+c+d


13.10

1200

Amount
(Rs.)

1,973.17

Drainage spouts complete as per drawing and technical


specifications Clause 1209
Unit = 1 No
a)

b)

Material
i)

Corrosion resistant structural steel grating including 5 per


cent wastage

kg

4.00

40.00

160.00

ii)

G I pipe 100 mm dia

1.00

200.00

200.00

Mate

day

0.02

100.00

2.00

Blacksmith, Welder etc. (Skilled)

day

0.02

120.00

2.40

Mazdoor (Unskilled)

day

0.20

80.00

16.00

Mate

day

0.01

100.00

1.00

Mason (1st Class)

day

0.01

180.00

1.80

Mazdoor (Unskilled)

day

0.20

80.00

16.00

Labour
For fabrication

For fixing in position

Add @ 5 per cent of cost of material and labour (a+b) for


electrodes, gas cutting, sealant, anti-corrrosive bituminous
paint, mild steel grating etc.

1.96

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

50.15

Rate per m = a+b+c+d


13.11

800

451.31

P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below


approach slab complete as per drawing and technical
specifications Clauses 800 and 1211
(i)

Nominal mix (1:2.5:5)


Unit = cum
a)

Material
Cement

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

0.275

4,000.00

1,100.00

SE.,Circle, Barmer

312

Sr.
No.

Unit

Quan tity

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.08

100.00

8.00

Mason (1st Class0

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Reference to
MORD specifications

Description

b)

c)

Rate
(Rs.)

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

0.00
208.79

Rate per cum = a+b+c+d+e+f


(ii)

Amount
(Rs.)

1,879.09

Nominal mix 1:2.5:5 (Hand mixing)


Unit = cum
a)

Material
Cement

b)

EE.,Dn.I,BMR

0.275

4,000.00

1,100.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.48

310.00

148.80

20 mm aggregate

cum

0.24

390.00

93.60

10 mm aggregate

cum

0.08

400.00

32.00

Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Bhisti

day

0.27

90.00

24.30

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

TA to SE Circle BMR

0.00

AAO.,Circle, Barmer

209.61

SE.,Circle, Barmer

313

Sr.
No.

Reference to
MORD specifications

Unit

Description

Quan tity

Rate
(Rs.)

Rate per cum = a+b+c+d


13.12

800

Amount
(Rs.)
1,886.51

Reinforced Cement Concrete M 25 grade approach slab


including reinforcement and formwork complete as per drawing
and technical specifications Clauses 800 and 1211
Unit = cum
a)

Material
Reinforced cement concrete M 25 grade
Rate as per Item 13.1 II

cum

1.00

2,538.45

2,538.45

0.05 38,090.25

1,904.51

HYSD reinforcement
Rate per item 13.2

Rate per cum = (a)


13.13

1200

4,442.96

Providing and laying of an elastomeric slab seal expansion joint


complete as per approved drawing and approved specifications
to be installed by manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturers
instructions for installlation and as per technical specifications
Clause 1207.2.5

Unit = Running m
Taking output = 7.5 m
a)

Material
Supply of elastomeric slab seal expansion joint assembly
manufactured by using chloroprene elastomer for elastomeric
slab unit conforming to Clause 915.1 of IRC:83 (Part II)
complete as per approved drawings and specifications. Add 5
per cent of cost of material for anchorage reinforcement,
welding and other incidentals.

b)

EE.,Dn.I,BMR

7.50

7,680.00 57,600.00

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

0.70

80.00

56.00

Mazdoor (skilled)

day

0.40

100.00

40.00

Labour

c)

Overheads @ 0% on (a+b)

17,310.00

d)

Contractors profit @ 12.5% on (a+b+c)

9,376.25

Cost for 7.5 m = a+b+c+d

84,386.25

Rate per m = (a+b+c+d)/7.5

11,251.50

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

314

Sr.
No.

Reference to
MORD specifications

Description

Unit

Quan tity

kg

293.00

Rate
(Rs.)

Amount
(Rs.)

Note: For this specialised item, overhead cost is assumed as 30 per cent
13.14

1200

Providing and laying of compression seal joint consisting of


steel armoured nosing at two edges of the joint gap suitably
anchored to the deck concrete and a preformed chloroprene
elastomer or closed cell foam joint sealer compressed and
formed into the joint gap with special adhesive binder as per
drawing, and technical specifications Clause 1207.2.4

Unit = Running m
Taking ourtput = 7.5 m
a)

Material
Galvanised angle section 100 mm x 100 mm of 12 mm
thickness weldable structural steel as per IS:2062, 2 Nos. of
7.5 m length each @ 17.7 kg/m and 5 per cent wastage.

40.00 11,720.00

Add 5 per cent of cost of above for structural steel for welding
and other incidentals.
Preformed continuous chlorprene elastomer or closed cell
foam sealing element with high tear strength, vulcanised in a
single operation for the full length of a joint to ensure water
tightness.

586.00
m

7.50

100.00

750.00

Add 1 per cent of cost of sealing element for lubricant-cumadhesive and other consumables.
b)

Labour
Mate

day

0.024

100.00

2.40

Mazdoor (Skilled)

day

0.20

100.00

20.00

Mazdoor (Unskilled)

day

0.40

80.00

32.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 7.5 m = a+b+c+d

EE.,Dn.I,BMR

1,967.69

The installation shall be done by the manufacturer or his


authorised representative to the satisfaction of the Engineer.

The concreting for joining the expansion joint assembly with


the deck has not been included in this analysis as the same is
catered for in the quantities of R.C.C deck

The anchoring bars of the expansion joint assembly shall be


welded to the main reinforement of the deck.

For this specialised item overheads are assumed @ 30 per


cent

TA to SE Circle BMR

1,639.74
14,757.64

Rate per m = (a+b+c+d)/7.5


Note:

7.50

AAO.,Circle, Barmer

SE.,Circle, Barmer

315

Sr.
No.

Reference to
MORD specifications

13.15

1200

Description

Unit

Quan tity

kg

150.00

Rate
(Rs.)

Amount
(Rs.)

Providing and laying a buried expansion joint, covered with 12


mm thick, 200 mm wide galvanised weldable structrual steel
plate as per IS:2062, placed symmetrical to centre line of the
joint, resting freely over the top surface of the deck concrete,
welding of 8 mm dia, 100 mm long galvanised nails spaced 300
mm c/c along the centre line of the plate, as per technical
specifications Clauses 1207.2.3

Unit = Running m
Taking output = 7.5 m
a)

Material
Galvanised M.S. plate 200 mm wide 12 mm thick @ 94.20
kg/sqm including 5 per cent wastage.

40.00

6,000.00

Add 1 per cent of cost of steel plate for cutting, welding,


consumables and galvanised nails.
b)

60.00

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Skilled)

day

0.25

100.00

25.00

Mazdoor (Unskilled)

day

0.15

80.00

12.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

762.25

Cost for 7.5 m = a+b+c+d

6,860.25

Rate per m = (a+b+c+d)/7.5


13.16

1200

914.70

Filler Joint
I)

Providing and fixing 2 mm thick corrugated copper plate


in expansion joint as per drawing and technical
specifications Clause 1207.2.2
Unit = Running m
Taking output = 7.5 m
a)

Material
Copper plate - 7.5 m long x 250 mm wide

kg

34.00

350.00 11,900.00

Area = 7.5 x 0.25 = 1.875 sqm


Weight = 1.875 x 0.002 x 8900 = 33.4 kg.
Wastage @ 2.5% = 0.83 kg.
Total weight = 34 kg
b)

EE.,Dn.I,BMR

Labour

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

316

Sr.
No.

Unit

Quan tity

Mate

day

0.02

100.00

2.00

Mazdoor (Unskilled)

day

0.35

80.00

28.00

Mazdoor (Skilled)

day

0.35

100.00

35.00

Reference to
MORD specifications

Description

Rate
(Rs.)

Amount
(Rs.)

For cutting, bending, carrying and fixing etc.

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

1,495.63

Cost for 7.5 m = (a+b+c+d)

13,460.63

Rate per m = (a+b+c+d)/7.5


II)

1,794.75

Providing and fixing 20 mm thick compressible fibre board


in expansion joint complete as per drawing and technical
specifications
Unit = Running m per cm depth
Taking output = 7.5 m/25cm
a)

Material
20 mm thick compressible fibre board 7.5 m long and sqm
250 mm deep

1.875

400.00

750.00

Area = 7.5 x 0.25 = 1.875 sqm


b)

Labour
For carrying, placing and fixing
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.10

80.00

8.00

Mazdoor (Skilled)

day

0.10

100.00

10.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 7.5 m = a+b+c+d

96.13
865.13

Rate per m = (a+b+c+d)/7.5/25


III)

4.61

Providing and fixing in position 20 mm thick premoulded


joint filler in expansion joint for fixed ends of simply
supported spans, covered with sealant complete as per
drawing and technical specifications

Unit = Running m per cm depth


Taking output = 7.5 m/30cm
a)

EE.,Dn.I,BMR

Material

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

317

Sr.
No.

Unit

Quan tity

sqm

2.25

400.00

900.00

Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.13

80.00

10.40

Mazdoor (Skilled)

day

0.07

100.00

7.00

Reference to
MORD specifications

Description

Premoulded joint filler 7.5 m long, 20 mm thick and 300


mm deep
b)

Rate
(Rs.)

Amount
(Rs.)

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

114.80

Cost for 7.5 m = (a+b+c+d)

1,033.20

Rate per m = (a+b+c+d)/7.5/30


IV)

4.59

Providing and fillling joint sealing compound as per


drawings and technical specifications with coarse sand
and 6 per cent bitumen by weight.
Unit = Running m
Taking output = 7.5 m
7.5 m long x 100 mm wide x 10 mm deep recess
a)

Material
Sand

cum

0.008

110.00

0.88

0.0007 31,700.00

22.19

Volume = 7.5 x 0.1 x 0.01 = 0.008 cum


Weight = 0.008 x 1400 = 11.2 kg
Bitumen-11.2 x 0.06 = 0.672 kg
b)

Labour
Mate

day

0.02

100.00

2.00

Mazdoor (Skilled)

day

0.50

100.00

50.00

Mazdoor (Unskilled)

day

0.10

80.00

8.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

10.38

Cost for 7.5 m with 10 mm depth =a+b+c+d

93.45

Rate per m with 1 cm depth = (a+b+c+d)/7.5

12.46

Note: For arriving at the final rate for filler joints per m length and per cm
depth of joint filling compound, the rates of Sr. Nos (i), (ii), (iii) and
(iv) shall be added.

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

318

Sr.
No.

Reference to
MORD specifications

13.17

700

Unit

Description

II.

800

sqm

254.66

sqm

726.38

cum

1,887.64

cum

1,880.21

Nominal mix 1:2.5:5 (Hand mixing)


Rate same as in item 12.5 I (ii)

II.

Nominal mix (1:2.5:5)


Rate same as in item 12.5 I (i)

1200

1,852.03

Providing and laying parapet with PCC M 15 as per drawing &


technical specifications Clauses 800 and 1208.4
I.

13.21

cum

Plastering with cement mortar (1:3) 15 mm thick on brickwork in


parapet as per technical specifications Clauses 613.4 and
1208.4
Rate same as in item 12.3

13.20

1,635.12

Pointing with cement mortar (1:3) on brickwork in parapet as


per technical specifications Clauses 613.3 and 1208.4
Rate same as in item 12.2

600

cum

Coursed rubble masonry (1st sort)


Rate same as in item 12.4 I (i)

13.19

Amount
(Rs.)

Random rubble masonry


Rate same as in item 12.4 III (i)

600

Rate
(Rs.)

Stone masonry in cement mortar 1:3 for parapet complete as


per drawing and technical specifications Clauses 700 and
1208.4
I.

13.18

Quan tity

Providing bituminous wearing coat comprising of 20 mm thick


premix carpet with 5 mm thick seal coat Type B for culverts as
per drawing and technical specifications Clauses 1206.2 and
500
i.

Rate for wearing coat as per item No. 5.9 of Chapter 5

sqm

ii.

Rate for seal coat Type B as per item No. 5.12 of Chapter 5

sqm

Note: This type of wearing coat may be adopted where a cushion is


provided over the culvert and the adjoining road pavement is
continued over it.
13.22

1200

EE.,Dn.I,BMR

Providing bituminous wearing coat comprising of 50 mm thick


bituminous macadam overlaid by 20 mm thick premix carpet
with 5 mm thick seal coat Type B
i.

Rate for BM layer may be analysed as per item No 5.3 of


Chapter 5

cum

ii.

Rate of 20 mm premix carpet wearing course as per item


No.5.9 of Chapter 5

sqm

iii.

Rate of seal coat Type B as per item No. 5.12 of Chapter 5

sqm

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

319

Sr.
No.

Reference to
MORD specifications

13.23

600

Unit

Quan tity

Brick 1st class

Nos.

525.00

1.80

945.00

Cement mortar (1:4) (Rate same as for item 11.5 II)

cum

0.24

1,802.70

432.65

Mate

day

0.20

100.00

20.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Mason (1st Class)

day

2.00

180.00

360.00

Bhisti

day

0.08

90.00

7.20

Description

Rate
(Rs.)

Amount
(Rs.)

Brickwork in arches in cement mortar 1:4 complete including


centering and shuttering excluding pointing and plastering as
per drawing and technical specifications Clauses 606 and
1205.1
Unit = cum
a)

b)

Material

Labour

c)

Add for centering and shuttering @ 110% of (a+b)

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

2,082.13
0.00
496.87

Rate per cum = a+b+c+d+e


Note:

13.24

700

4,471.85

In case cement mortar 1:3 is used, rate as in item 11.5 I. will


hold good.

Quantity of bricks for arches will be about 10 per cent more


than that for ordinary brickwork .

In case special arch bricks are used, the quantity of bricks per
cum shall be taken as 580 Nos.

Rates for spandrel walls shall be taken same as for brickwork


in substructure.

Rate for spandrel filling will depend on the filling material


adopted

Coursed rubble stone masonry arch (Ist sort) in cement mortar


(1:4) complete including centering etc. complete as per drawing
and technical specifications Clauses 706 and 1205.1

Unit = cum
a)

EE.,Dn.I,BMR

Material
Stone for CR masonry 1st sort

cum

1.10

300.00

330.00

Through and bond stone (7 Nos 0.24x0.24x0.39 = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate as in item 11.5 II)

cum

0.30

1,802.70

540.81

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

320

Sr.
No.

Unit

Quan tity

Mate

day

0.25

100.00

25.00

Mason (1st Class)

day

3.00

180.00

540.00

Mazdoor (Unskilled)

day

2.10

80.00

168.00

Bhisti

day

0.08

90.00

7.20

Reference to
MORD specifications

Description

b)

Rate
(Rs.)

Labour

c)

Add for centering and shuttering @ 100 % of (a+b)

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 10% of (a+b+c+d)

1,681.01
0.00
420.25

Rate per cum = a+b+c+d+e


Note:

13.25

800

Amount
(Rs.)

3,782.27

In case cement mortar 1:3 is used, rate for the same shall be
as per item 11.5 I.

The addition for centering and sluttering at (c) above is for


arch above 6 m span. For lesser span length the addition shall
be 80 per cent for span above 4 m length and 50 per cent for
spans less than 4 m.

Providing & Laying reinforced cement concrete arch complete


including centering and shuttering excluding reinforcement as
per drawings and technical specifications Clauses 800, 900 and
1205.1
Unit = cum
I.

RCC grade M20 (1:2.4) nominal mix


a)

Material
Cement

b)

c)

0.35

4,000.00

1,400.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

310.00

167.40

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.20

180.00

36.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

321

Sr.
No.

Reference to
MORD specifications

Unit

Description

d)

Add for cost of centering and shuttering @ 50 per


cent of (a+b) per sqm of surface of arch soffit

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Quan tity

Rate
(Rs.)

1,016.60

0.00
381.23

Rate per cum = a+b+c+d+e+f


II.

3,431.03

RCC Grade M 25
a)

Material
Cement

b)

c)

0.40

4,000.00

1,616.00

Coarse sand

cum

0.45

190.00

85.50

20 mm aggregate

cum

0.54

390.00

210.60

10 mm aggregate

cum

0.36

400.00

144.00

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.20

180.00

36.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Labour

Machinery
Concrete mixer 0.4/0.28 cum capacity

d)

Add for cost of centering and shuttering @ 45 per


cent of cost of (a+b) per sqm of surface of arch soffit

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Rate per cum = a+b+c+d+e+f


Note:

13.26

1200

EE.,Dn.I,BMR

Amount
(Rs.)

1,146.20

0.00
429.83
3,868.43

The additional cost of centering and shuttering @ 50 per cent


of cost of material and labour shall hold good for arch spans of
6 m and above. For lesser length of spans, the corresponding
additional cost can be taken as 40 per cent for spans above 4
m length and 30 per cent for spans less than 4m.

Providing steel R.S.Js/built-up steel sections including cutting,


welding/rivetting, hoisting, fixing in position for composite
girders with shear connectors complete with painting as per
drawing and technical specifications Clause 1205.6

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

322

Sr.
No.

Reference to
MORD specifications

Unit

Description

A)

Quan tity

Rate
(Rs.)

Amount
(Rs.)

Steel section
Unit = quintal
Taking output for a typical 6 m long built up section comprising
of of R.S.Js, with connecting plates with shear connectors
a)

Material
R.S.Js 350 m x 200 mm @ 56.9 kg/m
6.0 m x 56.9 kg = 341.4 kg
Add 5 per cent for wastage = 17.87 kg
Total = 358.47 kg
25 cm wide x 12 mm thick plate
4x6x8.25 = 565.25 kg
Wastage 5 per cent = 28.3 kg
Total = 593.54 kg
Add shear connectors @ 10% = 59 kg
Total = 358.47 +593.5+59 =
1011 kg
Steel fabricated section

10.11

3,300.00 33,363.00

0.454

6,000.00

Rivets 22 mm dia = 240 Nos


Wastage @ 5 per cent = 12 Nos
Total = 252 Nos
Quantity of rivetting @ 1.8 kg per 10 rivets = 45.35 kg
Add 5 per cent of cost of material for painting one shop
coat with red oxide primer and three coats of synthetic
enamel and consumables
b)

1,804.35

Labour
Fitter

day

6.00

150.00

900.00

Blacksmith

day

6.00

120.00

720.00

Mazdoor (Unskilled)

day

12.00

80.00

960.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

Cost for 10.11 q = a+b+c+d

EE.,Dn.I,BMR

2,724.00

TA to SE Circle BMR

5,058.92
45,530.27

AAO.,Circle, Barmer

SE.,Circle, Barmer

323

Sr.
No.

Reference to
MORD specifications

Unit

Description

Quan tity

Rate
(Rs.)

Rate per quintal = (a+b+c+d)/10.11


Note:

i)

In case of welded section, welding charges per cm length of


welding shall substitute cost of rivetting

ii)

Shear connectors should always be welded to the top flange

iii)

The analysis of R.C.C. deck slab for the composite girder to be


adopted from the item 13.1 of concrete superstructure

Amount
(Rs.)
4,503.49

iv) In the analysis of deck slab for composite girder


superstructure, the component of formwork for the same shall
be 20 per cent of cost of materials, labour and machinery for
deck slab.
v) For spans upto 6 m with height above 5 m extra labour of
mazdoor @ 3.0 days per quintal may be added
vi) For higher span lengths of different heights following additional
labour for erection of steel girders on pier/abutment caps may
be provided:
Mate

day

0.01

100.00

1.00

Mazdoor (Skilled)

day

0.06

100.00

6.00

Mazdoor (Unskilled)

day

0.24

80.00

19.20

However, it is preferable to analyse the cost of erection of


composite girder type of superstructure for required span
range and height range with a project - specific methodology.

vii) The provision of 10 per cent for shear connectors in the typical
case is tentative. The quantity shall be worked out as per
design.
viii) The cost of painting can also be analysed in detail in
accordance with item 10.6 of Chapter 10

EE.,Dn.I,BMR

TA to SE Circle BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

324

Chapter 14
PROTECTION WORKS
Sr.
No.

Reference to
MORD specifica- tions

Description

14.1

1300

Providing and laying boulder apron for bed protection with


stone boulders of minimum size and weight as per Table 1300.1,
no fragment weighing less than 25 kg laid dry complete as per
drawing and technical specifications Clause 1301

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Unit = cum
a)

b)

Material
Stone boulder (25 kg minimum)

cum

1.00

150.00

150.00

Stone spalls

cum

0.20

100.00

20.00

Mate

day

0.04

100.00

4.00

Mason 1st Class

day

0.35

180.00

63.00

Mazdoor (Unskilled)

day

0.75

80.00

60.00

Labour

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

37.13

Rate per cum = a+b+c+d

14.2

334.13

Note:

Nominal excavation required for preparation of bed has been taken


into account while making provisions for labour.

1300

Providing and laying of boulder apron laid in wire crates with 4


mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x
100 mm mesh (woven diagonally) including 10 per cent extra for
laps and joints laid with stone boulders weighing not less than
25 kg each as per drawing and technical specifications Clause
1301
Unit = cum
Taking ouput = 3 m x 1.5 m x 1.25 m = 5.63 cum
a)

Material
Stone boulder (25 kg minimum)

cum

5.63

150.00

844.50

Stone spalls

cum

1.13

100.00

113.00

kg

64.00

day

0.18

GI wires 4 mm dia @ 32 kg/10 sqm


b)

Labour
Mate

EE.,Dn.I, BMR

38.00 2,432.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

100.00

SE.,Circle, Barmer

18.00

325

Sr.
No.

Reference to
MORD specifica- tions

Description

Unit

Quantity

Rate
(Rs.)

day

1.50

100.00

150.00

Mazdoor (Unskilled)

day

3.00

80.00

240.00

Add for labour for weaving the wire crates @ 2 per cent of cost
of GI wire

8.16

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

475.71
4,281.37

Rate per cum = (a+b+c+d)/5.63

14.3

1300

(Rs.)

Mazdoor (Skilled)

Cost for 5.63 cum = a+b+c+d

Note:

Amount

760.46

Nominal cost of trimming for preparation of bed has been


included in the cost of labour

The analysis will by & large hold good for gabions

Providing and laying of apron with cement concrete blocks of


size as per Table 1300.1 cast-in-situ and made with nominal mix
of M-15 grade cement concrete as per drawing and technical
specifications Clause 1301
Unit = cum
a)

Concrete grade M 15
(Rate as per item No 11.4 II (i)

cum

1.00 1,954.25 1,954.25

Add 2 per cent of cost to account for excavation for


preparation of bed, nominal surface reinforcement and filling of
granular material in recesses between blocks.

39.09

Rate per cum = (a)


14.4

1300

1,993.34

Single bamboo palasiding / walling of whole 2nd class bamboo


(Jati or Bethua) 75mm dia and closely packed & driven
including fitting fixing with half bamboo kamis horizontally in
three rows with cane or tying with wire complete and struts 1.5
m apart longitudinally and providing brush wood as per
drawing and technical specifications Clause 1302.5

A)

Deleted

Driven at least 900 mm below ground and 1200 mm above


ground
Unit = Running metre
Taking Output = 3.00 metre
a)

Materials
2nd Class Bamboo 65 mm to 75 mm dia, (1.2 m to 3.0 m) nos.

EE.,Dn.I, BMR

Binding Wire

kg

Brush Wood (LS Rs.10.00)

LS

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

15.00

40.00

600.00

0.15

85.00

12.75
10.00

SE.,Circle, Barmer

326

Sr.
No.

Reference to
MORD specifica- tions

Description
b)

B)

Rate
(Rs.)

Amount
(Rs.)

Labour
day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

c)

Sundries (LS Rs.5.00)

LS

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

10.00
0.00
89.59

Cost for 3 metre = a+b+c+d+e

806.34

Rate per metre = (a+b+c+d+e) / 3.00

268.78

Driven at least 900 mm below ground and 900 mm above


ground on average
Materials
2nd Class Bamboo 65 mm to 75 mm dia, (1.8 m-2.5 m)
long

b)

1300

Quantity

Mate

a)

14.5

Unit

nos.

14.00

35.00

490.00

Binding Wire

kg

0.15

33.00

4.95

Brush Wood (LS Rs.10.00)

LS

10.00

Labour
Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

c)

Sundries

LS

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

10.00
0.00
74.87

Cost for 3 m = a+b+c+d+e

673.82

Rate per m = (a+b+c+d+e) / 3.00

224.61

Providing and laying pitching on slopes laid over prepared filter


media as per drawing and technical specifications Clause 1302

I.

Stone/Boulder
Unit = cum
a)

EE.,Dn.I, BMR

Material
Stone boulder (25 kg minimum)

cum

1.00

150.00

150.00

Stone spalls of minimum 25 mm size

cum

0.20

100.00

20.00

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

327

Sr.
No.

Reference to
MORD specifica- tions

Description
b)

Unit

Quantity

Rate
(Rs.)

(Rs.)

Labour
Mate

day

0.04

100.00

4.00

Mason 1st Class

day

0.35

180.00

63.00

Mazdoor (Unskilled)

day

0.75

80.00

60.00

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
37.13

Rate per cum = (a+b+c+d)


II.

Amount

334.13

Cement concrete blocks of size as per Table 1300.2 cast in


cement concrete of grade M 15
a)

Concrete grade M 15
(Rate as per item No. 11.4 II (i)except that the size of
aggregate shall be 20 mm & down

cum

1.00 1,954.25 1,954.25

Add 2 per cent of cost to account for surface


reinforcement and filling of granular material in recesses
between blocks

39.09

Rate per cum = (a)


III.

1,993.34

Brick pitchng set in cement mortar 1:4


Unit = cum
a)

b)

Material
Bricks

Nos. 500.00

1.80

900.00

Cement mortar 1:4 (Rate as in item 11.5 II)

cum

0.24 1,802.70

432.65

Mate

day

0.10

100.00

10.00

Mason 1st Class

day

0.80

180.00

144.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per cum = (a+b+c+d)


14.6

1300

0.00
204.08
1,836.73

Providing and laying filter material underneath pitching in


slopes complete as per drawing and technical specifications
Clause 1302
Unit = cum

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

328

Sr.
No.

Reference to
MORD specifica- tions

Description
a)

Quantity

Rate
(Rs.)

1.20

250.00

300.00

Mate

day

0.05

100.00

5.00

Mazdoor (Skilled)

day

0.25

100.00

25.00

Mazdoor (Unskilled)

day

1.02

80.00

81.60

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
51.45
463.05

Note:

Labour cost includes labour required for trimming of slope to proper


profile and preparation of bed.

1300

Providing and laying flooring laid over cement concrete


bedding complete as per drawing and technical specification
Clause 1303
I.

(Rs.)

cum

Rate per cum = a+b+c+d

14.7

Amount

Material
Graded stone aggregate of required size

b)

Unit

Rubble stone laid in cement mortar 1:3


Unit = cum
a)

Material
i.

Cement mortar (1:3) (For rate refer to item 11.5 (I)

cum

0.33 2,312.20

763.03

ii.

Add for cement concrete bedding (M 10) nominal


mix) (For rate refer to item 11.4 I (i)

cum

1.00 1,961.97 1,961.97

Quantity shall be adopted as per design.

Add 1 per cent of cost to account for excavation for


preparation of bed

b)

iii.

Stone for rubble flooring 150 mm thick

cum

1.00

160.00

160.00

iv.

Stone spalls

cum

0.20

100.00

20.00

Mate

day

0.08

100.00

8.00

Mason 1st Class

day

0.50

180.00

90.00

Mazdoor (Unskilled)

day

1.50

80.00

120.00

Labour

c)

Overheads @ 0% on (i+ii+iii+a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

Rate per cum = a+b+c+d

EE.,Dn.I, BMR

27.25

TA to SE.,Circle, BMR

0.00
393.78
3,544.03

AAO.,Circle, Barmer

SE.,Circle, Barmer

329

Sr.
No.

Reference to
MORD specifica- tions

Note:

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Quantity of cement mortar is inclusive of mortar for laying and filling


of joints.
II.

Cement conrete blocks grade M 15


Cement concrete blocks grade M 15
(Rate as per item 11.4 (II) (i)

cum

1.00 1,954.25 1,954.25

Add for cement concrete bedding


Rate as per item 11.4 (II) (i)

cum

1.00 1,954.25 1,954.25

Quantity shall be adopted as per design.


Add 1 per cent of cost to account for excavation for
preparation of bed.

39.09

Rate per cum


III.

3,947.59

Brick on edge laid in cement mortar (1:3)


Unit=cum
a)

b.

Material
Bricks

Nos

Cement mortar (1:3) [(Rate as in item 11.5 (i)]


Cement mortar bedding (1:5) [(Rate as in itm 12.1 (iii)]

500.00

1.80

900.00

cum

0.15 2,312.20

346.83

cum

0.25 1,522.70

380.68

Mate

day

0.10

100.00

10.00

Mason 1st Class

day

0.80

180.00

144.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

Labour

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
240.94

Rate per cum = a+b+c+d


14.8

1303

2,168.44

Providing and laying of dry rubble flooring complete as per


drawings and technical specifications Clause 1303.3
Unit = cum
a)

b)

EE.,Dn.I, BMR

Material
Stone for rubble flooring 150 mm thick

cum

1.00

160.00

160.00

Stone spalls

cum

0.20

100.00

20.00

Labour

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

330

Sr.
No.

Reference to
MORD specifica- tions

Description

Unit

Quantity

Rate
(Rs.)

1300

(Rs.)

Mate

day

0.10

100.00

10.00

Mason 1st Class

day

0.50

180.00

90.00

Mazdoor (Unskilled)

day

1.50

80.00

120.00

Add 1 per cent of (b) for trimming and preparation of base

2.20

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

50.28

Rate per cum = a+b+c+d


14.9

Amount

452.48

Providing and laying curtain walls complete as per drawing and


technical specification Clause 1304
Unit = cum
I.

Brick masonry in cement mortar (1:4)


(Rate same as per item 11.5 (II)

II.

cum

1.00 1,844.60 1,844.60

cum

1.00 1,492.03 1,492.03

cum

1.00 1,961.97 1,961.97

Stone boulder

cum

1.00

150.00

150.00

Stone spalls

cum

0.20

100.00

20.00

Mate

day

0.05

100.00

5.00

Mason 1st Class

day

0.25

180.00

45.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Coursed rubble masonary (2nd sort) in cement mortar (1:4)


(Rate same as per item 12.4 II (ii) )

III.

Cement concrete grade M 10


(Rate same as per item 11.4 I (i)

Note:

14.10

1300

Other items like excavation for foundation, filling behind wall,


filter media, weep holes, etc. shall be added separately as per
approved design.

For this item, where reference has been made to items


analysed in other Chapters, i.e., 11, 12 & 13, the overheads
shall be taken as 15 per cent instead of 20 per cent

Construction of flexible apron 1 m thick comprising of loose


stone boulders weighing not less then 25 kg beyond curtain
wall
Unit = cum
a)

b)

EE.,Dn.I, BMR

Material

Labour

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

331

Sr.
No.

Reference to
MORD specifica- tions

Description

Unit

Quantity

Rate
(Rs.)

1300

(Rs.)

Add: 1 per cent of cost of (a+b) for trimming and preparation


of bed

3.00

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

37.88

Rate per cum = a+b+c+d


14.11

Amount

340.88

Construction of toe walls for protection of slopes as per


drawing and technical specifications Clause 1302.5
I.

Random rubble masonry in case of stone pitching laid


with cement mortar (1:5)
(iii) In cement mortar (1:5)
Unit = cum
a)

b)

Material
Stone for RR masonry

cum

1.00

160.00

160.00

Through and bond stone


(7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)

Nos.

7.00

10.00

70.00

Cement mortar (Rate same as in item 12.1 III)

cum

0.33 1,522.70

502.49

Mate

day

0.12

100.00

12.00

Mason 1st Class

day

1.20

180.00

216.00

Mazdoor (Unskilled)

day

1.80

80.00

144.00

Bhisti

day

0.08

90.00

7.20

Labour

Add for scaffolding @ 5 per cent on (a+b)


c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

55.58
0.00
145.91

Rate per cum = a+b+c+d


Note:

1,313.18

For height less than 3 m, dry rubble masonry can also be used. In
that case, the sub-item of cement mortar may be omitted in the
analysis.
II.

Brick masonry in cement mortar 1:4 in case of brick


pitching
Unit = cum
a)

Material
Brick

Nos. 500.00

Cement mortar 1:4

cum

1.80

900.00

0.24 1,802.70

432.65

Rates as per sub-analysis

EE.,Dn.I, BMR

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

332

Sr.
No.

Reference to
MORD specifica- tions

Description
b)

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

Labour
Mate

day

0.09

100.00

9.00

Mason (1st Class)

day

0.80

180.00

144.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Bhisti

day

0.20

90.00

18.00

c)

Overheads @ 0% on (a+b)

d)

Contractors profit @ 12.5% on (a+b+c)

0.00
203.96

Rate per cum = a+b+c

1,835.60

Sub-analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
a)

Material
Cement

Sand
b)

0.38 4,000.00 1,520.00

cum

1.05

190.00

199.50

Mate

day

0.04

100.00

4.00

Mazdoor (Unskilled)

day

0.90

80.00

72.00

Bhisti

day

0.08

90.00

7.20

Labour

Total material and labour = (a+b)


III.

1,802.70

Cement concrete grade M 10 in case of concrete block


pitching
Unit = cum

I.

P.C.C grade M 20
(i)

Nominal mix 1:3:6


Unit = cum
a)

Material
Cement

b)

EE.,Dn.I, BMR

0.250 4,000.00 1,000.00

Coarse sand

cum

0.48

190.00

91.20

40 mm aggregate

cum

0.576

310.00

178.56

20 mm aggregate

cum

0.288

390.00

112.32

10 mm aggregate

cum

0.096

400.00

38.40

Labour

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

333

Sr.
No.

Reference to
MORD specifica- tions

Description

c)

Quantity

Rate
(Rs.)

Amount
(Rs.)

Mate

day

0.08

100.00

8.00

Mason (1st Class)

day

0.10

180.00

18.00

Mazdoor (Unskilled)

day

1.63

80.00

130.40

Bhisti

day

0.27

90.00

24.30

hour

0.40

60.00

24.00

Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity
fitted with water measuring device and preferably
also with load cell.

d)

Formwork @ 4% on cost of material, labour and


machinery (a+b+c)

e)

Overheads @ 0% on (a+b+c+d)

f)

Contractors profit @ 12.5% on (a+b+c+d+e)

Rate per cum = a+b+c+d+e+f

EE.,Dn.I, BMR

Unit

TA to SE.,Circle, BMR

AAO.,Circle, Barmer

65.01
0.00
211.27
1,901.46

SE.,Circle, Barmer

334

Chapter 15
MAINTENANCE OF ROADS
Sr.
No.

Reference to
MORD Specifica
tions

15.1

1900

Unit

Quantity

Mate

day

0.24

100.00

24.00

Mazdoor (Unskilled)

day

6.00

80.00

480.00

hour

3.00

40.00

120.00

cum

7.50

0.00

0.00

Description

Rate
(Rs.)

Amount
(Rs.)

Restoration of Rain Cuts


i)

Restoration of rain cuts with soil, moorum gravel or a mixture


of these, clearing the loose soil, benching for 300mm width
laying fresh material in layers not exceeding 250 mm and
compaction with plate compactor or power rammer to restore
the original alignment, level and slopes as per drawings and
technical specifications Clause 1902
A.

Manual Means
Unit = cum
Taking output = 10 cum
a)

b)

Labour

Machinery
Plate compactor

c)

Materials
Compensation for earth Taken from private land

d)

Overheads @ 0% on (a+b)

e)

Contractors profit @ 12.5% on (a+b+c)

0.00
78.00

Cost for 10 cum = a+b+c+d

702.00

Rate per cum = a+b+c+d/10


B.

70.20

Mechanical Means
Unit = cum
Taking output = 50 cum
a)

b.

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

hour

0.83

1,400.00

1,162.00

Machinery
Hydraulic Excavator 0.9 cum bucket capacty @ 60
cum/h

EE.,Dn.I, BMR

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

335

Sr.
No.

Reference to
MORD Specifica
tions

Description
Tipper 5.5 cum, 10 t capacity

Unit

Quantity

hour

2.27

Rate
(Rs.)
450.00

Amount
(Rs.)
1,021.50

Add 10% cost of carriage towards loading and


unloading charges
Plate compactor
c.

0.00
hour

15.00

40.00

600.00

cum

37.50

0.00

0.00

Materials
Compensation for earth taken from private land

d.

Overheads @ 0% on (a+b+c)

e.

Contractors profit @ 12.5% on (a+b+c)

0.00
452.94

Cost for 50 cum = a+b+c+d+e

4,076.44

Rate per cum a+b+c+d+e/50

81.53

Note: Only 75% of fresh material has been provided as 25% can be
retrieved from site from earth i.e. flown down the slop in the form of
slurry and deposited at the foot of rain cuts.

15.2

1900

1.

Maintenance of Earthen shoulder (filling with fresh


selected soil)
Making up loss of material/irregularities on shoulders to the
design level by adding fresh approved selected soil and
compacting it with appropriate equipment at OMC upto a lead
of 1000 m as per technical specification Clause 1903
Unit = sqm
Taking output = 100 sqm
Assuming average thickness of filling to be 150 mm
Quality of fresh material = 15 cum
a.

b.

Labour
Mate

day

0.20

100.00

20.00

Mazdoor (Unskilled)

day

5.00

80.00

400.00

Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum


per hour

hour

0.25

1,400.00

350.00

Tipper 5.5 cum

hour

0.68

450.00

306.00

Machinery

Add 10% cost of transportation to cover cost of loading


and unloading
Plate compactor @ 25 sqm per hour
c.

hour

4.00

40.00

160.00

cum

15.00

0.00

0.00

Material
Compensation of earth

EE.,Dn.I, BMR

0.00

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

336

Sr.
No.

Reference to
MORD Specifica
tions

Description

Unit

d.

Overheads @ 0% on (a+b+c)

e.

Contractors profit @ 12.5% on (a+b+c)

Quantity

Rate
(Rs.)

Amount
(Rs.)
0.00
154.50

Cost for 100 sqm = a+b+c+d+e

1,390.50

Rate per sqm = (a+b+c+d+e)/100


2.

13.91

Maintenance of Earhen shoulder (stripping of excess soil)


Stripping excess soil from the shoulder surface to achieve the
approved level and compacting with plate compactor at OMC
as per drawings and Technical Specification Clause 1903

Unit = sqm
Taking output = 100 sqm
Assuming height of stripping as 75 mm
Quantity of earth cutting involved = 7.5 cum
a.

b.

Labour
Mate

day

0.10

100.00

10.00

Mazdoor (Unskilled)

day

2.50

80.00

200.00

hour

4.00

40.00

160.00

Machinery
Plate compactor

c.

Overheads @ 0% on (a+b)

0.00

d.

Contractors profit @ 12.5% on (a+b+c)

Cost for 100 sqm = a+b+c+d

46.25
416.25

Rate per sqm = a+b+c+d/100

4.16

Note: Earth stripped from earthen shoulders to be used as shoulders or


dumped on the side slopes locally for disposal.
15.3

1900

Maintenace of bituminous surface road


i.

Repair to pot holes by removal of failed material, trimming the


sides to vertical and levelling the bottom, cleaning the same
with compressed air or any appropriate method filled with
75mm B.M, applying bitumen emulsion prime coat at the
bottom and bitumen emulsion tack coat on sides and on
bottom as per technical specifications Clauses 502 and 503.
Unit = cum
Taking output = 187.5x0.075 = 14.06 cum = (30.94 Tonne)
(5% area of one km)

EE.,Dn.I, BMR

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

337

Sr.
No.

Unit

Quantity

Mate

day

0.80

100.00

80.00

Mazdoor (Unskilled)

day

20.00

80.00

1,600.00

Jack hammer 25 kg with tractor

hour

4.00

170.00

680.00

Compressor 210 cfm with tractor

hour

2.00

194.00

388.00

Emulsion pressure distributor

hour

4.00

700.00

2,800.00

Mixall 6/10 t capacity

hour

4.00

400.00

1,600.00

Three wheeled 80-100 kN Static Roller

hour

4.00

160.00

640.00

Tonne

0.168 24,500.00

4,116.00

Tonne

0.064 24,500.00

1,568.00

Tonne

1.082 29,500.00 31,919.00

Reference to
MORD Specifica
tions

Description
a)

b)

c)

Rate
(Rs.)

Amount
(Rs.)

Labour

Machinery

Material
Primer with bitumen emulsion @ 9 kg/10 sqm 187.5x9 =
168.75 kg.
Tack coat with bitumen emulsion @ 3.0 kg/ 10 sqm
Bottom = 187.5
Sides = 28.27
Total = 215.77
Bitumen for BM @ 3.5% by weight of mix
= 30.94 x 3.5 / 100 = 1.082
Weight of mix (BM) 14.06 cum = (30.94 tonne)
Weight of Bitumen = 1.082
Weight of aggregate 30.94 -1.082 = 29.86
Taking density of aggregate 1.5 t per cum
Volume of aggregate 29.86 / 1.5 = 19.90 cum
Grading (1) (40 mm nominal size)
37.5 - 25 mm 15%

cum

2.985

365.00

1,089.53

25 - 10 mm 45%

cum

8.96

370.00

3,313.35

10 - 5 mm 25%

cum

4.975

230.00

1,144.25

5 mm and below 15%

cum

2.99

140.00

417.90

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c)

Cost of 14.06 cum = a+b+c+d+e

EE.,Dn.I, BMR

TA to SE Circle,BMR

6,419.50
57,775.53

AAO.,Circle, Barmer

SE.,Circle, Barmer

338

Sr.
No.

Reference to
MORD Specifica
tions

Description

Unit

Quantity

Rate
(Rs.)

Rate per cum = a+b+c+d+e/14.06


ii.

Amount
(Rs.)
4,109.21

Patch repair on already filled pot holes with 75 mm BM with 20


mm premix carpet and seal coat Type B as per drawings and
technical specification Clause 1904.2
Unit = sqm
Takign output = 200 sqm
a)

b)

c)

Labour
Mate

day

0.64

100.00

256.00

Mazdoor (Unskilled)

day

16.00

80.00

1,280.00

Mixall 6/10 tonne

hour

2.00

400.00

800.00

Bitumen pressure distributior

hour

2.00

700.00

1,400.00

Three wheeled 80-100 kN Static Roller

hour

4.00

160.00

640.00

Machinery

Material
Bitumen for pre-mix carpet @ 14.60 kg/10 sqm
200x14.60/10 =292 kg

tonne

0.292 29,500.00

8,614.00

Bitumen for tack coat @ 2 kg per 10 sqm 200 x 2 / 10 =


40 kg

tonne

0.04 24,500.00

980.00

Bitumen for seal coat @ 6.8 kg per 10 sqm


200 x 6.8 / 10 = 136 kg

tonne

0.136 29,500.00

4,012.00

Crushed stone aggregate @ 0.27 cum per 10 sqm


= 200 x 0.27 / 10 = 5.4 cum

cum

5.40

305.00

1,647.00

Crushed sand passing 2.36 mm sieve and retained on


180 mircon sieve @ 0.06 cum per 10 sqm

cum

1.20

125.00

150.00

200 x 0.06 / 10 = 1.20 cum


d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

Cost of 200 sqm = a+b+c+d+e

2,472.38
22,251.38

Rate/sqm = a+b+c+d+e/200
iii.

111.26

Repair to pot holes and removal of loose material, trimming of


sides, cleaning of surface by providing tack coat, 20 mm thick
pre-mix carpet and seal coat type B specification Clause
1904.2
Unit = sqm
Taking output = 200 sqm

EE.,Dn.I, BMR

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

339

Sr.
No.

Unit

Quantity

Mate

day

0.80

100.00

80.00

Mazdoor (Unskilled)

day

20.00

80.00

1,600.00

Air compressor 210 cfm with tractor

hour

2.00

194.00

388.00

Bitumen pressure distributor

hour

2.00

700.00

1,400.00

Mixall 6/10t capacity

hour

2.00

400.00

800.00

Three wheeled 80-100 kN Static Roller

hour

4.00

160.00

640.00

tonne

0.064 24,500.00

1,568.00

Bitumen for pre-mix carpet @ 14.60 kg per 10 sqm = 200 tonne


x 14.6 / 10 = 292 kg

0.29 24,500.00

7,154.00

Bitumen for seal coat @ 6.8 kg per 10 sqm


= 200 x 6.8 / 10 = 136 kg

tonne

0.14 24,500.00

3,332.00

Crushed stone aggregate @ 0.27 cum per 10 sqm


= 200 x 0.27 / 10 = 5.4 cum

cum

5.40

305.00

1,647.00

Crushed sand passing 2.36 mm sieve and retained on


180 micron sieve @ 0.06 cum per 10 sqm
200 x 0.06 / 10 = 1.20 cum

cum

1.20

125.00

150.00

Reference to
MORD Specifica
tions

Description
a)

b)

c)

Rate
(Rs.)

Labour

Machinery

Material
Bitumen for tack coat @ 3kg per 10 sqm 200 x 3 / 10 =
60 kg

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

2,344.88

Cost for 200 sqm = a+b+c+d+e

21,103.88

Rate per sqm = a+b+c+d+e/200


iv.

Amount
(Rs.)

105.52

Repair to pot holes and removal of loose material, trimming of


sides, cleaning of surface by providing tack coat with bitumen
emulsion, 20 mm thick pre-mix carpet using catonic bitumen
emulsion and seal coat type B with bitumen emulsion

Unit = sqm
Taking output = 200 sqm
a)

b)

Labour
Mate

day

0.64

100.00

64.00

Mazdoor (Unskilled)

day

16.00

80.00

1,280.00

hour

2.50

60.00

150.00

Machinery
Concrete mixer 0.4 / 0.28 cum capacity

EE.,Dn.I, BMR

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

340

Sr.
No.

Unit

Quantity

Air compressor 210 CFM with tractor

hour

2.00

194.00

388.00

Emulsion pressur distributor

hour

2.00

700.00

1,400.00

Three wheeled 80-100 kN Static Roller

hour

4.00

160.00

640.00

Emulsion for tack coat @ 3 kg per 10 sqm


200 x 3 / 10 = 60 kg

tonne

0.06 24,500.00

1,470.00

Emulsion for premix carpet @ 21.50 kg per 10 sqm


200 x 21.50 / 10 = 430 kg

tonn

0.43 24,500.00 10,535.00

Emulsion for seal coat @ 10 kg per 10 sqm


= 200 x 10 / 10 = 200 kg

tonn

0.20 24,500.00

4,900.00

Crushed stone aggregate @ 0.27 cum per 10 sqm =


200 x 0.27 / 10 = 5.4 cum

cum

5.40

305.00

1,647.00

Crushed sand passing 2.36 mm sieve and retained on


180 micron sieve @ 0.06 cum per 10 sqm =
200 x 0.06 / 10 = 1.20

cum

1.20

125.00

150.00

Reference to
MORD Specifica
tions

Description

c)

Rate
(Rs.)

Materials

d)

Overheads @ 0% on (a+b+c)

0.00

e)

Contractors profit @ 12.5% on (a+b+c+d)

2,828.00

Cost for 200 sqm = a+b+c+d+e

25,452.00

Rate per sqm = a+b+c+d+e/200


15.4

1900

Amount
(Rs.)

127.26

Maintenance of Gravel Road


Maintenance of gravel road including making up the loss of profile,
rectifying corrugated surface, filling up of depressions, pot holes and
erosion gullies by adding fresh material and compacting it with
appropriate equipment or to strip excess of material from the road
surface as per drawings and technical specification Clause 1905

Unit = sqm
Taking out put @ 5% of the area in one km. as affected:
= 1000 x 3.75x0.05 / 100 = 187.5 Sqm
Quantity = 187.5 x 0.15 = 28.12 cum
a)

Rate as per item 4.1 of Chapter 4

cum

b)

Add 50% for extra efforts involved as maintenance is to be


done in small reaches

Cost of 187.5 Sqm = a+b

28.12

176.73

4,969.65
2,484.82
7,454.47

Rate per sqm = a+b/187.5

39.76

Note: The cost of 25% retrived material may be deducted from rates.
15.5

1900

EE.,Dn.I, BMR

Maintenance of WBM Road

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

341

Sr.
No.

Reference to
MORD Specifica
tions

Description

Unit

Quantity

cum

14.06

Rate
(Rs.)

Amount
(Rs.)

Maintenance of WBM road including filling up of pot holes, ruts and


rectifying corrugated surface, damaged edges and ravelling as per
technical specification Clause 1906.
Unit = Sqm
Output - Taking affected area @ 5% in 1 km
= 1000 x 3.75 x 0.05 = 187.5 sqm
Quantity 187.5 x 0.075 = 14.06 cum
a)

Rate as per item No. 4.7 of Chapter 4

b)

Add 50% for Extra Efforts involved on maintenance to be done


in Small reachs

590.38

8,300.67
4,150.34

Cost of 187.5 Sqm = a+b

12,451.01

Rate of per sqm a+b/187.5

66.41

Note: The cost of 25% retrived material may be deducted from rates.
15.6

1900

Maintenance of Drains
The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains as well as
catch water drains as per technical specification Clause 1907.

Unit - Per Metre


Taking output one km = 1000 metre
a)

Labour
Mate

day

0.32

100.00

32.00

Mazdoor (Unskilled)

day

8.00

80.00

640.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

Cost for 1000 metre = a+b+c

84.00
756.00

Rate per Metre = a+b+c/1000


15.7

1900

(I)

0.76

Maintenance of Culverts
Maintenance of Hume pipe Culvert by way of Clearing,
Cleaning, Erosion repair, repairs to cracks, parapet wall and
protection work as per drawing and technical specification
Clause 1908
Unit = One No. Hume pipe (1000 mm dia)
Taking output = One No.H.P. Culvert
a)

EE.,Dn.I, BMR

Labour

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

342

Sr.
No.

Unit

Quantity

Mate

day

0.10

100.00

10.00

Mazdoor (Unskilled)

day

1.00

80.00

80.00

Mason 2nd Class

day

1.40

150.00

210.00

Reference to
MORD Specifica
tions

Description

b)

Amount
(Rs.)

Material
Cement, Sand, Brick, Boulder etc.

(II)

Rate
(Rs.)

L.S

200.00

c)

Overheads @ 0% on (a)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

62.50

Cost for one No. Hume pipe culvert = a+b+c+d

562.50

Rate per hume pipe Culvert = a+b+c+d

562.50

Maintenance of Culverts Slab type


Maintenance of Slab type Culverts by way of clearing,
Cleaning, Erosion repair, repairs to cracks, parapet walls and
Protection works as per drawing and technical specification
Clasue 1908
Unit = One No. Culvert (2 m span)
Taking output = one No. Slab Culvert
a)

b)

Labour
Mate

day

0.20

100.00

20.00

Mazdoor (Unskilled)

day

4.00

80.00

320.00

Mason 2nd Class

day

1.00

150.00

150.00

Material
Cement, Sand, Bricks, Stone Boulder etc.

15.8

1900

c)

Overheads @ 0% on (a)

d)

Contractors profit @ 12.5% on (a+b+c)

L.S

500.00
0.00
123.75

Cost for One Slab Culverts =a+b+c+d

1,113.75

Rate per Culvert = a+b+c+d

1,113.75

Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs,
replacing Guide Posts, repair of flood gauges, removal of debris,
providing boulders and protection work and painting as per technical
specification Clause 1909
Unit = One metre

EE.,Dn.I, BMR

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

343

Sr.
No.

Unit

Quantity

Mate

day

0.80

100.00

80.00

Mazdoor (Unskilled)

day

1.60

80.00

128.00

Mason 1st Class/Painter 1st Class

day

4.00

180.00

720.00

Reference to
MORD Specifica
tions

Description

Rate
(Rs.)

Amount
(Rs.)

Taking output = 50 metre causeway


a)

b)

Labour

Material
Supply of cement, paint, sand, aggregate, boulder etc.

LS

350.00

(LS Rs.350.00)
c)

Overheads @ 0% on (a)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

159.75

Cost for 50 metre = a+b+c+d

1,437.75

Rate per metre = a+b+c+d/50


15.9

1900

28.76

Maintenance of Road Signs


Maintenance of road signs by way of cleaning and repainting of
mandatory / requlatory / cautionary / informatory and place
identifications sign board as perdrawings and technical specification
Clause 1910
Unit = 1 km
Taking output = one km
All types of signs in one Km
a)

b)

Labour
Mate

day

0.09

100.00

9.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

Painter 1st Class

day

0.125

150.00

18.75

Material
Synthetic Enamel Paint, Engineering grade tape, welding
machine etc. (LS Rs.300)

15.10

1900

EE.,Dn.I, BMR

c)

Overheads @ 0% on (a)

d)

Contractors profit @ 12.5% on (a+b+c)

LS

300.00
0.00
60.97

Cost for one Km = a+b+c+d

548.72

Rate per km = a+b+c+d

548.72

Maintenance of steel and RCC Railing

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

344

Sr.
No.

Unit

Quantity

Mate

day

0.024

100.00

2.40

Mazdoor (Unskilled)

day

0.30

80.00

24.00

Painter 1st Class

day

0.10

150.00

15.00

Blacksmith

day

0.20

120.00

24.00

0.039 33,000.00

1,287.00

0.001 60,000.00

60.00

Reference to
MORD Specifica
tions

Description
(i)

Rate
(Rs.)

Amount
(Rs.)

Repair of steel railing to bring it to original shape cleaning and


repainting as per drawing and technical specification Clause
1911
Steel Railing
Unit = Running metre
Taking output = 10 metre
It is assumed that damage is to the extent of 10%
a)

b)

Labour

Materials
Mild steel (structural steel)
ISMC = 0.029T
MS plate = 0.01
Nuts and bolts

c)

Machinery
Welding set (LS Rs.100.00)

LS

d)

Overheads @ 0% on (a+b+c)

e)

Contractors profit @ 12.5% on (a+b+c+d)

100.00
0.00
189.05

Cost for 10 metre = a+b+c+d+e

1,701.45

Rate per metre = a+b+c+d+e/10


(ii)

170.15

Repair of RCC railing to bring it to the original shape, cleaning


and repainting as per drawings and technical specification
Clause 1911
RCC Railing
Unit = running metre
Taking output = 1 metre
It is assumed that damage is to the extent of 10%
a)

Labour
Mate

EE.,Dn.I, BMR

TA to SE Circle,BMR

day

AAO.,Circle, Barmer

0.012

100.00

SE.,Circle, Barmer

1.20

345

Sr.
No.

Unit

Quantity

Mazdoor (Unskilled)

day

0.20

80.00

16.00

Mason 1st Class

day

0.10

180.00

18.00

cum

0.10

2,700.45

270.05

0.013 38,090.25

495.17

Reference to
MORD Specifica
tions

Description

b)

Rate
(Rs.)

Amount
(Rs.)

Materials
M 30 grade cement concrete
Rate as per item no. 13.1 (III) of Chapter 13
Steel bars reinforcement
Rate as per item no.13.2 of Chapter 13

c)

Overheads @ 0% on (a)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

4.40

Rate per metre = a+b+c+d+e


15.11

1900

804.82

Maintenance of 200 metre and km stones


Maintenance of 200 metre km stone by way of refiting of tilted
stones repairing with cement mortar, cleaning, repairing and lettering
on 200 metre km stone and 5th km stone as per drawing and
technical specification Clause 1912
Unit = 1 km
Assuming 1 km stone, 4 nos 200 metre stone and 1/5th 5km stone
(i)

Painting two coats with synthetic enamel paint


200 m stone 4 nos = 0.760 sqm.
One km stone = 0.815 sqm.
5th km stone 1x1/5 = 0.320 sqm.
Total = 1.895 sqm.
As per item No. 10.5 of chapter 10

(ii)

sqm

1.895

44.90

85.08

220.00

0.35

76.88

Printing letters and figures of any shade with synthtic enamel


paint of any approved colour to give an even shade
200 m stone 4 Nos. = 40 per cm height per letter
One no km stone = 120 per cm height per letter
5th km stones 1/5th = 60 per cm height per letter
Total = 220 per cm height per letter
Rate as per item no 10.1 of chapter 10

a)

EE.,Dn.I, BMR

per cm
height per
letter

Labour

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

346

Sr.
No.

Unit

Quantity

Mate

day

0.024

100.00

2.40

Mazdoor

day

0.50

80.00

40.00

Mason 1st Class

day

0.10

180.00

18.00

Reference to
MORD Specifica
tions

Description

b)

Rate
(Rs.)

Amount
(Rs.)

Materials
Cement, sand, aggregates etc.

LS

100.00

(LS = Rs.100.00)

15.12

1900

c)

Overheads @ 0% on (a+b)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

20.05

Cost for one km = (i+ii+a+b+c+d)

342.41

Rate per/km = (i+ii+a+b+c+d)

342.41

Cutting of branches of trees shrubs and trimming of grass and


weeds
(i)

Cutting of branches of trees and shrubs from the road way or


with in R.O.W including disposal of wood and leaves to
suitable location as per technical specification Clause 1914

Unit = one tree


Taking output = 10 trees of 900 mm average girth
a)

(ii)

Labour
Mate

day

0.12

100.00

12.00

Mazdoor (Skilled)

day

1.00

100.00

100.00

Mazdoor (Unskilled)

day

2.00

80.00

160.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

34.00

Cost for 10 trees = (a+b+c)

306.00

Rate per tree = (a+b+c)/10

30.60

Cutting of shrubs from the road way or with in R.O.W and


disposal of shrubs to suitable locations as per technical
specifications Clause 1914
Unit=Each
Taking output = 100 nos shrubs
a)

Labour
Mate

EE.,Dn.I, BMR

TA to SE Circle,BMR

day

AAO.,Circle, Barmer

0.08

100.00

SE.,Circle, Barmer

8.00

347

Sr.
No.

Reference to
MORD Specifica
tions

Description
Mazdoor (Unskilled)
b)

Overheads @ 0% on (a)

c)

Contractors profit @ 12.5% on (a+b)

Unit

Quantity

day

2.00

Rate
(Rs.)
80.00

Amount
(Rs.)
160.00
0.00
21.00

Cost for 100 shurbs = a+b+c

189.00

Rate per shurb = a+b+c/100


(iii)

1.89

Trimming of grass and weeds from the shoulders/berms and


disposing off the same to suitable locations as per technical
specifications Clause 1914
Unit = sqm
Taking output = 1500 sqm
a)

Labour
Mate

day

0.40

100.00

40.00

Mazdoor (Unskilled)

day

10.00

80.00

800.00

b)

Overheads @ 0% on (a)

0.00

c)

Contractors profit @ 12.5% on (a+b)

105.00

Cost for 1500 sqm = a+b+c

945.00

Rate per sqm = a+b+c/1500


15.13

1900

0.63

White washing of parapet walls of CD work and tree truncks


White washing two coats on parapet walls and tree trunks including
preparation of surface by cleaning scraping etc. as per technical
specifications Clause 1915
Unit = sqm
Taking output = 9 sqm
a)

b)

Labour
Mate

day

0.01

100.00

1.00

Mazdoor (Unskilled)

day

0.143

80.00

11.43

White washer

day

0.143

100.00

14.29

quintel

0.045

200.00

9.00

Fevicol adhesive

kg

0.10

120.00

12.00

Indigo

kg

0.013

135.00

1.76

Materials
Lime

EE.,Dn.I, BMR

TA to SE Circle,BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

348

Sr.
No.

Reference to
MORD Specifica
tions

Description

Unit

Quantity

Rate
(Rs.)

Amount
(Rs.)

c)

Overheads @ 0% on (a)

0.00

d)

Contractors profit @ 12.5% on (a+b+c)

6.18

Cost for 9 sqm = a+b+c+d

55.65

Rate per sqm = a+b+c+d/9

6.18

Note: For analysis of rates for maintenance works bitumen grade S-90 has
been taken. User may modify as per site requirement
15.14

1900

Periodical Renewal to existing bituminous surface


1

Open graded Premix carpet 20 mm thick


Unit = sqm
(i)

Tack coat

With bituminous Emulsion (RS-1)


Rates as per item 5.2 (ii)
(ii)

sqm

Pre-mix carpet using bituminous (penetration grade


modified bitumen) binder

Rates as per item No. 5.9

sqm

as relevant
Or
(iii)

Premix carpet using bitumen Emulsion

Rates as per item No. 5.10

sqm

(iv) Seal coat Type A, B or C


Rates as per item No. 5.11
2

Surface dressing single coat/first coat or 2nd coat


Rates as per item No. 5.6

EE.,Dn.I, BMR

TA to SE Circle,BMR

sqm

AAO.,Circle, Barmer

SE.,Circle, Barmer

349

BASIC RATES
(A) Labour
Sl. No.

Description of Labour

Unit

Rate (Rs.)

L-01

Bhisti

day

90.00

L-02

Bitumen Sprayer

day

100.00

L-03

Blacksmith

day

120.00

L-04

Blaster

day

150.00

L-05

Carpenter 1st Class

day

200.00

L-06

Chips spreader

day

90.00

L-07

Chiseller

day

150.00

L-08

Dresser (Skilled)

day

200.00

L-09

Driller

day

150.00

L-10

Electrician

day

150.00

L-11

Fitter

day

150.00

L-12

Mason (1st class)

day

180.00

L-13

Mason (2nd Class)

day

150.00

L-14

Mate

day

100.00

L-15

Mazdoor (Unskilled)

day

80.00

L-16

Mazdoor (Semi skilled)

day

90.00

L-17

Mazdoor (Skilled)

day

100.00

L-18

Painter (Ist class)

day

150.00

L-19

Plumber

day

150.00

L-20

Surveyor

day

170.00

L-21

White Washer

day

100.00

Overheads Charges

Please Enter
Please
/ Edit Enter
the Rate of the
Labour
Rate of L

Contractors profit

12.50

Please Enter
Please
/ EditEnter / Edit
the Rate of the
Labour
Rate of Labour

350

BASIC RATES
(C) Material
Sl. No.

Description

M-001

AC pipe 100 mm

M-002

Input
Unit Rates
(Rs.)
m

65.00

Aggregate - For 37.5 mm Maximum size - 22.4 mm to 5.6 mm

cum

315.00

M-003

Aggregate - For 37.5 mm Maximum size - 45 mm to 22.5 mm

cum

305.00

M-004

Aggregate - For 37.5 mm Maximum size - Below 5.6 mm

cum

115.00

M-005

Aggregate - For 53 mm Maximum size - 22.5 mm to 5.6 mm

cum

315.00

M-006

Aggregate - For 53 mm Maximum size - 63 mm to 45 mm

cum

280.00

M-007

Aggregate - For 53 mm Maximum size - Below 5.6 mm

cum

125.00

M-008

Aggregate - Grading I (40 mm nominal Size) 10 mm - 5 mm

cum

230.00

M-009

Aggregate - Grading I (40 mm nominal Size) 25 mm 10 mm

cum

370.00

M-010

Aggregate - Grading I (40 mm nominal Size) 37.25 mm - 25 mm

cum

365.00

M-011

Aggregate - Grading I (40 mm nominal Size) 5 mm and below

cum

140.00

M-012

Aggregate - Grading II (19 mm nominal Size) 10 mm - 5 mm

cum

230.00

M-013

Aggregate - Grading II (19 mm nominal Size) 25 mm 10 mm

cum

370.00

M-014

Aggregate - Grading II (19 mm nominal Size) 5 mm and below

cum

140.00

M-015

Aggregate 10 mm

cum

400.00

M-016

Aggregate 20 mm

cum

390.00

M-017

Aggregate 40 mm

cum

310.00

M-018

Aggregate- Crushable type such as moorum or Gravel for Grading I

cum

100.00

M-019

Aggregate- Crushable type such as moorum or Gravel for Grading II

cum

95.00

M-020

Aggregate- Crushable type such as moorum or Gravel for Grading III

cum

90.00

M-021

Aggregate-Grading I 90 mm to 45 mm(H.B.)

cum

145.00

M-022

Aggregate-Grading II 63 mm to 45 mm(H.B.)

cum

190.00

M-023

Aggregate-Grading III 53 mm to 22.4 mm(C.B.)

cum

320.00

M-024

Aggregates 22.4 mm to 2.36 mm for wet mix macadam

cum

370.00

M-025

Aggregates 45 mm to 22.4 mm for wet mix macadam

cum

330.00

M-025

Aluminium sheeting (1.5 mm thick)

sqm

4,500.00

M-026

Aluminium Studs 100 mm x 100 mm fitted with lense reflectors

Nos.

150.00

351

Sl. No.

Description

Input
Unit Rates
(Rs.)

M-027

Bamboo (1st Class) 85 mm - 100 mm dia, 2.0 m long

No.

40.00

M-028

Bamboo (1st Class) 85 mm - 100 mm dia, 2.5 m long

No.

50.00

M-028

Bamboo (1st Class) 85 mm - 100 mm dia, 3.0 m long

No.

55.00

M-029

Bamboo (1st Class) 85 mm - 100 mm dia, 4.5 m - 5.5 m long

No.

60.00

M-028

Bamboo (2nd Class) 75mm dia, 1.8 m - 2.5 m long

No.

35.00

M-029

Bamboo (2nd Class) 75mm dia, 2.1 m - 3.0 m long

No.

40.00

M-030

Barbed wire

kg

45.00

M-031

Binding Material

cum

85.00

M-032

Binding wire

kg

33.00

M-033

Bitumen (Crumb Rubber Modified)

tonne

34,900.00

M-034

Bitumen (Natural Rubber Modified)

tonne

36,000.00

M-035

Bitumen (Polymer Modified)

tonne

37,000.00

M-036

Bitumen (S-65)

31,700.00

M-037

Bitumen (S-90)

29,500.00

M-038

Bitumen Emulsion (RS-1)

25,000.00

M-039

Bitumen Emulsion (SS-1)

24,500.00

M-040

Bituminous sealant

litre

100.00

M-041

Blasted rubble

cum

40.00

M-042

Blasting material

kg

55.00

M-043

Bond stone (400 mm x 150 mm x 150 mm)

No.

10.00

M-044

Brick 1st Class

No.

1.80

M-045

Cement

M-046

Cement Primer

M-047

Chlorprene Elastomer or Closed Cell Foam Sealing Element

M-048

Compensation for earth taken from private land

cum

M-049

Compressible Fibre Board

sqm

400.00

M-050

Copper plate

kg

350.00

M-051

Corbelling Stones (300 mm x 150 mm x 150 mm)

No.

25.00

M-052

Corrosion Resistant Structural Steel Grating

kg

40.00

4,000.00

litre

20.00

100.00
-

352

Sl. No.

Description

Input
Unit Rates
(Rs.)

M-053

Credit for excavated rock found suitable for use

cum

55.00

M-054

Crow bars 40 mm dia (hire charges)

hour

5.00

M-055

Crushed Sand or Grit Passing 2.36 mm and retained on 180 micron

cum

125.00

M-056

Crushed Slag

cum

160.00

M-057

Crushed Stone Aggregate 26.5 mm to 75 micron

cum

305.00

M-058

Crushed Stone chipping 13.2 mm nominal size

cum

400.00

M-059

Crushed Stone Chipping 6.7 mm size 100% passing 11.2 mm and retained on
2.36 mm

cum

230.00

M-060

Crushed Stone Chipping 6.7 mm size 100% passing 9.5 mm and retained on
2.36 mm

cum

320.00

M-061

Crushed Stone chipping 9.5 mm nominal size

cum

320.00

M-062

Crushed Stone Coarse Aggregate Passing 53 mm and retained on 2.8 mm

cum

280.00

M-063

Curing compound

litre

40.00

M-064

Debonding strips

15.00

M-065

Edge Stone (450 mm x 350 mm x 100 mm)

No.

20.00

M-066

Edge Stone (450 mm x 350 mm x 200 mm)

No.

35.00

M-067

Elastomeric bearing assembly

Nos.

7,680.00

M-068

Electric Detonator

each

10.00

M-069

Epoxy Paint

litre

300.00

M-070

Epoxy Primer

litre

250.00

M-071

Farmyard manure

cum

200.00

M-072

Fevicol adhesive

kg

120.00

M-073

Filter media

cum

200.00

M-074

Fine aggregate/Crushed sand 2.36 mm to 75 micron

cum

115.00

M-075

Galvanised angle

kg

40.00

M-076

Galvanised angle Section 100 mm x 100 mm of 12 mm thickness

kg

50.00

M-077

Gelatine 80 per cent

kg

120.00

M-078

GI Pipe 100 mm dia

200.00

M-079

GI Pipe 50 mm dia

150.00

M-080

GI wires

kg

38.00

353

Sl. No.

Description

Input
Unit Rates
(Rs.)

M-081

Graded stone aggregate

cum

250.00

M-082

Granular material (Natural occuring, soil gravel mixture / quarry waste, kankar,
laterite, dhandla

cum

95.00

M-083

Hand Broken Metal 40 mm size

cum

240.00

M-084

Indigo

kg

135.00

M-085

Interlocking Blocks with 60 mm thickness

sqm

300.00

M-086

Interlocking Blocks with 80 mm thickness

sqm

400.00

M-087

Joint filler board

sqm

400.00

M-088

Jute netting, open weave 25 mm square opening

sqm

30.00

M-089

Jute rope 12 mm dia

7.00

M-090

Key Aggregates passing 22.4 mm and retained on 2.8 mm

M-091

Lime

2,000.00

M-092

Lime putty

2,200.00

M-093

Local Wood Piles (1st Class) 150-200 mm dia ,6m long

No.

300.00

M-094

Local Wood Piles (1st Class) 100 mm x 75 mm

cum

200.00

M-095

Loose stone

cum

100.00

M-096

MS clamps

Nos.

20.00

M-097

MS Flat / Structural Steel

M-098

MS Sheet Tube (47 mm x 47 mm x 12 SWG Sheet)

M-099

MS Sheet 1.5 mm thick

sqm

1,500.00

M-100

MS Sheet 2 mm thick

sqm

2,000.00

M-101

Nuts, Bolts and Rivets

60,000.00

M-102

Paint (Synthetic Enamel)

litre

150.00

M-103

Plasticizer

litre

60.00

M-104

Polythene sheet (125 micron)

sqm

2.70

M-105

Polythene Sheething

Nos.

4.50

M-106

Quarried Stone 150-200 mm size

cum

45.00

M-107

RCC Pipe NP3 (1200 mm dia)

3,100.00

M-108

RCC Pipe NP3 (1000 mm dia)

2,500.00

cum

t
kg

290.00

33,000.00
45.00

354

Sl. No.

Description

Input
Unit Rates
(Rs.)

M-109

RCC Pipe NP3 (750 mm dia)

1,800.00

M-110

RCC Pipe NP3 (600 mm dia)

1,500.00

M-111

RCC Pipe NP3 (500 mm dia)

1,400.00

M-112

RCC Pipe NP4 (1200 mm dia)

3,900.00

M-113

RCC Pipe NP4 (1000 mm dia)

3,100.00

M-114

RCC Pipe NP4 (750 mm dia)

2,200.00

M-115

RCC Pipe NP4 (600 mm dia)

1,700.00

M-116

RCC Pipe NP4 (500 mm dia)

1,600.00

M-117

Red-oxide Primer

litre

80.00

M-118

Road marking paint

litre

160.00

M-119

Sand (Coarse)

cum

190.00

M-120

Sand (Fine)

cum

110.00

M-121

Seeds

kg

30.00

M-122

Steel Pipe 50 mm dia

180.00

M-123

Steel Reinforcement (HYSD Bars)

31,000.00

M-124

Steel Reinforcement (MS Round Bars)

28,000.00

M-125

Steel Reinforcement (TMT Bars)

33,000.00

M-126

Stone Boulder of size 150 mm and below

cum

150.00

M-127

Stone Chips 12 mm size

cum

400.00

M-128

Stone Chips 13.2 mm to 5.6 mm

cum

390.00

M-129

Stone Crushed Aggregate 11.2 mm to 0.09 mm

cum

230.00

M-130

Stone for Coarse Rubble Masonry 1st Sort

cum

300.00

M-131

Stone for Coarse Rubble Masonry 2nd Sort

cum

250.00

M-132

Stone for Random Rubble Masonry

cum

160.00

M-133

Stone for Stone Set Pavement (300 mm x 200 mm x 150 mm)

No.

20.00

M-134

Stone Screening - Type A 13.2 mm for Grading-1

cum

175.00

M-135

Stone Screening - Type A 13.2 mm for Grading-2

cum

175.00

M-136

Stone Screening - Type B 11.2 mm for Grading-2

cum

150.00

M-137

Stone Screening - Type B 11.2 mm for Grading-3

cum

150.00

355

Sl. No.

Description

Input
Unit Rates
(Rs.)

M-138

Stone spall

cum

100.00

M-139

Traffic cones

No.

450.00

M-140

Water

kl

15.00

M-141

Well graded Granular Base Material - Grading A 2.36 mm below

cum

70.00

M-142

Well graded Granular Base Material - Grading A 26.5 mm to 4.75 mm

cum

95.00

M-143

Well graded Granular Base Material - Grading A 53 mm to 26.5 mm

cum

100.00

M-144

Well graded Granular Base Material - Grading B 2.36 mm below

cum

70.00

M-145

Well graded Granular Base Material - Grading B 26.5 mm to 4.75 mm

cum

95.00

M-146

Well graded Granular Base Material - Grading C 2.36 mm below

cum

70.00

M-147

Well graded Granular Base Material - Grading C 9.5 mm to 4.75 mm

cum

85.00

M-148

Well Graded Material for Sub-Base - Grading I 2.36 mm below

cum

65.00

M-149

Well Graded Material for Sub-Base - Grading I 53 mm to 9.5 mm

cum

100.00

M-150

Well Graded Material for Sub-Base - Grading I 9.5 mm to 2.36 mm

cum

85.00

M-151

Well Graded Material for Sub-Base - Grading II 2.36 mm below

cum

65.00

M-152

Well Graded Material for Sub-Base - Grading II 26.5 mm to 9.5 mm

cum

90.00

M-153

Well Graded Material for Sub-Base - Grading II 9.5 mm to 2.36 mm

cum

85.00

M-154

Well Graded Material for Sub-Base - Grading III 2.36 mm below

cum

65.00

M-155

Well Graded Material for Sub-Base - Grading III 4.75 mm to 2.36 mm

cum

70.00

M-156

Well Graded Material for Sub-Base - Grading III 9.5 mm to 4.75 mm

cum

85.00

M-157

Wooden sleepers (250 mm x 250 mm x 125 mm) (hire charges)

No.

10.00

M-158

Granular Material for Sub-Base CBR value not less than 15

cum

65.00

M-159

Aggregate-Grading II 63 mm to 45 mm(C.B.)

cum

290.00

M-160

RCC Pipe NP3 (300 mm dia)

550.00

M-161

RCC Pipe NP4 (300 mm dia)

800.00

M-162

Cut stone (Three line Dressed) (5Km, Stone)

each

5,000.00

M-163

Cut stone (Three line Dressed) (Ordinary, Stone)

each

4,600.00

M-164

Cut stone (Three line Dressed) (200mtr Stone)

each

4,400.00

M-165

Cut stone (Three line Dressed) Boundary

each

4,400.00

M-166

Mild steel angle iron 75 x 75 x 6 mm

kg

32.00

356

Sl. No.

Description

M-167

1.6 mm thick MS sheet strengthened by 25mm x 5 MS flat iron on logo and


middle plate angle iron 25mm x 25mm x 5mm on bottom plate painting with
stove enameled paint on both sides as per MORD specifications

Input
Unit Rates
(Rs.)
sqm

900.00

356

BASIC RATES
(B) USAGE RATES OF PLANT & MACHINERY
Sr. No.

Output of
Machine

Description of

Usage Rates in Rs.

Machine

Activity

Unit

PM-001

Air Compressor 210 cfm

Supplying
compressed air

cfm

210.00 per hour

194.00

PM-002

Batch mix HMP 40-60 TPH

BM, DBM, SDBC, PM

t/h

50.00 per hour

8,800.00

PM-003

Batch type HMP 30/40 TPH

BM, DBM, SDBC, PM

t/h

35.00 per hour

6,200.00

PM-004

Bitumen boiler oil fired


200 litre

Heating of bitumen

400.00 per hour

60.00

litre / h

2000.00 per hour

80.00

Applying bitumen tack


coat

sqm/h

1750.00 per hour

700.00

cum/h

2.50 per hour

60.00

per hour

500.00

Concrete mixer 0.28/0.4 cum

Mixing of ingradients

PM-007

Crane upto 8T

Lifting of materials

Dozer D 50

Dozing cutting

PM-008

cum/h

200.00

750.00
per hour

cum/h

100.00

750.00

In Rock cutting

cum/h

30.00

1,200.00

KVA

PM-009

Electric generator set, 125 KVA

Electricity generation

PM-010

Emulsion Sprayer with Tractor

Spraying of Emulsion

Front end-loader 1 cum bucket


capacity @ 45 cum/hour

Rate

litre / h

PM-006

PM-011

Unit

Heating of bit

1000 litre
PM-005 Bitumen emulsion pressure distributor

Output

Loading Aggregates

cum/h

100.00 per hour

510.00

per hour

700.00

45.00

300.00
per hour

Loading Soil

cum/h

100.00

300.00

PM-012

Hydraulic broom with tractor

Surface cleaning

sqm/h

1250.00 per hour

170.00

PM-013

Hydraulic Excavator 0.9 cum

Excavation

cum/h

100.00 per hour

1,400.00

Surface Dressing

sqm/h

1500.00 per hour

750.00

PM-014 Hydraulic self propelled chip spreader


PM-015

Jack Hammer with tractor

Pavement breaking &


rock drilling

cum/h 05. to 1

per hour

170.00

357

Sr. No.

Output of
Machine

Description of

Usage Rates in Rs.

Machine

Activity

Unit

PM-016

Joint Cutting Machine with 2-3 blades

Cutting of Joints

per hour

300.00

PM-017

Mixall 6-10 t capacity

Mixing of bituminous
materials

t/h

8.00 per hour

400.00

PM-018

Output

Unit

200.00
Motor Grader

Scarifier & levelling

cum/h

Rate

700.00
per hour

50.00

700.00

PM-019

Needle vibrator

Vibrating cement
concrete mix

cum/h

3.50 per hour

40.00

PM-020

Paver finisher

Laying/spreading

t/h

75.00 per hour

550.00

PM-021

Plate compactor

Compaction

cum/h

per hour

40.00

PM-022

Plate vibrator

Compaction

cum/h

per hour

40.00

PM-023

Screed vibrator

Compaction

cum/h

per hour

60.00

PM-024

Smooth wheeled 80-100 kN tandem


roller

Compaction of Subbase/ Asphalt

cum/h

30.00 per hour

160.00

Crushing of Spalls

t/h

200.00 per hour

13,500.00

PM-025 Stone crusher (Integrated) of 200 TPH


PM-026

Three wheel 80-100 kN Static Roller

Compaction/ Rolling
Earth:- Embankment
or sub-grade

160.00
cum/h 80/70

160.00

Sub-base G-I

cum/h

10.00

160.00

Sub-base G-II/G-III

cum/h

8.00

160.00

WMM

cum/h

16.00

160.00

BUSG

cum/h

10.00 per hour

160.00

BM 50/75 mm

cum/h

12.00

160.00

Premix 20 mm

sqm/h

250.00

160.00

Seal Coat

sqm/h

500.00

160.00

Surface Dressing 1st


Coat

sqm/h

400.00

160.00

358

Sr. No.

Output of
Machine

Description of
Machine

Activity

Unit

Surface Dressing
2ndCoat

sqm/h

Usage Rates in Rs.

Output

Unit

500.00

Rate
160.00

PM-027

Tipper 5.5 cum/10 t

Carriage

cum/trip

5.50 per hour

450.00

PM-028

Tractor with Disc Harrows

Pulverisation of soil

cum/h

80.00 per hour

180.00

Ripping Pavements,
uprooting trees

cum/h

60.00 per hour

180.00

PM-029 Tractor with ripper @ 60 cum per hour


PM-030

Tractor with trolley

Transportation of
materials

t/trip

PM-031

Tractor with Rotavator

Scarifier

PM-032

Truck 10 t capacity

PM-033
Vibratory roller 80-100 kN

3 to 5

per hour

150.00

cum/h

25.00 per hour

180.00

Carriage

cum/trip

5.50 per hour

400.00

Compaction of soil
WMM

cum/h

100.00

Compaction of BM

cum/h

60.00

litre / h 12000.00 per hour

800.00
per hour
600.00

PM-034

Water tanker 6 kl capacity (Truck


Mounted)

Carriage of water

PM-035

Wet mix plant (Pug Mill)

Wet Mix

cum/h

25.00 per hour

4,000.00

PM-036

Tipper 5.5 cum/10 t(idle charges)

Carriage

cum/trip

5.50 per hour

80.00

PM-037

Truck 10 t capacity(idle charges)

Carriage

cum/trip

5.50 per hour

70.00

PM-038

Concrete mixer with Batch mix Plant


0.28/0.4 cum

Mixing of ingradients

cum/h

2.50 per hour

300.00

250.00

CONTENTS
Item
No.

Chapter

Description

BASIC APPROACH AND GENERAL CONDITIONS AND ASSUMPTIONS FOR THE


PREPARATION OF STANDARD DATA BOOK
ABBREVIATIONS
SUMMARY
1

Carriage of Materials
Preamble
1.1

Loading and unloading of Earth, Sand, Bajri, Lime Moorum, Ballast, Stone
Boulder, Brick ballast, Kankar, Building Rubbish, Manure, crushed slag,
Fly ash, stone for masonry work by manual means

1.2

Loading and unloading of Earth, Sand, Bajri, Lime Moorum, Ballast, Stone
Bulders, Brick ballast, Kankar, Building Rubbish, Manure, Crushed slag,
Fly ash, stone for masonry work by Mechnical Means

1.3

Loading, Unloading and stacking of Bricks by Manual Means

1.4

Loading and Unloading of Cement by Manual Means

1.5

Loading and Unloading of structural steel, steel Bars by manual means

1.6

Loading and unloading of Bitumen drums by manual means

1.7

Loading and unloading of Timber by manual means

1.8

Loading and unloading of C.C. Blocks, Km Stone, 200 mt stone, Boundary


pillars, kerb, channel, Bond Stone by manual means

1.9

Loading and unloading of R.C.C. Hume Pipes by mechanical means

1.10

Haulage Excluding Loading & Unloading

1.11

Loading in or unloading from Railway wagans and stacking

1.12

(i)

Supply of quarried stone and hand breaking into coarse aggregate to


Grading 1 (90 mm to 45 mm)

(ii)

Supply of quarried stone and hand breaking into coarse aggregate to


Grading 2 (63 mm to 45 mm)

(iii)

Supply of quarried stone and hand breaking into coarse aggregate to


Grading 3 (53 mm to 22.4 mm)

Crushing of Stone Aggregates 100 per cent passing through 53 mm sieve

1.13

Crushing of Stone Aggregates 100 per cent passing through 22.4 mm


sieve

1.14

Crushing of Stone Aggregates Nominal Size 13.2 mm

1.15

Crushing of Stone Aggregates 9.5 mm Nominal Size

1.16

Setting Out

Site Clearance And Setting out


Preamble
2.1

Clearing Grass and Removal of Rubbish

2.2

Clearing and Grubbing Road Land

2.3

Cutting of Trees including Cutting of Trunks, Branches and Removal of


Stumps

2.4

Uprooting and Removing Stumps & Roots

2.5

Dismantling of Structures

2.6

Dismantling Brick / Tile Work

2.7

Dismantling stone masonry

2.8

Wood work wrought and planed fixed in frames of trusses upto a height of
5m above plinth level

2.9

Dismantling Steel Work in all Types of Sections upto a height of 5 m above


Plinth Level excluding Cutting of rivet

2.10

Scraping of bricks dismantled from brick work including stacking

2.11

Scraping of stone from dismantled stone masonry

2.12

Scraping plaster in lime or cement mortar from Brick/Stone masonry

2.13

Removing all type of hume pipes and stacking

2.14

Dismantling of Flexible Pavements

2.15

Dismantling of cement concrete pavement

2.16

Dismantling Guard Rails

2.17

Dismantling kerb stone

2.18

Dismantling kerb stone channel

2.19

Dismantling kilometer stone

2.20

Dismantling of Fencing

2.21

Dismantling of CI Water pipe line

2.22

Removal of cement concrete pipe of sewer gutter

2.23

Removal of Telephone/Electric Poles and lines

Earthwork, Erosion Control and Drainage


Preamble
3.1

Scarifying existing granular surface to a depth of 50 mm by manual means

3.2

Scarifying existing bituminous surface to a depth of 50 mm by mechanical


means

3.3

Construction of embankment with material obtained from Roadway cutting

3.4

Construction of Embankment with Material Obtained from Borrow Pits

3.5

(i)

Excavation in Cutting in Soil by manual means with lead upto 50 m

(ii)

Excavation in Soil with Dozer with lead upto 100 m

(iii)

Excavation in Soil using Hydraulic Excavator and Tippers with


disposal upto 1000 m

3.6

Excavation in Marshy soil

3.7

Removal of Unsuitable Soil with Disposal upto 1000 m

3.8

(i)

Excavation in ordinary Rock by manual means

(ii)

Excavation in Ordinary Rock with Dozer with lead upto 100 m

(iii)

Excavation in Ordinary Rock using Hydraulic Excavator and Tippers


with disposal upto 1000 m

(i)

Excavation in Hard Rock (requiring blasting) with disposal upto 1000


metres

(ii)

Excavation in Hard Rock (Blasting Prohibited)

(iii)

Excavation in Hard Rock (controlled Blasting)

3.9

3.10

Stripping & Storing Top soil from right of way (R.O.W)

3.11

Stripping, storing and re-laying top soil from borrow areas in agricultural
fields

3.12

Turfing with sods

3.13

Seeding and Mulching

3.14

Construction of Subgrade and Earthen shoulders

3.15

(i)

Compacting original ground supporting embankment

(ii)

Compacting original ground supporting subgrade

3.16

Repairs of damages caused by rain/spillage of water

3.17

Presplitting of Rock Excavation Slopes

3.18

Construction of Embankment with Flyash/Pond ash available from coal or


lignite buring Thermal Plants as waste material

3.19

(i)

Surface Drains in soil

(ii)

Surface Drains in Ordinary Rock

(iii)

Surface Drains in Hard Rock

3.20
4

Chute Drains

Sub Bases, Bases (Non-Bituminous) and Shoulders


Preamble
4.1

Granular Sub-base with Well Graded Material (Table 400.1)

4.2

(i)

Gravel/Soil-Aggregate Base (Table 400.2) Grading A

(ii)

Gravel/Soil-Aggregate Base (Table 400.2) Grading B

(iii)

Gravel/Soil-Aggregate Base (Table 400.2) Grading C

4.3

Gravel/Soil-Aggregate Surface Course (Table 400.3)

4.4

Lime Stablisation for Improving sub-grade

4.5

Lime Treated soil sub-base/Base

4.6

Cement Tracted soil sub-base/Base

4.7

Water Bound Macadam

4.8

Water Bound Macadam with Crushable Screenings

4.9

Wet Mix Macadam

4.10

Construction of Shoulders

4.11

Granular sub-base/base/surface course with local materials (Table 400.13)

4.12

Construction of Water bound Macadam

4.13

Lime-Flyash Stablised Soil Sub-base

4.14

Construction of Sub-base/Course Using Crushed Slag as per Table 400.19

4.15

Water Bound Macadam using crushed slag

4.16

Cement Bound Granular Material sub-base/base

4.17

Crusher Run Macadam Base

4.18

Brick Soiling

4.19

Stone Set Pavement

Bases and Surface Courses (Bituminous)


Preamble
5.1

Prime coat

5.2

Tack coat

5.3

Bituminous Macadam

5.4

Built up spray Grout

5.5

Modified Penetration Macadam

5.6

Surface Dressing (with Bitumen)

5.7

Surface Dressing (with Bitumen Emulsion)

5.8

Precoating of chips

5.9

Open-Graded Premix Carpet using Bituminous (penetration grade /


modified bitumen) Binder

5.10

Open Graded Premix Carpet using Bitumen Emulsion

5.11

Mixed seal surface

5.12

Seal Coat

5.13

Supply of Stone Aggregates for Pavement Courses

Cement Concrete Pavement


Preamble

6.1

Granual Sub-base

6.2

Lime Treated Soil

6.3

Water Bound Macadam (WBM) - Sub-base

6.4

Cement Concrete Pavement

6.5

Roller compacted concrete Pavement

6.6

Rectangular Concrete Bock Pavement

6.7

Interlocking Concrete Block Pavement

Causeway and Submersible Bridges


Preamble
7.1

Construction of Cut-off Walls/Head Walls

7.2

Preparation of Subgrade

7.3

Granular Sub-base

7.4

W.B.M. Base Course

7.5

Cement Concrete Slab

7.6

(i)

Providing and Laying Apron with Stone Boulders as per Drawings &
Technical Specification Clause 1301

(ii)

Providing and Laying of Boulder Apron Laid in Wire Crates as per


Drawing and Technnical Specification Clause 1301

(iii)

Providing and Laying of Apron with Cement Concrete Blocks as per


Drawing and Technical Specification Clause 1301

7.7

Guide Posts

7.8

Bedding for Causeway

7.9

Laying Reinforced Cement Concrete Pipe NP3 as per drawing and


technical specification Clause 1402.6

7.10

Laying Reinforced Cement Concrete Pipe NP4 as per technical


specification Clause 1402.6

Hill Road
Preamble
8.1

Site Clearance

8.2

Setting out

8.3

Earth work in Hill Road


(i)

Excavation in Hilly Areas in Soil by manual means

(ii)

Excavation in Hilly Areas in Soil by mechanical means

(iii)

Excavation in Hilly Area in Ordinary Rock by manual means

(iv)

Excavation in Hilly Areas in Ordinary Rock by mechanical means not


requiring blasting

(v)

Excavation in Hilly Areas in Hard Rock requiring blasting

8.4

Retaining Walls / Breast Walls

8.5

Construction of Hill Side Drain

8.6

Construction of Catch Water / Intercepting Drain

8.7

Construction of Scupper

8.8

Construction of RCC guide posts of 250 mm dia M15 grade cast-in-situ


with 20 mm nominal size aggregate

8.9

Providing edge stones on valley side of formation

8.10

Turfing with sods

8.11
9

Seeding and Mulching

Pipe Culverts
Preamble

10

9.1

Excavation for Structures

9.2

Bedding for Pipe

9.3

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design
in Single Row

9.4

Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design
in Single Row

9.5

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per


Design in Double Row

9.6

Providing and Laying Reinforced Cement Concrete Pipe NP3 as per


Design in Double Row

9.7

Laying Cement Concrete Pipe NP3 (burried conduits)

9.8

Laying Cement Concrete Pipe NP4 (burried conduits)

9.9

Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below
open foundation of Head walls

9.10

Brick Masonry Work in cement mortar in foundation of Head walls


complete exculding pointing and plastering

9.11

Stone Masonry Work in cement mortar in foundation of Head walls


complete

9.12

Pointing with cement mortar (1:3) on brickwork as per technical


specification

9.13

Plastering with cement mortar (1:4), 10 mm thick on brickwork in


substructure as per technical specification

9.14

Back filling in foundation trenches as per drawing and technical


specification

9.15

Providing PCC M-20 architectural coping on the top of wing wall, return
wall, etc. complete as per drawing and technical specification

Traffic Signs, Markings & Other Road Appurtenances


Preamble
10.1

Printing new letters and figures of any shade

10.2

Traffic Signs

10.3

Direct and place Identifications signs upto 0.9 sqm size board

10.4

Direct and place Identifications signs with size more than 0.9 sqm size
board

10.5

Painting two coats on New concrete surfaces

10.6

Painting on steel surfaces

10.7

Painting on concrete/steel surfaces with epoxy

10.8

Painting lines, Dashes, Arrows etc. on Road in Two coats on New Work

10.9

Painting lines, Dashes, Arrows etc. on Roads in Two coats on old work

10.10 Kilo metre stone


10.11 Boundary pillars
10.12 G.I Barbed wire fencing 1.2 metre high
10.13 G.I Barbed wire fencing 1.8 metre high
10.14 Tubular steel railing on medium weight steel (ISMC Series) 100 MM X 50
MM.
10.15 Tubular Steel Railing on Precast RCC posts 1.2 m high above ground level
10.16 Providing and fixing 'Logo' of PMGSY Project
10.17 Traffic Cone
10.18 Rumble Strips
10.19 Safety Devices and signs in Construction Zones
10.20 Road Markers/Road stud with lens Reflector
11

Foundation
Preamble
11.1

Excavation for structure

11.2

Filling in foundation trenches

11.3

Filling Annular space around footing in Rock

11.4

Providing concrete for plain/reinforced concrete in open foundations


complete

12

11.5

Brick masonry work in cement mortar in foundation complete excluding


pointing and plastering

11.6

Stone masonry work in cement mortar in foundation

11.7

Supplying, fitting and placing HYSD bar reinforcement in foundation

11.8

Supplying, fitting and placingTMT bar reinforcement in foundation

11.9

Supplying, fitting and placing MS bar reinforcement in foundation

Substructure
Preamble
12.1

Brick masonry work in cement mortar (1:3) cement mortar (1:4), cement
mortar (1:5) and cement lime mortar (1:0.5.4.5)

12.2

Pointing with cement mortar (1:3) on brickwork

12.3

Plastering with cement mortar (1:4) on Brick work

12.4

Stone masonry work in cement mortar (11:3) cement mortar (1:4) cement
mortar (1:5) & cement lime mortar (1:0.5:4.5)

12.5

Plain/Reinforced cement concrete in superstructure

12.6

Supplying, fitting and placing HYSD Bar reinforcement

12.7

Supplying, fitting and placing TMT bar reinforcement (Fe 415) in


substructrue

12.8

Supplying, fitting and placing with MS bar reinforcement (Fe 415) in


substructrue

12.9

Providing weepholes in brick masonry/stone masonry, plain/reinforced


concrete abutment, wing wall, return wall with 100 mm dia AC pipe

12.10 Backfilling behind abutment, wing wall and return wall


12.11 Providing and laying filter media with granular crushed aggregates
12.12 Supplying, fitting and fixing in position true to line and level elastomeric
bearing conforming to IRC:83 (Part-II) Section IX
12.13 Providing PCC M-20 architectural coping on the top of wing wall, return wall
etc.
12.14 Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a
filter media base of 500 mm x 500 mm
13

Superstructure
Preamble

13.1

Providing and laying Reinforced cement concrete

13.2

Supplying fitting and placing HYSD reinforcement

13.3

Supplying, fitting, and placing TMT bar reinforcement in superstructure

13.4

Supplying, fitting, and placing MS bar reinforcement in superstructure

13.5

Providing and laying cement concrete wearing course M 30 grade including


reinforcement

13.6

Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm


nominal size aggregate

13.7

Providing fitting and fixing mild steel railing

13.8

Providing and fixing in position pipe railing

13.9

Brick masonry work in cement mortar 1:3 in parapet excluding pointing and
plastering

13.10 Drainage spouts


13.11 P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab
13.12 Reinforced Cement Concrete M 25 grade approach slab including
reinforcement and formwork
13.13 Providing and laying of an elastomeric slab seal expansion joint
13.14 Providing and laying of compression seal joint
13.15 Providing and laying a buried expansion joint
13.16 Filler Joint
13.17 Stone masonry in cement mortar 1:3 for parapet
13.18 Pointing with cement mortar (1:3) on brickwork in parapet
13.19 Plastering with cement mortar (1:3) 15 mm thick on brickwork in parapet
13.20 Providing and laying parapet with PCC M 15
13.21 Providing bituminous wearing coat comprising of 20 mm thick premix
carpet with 5 mm thick seal coat Type B for culverts
13.22 Providing bituminous wearing coat comprising of 50 mm thick bituminous
macadam overlaid by 20 mm thick premix carpet with 5 mm thick seal coat
Type B
13.23 Brickwork in arches in cement mortar 1:4 complete including centering and
shuttering excluding pointing and plastering

13.24 Coursed rubble stone masonry arch (Ist sort) in cement mortar (1:4)
complete including centering etc.
13.25 Providing & Laying reinforced cement concrete arch
13.26 Providing steel R.S.Js/built-up steel sections
14

Protection works
Preamble
14.1

Providing & Laying Boulder Apron

14.2

Boulder Apron laid in wire crates

14.3

Providing & Laying of Apron with Cement Concrete Blocks

14.4

Single bamboo palasiding / walling of whole 2nd class bamboo (Jati or


Bethua) 75mm dia

14.5

Providing and laying pitching on slopes laid over prepared filter media

14.6

Providing & Laying Filter Material

14.7

Providing & Laying Flooring

14.8

Dry Rubble Flooring

14.9

Curtain Wall

14.10 Flexible Apron


14.11 Toe walls
14.12 Single Bamboo Spur and Palisading of Whole 2nd Class Bamboo
14.13 Single Bamboo Spur and Palisading of Whole 1st Class Bamboo
14.14 Bamboo Spur 'A' Type with Whole Bamboo
14.15 Providing 'A' Type Single Spur with 1st Class Bamboo
14.16 Providing close bamboo toe walling consisting of 65mm to 75mm dia
bamboos of length ranging from 1.2 m to 3m driven
14.17 Double Timber Spur with Two Rows
14.18 Supplying and filling up hollows of the Timber Spur

15

Maintenance
Preamble
15.1

Restoration of Rain Cuts

15.2

1.

Maintenance of Earthen Shoulder (Filling with Fresh Soil)

2.

Maintenance of Earthen Shoulder (Stripping of Excess Soil)

15.3

Maintenance of Bituminous Surface Road

15.4

Maintenance of Gravel Road

15.5

Maintenance of WBM Road

15.6

Maintenance of Drains

15.7

(I)

Maintenance of Culverts

(II)

Maintenance of Culverts Slab Type

15.8

Maintenance of Causeway

15.9

Maintenance of Road Signs

15.10 Maintenance of Steel and RCC Railing


15.11 Maintenance of 200 metre and Km Stone
15.12 Cutting of branches of trees shrubs and trimming of grass and weeds
15.13 White washing of parapet walls of CD work and tree truncks
15.14 Periodical Renewal to existing bituminous surface

Page

Chapter 1
LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING OUT
Item
No.

Description

1.1

Loading and Unloading of Lime, Aggregate, Stone Boulder,


Brick Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by Manual Means

1.2

1.3

EE.,Dn.I,BMR

Unit

(i)

Loading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by manual means including a
lead upto 30 m

cum

(ii)

Loading of Earth, Sand, Moorum, Manure, Flyash by


manual means including a lead upto 30 m

cum

(iii) Unloading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by manual means including a
lead upto 30 m

cum

(iv) Unloading of Earth, Sand, Moorum, Manure, Flyash by


manual means including a lead upto 30 m

cum

Loading and Unloading Lime, Aggregate, Stone Boulder,


Brick Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by Mechanical Means
(i)

Loading of Lime, Aggregate, Stone Boulder, Brick


Aggregate, Kankar, Building Rubbish, Crushed Slag,
Stone for Masonry Work by mechanical means
including a lead upto 30 m

cum

(ii)

Loading of Earth, Sand, Moorum, Manure, Flyash by


mechanical means including a lead upto 30 m.

cum

(iii) Unloading of Earth, Sand, Lime, Moorum, Aggregate,


Stone Boulder, Brick Aggregate, Kankar, Building
Rubbish, Manure, Crushed Slag, Flyash, Stone for
Masonry Work by mechanical means.

cum

Loading, Unloading and Stacking of Bricks by Manual


Means
(i)

Loading of Bricks by manual means including a lead


upto 30 m

1000
Nos.

(ii)

Unloading and Stacking of Bricks by manual means


including a lead upto 30 m

1000
Nos.

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.
1.4

Description
Loading and Unloading of Cement by Manual Means
(i)
(ii)

1.5

1.6

1.8

1.9

Loading of Cement by manual means including a lead


upto 30 m
Unloading of Cement by manual means including a
lead upto 30 m

(i)

Loading of Structural Steel, Steel Bars by manual


means including a lead upto 30 m

(ii)

Unloading of Structural Steel, Steel Bars by manual


means including a lead upto 30 m

Loading and Unloading of Bitumen Drums by Manual


Means
(i) Loading of Bitumen Drums by manual means including
a lead upto 30 m
Unloading of Bitumen Drums by Manual Means
including a lead upto 30 m

t
t

Loading and Unloading of Timber by Manual Means


(i)

Loading of Timber by manual means including a lead


upto 30 m

(ii)

Unloading of Timber by manual means including a lead


upto 30 m

Loading and Unloading of C.C. Blocks, Kerb, etc.


(i)

Loading with care C.C. Blocks, km Stone, 200 m Stone,


Boundary Pillar, Kerb, Channel, Bond Stone, etc. by
manual means including a lead upto 30 m

cum

(ii)

Unloading with care C.C. Blocks, km Stone, 200 m


Stone, Boundary Pillar, Kerb, Channel, Bond Stone,
etc. by manual means including a lead upto 30 m

cum

Loading and Unloading of Hume Pipes


(i) Loading of RCC Hume pipes by mechanical means
including a lead upto 30 m
A.

EE.,Dn.I,BMR

Loading and Unloading of Structural Steel and Steel


Bars by manual means

(ii)

1.7

Unit

1000 / 1200 mm dia Hume pipe

TA to SE Circle, BMR

AAO.,Circle, Barmer

per
pipe
SE.,Circle, Barmer

Item
No.

Description

(ii)

B.

750 mm dia Hume pipe

C.

600/450 mm dia Hume pipe

Unit
per
pipe
per
pipe

Unloading of RCC Hume pipe by manual means


including a lead upto 30 m
A.

1000/1200 mm dia RCC Hume pipes

B.

750 mm dia Hume pipe

C.

600/450 mm dia Hume pipe

per
pipe
per
pipe
per
pipe

(iii) Unloading of RCC Hume pipes by mechanical means


including a lead upto 30 m

1.10

A.

1000/1200 mm dia Hume pipe

B.

750 mm dia Hume pipe

C.

600/450 mm dia Hume pipe

per
pipe
per
pipe
per
pipe

Haulage excluding Loading & Unloading


Haulage of materials by tipper excluding cost of loading,
unloading and stacking.
Case-I : Surfaced Road
Case-II: Unsurfaced Gravel Road
Case-III: Katcha Track and Track in River Bed/Nallah Bed
and Choe Bed

1.11

1.12

Supply of Quarried stone and hand breaking


(i) Supply of quarried stone and hand breaking into coarse
aggregate to Grading 1 (90 mm to 45 mm) as per Table
400.8 of Technical Specifications.

cum

(ii)

Supply of quarried stone and hand breaking into coarse


aggregate to Grading 2 (63 mm to 45 mm) as per Table
400.8 of Technical Specifications.

cum

(iii) Supply of quarried stone and hand breaking into coarse


aggregate to Grading 3 (53 mm to 22.4 mm) as per
Table 400.8 of Technical Specifications.

cum

Crushing of Stone Aggregates 100 per cent passing


through 53 mm sieve as per Table 500.6 of Technical
Specifications.
Crushing of stone boulders of 150 mm size in an integrated
stone crushing unit of 200 t/h capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating
screens to obtain stone aggregates 100 per cent passing
through 53 mm sieve as per Table 500.6 of Technical
Specifications including the cost of stone.

EE.,Dn.I,BMR

t.km
t.km
t.km

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

Item
No.

Description

Unit

1.13

Crushing of Stone Aggregates 100 per cent passing


through 22.4 mm sieve as per Table 500.6 of Technical
Specifications.
Crushing of stone boulders of 150 mm size in an integrated
stone crushing unit of 200 t/h capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating
screens to obtain stone aggregates 100 per cent passing
through 22.4 mm sieve as per Table 500.6 of Technical
Specifications including the cost of stone.

1.14

Crushing of Stone Aggregates Nominal Size 13.2 mm as


per Table 500.9 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated
stone crushing unit of 200 t/h capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating
screens to obtain stone aggregates of 13.2 mm nominal size
as per Table 500.9 of Technical Specifications including the
cost of stone.

1.15

EE.,Dn.I,BMR

cum

Crushing of Stone Aggregates 9.5 mm Nominal Size as


per Table 500.9 of Technical Specifications.
Crushing of stone boulders of 150 mm size in an integrated
stone crushing unit of 200 t/h capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating
screens to obtain stone aggregates of 9.5 mm nominal size
as per Table 500.9 of Technical Specifications including the
cost of stone.

1.16

cum

cum

Setting Out
Construction of referance bench mark (1No.) working bench
mark (4Nos) and near all drainage structure and bridges as
per MORD data book drawing no 2001 and construction of
referance pillars/burgees @ 50m interval on both side of the
formation width in R.R.stone masonry (1:5) with cement
mortar plaster (1:4) 20mm, thick (drawing no 2002) including
marking of center line leveling white washing painting etc as
per MORD specification clause 108

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 2
SITE CLEARANCE
2.1

Clearing Grass and Removal of Rubbish


Clearing grass and removal of rubbish up to a distance of 30
m outside the periphery of the area as per Technical
Specification Clause 201.
By Manual Means

2.2

hectare

Clearing and Grubbing Road Land


Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of
girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and stacking
of serviceable material to be used or auctioned, upto a lead
of 1000 m including removal and disposal of top organic soil
not exceeding 150 mm in thickness as per Technical
Specification Clause 201.
(I)

By Manual Means
(A)

In area of non-thorny jungle

hectare

(B)

In area of thorny jungle

hectare

(II) By Mechanical Means

2.3

(A)

In area of non-thorny jungle

hectare

(B)

In area of thorny jungle

hectare

Cutting of Trees including Cutting of Trunks, Branches


and Removal of Stumps
Cutting of trees, including cutting of trunks, branches and
removal of stumps & roots, refilling, compaction of backfilling
and stacking of serviceable material by manual means with
all lifts as per Technical Specification Clause 201.
A.

EE.,Dn.I,BMR

Lead upto 100 m


(i)
Girth above 300 mm to 600 mm

each

(ii)

Girth above 600 mm to 900 mm

each

(iii)

Girth above 900 mm to 1800 mm

each

(iv)

Girth above 1800 mm to 2700 mm

each

(v)

Girth above 2700 mm to 4500 mm

each

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description
(vi)
B.

2.4

Girth above 4500 mm

each

Lead upto 1000 m


(i)

Girth above 300 mm to 600 mm

each

(ii)

Girth above 600 mm to 900 mm

each

(iii)

Girth above 900 mm to 1800 mm

each

(iv)

Girth above 1800 mm to 2700 mm

each

(v)

Girth above 2700 mm to 4500 mm

each

(vi)

Girth above 4500 mm

each

Uprooting and Removing Stumps & Roots


A.

B.

2.5

Unit

Lead upto 100 m


(i)

Girth above 300 mm to 600 mm

each

(ii)

Girth above 600 mm to 900 mm

each

(iii)

Girth above 900 mm to 1800 mm

each

(iv)

Girth above 1800 mm to 2700 mm

each

(v)

Girth above 2700 mm to 4500 mm

each

(vi)

Girth above 4500 mm

each

Lead upto 1000 m


(i)

Girth above 300 mm to 600 mm

each

(ii)

Girth above 600 mm to 900 mm

each

(iii)

Girth above 900 mm to 1800 mm

each

(iv)

Girth above 1800 mm to 2700 mm

each

(v)

Girth above 2700 mm to 4500 mm

each

(vi)

Girth above 4500 mm

each

Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 m as per
Technical Specification Clause 202.
(I)

EE.,Dn.I,BMR

By Manual Means
(A) Lime Concrete

cum

(B)

cum

Cement Concrete

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description
(C)

Unit

Reinforced Cement Concrete

cum

(II) By Mechanical Means

2.6

(A)

Cement Concrete

cum

(B)

Reinforced Cement Concrete

cum

Dismantling Brick/Tile Work


Dismantling of existing structures like culverts, bridges,
retaining walls and other structures comprising of brick
masonry, including disposal of unserviceable material and
stacking the serviceable material with all lift and lead of 1000
m as per Technical Specification Clause 202.

2.7

(A) Lime mortar

cum

(B) Cement mortar

cum

(C) Mud Mortar

cum

(D) Dry Brick Pitching or Brick Soling

cum

Dismantling Stone Masonry


Specification Clause 202.

as

per

Technical

Dismantling of existing structures like culverts, bridges,


retaining walls and other structure comprising of stone
masonry, including disposal of unserviceable material and
stacking the serviceable material with all lift and lead of 1000
m as per Technical Specification Clause 202.

2.8

EE.,Dn.I,BMR

(A) Rubble Stone Masonry in Lime Mortar

cum

(B) Rubble Stone Masonry in Cement Mortar

cum

(C) Rubble Stone Masonry in Mud Mortar

cum

(D) Dry Rubble Masonry

cum

(E) Dismantling Stone Pitching / Dry Stone Spalls

cum

(F) Dismantling boulders laid in wire crates including


opening of crates and stacking dismantled materials

cum

Dismantling Wood Work Wrought and Planed Fixed in


Frames of Trusses upto a height of 5 m above Plinth Level
as per Technical Specification Clause 202.

cum

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

2.9

Dismantling Steel Work in all Types of Sections upto a


height of 5 m above Plinth Level excluding Cutting of rivet as
per Technical Specification Clause 202.
(A) Including dismembering

(B) Excluding dismembering

(C) Extra over Items (A) and (B) for cutting rivets

2.10

Scraping of bricks dismantled from brick work including


stacking as per Technical Specification Clause 202.

2.11

Scraping of Stone from Dismantled Stone Masonry as per


Technical Specification Clause 202.

1000
Nos.

In Cement or Lime Mortar

cum

2.12

Scraping Plaster in Lime or Cement Mortar from Brick /


Stone Masonry as per Technical Specification Clause 202.

sqm

2.13

Removing all types of Hume pipes and stacking within a lead


of 1000 m including Earthwork and Dismantling of Masonry
Works as per Technical Specification Clause 202.
(A) Upto 600 mm dia Hume pipe

(B) Above 600 mm to 900 mm dia Hume pipe

(C) Above 900 mm dia Hume pipe

2.14

Dismantling of Flexible Pavements


Dismantling of flexible pavements and disposal of
dismantled materials upto a lead of 100 m, stacking
serviceable and unserviceable materials separately as per
Technical Specification Clause 202
(I)

By Manual Means
(A)

Bituminous Courses

cum

(B)

Granular Courses

cum

(II) By Mechanical Means


(A)
2.15

EE.,Dn.I,BMR

Bituminous Courses

cum

Dismantling of Cement Concrete Pavements as per


Technical Specification Clause 202.
TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

2.16

Description

Unit

Dismantling of cement concrete pavements by mechanical


means using pneumatic tools breaking to pieces not
exceeding 0.02 cum in volume and stock piling at
designated locations and disposal of dismantled materials
upto a lead of 1000 m, stacking serviceable and
unserviceable materials separately

cum

Dismantling Guard Rails


Dismantling guard rails by manual means and disposal of
dismantled material with all lifts and upto a lead of 1000 m,
stacking serviceable materials and unserviceable materials
separately as per Technical Specification Clause 202.

2.17

Dismantling Kerb Stones


Dismantling kerb stones by manual means and disposal of
dismantled material with all lifts and upto a lead of 1000 m
as per Technical Specification Clause 202.

2.18

runni
ng m

Dismantling Kerb Stone Channels


Dismantling kerb stone channels by manual means and
disposal of dismantled material with all lifts and upto a lead
of 1000 m as per Technical Specification Clause 202.

2.19

runni
ng m

runni
ng m

Dismantling Kilometre Stones


Dismantling of kilometre stones including cutting of earth,
foundation and disposal of dismantled material with all lifts
and lead upto 1000 m and backfilling of pit as per Technical
Specification Clause 202.

2.20

(A) 5th km Stone

(B) Ordinary km Stones

(C) 200 m Stones

Dismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing
including posts, foundation concrete, backfilling of pit by
manual means including disposal of dismantled material with
all lifts and upto a lead of 1000 m, stacking serviceable
material and unserviceable material separately as per
Technical Specification Clause 202.

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

runni
ng m

SE.,Circle, Barmer

Item
No.

Description

2.21

Dismantling of CI Water Pipe Line

Unit

Dismantling of CI water pipe line 600 mm dia including


disposal with all lifts and lead upto 1000 m and stacking of
serviceable material and unserviceable material separately
under supervision of concerned department as per Technical
Specification Clause 202.
2.22

Removal of Cement Concrete Pipe of Sewer Gutter


Removal of cement concrete pipe of sewer gutter 1500 mm
dia under the supervision of concerned department including
disposal with all lifts and upto a lead of 1000 m and stacking
of serviceable and unserviceable material separately but
excluding earth excavation and dismantling of masonry
works as per Technical Specification Clause 202.

2.23

runni
ng m

Removal of Telephone/Electric Poles and Lines


Removal of telephone/electric poles with wires including
excavation and dismantling of foundation concrete and lines
under the supervision of concerned department, disposal
with all lifts and upto a lead of 1000 m and stacking the
serviceable and unserviceable material separately as per
Technical Specification Clause 202.

EE.,Dn.I,BMR

runni
ng m

TA to SE Circle, BMR

AAO.,Circle, Barmer

each

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
3.1

Preparation of Foundation for Embankment


Scarifying Existing Granular Surface to a Depth of 50 mm by
Manual Means
Scarifying existing granular surface to a depth of 50 mm and
disposal of scarified material with a lift upto 3 m and leads
upto 1000 m as per Technical Specification Clause 301.4.

3.2

sqm

Preparation of Foundation for Embankment


Scarifying Existing Bituminous Surface to a Depth of 150
mm by Mechanical Means
Scarifying the existing bituminous road surface to a depth of
150 mm and disposal of scarified material with a lift upto 3 m
and lead upto 1000 m as per Technical Specification Clause
301.4.

3.3

Construction of Embankment with Material Obtained


from Roadway Cutting
Construction of embankment with approved materials
deposited at site from roadway cutting and excavation from
drain and foundation of other structures graded and
compacted to meet requirement of Tables 300.1 and 300.2
as per Technical Specification Clause 301.5

3.4

Construction of Embankment with Material Obtained


from Borrow Pits

Construction of embankment with approved material


obtained from borrow pits with a lift upto 1.5 m, transporting
to site, spreading, grading to required slope and compacting
to meet requirement of Tables 300.1 and 300.2 with a lead
upto 1000 m as per Technical Specifrication Clause 301.5

EE.,Dn.I,BMR

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

cum

SE.,Circle, Barmer

Item
No.

Description

Unit

b.

Construction of embankment with approved material


obtained from borrow pits with a lift upto 1.5 m, transporting
to site, spreading, grading to required slope and compacting
to meet requirement of Tables 300.1 and 300.2 with a lead
upto 100 m as per Technical Specifrication Clause 302.3

cum

3.5

(i)

Excavation in Cutting in Soil by manual means with


lead upto 50 m
Excavation for roadway in soil using manual means for
carrying of cut earth to embankment site with a lift upto
1.5 m and lead upto 50 m as per Technical
Specification Clause 302.3

(ii)

cum

Excavation in Soil with Dozer with lead upto 100 m


Excavation for roadway in soil by mechanical means
including cutting and pushing the earth to site of
embankment upto a distance of 100 m, including
trimming bottom and side slopes in accordance with
requirements of lines, grades and cross-sections.

cum

(iii) Excavation in Soil using Hydraulic Excavator and


Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator
of 0.9 cum bucket capacity including cutting and
loading in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and
cross-sections, and transporting to the embankment
location with a lift upto 1.5 m and lead upto 1000 m as
per Technical Specification Clause 302.3

3.6

Excavation in Marshy Soil


Excavation for roadway in marshy soil with hydraulic
excavator 0.9 cum bucket capacity including cutting and
loading in tippers and disposal with a lift upto 1.5 m and lead
upto 1000 m, trimming of bottom and side slopes in
accordance with requirements of lines, grades and crosssections as per Technical Specification Clause 302.3.6.

3.7

EE.,Dn.I,BMR

cum

cum

Removal of Unsuitable Soil with Disposal upto 1000 m

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

3.8

Description

Unit

Removal of unsuitable soil including excavation, loading and


disposal upto 1000 m lead but excluding compaction
ground supporting embankment subgrade replacement by
suitable soil, which shall be paid separately as per Clause
303.5.2 as per Technical Specification Clause 302.3.11

cum

(i)

Excavation in ordinary Rock by manual means


Excavation in ordinary rock using manual means
including loading in a truck and carrying of excavated
material to embankment site with a lift upto 1.5 m and
lead upto 50 m as per Technical Specification Clause
302.3.5.

(ii)

cum

Excavation in Ordinary Rock with Dozer with lead


upto 100 m
Excavation for roadway in ordinary rock by deploying a
dozer D-50 including cutting and pushing the cut earth
to site of embankment upto a distance of 100 m
(average lead 50 m), trimming bottom and side slopes
in accordance with the requirements of lines, grades
and cross-sections with lift upto 1.5 m.

cum

(iii) Excavation in Ordinary Rock


using Hydraulic
Excavator and Tippers with disposal upto 1000 m

Excavation for roadway in ordinary rock with hydraulic


excavator of 0.9 cum bucket capacity including cutting
and loading in tippers, transporting to embankment site
with a lift upto 1.5 m and lead upto 1000 m, trimming
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections as per
Technical Specification Clause 302.3.5

3.9

(i)

Excavation in Hard Rock (requiring blasting) with


disposal upto 1000 m
Excavation for roadway in hard rock (requiring blasting)
by drilling, blasting and breaking, trimming of bottom
and side slopes in accordance with requirements of
lines, grades and cross-sections, loading and disposal
of cut rock with a lift upto 1.5 m and leads upto 1000 m
as per Technical Specification Clause 302.3.5

(ii)
EE.,Dn.I,BMR

cum

cum

Excavation in Hard Rock (blasting prohibited)


TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Excavation for roadway in hard rock (blasting


prohibited) with rock breakers including breaking rock,
loading in tippers and disposal with a lift upto 1.5 m and
lead upto 1000 metres, trimming bottom and side
slopes in accordance with requirements of lines, grades
and cross- sections as per Technical Specification
Clause 302.3.5
(A)
(B)

Manual Means
Mechanical Means

cum
cum

(iii) Excavation in Hard Rock (controlled blasting) with


disposal upto 1000 m
Excavation for roadway in hard rock with controlled
blasting by drilling, blasting and breaking, trimming of
bottom and side slopes in accordance with
requirements of lines, grades and cross-sections,
loading and disposal of cut rock with a lift upto 1.5 m
and leads upto 1000 m as per Technical Specification
Clause 302.3.5
3.10

Stripping, Storing and Relaying Top Soil from Right-of-Way


(R.O.W)

3.11

Stripping, Storing and Relaying Top Soil from Borrow


Areas in Agricultural Fields
Stripping of top soil from borrow areas located in agriculture
fields, storing at a suitable place, spreading and relaying
after taking the borrow earth to maintain fertility of the
agricultural field, finishing it to the required levels to the
satisfaction of the farmer/land owner as per Technical
Specification Clause 302.3.2.

3.12

3.13

3.14

EE.,Dn.I,BMR

Turfing with Sods


Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, fetching of sods
and watering as per Technical Specification Clause 309.
Seeding and Mulching
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, mulching material,
applying bituminous emulsion @ 0.23 litre per sqm and
laying and fixing jute netting, including watering for 3 months
all as per Technical Specification Clause 310.

cum

cum

cum

sqm

sqm

Construction of Subgrade and Earthen Shoulders

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

a.

Construction of subgrade and earthen shoulders with


approved material obtained from borrow pits with all lifts and
leads, transporting to site, spreading, grading to required
slope and compacted to meet requirement of Table 300.2
with lead upto 1000 m as per Technical Specification
Clause 303.1

cum

b.

Construction of subgrade and earthen shoulders with


approved material obtained from borrow pits with all lifts and
leads, transporting to site, spreading, grading to required
slope and compacted to meet requirement of Table 300.2
with lead upto 100 m as per Technical Specification
Clause 303.1

cum

3.15

Compacting Original Ground


(i)

Compacting
embankment

original

ground

supporting

Loosening, Levelling and Compacting original ground


supporting embankment to facilitate placement of first
layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by rolling
so as to achieve minimum dry density as given in
Tables 300.1 and 300.2 for embankment construction
as per Technical Specification Clause 301.4.1.
(ii)

Compacting original ground supporting subgrade


Loosening of the ground upto a level of 300 mm below
the subgrade level, watered, graded and compacted in
layers to meet requirement of Tables 300.1 and 300.2
for subgrade construction as per Technical Specification
Clause 303.5.2.

3.16

EE.,Dn.I,BMR

cum

Repairs of damages caused by rain/spillage of water


Preparation and surface treatment of formation by removing
mud and slurry, watering to the extent needed to maintain
the desired moisture content, trimming to the required line,
grade, profile and rolling with three wheel 80-100 kN static
roller, complete as per Technical Specification Clause
301.5.5.1

3.17

cum

sqm

Presplitting Rock Excavation Slopes

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

3.18

Description

Unit

Carrying out excavation in hard rock to achive a specified


slope of the rock face by controlled use of explosives and
blasting accessories in properly aligned and spaced drill
holes, collection of the excavated rock by a D-50 dozer,
loading in tipper by a front end loader and disposing of the
material with a lift upto 1.5 m and lead upto 1000 m as per
Technical Specification Clause 304.3

sqm

Construction of Embankment with Flyash/Pond ash


available from Coal or Lignite Burning Thermal Plants as
Waste Material
Construction of embankment with flyash conforming to Table
1 of IRC:SP:58 obtained from coal or lignite burning thermal
power stations as waste material, spread and compacted in
layer of 200 mm thickness each at OMC, all as specified in
IRC:SP:58 and as per approved plans with lead upto 1000 m
as per Technical Specification Clause 306.

3.19

(i)

cum

Surface Drains in Soil


Construction of unlined surface drains of average
cross-sectional area 0.40 sqm in soil to specified lines,
grades, levels and dimensions. Excavated material to
be used in embankment with a lift upto 3m and lead of
50 m (average lead 25 m) as per Technical
Specification Clause 307.

(ii)

(A)

Manual Means

(B)

Mechanical Means

Surface Drains in Ordinary Rock


Construction of unlined surface drain of average crosssectional area 0.4 sqm in ordinary rock to specified
lines, grades, levels and dimensions as per approved
design and Technical Specification Clause 307.
Excavated material to be used in embankment at site.
(A)

Manual Means

(B)

Mechanical Means

(iii) Surface Drains in Hard Rock

3.20

EE.,Dn.I,BMR

Chute Drains

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

EE.,Dn.I,BMR

Description

Unit

A.

Providing chute drains across embankment slopes in


approches of bridges and on horizontal curves as per
drawings.

B.

Providing chute drains across embankment slopes in


approches of bridges and on horizontal curves as per
drawings.

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
4.1

Granular Sub-base with Well Graded Material (Table


400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well
graded material brought from a lead upto 1 km ,
spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with smooth wheel
roller to achieve the desired density, complete as per
Technical Specification Clause 401.
(i)

For Grading I Material

cum

(ii)

For Grading II Material

cum

(iii)

For Grading III Material

cum

(iv)

For GSB material CBR value not less than 15

cum

(B) Plant Mix Method


Construction of granular sub-base by providing well
graded material, mixing in a mechanical mix plant at
OMC, carriage of mixed material to work site upto lead
of 1000 m spreading in uniform layers with motor
grader on prepared surface and compacting with
smooth wheel roller to achieve the desired density,
complete as per Technical Specification Clause 401
(i)
(ii)
(iii)
4.2

i)

For Grading I Material


For Grading II Material
For Grading III Material

cum
cum
cum

Gravel/Soil-Aggregate Base (Table 400.2) Grading A


Construction of gravel/soil-aggregate base by providing
well graded material brought from a lead upto 1 km,
spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel
80-100 kN static roller to achieve the desired density,
complete as per Technical Specifications Clause 402

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

Item
No.

Description
ii)

Unit

Gravel/Soil-Aggregate Base (Table 400.2) Grading B


Construction of granular sub-base by providing well
graded material brought from a lead upto 1 km,
spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel
80-100 kN static roller capacity to achieve the desired
density, complete as per Technical Specification Clause
402

iii)

cum

Gravel/Soil-Aggregate Base (Table 400.2) Grading C


Construction of granular sub-base by providing well
graded material brought from a lead upto 1 km,
spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with
rotavator at OMC, and compacting with three wheel
80-100 kN static roller capacity to achieve the desired
density, complete as per Technical Specification Clause
402

cum

4.3

Construction of granular surface course by providing well


graded material brought from a lead upto 1 km, spreading in
uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at OMC, and
compacting with three wheel 80-100 kN static roller capacity
to achieve the desired density, complete as per Technical
Specification Clause 402

cum

4.4

Lime Stabilisation for Improving Subgrade


Laying and spreading available soil in the subgrade on a
prepared surface, pulverising, mixing the spread soil in place
with rotavator with 2 per cent slaked lime having minimum
70 per cent of contents of CaO, grading with motor grader
and compacting with the smooth wheel road roller at OMC
to the desired density to form a layer of improved Sub-grade
as per Technical Specification Cluase 403.

4.5

EE.,Dn.I,BMR

(A) By Manual Means

cum

(B) By Mechanical Means

cum

Lime Treated Soil for Sub-Base

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

4.6

Description

Unit

Providing, laying and spreading soil on a prepared subgrade, pulverising, mixing the spread soil in place with
rotavator with 4 per cent slaked lime with minimum content
of 70 per cent of CaO, grading with motor grader and
compacting with the road roller at OMC to achieve atleast
98 per cent of the max dry density to form a layer of subbase as per Technical Specification Clause 403.

cum

Cement Treated Soil Sub-Base/Base


Providing, laying and spreading soil on a prepared subgrade, pulverising, adding the designed quantity of cement
to the spread soil, mixing in place with rotavator, grading with
the motor grader and compacting with the road roller at
OMC to achieve the desired unconfined compressive
strength and to form a layer of sub-base/base as per
Technical Specification Clause 404.
For 4 per cent quantity of cement by weight of soil

4.7

cum

Water Bound Macadam Sub-base/base


1)

WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates of specific sizes brought from a lead upto 1
km to water bound macadam specification including
spreading in uniform thickness, hand packing, rolling
with three wheel 80-100 kN static roller in stages to
proper grade and camber, applying and brooming,
stone screening/binding materials to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 1 as per
Technical Specification Clause 404.

2)

EE.,Dn.I,BMR

(A)

By Manual Means

cum

(B)

By Mechanical Means

cum

WBM Grading 2

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description
A.

B.

Providing, laying, spreading and compacting stone


aggregates (Hand Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up
the interstices of coarse aggregate, watering and
compacting to the required density grading 2 as per
Technical Specification Clause 405.

(A)

By Manual Means

cum

(B)

By Mechanical Means

cum

Providing, laying, spreading and compacting stone


aggregates (Crusher Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up
the interstices of coarse aggregate, watering and
compacting to the required density grading 2 as per
Technical Specification Clause 405.

(A)
3)

Unit

By Manual Means

cum

WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates (Crusher Borken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening to fill-up the interstices of
coarse aggregate, watering and compacting to the
required density Grading 3 as per Technical
Specification Clause 405.

4.8

EE.,Dn.I,BMR

(A)

By Manual Means

cum

(B)

By Mechanical Means

cum

Water Bound Macadam with Crushable Screenings

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description
1)

Unit

WBM Grading 1
Providing, laying, spreading and compacting stone
aggregates (Hand Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller in stages to proper grade and camber, applying
and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 1 as per
Technical Specification Clause 405.
(A)

By Manual Means

cum

(B)

By Mechanical Means

cum

2a) WBM Grading 2


Providing, laying, spreading and compacting stone
aggregates (Hand Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller in stages to proper grade and camber, applying
and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 2 as per
Technical Specification Clause 405.

(A)

By Manual Means

cum

(B)

By Mechanical Means

cum

2b) WBM Grading 2


Providing, laying, spreading and compacting stone
aggregates (Crusher Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller in stages to proper grade and camber, applying
and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 2 as per
Technical Specification Clause 405.

(A)

EE.,Dn.I,BMR

By Manual Means

TA to SE Circle, BMR

cum

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

3)

Unit

WBM Grading 3
Providing, laying, spreading and compacting stone
aggregates (Crusher Broken) of specific sizes brought
from a lead upto 1 km to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with three wheel 80-100 kN static
roller in stages to proper grade and camber, applying
and brooming, crushable screening to fill-up the
interstices of coarse aggregate, watering and
compacting to the required density Grading 3 as per
Technical Specification Clause 405.

(A)
(B)
4.9

By Manual Means
By Mechanical Means

cum
cum

Wet Mix Macadam


Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the material with water at OMC in mechanical
mixer (Pug Mill), carriage of mixed material by tipper to site,
laying in uniform layers in sub-base/base course on a well
prepared sub-base and compacting with smooth wheel
roller of 80 to 100kN weight to achieve the desired density
including lighting, barricading and maintenance of diversion,
etc as per Tables 400.11 & 400.12 and Technical
Specification Clause 406.
By Mechanical Means with 1 km lead

4.10

Construction
of
Shoulders
Specification Clause 407.
A.

cum
as

per

Technical

Earthen Shoulders
The rate as applicable for sub-grade construction may
be adopted.

B.

Hard Shoulders
Rate as applicable for sub-base and/or base may be
adopted as per approved design.

C.

Paved Shoulders
The rates may be adopted as applicable for different
layers of pavement depending upon approved design of
paved shoulders.

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

4.11

Granular sub-base/base/surface course with local materials


(Table 400.13) by mix in place method normal Construction
of granular sub-base by providing local material spreading in
uniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at once and
compacting with smooth wheel roller to achieve the desired
density complete as per Clause 401.4 as per Technical
Specification Clause 408.

4.12

Unit

(i)

Using naturally occuring gravel

cum

(ii)

Using Gravel mix soil using

cum

Construction of Water Bound Macadam


available material (Table 400.13)

using locally

Providing, laying spreading and compacting local material in


block or large discrete particles, such as kankar, Laterite,
Dhandla etc. as per Table 400.13 to water bound macadam
specification including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller in
stages to proper grade and camber, applying and brooming
requisite type of screening /binding materials to fill-up the
interstices of laid material watering and compacting to the
required density as per Clause 405.3 and Technical
Specification Cluase 408.

4.13

Lime-Flyash Stablised Soil Sub-base


Construction of sub-base using lime-flyash admixture with
granular soil, free from organic matter/deleterious material or
clayey silts and low plasticity clays having PI between 5 and
20 and liquid limit less than 25 and commercial dry lime,
slaked at site or pre-slaked with CaO content not less than
50 per cent, flyash to conform to gradation as per Clause 4.3
of IRC:SP:20, lime+flyash content ranging between 10 to 30
per cent, the minimum un-confined compressive strength
and CBR value after 28-days curing and 4-days soaking to
be 0.75 MPa and 25 per cent respectively, all as specified in
IRC:88 including a lead upto 1000 m as per Technical
Specification Cluase 409.

4.14

EE.,Dn.I,BMR

cum

cum

Construction of Sub-base/Course Using Crushed Slag


as per Table 400.19

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

4.15

Description

Unit

Construction of Sub-base by providing crushed slag


spreading in uniform layer with motor grader on prepared
surface mixing by mix-in-place method with Rotavator @
OMC, and compacting with three wheel 80-100 kN static
roller to achieve the desired density complete as per
Technical Specifications Cluase 402.4 and 410.3.2

cum

Water Bound Macadam using crushed slag


Providing, laying, spreading and compacting crushed slag to
water Bound Macadam specification including spreading in
uniform thickness, hand packing rolling with smooth wheel
roller 80-100 kN in stages to proper grade and camber,
applying and brooming requisite type of screening/binding
materials to fill up the interstees of crushed slag watering
and compacting to the required density as per Clause 405.3
and Technical Specification Cluase 410.3.2.

4.16

Cement Bound Granular Material sub-base/base


Providing laying and spreading granulated blast furnace
slag on a prepared sub-grade pulverising adding the
designed quantitity of cement to the spread granulated blast
furnace slag mixing in place with rotavator grading with the
mortar grader and compacting with smooth wheel roller 80100 kN at OMC to achieve the desired unconfined
compressive strength and to form a layer of sub-base/base
as per Technical Specification Clauses 404.3 and 410.4.2.

4.17

cum

cum

Crusher Run Macadam Base


Providing crushed run stone aggregate greading conforming
to table 400.20 depositing on a prepared surface by hauling
vehicles, spreading and mixing with
a motor grader,
watering and compacting with a three wheel 80-100 kN
static roller as per Technical Specification Clause 411 to
form a layer of sub-base/base
A)

B)

EE.,Dn.I,BMR

By mix-in-place method
(i)

With 53 mm maximum size of aggregates

cum

(ii)

With 37.5 mm maximum size of aggregates

cum

By mixing plant method

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

4.18

Description

Unit

(i)

With 53 mm maximum size of aggregates

cum

(ii)

With 37.5 mm maximum size of aggregates

cum

Brick Soling
Laying brick soling layer on prepared sub-grade with brick
on end edging according to lines, graded and cross-section
shown on the drawing filling joints with sand and earth,
spreading 25 mm thick layer of earth over brick soling,
watering and rolliing the same with three wheel road roller
80-100 kN as per Technical Specification Clause 412

4.19

Stone Set Pavement


Providing and laying stone set pavement on prepared
surface with sub-base 100 mm thick compacted Granular
Sub-base as per Clause 401.4 and base 75 mm thick
compacted water bound macadam grading 2 as per Clause
405.3. The 150 mm thick hammer desired stones are laid in
the herring one or stretched bond pattern. The stones are
compacted into the bedding sand of 40 mm over the WBM
base bounded by edge stone using suitable compacting
device. The gaps are filled with fine sand stone dust as per
Technical Specification Clause 413.4

4
.
2
0

EE.,Dn.I,BMR

sqm

sqm

Haulage excluding Loading & Unloading


Add extra over item no.4.1,4.2,4.3,4.7,4.8,4.9,4.17 for
additional lead of every subsequent Km beyond 1 Km lead
(
compacted
Qty.to
be
measured)
from
Quarry/Crusher/Plant.

TA to SE Circle, BMR

AAO.,Circle, Barmer

Cum
per
Km

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)

5.1

Prime Coat
(i)

Low porosity
Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502

(ii)

sqm

Medium porosity
Providing and applying primer coat with Bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.90- 1.2 kg/sqm using mechanical means
as per Technical Specification Clause 502.

sqm

(iii) High porosity


Providing and applying primer coat with Bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 1.2-1.5 kg/sqm using mechanical means
as per Technical Specification Clause 502.

5.2

EE.,Dn.I,BMR

sqm

Tack Coat
(i)

Providing and applying tack coat with Bitumen emulsion


(RS-1) using emulsion distributor at the rate of 0.20 to
0.25 kg per sqm on the prepared bituminous surface
cleaned with Hydraulic broom as per Technical
Specification Clause 503.

sqm

(ii)

Providing and applying tack coat with Bitumen emulsion


(RS-1) using emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared dry and hungry
bituminous surface cleaned with Hydraulic broom as
per Technical Specification Clause 503.

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

5.3

Description

Unit

(iii) Providing and applying tack coat with Bitumen emulsion


(RS-1) using emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared granular surfaces
treated with primer & cleaned with Hydraulic broom as
per Technical Specification Clause 50

sqm

(iv) Providing and applying tack coat with Bitumen emulsion


(RS-1) using emulsion pressure distributor at the rate
of 0.30 to 0.35 kg per sqm on the prepared nonbituminous surfaces (cement concrete pavement)
cleaned with Hydraulic broom as per Technical
Specification Clause 503.

sqm

Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant
using crushed aggregates of grading as per Table 500.4
premixed with bituminous binder, transported to site upto a
lead of 1000 m laid over a previously prepared surface with
paver finisher to the required grade, level and alignment and
rolled to achieve the desired compaction as per Technical
Specification Clause 504.

(I)
(II)
(III)

Bitumen S-90
Bitumen S-65
Bitumen CRMB

5.4

Built-Up Spray Grout

cum
cum
cum

Providing, laying and rolling of built-up spray grout layer over


prepared base consisting of a two layer composite
construction of crushed coarse aggregates using motor
grader for aggregates. Key stone chips spreader may be
used with application of bituminous binder after each layer,
and with key aggregates placed on top of the second layer to
serve as a base, conforming to the line, grades and crosssection specified, the compacted layer thickness being 75
mm as per Technical Specification Clause 505.
(A) By Manual Means
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(B) By Mechanical Means


(I)

5.5
EE.,Dn.I,BMR

Bitumen (S-90)

sqm

Modified Penetration Macadam


TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Construction of penetration macadam over prepared base


by providing a layer of compacted crushed coarse aggregate
using chips spreader with alternate applications of
bituminous binder and key aggregates and rolling with a
three wheel 80-100 kN static roller to achieve the desired
degree of compaction as per Technical Specification Clause
506.
(A) 50 mm thick
(I)

Bitumen (S-90)

sqm

(B) 75 mm thick

5.6

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

Surface Dressing using Bituminous


grade / modified bitumen) Binder

(Penetrations

Providing and laying surface dressing as wearing course


consisting of a layer of bituminous binder laid on the
prepared surface, followed by a cover of crushed stone
aggregates of specified size and rolling with three wheel 80100 kN static roller including cleaning the road surface as
per Technical Specification Clause 507.
(A) By Manual Means
Case I: Nominal chipping size 13.2 mm
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Case II: Nominal chipping size 9.5 mm

EE.,Dn.I,BMR

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

(B) By Mechanical Means


Case I: Nominal chipping size 13.2 mm
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Case II: Nominal chipping size 9.5 mm

5.7

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Surface Dressing using Bitumen Emulsion


Providing and laying surface dressing as wearing course
consisting of a layer of bitumen emulsion laid on the
prepared surface, followed by a cover of crushed stone
chippings of specified size and rolling with 80-100 kN roller
including cleaning the road surface as per Technical
Specification Clause 507.
(A) By Manual Means
Case I: Nominal aggregate size 13.2 mm

sqm

Case II: Nominal chipping size 9.5 mm

sqm

(B) By Mechanical Means

5.8

Case I: Nominal chipping size 13.2 mm

sqm

Case II: Nominal chipping size 9.5 mm

sqm

Pre-coating Chips
Pre-coating of chips with 1 per cent of paving bitumen by
weight of chips in a suitable mixer duly heated to 160 degree
C as per Technical Specification Clause 507.2.5
(I)

EE.,Dn.I,BMR

Bitumen (S-90)
TA to SE Circle, BMR

cum
AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

(II) Bitumen (S-65)


5.9

cum

20mm thick Open-Graded Premix Carpet using


Bituminous (penetration grade/modified bitumen) Binder
Providing, laying and rolling of open-graded premix carpet of
20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade bitumen or
emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including
mixing in a suitable plant, laying and rolling with a three
wheel 80-100 kN static roller capacity, finished to required
level and grades to be followed by seal coat of either Type A
or Type B or Type C as per Technical Specification Clause
508.
Case - I By Manual Means
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V)

sqm

Natural Rubber Modified Bitumen

Case - II By Mechanical Means


(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V)

sqm

Natural Rubber Modified Bitumen

5.10

20 mm thick Open Graded Premix Carpet using Bitumen


Emulsion as per Technical Specification Clause 508.2

5.11

Mix Seal Surfacing

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

sqm

SE.,Circle, Barmer

Item
No.

Description

Unit

Providing, laying and rolling of close-graded premix


surfacing material of 20 mm thickness composed of 11.2 mm
to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B)
aggregates using penetration grade bitumen to required line,
grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable plant, laying
and rolling with a three wheel 8-10 kN static roller and
finishing to required level and grades as per Technical
Specification Clause 509
By Manual Means
Type A
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Type B
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

By Mechanical Means
Type A
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Type B

EE.,Dn.I,BMR

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

5.12

Description

Unit

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510
A.

By Manual Means
Case - I : Type A
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Case - II : Type B
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Case - III : Type C

B.

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

By Mechanical Means
Case - I : Type A

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Case - II : Type B
(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Case - III : Type C


Providing and laying premixed seal coat
using Hot mix plant and paver finisher with
aggregate of 6.7 mm size defined as 100%
passing through 11.2mm sieve and retained
on 2.36 mm sieve with 0.09 Cum per 10
Sqm and 4.5% bitumin including preparation
and transportation of mix spreading , laying
and rolling etc. complete in all respect
including cost of binder .

5.13

(I)

Bitumen (S-90)

sqm

(II)

Bitumen (S-65)

sqm

(III) Polymer Modified Bitumen

sqm

(IV) Crumb Rubber Modified Bitumen

sqm

(V) Natural Rubber Modified Bitumen

sqm

Supply of Stone Aggregates for Pavement Courses


Supply of stone aggregates from approved sources
conforming to the physical requirement, specified in the
respective clauses, including royalties, fees rents, collection,
transportation, stacking and testing and measured in cum as
per Clause 511.5.

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

Item
No.

Description
Note:

EE.,Dn.I,BMR

Unit

Competitive market rates to be ascertained.


Alternatively, rates for stone crushing given in
Chapter 1 may be adopted, if found economical.
In case for supply of aggregates at site are not
available, nearest crusher site may be
ascertained. Loading and unloading

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 6
CEMENT CONCRETE PAVEMENT
6.1

Granual Sub-base
Rate as per item No.4.1 of Chapter 4

6.2

Lime Treated Soil


Rate as per item No.4.5 of Chapter 4

6.3

Water Bound Macadam (WBM) - Sub-base


(A) By Manual Means
As per item No.4.7 of Chapter 4
(B) By Mechnical Means
As per item No.4.7 of Chapter 4

6.4

Cement Concrete Pavement


Construction of un-reinforced, dowel jointed at expansion
and construction joint only, plain cement concrete pavement,
thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30
(Grade), coarse and fine aggregates conforming to IS:383,
maximum size of coarse aggregate not exceeding 25 mm,
mixed in a concrete mixer of not less than 0.2 cum capacity
and appropriate weigh batcher using approved mix design,
laid in approved fixed side formwork (steel channel, laying
and fixing of 125 micron thick polythene film, wedges, steel
plates including levelling the formwork as per drawing),
spreading the concrete with shovels, rakes, compacted
using needle, screed and plate vibrators and finished in
continuous operation including provision of contraction and
expansion, construction joints, applying debonding strips,
primer, sealant, dowel bars, near approaches to
bridge/culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14-days,

cum

using curing compound (where specified) and water finishing


to lines and grade as per drawing
and Technical
Specification Clause 1501
EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.
6.5

Description

Unit

Roller Compacted Concrete Pavement


Construction of Roller Compacted Concrete Pavement
(RCCP) with coarse and fine aggregates conforming to
IS:383, the size of coarse aggregate not exceeding 25 mm
with minimum aggregate cement ratio of 5:1 mm and with
minimum cemnt content of 310 kg per cum, aggregate
gradation to be as per Table 602.2 after blending, mixing in
concrete mixer at optimum moisture content, transporting to
site, laying with wheel barrows or steel pans or with
mechanical paver, compacting with 80-100 kN smooth
wheel, tandem vibratory roller, to achieve, the designed
flexural strength, finishing and curing as per drawings and
Technical Specification Clause 1502

6.6

Rectangular Concrete Block Pavement


Manufacturing, laying of cement concrete blocks of size
0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.) M30
garde and spreading 25 mm thick sand under neath and
filling joints with sand on existing W.B.M. base as per
Technical Specification Clause 1503.

6.7

EE.,Dn.I,BMR

cum

sqm

Interlocking Concrete Block Pavement


(1) Providing and Laying of Interlocking Concrete Block
Pavements having thickness 80 mm as per drawings
and Technical Specification Clause 1504.

sqm

(2) Providing and Laying of Interlocking Concrete Blcok


Pavements having thickness 60 mm as per drawing
and Technical Specification Clause 1504

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
7.1

Construction of Cut-off Walls/Head Walls


(i)

Earthwork in excavation for structures as per drawing


and technical specification Clause 305.
Rate as per item No.11.1 of Chapter 11

(ii)

cum

Plain cement concrete M15 grade


Rate as per item No.11.4 (ii) of Chapter 11

cum

(iii) Brick masonry in cement mortar 1:4


Rate as per item No.11.5 (ii) of Chapter 11

cum

(iv) Stone masonry in cement mortar 1:4


Rate as per item No.11.6 (ii) of Chapter 11
(v)

Providing P.C.C M20 architectural coping on top of wall


Rate as per item No.12.13 of Chapter 12

7.2

cum

Cement Concrete Slab


Rate as per item No.6.4 of Chapter 6

EE.,Dn.I,BMR

cum

W.B.M. Base Course


Rate as per item No.4.7 of Chapter 4

7.5

cum

Granular Sub-base
Rate as per item No.4.1 of Chapter 4

7.4

Preparation of Subgrade
Rate as per item No.3.15 of Chapter 3

7.3

cum

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

Item
No.
7.6

Description
(i)

Unit

Providing and Laying Apron with Stone Boulders as per


Drawings & Technical Specification Clause 1301
Rate as per item No.14.1 of Chapter 14

(ii)

cum

Providing and Laying of Boulder Apron Laid in Wire


Crates as per Drawing and Technnical Specification
Clause 1301
Rate as per item No.14.2 of Chapter 14

cum

(iii) Providing and Laying of Apron with Cement Concrete


Blocks as per Drawing and Technical Specification
Clause 1301
Rate as per item No.14.3 of Chapter 14

7.7

cum

Guide Posts
Construction of R.C.C. guide posts of 250 mm dia, M25
grade as per drawing and technical specification Clause
1401.6
Rate as per item No.8.8 of Chapter 8

7.8

cum

Bedding for Causeway


(i)

Type A (concrete cradle) Bedding Clause 1402.5


As per item No.9.2 of Chapter 9

(ii)

cum

Type B (first class) Bedding Clause 1402.5


As per item No.9.2 of Chapter 9

7.9

cum

Laying Reinforced Cement Concrete Pipe NP3 as per


drawing and technical specification Clause 1402.6
As per item No.9.3 of Chapter 9

7.10

Laying Reinforced Cement Concrete Pipe NP4 as per


technical specification Clause 1402.6
As per item No.9.4 of Chapter 9

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 8
HILL ROADS
8.1

Site Clearance

8.2

Setting Out

8.3

(1) Construction of reference pillars as per Fig. 1600.1 (b)


as per drawing and Technical Specification Clause
1602.1

each

(2) Construction of back piller as per Fig. 1600.1( c) as per


drawing and Technical Specification Clause 1602.3

each

(3) Construction of Job pillers as per Fig. 1600.1 (d) and


Technical Specification Clause 1602.4

each

Earthwork in Hill Road


(i)

(ii)

Excavation in Hilly Areas in Soil by manual means.


A)

Excavation in soil in Hilly Area by manual means


including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m
and a lead upto 20 m as per drawing and
Technical Specification Clause 1603.1

cum

B)

Extra for Every Additional Lift of 1.5 m or Part


thereof

cum

Excavation in Hilly Areas in Soil by mechanical


means
A)

Excavation in soil in Hilly Area by mechanical


means including cutting and trimming of side
slopes and disposing of excavated earth with a lift
upto 1.5 m and a lead upto 20 m as per Technical
Specification Clause 1603.1

cum

B)

Extra for Every Additional Lift of 1.5 m or Part


thereof

cum

(iii) Excavation in Hilly Area in Ordinary Rock by manual


means

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

A)

Excavation in ordinary rock using manual means


including loading in a truck and carrying of
excavated material to embankment site with a lift
upto 1.5 m and lead upto 20 m as per Clause
1603.2.

cum

B)

Extra for Every Additional Lift of 1.5 m or Part


thereof

cum

(iv) Excavation in Hilly Areas in Ordinary Rock by


mechanical means not requiring blasting
Excavation in hilly area in ordinary rock not requiring
blasting by mechanical means including cutting and
trimming of slopes and disposal of cut material with a lift
upto 1.5 m and lead upto 20 m as per Clause 1603.2.

(v)

8.4

cum

Excavation in Hilly Areas in Hard Rock requiring


blasting
A)

Excavation in hilly areas in hard rock requiring


blasting, by mechanical means, lift upto 1.5 m and
disposal of excavated rock upto a lead of 20 m as
per Clause 1603.2.

cum

B)

Extra for Every Additional Lift of 1.5 m or Part


thereof

cum

Retaining Walls / Breast Walls


Construction of retaining walls/breast walls in cement mortar
1:5 as per drawing and technical specifications Clause 1604
(i)

Earthwork in excavation for structures


Rate as per item No.11.1 of Chapter 11

(ii)

cum

Plain cement concrete M 10 grade


Rate as per item No.11.4 of Chapter 11

cum

(iii) Stone masonry in cement mortar 1:5


Rate as per item No. 12.4 (III) (iii) of Chapter 12

cum

(iv) Pointing with cement mortar 1:3


Rate as per item No.12.2 of Chapter 12
(v)

EE.,Dn.I,BMR

sqm

Providing P.C.C. M 20 architectural coping on top of


retaining wall/breast wall

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Rate as per item No.12.13 of Chapter 12

(vi) Filter material behind retaining wall / breast wall as per


Specification 1204.3.8 in a width of 600 m
Rate as per item No. 12.11 of Chapter 12

cum

(vii) Back filling behind retaining wall/breast wall


Rate as per item No. 12.10 of Chapter 12
8.5

cum

Construction of Hill Side Drain


Construction of hill side drain in accordance with the
requirement of specifications true to lines and grades.
Dimesions and other particulars as per drawing and
Technical Specification Clause 1606.1
Note:

8.6

Please ensure that quantities of various items are


entered in the Rate Analysis

Construction of Catch Water / Intercepting Drain


Construction of catch water/intercepting drain in random
rubble masonry in 1:5 cement mortar true to the specified
lines grades levels and dimensions as per the requirement
of the specifications Clause 1606.2
Note:

8.7

Construction of Scupper
Runni
ng m

Construction of RCC guide posts of 250 mm dia M15 grade


cast-in-situ with 20 mm nominal size aggregate, true to line
and grade, tolerance of vertical RCC posts not to exceed 1
in 500 as per drawing and Technical Specification Clause
1608.2
(i)

Earth work in excavation for structures


Rates as per item No. 11.1 of Chapter 11

(ii)

cum

RCC M15 grade


Rate as per item No. 11.4 of Chapter 11

EE.,Dn.I,BMR

Runni
ng m

Please ensure that quantities of various items are


entered in the Rate Analysis

Construction of scupper with dry stone masonry as per


drawing and technical specifications as per Clause 1606.5.

8.8

Runni
ng m

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

Item
No.

Description

Unit

(iii) HYSD steel bars


Rate as per item No. 12.6 of Chapter 12

(iv) Painting two coats including prime coat on new


concrete surface
Rate as per item No.10.5 of Chapter 10

sqm

8.9

Providing edge stones on valley side of formation as per


drawing and Technical Specification Clause 1608.2.6

8.10

Turfing with Sods


Furnishing and laying of the live sods of perennial turf
forming grass on embankment slope, verges or other
locations shown on the drawing or as directed by the
Engineer including preparation of ground, stacking the sods
and watering as per Clause 309

8.11

sqm

Seeding and Mulching


Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, multching material,
applying bituminous emulsion at the rate of 0.23 l per sqm
and laying and fixing jute netting, including watering for 3
months all as per

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

sqm

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 9
PIPE CULVERTS
9.1

Excavation for Structures


Earthwork in excavation for foundation of structures upto 3
m depth as per drawing and technical specification Clause
1104 includding setting out, construction of shoring and
bracing, removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with approved
material.
Rate as per item No.11.1 of Chapter 11

9.2

cum

Bedding for Pipe


(i)

Type A (Concrete Cradle) Bedding


Laying concrete cradle bedding with M15 Grade
Cement Concrete as per Clause 1105 (i)
Rate as per Item No.11.4 (II)(i) of Chapter 11

(ii)

cum

Type B (First Class) Bedding


Laying (First Class) bedding on well compacted sand,
moorum or approved granular material as per Clause
1105 (ii)
Rate as per Item No.11.2 of Chapter 11

9.3

cum

Providing and Laying Reinforced Cement Concrete Pipe


NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular material in
single row including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets Clause 1106.

EE.,Dn.I,BMR

(A) 1200 mm dia

(B) 1000 mm dia

(C) 750 mm dia

(D) 600 mm dia

(E) 300 mm dia

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

9.4

Providing and Laying Reinforced Cement Concrete Pipe


NP4 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP4
for culverts on first class bedding of granular material in
single row including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets Clause 1106.

9.5

(A) 1200 mm dia

(B) 1000 mm dia

(C) 750 mm dia

(D) 600 mm dia

(E) 300 mm dia

Providing and Laying Reinforced Cement Concrete Pipe


NP3 as per Design in Double Row
Providing and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular material in
double row including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets as per
Clause 1106.

9.6

(A) 1200 mm dia

(B) 1000 mm dia

(C) 750 mm dia

Providing and Laying Reinforced Cement Concrete Pipe


NP4 as per Design in Double Row
Providing and laying reinforced cement concrete pipe NP4
for culverts on first class bedding of granular material in
double row including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling, concrete
and masonry works in head walls and parapets as per
Clause 1106.

EE.,Dn.I,BMR

(A) 1200 mm dia

(B) 1000 mm dia

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

(C) 750 mm dia

9.7

9.8

9.9

Laying Cement Concrete Pipe NP3 (burried conduits) on first


class bedding of granular material including fixing collar with
cement sand mortar 1:2 but excluding excavation, protection
works, backfilling, concrete and masonary work in head wall
and parapets
500 mm dia

300 mm dia

Providing & Laying Cement Concrete Pipe NP4 (burried


conduits) on first class bedding of granular material including
fixing collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and
masonary work in head wall and parapet
500 mm dia

300 mm dia

Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling


course below open foundation of Head walls as per
drawings & Technical Specification Clause 1109
Rate as per item No.11.4 of Chapter 11

9.10

cum

Brick Masonry Work in cement mortar in foundation of Head


walls complete exculding pointing and plastering as per
drawing and technical specification Clause 1109
(A) Brick Masonry in 1:4 cement mortar
Rate as per item No.11.5 (ii) Chapter 11

cum

(B) In cement-lime mortar (1:0.5:4.5)


Rate as per item No.11.5 (iii) Chapter 11

9.11

cum

Stone Masonry Work in cement mortar in foundation of Head


walls complete as per drawing and technical specification
Clasue 1109
(A) In 1:4 cement mortar

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Rate as per item No.11.6 (II) (ii) Chapter 11

cum

(B) In cement-lime mortar (1:0.5:4.5)


Rate as per item No.11.6 (II) (iii) Chapter 11

9.12

cum

Pointing with Cement Mortar (1:3) on brickwork as per


technical specification Clause 613.3
Rate as per item No.12.2 of Chapter 12

9.13

sqm

Plastering with Cement Mortar (1:4), 15 mm thick on


brickwork in substructure as per technical specification
Rate as per item No.12.3 of Chapter 12

9.14

sqm

Backfilling in Foundation Trenches as per drawing and


technical specification Clause 1108
Rate as per Item No.11.2 of Chapter 11

9.15

Providing PCC M20 Architectural Coping on the top of wing


wall, return wall etc. complete as per drawing and technical
specification Clause 615
Rate as per Item No.12.13 of Chapter 12

EE.,Dn.I,BMR

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
10.1

Printing New Letters and Figures of any Shade


Printing new letter and figures of any shade with synthetic
enamel paint black or any other approved colour to give an
even shade as per drawings and Technical Specification
Clause 1701

10.2

i)

Hindi (Matras commas and the like not to be measured


and paid for. Half letters shall be counted as half only)

per cm
height
per letter

ii)

English and Roman

per cm
height
per letter

Traffic Signs
A.

Retro-reflectorised Traffic Signs


(1)

Providing and fixing of retro-reflectorised cautionary,


mandatory and informatory sign as per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3 fixed over aluminium sheeting, 1.5 mm thick
supported on a mild steel angle iron post 75 mm x 75
mm x 6 mm firmly fixed to the ground by means of
properly designed foundation with M15 grade cement
concrete 450 mm x 450 mm x 600 mm, 600 mm below
ground level as per
drawings and Technical
Specification Clause 801

i
ii
iii
iv
v
vi
vii
Note:

EE.,Dn.I,BMR

900mm equilateral triangle


600mm equilateral triangle
600mm circular
800mm x 600mm rectangular
600mm x 450mm rentagular
600mm x 600mmsquare
900mm side octagon
Please ensure that area of aluminium plate
of required size is entered in the analysis
item

TA to SE Circle, BMR

AAO.,Circle, Barmer

each
each
each
each
each
each
each

SE.,Circle, Barmer

Item
No.

Description
(2)

Providing and fixing of retro-reflectorised cautionary,


mandatory and informatory sign as per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 1.5 mm thick
supported on GI pipe 50 mm dia firmly fixed to the
ground by means of properly designed foundation with
M-15 grade cement concrete 450 mm x 450 mm x 600
mm, 600 mm below ground level as per drawings and
Technical Specification Clause 1701

i
ii
iii
iv
v
vi
vii
Note:

(3)

Note:

EE.,Dn.I,BMR

900mm equilateral triangle


600mm equilateral triangle
600mm circular
800mm x 600mm rectangular
600mm x 450mm rentagular
600mm x 600mmsquare
900mm side octagon
Please ensure that area of aluminium plate
of required size is entered in the analysis
item

each
each
each
each
each
each
each

Providing and fixing of retro-reflectorised cautionary,


mandatory and informatory sign as per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 1.5 mm thick
supported on RCC Post 100 mm x 100 mm firmly fixed
to the ground by means of properly designed
foundation with M15 grade cement concrete 450 mm x
450 mm x 600 mm, 600 mm below ground level as per
approved drawing Clause 1701

i
ii
iii
iv
v
vi
vii

B.

Unit

900mm equilateral triangle


600mm equilateral triangle
600mm circular
800mm x 600mm rectangular
600mm x 450mm rentagular
600mm x 600mmsquare
900mm side octagon

each
each
each
each
each
each
each

Please ensure that area of aluminium plate


of required size is entered in the analysis
item

Semi Reflective Traffic Signs

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Providing and fixing of semi reflective cautionary,


mandatory and informatory sign board as per IRC:67
made of 1.5 mm thick MS Sheet duly stove white colour
in front and gray colour on back with red reflective
border of 65 mm width and required letters and figures
with reflective tape engineering grade as per Clause
1701.3.9 of MORD for Rural Roads of required shade
and colour supported and welded on 47mm x 47 mm x
12 SWG sheet tube firmly fixed to the ground by mean
of properly designed foundations with M-15 grade
cement concrete 450x450x600 mm, 600 mm below
ground level as per approved drawing Clause 1701.2.2

i
ii
iii
iv
v
vi
vii
Note:

10.3

each
each
each
each
each
each
each

Direction and Place Identification signs upto 0.9 sqm


size board
A.

Retro-reflectorised Traffic Signs


(i)

Providing and erecting direction and place identification


retro-reflectorised sign as
per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick
with area not exceeding 0.9 sqm supported on a mild
steel single angle iron post 75 x 75 x 6 mm firmly fixed
to the ground by means of properly designed
foundation with M-15 grade cement concrete 450 x 450
x 600 mm, 600 mm below ground level as per
approved drawing and Technical Specification Clause
1701
i)
ii)
iii)
iv)
v)

EE.,Dn.I,BMR

900mm equilateral triangle


600mm equilateral triangle
600mm circular
800mm x 600mm rectangular
600mm x 450mm rentagular
600mm x 600mmsquare
900mm side octagon
Please ensure that area of MS Sheet of
required size is entered in the analysis item

Size 120cm x 75cm


Size 90cm x 75cm
Size 90cm x 60cm
Size 75cm x 45cm
Size 60cm x 45cm

TA to SE Circle, BMR

AAO.,Circle, Barmer

Each
Each
Each
Each
Each

SE.,Circle, Barmer

Item
No.

Description
(ii)

Providing and erecting direction and place


identification retro-reflectorised sign as per IRC:67
made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area not
exceeding 0.9 sqm supported on 2 inch dia GI
Pipe firmly fixed to the ground by means of
properly designed foundation with M-15 grade
cement concrete 450 x 450 x 600 mm, 600 mm
below ground level as per approved drawing and
Tehnical Specification Clause 1701.
i)
ii)
iii)
iv)
v)

(iii)

Size 120cm x 75cm


Size 90cm x 75cm
Size 90cm x 60cm
Size 75cm x 45cm
Size 60cm x 45cm

Each
Each
Each
Each
Each

Providing and erecting direction and place


identification retro-reflectorised sign as
per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area not
exceeding 0.9 sqm supported on RCC Post 100
mm x 100 mm firmly fixed to the ground by means
of properly designed foundation with M-15 grade
cement concrete 450 x 450 x 600 mm, 600 mm
below ground level as per approved drawing and
Technical Specification Clause 1701

i)
ii)
iii)
iv)
v)

B.

Unit

Size 120cm x 75cm


Size 90cm x 75cm
Size 90cm x 60cm
Size 75cm x 45cm
Size 60cm x 45cm

Each
Each
Each
Each
Each

Semi-Reflective Traffic signs


Direction and place indentification signs up to 0.9 sqm
size board

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Providing
and erecting direction
and place
identifications of semi reflective sign boards as per
IRC:67 made of 2 mm thick M.S. Sheet duly stove
enameled paint in white colour in front and grey colour
on back with red reflective border of 70 mm width and
required message, letters, figures with reflective
engineering grade tape as per MORD specifications of
required shade and colour. Supported and welded on
47 mm x 47mm of 12 SWG Square tube of 3050 mm
height duly strengthened by 25 mm x 5 mm M/s flat iron
on edges on back firmly fixed to the ground by means
of properly designed foundations with M-15 grade
cement concrete 450 mm x 450 mm x 600 mm, 600
mm below ground level as per approved drawing and
Technical Specification Clause 1701

i)
ii)
iii)
iv)
v)
10.4

Each
Each
Each
Each
Each

Direction and Place Identification signs with size more


than 0.9 sqm size board
A.

Retro-reflectorised Traffic Signs


(i)

EE.,Dn.I,BMR

Size 120cm x 75cm


Size 90cm x 75cm
Size 90cm x 60cm
Size 75cm x 45cm
Size 60cm x 45cm

Providing and erecting direction and place


identification retro-\reflectorised sign as
per
IRC:67 made of encapsulated lens type reflective
sheeting vide Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm thick with area
exceeding 0.9 sqm supported on mild steel angle
iron posts 75 mm x 75 mm x 6 mm, 2 Nos. firmly
fixed to the ground by means of properly designed
foundation with M-15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground
level as per approved drawing and Technical
Specification Clause 1701 Size 150cm x 120cm

TA to SE Circle, BMR

AAO.,Circle, Barmer

Each

SE.,Circle, Barmer

Item
No.

Description

B.

Unit

(ii)

Providing and erecting direction and place identification Each


retro-reflectorised sign as per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick
with area exceeding 0.9 sqm supported on dia GI Pipe
firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below ground
level as per approved drawing and Technical
Specification Clause 1701 Size 150cm x 120cm

(iii)

Providing and erecting direction and place identification Each


retro- reflectorised sign as per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3, fixed over aluminium sheeting, 2 mm thick
with area exceeding 0.9 sqm supported on RCC Posts
100 mm x 100 mm firmly fixed to the ground by means
of properly designed foundation with M 15 grade
cement concrete 450 mm x 450 mm x 600 mm, 600
mm below ground level as per approved drawing and
Technical Specification Clause 1701 Size 150cm x
120cm

Semi-Reflective Traffic signs


Direction and place identification signs more than
0.90 sqm sign board
Providing and erecting direction and place identification
of semi reflective sign boards as per IRC-67 made of 2
mm thick M.S. Sheet duly stove enameled paint white
colour in front and grey colour on back with reflective
border of 70 mm width and required message, letters,
figures with reflective tape of engineering grade as per
MORD specifications of required shade and colour.
Supported and welded on two nos. 47 mm x 47 mm of
12 SWG square tube of 3050 mm height duly
strengthened by 25 mm x 5 mm MS flat iron on edges
on back firmly fixed to the ground by means of properly
designed foundations with M-15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below ground
level as per approved drawing and Technical
Specification Clause 1701

10.5

EE.,Dn.I,BMR

Each

Painting Two Coats on New Concrete Surfaces

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

10.6

Description

Unit

Painting two coats including primer coat after filling the


surface with synthetic enamel paint in all shades on new,
plastered / concrete surfaces as per drawing and Technical
Specification Clause 1701

sqm

Painting on Steel Surfaces


Providing and applying two coats of ready mix paint
including primer coat of approved brand on steel surface
after through cleaning of surface to give an even shade as
per drawing and Technical Specification Clause 1701

10.7

Painting on Concrete/Steel Surfaces with Epoxy


Painting two coats including prime coat with epoxy paint of
approved brand on concrete/steel surfaces after through
cleaning of surface to give an even shade as per drawing
and Technical Specification Clause 1701

10.8

sqm

Painting lines, Dashes, Arrows, etc. on Roads in Two


Coats on Old Work
Painting lines, dashes, arrows, etc. on roads in two coats on
old work with ready mixed road marking paint conforming to
IS:164 on bituminous/concrete surface, including cleaning
the surface of all dirt, dust and other foreign matter,
demarcation at site

10.10

sqm

Painting lines, Dashes, Arrows, etc. on Road in Two


Coats on New Work
Painting lines, dashes, arrows, etc. on roads in two coats on
new work with ready mixed road marking paint conforming to
IS:164 on bituminous/concrete surface, including cleaning
the surface of all dirt, dust and other foreign matter,
demarcation at site

10.9

sqm

sqm

Kilometre Stone
Reinforced cement concrete M15
grade kilometre
stone/local stone of standard design as per IRC:8 fixing in
position including painting and printing, etc as per drawing
and Technical Specification Clause 1703
i)
ii)
iii)

EE.,Dn.I,BMR

5th Kilometre Stone (precast)


Ordinary Kilometer Stone (Precast)
200 m stone (precast)

TA to SE Circle, BMR

AAO.,Circle, Barmer

each
each
each

SE.,Circle, Barmer

Item
No.

Description

Unit

Cut Stone kilometre stone/local stone of standard design as


per IRC:8 fixing in position including painting and printing,
etc as per drawing and Technical Specification Clause 1703
i)
ii)
iii)

5th Kilometre Stone (precast)


Ordinary Kilometer Stone (Precast)
200 m stone (precast)

each
each
each

10.11

Boundary Pillar

Reinforced cement concrete M15 grade boundary


pillars/local stone of standard design as per IRC:25, fixed in
position including finishing and lettering but excluding
painting as per drawing and Technical Specification Clause
1704

each

Cut Stone boundary pillars/local stone of standard design as


per IRC:25, fixed in position including finishing and lettering
but excluding painting as per drawing and Technical
Specification Clause 1704

each

10.12

G.I Barbed Wire Fencing 1.2 m high


Providing and fixing 1.2 m high GI barbed wire fencing with
1.8 m RCC posts 150 mm x 150 mm placed every 3 m
centre-to-centre founded in M15 grade cement concrete, 0.6
m below ground level, every 15th post, last but one end post
and corner post shall be strutted on both sides and end post
on one side only and provided with 9 horizontal lines and 2
diagonals interwoven with horizontal wires, fixed with GI
staples, turn buckles etc. complete as per Clause 1705.

10.13

G.I Barbed Wire Fencing 1.8 m high


Providing and fixing 1.8 m high GI barbed wire fencing with
2.4 m RCC M15 grade 150 mm x 150 mm concrete post
placed every 3 m centre-to-centre founded in M15 grade
cement concrete, 0.6 m below ground level, every 15th post,
last but one end post and corner post shall be strutted on
both sides and end post on one side only and provided with
12 horizontal lines and 2 diagonals interwoven with
horizontal wires, fixed with GI staples, turn buckles etc.
complete as per Clause 1705.

10.14

EE.,Dn.I,BMR

Runni
ng m

Runni
ng m

Tubular Steel Railing on Medium Weight Steel Channel


(ISMC series) 100 mm x 50 mm
TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

10.15

10.16

Description

Unit

Providing, fixing and erecting 50 mm dia steel pipe railing in


3 rows duly painted on medium weight steel channels (ISMC
series) 100 mm x 50 mm, 1.2 m high above ground, 2 m
centre-to-centre, complete as per approved
drawings
Clause 1706

Runni
ng m

Tubular Steel Railing on Precast RCC posts, 1.2 m high


above Ground Level
Providing, fencing and erecting 50 mm dia painted steel pipe
railing in 3 rows on precast M-20 grade RCC vertical posts
175 mm x 175 mm x 1.8 m high (1.2 m above Gl) with 3
holes 50 mm dia for pipe, fixed 2 m centre-to- centre
complete as per approved drawings Clause 1706
Providing and Fixing 'Logo' of PMGSY Project
Providing and fixing of typical PMGSY informatory sign
board with Logo as per MORD specifications and drawing.
Three MS Plates of 1.6 mm thick, top and middle plate duly
welded with MS flat iron 25mm x 5m size on back on edges.
The lower plate will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron frame of the lower
most plate and flat iron frame of middle plate will be welded
to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly
embedded in cement concrete M-15 grade blocks of 450mm
x 450mm x 600mm, 600mm below ground level. The top
most diamond plate will be welded to middle plate by 47mm
x 47mm of 12 SWG steel plate tube. All M.S. will be stove
enameled on both sides. Lettering and printing arrows,
border etc. will be painted with ready mixed synthetic enamel
paint of superior quality in required shade and colour. All
sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing Clause
1701 and Annexure 1700.1

10.17

EE.,Dn.I,BMR

each

Traffic Cone
Provision of red fluorescent with white reflective sleeve traffic
cone made of Low Density Polyethylene (LDPE) material
with a square base of 390 x 390 x 35 mm and a height of
770 mm, 4 kg in weight, placed at 1.5 m interval, all as per
BS:873

10.18

Runni
ng m

each

Road Markers/Road Stud with Lens Reflector

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Providing and fixing of road stud 100 x 100 mm die cast in


aluminium, resistant to corrosive effect of salt and grit, fitted
with lense reflectors, installed in concrete or asphaltic
surface by drilling holes 30 mm upto a depth of 600 mm and
bedded in a suitable bituminous grout or epoxy mortar, all as
per BS:873 (Part 4) 1973.

Each

10.19

Defination plate on curve Board

(1)

Providing and fixing of retro-reflectorised Defination Plate


made of Aluminium sheeting fixed with encapsulated lens
type reflective sheeting of size including lettering and signs
as applicable background with epoxy paint 1.5 mm thick
with 25mm x5mm flat firmy fixed to angle of board by nuts
&bolt etc.Of size 450x600mm

each

(2)

Providing and fixing of retro-reflectorised Defination Plate


made of semi reflective sign boards made of 2 mm thick
M.S. Sheet duly stove enameled paint white colour in front
and grey colour on back with reflective border of 25 mm
width and required message, letters, figures with reflective
tape of engineering grade as per MORD specifications of
required shade and colour.
Supported and welded
strenthened by 25 mm x 5 mm MS flat iron.Of size
450x600mm

each

10.2

PMGSY LOGO Board


A

(1)

Providing and fixing of retro-reflectorised PMGSY logo with


Defination plate(as per MORD design /Drawing) made of
encapsulated lens type reflective sheeting vide Clause
1701.2.3 fixed over aluminium sheeting, 1.5 mm thick
supported on a mild steel angle iron post 75 mm x 75 mm x
6 mm,Size of Diamond plate 600x600mm,Defination Plate
900x250mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 450
mm x 450 mm x 600 mm, 600 mm below ground level as per
drawings and Technical Specification Clause 801

EE.,Dn.I,BMR

Retro-reflectorised Traffic Signs


Each

Semi Reflective Traffic Signs

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.
(2)

EE.,Dn.I,BMR

Description

Unit

Providing and fixing of semi reflective PMGSY LOGO with


Defination Plate (as per MORD design/Drawing )made of 2
mm thick MS Sheet framed to angle iron 47x47x12SWG
sheet tube on M.S. post of angle iron size 75x75x6mm
3050mm long duly stove Luminious orange colour in front
and gray colour on back with reflective border of 65 mm
width and required letters and figures with reflective tape
engineering grade as per Clause 1701.3.9 of MORD for
Rural Roads of required shade and colour with diomond
plate 600x600mm, Defination Plate 900x250mm firmly fixed
to the ground by mean of properly designed foundations with
M-15 grade cement concrete 450x450x600 mm, 600 mm
below ground level as per approved drawing Clause
1701.2.2

Each

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 11
FOUNDATION

11.1

Excavation for Structures


Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material.
I.

II.

11.2

11.3

Ordinary soil
(i)

Upto 3 m depth

cum

(ii)

3 m to 6 m depth

cum

Ordinary rock (not requiring blasting)


Upto 3 m depth

cum

III.

Hard rock (requiring blasting)

cum

IV.

Hard rock (blasting prohibited)

cum

V.

Marshy soil

cum

Fillling in foundation trenches as per drawing and


technical specification Clause 305.3.9
I.

Sand filling

cum

II.

Earth filling (For marshy soil)

cum

Filling annular space around footing in rock as per technical


specification Clause 1203.4.3.
P.C.C grade M 15
Nominal mix 1:2.5:5

11.4

Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
I.

EE.,Dn.I,BMR

cum

P.C.C grade M 10
TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

II.

III.

11.5

11.6

(i)

Nominal mix 1:3:6

cum

(ii)

Nominal mix 1:3.6 (Hand mixing)

cum

P.C.C grade M 15
(i)

Nominal mix (1:2.5:5)

cum

(ii)

Nominal mix 1:2.5:5 (Hand mixing)

cum

P.C.C. grade M 20
(i)

Nominal mix (1:2:4)

cum

(ii)

Nominal mix 1:2:4 (Hand mixed)

cum

IV.

R.C.C grade M 20

cum

V.

R.C.C. grade M 25

cum

Brick masonry work in cement mortar in foundation complete


excluding pointing and plastering as per drawing and
technical specifications Clauses 600, 1202 & 1203
I.

Brick masonry in 1:3 cement mortar

cum

II.

Brick masonry in 1:4 cement mortar

cum

III.

Brick masonry in cement-lime-mortar (1:0.5:4.5)

cum

Stone masonry work in cement mortar in foundation


complete as per drawing and technical specifications
Clauses 702, 704, 1202 & 1203.
I.

II.

III.

Coursed rubble masonry (1st sort)


(i)

In 1:3 cement mortar

cum

(ii)

In 1:4 cement mortar

cum

(iii)

In cement-lime-sand mortar (1:0.5:4.5)

cum

Coursed rubble masonry (2nd sort)


(i)

In 1:3 cement mortar

cum

(ii)

In 1:4 cement mortar

cum

(iii)

In cement-lime-mortar (1:0.5:4.5)

cum

Random Rubble Masonry


(i)

EE.,Dn.I,BMR

Unit

In 1:3 cement mortar


TA to SE Circle, BMR

cum
AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

(ii)

In cement mortar 1:4

cum

(iii)

In cement lime mortar (1:0.5:4.5)

cum

11.7

Supplying, fitting and placing HYSD bar reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202

11.8

Supplying, fitting and placingTMT bar reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202

11.9

Supplying, fitting and placing MS bar reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 12
SUBSTRUCTURE

12.1

Brick masonry work in cement mortar in substructure


complete excepting pointing and plastering, as per drawing
and technical specification Clauses 602, 603, 604, 1202 &
1204
I.

In 1:3 cement mortar

cum

II.

In 1:4 Cement mortar

cum

III.

In 1:5 cement mortar

cum

IV.

In cement lime mortar (1:0.5:4.5)

cum

12.2 I. Pointing with cement mortar (1:3) on brickwork as per


drawing and technical specification Clauses 613.3 and 1204

10
sqm

II

Pointing with cement mortar (1:3) on stone masonry as per


drawing and technical specification Clauses 613.3 and 1204

a).

Flush and Rulled Type

10sq
m

b).

Raised and Cut Type

10sq
m

12.3 I Plastering with cement mortar (1:4), 15 mm thick on


brickwork in substructure as per technical specification
Clauses 613.4 & 1204

10
sqm

II

Plastering with cement mortar (1:4), 20 mm thick on stone


masonry work in substructure as per technical specification
Clauses 613.4 & 1204

10
sqm

12.4

Stone masonry in cement mortar for substructure complete


as per drawing & technical specification Clauses 702, 704,
1202 and 1204
I.

EE.,Dn.I,BMR

Coursed rubble masonry (1st sort)


(i)

In 1:3 cement mortar

cum

(ii)

In 1:4 cement mortar

cum

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

II.

III.

12.5

Unit

(iii)

In cement mortar (1:5)

cum

(iv)

In cement lime mortar (1:0.5:4.5)

cum

Coursed Rubble masonry (2nd sort)


(i)

In cement mortar (1:3)

cum

(ii)

In 1:4 cement mortar

cum

(iii)

In cement mortar (1:5)

cum

(iv)

In cement lime mortar (1:0.5:4.5)

cum

Random rubble masonry


(i)

In cement mortar (1:3)

cum

(ii)

In 1:4 cement mortar

cum

(iii)

In cement mortar (1:5)

cum

(iv)

In cement lime mortar (1:0.5:4.5)

cum

Plain/reinforced cement concrete in substructure complete


as per drawings and technical specification Clauses 802,
804, 805, 806, 807, 1202 ans 1204
For height upto 5 m
I.

II.

12.6

EE.,Dn.I,BMR

P.C.C grade M 15
(i)

Nominal mix (1:2.5:5)

cum

(ii)

Nominal mix 1:2.5:5 (Hand mixing)

cum

P.C.C. grade M 20
(i)

Nominal mix (1:2:4)

cum

(ii)

Nominal mix 1:2:4 (Hand mixed)

cum

III.

R.C.C grade M 20

IV.

R.C.C. grade M 25

cum

Supplying, fitting and placing HYSD bar reinforcement (Fe


415) in substructrue complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

12.7

Supplying, fitting and placing TMT bar reinforcement (Fe


415) in substructrue complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202

12.8

Supplying, fitting and placing with MS bar reinforcement (Fe


415) in substructrue complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202

12.9

Providing weepholes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width of
the structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7

Nos.

12.10

Backfilling behind abutment, wing wall and return wall


complete as per drawings & technical specification Clause
1204.3.8
I)

Granular material

cum

II)

Sandy material

cum

12.11

Providing and laying filter media with granular crushed


aggregates as per specification to a thickness of not less
than 600 mm with smaller size towards the soil and bigger
size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and
technical specification Clause 1204.3.8

cum

12.12

Supplying, fitting and fixing in position true to line and level


elastomeric bearing conforming to IRC:83 (Part-II) Section
IX complete, including all accessories as per drawings and
technical specification Clause 1207.1

cucm

12.13 I.

Providing PCC M-20 architectural coping on the top of wing


wall, return wall etc. complete as per drawing and technical
specification Clauses 615, 710 and 1204.3.11

a).

150mm thick

sqm

b).

75mm thick

sqm

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

II

Providing PCC M-20 50mm thick coping 20mm nominal


size aggregate on the top of wing wall, return wall etc.
with rounding of edges etc. complete as per drawing
and technical specification Clauses 615, 710
and
1204.3.11

sqm

12.14

Providing pressure relief pipes 100 mm dia in bottom slab of


box cell on a filter media base of 500 mm x 500 mm as per
drawing and technical specification Clause 1205.5.7

Nos.

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 13
SUPERSTRUCTURE

13.1

Providing and laying reinforced cement concrete in


superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5
I.

R.C.C grade M 20
(i)

For nominal mix 1:2:4

cum

(ii)

For nominal mix 1:2:4 (Hand mixed)

cum

(iii)

For design mix RCC M 20

cum

II.

R.C.C M 25

cum

III.

R.C.C. Grade M 30

cum

13.2

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202

13.3

Supplying, fitting, and placing TMT bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202

13.4

Supplying, fitting, and placing MS bar reinforcement in


superstructure complete as per drawing and technical
specifications Clauses 1002, 1010 and 1202

13.5

Providing and laying cement concrete wearing course M 30


grade including reinforcement complete as per drawing and
technical specifications Clauses 800 and 1206.3

cum

13.6

Construction of R.C.C. railing of M 25 grade in cast-in-situ


with 20 mm nominal size aggregate, true to line and grade,
tolerance of vertical railing post not to exceed 1 in 500,
centre-to-centre spacing between vertical posts not to
exceed 2000
mm as per drawing and technical
specifications Clauses 800, 900 and 1208.3

Runni
ng m

13.7

Providing fitting and fixing mild steel railing complete as per


drawing and technical specifications Clause 1208.2

Runni
ng m

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

13.8

Providing and fixing in position pipe railing consisting of IS


Rolled steel joist posts designation IS MB 100 (100x75) at
2.5 m interval and three rows of 50 mm dia steel pipes (light)
including fixing in position on bridge deck complete as per
drawing and technical specifications Clause 1208.2

Runni
ng m

13.9

Brick masonry work in cement mortar 1:3 in parapet


excluding pointing and plastering as per drawing and
technical specifications Clauses 600, 900 and 1208.4

cum

13.10

Drainage spouts complete as per drawing and technical


specifications Clause 1209

Nos.

13.11

P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below


approach slab complete as per drawing and technical
specifications Clauses 800 and 1211
(i)

Nominal mix (1:2.5:5)

cum

(ii)

Nominal mix 1:2.5:5 (Hand mixing)

cum

13.12

Reinforced Cement Concrete M 25 grade approach slab


including reinforcement and formwork complete as per
drawing and technical specifications Clauses 800 and 1211

cum

13.13

Providing and laying of an elastomeric slab seal expansion


joint complete as per approved drawing and approved
specifications to be installed by manufacturer/supplier or
their authorised representative ensuring compliance to the
manufacturers instructions for installlation and as per
technical specifications Clause 1207.2.5

Runni
ng m

13.14

Providing and laying of compression seal joint consisting of


steel armoured nosing at two edges of the joint gap suitably
anchored to the deck concrete and a preformed chloroprene
elastomer or closed cell foam joint sealer compressed and
formed into the joint gap with special adhesive binder as per
drawing, and technical specifications Clause 1207.2.4

Runni
ng m

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

13.15

Providing and laying a buried expansion joint, covered with


12 mm thick, 200 mm wide galvanised weldable structrual
steel plate as per IS:2062, placed symmetrical to centre line
of the joint, resting freely over the top surface of the deck
concrete, welding of 8 mm dia, 100 mm long galvanised
nails spaced 300 mm c/c along the centre line of the plate,
as per technical specifications Clauses 1207.2.3

Runni
ng m

13.16

Filler Joint
I)

Providing and fixing 2 mm thick corrugated copper plate


in expansion joint as per drawing and technical
specifications Clause 1207.2.2

Runni
ng m

II)

Providing and fixing 20 mm thick compressible fibre


board in expansion joint complete as per drawing and
technical specifications

III)

Providing and fixing in position 20 mm thick


premoulded joint filler in expansion joint for fixed ends
of simply supported spans, covered with sealant
complete as per drawing and technical specifications

metre
per
cm
depth
metre
per
cm
depth

IV) Providing and fillling joint sealing compound as per


drawings and technical specifications with coarse sand
and 6 per cent bitumen by weight.

13.17

Runni
ng m

Stone masonry in cement mortar 1:3 for parapet complete


as per drawing and technical specifications Clauses 700 and
1208.4
I.

Random rubble masonry

cum

II.

Coursed rubble masonry (1st sort)

cum

13.18

Pointing with cement mortar (1:3) on brickwork in parapet as


per technical specifications Clauses 613.3 and 1208.4

10
sqm

13.19

Plastering with cement mortar (1:3) 15 mm thick on


brickwork in parapet as per technical specifications Clauses
613.4 and 1208.4

10
sqm

13.20

Providing and laying parapet with PCC M 15 as per drawing


& technical specifications Clauses 800 and 1208.4

EE.,Dn.I,BMR

I.

Nominal mix 1:2.5:5 (Hand mixing)

cum

II.

Nominal mix (1:2.5:5)

cum

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.
13.21

13.22

Description

Unit

Providing bituminous wearing coat comprising of 20 mm


thick premix carpet with 5 mm thick seal coat Type B for
culverts as per drawing and technical specifications Clauses
1206.2 and 500
i.

Rate for wearing coat as per item No. 5.9 of Chapter 5

sqm

ii.

Rate for seal coat Type B as per item No. 5.12 of


Chapter 5

sqm

Providing bituminous wearing coat comprising of 50 mm


thick bituminous macadam overlaid by 20 mm thick premix
carpet with 5 mm thick seal coat Type B
i.

Rate for BM layer may be analysed as per item No 5.3


of Chapter 5

cum

ii.

Rate of 20 mm premix carpet wearing course as per


item No.5.9 of Chapter 5

sqm

iii.

Rate of seal coat Type B as per item No. 5.12 of


Chapter 5

sqm

13.23

Brickwork in arches in cement mortar 1:4 complete including


centering and shuttering excluding pointing and plastering
as per drawing and technical specifications Clauses 606 and
1205.1

cum

13.24

Coursed rubble stone masonry arch (Ist sort) in cement


mortar (1:4) complete including centering etc. complete as
per drawing and technical specifications Clauses 706 and
1205.1

cum

13.25

Providing & Laying


reinforced cement concrete arch
complete including centering and shuttering excluding
reinforcement as per drawings and technical specifications
Clauses 800, 900 and 1205.1

13.26

EE.,Dn.I,BMR

I.

RCC grade M20 (1:2.4) nominal mix

cum

II.

RCC Grade M 25

cum

Providing steel R.S.Js/built-up steel sections including


cutting, welding/rivetting, hoisting, fixing in position for
composite girders with shear connectors complete with
painting as per drawing and technical specifications Clause
1205.6
TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description
A)

EE.,Dn.I,BMR

Steel section

TA to SE Circle, BMR

Unit
quinta
l

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 14
PROTECTION WORKS

14.1

Providing and laying boulder apron for bed protection with


stone boulders of minimum size and weight as per Table
1300.1, no fragment weighing less than 25 kg laid dry
complete as per drawing and technical specifications Clause
1301

cum

14.2

Providing and laying of boulder apron laid in wire crates with


4 mm dia GI wire conforming to IS:280 and IS:4826 in 100
mm x 100 mm mesh (woven diagonally) including 10 per
cent extra for laps and joints laid with stone boulders
weighing not less than 25 kg each as per drawing and
technical specifications Clause 1301

cum

14.3

Providing and laying of apron with cement concrete blocks of


size as per Table 1300.1 cast-in-situ and made with nominal
mix of M-15 grade cement concrete as per drawing and
technical specifications Clause 1301

cum

14.4

Single bamboo palasiding / walling of whole 2nd class


bamboo (Jati or Bethua) 75mm dia and closely packed &
driven including fitting fixing with half bamboo kamis
horizontally in three rows with cane or tying with wire
complete and struts 1.5 m apart longitudinally and providing
brush wood as per drawing and technical specifications
Clause 1302.5

14.5

EE.,Dn.I,BMR

A)

Driven at least 900 mm below ground and 1200 mm


above ground

Runni
ng m

B)

Driven at least 900 mm below ground and 900 mm


above ground on average

Runni
ng m

Providing and laying pitching on slopes laid over prepared


filter media as per drawing and technical specifications
Clause 1302
I.

Stone/Boulder

II.

Cement concrete blocks of size as per Table 1300.2


cast in cement concrete of grade M 15

TA to SE Circle, BMR

cum

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description
a)
III.

Unit

Concrete grade M 15

cum

Brick pitchng set in cement mortar 1:4

cum

14.6

Providing and laying filter material underneath pitching in


slopes complete as per drawing and technical specifications
Clause 1302

14.7

Providing and laying flooring laid over cement concrete


bedding complete as per drawing and technical specification
Clause 1303
I.

Rubble stone laid in cement mortar 1:3

Note:

cum

Please ensure that quantity of cement concrete


bedding is entered in the Rate of Analysis

II.

Cement conrete blocks grade M 15

cum

III.

Brick on edge laid in cement mortar (1:3)

cum

14.8

Providing and laying of dry rubble flooring complete as per


drawings and technical specifications Clause 1303.3

14.9

Providing and laying curtain walls complete as per drawing


and technical specification Clause 1304

cum

I.
II.

Brick masonry in cement mortar (1:4)


Coursed rubble masonary (2nd sort) in cement mortar
(1:4)

cum
cum

III.

Cement concrete grade M 10

cum

14.10

Construction of flexible apron 1 m thick comprising of loose


stone boulders weighing not less then 25 kg beyond curtain
wall

14.11

Construction of toe walls for protection of slopes as per


drawing and technical specifications Clause 1302.5

cum

I.

Random rubble masonry in case of stone pitching laid


with cement mortar (1:5)

cum

II.

Brick masonry in cement mortar 1:4 in case of brick


pitching

cum

III.

Cement concrete grade M 10 in case of concrete block


pitching
P.C.C grade M 20
Nominal mix 1:3:6

EE.,Dn.I,BMR

cum

TA to SE Circle, BMR

cum
AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

EE.,Dn.I,BMR

Description

TA to SE Circle, BMR

AAO.,Circle, Barmer

Unit

SE.,Circle, Barmer

Item
No.

Description

Unit

Chapter 15
MAINTENANCE OF ROADS

15.1

Restoration of Rain Cuts


i)

15.2

1.

Restoration of rain cuts with soil, moorum gravel or a


mixture of these, clearing the loose soil, benching for
300mm width laying fresh material in layers not
exceeding 250 mm and compaction with plate
compactor or power rammer to restore the original
alignment, level and slopes as per drawings and
technical specifications Clause 1902
A.

Manual Means

cum

B.

Mechanical Means

cum

Maintenance of Earthen shoulder (filling with fresh


selected soil)
Making up loss of material/irregularities on shoulders to
the design level by adding fresh approved selected soil
and compacting it with appropriate equipment at OMC
upto a lead of 1000 m as per technical specification
Clause 1903

2.

Maintenance of Earhen shoulder (stripping of


excess soil)
Stripping excess soil from the shoulder surface to
achieve the approved level and compacting with plate
compactor at OMC as per drawings and Technical
Specification Clause 1903

15.3

sqm

Maintenace of bituminous surface road


i.

EE.,Dn.I,BMR

sqm

Repair to pot holes by removal of failed material,


trimming the sides to vertical and levelling the bottom,
cleaning the same with compressed air or any
appropriate method filled with 75mm B.M, applying
bitumen emulsion prime coat at the bottom and bitumen
emulsion tack coat on sides and on bottom as per
technical specifications Clauses 502 and 503.

TA to SE Circle, BMR

AAO.,Circle, Barmer

cum

SE.,Circle, Barmer

Item
No.

15.4

Description

Unit

ii.

Patch repair on already filled pot holes with 75 mm BM


with 20 mm premix carpet and seal coat Type B as per
drawings and technical specification Clause 1904.2

sqm

iii.

Repair to pot holes and removal of loose material,


trimming of sides, cleaning of surface by providing tack
coat, 20 mm thick pre-mix carpet and seal coat type B
specification Clause 1904.2

sqm

iv.

Repair to pot holes and removal of loose material,


trimming of sides, cleaning of surface by providing tack
coat with bitumen emulsion, 20 mm thick pre-mix carpet
using catonic bitumen emulsion and seal coat type B
with bitumen emulsion

sqm

Maintenance of Gravel Road


Maintenance of gravel road including making up the loss of
profile, rectifying corrugated surface, filling up of
depressions, pot holes and erosion gullies by adding fresh
material and compacting it with appropriate equipment or to
strip excess of material from the road surface as per
drawings and technical specification Clause 1905

15.5

Maintenance of WBM Road


Maintenance of WBM road including filling up of pot holes,
ruts and rectifying corrugated surface, damaged edges and
ravelling as per technical specification Clause 1906.

15.6

EE.,Dn.I,BMR

sqm

Maintenance of Drains
The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains as
well as catch water drains as per technical specification
Clause 1907.

15.7

sqm

(I)

Maintenance of Culverts

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Maintenance of Hume pipe Culvert by way of Clearing,


Cleaning, Erosion repair, repairs to cracks, parapet wall
and protection work as per drawing and technical
specification Clause 1908

One
No.
Hume
Pipe

(II) Maintenance of Culverts Slab type


Maintenance of Slab type Culverts by way of clearing,
Cleaning, Erosion repair, repairs to cracks, parapet
walls and Protection works as per drawing and
technical specification Clasue 1908

15.8

Maintenance of Causeway
Maintenance of Causeway by way of minor Surface repairs,
replacing Guide Posts, repair of flood gauges, removal of
debris, providing boulders and protection work and painting
as per technical specification Clause 1909

15.9

Repair of steel railing to bring it to original shape


cleaning and repainting as per drawing and technical
specification Clause 1911
Steel Railing

(ii)

Repair of RCC railing to bring it to the original shape,


cleaning and repainting as per drawings and technical
specification Clause 1911
RCC Railing

EE.,Dn.I,BMR

km

Maintenance of steel and RCC Railing


(i)

15.11

Maintenance of Road Signs


Maintenance of road signs by way of cleaning and repainting
of mandatory / requlatory / cautionary / informatory and
place identifications sign board as perdrawings and
technical specification Clause 1910

15.10

Culve
rt

Runni
ng m

Maintenance of 200 metre and km stones

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

Description

Unit

Maintenance of 200 metre km stone by way of refiting of


tilted stones repairing with cement mortar, cleaning,
repairing and lettering on 200 metre km stone and 5th km
stone as per drawing and technical specification Clause
1912

15.12

15.13

(i)

Painting two coats with synthetic enamel paint

km

(ii)

Printing letters and figures of any shade with synthtic


enamel paint of any approved colour to give an even
shade

km

Cutting of branches of trees shrubs and trimming of


grass and weeds
(i)

Cutting of branches of trees and shrubs from the road


way or with in R.O.W including disposal of wood and
leaves to suitable location as per technical specification
Clause 1914

one
tree

(ii)

Cutting of shrubs from the road way or with in R.O.W


and disposal of shrubs to suitable locations as per
technical specifications Clause 1914

each

(iii) Trimming of grass and weeds from the shoulders/berms


and disposing off the same to suitable locations as per
technical specifications Clause 1914

sqm

White washing of parapet walls of CD work and tree


truncks
White washing two coats on parapet walls and tree trunks
including preparation of surface by cleaning scraping etc. as
per technical specifications Clause 1915

15.14

Periodical Renewal to existing bituminous surface


1

Open graded Premix carpet 20 mm thick


(i)

Tack coat
Rates as per item 5.2 (ii)

(ii)

sqm

Pre-mix carpet using bituminous (penetration


grade modified bitumen) binder
Rates as per item No. 5.9

(iii)

EE.,Dn.I,BMR

sqm

sqm

OR
Premix carpet using bitumen Emulsion

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Item
No.

(iv)

Description

Unit

Rates as per item No. 5.10

sqm

Seal coat Type A, B or C


Rates as per item No. 5.11

Surface dressing single coat/first coat or 2nd coat


Rates as per item No. 5.6

EE.,Dn.I,BMR

sqm

TA to SE Circle, BMR

AAO.,Circle, Barmer

sqm

SE.,Circle, Barmer

Item
No.

EE.,Dn.I,BMR

Description

TA to SE Circle, BMR

AAO.,Circle, Barmer

Unit

SE.,Circle, Barmer

Item
No.

EE.,Dn.I,BMR

Description

TA to SE Circle, BMR

AAO.,Circle, Barmer

Unit

SE.,Circle, Barmer

Item
No.

EE.,Dn.I,BMR

Description

TA to SE Circle, BMR

AAO.,Circle, Barmer

Unit

SE.,Circle, Barmer

Item
No.

EE.,Dn.I,BMR

Description

TA to SE Circle, BMR

AAO.,Circle, Barmer

Unit

SE.,Circle, Barmer

Chapter 1

ARRIAGE CRUSHING OF MATERIALS AND SETTING OUT


Rate
(Rs.)

16.00

8.00
8.00

5.00

10.00

5.00

1.00

25.00
25.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

22.00
22.00

25.00
25.00

25.00
21.00

35.00
35.00

56.00

56.00

29.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
17.00
12.00

57.00
48.00
36.00

20.00
12.00
8.00

2.20
2.90
6.00

169.00

197.00

226.00

277.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

286.00

356.00

374.00

86,207.52

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 2
SITE CLEARANCE

3,780.00

14,344.00
19,238.00

8,984.00
10,945.00

69.00
120.00
236.00
449.00
925.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
2,700.00
74.00
136.00
257.00
479.00
959.00
2,784.00

41.00
65.00
137.00
270.00
546.00
1,544.00

42.00
69.00
143.00
277.00
554.00
1,586.00

112.00
131.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
315.00

219.00
313.00

74.00
93.00
67.00
63.00

82.00
93.00
74.00
70.00
67.00
74.00

198.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

404.00
287.00
3.00
331.00

133.00
4.00

49.00
66.00
114.00

206.00
150.00

94.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
722.00

23.00

5.00

7.00

96.00
60.00
13.00

14.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

63.00

86.00

51.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 3

RK, EROSION CONTROL AND DRAINAGE

6.00

5.20

14.30

75.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
32.00

35.00

18.00

37.00

44.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
37.00

55.00

59.00

103.00

195.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

424.00
349.00

220.00

111.00

48.00

28.00

72.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
79.00

36.00

7.00

17.00

0.60

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
99.00

77.00

18.90
9.00

28.00
20.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
300.96

710.51

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 4

SES, BASES (NON-BITUMINOUS) AND SHOULDERS

177.00
165.00
157.00
146.00

363.00
352.00
330.00

184.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

179.00

167.00

143.00

112.00
114.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
244.00

402.00

368.00
322.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

426.00
380.00

562.00

590.00
544.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

341.00
293.00

404.00
358.00

540.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

580.00
534.00

693.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

189.00
188.00

198.00

212.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
283.00

361.00

380.00

385.00
387.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
570.00
552.00

139.00

405.00

4.30

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 5

ND SURFACE COURSES (BITUMINOUS)

24.30

29.80

38.20

7.10

8.50

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
8.50

10.00

3,608.00
3,787.00
4,048.00

154.00
162.00

142.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

87.00

103.00
108.00

45.30
47.80
53.80
51.40
53.00

39.50
41.70
47.10
45.00
46.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

40.60
43.10
49.00
46.70
48.00

35.60
37.80
43.20
41.00
42.00

55.30
49.80

48.70
45.10

686.00
EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
726.00

70.90
74.50
83.20
79.80
82.00

74.90
78.50
87.20
83.70
86.00

76.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

93.90
99.30
112.40
107.20
110.00

83.90
88.60
99.90
95.70
98.00

94.30
99.80
112.90
107.70
110.00

84.40
89.10

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
100.40
95.90
98.00

37.90
40.30
46.20
43.90
45.00

26.20
27.90
31.90
30.30
31.00

27.80
29.40
33.30
31.80
33.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
37.30
39.70
45.50
43.20
44.00

27.40
29.10
33.10
31.50
32.00

30.20
31.80
35.60
34.10
35.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 6

EMENT CONCRETE PAVEMENT

2,900.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

2,478.00

483.00

600.00

537.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 7

EWAY AND SUBMERSIBLE BRIDGES

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 8
HILL ROADS

2,376.00

9,671.00

240.00

47.00

5.00

35.00

5.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
104.00

8.00

149.00

190.00

10.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

0.00

12,189.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

87.00

21.00

73.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 9
PIPE CULVERTS

3,583.00
2,864.00
2,056.00
1,645.00
624.00
EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

4,483.00
3,539.00
2,506.00
2,005.00
905.00

7,186.00
5,740.00
4,111.00

8,986.00
7,090.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
5,011.00

1,596.00
636.00

1,821.00
917.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 10

MARKINGS AND OTHER ROAD APPURTENANCES

0.35

0.22

2,979.00
1,968.00
2,630.00
3,657.00
2,562.00
3,031.00
4,658.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

2,671.00
1,660.00
2,322.00
3,349.00
2,254.00
2,723.00
4,350.00

2,636.00
1,612.00
2,274.00
3,301.00
2,206.00
2,676.00
4,303.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

1,654.00
1,297.00
1,517.00
1,860.00
1,495.00
1,651.00
2,193.00

6,453.00
4,674.00
3,970.00
2,914.00
2,562.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

5,967.00
4,366.00
3,662.00
2,606.00
2,254.00

5,876.00
4,188.00
3,504.00
2,479.00
2,138.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

3,449.00
2,619.00
2,306.00
1,837.00
1,681.00

12,054.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
11,332.00

10,885.00

6,595.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
45.00

43.00

65.00

51.00

33.00

1,359.00
805.00
255.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

1,378.00
446.00
122.00

187.00

189.00

218.00

299.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
924.00

884.00

7,434.00

507.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
188.00

1,408.00

469.00

3,880.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
1,846.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 11
FOUNDATION

75.60
89.80

95.00
220.00
266.00
142.00

285.00
49.00

1,962.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
1,901.00
1,909.00

1,954.00
1,962.00

2,263.00
2,271.00
2,406.00
2,652.00

1,800.00
1,845.00
1,984.00

1,747.00
1,575.00
1,750.00

1,596.00
1,406.00
1,598.00

1,544.00
EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
1,355.00
1,547.00

37,697.00

40,059.00

34,153.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 12
SUBSTRUCTURE

2,055.00
1,927.00
1,848.00
2,083.00
255.00

236.00
366.00

706.00

726.00

1,852.00
1,671.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
1,418.00
1,855.00

1,691.00
1,492.00
1,383.00
1,694.00

1,635.00
1,437.00
1,327.00
1,638.00

1,880.00
1,888.00

2,177.00
2,185.00
2,315.00
2,558.00

37,816.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
40,178.00

34,272.00

108.00

225.00
247.00

372.00

0.60

327.00
163.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
119.86

181.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 13
SUPERSTRUCTURE

2,313.00
2,308.00
2,223.00
2,538.00
2,700.00
38,090.00

40,453.00

34,547.00

5,733.00

1,404.00

1,821.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
1,158.00

1,973.00

451.00

1,879.00
1,887.00
4,443.00

11,252.00

1,968.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
915.00

1,795.00

4.60

4.60

12.50

1,635.00
1,852.00
255.00

726.00

1,888.00
1,880.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

4,472.00

3,782.00

3,431.00
3,868.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
4,503.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 14
PROTECTION WORKS

334.00

760.00

1,993.00

269.00
225.00

334.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
1,993.00
1,837.00

463.00

3,544.00

3,948.00
2,168.00
452.00

1,845.00
1,492.00
1,962.00
341.00

1,313.00
1,836.00

1,901.00
EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
Chapter 15
MAINTENANCE OF ROADS

70.00
82.00

14.00

4.20

4,109.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
111.00

106.00

127.00

40.00

66.00

1.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)
563.00

1,114.00

29.00

549.00

170.00

805.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

85.00
342.00

31.00

2.00

1.00

6.00

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

Rate
(Rs.)

EE.,Dn.I,BMR

TA to SE Circle, BMR

AAO.,Circle, Barmer

SE.,Circle, Barmer

BASIC APPROACH AND GENERAL CONDITIONS


AND ASSUMPTIONS FOR THE PREPARATION OF STANDARD DATA BOOK
The basic approach for the preparation of Standard Data Book for Rural Roads is indicated as
under:
1

Description of items: The description of items is given briefly and linked with the relevant
Clauses of the Ministry of Rural Developments (MORD) Specifications wherever feasible,
which may be referred for detailed description, provisions and interpretation.

Use of Machinery

2.1.

The Standard Data Book is based on the assumption that Rural Roads in our country
are to be constructed with intermediate technology, i.e., manual means with medium
input of machinery, wherever required to ensure the required quality of work.

2.2.

For rolling, use of static roller has been generally considered. However, use of
vibratory pneumatic tyre roller has been considered wherever required as per
provisions of MORD Specifications.

Working Conditions
3.1.

Rates have been analysed for average working conditions prevailing in the country.

3.2.

Average achievable outputs of machines and labour have been considered taking into
account the job and management factors.

3.3.

However, the output of machineries and labour reduces substantially in hilly areas as
the altitude increases. Therefore, for hilly areas reduced outputs have been
considered as indicated in the preamble of Chapter 8.

Overheads: The overheads are considered as 10 per cent for items of road works and 20
per cent for items of bridge works. This is assumed to include interalia the following
elements:
i.

Site accommodation, setting up plant, access road, water supply, electricity and
general site arrangements.

ii.

Site office infrastructure.

iii.

Expenditure on
(a)

Corporate office of the Contractor

(b)

Site supervision by the Contractor

(c)

Preparation of "as built" drawings

iv.

Mobilisation/demobilisation of resources.

v.

Labour camps with minimum amenities, required as per labour laws.

vi.

Light vehicles for site supervision including administrative and managerial


requirements.

vii.

Setting up of laboratories for quality control, field and laboratory testing for control of
quality of various items of work and documentation of test results as per requirements
of the MORD Specifications.

viii.

Minor T&P including needle vibrators required for concrete work.

ix.

Survey instruments and the task of setting out of works including verification of line
and dimensions (but excluding construction of bench marks and reference pillars
which are separate items under setting out).

x.

Taking of trial pits and bore holes, where required as per the MORD Specifications.

xi.

Watch and ward.

xii.

Arrangement for traffic and traffic management during construction.

xiii.

Expenditure on safeguarding environment during construction.

xiv.

Sundries.

xv.

Financing expenditure of the Contractor.

xvi.

Work insurance/compensation.

xvii.

Sales/Turnover tax has been assumed at 4%. In case this tax is more than 4% in
certain States the percentage of overheads should be increased correspondigly.

Contractors Profit: Contractors profit is considered @ 10 per cent uniformly and is added
on Overheads also.

General:

6.1.

The Clause numbers refer to the MORD Specifications for Rural Roads and Cross
Drainage Works.

6.2.

Additional assumptions made for analysing different items have been indicated in
respective Chapters in the form of preamble and notes/footnotes wherever required.

6.3.

For some of the items, certain size/specifications have been assumed.


If
size/specifications other than the same are adopted, corresponding modifications
may be made in the inputs of analysis.

6.4.

In the rate analysis of some items, the quantities of sub-items involved in that
analysis, like excavation for foundation, foundation concrete, masonry work, painting,
lettering, etc. have been given. For rate analysis of such sub-items, reference may
be made to relevant Chapters dealing with the sub-items.

6.5.

The sources of all materials and samples of materials are required to be approved by
the Engineer before start of such work.

6.6.

For pipe culverts both NP3 and NP4 pipes have been considered.

6.7.

Quality control of works shall be governed by the relevant MORD Specifications.

Basic Inputs
7.1.

The Standard Data Book is based on the requirements of basic inputs of materials,
labour and machineries for various items.

7.2.

The rates for material and labour for the area where the project is located are to be
ascertained from local authorities/enquiries to prepare SOR for the area. However,
the usage charges of machineries shall be considered as given in Chapter 15 of this
Data Book.

7.3.

The basic rates of materials, such as, stone boulders, stone for masonry, stone
ballast (hand broken/machine broken), crushed aggregate, stone dust, moorum,
gravel, lime, manure, sludge, quarry sweep, kankar, bricks, brick ballast, crushed
slag, etc. at quarry/ crusher sites shall be fixed by the respective States for various
zones from time to time.

7.4.

While preparing estimates/Detailed Notice Inviting Tender/Analysis of rates, only the


basic rates fixed by respective States for concerned zones should be adopted.

7.5.

The cost of materials should include the cost at source and the cost of their carriage
upto the work site.

7.6.

Although market rates for supply of aggregates at site are generally adopted for
estimation purpose, rates for crushing of aggregates have also been analysed as
most Contractors prefer to crush their own aggregates in case of larger sized projects.
The cost of materials shall be evaluated considering the cost at crushing plants and
its carriage upto the work site. These should be compared with rates for own crushing
and carriage by the construction agency and lesser of the rates should be adopted for
estimation purpose.

Plants and Equipment:


8.1.

Keeping in view the job and managerial factors and the age factor of machines, the
output of plant and equipment is taken approximately 70 per cent of the rated
capacity given by manufacturer under ideal conditions.

8.2.

The requirement of machinery has been worked out assuming working period of 6
hours per shift of 8 hours.

8.3.

Certain equipment, like, road rollers, are required to be available at site for complete
period of the shift, though from the consideration of their output, they may be required
only for 3 to 4 hours. This is necessitated to match with the output of other
associated machines, like, HMP, Pavers, etc. In such cases, the hire charges of road
rollers have been multiplied with a factor of 0.65 to account for the idle period
wherever considered appropriate.

8.4.

Though electrically operated equipment, like, concrete mixers and vibrators have
been provided, diesel operated equipment can be used where electricity is not
available.

8.5.

Wherever electric generator has not been provided to run a plant or equipment, it is
assumed that it is fitted with a diesel engine.

8.6.

For small jobs where loading and unloading is required to be done manually, tractortrolley has been considered for carriage instead of tipper.

8.7.

Output of plant/equipment is considered for the compacted quantities.

8.8.

A water tanker of 6 kl capacity which is commonly used at construction sites has been
considered.

8.9.

The usage charges for machines include ownership charges, cost of repair and
maintenance including replacement of tyres and running and operating charges which
includes crew, fuel and lubricants.

Labour:
9.1.

For labour, the general classification is mazdoor, bhisti, etc. for unskilled labour and
mason, fitter, blacksmith, etc. for skilled labour.

10

11

9.2.

One mate has been provided for 25 labours for all items of works.

9.3.

The labour wages should be as per rates fixed by State Government.

Materials:
10.1.

Quantities of materials considered in the rate analysis are approximate for the
purpose of estimation and include normal wastages. Actual consumption would
depend on mix design.

10.2.

The rates of material should include basic cost at locations of stone crushers/ factory/
rail head and cost of its carriage to the site of work/plant including loading, unloading
and stacking.

10.3.

The supply of materials will be taken either at the location of mixing plant or at the
work site as per requirement of use.

10.4.

Contractor will make his own arrangements for borrowing earth.


However,
compensation for earth taken from private land has been included in the rate analysis
for construction of embankment/ sub-grade with borrowed earth.

10.5.

Credit for Dismantled Material: The dismantled materials should be examined and a
realistic assessment made for credit for such materials, which can be utilized for
works or auctioned.

10.6.

The basic rates should include all octroi charges, toll tax, sale tax, VAT, municipal
taxes and other local taxes, etc.

Items of Culverts:
Items in Chapters 11, 12 & 13 on Foundation, Substructure and Superstructure cover both
minor bridge works as well as slab culverts as per Chapter 1200 of MORD Specifications.
Items of pipe culverts are, however, covered separately in Chapter 9.

12

Concrete Items:
12.1.

For concrete work, the grades of concrete covered by the Data Book in accordance
with MORD Specifications are:i)

PCC M-15 grade to M-25 for structures (For lean concrete under foundation M10 can be used).

ii)

RCC grade M-20, M-25 and M-30 for structures

iii)

Design mix concrete M-25 and M-30 for concrete pavement

12.2.

The analysis of rates accounts for input of materials by weight and use of ordinary
mixer.

12.3.

Use of vibrators for all concreting work has been included in the items.

12.4.

Ten per cent extra cement may be provided for concreting under water, where
required.

12.5.

Quantities of cement in various grades of cement concrete are to be as per nominal


mix/ design mix. Grade of cement may also be adopted as per mix design.

12.6.

Quantities of cement in various grades of cement concrete for structures have been
taken as per IRC:21:2000 & IRC:78:2000.

12.7.

Steel reinforcement for cement concrete work is required to be provided separately.


The rate for the same has been analysed separately.

12.8.

As per the MORD Specifications, the type of superstructure envisaged for rural roads
are RCC slabs and box culverts not exceeding 15 m span as well brick/stone
masonry arches and composite girder type of superstructure. RCC arches provided
for in IRC:SP:20 have also been analysed.

13

The MORD Specifications includes specifications for the items of turfing with sods and
seeding and mulching in Chapter 1600 of Hill Road Construction only. However, in view of the
importance of these items for erosion control in all locations, these have also been analysed
in Chapter 3 of this document.

14

Privileged Document: The Standard Data Book in for Department use ONLY. It should not be
produced in any court of law as reference/authority and to that extent it is a privileged
document.

You might also like