Bunkering Scenarios
Confidential
Content
Bunkering Operations
Confidential
Rule Sets
ABS Rules for Building and Classing Steel Vessels (Jan. 2015)
SOURCE:
Rule Sets
ABS Rules for Building and Classing Steel Barges (Jan. 2015)
Source: Enterpriseproducts.com
Confidential
Content
Bunkering Operations
Confidential
Note:
Confidential
ABS has published on May 2011 and last updated on May 2015 a
Guide for Propulsion and Auxiliary Systems for Gas Fueled
Ships
Confidential
Confidential
Source: Wartsila
10
Stop
valve and
ESD
valve
Gas detection
and ventilation for
enclosed or semi
enclosed station
LNG SUPPLY
VAPOR RETURN
Drip trays
and
means of
drainage
to be
provided
COMM LINK/ESD
BONDING CONNECTION
CONTROL STATION
Confidential
11
Confidential
12
Content
Bunkering Operations
13
Confidential
Integrated tanks
Type A
Type B
Type C
Membrane Tanks
None in operation
New systems under
development:
Spherical (Moss)
Cylindrical
GTT No 96
Bilobe
- Aker ADBT
- LNT A-Box
- Torgy
Based on classical
ship structure
design rules
Pressure vessels,
based on pressure
vessel code
Confidential
Other Systems:
- GTT MARK V
- KOGAS KC-1
- SHI SCA-WS
- HHI LNG Membrane
- DSME Membrane
14
Membrane Type
Type B Tanks
By courtesy of GTT
By courtesy of TGE
Confidential
Confidential
By Courtesy of LNT
16
Design Pressure
Additional equipment
Operators skills
Cost
Confidential
17
Converted ferry
IGC Code
Type C tank 187m 3
No vapor return
Pressure decant
Other concepts/projects
Confidential
18
ABS AIP
2000 m3
LNG America
Photo Source: Jensen Maritime Consultants / LNG America / World Maritime News
Confidential
19
Confidential
20
10
Confidential
21
Approval-In-Principle (AIP)
General arrangement
Engine selection
Gas system equipment selection
Hazardous areas plan
LNG fuel containment type
Tank location and supporting structure
Fuel gas and ventilation systems routing plan
Bunkering operation philosophy
Confidential
22
11
Content
Bunkering Operations
23
Confidential
Notes:
Aeration/Inerting
dew point to be kept below
45 C
Gassing up
Confidential
24
12
Notes:
Confidential
25
Notes:
26
13
Warming up
Inerting
Notes:
Warming up process will
generate boil off gas. To be sent
to shore or burned
Aeration
Confidential
27
Content
Bunkering Operations
Confidential
28
14
Main Components
Courtesy: GTTNA
Transfer systems
Confidential
29
Fuel Transfer
GTT
Confidential
30
15
Loading rates
Local requirements
Exclusion zones
Hazardous area, safety zone, security zone
Simultaneous operations
Firefighting requirements
Environmental issues
Quantity
Gas properties
Confidential
31
32
16
Confidential
Covers
ESD
Receiving Ship
ESD
Confidential
Onshore supply
Truck-to-ship bunkering
Offshore supply
Ship-to-ship bunkering
34
17
ISO/TS 18683:2015
Confidential
35
The LNG in the fueled vessel will likely be at a higher vapour pressure
and temperature than the LNG bunkering vessel
Design pressure of the bunkering vessel can be lower than the design
pressure of the LNG fuel tank on the LNG fueled vessel
The LNG bunker tank normal operating pressure can be in the range of
6 barg, the bunker vessel may be operating at near atmospheric
pressure
Some sort of pressure control will be required on the vapour return line
Confidential
36
18
Confidential
37
STS Considerations
Ship compatibility
Transfer area
Environmental conditions and Navigation warnings
Cargo sloshing considerations
Electrical Isolation
STS operations Risk Assessment
Safety Issues during transfer
Emergency Response
Communications
Confidential
38
19
Confidential
39
Content
Bunkering Operations
Confidential
40
20
Flammable
Confidential
41
Safety Issues
Personnel hazard
Gas release
Liquid on deck
Overfilling
Confidential
42
21
Considerations on Safety
Confidential
43
Confidential
44
22
Personnel Training
45
Confidential
www.eagle.org
23