sr.

no

Discription
1 layout
2 earth work
common wall
internal walls

stair base
water tank
total earth work

front wall, store wall, back wall

cabin wall

room common wall

toilet common wall

45

20

2
3
1
2
1
1
1
2
1
1
1

48
22
10
5.5
12
11
9.6
6
9
4
4.5

3
3
3
3
3
3
3
3
3
4
6.5

cement concrete in
3 foundation
4 brick work
common wall

quantity

3
3
3
3
3
3
3
3
3
4
4.5

unit
900 sqft

rate
1.35

864 cft
594 cft
90 cft
99 cft
108 cft
99 cft
86.4 cft
108 cft
81 cft
64 cft
131.625 cft
2325.025 cft

16

22

141.6

0.5

212.4 cft

2
2
2
2
2

46.5
46
45.66
45.33
45

2.25
1.83
1.5
1.08
0.75

0.5
0.5
0.5
0.5
3.5

104.625 cft
84.18
68.49
48.9564
236.25

3
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
1
1

18.5
18
17.58
17.16
16.75
9.83
9.42
9.08
8.66
8.42
12.25
11.83
11.5
11.08
10.83
9.5
9.08
8.75

0.75
1.08
1.5
1.83
2.25
0.75
1.08
1.5
1.83
2.25
0.75
1.08
1.5
1.83
2.25
0.75
1.08
1.5

3.5
0.5
0.5
0.5
0.5
3.5
0.5
0.5
0.5
0.5
3.5
0.5
0.5
0.5
0.5
3.5
0.5
0.5

145.6875
29.16
39.555
47.1042
56.53125
25.80375
5.0868
6.81
7.9239
9.4725
32.15625
6.3882
8.625
10.1382
12.18375
24.9375
4.9032
6.5625

store room front wall

pantry wall

store common wall

stair base
total foundation brick work

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

8.33
8.08
9.25
8.83
8.5
8.08
7.83
6
5.58
5.25
4.83
4.58
10.75
10.33
10
9.58
9.33
4

0.83
2.25
0.75
1.08
1.5
1.83
2.25
0.75
1.08
1.5
1.83
2.25
0.75
1.08
1.5
1.83
2.25
4

0.5
0.5
3.5
0.5
0.5
0.5
0.5
3.5
0.5
0.5
0.5
0.5
3.5
0.5
0.5
0.5
0.5
4

2
1
1
1
1
1
1
1
1
1
6

45
9.25
10
18.5
5.25
8.75
12
9
14.75
18.5
4.25

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

3.45695
9.09
24.28125
4.7682
6.375
7.3932
8.80875
15.75
3.0132
3.9375
4.41945
5.1525
28.21875
5.5782
7.5
8.7657
10.49625
64
1242.5358 cft

deduction in foundation
as per foundation beam
internal beam

column
total deduction upto DPC
total brick work after deduction
upto DPC

1117.94 cft

DPC
laying of trfelt sheet on DPC

5 brick work
common wall
toilet wall
cabin wall
room wall

50.625
5.203125
5.625
10.40625
2.953125
4.921875
6.75
5.0625
8.296875
10.40625
14.34375
124.59375

178 rft
133.5 sqft

above DPC
2
1
1
1

45
5.33
4.25
5.33

0.75
0.37
0.75
0.75

10
10
10
10

675
19.721
31.875
39.975

29
16.5
11.5

room wall
room/cabin wall
cabin/waiting wall
room/toilet wall
pantry wall
store wall
stone/front wall
porch/store wall
porch/waiting wall
total brick work above DPC

1
1
1
1
1
1
1
1
1

4
12.25
11
9.5
6
9.25
9.25
10.75
9.58

0.37
0.37
0.37
0.37
0.37
0.37
0.75
0.37
0.75

10
10
10
10
10
10
10
10
10

14.8
45.325
40.7
35.15
22.2
34.225
69.375
39.775
71.85
1139.971 cft
1414.9 sqft

1
1
1
1
1
3
1
1
1
1
1
1

5.83
5.83
3.58
3.58
3
3
4.75
2.58
6
2.5
1.66
4.75

4
2
8
3.58
6.58
6.75
6
2.41
2.58
6.75
5
6

0.75
0.37
0.75
0.75
0.37
0.37
0.75
0.75
0.75
0.37
0.37
0.37

17.49
4.3142
21.48
9.6123
7.3038
22.4775
21.375
4.66335
11.61
6.24375
3.071
10.545
140.1859
220.29 sqft

deduction

total brickwork after deduction


above ground floor slab
6 RCC WORK
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
FOUNDATION BEAM
total
lintel beam
lintel beam
lintel beam
lintel beam
lintel beam

1194.61 sqft

2
1
1
1
1
1
1
1
1
1
1
1
1
1
1

45
9.25
10
18.5
5.25
8.75
12
9
14.75
18.5
30.25
11.75
9.75
12.6
6.75

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

50.625
5.203125
5.625
10.40625
2.953125
4.921875
6.75
5.0625
8.296875
10.40625
113.25(lxb)
sqft
0.75
17.015625
0.75
6.609375
0.75
5.484375
0.5
4.725
0.75
3.796875

28.5

0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

56

footing
column
total

6
6

3
0.75

3
0.75

0.5
15

27
50.625
115.25625 cft

57.5

total RCC work

7 ground

floor roof slab

deduction
back side
front above staircase
front above staircase
total deduction

cantiliver beam

43.5

1
1
1

4.75
6.83
7.42

19.25 0.41

2.75
3
3.25

343.32375 cft
837.375 sqft

13.0625
20.49
24.115
57.6675 sqft
779.7075 sqft

11.5

0.75 0.25

2
1
1
1
2
1
1
1
1
1
1
2

40
18.5
18.5
13
5.37
18.5
8.25
8.25
18.6
12
6.5
4

0.75
0.75
0.37
0.37
0.37
0.37
0.37
0.37
0.75
0.75
4.5
0.37

1
1
1
1
2
1
1
1

3.58
5
6
7.66
3.58
3
4
2.5

8.5
3.66
7
8.5
7
2.5
5.5
6.83

6.46875

FIRST FLOOR
8 BRICK WORK
common wall
back wall
bed room wall
bedroom/bedroom wall
toilet
bed room wall
pooja room
kitchen
pooja / drwg room
drwg room wall
drwg/stair
kitchen
total brick work

10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
4

630
145.6875
71.8725
50.505
41.7249
71.8725
32.05125
32.05125
146.475
94.5
307.125
11.84
1635.7049
1774.43sqft

deduction
0.37
0.75
0.75
0.75
0.37
0.75
0.37
0.37

11.2591
13.725
31.5
48.8325
18.5444
5.625
8.14
6.31775

60
60

1
1
1
1

2.58
4.66
3.25
2.58

3.33
6
2.66
7

total-

0.37
0.75
0.37
0.37

3.178818
20.97
3.19865
6.6822
177.973418
290.73sqft

total brick work on first floor


9 ground

floor roof slab

deduction
back side
front above staircase
front above staircase
total deduction
column
cantiliver beam

1483.7 sqft

43.5

1
1
1

4.75
6.83
7.42

6
3

0.75
11.5

19.25 0.41

2.75
3
3.25

0.75
11
0.75 0.25

filling of soil
RCC stair step without slab and
support
water tank

343.32375 cft
837.375 sqft

13.0625
20.49
24.115
57.6675 sqft
779.7075 sqft
37.125 cft
6.46875
3200cft

16

34.2

1.5

cft

72 sqft

grand total

72
69
60

185

unit
sqft

amount
1215

cft

37200.4

cft

4672.8

cft
rft
sqft

32420.26
2937
1535.25

sqft

34046.39

sqft

6342

cft

6627.234

sqft

46782.45

sqft

388.125

sqft

50742.54

sqft
cft
sqft

56138.94
2561.625
388.125

sqft

13320
2000
299318.1