1.

- LIQUIDACION DE OBRA
OBRA:
CONTRATANTE:
CONTRATISTA:

MEJORAMIENTO DEL CAMINO VECINAL SM-529: MOYOBAMBA YANTAL, PROVINCIA DE MOYOBAMBA DEPARTAMENTO DE SAN M
PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACIN
DESCRIPCION

PARCIAL

A. DE LAS VALORIZACIONES:
A.1.
a.1.1.

a.1.2.

a.1.3.

MONTOS AUTORIZADOS
CONTRATO:
1.1.
Monto de Obra Principal
1.2.
Deductivos de Obra
1.2.1.
Deductivo de Obra N 01
1.2.2.
Deductivo de Obra N 02
1.2.3.
Deductivo de Obra N 03
1.2.4.
Deductivo de Obra N 04 - Saldos de Metrados
1.3.
Adicionales de Obra
1.3.1.
Adicional de Obra N 01
1.3.2.
Adicional de Obra N 02
1.3.3.
Adicional de Obra N 03
1.3.4.
Adicional de Obra N 04
1.4.
Intereses
1.5.
Mayores Gastos Generales
1.6.
Resarcimiento de Daos y Perjuicios Por Demora en Adelanto Directo

3,797,362.73
78,006.03
26,201.40
105,138.26
2,602.72
600,602.33
20,253.26
101,814.38
53,639.65
1,455.05
153,364.34
9,493.41

REAJUSTES
2.1.
Reajustes Recalculados:
2.1.1.
Del Contrato Principal
2.1.2.
De Adicionales de Obra

154,276.31
7,199.01

DEDUCCIONES
3.1.
Por Reintegro que no Corresponde:
3.1.1.
Adelanto Directo
3.1.2.
Adelanto de Materiales

25,656.09
23,383.70
TOTAL SIN IGV (19%)
TOTAL CON IGV (19%)

A.2.
a.2.1.

A.4.

MONTOS PAGADOS
CONTRATO:
1.1.
Monto de Obra Principal
1.2.
Monto de Adicionales de Obra

1,831,953.98
781,376.27

1.3.

Adelanto Directo

759,472.55

1.4.

Adelanto de Materiales N 01

391,781.20

1.5.

Adelanto de Materiales N 02

707,856.95

1.6.

Mayores Gastos Generales

SALDO

77,439.98

A FAVOR DEL CONTRATISTA:

B. ADELANTOS
B.1.

B.2.

B.3.

OTORGADOS
1.1.
Directo
1.2.
Por Materiales:
1.2.1.

Adelanto N 01

391,781.20

1.2.2.

Adelanto N 02

707,856.95

759,472.55

AMORTIZADOS
2.1.
Directo
2.2.
Por Materiales:
1.2.1.

Adelanto N 01

391,781.20

1.2.2.

Adelanto N 02

708,177.18

SALDOS
3.1.
Directo
3.2.

Por Materiales:

759,472.55

0.00
-320.23

S/.

A CARGO DEL CONTRATISTA:

S/.

C. PENALIDADES
C.1.

C.3.

ATRASOS EJECUCION DE OBRA


1.1.
Multa por Atraso de Obra
1.2.
Otros

0.00
0.00

SALDOS
A FAVOR DEL CONTRATISTA:

S/.

D. RESUMEN DE LIQUIDACION DE SALDOS ESTABLECIDOS


C ONCEPTO

A FAVOR DEL CONTRATISTA

A CARGO D

88,591.33

A.

VALORIZACIONES

B.

ADELANTOS

0.00

C.

PENALIDADES

0.00

SUB TOTAL (A FAVOR DEL CONTRATISTA)


IGV (19%)
TOTAL (A FAVOR DEL CONTRATISTA)

88,
EXON
88,

LIQUIDACION DE OBRA

OBAMBA YANTAL, PROVINCIA DE MOYOBAMBA DEPARTAMENTO DE SAN MARTN

TOTAL

3,797,362.73

211,948.41

776,309.62
1,455.05
153,364.34
9,493.41

161,475.32

49,039.79

4,638,472.26
EXONERADO

4,549,880.93
88,591.33

1,859,110.70

1,859,430.93

-320.23

-320.23

0.00
0.00

A CARGO DEL CONTRATISTA

0.00
-320.23
0.00

88,271.11
EXONERADO
88,271.11

2.- CANCELACIONES EFECTUADAS POR LA ENTIDAD CONTRATANTE


OBRA:

MEJORAMIENTO DEL CAMINO VECINAL SM-529: MOYOBAMBA YANTAL, PROVINCIA DE MOYOBAMBA DEPARTAMENTO DE SAN MARTN

CONTRATANTE:
CONTRATISTA:

PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACIN

ITEM N

DESCRIPCION

FECHA CANCELACION

MONTO

IGV

PARCIAL

11/26/2010
12/21/2010
12/21/2010
3/7/2011
3/4/2011
3/7/2011
3/8/2011
3/31/2011
5/16/2011
6/9/2011
6/10/2011
8/8/2011
8/8/2011

1,831,953.98
19,094.72
250,000.00
198,100.52
250,000.00
146,852.85
250,000.00
143,342.16
10,282.90
87,633.08
112,649.31
289.35
250,000.00
113,709.09

Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado
Exonerado

1,831,953.98
19,094.72
250,000.00
198,100.52
250,000.00
146,852.85
250,000.00
143,342.16
10,282.90
87,633.08
112,649.31
289.35
250,000.00
113,709.09

1.00
1.1.
1.2.
1.2.
1.3.
1.3.
1.4.
1.4.
1.5.
1.6.
1.7.
1.8.
1.9.
1.9.

CONTRATO PRINCIPAL
Valorizacin N 01 - Octubre 2010
Valorizacin N 02 - Noviembre 2010
Valorizacin N 02 - Noviembre 2010
Valorizacin N 03 - Diciembre 2010
Valorizacin N 03 - Diciembre 2011
Valorizacin N 04 - Enero 2011
Valorizacin N 04 - Enero 2011
Valorizacin N 05 - Febrero 2011
Valorizacin N 06 - Marzo 2011
Valorizacin N 07 - Abril 2011
Valorizacin N 08 - Mayo 2011
Valorizacin N 09 - Junio 2011
Valorizacin N 09 - Junio 2012

2.00
2.1.

ADICIONALES DE OBRA
Adicional de Obra N 01
2.1.1. Valorizacin N 01

3/31/2011

250,000.00

Exonerado

250,000.00

2.1.1.

Valorizacin N 01

3/31/2011

250,000.00

Exonerado

250,000.00

2.1.1. Valorizacin N 01
Adicional de Obra N 02
2.2.1. Valorizacin N 01
2.2.2. Valorizacin N 02
Adicional de Obra N 03
2.3.1. Valorizacin N 01
2.3.2. Valorizacin N 02
Adicional de Obra N 04
2.4.1. Valorizacin N 01

3/31/2011

100,602.33

Exonerado

100,602.33

3/31/2011
NO FUE CANCELADA

19,758.12

Exonerado
Exonerado

19,758.12
NO FUE CANCELADA

5/16/2011
6/9/2011

75,287.45
31,605.96

Exonerado
Exonerado

75,287.45
31,605.96

7/14/2011

54,122.41

Exonerado

54,122.41

2.2.

2.3.

2.4.

781,376.27

781,376.27

3.00

MAYORES GASTOS GENERALES

1.1.

Mayores Gastos Generales por Ampliacin de Plazo N 01

5/25/2011

77,439.98
20,531.64

Exonerado

20,531.64

1.2.
1.3.

Mayores Gastos Generales por Ampliacin de Plazo N 05


Mayores Gastos Generales por Ampliacin de Plazo N 06

5/27/2011
6/9/2011

15,398.73
41,509.61

Exonerado
Exonerado

15,398.73

1.4.
1.5.

Mayores Gastos Generales por Ampliacin de Plazo N 07


Mayores Gastos Generales por Ampliacin de Plazo N 08

NO FUE CANCELADA
NO FUE CANCELADA

MONTOS NO
CANCELADO
S/. 1,791.35

77,439.98

Exonerado
Exonerado

41,509.61
NO FUE CANCELADA
NO FUE CANCELADA

MONTOS NO
CANCELADOS
S/. 41,793.32
S/. 26,114.34

1.5.

Mayores Gastos Generales por Ampliacin de Plazo N 10

NO FUE CANCELADA

Exonerado

NO FUE CANCELADA

S/. 7,834.30

3.- CUADRO RESUMEN PRESUPUESTAL


OBRA:

MEJORAMIENTO DEL CAMINO VECINAL SM-529: MOYOBAMBA YANTAL, PROVINCIA DE MOYOBAMBA DEPARTAMENTO DE SAN MARTN

CONTRATANTE:

PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACIN

CONTRATISTA:

ITEM
COSTO DIRECTO
REAJUSTE
DEDUCCION POR REINTEGRO
AMORTIZACION
SUB TOTAL
IGV (19 %)
TOTAL PRESUPUESTO

N 01
23,602.86
212.43
0.00
4,720.57
19,094.72

N 02
571,103.80
3,997.73
-226.40
127,227.41
448,100.52

N 03
532,523.78
5,325.24
139.90
140,856.27
396,852.85

VALORIZACIONES EJECUTADAS Y/O PAGADAS


N 04
N 05
N 06
543,770.27
270,130.00
247,413.97
6,525.24
5,158.81
13,072.43
485.50
2,094.84
5,630.68
156,467.85
262,911.07
167,222.64
393,342.16
10,282.90
87,633.08

N 08
953,341.36
77,772.56
172,388.38
858,436.19
289.35

N 09
253,732.94
26,779.88
-137,624.62
54,428.35
363,709.09

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

S/. 19,094.72

S/. 448,100.52

S/. 396,852.85

S/. 393,342.16

S/. 10,282.90

S/. 87,633.08

S/. 112,649.31

S/. 289.35

S/. 363,709.09

ADICIONALES DE OBRA APROBADOS CON RESOLUCION

DEDUCTIVOS DE OBRA APROBADOS CON RESOLUCION

ITEM
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL
IGV (19 %)
TOTAL PRESUPUESTO

N 07
189,794.91
15,939.45
6,244.69
86,840.36
112,649.31

TOTAL DEDUCTIVOS

N 01
62,695.74
9,040.72
6,269.57
78,006.03

N 02
21,058.83
3,036.69
2,105.88
26,201.40

N 03
84,502.70
12,185.29
8,450.27
105,138.26

168,257.27
24,262.70
16,825.72
209,345.69

N 01
517,760.63
31,065.64
51,776.06
600,602.33

N 02
16,074.60
2,571.20
1,607.46
20,253.26

N 03
84,848.00
8,481.58
8,484.80
101,814.38

N 04
44,523.65
4,663.63
4,452.37
53,639.65

PRESUPUESTO
ADICIONALES DE
OBRA
663,206.88
46,782.05
66,320.69
776,309.62

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

EXONERADO

S/. 78,006.03

S/. 26,201.40

S/. 105,138.26

S/. 209,345.69

S/. 600,602.33

S/. 20,253.26

S/. 101,814.38

S/. 53,639.65

S/. 776,309.62

PRESUPUESTO
TOTAL VALORIZADO
3,585,413.89
154,783.77
49,132.97
1,859,110.71
1,831,953.98
EXONERADO

S/. 1,831,953.98

PRESUPUESTO
TOTAL VALORIZADO
3,585,413.89
154,783.77
49,132.97
1,859,110.71
EXONERADO

S/. 1,831,953.98

ITEM
COSTO DIRECTO DEL CONTRATO
GASTOS GENERALES FIJOS (2.00%)
GASTOS GENERALES VARIABLES (12.42%)

UTILIDAD
SUB TOTAL
IGV (19 %)
TOTAL PRESUPUESTO DEL CONTRATO

PRESUPUESTOS Y ADELANTOS
PRESUPUESTO TOTAL VALORIZADO
PRESUPUESTO TOTAL ADICIONALES
PRESUPUESTO TOTAL DEDUCTIVOS
ADELANTO DIRECTO
ADELANTO DE MATERIALES N 01 Y 02
PRESUPUESTO TOTAL EJECUTADO

CONTRACTUAL

3,052,051.71
61,041.03
379,064.82
305,205.17
3,797,362.73
EXONERADO

S/. 3,797,362.73

PRESUPUESTO ACTUALIZADO
VALORIZADO + ADICIONALES DE OBRA +
DEDUCTIVOS

1,831,953.98
776,309.62
209,345.69
759,472.55
1,099,638.15
S/. 4,258,028.61

S/. 391,781.20
S/. 707,856.95
S/. 1,859,110.70

4.- CALCULO DE INTERESES POR DEMORA EN LA CANCELACION DE VALORIZACIONES


MEJORAMIENTO DEL CAMINO VECINAL SM-529: MOYOBAMBA YANTAL, PROVINCIA DE MOYOBAMBA DEPARTAMENTO DE SAN MARTN
PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACIN

OBRA:
CONTRATANTE:
CONTRATISTA:

Base Legal a aplicar Art. 153 del Reglamento del T.U.O de La Ley N 26850)
FORMULA DE INTERES LEGAL:

INTERES =

M x ( (FA Fecha de Pago/FA Origen de Deuda) - 1 )

Donde:
M = Monto Adeudado por la Entidad.
FA = Factor Acumulado Inters Legal - Circulares del Banco Central de Reserva del Per.
MONTO
CONCEPTO

Valorizacin N 01 - Octubre 2010

MONTO

CANCELADO

SALDO POR

FECHA ULTIMA

FECHA EFECTIVA

APROBADO

EN SU

CANCELAR

DE CANCELACION

DE CANCELACION

OPORTUNIDAD

(M)

FA ORIGEN DE PAGO
FECHA

FA FECHA DE PAGO

VALOR

FECHA

VALOR

19,094.72

0.00

19,094.72

30.11.10

26.11.10

30.11.10

26.11.10

Valorizacin N 02 - Noviembre 2010

250,000.00

0.00

250,000.00

31.12.10

21.12.10

31.12.10

21.12.10

Valorizacin N 02 - Noviembre 2010

198,100.52

0.00

198,100.52

31.12.11

21.12.10

31.12.11

Valorizacin N 03 - Diciembre 2010

250,000.00

0.00

250,000.00

31.01.11

07.03.11

31.01.11

6.17496

07.03.11

6.18682

Valorizacin N 03 - Diciembre 2010

146,852.85

0.00

146,852.85

31.01.11

04.03.11

31.01.11

6.17496

04.03.11

6.18579

Valorizacin N 04 - Enero 2011

250,000.00

0.00

250,000.00

28.02.11

07.03.11

28.02.11

6.18443

07.03.11

6.18682

Valorizacin N 04 - Enero 2011

143,342.16

0.00

143,342.16

28.02.11

08.03.11

28.02.11

6.18443

08.03.11

6.18716

10,282.90

0.00

10,282.90

31.03.11

31.03.11

31.03.11

Valorizacin N 05 - Febrero 2011


Valorizacin N 06 - Marzo 2011

21.12.10

31.03.11

87,633.08

0.00

87,633.08

30.04.11

16.05.11

30.04.11

6.20587

16.05.11

6.21196

112,649.31

0.00

112,649.31

31.05.11

09.06.11

31.05.11

6.21806

09.06.11

6.22180

Valorizacin N 08 - Mayo 2011

289.35

0.00

289.35

30.06.11

10.06.11

30.06.11

Valorizacin N 09 - Junio 2011

250,000.00

0.00

250,000.00

31.07.11

08.08.11

31.07.11

6.24389

08.08.11

6.24733

Valorizacin N 09 - Junio 2011

113,709.09

0.00

113,709.09

31.07.11

08.08.11

31.07.11

6.24389

08.08.11

6.24733

Valorizacin N 01 - Febrero 2011 (Adicional de Obra N 01)

250,000.00

0.00

250,000.00

31.03.11

31.03.11

31.03.11

31.03.11

Valorizacin N 01 - Febrero 2011 (Adicional de Obra N 01)

250,000.00

0.00

250,000.00

31.03.11

31.03.11

31.03.11

31.03.11

Valorizacin N 01 - Febrero 2011 (Adicional de Obra N 01)

100,602.33

0.00

100,602.33

31.03.11

31.03.11

31.03.11

31.03.11

Valorizacin N 01 - Febrero 2011 (Adicional de Obra N 02)

19,758.12

0.00

19,758.12

31.03.11

31.03.11

31.03.11

31.03.11

Valorizacin N 02 - Mayo 2011 (Adicional de Obra N 02)

1,791.35

0.00

Valorizacin N 01 - Marzo 2011 (Adicional de Obra N 03)

75,287.45

0.00

75,287.45

30.04.11

16.05.11

30.04.11

6.20587

16.05.11

6.21196

Valorizacin N 02 - Abril 2011 (Adicional de Obra N 03)

31,605.96

0.00

31,605.96

31.05.11

09.06.11

31.05.11

6.21806

09.06.11

6.22180

Valorizacin N 01 - Mayo 2011 (Adicional de Obra N 04)

54,122.41

0.00

54,122.41

30.06.11

14.07.11

30.06.11

6.23075

14.07.11

6.23673

Pago Mayores Gastos Generales por Ampliacin de Plazo N 01

20,531.64

0.00

20,531.64

08.04.11

25.05.11

08.04.11

6.19794

25.05.11

6.21559

Pago Mayores Gastos Generales por Ampliacin de Plazo N 05

15,398.73

0.00

15,398.73

08.06.11

27.05.11

08.06.11

27.05.11

Pago Mayores Gastos Generales por Ampliacin de Plazo N 06

41,509.61

0.00

41,509.61

08.06.11

09.06.11

08.06.11

09.06.11

Pago Mayores Gastos Generales por Ampliacin de Plazo N 07

41,793.32

0.00

41,793.32

NO SE CANCELO

NO SE CANCELO

Pago Mayores Gastos Generales por Ampliacin de Plazo N 08

26,114.34

0.00

26,114.34

NO SE CANCELO

NO SE CANCELO

Pago Mayores Gastos Generales por Ampliacin de Plazo N 10

7,834.30

0.00

7,834.30

NO SE CANCELO

NO SE CANCELO

Valorizacin N 07 - Abril 2011

NO SE CANCELO

10.06.11

NO SE CANCELO

TOTAL INTERESES

http://www.sbs.gob.pe/app/stats/TasaDiaria_8.asp

19,094.72
448,100.52
396,852.85
393,342.16

75,287.45

10,282.90

31,605.96

87,633.08

106,893.41

112,649.31
289.35
363,709.09

1,831,953.98

DEMORA EN LA CANCELACION DE VALORIZACIONES

-529: MOYOBAMBA YANTAL, PROVINCIA DE MOYOBAMBA DEPARTAMENTO DE SAN MARTN

INTERES
CALCULADO

PAGO A TIEMPO
PAGO A TIEMPO
PAGO A TIEMPO
480.17
257.56
96.61
63.28
PAGO A TIEMPO
86.00
67.76
PAGO A TIEMPO
137.73
62.65
PAGO A TIEMPO
PAGO A TIEMPO
PAGO A TIEMPO
PAGO A TIEMPO
NO SE CANCELO
73.88
19.01
51.94
58.47
PAGO A TIEMPO
PAGO A TIEMPO
NO SE CANCELO
NO SE CANCELO
NO SE CANCELO

1,455.05

OBRA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO

CONTRATISTA

CONSORCIO CRISTO DE LA EXALTACION

5.- RESARCIMIENTO DE DAOS Y PERJUICIOS


INCUMPLIMIENTO DEL ARTICULO 184 DEL REGLAMENTO DE LA LEY DE CONTRATACIONES
A CARGO DE LA ENTIDAD CONTRATANTE
Base Legal:

Artculo 184 del Reglamento de la Ley de Contrataciones.

Causal:

Demora en la Cancelacin del Adelanto Directo.


Frmula de clculo
RDP =

PD x DA x PC

Donde
RDP

Resarcimiento de Daos y Perjuicios

PD

Penalidad Diaria (5/10000)

DA

Das de Atrazo

PC

Presupuesto Contractual

PC

Fecha Inicio Causal

Fecha Final Causal

DA

PD

S/.

(5/10000)

3,797,362.73

18.10.10

22.10.10

5.00

1,898.68

Informado mediante Asiento N 008 del 17.10.10


Informado mediante Asiento N 012 del 22.10.10

Fecha Inicio de Causal:


Fecha Final de Causal:

4,361,723.94

6.00

Segn MEMORANDO N

2,180.86

CIONES

MGG

9,493.41

MEMORANDO N 512-2010-GRSM-PEAM-04.00 fecha de inicio de causal= 18/10/10

13,085.17 asi deberia ser

6.- CALCULO DE MAYORES GASTOS GENERALES


POR APROBACION DE AMPLIACION DE PLAZO N 01
OBRA:

: MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO (PEAM)

CONTRATISTA

: CONSORCIO CRISTO DE LA EXALTACION

Base Legal:

Artculo 203 del Reglamento de la Ley de Contrataciones.


Resolucin Gerencial N 044-2011-GRSM-PEAM-01.00
Frmula de clculo
MGG =

GG x A x (Ip/Io) / T

Donde
MGG

Mayores Gastos Generales

GG

Gastos Generales Variables Ofertados

Perodo de Ampliacin de Plazo

Plazo de Ejecucin del Contrato Principal

Ip

Indice de Precios al Consumidor al mes Calendario en que Ocurre la Causal de Ampliacin (Enero 2,011)

Io

Indice de Precios al Consumidor al mes Calendario del Valor Referencial

GG (Ofertados)

S/.

379,064.82

8.00

150.00

Ip

Io

(Enero 2,011)

(Marzo 2,010)

358.05

350.59

S
01

MGG

20,646.97

6.- CALCULO DE MAYORES GASTOS GENERALES


POR APROBACION DE AMPLIACION DE PLAZO N 05
OBRA:

: MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO (PEAM)

CONTRATISTA

: CONSORCIO CRISTO DE LA EXALTACION

Base Legal:

Artculo 203 del Reglamento de la Ley de Contrataciones.


Resolucin Gerencial N 044-2011-GRSM-PEAM-01.00
Frmula de clculo
MGG =

GG x A x (Ip/Io) / T

Donde
MGG

Mayores Gastos Generales

GG

Gastos Generales Variables Ofertados

Perodo de Ampliacin de Plazo

Plazo de Ejecucin del Contrato Principal

Ip

Indice de Precios al Consumidor al mes Calendario en que Ocurre la Causal de Ampliacin (Febrero 2,011)

Io

Indice de Precios al Consumidor al mes Calendario del Valor Referencial

GG (Ofertados)

S/.

379,064.82

6.00

150.00

Ip

Io

(Febrero 2,011)

(Marzo 2,010)

357.41

350.59

LES
N 05

MGG

15,457.55

S/. 15,398.73

6.- CALCULO DE MAYORES GASTOS GENERALES


POR APROBACION DE AMPLIACION DE PLAZO N 06
OBRA:

: MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO (PEAM)

CONTRATISTA

: CONSORCIO CRISTO DE LA EXALTACION

Base Legal:

Artculo 203 del Reglamento de la Ley de Contrataciones.


Resolucin Gerencial N 044-2011-GRSM-PEAM-01.00
Frmula de clculo
MGG =

GG x A x (Ip/Io) / T

Donde
MGG

Mayores Gastos Generales

GG

Gastos Generales Variables Ofertados

Perodo de Ampliacin de Plazo

Plazo de Ejecucin del Contrato Principal

Ip

Indice de Precios al Consumidor al mes Calendario en que Ocurre la Causal de Ampliacin (Marzo 2,011)

Io

Indice de Precios al Consumidor al mes Calendario del Valor Referencial

GG (Ofertados)

S/.

379,064.82

16.00

150.00

Ip

Io

(Marzo 2,011)

(Marzo 2,010)

359.92

350.59

ES
06

MGG

41,509.61

S/. 41,509.61

6.- CALCULO DE MAYORES GASTOS GENERALES


POR APROBACION DE AMPLIACION DE PLAZO N 07
OBRA:

: MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO (PEAM)

CONTRATISTA

: CONSORCIO CRISTO DE LA EXALTACION

Base Legal:

Artculo 203 del Reglamento de la Ley de Contrataciones.


Resolucin Gerencial N 142-2011-GRSM-PEAM-01.00
Frmula de clculo
MGG =

GG x A x (Ip/Io) / T

Donde
MGG

Mayores Gastos Generales

GG

Gastos Generales Variables Ofertados

Perodo de Ampliacin de Plazo

Plazo de Ejecucin del Contrato Principal

Ip

Indice de Precios al Consumidor al mes Calendario en que Ocurre la Causal de Ampliacin (Abril 2,011)

Io

Indice de Precios al Consumidor al mes Calendario del Valor Referencial

GG (Ofertados)

S/.

379,064.82

16.00

150.00

Ip

Io

(Abril 2,011)

(Marzo 2,010)

362.38

350.59

ES
07

( abril 2011 )

MGG

41,793.78

S/. 41,793.32

6.- CALCULO DE MAYORES GASTOS GENERALES


POR APROBACION DE AMPLIACION DE PLAZO N 08
OBRA:

: MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO (PEAM)

CONTRATISTA

: CONSORCIO CRISTO DE LA EXALTACION

Base Legal:

Artculo 203 del Reglamento de la Ley de Contrataciones.


Resolucin Gerencial N 170-2011-GRSM-PEAM-01.00
Frmula de clculo
MGG =

GG x A x (Ip/Io) / T

Donde
MGG

Mayores Gastos Generales

GG

Gastos Generales Variables Ofertados

Perodo de Ampliacin de Plazo

Plazo de Ejecucin del Contrato Principal

Ip

Indice de Precios al Consumidor al mes Calendario en que Ocurre la Causal de Ampliacin (Mayo 2,011)

Io

Indice de Precios al Consumidor al mes Calendario del Valor Referencial

GG (Ofertados)

S/.

379,064.82

10.00

150.00

Ip

Io

(Mayo 2,011)

(Marzo 2,010)

362.29

350.59

LES
N 08

n (Mayo 2,011)

MGG

26,114.34

S/. 26,114.34

6.- CALCULO DE MAYORES GASTOS GENERALES


POR APROBACION DE AMPLIACION DE PLAZO N 10
OBRA:

: MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

PROPIETARIO

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO (PEAM)

CONTRATISTA

: CONSORCIO CRISTO DE LA EXALTACION

Base Legal:

Artculo 203 del Reglamento de la Ley de Contrataciones.


Resolucin Gerencial N 184-2011-GRSM-PEAM-01.00
Frmula de clculo
MGG =

GG x A x (Ip/Io) / T

Donde
MGG

Mayores Gastos Generales

GG

Gastos Generales Variables Ofertados

Perodo de Ampliacin de Plazo

Plazo de Ejecucin del Contrato Principal

Ip

Indice de Precios al Consumidor al mes Calendario en que Ocurre la Causal de Ampliacin (Junio 2,011)

Io

Indice de Precios al Consumidor al mes Calendario del Valor Referencial

GG (Ofertados)

S/.

379,064.82

3.00

150.00

Ip

Io

(Junio 2,011)

(Marzo 2,010)

362.65

350.59

LES
N 10

n (Junio 2,011)

MGG

7,842.09

S/. 7,834.30

VALORIZACIN N 09 - JUNIO DEL 2011


#REF!
#REF!

PROYECTO
OBRA
ENTIDAD

#REF!

EJECUTA

#REF!

POR CONTRATO
N 024 -2010- GRSM-PEAM/01.00

MODALIDAD:
CONTRATO:

SUPERVISIN

FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN

PRESUPUESTO

JEFE DE SUPERVISION:

ING VICTOR EDUARDO SAMAME ZATTA

FECHA DE INICIO DE OBRA


PLAZO DE EJECUCIN
FECHA DE TERMINO DE OBRA
PRESUPUESTO

Codigo
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
04
04.01
04.02
04.03
04.04
04.05
05
05.01
05.02
06
06.01
06.01.01
06.02
06.02.01
06.03
06.03.01
06.04
06.04.01
06.04.02
06.04.03
06.04.04
07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.01.06
07.01.07
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05

DESCRIPCION
OBRAS PROVISIONALES
CAMPAMENTO PROVISIONAL DE OBRA
CARTEL DE OBRA (4.80 x 2.40 ML)
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
TRAZO Y REPLANTEO EN TERRENO NORMAL CON EQUIPO
EXPLANACIONES
ELIMINACION DE MATERIAL ORGANICO
CORTE EN MATERIAL SUELTO
PERFILADO Y COMPACTADO DE SUB RASANTE EN CORTE
CONFORMACION Y PERFILADO DE CUNETAS
REPOSICION DE MAT. ORGANICO (CONF. DE TERRAPLEN)
REPOSICION DE MAT. SATURADO (CONF. DE TERRAPLEN)
CONFORMACION DE TERRAPLENES CON MATERIAL PROPIO
CONFORMACION DE TERRAPLENES CON MATERIAL EXCEDENTE DE CORTE
CONFORMACION DE TERRAPLENES CON MATERIAL DE CANTERA
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
PAVIMENTOS
MEJORAMIENTO DE BASE EXISTENTE (AFIRMADO e=0.15m)
IMPRIMACION ASFALTICA CON RC-250
CAPE SEAL : A-TRATAM. SUPERF. MONOCAPA CON PIEDRA CHANCADA DE 1/2" - No 4
CAPE SEAL : B-SLURRY SEAL e=10.00mm CON EMULSION ASFALTICA CSE-1HP
MARCAS EN EL PAVIMENTO
TRANSPORTE
TRANSPORTE PAGADO MENOR 1 KM
TRANSPORTE PAGADO MAYOR 1 KM
VEREDAS DE CONCRETO
OBRAS PRELIMINARES
TRAZO Y REPLANTEO EN VEREDAS
MOVIMIENTO DE TIERRAS
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
MATERIAL SELECCIONADO
BASE GRANULAR E=0.10m
OBRAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO-VEREDA
ACERO DE REFUERZO Fy=4200kg/cm2
CONCRETO F'C=175 KG/CM2-VEREDA
JUNTAS CON ASFALTO E=1"
OBRAS DE ARTE Y DRENAJE
MEJORAMIENTO DE OBRAS DE ARTE
LIMPIEZA Y DESCOLMATADO DE ALCANTARILLAS Y PUENTES
RASQUETEO DE ALCANTARILLAS METALICAS
PROTECCION CON PINTURA ANTICORROSIVA-ALCANTARILLA METALICA
PROTECCION CON PINTURA ANTICORROSIVA-BARANDAS METALICAS-PUENTE
PROTECCION CON PINTURA ASFALTICA-ALCANTARILLA METALICA
PINTADO BARANDAS DE PUENTE DE CONCRETO
ACONDICIONAMIENTO E INSTALACION BARANDAL TUBO GALVANIZADO
CUNETAS DE CONCRETO
TRAZO Y REPLANTEO EN OBRAS DE ARTE
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS MANUAL
DEMOLICION DE CUNETA
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL

Unid.

Metrado

Precio S/.

Parcial S/.

METRADO

ANTERIOR
VALORIZ.

METRA.

AVANCES
ACTUAL
VALORIZ.

ACUMULADO
VALORIZ.

METRA.

m2
und
mes

120.00
2.00
5.00

51.69
1,100.60
5,695.04

6,202.80
2,201.20
28,475.20

120.00
2.00
5.00

6,202.80
2,201.20
28,475.20

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

120.00
2.00
5.00

6,202.80
2,201.20
28,475.20

100.00%
100.00%
100.00%

GLB
KM

1.00
7.96

91,280.00
575.44

91,280.00
4,580.50

0.95
7.96

86,716.00
4,580.50

95.00%
100.00%

0.05
0.00

4,564.00
0.00

5.00%
0.00%

1.00
7.96

91,280.00
4,580.50

100.00%
100.00%

m3
m3
m2
m
m3
m3
m3
m3
m3
m3

1,388.17
8,580.78
13,511.06
4,694.93
1,388.17
72.26
883.77
3,712.23
6,172.51
403.90

6.34
5.25
1.52
1.16
6.89
6.89
6.89
6.89
22.60
8.01

8,801.00
45,049.10
20,536.81
5,446.12
9,564.49
497.87
6,089.18
25,577.26
139,498.73
3,235.24

1,388.17
8,580.78
13,511.06
4,694.93
178.17
0.00
94.82
179.00
6,172.51
403.90

8,801.00
45,049.10
20,536.81
5,446.12
1,227.59
0.00
653.31
1,233.31
139,498.73
3,235.24

100.00%
100.00%
100.00%
100.00%
12.83%
0.00%
10.73%
4.82%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1,388.17
8,580.78
13,511.06
4,694.93
178.17
0.00
94.82
179.00
6,172.51
403.90

8,801.00
45,049.10
20,536.81
5,446.12
1,227.59
0.00
653.31
1,233.31
139,498.73
3,235.24

100.00%
100.00%
100.00%
100.00%
12.83%
0.00%
10.73%
4.82%
100.00%
100.00%

m2
m2
m2
m2
m2

58,155.88
47,510.69
47,510.69
47,510.69
1,891.08

13.71
3.29
8.86
8.60
14.04

797,317.11
156,310.17
420,944.71
408,591.93
26,550.76

58,003.87
47,510.69
47,510.69
27,510.69
0.00

795,233.06
156,310.17
420,944.71
236,591.93
0.00

99.74%
100.00%
100.00%
57.90%
0.00%

0.00
0.00
0.00
19,999.09
1,891.08

0.00
0.00
0.00
171,992.17
26,550.76

0.00%
0.00%
0.00%
42.09%
100.00%

58,003.87
47,510.69
47,510.69
47,509.78
1,891.08

795,233.06
156,310.17
420,944.71
408,584.11
26,550.76

99.74%
100.00%
100.00%
100.00%
100.00%

M3K
M3K

11,272.91
53,547.09

5.45
0.71

61,437.36
38,018.43

6,854.35
53,547.09

37,356.21
38,018.43

60.80%
100.00%

0.00
0.00

0.00
0.00

0.00%
0.00%

6,854.35
53,547.09

37,356.21
38,018.43

60.80%
100.00%

m2

1,306.88

1.83

2,391.59

1,306.88

2,391.59

100.00%

0.00

0.00

0.00%

1,306.88

2,391.59

100.00%

m2

1,306.88

5.16

6,743.50

1,306.88

6,743.50

100.00%

0.00

0.00

0.00%

1,306.88

6,743.50

100.00%

m2

1,306.88

10.53

13,761.45

1,306.88

13,761.45

100.00%

0.00

0.00

0.00%

1,306.88

13,761.45

100.00%

m2
kg
m3
m

646.06
70.00
158.96
324.80

26.79
5.11
345.51
3.35

17,307.95
357.70
54,922.27
1,088.08

646.06
70.00
158.96
324.80

17,307.95
357.70
54,922.27
1,088.08

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

646.06
70.00
158.96
324.80

17,307.95
357.70
54,922.27
1,088.08

100.00%
100.00%
100.00%
100.00%

m2
m2
m2
m
m2
m
m

775.00
132.30
132.30
100.00
132.30
100.00
6.00

3.81
24.13
21.97
10.30
30.12
8.07
72.49

2,952.75
3,192.40
2,906.63
1,030.00
3,984.88
807.00
434.94

775.00
132.30
132.30
100.00
132.30
100.00
6.00

2,952.75
3,192.40
2,906.63
1,030.00
3,984.88
807.00
434.94

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

775.00
132.30
132.30
100.00
132.30
100.00
6.00

2,952.75
3,192.40
2,906.63
1,030.00
3,984.88
807.00
434.94

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

m2
m3
m3
m3
m2

1,724.07
281.92
5.20
344.54
1,724.07

1.83
25.52
26.03
8.01
5.16

3,155.05
7,194.60
135.36
2,759.77
8,896.20

1,724.07
281.92
5.20
344.54
1,724.07

3,155.05
7,194.60
135.36
2,759.77
8,896.20

100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

1,724.07
281.92
5.20
344.54
1,724.07

3,155.05
7,194.60
135.36
2,759.77
8,896.20

100.00%
100.00%
100.00%
100.00%
100.00%

VALORIZACIN N 09 - JUNIO DEL 2011


#REF!
#REF!

PROYECTO
OBRA
ENTIDAD

#REF!

EJECUTA

#REF!

POR CONTRATO
N 024 -2010- GRSM-PEAM/01.00

MODALIDAD:
CONTRATO:

SUPERVISIN

FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN

PRESUPUESTO

JEFE DE SUPERVISION:

ING VICTOR EDUARDO SAMAME ZATTA

FECHA DE INICIO DE OBRA


PLAZO DE EJECUCIN
FECHA DE TERMINO DE OBRA
PRESUPUESTO

Codigo
07.02.06
07.02.07
07.02.08
07.02.09
07.02.10
07.03
07.03.01
07.03.02
07.03.03
07.03.04
07.03.05
07.03.06
07.03.07
07.03.08
07.03.09
07.03.10
07.04
07.04.01
07.04.02
07.04.03
07.04.04
07.04.05
07.04.06
07.04.07
07.04.08
07.04.09
07.04.10
07.04.11
07.04.12
07.04.13
07.04.14
07.05
07.05.01
07.05.02
07.05.03
07.05.04
07.05.05
07.05.06
07.05.07
07.05.08
07.05.09
08
08.01
08.01.01
08.01.02
08.01.03
08.01.04
08.01.05
08.01.06
08.01.07
09
09.01
09.02
09.03
10

DESCRIPCION
BASE GRANULAR E=0.10m
ENCOFRADO Y DESENCOFRADO-CUNETA
ACERO DE REFUERZO Fy=4200kg/cm2
CONCRETO F'C=175 KG/CM2-CUNETA
JUNTAS CON ASFALTO E=1"
ALCANTARILLAS DE CONCRETO ARMADO
TRAZO Y REPLANTEO EN OBRAS DE ARTE
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS CON EQUIPO
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS MANUAL
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
SOLADO E=4" (C:H 1:10)
ENCOFRADO Y DESENCOFRADO-ALCANTARILLA
ACERO DE REFUERZO Fy=4200kg/cm2-ALCANTARILLA DE CONCRETO
CONCRETO F'C=210 KG/CM2-ALCANTARILLA
RELLENO COMPACTADO CON MATERIAL PROPIO
JUNTAS CON ASFALTO E=1"
TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD
TRAZO Y REPLANTEO EN OBRAS DE ARTE
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS CON EQUIPO
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS MANUAL
DEMOLICION DE CABEZAL DE ALCANTARILLA
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
BASE GRANULAR E=0.10m
SOLADO E=4" (C:H 1:10)
ENCOFRADO Y DESENCOFRADO-CABEZALES DE ALCANTARILLA
ACERO DE REFUERZO Fy=4200kg/cm2-CABEZALES DE ALCANTARILLA
CONCRETO F'C=175 KG/CM2-CABEZALES DE ALCANTARILLA
TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD D=36"
TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD D=60"
RELLENO COMPACTADO CON MATERIAL PROPIO
EMBOQUILLADO DE PIEDRA F'C=175 KG/CM2, E=0.20m
BADEN DE CONCRETO
TRAZO Y REPLANTEO EN OBRAS DE ARTE
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS MANUAL
ELIMINACION DE MATERIAL EXCEDENTE MANUAL
BASE GRANULAR E=0.10m
ENCOFRADO Y DESENCOFRADO-BADEN
ACERO DE REFUERZO Fy=4200kg/cm2-BADEN
CONCRETO F'C=175 KG/CM2-BADEN
EMBOQUILLADO DE PIEDRA F'C=175 KG/CM2, E=0.20m
JUNTAS CON ASFALTO E=1"
OBRAS DE PROTECCION
GAVIONES
TRAZO Y REPLANTEO PARA GAVIONES
REFINE, NIVELACION Y COMPACTACION EN TERRENO NORMAL
GEOTEXTIL NO TEJIDO
GAVION CAJA 10X12, 3.40mm G+PVC 5.0X1.50X1.0
GAVION CAJA 10X12, 3.40mm G+PVC 5.0X1.0X1.0
GAVION COLCHON 10X12, 3.40mm G+PVC 5.0X2.0X0.30
TUBERIA PERFORADA PARA DRENAJE
SEALIZACION VIAL
SEALES PREVENTIVAS (0.60mX0.60m)
SEALES INFORMATIVAS (1.63mX0.72m)
HITOS KILOMETRICOS
JARDINERIA

Unid.

Metrado

Precio S/.

Parcial S/.

ANTERIOR
VALORIZ.
18,154.46
55,328.32
15,632.36
138,632.43
2,870.55

%
100.00%
88.00%
83.38%
100.00%
100.00%

METRA.

AVANCES
ACTUAL
VALORIZ.
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%

METRA.
1,724.07
2,065.26
3,059.17
401.24
856.88

ACUMULADO
VALORIZ.
18,154.46
55,328.32
15,632.36
138,632.43
2,870.55

%
100.00%
88.00%
83.38%
100.00%
100.00%

m2
m2
kg
m3
m

1,724.07
2,346.76
3,668.90
401.24
856.88

10.53
26.79
5.11
345.51
3.35

18,154.46
62,869.70
18,748.08
138,632.43
2,870.55

METRADO
1,724.07
2,065.26
3,059.17
401.24
856.88

m2
m3
m3
m3
m2
m2
kg
m3
m3
m

81.60
36.47
2.13
48.25
36.77
149.52
1,661.81
23.77
48.96
22.20

1.83
12.34
34.03
8.01
29.85
26.79
5.11
430.70
35.18
3.35

149.33
450.04
72.48
386.48
1,097.58
4,005.64
8,491.85
10,237.74
1,722.41
74.37

66.10
36.47
1.79
20.86
31.10
135.67
1,348.73
21.66
25.38
18.00

120.96
450.04
60.91
167.09
928.34
3,634.60
6,892.01
9,328.96
892.87
60.30

81.00%
100.00%
84.04%
43.23%
84.58%
90.74%
81.16%
91.12%
51.84%
81.08%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

66.10
36.47
1.79
20.86
31.10
135.67
1,348.73
21.66
25.38
18.00

120.96
450.04
60.91
167.09
928.34
3,634.60
6,892.01
9,328.96
892.87
60.30

81.00%
100.00%
84.04%
43.23%
84.58%
90.74%
81.16%
91.12%
51.84%
81.08%

m2
m3
m3
m3
m3
m2
m2
m2
kg
m3
m
m
m3
m2

121.00
243.46
5.36
18.59
311.03
81.40
61.44
210.86
912.17
62.63
33.36
11.06
125.72
25.40

1.83
20.57
34.03
26.03
8.01
10.53
29.85
26.79
5.11
345.51
899.30
2,410.50
35.18
81.84

221.43
5,007.97
182.40
483.90
2,491.35
857.14
1,833.98
5,648.94
4,661.19
21,639.29
30,000.65
26,660.13
4,422.83
2,078.74

79.83
155.85
4.26
13.26
187.03
49.91
41.80
115.06
702.52
32.33
20.63
9.80
0.00
21.40

146.09
3,205.83
144.97
345.16
1,498.11
525.55
1,247.73
3,082.46
3,589.88
11,170.34
18,552.56
23,622.90
0.00
1,751.38

65.98%
64.01%
79.48%
71.33%
60.13%
61.31%
68.03%
54.57%
77.02%
51.62%
61.84%
88.61%
0.00%
84.25%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

79.83
155.85
4.26
13.26
187.03
49.91
41.80
115.06
702.52
32.33
20.63
9.80
0.00
21.40

146.09
3,205.83
144.97
345.16
1,498.11
525.55
1,247.73
3,082.46
3,589.88
11,170.34
18,552.56
23,622.90
0.00
1,751.38

65.98%
64.01%
79.48%
71.33%
60.13%
61.31%
68.03%
54.57%
77.02%
51.62%
61.84%
88.61%
0.00%
84.25%

m2
m3
m3
m2
m2
kg
m3
m2
m

413.10
112.68
135.22
264.14
155.20
2,561.91
79.31
100.80
91.00

1.83
34.03
38.14
10.53
26.79
5.11
345.51
81.84
3.35

755.97
3,834.50
5,157.29
2,781.39
4,157.81
13,091.36
27,402.40
8,249.47
304.85

69.35
20.49
24.59
56.75
32.70
567.17
17.65
0.00
17.00

126.91
697.27
937.86
597.58
876.03
2,898.24
6,098.25
0.00
56.95

16.79%
18.18%
18.19%
21.48%
21.07%
22.14%
22.25%
0.00%
18.68%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

69.35
20.49
24.59
56.75
32.70
567.17
17.65
0.00
17.00

126.91
697.27
937.86
597.58
876.03
2,898.24
6,098.25
0.00
56.95

16.79%
18.18%
18.19%
21.48%
21.07%
22.14%
22.25%
0.00%
18.68%

m2
m2
m2
und
und
und
m

450.00
247.50
3,040.00
43.00
5.00
18.00
150.00

3.69
5.16
5.60
1,292.30
960.15
986.59
20.75

1,660.50
1,277.10
17,024.00
55,568.90
4,800.75
17,758.62
3,112.50

450.00
247.50
3,040.00
43.00
5.00
18.00
150.00

1,660.50
1,277.10
17,024.00
55,568.90
4,800.75
17,758.62
3,112.50

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

450.00
247.50
3,040.00
43.00
5.00
18.00
150.00

1,660.50
1,277.10
17,024.00
55,568.90
4,800.75
17,758.62
3,112.50

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

und
und
und

39.00
8.00
9.00

476.27
701.93
160.81

18,574.53
5,615.44
1,447.29

39.00
8.00
9.00

18,574.53
5,615.44
1,447.29

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

39.00
8.00
9.00

18,574.53
5,615.44
1,447.29

100.00%
100.00%
100.00%

VALORIZACIN N 09 - JUNIO DEL 2011


#REF!
#REF!

PROYECTO
OBRA
ENTIDAD

#REF!

EJECUTA

#REF!

POR CONTRATO
N 024 -2010- GRSM-PEAM/01.00

MODALIDAD:
CONTRATO:

SUPERVISIN

FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN

PRESUPUESTO

JEFE DE SUPERVISION:

ING VICTOR EDUARDO SAMAME ZATTA

FECHA DE INICIO DE OBRA


PLAZO DE EJECUCIN
FECHA DE TERMINO DE OBRA
PRESUPUESTO

Codigo
10.01
10.02
10.03
10.04
10.05
11
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08

DESCRIPCION

Unid.

Metrado

Precio S/.

Parcial S/.

ANTERIOR
VALORIZ.
2,777.28
1,119.93
7,554.25
0.00
0.00

%
100.00%
100.00%
100.00%
0.00%
0.00%

4,225.92
3,509.65
0.00
512.00
614.25
3,076.92
13,920.00
6,960.00

100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
0.00%
100.00%
100.00%

METRA.
105.24
5.64
121.12
5.37
40.00

ACUMULADO
VALORIZ.
2,777.28
1,119.93
7,554.25
150.47
407.60

%
100.00%
100.00%
100.00%
100.00%
100.00%

0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%

4.00
5.00
120.00
800.00
787.50
1.00
4.00
2.00

4,225.92
3,509.65
267.60
512.00
614.25
3,076.92
13,920.00
6,960.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2,881,702.23

6.68

m2
m3
m2
m3
und

105.24
5.64
121.12
5.37
40.00

26.39
198.57
62.37
28.02
10.19

2,777.28
1,119.93
7,554.25
150.47
407.60

METRADO
105.24
5.64
121.12
0.00
0.00

mes
und
m2
m2
m3
HA
CHL
CHL

4.00
5.00
120.00
800.00
787.50
1.00
4.00
2.00

1,056.48
701.93
2.23
0.64
0.78
3,076.92
3,480.00
3,480.00

4,225.92
3,509.65
267.60
512.00
614.25
3,076.92
13,920.00
6,960.00

4.00
5.00
0.00
800.00
787.50
1.00
4.00
2.00

COSTO DIRECTO

S/.

3,052,051.71

2,677,769.62

203,932.60

GASTOS GENERALES FIJOS (2.00%)

S/.

61,041.03

53,555.39

4,078.65

57,634.04

GASTOS GENERALES VARIABLES (12.42%)

S/.

379,064.82

332,578.99

25,328.43

357,907.42

UTILIDAD (10.00 %)

S/.

305,205.17

267,776.96

20,393.26

288,170.22

SUB TOTAL S/.

S/.

3,797,362.73

3,331,680.96

253,732.94

3,585,413.91

EXONERADO

EXONERADO

3,331,680.96

253,732.94

ENCOFRADO Y DESENCOFRADO-CIMIENTO CORRIDO


CIMIENTO CORRIDO - MEZCLA C:H 1:10+30% PG
MURO DE LADRILLO KK 18H (9X13X24) CABEZA MEZCLA C:A 1:5 E=1.50CM
TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES
SIEMBRA DE PLANTONES
MITIGACION AMBIENTAL
RIEGO PERMANENTE EN OBRA
SEALES AMBIENTALES (1.63mX0.72m)
REACONDICIONAMIENTO DE AREA DE CAMPAMENTO Y PATIO DE MAQUINAS
RESTAURACION DE CANTERAS
ACONDICIONAMIENTO DE BOTADEROS
REVEGETALIZACION (BOTADEROS)
CAPACITACION EN MANTENIMIENTO VIAL PREVENTIVO
CHARLAS DE EDUCACION AMBIENTAL

IGV (19.00%)
VALORIZACIN

EXONERADO
S/.

3,797,362.73

METRA.

AVANCES
ACTUAL
VALORIZ.
0.00
0.00
0.00
0.00
0.00
0.00
5.37
150.47
40.00
407.60
0.00
0.00
120.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
267.60
0.00
0.00
0.00
0.00
0.00

6.68

EXONERADO
6.68

3,585,413.91

94.42

N 09 - JUNIO DEL 2011

PRESUPUESTO

S/. 3,797,362.73

FECHA DE INICIO DE OBRA

10/23/2010

PLAZO DE EJECUCIN

242 DIAS CALENDARIOS

FECHA DE TERMINO DE OBRA

6/21/2011
SALDO POR VALORIZAR
METRA.

VALORIZ.

0%
0%
0%

0%
0%

1,210.00
72.26
788.95
3,533.23
-

8,336.90
497.87
5,435.87
24,343.95
-

0%
0%
0%
0%
87%
100%
89%
95%
0%
0%

152.01
0.91
-

2,084.05
7.83
-

0%
0%
0%
0%
0%

4,418.56
-

24,081.15
-

39%
0%

0%

0%

0%

0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

N 09 - JUNIO DEL 2011

PRESUPUESTO

S/. 3,797,362.73

FECHA DE INICIO DE OBRA

10/23/2010

PLAZO DE EJECUCIN

242 DIAS CALENDARIOS

FECHA DE TERMINO DE OBRA

6/21/2011
SALDO POR VALORIZAR
METRA.

VALORIZ.

281.50
609.73
-

7,541.39
3,115.72
-

0%
12%
17%
0%
0%

15.50
0.34
27.39
5.67
13.85
313.08
2.11
23.58
4.20

28.37
11.57
219.39
169.25
371.04
1,599.84
908.78
829.54
14.07

19%
0%
16%
57%
15%
9%
19%
9%
48%
19%

41.17
87.61
1.10
5.33
124.00
31.49
19.64
95.80
209.65
30.30
12.73
1.26
125.72
4.00

75.34
1,802.14
37.43
138.74
993.24
331.59
586.25
2,566.48
1,071.31
10,468.95
11,448.09
3,037.23
4,422.83
327.36

34%
36%
21%
29%
40%
39%
32%
45%
23%
48%
38%
11%
100%
16%

343.75
92.19
110.63
207.39
122.50
1,994.74
61.66
100.80
74.00

629.06
3,137.23
4,219.43
2,183.82
3,281.78
10,193.12
21,304.15
8,249.47
247.90

83%
82%
82%
79%
79%
78%
78%
100%
81%

0%
0%
0%
0%
0%
0%
0%

0%
0%
0%

N 09 - JUNIO DEL 2011

PRESUPUESTO

S/. 3,797,362.73

FECHA DE INICIO DE OBRA

10/23/2010

PLAZO DE EJECUCIN

242 DIAS CALENDARIOS

FECHA DE TERMINO DE OBRA

6/21/2011
SALDO POR VALORIZAR
METRA.

VALORIZ.

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%

170,349.52

5.58

3,406.99
21,157.41
17,034.95
211,948.87
EXONERADO
211,948.87

5.58

7.- CALCULO DE COEFICIENTES DE REAJUSTE (K)


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:
RESIDENYE:

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


K = 0.050(Ar/Ao)+0.054(MNr/MNo)+0.072(Ar/Ao)+0.075(MOr/MOo)+0.165(ASr/ASo)+0.260(MIr/MIo)+0.324(Ir/Io)

MONOMIO

A
MN
A
MO
AS
MI
I

DESCRIPCION

Acero de Construccin Corrugado


Maquinaria y Equipo Nacional
Agregado Grueso
Mano de Obra Inc. Leyes Sociales
Asfalto
Maquinaria y Equipo Importado
Indice General de Precios al Consumidor

COEFICIENTE

PARTICIPACION

I.U.

INCIDENCIA

PORCENTUAL

03
48
05
47
13
49
39

0.050
0.054
0.072
0.075
0.165
0.260
0.324

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

K0 (FECHA 1ER. ADELANTO (OCTUBRE 2010)


Oct-10

513.17
330.88
431.91
430.83
1,265.36
239.47
354.01

K1 (FECHA ELABOR. VALORIZ. OCTUBRE. 2010)

INDICE BASE

(Marzo 10)

Octubre 10

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

0.058
0.053
0.071
0.078
0.165
0.255
0.327

Ko

MONOMIO

A
MN
A
MO
AS
MI
I

DESCRIPCION

Acero de Construccin Corrugado


Maquinaria y Equipo Nacional
Agregado Grueso
Mano de Obra Inc. Leyes Sociales
Asfalto
Maquinaria y Equipo Importado
Indice General de Precios al Consumidor

I.U.

03
48
05
47
13
49
39

COEFICIENTE

PARTICIPACION

INCIDENCIA

PORCENTUAL

0.050
0.054
0.072
0.075
0.165
0.260
0.324

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

A
MN
A
MO
AS
MI
I

DESCRIPCION

Acero de Construccin Corrugado


Maquinaria y Equipo Nacional
Agregado Grueso
Mano de Obra Inc. Leyes Sociales
Asfalto
Maquinaria y Equipo Importado
Indice General de Precios al Consumidor

I.U.

03
48
05
47
13
49
39

COEFICIENTE

PARTICIPACION

INCIDENCIA

PORCENTUAL

0.050
0.054
0.072
0.075
0.165
0.260
0.324

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

513.17
330.88
431.91
430.83
1,265.36
239.47
354.01

1.007

528.61
331.54
432.77
427.68
1,265.36
238.94
356.05

578.14
331.87
430.95
427.68
1,718.06
240.64
362.29

(Marzo 10)

Enero 11

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

Feb-11

0.059
0.054
0.072
0.077
0.165
0.255
0.329

573.48
331.31
430.55
427.68
1,380.33
238.57
357.41

1.011

K8

(Marzo 10)

Octubre 10

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

Nov-10

0.058
0.053
0.071
0.078
0.165
0.255
0.327

515.74
331.70
433.62
430.83
1,265.36
240.48
354.04

1.007

(Marzo 10)

Febrero 11

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

(Marzo 10)

Mayo 11

0.065
0.054
0.071
0.077
0.224
0.257
0.335

1.083

575.46
332.12
431.25
427.68
1,718.06
239.68
362.65

1.031

K9

INDICE BASE

(Marzo 10)

Junio 11

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

(Marzo 10)

Noviembre 10

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

Dec-10

0.058
0.054
0.072
0.078
0.165
0.256
0.327

K2

Mar-11

0.064
0.054
0.071
0.077
0.180
0.255
0.330

K5

Jun-11

K3 (FECHA EL

INDICE BASE

517.58
332.35
435.90
430.83
1,265.36
240.97
354.67

1.010

K3

K6 (FECHA ELABOR. VALORIZ. MARZO 2011)

INDICE BASE

K9 (FECHA ELABOR. VALORIZ. JUNIO 2011)

INDICE BASE

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

K5 (FECHA ELABOR. VALORIZ. FEBRERO 2011)

INDICE BASE

K8 (FECHA ELABOR. VALORIZ. MAYO 2011)


May-11

K2 (FECHA ELABOR. VALORIZ. NOVIEMBRE 2010)

INDICE BASE

K1

K4 (FECHA ELABOR. VALORIZ. ENERO 2011)


Jan-11

K4

MONOMIO

Oct-10

0.064
0.054
0.071
0.077
0.224
0.256
0.335

1.081

580.80
332.16
428.84
427.68
1,520.49
240.07
359.92

K6

K7 (FECHA

INDICE BASE

(Marzo 10)

Marzo 11

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

Apr-11

0.065
0.054
0.071
0.077
0.198
0.256
0.333

1.054

586.47
334.30
429.97
427.68
1,637.60
243.55
362.38

K7

ICIENTES DE REAJUSTE (K)

MOYOBAMBA - YANTALO

75(MOr/MOo)+0.165(ASr/ASo)+0.260(MIr/MIo)+0.324(Ir/Io)
K3 (FECHA ELABOR. VALORIZ. DICIEMBRE 2010)
INDICE BASE

(Marzo 10)

Diciembre 10

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

0.058
0.054
0.072
0.078
0.165
0.257
0.328

K3

1.012

K7 (FECHA ELABOR. VALORIZ. ABRIL 2011)


INDICE BASE

(Marzo 10)

Abril 11

446.16
334.22
434.98
415.58
1,265.36
243.77
350.59

K7

0.066
0.054
0.071
0.077
0.214
0.260
0.335

1.077

8.- CALCULO DE COEFICIENTES DE REAJUSTE (K) ADICIONAL DE OBRA N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:
RESIDENYE:

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 01
K = 0.148(Mr/Mo)+0.714(MAQr/MAQo)+0.138(Ir/Io)

MONOMIO

MO
MI
I

DESCRIPCION

Mano de Obra Inc. Leyes Sociales


Maquinaria y Equipo Nacional
Indice General de Precios al Consumidor

I.U.

47
48
39

COEFICIENTE

PARTICIPACION

INCIDENCIA

PORCENTUAL

0.148
0.714
0.138

100.00%
100.00%
100.00%

K1 (FECHA ELABOR. VALORIZ. FEBRERO 2011)


Feb-11

427.68
331.31
357.41

INDICE BASE

(Marzo 10)

Febrero 2011

415.58
334.22
350.59

K1

0.152
0.708
0.141

1.001

REAJUSTE (K) ADICIONAL DE OBRA N 01

9: MOYOBAMBA - YANTALO
NAL DE OBRA N 01

.714(MAQr/MAQo)+0.138(Ir/Io)

8.- CALCULO DE COEFICIENTES DE REAJUSTE (K) ADICIONAL DE OBRA N 02


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:
RESIDENYE:

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 02
K = 0.131(Ar/Ao)+0.288(Cr/Co)+0.336(Mr/Mo)+0.245(Ir/Io)

MONOMIO

A
C
M
I

DESCRIPCION

Acero de Construccion Corrugado


Cemento Portland Tipo I
Mano de Obra Inc. Leyes Sociales
Indice General de Precios al Consumidor

I.U.

03
21
47
39

COEFICIENTE

PARTICIPACION

INCIDENCIA

PORCENTUAL

0.131
0.288
0.336
0.245

100.00%
100.00%
100.00%
100.00%

K1 (FECHA ELABOR. VALORIZ. FEBRERO 2011)


Feb-11

573.48
416.97
427.68
357.41

(Marzo 10)

Febrero 2011

446.16
409.58
415.58
350.59

K1

K2 (FECHA ELABOR. VALORIZ. MAYO 2011)

INDICE BASE

0.168
0.293
0.346
0.250

1.057

May-11

578.14
415.90
427.68
362.29

K2

INDICE BASE

(Marzo 10)

Mayo 2011

446.16
409.58
415.58
350.59

0.170
0.292
0.346
0.253

1.061

REAJUSTE (K) ADICIONAL DE OBRA N 02

9: MOYOBAMBA - YANTALO
NAL DE OBRA N 02

(Cr/Co)+0.336(Mr/Mo)+0.245(Ir/Io)

8.- CALCULO DE COEFICIENTES DE REAJUSTE (K) ADICIONAL DE OBRA N 03


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:
RESIDENYE:

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 03
K = 0.100(Cr/Co)+0.112(Ar/Ao)+0.162(Mr/Mo)+0.376(Jr/Jo)+0.250(Ir/Io)

MONOMIO

C
A
M
J
I

DESCRIPCION

Cemento Portland Tipo I


Acero de Construccin Corrugado
Maquinaria y Equipo Nacional
Mano de Obra Inc. Leyes Sociales
Indice General de Precios al Consumidor

I.U.

21
03
48
47
39

COEFICIENTE

PARTICIPACION

INCIDENCIA

PORCENTUAL

0.100
0.112
0.162
0.376
0.250

100.00%
100.00%
100.00%
100.00%
100.00%

K1 (FECHA ELABOR. VALORIZ. MARZO 2011)


Mar-11

415.90
580.80
332.16
427.68
359.92

(Marzo 10)

Marzo 2011

409.58
446.16
334.22
415.58
350.59

K1

K2 (FECHA ELABOR. VALORIZ. ABRIL 2011)

INDICE BASE

0.102
0.146
0.161
0.387
0.257

1.053

Apr-11

415.90
586.47
334.30
427.68
362.38

K2

INDICE BASE

(Marzo 10)

Abril 2011

409.58
446.16
334.22
415.58
350.59

0.102
0.147
0.162
0.387
0.258

1.056

REAJUSTE (K) ADICIONAL DE OBRA N 03

MOYOBAMBA - YANTALO
L DE OBRA N 03

0.162(Mr/Mo)+0.376(Jr/Jo)+0.250(Ir/Io)

8.- CALCULO DE COEFICIENTES DE REAJUSTE (K) ADICIONAL DE OBRA N 04


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:
RESIDENYE:

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 04
K = 0.131(Jr/Jo)+0.699(Mr/Mo)+0.170(Ir/Io)

MONOMIO

J
M
I

DESCRIPCION

Mano de Obra Inc. Leyes Sociales


Maquinaria y Equipo Importado
Indice General de Precios al Consumidor

I.U.

47
49
39

COEFICIENTE

PARTICIPACION

INCIDENCIA

PORCENTUAL

0.131
0.699
0.170

100.00%
100.00%
100.00%

K1 (FECHA ELABOR. VALORIZ. MAYO 2011)


May-11

427.68
240.64
362.29

INDICE BASE

(Marzo 10)

Mayo 2011

415.58
243.77
350.59

K1

0.135
0.690
0.176

1.001

EAJUSTE (K) ADICIONAL DE OBRA N 04

MOYOBAMBA - YANTALO
L DE OBRA N 04

.699(Mr/Mo)+0.170(Ir/Io)

9.- REAJUSTE POR FORMULA POLINOMICA ( K )


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

OBRA:
PROPIETARIO:
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISION:
RESIDENTE

MONTO REFERENCIAL ( C / IGV )

S/.4,220,422.37

MONTO REFERENCIAL ( S / IGV )

S/.3,546,573.42

MONTO CONTRATADO ( S / IGV )

S/.3,797,362.73

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


PROGRAMADO
VAL. N

FECHA

Vp

EJECUTADO
R

Ve

Vp x (K-1)

REAJUSTE ACUMULADO
R

PROGRAMADO

EJECUTADO

REAJUSTE

Vp

Ve

REAJUSTE

RECONOCIDO

Acumulada

Acumulada

RECONOCIDO

Ve x (K-1)

ACUMULADO

Oct-10

12,780.92

1.007

89.47

23,602.86

1.007

165.22

89.47

165.22

165.22

12,780.92

23,602.86

165.22

Nov-10

51,658.87

1.010

516.59

571,103.80

1.010

5,711.04

606.06

5,876.26

5,711.04

64,439.79

594,706.66

5,876.26

Dec-10

308,950.71

1.012

3,707.41

532,523.78

1.012

6,390.29

4,313.46

12,266.54

6,390.29

373,390.50 1,127,230.44

12,266.54

Jan-11

504,372.58

1.011

5,548.10

543,770.27

1.011

5,981.47

9,861.56

18,248.02

5,981.47

877,763.08 1,671,000.71

18,248.02

Feb-11

595,531.50

1.031

18,461.48

270,130.00

1.031

8,374.03

28,323.04

26,622.05

8,374.03 1,473,294.58 1,941,130.71

26,622.05

Mar-11

245,777.10

1.054

13,271.96

247,413.97

1.054

13,360.35

41,595.00

39,982.40

13,360.35 1,719,071.68 2,188,544.68

39,982.40

Apr-11

276,609.74

1.077

21,298.95

189,794.91

1.077

14,614.21

62,893.95

54,596.61

14,614.21 1,995,681.42 2,378,339.59

54,596.61

May-11

1,555,904.86

1.083 129,140.10

953,341.36

1.083

79,127.33

192,034.06

133,723.94

79,127.33 3,551,586.28 3,331,680.96

133,723.94

Jun-11

36,430.77

1.081

253,732.94

1.081

20,552.37

194,984.95

154,276.31

20,552.37 3,588,017.05 3,585,413.90

154,276.31

2,950.89

ULA POLINOMICA ( K )

OBAMBA - YANTALO
OBSERVACIONES

OBRA ADELANTADA

165.22002

OBRA ADELANTADA

5711.038004

OBRA ADELANTADA

6390.285404

OBRA ADELANTADA

5981.47297

OBRA ADELANTADA

8374.03

OBRA ADELANTADA

13360.35438

OBRA ADELANTADA

14614.20798

OBRA ATRASADA

79127.33312

OBRA TERMINADA

21059.8341

10.- REAJUSTE POR FORMULA POLINOMICA ( K ) POR ADICIONAL DE OBRA N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

OBRA:
PROPIETARIO:
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISION:
RESIDENTE

MONTO CONTRATADO ( S / IGV )

S/.600,602.33

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 01
PROGRAMADO
VAL. N

FECHA

Vp

EJECUTADO
R

Ve

Vp x (K-1)

Feb-11

47,886.79

Mar-11

552,715.54

1.001

47.89

REAJUSTE ACUMULADO
R

PROGRAMADO

EJECUTADO

REAJUSTE

Vp

Ve

REAJUSTE

RECONOCIDO

Acumulada

Acumulada

RECONOCIDO

Ve x (K-1)

600,602.33

1.001

600.60

ACUMULADO

47.89

600.60

600.60

47,886.79

600,602.33

600.60

POLINOMICA ( K ) POR ADICIONAL DE OBRA N 01

529: MOYOBAMBA - YANTALO


ONAL DE OBRA N 01
OBSERVACIONES

OBRA ADELANTADA

10.- REAJUSTE POR FORMULA POLINOMICA ( K ) POR ADICIONAL DE OBRA N 02


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

OBRA:
PROPIETARIO:
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISION:
RESIDENTE

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 02
PROGRAMADO
VAL. N

FECHA

Vp

EJECUTADO
R

Ve

Vp x (K-1)

REAJUSTE ACUMULADO
R

PROGRAMADO

EJECUTADO

REAJUSTE

Vp

Ve

REAJUSTE

RECONOCIDO

Acumulada

Acumulada

RECONOCIDO

Ve x (K-1)

ACUMULADO

Feb-11

20,253.26

1.057

1,154.44

18,569.66

1.057

1,058.47

1,154.44

1,058.47

1,058.47

20,253.26

18,569.66

1,058.47

May-11

0.00

1.061

0.00

1,683.60

1.061

102.70

1,154.44

1,161.17

0.00

0.00

1,683.60

1,058.47

POLINOMICA ( K ) POR ADICIONAL DE OBRA N 02

529: MOYOBAMBA - YANTALO


ONAL DE OBRA N 02
OBSERVACIONES

OBRA ATRASADA
OBRA ADELANTADA

10.- REAJUSTE POR FORMULA POLINOMICA ( K ) POR ADICIONAL DE OBRA N 03


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

OBRA:
PROPIETARIO:
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISION:
RESIDENTE

MONTO CONTRATADO ( S / IGV )

S/.101,814.38

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 03
PROGRAMADO
VAL. N

FECHA

Vp

EJECUTADO
R

Ve

Vp x (K-1)

REAJUSTE ACUMULADO
R

PROGRAMADO

EJECUTADO

REAJUSTE

Vp

Ve

REAJUSTE

RECONOCIDO

Acumulada

Acumulada

RECONOCIDO

Ve x (K-1)

ACUMULADO

Mar-11

66,817.99

1.053

3,541.35

71,770.69

1.053

3,803.85

3,541.35

3,803.85

3,803.85

66,817.99

71,770.69

3,803.85

Apr-11

34,996.39

1.056

1,959.80

30,043.69

1.056

1,682.45

5,501.15

5,486.29

1,682.45

101,814.38

101,814.38

5,486.29

POLINOMICA ( K ) POR ADICIONAL DE OBRA N 03

529: MOYOBAMBA - YANTALO


ONAL DE OBRA N 03
OBSERVACIONES

OBRA ADELANTADA
OBRA ADELANTADA

10.- REAJUSTE POR FORMULA POLINOMICA ( K ) POR ADICIONAL DE OBRA N 04


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
ING HERNANDO YBAEZ GARCIA

OBRA:
PROPIETARIO:
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISION:
RESIDENTE

MONTO CONTRATADO ( S / IGV )

S/.53,639.65

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO


ADICIONAL DE OBRA N 04
PROGRAMADO
VAL. N

FECHA

Vp

EJECUTADO
R

Ve

Vp x (K-1)

May-11

53,639.65

1.001

53.64

REAJUSTE ACUMULADO
R

PROGRAMADO

EJECUTADO

REAJUSTE

Vp

Ve

REAJUSTE

RECONOCIDO

Acumulada

Acumulada

RECONOCIDO

Ve x (K-1)

53,639.65

1.001

53.64

ACUMULADO

53.64

53.64

53.64

53,639.65

53,639.65

53.64

POLINOMICA ( K ) POR ADICIONAL DE OBRA N 04

529: MOYOBAMBA - YANTALO


ONAL DE OBRA N 04
OBSERVACIONES

OBRA ADELANTADA

11.- CALCULO AMORTIZACION DE ADELANTO EN EFECTIVO N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO

OBRA:

GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO


CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:

MONTO REFERENCIAL:

SIN IGV:

4,220,422.37
3,546,573.42

S/IGV (EXONERADI):

3,797,362.73

CON IGV:

MONTO CONTRATADO:

FECHA ADELANTO:
MONTO DEL ADELANTO:

October-10
759,472.55

FORMULA POLINOMICA:

MEJ. C.V. SM 529: MOYOBAMBA - YANTALO

759,472.55

MONTO OTORGADO AL CONTRATISTA SIN IGV:

VALORIZACION EJECUTADA
VALOR. N

MES

1
2
3
4
5
6
7
8
8

Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11
Jun-11

MONTO

AMORTIZACION
% AVANCE

23,602.86
571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36
253,732.94

0.62%
15.04%

MES

ACUMULADO

4,720.57
114,220.76
114,036.04
116,444.39
57,846.35
52,981.88
40,643.18
204,151.02
54,428.35

4,720.57
118,941.33
232,977.37
349,421.77
407,268.12
460,249.99
500,893.17
705,044.20
759,472.55

ZACION DE ADELANTO EN EFECTIVO N 01

. SM 529: MOYOBAMBA - YANTALO

759,472.55
AMORTIZACION
SALDO

754,751.98
640,531.22
526,495.18
410,050.78
352,204.43
299,222.56
258,579.38
54,428.35
0.00

12.- CALCULO DE DEDUCCION POR ADELANTO EN EFECTIVO N 01


OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:
JEFE DE SUPERVISION:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
MONTO CONTRATO S/IGV

S/.3,797,362.73

MONTO OTORGADO S/IGV

S/.759,472.55

FECHA DE PAGO:
VALORIZACIONES
N

OCTUBRE 2,010
MONTO

FECHA

DE

MONTO
ADELANTO

CONTRATADO

Kr

VALORIZACION

Ka

DEDUCCION

Oct-09

3,797,362.73
1
2
3
4
5
6
7
8
9

TOTAL DEDUCCIN

Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11
Jun-11

23,602.86
571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36
253,732.94

594,706.66

759,472.55
759,472.55
759,472.55
759,472.55
759,472.55
759,472.55
759,472.55
759,472.55
759,472.55

1.007
1.010
1.012
1.011
1.031
1.054
1.077
1.083
1.081

1.007

0.00
340.28
528.82
431.99
1,287.61
2,309.52
2,638.66
14,390.06
3,729.14

25,656.09

CION POR ADELANTO EN EFECTIVO N 01

OBSERVACIONES

13.- AMORTIZACION DEL ADELANTO DE MATERIALES N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 391,781.20

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

ACERO DE REFUERZO FY=4,200 GRADO 60

34,799.10

30,255.02

Oct-10

GEOTEXTIL NO TEJIDO Mca Tex N MT200

16,720.00

14,536.69

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

28,977.27

25,193.40

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

2,458.55

2,137.51

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT) D=36"

22,639.10

19,682.87

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12 WT) D=60"

25,472.84

22,146.58

Oct-10

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

9,326.34

8,108.50

Oct-10

PIEDRA CHANCADA DE 1/2"

145,418.00

146,451.63

Oct-10

PIEDRA GRANDE DE 6"-10"

30,590.00

30,807.43

Oct-10

ARENA GRUESA

26,740.00

26,930.07

Oct-10

ARENA GRUESA SELECCIONADA

48,640.00

48,985.73

Oct-10

391,781.20
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Octubre-10)

(Marzo-10)

S/.

OTORGADO
34,799.10

ACERO DE REFUERZO FY=4,200 GRADO 60

0.00

3.65

0.00

513.17

446.16

0.00

0.00

3.65

0.00

513.17

446.16

0.00

0.00

3.65

0.00

513.17

446.16

0.00

3,162.93

3.65

11,544.69

513.17

446.16

13,278.62

1,193.25

3.65

4,355.36

513.17

446.16

5,009.51

794.00

3.65

2,898.10

513.17

446.16

3,333.37

3,138.87

3.65

11,456.86

513.17

446.16

13,177.59

May-11

13,177.59

13,177.60
16,720.00

GEOTEXTIL NO TEJIDO Mca Tex N MT200

0.00

5.50

0.00

513.17

446.16

0.00

0.00

5.50

0.00

513.17

446.16

0.00

0.00

5.50

0.00

513.17

446.16

0.00

760.00

5.50

4,180.00

513.17

446.16

4,807.81

1,883.04

5.50

10,356.69

513.17

446.16

11,912.19

0.00

5.50

0.00

513.17

446.16

0.00

0.00

5.50

0.00

513.17

446.16

May-11

0.00
0.00

0.00
28,977.27

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

0.00

673.89

0.00

513.17

446.16

0.00

0.00

673.89

0.00

513.17

446.16

0.00

0.00

673.89

0.00

513.17

446.16

0.00

29.00

673.89

19,542.81

513.17

446.16

22,478.00

8.39

673.89

5,650.59

513.17

446.16

6,499.27

0.00

673.89

0.00

513.17

446.16

0.00

13.- AMORTIZACION DEL ADELANTO DE MATERIALES N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 391,781.20

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

ACERO DE REFUERZO FY=4,200 GRADO 60

34,799.10

30,255.02

Oct-10

GEOTEXTIL NO TEJIDO Mca Tex N MT200

16,720.00

14,536.69

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

28,977.27

25,193.40

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

2,458.55

2,137.51

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT) D=36"

22,639.10

19,682.87

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12 WT) D=60"

25,472.84

22,146.58

Oct-10

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

9,326.34

8,108.50

Oct-10

PIEDRA CHANCADA DE 1/2"

145,418.00

146,451.63

Oct-10

PIEDRA GRANDE DE 6"-10"

30,590.00

30,807.43

Oct-10

ARENA GRUESA

26,740.00

26,930.07

Oct-10

ARENA GRUESA SELECCIONADA

48,640.00

48,985.73

Oct-10

391,781.20
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA
0.00

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Octubre-10)

(Marzo-10)

S/.

OTORGADO

673.89

0.00

513.17

446.16

May-11

0.00
0.00

0.00
2,458.55

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

0.00

491.71

0.00

513.17

446.16

0.00

0.00

491.71

0.00

513.17

446.16

0.00

0.00

491.71

0.00

513.17

446.16

0.00

4.35

491.71

2,137.51

513.17

446.16

2,458.55

0.00

491.71

0.00

513.17

446.16

0.00

0.00

491.71

0.00

513.17

446.16

0.00

0.00

491.71

0.00

513.17

446.16

May-11

0.00
0.00

0.00
22,639.10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT)

May-11

0.00

678.63

0.00

513.17

446.16

0.00

0.00

678.63

0.00

513.17

446.16

0.00

0.00

678.63

0.00

513.17

446.16

0.00

0.00

678.63

0.00

513.17

446.16

0.00

20.63

678.63

14,000.14

513.17

446.16

16,102.86

8.37

678.63

5,682.74

513.17

446.16

6,536.25

0.00

678.63

0.00

513.17

446.16

0.00
0.00

0.00
25,472.84

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12

0.00

2303.15

0.00

513.17

446.16

0.00

0.00

2303.15

0.00

513.17

446.16

0.00

0.00

2303.15

0.00

513.17

446.16

0.00

0.00

2303.15

0.00

513.17

446.16

0.00

13.- AMORTIZACION DEL ADELANTO DE MATERIALES N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 391,781.20

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

ACERO DE REFUERZO FY=4,200 GRADO 60

34,799.10

30,255.02

Oct-10

GEOTEXTIL NO TEJIDO Mca Tex N MT200

16,720.00

14,536.69

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

28,977.27

25,193.40

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

2,458.55

2,137.51

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT) D=36"

22,639.10

19,682.87

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12 WT) D=60"

25,472.84

22,146.58

Oct-10

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

9,326.34

8,108.50

Oct-10

PIEDRA CHANCADA DE 1/2"

145,418.00

146,451.63

Oct-10

PIEDRA GRANDE DE 6"-10"

30,590.00

30,807.43

Oct-10

ARENA GRUESA

26,740.00

26,930.07

Oct-10

ARENA GRUESA SELECCIONADA

48,640.00

48,985.73

Oct-10

391,781.20
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Octubre-10)

(Marzo-10)

S/.

OTORGADO

9.62

2303.15

22,146.58

513.17

446.16

25,472.84

0.00

2303.15

0.00

513.17

446.16

0.00

0.00

2303.15

0.00

513.17

446.16

May-11

0.00
0.00

0.00
9,326.34

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

0.00

518.13

0.00

513.17

446.16

0.00

0.00

518.13

0.00

513.17

446.16

0.00

0.00

518.13

0.00

513.17

446.16

0.00

0.00

518.13

0.00

513.17

446.16

0.00

15.65

518.13

8,108.50

513.17

446.16

9,326.34

0.00

518.13

0.00

513.17

446.16

0.00

0.00

518.13

0.00

513.17

446.16

May-11

0.00
0.00

0.00
145,418.00

PIEDRA CHANCADA DE 1/2"

89.11

100.00

8,911.00

431.91

434.98

8,848.11

59.86

100.00

5,986.00

431.91

434.98

5,943.75

84.00

100.00

8,400.00

431.91

434.98

8,340.71

922.36

100.00

92,236.00

431.91

434.98

91,585.02

65.41

100.00

6,541.00

431.91

434.98

6,494.83

30.00

100.00

3,000.00

431.91

434.98

2,978.83

213.78

100.00

21,377.63

431.91

434.98

21,226.75

May-11

21,226.75

21,226.75
30,590.00

PIEDRA GRANDE DE 6"-10"

0.00

70.00

0.00

431.91

434.98

0.00

0.00

70.00

0.00

431.91

434.98

0.00

13.- AMORTIZACION DEL ADELANTO DE MATERIALES N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 391,781.20

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

ACERO DE REFUERZO FY=4,200 GRADO 60

34,799.10

30,255.02

Oct-10

GEOTEXTIL NO TEJIDO Mca Tex N MT200

16,720.00

14,536.69

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

28,977.27

25,193.40

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

2,458.55

2,137.51

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT) D=36"

22,639.10

19,682.87

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12 WT) D=60"

25,472.84

22,146.58

Oct-10

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

9,326.34

8,108.50

Oct-10

PIEDRA CHANCADA DE 1/2"

145,418.00

146,451.63

Oct-10

PIEDRA GRANDE DE 6"-10"

30,590.00

30,807.43

Oct-10

ARENA GRUESA

26,740.00

26,930.07

Oct-10

ARENA GRUESA SELECCIONADA

48,640.00

48,985.73

Oct-10

391,781.20
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Octubre-10)

(Marzo-10)

S/.

OTORGADO

0.00

70.00

0.00

431.91

434.98

0.00

242.50

70.00

16,975.00

431.91

434.98

16,855.19

127.61

70.00

8,932.43

431.91

434.98

8,869.39

70.00

70.00

4,900.00

431.91

434.98

4,865.42

0.00

70.00

0.00

431.91

434.98

May-11

0.00
0.00

0.00
26,740.00

ARENA GRUESA

59.83

70.00

4,188.10

431.91

434.98

4,158.54

40.19

70.00

2,813.30

431.91

434.98

2,793.44

56.00

70.00

3,920.00

431.91

434.98

3,892.33

87.42

70.00

6,119.40

431.91

434.98

6,076.21

70.98

70.00

4,968.60

431.91

434.98

4,933.53

20.86

70.00

1,460.20

431.91

434.98

1,449.89

49.44

70.00

3,460.47

431.91

434.98

May-11

3,436.05
3,436.05

3,436.04
48,640.00

ARENA GRUESA SELECCIONADA

May-11

0.00

80.00

0.00

431.91

434.98

0.00

0.00

80.00

0.00

431.91

434.98

0.00

0.00

80.00

0.00

431.91

434.98

0.00

0.00

80.00

0.00

431.91

434.98

0.00

0.00

80.00

0.00

431.91

434.98

0.00

0.00

80.00

0.00

431.91

434.98

0.00

612.32

80.00

48,985.73

431.91

434.98

48,640.00
48,640.00
AMORTIZADOS

48,640.00
ACUMULADOS

13.- AMORTIZACION DEL ADELANTO DE MATERIALES N 01


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 391,781.20

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

ACERO DE REFUERZO FY=4,200 GRADO 60

34,799.10

30,255.02

Oct-10

GEOTEXTIL NO TEJIDO Mca Tex N MT200

16,720.00

14,536.69

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

28,977.27

25,193.40

Oct-10

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

2,458.55

2,137.51

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT) D=36"

22,639.10

19,682.87

Oct-10

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12 WT) D=60"

25,472.84

22,146.58

Oct-10

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

9,326.34

8,108.50

Oct-10

PIEDRA CHANCADA DE 1/2"

145,418.00

146,451.63

Oct-10

PIEDRA GRANDE DE 6"-10"

30,590.00

30,807.43

Oct-10

ARENA GRUESA

26,740.00

26,930.07

Oct-10

ARENA GRUESA SELECCIONADA

48,640.00

48,985.73

Oct-10

391,781.20
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Octubre-10)

(Marzo-10)

S/.

OTORGADO

VALORIZACION N 02

S/.

13,006.65

13,006.65

VALORIZACION N 03

S/.

8,737.20

21,743.85

VALORIZACION N 04

S/.

12,233.05

33,976.89

VALORIZACION N 05

S/.

157,539.40

191,516.29

VALORIZACION N 06

S/.

94,620.77

286,137.06

VALORIZACION N 07

S/.

19,163.76

305,300.82

VALORIZACION N 08

S/.

86,480.39

391,781.21

L ADELANTO DE MATERIALES N 01

O VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
34,799.10
34,799.10
34,799.10
34,799.10
21,520.48
16,510.97
13,177.60
0.00
16,720.00
16,720.00
16,720.00
16,720.00
11,912.19
0.00
0.00
0.00
28,977.27
28,977.27
28,977.27
28,977.27
6,499.27
0.00
0.00

L ADELANTO DE MATERIALES N 01

O VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
0.00
2,458.55
2,458.55
2,458.55
2,458.55
0.00
0.00
0.00
0.00
22,639.10
22,639.10
22,639.10
22,639.10
22,639.10
6,536.24
0.00
0.00
25,472.84
25,472.84
25,472.84
25,472.84
25,472.84

L ADELANTO DE MATERIALES N 01

O VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
0.00
0.00
0.00
9,326.34
9,326.34
9,326.34
9,326.34
9,326.34
0.00
0.00
0.00
145,418.00
136,569.89
130,626.14
122,285.43
30,700.41
24,205.57
21,226.75
0.00
30,590.00
30,590.00
30,590.00

L ADELANTO DE MATERIALES N 01

O VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
30,590.00
13,734.81
4,865.42
0.00
0.00
26,740.00
22,581.46
19,788.01
15,895.68
9,819.47
4,885.94
3,436.04
0.00
48,640.00
48,640.00
48,640.00
48,640.00
48,640.00
48,640.00
48,640.00
0.00
SALDOS

L ADELANTO DE MATERIALES N 01

O VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
378,774.55
370,037.35
357,804.30
200,264.90
105,644.13
86,480.38
0.0

14.- AMORTIZACION DEL ADELANTO DE MATERIALES N 02


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 707,856.95

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

13

EMULSION ASFALTICA CATIONICA DE ROTURA RAPIDA

13

ASFALTO LIQUIDO RC - 250

13

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

252,046.22

252,046.22

Dec-10

17,507.50

17,507.50

Dec-10

EMULSION ASFALTICA CATIONICA SUPER ESTABLE CON POLIMEROS CSE - 1HP

258,348.23

258,348.23

Dec-10

39

CEMENTO PORTLAND TIPO I

140,160.00

138,547.65

Dec-10

39

MADERA TORNILLO

39,795.00

39,337.21

Dec-10

707,856.95
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Diciembre-10)

(Marzo-10)

S/.

OTORGADO
252,046.22

EMULSION ASFALTICA CATIONICA DE ROTURA RAPIDA

0.00

9.58

0.00

1,265.36

1,265.36

0.00

0.00

9.58

0.00

1,265.36

1,265.36

0.00

0.00

9.58

0.00

1,265.36

1,265.36

0.00

0.00

9.58

0.00

1,265.36

1,265.36

0.00

0.00

9.58

0.00

1,265.36

1,265.36

0.00

0.00

9.58

0.00

1,265.36

1,265.36

0.00

26,309.63

9.58

252,046.22

1,265.36

1,265.36

252,046.22

May-11

252,046.22

252,046.22
17,507.50

ASFALTO LIQUIDO RC - 250

0.00

7.45

0.00

1,265.36

1,265.36

0.00

0.00

7.45

0.00

1,265.36

1,265.36

0.00

0.00

7.45

0.00

1,265.36

1,265.36

0.00

0.00

7.45

0.00

1,265.36

1,265.36

0.00

0.00

7.45

0.00

1,265.36

1,265.36

0.00

2,350.00

7.45

17,507.50

1,265.36

1,265.36

17,507.50

0.00

7.45

0.00

1,265.36

1,265.36

May-11

0.00
0.00

0.00
258,348.23

EMULSION ASFALTICA CATIONICA SUPER ESTABLE CON P

0.00

10.53

0.00

1,265.36

1,265.36

0.00

0.00

10.53

0.00

1,265.36

1,265.36

0.00

0.00

10.53

0.00

1,265.36

1,265.36

0.00

0.00

10.53

0.00

1,265.36

1,265.36

0.00

0.00

10.53

0.00

1,265.36

1,265.36

0.00

0.00

10.53

0.00

1,265.36

1,265.36

0.00

14.- AMORTIZACION DEL ADELANTO DE MATERIALES N 02


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 707,856.95

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

13

EMULSION ASFALTICA CATIONICA DE ROTURA RAPIDA

13

ASFALTO LIQUIDO RC - 250

13

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

252,046.22

252,046.22

Dec-10

17,507.50

17,507.50

Dec-10

EMULSION ASFALTICA CATIONICA SUPER ESTABLE CON POLIMEROS CSE - 1HP

258,348.23

258,348.23

Dec-10

39

CEMENTO PORTLAND TIPO I

140,160.00

138,547.65

Dec-10

39

MADERA TORNILLO

39,795.00

39,337.21

Dec-10

707,856.95
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA
24,534.49

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Diciembre-10)

(Marzo-10)

S/.

OTORGADO

10.53

258,348.22

1,265.36

1,265.36

May-11

258,348.22
258,348.22

258,348.23
140,160.00

CEMENTO PORTLAND TIPO I

0.00

21.90

0.00

354.67

350.59

0.00

723.62

21.90

15,847.28

354.67

350.59

16,031.70

1,014.00

21.90

22,206.60

354.67

350.59

22,465.03

1,588.00

21.90

34,777.20

354.67

350.59

35,181.92

607.00

21.90

13,293.30

354.67

350.59

13,448.00

374.00

21.90

8,190.60

354.67

350.59

8,285.92

2,031.01

21.90

44,479.21

354.67

350.59

44,996.83

May-11

44,996.83

44,747.43
39,795.00

MADERA TORNILLO

0.00

3.50

0.00

354.67

350.59

0.00
2,083.51

588.44

3.50

2,059.54

354.67

350.59

1,518.00

3.50

5,313.00

354.67

350.59

5,374.83

3,510.00

3.50

12,285.00

354.67

350.59

12,427.97

1,753.00

3.50

6,135.50

354.67

350.59

6,206.90

355.00

3.50

1,242.50

354.67

350.59

1,256.96

3,534.76

3.50

12,371.67

354.67

350.59

12,515.65

May-11

12,515.65
AMORTIZADOS

12,444.83
ACUMULADOS

VALORIZACION N 02

S/.

0.00

0.00

VALORIZACION N 03

S/.

18,115.21

18,115.21

VALORIZACION N 04

S/.

27,839.86

45,955.07

14.- AMORTIZACION DEL ADELANTO DE MATERIALES N 02


MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO
GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA

OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISION:
JEFE DE SUPERVISION:

S/. 707,856.95

ADELANTO OTORGADO (SIN IGV):

FORMULA POLINOMICA:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


IU

MATERIAL SOLICITADO

13

EMULSION ASFALTICA CATIONICA DE ROTURA RAPIDA

13

ASFALTO LIQUIDO RC - 250

13

ADELANTO

ADELANTO

OTORGADO

DEFLACTADO

FECHA

252,046.22

252,046.22

Dec-10

17,507.50

17,507.50

Dec-10

EMULSION ASFALTICA CATIONICA SUPER ESTABLE CON POLIMEROS CSE - 1HP

258,348.23

258,348.23

Dec-10

39

CEMENTO PORTLAND TIPO I

140,160.00

138,547.65

Dec-10

39

MADERA TORNILLO

39,795.00

39,337.21

Dec-10

707,856.95
1er ADELANTO

3=1x2

VALORIZ.N

MATERIALES

P. U.

MONTO A LA

UTILIZADOS

FECHA

6=(3x4)/5

A FECHA DEL

FECHA DEL

Ima

Imo

AMORTIZACION

ADELANTO

P. BASE CON F.R.

PRESUPUESTO BASE

(Diciembre-10)

(Marzo-10)

S/.

OTORGADO

VALORIZACION N 05

S/.

47,609.89

93,564.96

VALORIZACION N 06

S/.

19,654.90

113,219.86

VALORIZACION N 07

S/.

27,050.38

140,270.24

VALORIZACION N 08

S/.

567,906.94

708,177.18

ADELANTO DE MATERIALES N 02

VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
252,046.22
252,046.22
252,046.22
252,046.22
252,046.22
252,046.22
252,046.22
0.00
17,507.50
17,507.50
17,507.50
17,507.50
17,507.50
17,507.50
0.00
0.00
258,348.23
258,348.23
258,348.23
258,348.23
258,348.23
258,348.23
258,348.23

ADELANTO DE MATERIALES N 02

VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
0.00
140,160.00
140,160.00
124,128.30
101,663.27
66,481.35
53,033.35
44,747.43
-249.41
39,795.00
39,795.00
37,711.49
32,336.66
19,908.69
13,701.79
12,444.83
-70.82
SALDOS
707,856.95
689,741.74
661,901.88

ADELANTO DE MATERIALES N 02

VECINAL SM 529: MOYOBAMBA - YANTALO

8=7-6

SALDO
POR
AMORTIZAR
614,291.99
594,637.09
567,586.71
-320.23

15.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALE
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

VAL N

Mes

ADELANTO N :

2
3
4
5
6
7
8

Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

Vo
(2)

34,799.10
34,799.10
34,799.10
34,799.10
34,799.10
34,799.10
34,799.10

Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

16,720.00
16,720.00
16,720.00
16,720.00
16,720.00
16,720.00
16,720.00

NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE

2,010
2,010
2,010
2,010
2,010
2,010
2,010

28,977.27
28,977.27
28,977.27
28,977.27
28,977.27
28,977.27
28,977.27

Max. Adelanto por


Utilizar (A)
(4)=(2)x(3)

Imr
(5)

Ima
(6)

Imo
(7)

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)

Adelanto por
Utilizar
(9)

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

0.050
0.050
0.050
0.050
0.050
0.050
0.050

28,555.19
1,699.83
0.00
0.00
0.00
0.00
0.00

515.74
517.58
528.61
573.48
580.80
586.47
578.14

513.17
513.17
513.17
513.17
513.17
513.17
513.17

446.16
446.16
446.16
446.16
446.16
446.16
446.16

30,255.02

30,255.02
1,699.83
0.00
0.00
0.00
0.00
0.00

14,536.69
0.00
0.00
0.00
0.00
0.00
0.00

515.74
517.58
528.61
573.48
580.80
586.47
578.14

513.17
513.17
513.17
513.17
513.17
513.17
513.17

446.16
446.16
446.16
446.16
446.16
446.16
446.16

14,536.69

14,536.69
0.00
0.00
0.00
0.00
0.00
0.00

515.74
517.58
528.61
573.48
580.80
586.47
578.14

513.17
513.17
513.17
513.17
513.17
513.17
513.17

446.16
446.16
446.16
446.16
446.16
446.16
446.16

25,193.40

25,193.40
0.00
0.00
0.00
0.00
0.00
0.00

GEOTEXTIL NO TEJIDO Mca Tex N MT200

NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE

2,010
2,010
2,010
2,010
2,010
2,010
2,010

1
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

Coeficiente
Incidencia
(3)

ACERO DE REFUERZO FY=4,200 GRADO 60

ADELANTO N :
2
3
4
5
6
7
8

Fecha

ADELANTO N :

2
3
4
5
6
7
8

ADELANTO OTORGADO
Monto
(1)

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

0.050
0.050
0.050
0.050
0.050
0.050
0.050

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.50X1.0

NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE

2,010
2,010
2,010
2,010
2,010
2,010
2,010

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

0.050
0.050
0.050
0.050
0.050
0.050
0.050

25,193.40
0.00
0.00
0.00
0.00
0.00
0.00

15.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALE
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

VAL N

Mes

ADELANTO N :
2
3
4
5
6
7
8

ADELANTO OTORGADO
Monto
(1)
1

Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

ADELANTO N :

2,458.55
2,458.55
2,458.55
2,458.55
2,458.55
2,458.55
2,458.55

Fecha

NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE
NOVIEMBRE

Vo
(2)

Coeficiente
Incidencia
(3)

Max. Adelanto por


Utilizar (A)
(4)=(2)x(3)

Imr
(5)

Ima
(6)

Imo
(7)

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)

Adelanto por
Utilizar
(9)

GAVION CAJA 10X12cm, 3.40mm GALFAN+PVC 5.0X1.0X1.0

2,010
2,010
2,010
2,010
2,010
2,010
2,010

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

0.050
0.050
0.050
0.050
0.050
0.050
0.050

2,137.51
0.00
0.00
0.00
0.00
0.00
0.00

515.74
517.58
528.61
573.48
580.80
586.47
578.14

513.17
513.17
513.17
513.17
513.17
513.17
513.17

446.16
446.16
446.16
446.16
446.16
446.16
446.16

2,137.51

2,137.51
0.00
0.00
0.00
0.00
0.00
0.00

19,682.87

19,682.87

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE N-12 WT) D=36"

Nov-10

22,639.10

NOVIEMBRE 2,010

571,103.80

0.050

19,682.87

515.74

513.17

446.16

Dec-10

22,639.10

NOVIEMBRE 2,010

532,523.78

0.050

0.00

517.58

513.17

446.16

0.00

Jan-11

22,639.10

NOVIEMBRE 2,010

543,770.27

0.050

0.00

528.61

513.17

446.16

0.00

Feb-11

22,639.10

NOVIEMBRE 2,010

270,130.00

0.050

0.00

573.48

513.17

446.16

0.00

Mar-11

22,639.10

NOVIEMBRE 2,010

247,413.97

0.050

0.00

580.80

513.17

446.16

0.00

Apr-11

22,639.10

NOVIEMBRE 2,010

189,794.91

0.050

0.00

586.47

513.17

446.16

0.00

May-11

22,639.10

NOVIEMBRE 2,010

953,341.36

0.050

0.00

578.14

513.17

446.16

0.00

ADELANTO N :

TUBERIA CORRUGADA DE POLIETILENO DE ALTA DENSIDAD (HDPE ADS N-12 WT) D=60"

Nov-10

25,472.84

NOVIEMBRE 2,010

571,103.80

0.050

22,146.58

515.74

513.17

446.16

Dec-10

25,472.84

NOVIEMBRE 2,010

532,523.78

0.050

0.00

517.58

513.17

446.16

22,146.58

22,146.58
0.00

Jan-11

25,472.84

NOVIEMBRE 2,010

543,770.27

0.050

0.00

528.61

513.17

446.16

0.00

Feb-11

25,472.84

NOVIEMBRE 2,010

270,130.00

0.050

0.00

573.48

513.17

446.16

0.00

Mar-11

25,472.84

NOVIEMBRE 2,010

247,413.97

0.050

0.00

580.80

513.17

446.16

0.00

15.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALE
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

VAL N

Mes

ADELANTO OTORGADO
Monto
(1)

Fecha

Vo
(2)

Coeficiente
Incidencia
(3)

Max. Adelanto por


Utilizar (A)
(4)=(2)x(3)

Imr
(5)

Ima
(6)

Imo
(7)

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)

Adelanto por
Utilizar
(9)

Apr-11

25,472.84

NOVIEMBRE 2,010

189,794.91

0.050

0.00

586.47

513.17

446.16

0.00

May-11

25,472.84

NOVIEMBRE 2,010

953,341.36

0.050

0.00

578.14

513.17

446.16

0.00

ADELANTO N :

GAVION COLCHON 10X12cm, 3.40mm GALFAN+PVC 5.0X2.0X0.30

Nov-10

9,326.34

NOVIEMBRE 2,010

571,103.80

0.050

8,108.50

515.74

513.17

446.16

Dec-10

9,326.34

NOVIEMBRE 2,010

532,523.78

0.050

0.00

517.58

513.17

446.16

0.00

Jan-11

9,326.34

NOVIEMBRE 2,010

543,770.27

0.050

0.00

528.61

513.17

446.16

0.00

Feb-11

9,326.34

NOVIEMBRE 2,010

270,130.00

0.050

0.00

573.48

513.17

446.16

0.00

Mar-11

9,326.34

NOVIEMBRE 2,010

247,413.97

0.050

0.00

580.80

513.17

446.16

0.00

Apr-11

9,326.34

NOVIEMBRE 2,010

189,794.91

0.050

0.00

586.47

513.17

446.16

0.00

May-11

9,326.34

NOVIEMBRE 2,010

953,341.36

0.050

0.00

578.14

513.17

446.16

0.00

ADELANTO N :

8,108.50

8,108.50

PIEDRA CHANCADA DE 1/2"

Nov-10

145,418.00

NOVIEMBRE 2,010

571,103.80

0.072

41,119.47

433.62

431.91

434.98

Dec-10

145,418.00

NOVIEMBRE 2,010

532,523.78

0.072

38,341.71

435.90

431.91

434.98

105,332.15

Jan-11

145,418.00

NOVIEMBRE 2,010

543,770.27

0.072

39,151.46

432.77

431.91

434.98

66,990.44

Feb-11

145,418.00

NOVIEMBRE 2,010

270,130.00

0.072

19,449.36

430.55

431.91

434.98

27,838.98

Mar-11

145,418.00

NOVIEMBRE 2,010

247,413.97

0.072

8,389.62

428.84

431.91

434.98

8,389.62

Apr-11

145,418.00

NOVIEMBRE 2,010

189,794.91

0.072

0.00

429.97

431.91

434.98

0.00

May-11

145,418.00

NOVIEMBRE 2,010

953,341.36

0.072

0.00

430.95

431.91

434.98

0.00

ADELANTO N :

PIEDRA GRANDE DE 6"-10"

146,451.63

146,451.63

15.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALE
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

VAL N

Mes

ADELANTO OTORGADO
Monto
(1)

Fecha

Vo
(2)

Coeficiente
Incidencia
(3)

Max. Adelanto por


Utilizar (A)
(4)=(2)x(3)

Imr
(5)

Ima
(6)

Imo
(7)

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)

Nov-10

30,590.00

NOVIEMBRE 2,010

571,103.80

0.072

30,807.43

433.62

431.91

434.98

Dec-10

30,590.00

NOVIEMBRE 2,010

532,523.78

0.072

0.00

435.90

431.91

434.98

0.00

Jan-11

30,590.00

NOVIEMBRE 2,010

543,770.27

0.072

0.00

432.77

431.91

434.98

0.00

Feb-11

30,590.00

NOVIEMBRE 2,010

270,130.00

0.072

0.00

430.55

431.91

434.98

0.00

Mar-11

30,590.00

NOVIEMBRE 2,010

247,413.97

0.072

0.00

428.84

431.91

434.98

0.00

Apr-11

30,590.00

NOVIEMBRE 2,010

189,794.91

0.072

0.00

429.97

431.91

434.98

0.00

May-11

30,590.00

NOVIEMBRE 2,010

953,341.36

0.072

0.00

430.95

431.91

434.98

0.00

ADELANTO N :

30,807.43

Adelanto por
Utilizar
(9)

30,807.43

ARENA GRUESA

Nov-10

26,740.00

NOVIEMBRE 2,010

571,103.80

0.072

26,930.07

433.62

431.91

434.98

Dec-10

26,740.00

NOVIEMBRE 2,010

532,523.78

0.072

0.00

435.90

431.91

434.98

0.00

Jan-11

26,740.00

NOVIEMBRE 2,010

543,770.27

0.072

0.00

432.77

431.91

434.98

0.00

Feb-11

26,740.00

NOVIEMBRE 2,010

270,130.00

0.072

0.00

430.55

431.91

434.98

0.00

Mar-11

26,740.00

NOVIEMBRE 2,010

247,413.97

0.072

0.00

428.84

431.91

434.98

0.00

Apr-11

26,740.00

NOVIEMBRE 2,010

189,794.91

0.072

0.00

429.97

431.91

434.98

0.00

May-11

26,740.00

NOVIEMBRE 2,010

953,341.36

0.072

0.00

430.95

431.91

434.98

0.00

ADELANTO N :

26,930.07

26,930.07

ARENA GRUESA SELECCIONADA

Nov-10

48,640.00

NOVIEMBRE 2,010

571,103.80

0.072

41,119.47

433.62

431.91

434.98

Dec-10

48,640.00

NOVIEMBRE 2,010

532,523.78

0.072

7,866.26

435.90

431.91

434.98

48,985.73

48,985.73
7,866.26

Jan-11

48,640.00

NOVIEMBRE 2,010

543,770.27

0.072

0.00

432.77

431.91

434.98

0.00

Feb-11

48,640.00

NOVIEMBRE 2,010

270,130.00

0.072

0.00

430.55

431.91

434.98

0.00

15.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALE
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

ADELANTO OTORGADO
Monto
(1)

Fecha

Vo
(2)

Coeficiente
Incidencia
(3)

Max. Adelanto por


Utilizar (A)
(4)=(2)x(3)

Imr
(5)

Ima
(6)

Imo
(7)

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)

Adelanto por
Utilizar
(9)

VAL N

Mes

Mar-11

48,640.00

NOVIEMBRE 2,010

247,413.97

0.072

0.00

428.84

431.91

434.98

0.00

Apr-11

48,640.00

NOVIEMBRE 2,010

189,794.91

0.072

0.00

429.97

431.91

434.98

0.00

May-11

48,640.00

NOVIEMBRE 2,010

953,341.36

0.072

0.00

430.95

431.91

434.98

0.00

CALCULADOS
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

S/.

1,243.59
440.66
77.41
-60.81
-59.21
0.00
0.00

TOTAL DEDUCCIONES :

R ADELANTO ESPECIFICO PARA MATERIALES N 01

= Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))

I.U.

1,699.83
0.00
0.00
0.00
0.00
0.00
0.00

I.U.

164.49
16.80
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

I.U.

83.74
0.00
0.00
0.00
0.00
0.00
0.00

3
0.00
0.00
0.00
0.00
0.00
0.00
0.00

145.12
0.00
0.00
0.00
0.00
0.00
0.00

515.74
515.58
528.61
573.48
580.8
586.47
578.14

513.17
513.17
513.17
513.17
513.17
513.17
513.17

R ADELANTO ESPECIFICO PARA MATERIALES N 01

= Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)
I.U.

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))
3

0.00
0.00
0.00
0.00
0.00
0.00
0.00

I.U.

12.31
0.00
0.00
0.00
0.00
0.00
0.00

0.00

113.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

I.U.

0.00

127.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

R ADELANTO ESPECIFICO PARA MATERIALES N 01

= Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))

0.00

0.00

0.00

0.00

I.U.

0.00

46.71

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

I.U.

105,332.15

161.65

433.62

431.91

66,990.44

351.70

435.9

431.91

27,838.98

77.41

432.77

431.91

8,389.62

-60.81

430.55

431.91

0.00

-59.21

428.84

431.91

0.00

0.00

429.97

431.91

0.00

0.00

430.95

431.91

I.U.

R ADELANTO ESPECIFICO PARA MATERIALES N 01

= Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))

0.00

121.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

I.U.

0.00

105.87

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

I.U.

7,866.26

161.65

0.00

72.16

0.00

0.00

0.00

0.00

R ADELANTO ESPECIFICO PARA MATERIALES N 01

= Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))

0.00

0.00

0.00

0.00

0.00

0.00

DEDUCIDOS EN VAL.SUB TOTAL A DEDUCIR

0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL DEDUCCIONES :

1,243.59
440.66
77.41
-60.81
-59.21
0.00
0.00

1,641.63

16.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES N 02
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

VAL N

Mes

ADELANTO N :

2
3
4
5
6
7
8

Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

ADELANTO N :

Vo
(2)

252,046.22
252,046.22
252,046.22
252,046.22
252,046.22
252,046.22
252,046.22

Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

17,507.50
17,507.50
17,507.50
17,507.50
17,507.50
17,507.50
17,507.50

DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE

2,010
2,010
2,010
2,010
2,010
2,010
2,010

258,348.23
258,348.23
258,348.23
258,348.23
258,348.23
258,348.23
258,348.23
2

Max. Adelanto por


Utilizar (A)
(4)=(2)x(3)

Imr
(5)

Ima
(6)

Imo
(7)

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)

Adelanto por
Utilizar
(9)

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

0.165
0.165
0.165
0.165
0.165
0.165
0.165

0.00
87,866.42
89,722.09
44,571.45
29,886.26
0.00
0.00

1,265.36
1,265.36
1,265.36
1,380.33
1,520.49
1,637.60
1,718.06

1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36

1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36

252,046.22

252,046.22
252,046.22
164,179.80
74,457.71
29,886.26
0.00
0.00

0.165
0.165
0.165
0.165
0.165
0.165
0.165

0.00
17,507.50
0.00
0.00
0.00
0.00
0.00

1,265.36
1,265.36
1,265.36
1,380.33
1,520.49
1,637.60
1,718.06

1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36

1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36

17,507.50

17,507.50
17,507.50
0.00
0.00
0.00
0.00
0.00

1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36

1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36
1,265.36

258,348.23

258,348.23
258,348.23
170,481.80
80,759.71
36,188.26
0.00
0.00

ASFALTO LIQUIDO RC - 250

DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE

2,010
2,010
2,010
2,010
2,010
2,010
2,010

2
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

Coeficiente
Incidencia
(3)

EMULSION ASFALTICA CATIONICA DE ROTURA RAPIDA

ADELANTO N :
2
3
4
5
6
7
8

Fecha

ADELANTO N :

2
3
4
5
6
7
8

ADELANTO OTORGADO
Monto
(1)

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

EMULSION ASFALTICA CATIONICA SUPER ESTABLE CON POLIMEROS CSE - 1HP

DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE
DICIEMBRE

2,010
2,010
2,010
2,010
2,010
2,010
2,010

571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36
CEMENTO PORTLAND TIPO I

0.165
0.165
0.165
0.165
0.165
0.165
0.165

0.00
87,866.42
89,722.09
44,571.45
36,188.26
0.00
0.00

1,265.36
1,265.36
1,265.36
1,380.33
1,520.49
1,637.60
1,718.06

16.- DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES N 02
OBRA:
PROPIETARIO:
CONTRATISTA:
SUPERVISOR:

FECHA P. BASE:

MEJORAMIENTO DEL CAMINO VECINAL SM 529: MOYOBAMBA - YANTALO


GOBIERNO REGIONAL DE SAN MARTIN - PROYECTO ESPECIAL ALTO MAYO
CONSORCIO CRISTO DE LA EXALTACION
FACULTAD DE INGENIERIA CIVIL - UNIVERSIDAD NACIONAL DE SAN MARTIN
ING VICTOR EDUARDO SAMAME ZATTA
March-10
D = A x ((Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)

FORMULA:

VAL N

Mes

2
3
4
5
6
7
8

Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

ADELANTO N :

ADELANTO OTORGADO
Monto
Fecha
(1)
140,160.00 DICIEMBRE 2,010
140,160.00 DICIEMBRE 2,010
140,160.00 DICIEMBRE 2,010
140,160.00 DICIEMBRE 2,010
140,160.00 DICIEMBRE 2,010
140,160.00 DICIEMBRE 2,010
140,160.00 DICIEMBRE 2,010

Vo
(2)
571,103.80
532,523.78
543,770.27
270,130.00
247,413.97
189,794.91
953,341.36

Coeficiente
Max. Adelanto por
Incidencia
Utilizar (A)
(3)
(4)=(2)x(3)
0.324
0.00
0.324
138,794.19
0.324
0.00
0.324
0.00
0.324
0.00
0.324
0.00
0.324
0.00

Imr
(5)
354.04
354.67
356.05
357.41
359.92
362.38
362.29

Ima
(6)
354.04
354.04
354.04
354.04
354.04
354.04
354.04

Imo
(7)
350.59
350.59
350.59
350.59
350.59
350.59
350.59

Monto Mx.
Utilizable
(8)=(1)x(7)/(6)
138,794.19

Adelanto por
Utilizar
(9)
138,794.19
138,794.19
0.00
0.00
0.00
0.00
0.00

39,407.21

39,407.21

MADERA TORNILLO

Nov-10

39,795.00

DICIEMBRE 2,010

571,103.80

0.324

0.00

354.04

354.04

350.59

Dec-10

39,795.00

DICIEMBRE 2,010

532,523.78

0.324

39,407.21

354.67

354.04

350.59

39,407.21

Jan-11

39,795.00

DICIEMBRE 2,010

543,770.27

0.324

0.00

356.05

354.04

350.59

0.00

Feb-11

39,795.00

DICIEMBRE 2,010

270,130.00

0.324

0.00

357.41

354.04

350.59

0.00

Mar-11

39,795.00

DICIEMBRE 2,010

247,413.97

0.324

0.00

359.92

354.04

350.59

0.00

Apr-11

39,795.00

DICIEMBRE 2,010

189,794.91

0.324

0.00

362.38

354.04

350.59

0.00

May-11

39,795.00

DICIEMBRE 2,010

953,341.36

0.324

0.00

362.29

354.04

350.59

0.00

CALCULADOS
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11

S/.

0.00
320.22
0.00
8,099.48
13,322.37
0.00
0.00

TOTAL DEDUCCIONES :

R ADELANTO ESPECIFICO PARA MATERIALES N 02

(Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))

I.U.

13

252,046.22
164,179.80
74,457.71
29,886.26
0.00
0.00
0.00

I.U.

0.00
0.00
0.00
4,049.74
6,025.86
0.00
0.00

13

17,507.50
0.00
0.00
0.00
0.00
0.00
0.00
I.U.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
13

258,348.23
170,481.80
80,759.71
36,188.26
0.00
0.00
0.00
I.U.

0.00
0.00
0.00
4,049.74
7,296.51
0.00
0.00
39

R ADELANTO ESPECIFICO PARA MATERIALES N 02

(Imr - Ima)/Imo) = Coef. Incidencia x Vo ((Imr - Ima))/Imo)


Saldo del Adelanto
por Utilizar
(10) = (9) - (4)
138,794.19
0.00
0.00
0.00
0.00
0.00
0.00

I.U.

39

39,407.21

0.00

0.00

70.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

DEDUCIDOS
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TOTAL DEDUCCIONES :

Clculo Deduccin que


No Corresponde (D)
D = (4) x (((5)-(6))/(7))
0.00
249.41
0.00
0.00
0.00
0.00
0.00

SUB TOTAL A DEDUCIR


0.00
320.22
0.00
8,099.48
13,322.37
0.00
0.00

21,742.07