Platforms, Crossovers & Railings Required for Plant

(Operation & Maintenance Purpose)

Sweet Gas Cooler (Platform with railing required on both sides for operation &
maintenance purpose).
Lean/Rich Exchanger (Railing required for maintenance purpose).
Amine Cooler (Platform with railing required on both sides & at inspection
window for maintenance purpose).
Amine Reflux Condenser (Platform with railing required on both sides & at
inspection window for operation & maintenance purpose).
Hot Oil Heater Stack (Platform with railing required at Stake for Emission Test
purpose).
Dew Point Unit (LTS Skid, Platform with railing required on for operation &
maintenance purpose).
Instrument Air Compressor (Platform with railing required maintenance purpose).
Propane Condenser (Platform with railing required maintenance purpose at other
side).
Debute Overhead Condenser/Condensate Cooler (Platform with railing required
maintenance purpose at other side).
03 Crossovers on Raw Gas Metering Skid & Adam West X1 Inlet Area.
0 Crossovers required at Fire Water Pumps A & B.