LRMC sets priorities in LRT-1

rehab LRMC earlier disclosed plans to


upgrade the passenger terminals,
Light Rail Manila Corp. (LRMC) on escalators and elevators and adding
Thursday said it has started lift, General Ticketing Machines
assessing the trains, substations, (GTMs), at least one Passenger
tracks, and passenger terminals LRT- Service Centre (PSC), payphones,
1 to determine the extent of work toilets, LED and plasma displays
needed to bring the commuter rail (showing the time (hours, minutes
system in tip-top shape. and seconds), date (DD-MM-YYYY),
train service information, safety
Together with the Department of messages and commercials), located
Transportation and Communication within the unpaid area of the
(DOTC) and the Light Rail Transit concourse level in the train stations.
Authority (LRTA), LRMC will work to
complete the full assessment of Line LRMC took over the LRT-1 operations
1 as soon as possible, LRMC and maintenance last September 12,
President and CEO Jesus P. Francisco 2015 as part of the concession
said in an emailed statement. agreement with the DOTC and the
LRTA for the P65-billion LRT-1 Cavite
Two weeks after taking control of the extension project under the 2011-
LRT-1 operations and maintenance, 2016 Philippine Development Plan.
LRMC has already found a few items
to prioritize. Proposed Rehabilitation of
Doroteo Jose Station
The priority is to bring back more
light rail vehicles (LRVs) on the line The improvements in LRT1 stations
to reduce the customers waiting will start with Doroteo Jose station,
time, Francisco said. the interchange terminal of LRT1 and
LRT Line 2 in Sta. Cruz, Manila.
Expanding the capacity of the trains
to lessen waiting time means Construction for Doroteo Jose station
refurbishing existing trains and is targeted to start in December
purchasing new ones to complement 2015.
the governments acquisition of new
LRVs which we hope will come as per Improvements in the two biggest
DOTC and LRTAs timetable, he stations, EDSA, Central Terminal and
added. Baclaran, and 3 smaller stations, R.
Papa, Abad Santos, and Gil Puyat will
The tracks need to be repaired to be follow in March 2016.
able to handle the higher speeds of
the new trains. We also need to The construction for the other 14
improve the condition of the rails in stations, according to Francisco, will
preparation for the time when we start in May and August 2016.
can bring the trains up to speed,
Francisco said.

1
LRMC to spend up to $200M for than 30 percent within the next 12
LRT-1 rehab months or so, Francia said.

AYALA-LED Light Rail Manila Corp. (LRMC) LRT-1, which runs through EDSA, Rizal
is buckling up to spend up to $200 and Taft Avenues, currently has a
million for the rehabilitation of the 32- recorded ridership of 750,000 passengers
year-old Light Rail Transit (LRT) Line 1 daily.
that traverses 20 stations from Roosevelt
Avenue, Quezon City to Baclaran, Pasay Meanwhile, LRMC is looking to spend
City in Metro Manila. P500 million to improve the LRT-1
stations over the next two years.
LRMC was awarded the concession to
operate and maintain LRT-1, taking over On February 11, 2016 signed a P24-
operations of the overhead train line billion, 15-year Omnibus Loan and
starting September 12, 2015. Security Agreement (OLSA) with
Metrobank, Security Bank, and RCBC,
$150 million to $200 million is the total enabling it to finance the 11.7-kilometer
rehab cost that we are looking at, said extension from Baclaran, Paraaque to
Eric Francia, president of AC Niyog, Cavite.
Infrastructure, also a wholly owned
subsidiary of Ayala Corp. which holds a On the same day, the LRMC also signed
35-percent stake in LRMC. the engineering, procurement, and
construction (EPC) contract with Bouyges
Francia told reporters in a media Travaux Publics (in charge of the civil
roundtable in Makati Friday that LRMC is works) and Alstom Transport (in charge of
currently working on the rehabilitation the electromechanical works) for the
and upgrade of LRT Line 1 to improve its public-private partnership project.
capacity to accommodate more
passengers. This work includes the construction of the
Cavite extension, as well as the
Under the 32-year contract, the Ayala-led rehabilitation of the older line which runs
concessionaire will operate, rehabilitate from the Roosevelt to Baclaran stations.
and build an extension of the LRT line to
the towns of Cavite south of Metro At least P15.3 billion of the loan will be
Manila. used for the Cavite extension, while P8.7
billion while be allocated for the
What were doing now is rehab the rehabilitation of the existing LRT 1
existing system. We are expecting to system.
increase it [capacity] some more, to more
2
Government finalizing bid terms for the approval of the final terms by the
P30-billion LRT train cars Japanese creditor.

RAILWAY operator Light Rail Manila Corp. Transportation Undersecretary for Rails
(LRMC) is moving to increase the speed Noel Eli B. Kintanar said the government
of the oldest overhead train system in will pursue the purchase of 120 train cars
Metro Manila from 40 kilometers per hour for the Light Rail Transit (LRT) Line 1 from
(kph) to 60 kph by the third quarter next a Japanese supplier, pursuant to the
year. previous administrations agreement with
Tokyo.
This, documents showed, will be made
possible with the completion of the 26.5- We are back on track and we are
kilometer rail-replacement program for working with the Japanese government to
the Light Rail Transit Line 1 (LRT 1) by accelerate the finalization of the terms,
September 2017. he said in an interview.

The project covers 21 km of rail tracks on The bidding should be launched within
the northbound route and 5 km on the the month, pending the approval of the
southbound route. These replacements terms of procurement by the Japan
will be the final phase to complete the International Cooperation Agency (JICA).
overall rehabilitation of the LRT 1s tracks
system. We still need JICAs concurrence for the
final terms, Kintanar said. We are
The Light Rail Transit Authority, the planning to launch the bidding within the
previous operator of the train system, month.
completed the first phase of rail
replacements along the southbound To recall, the bidding for the supply of
route in December 2015 on top of the 8 120 light-rail vehicles (LRVs) for the
km already replaced in previous years. oldest overhead railway line in Southeast
The replaced rails will also increase the Asia was declared as a failure earlier this
lifespan of the light rail vehicles (LRVs), year.
avoid wear and tear of the rolling stock,
and ensure the reliability of the whole Under the loan signed with the JICA, only
train system. Japanese companies are allowed to
submit bids for the multibillion-peso
This is equivalent to adding up to four to contract.
seven trains in theory, depending on
headway assumptions, the document Marubeni Corp. and Sumitomo Corp.
read. initially expressed interest to participate
in the auction for the procurement of the
Besides this, the private company new LRT train cars.
controlled by Metro Pacific Investments
Corp. and Ayala Corp.is gearing toward When procured, these 120 LRVs will be
the further augmentation of the capacity configured in 30 four-car train sets, to
of the railway system. allow the rail line to accommodate up to
about 750,000 passengers daily.
The failed auction for the P30-billion train
car-supply deal will be revived sometime The winning bidder will cover the
this month, a ranking official of the technical design of the coaches,
transportation department said, pending procurement of materials required for
manufacturing the LRVs and ensure

3
compliance with technical specifications
through testing. Mr. Chavez noted that train coach
demand in Japan is surging because of
The winning bidder will be required to building projects associated with the
submit a project management plan, 2020 Tokyo Olympics.
design and development plan, as well as
an inspection, testing and commissioning "Govt shortlists Japanese bidders
plan, in order for implementation to run for LRT-1 trains"
smoothly.
The government is seeking anew offers
The supplier will have three years to from Japanese firms for the supply of 120
complete the delivery of the new train new light rail vehicles (LRVs) for the Light
cars. Rail Transit Line 1 (LRT-1) after a failed
bidding last March.
These new train cars are needed to
complement the construction of the new Pursuant to the rules for Official
train stations in Cavite. Development Assistance (ODA) Funding,
the DOTr (Department of Transportation)
Japan-content requirement for LRT-1 is inviting eligible Engineering,
needs to fall, DoTr says Procurement and Construction (EPC)
Bidders of Japanese nationality to
THE government is looking to reduce the participate in the Competitive Bidding
proportion of Japan-sourced components process following the procedures
to be used in 120 coaches to be deployed specified in the Guidelines for
on Light Rail Transit Line 1 (LRT-1), in Procurement on the Japanese ODA Loans
order for the project to attract more for the Procurement of New Rolling Stock
suppliers. LRV (4th Generation), the department
said in an invitation to bidders.
The 30% minimum-content requirement
from Japan was set by the Japan The invitation was issued for the
International Cooperation Agency (JICA), procurement of 120 new LRVs for the
which is funding the project. LRT-1 running from Roosevelt Avenue
station in Quezon City to Baclaran station
There are few takers at 30%, Transport in Pasay City.
Assistant Secretary Caesar B. Chavez
said. If the content requirement is Under the contract, the winning bidder
lowered to 23% or 22% other suppliers would be responsible for the design,
will emerge. production, verification, delivery, testing,
commissioning, technical support
He said final terms of the JICA P30 billion materials associated with operation and
loan will be ready by years end, which maintenance of the vehicles, as well as
will pave the way for soliciting new bids training for maintenance staff, engineers
from suppliers. and operators.
When procured, the 120 coaches will be To be eligible to bid, the prime contractor
configured into 30 four-car train sets should be Japanese, while the sub-
which will accommodate up to about contractors could be of any nationality.
750,000 passengers daily.
In case the prime contractor is a joint
The first April auction for the coach venture, such would be eligible to
contract failed. participate in the bidding provided the
4
lead partner is from Japan, the other Perch Seats
partners are Japanese and/or Filipino and Seats at the ends of each train car have
the total share of work of Japanese been changed to perch seats, creating
partners in the JV is more than 50 wider standing space for commuters.
percent of the contract amount.
Platform Gap Width Reduction
The pre-bid conference is scheduled on The bottom of each doors has a frangible
Jan. 20. Deadline and opening of bids is gap made of rubber that protrudes out,
on April 13. reducing the platform-train gap. This
helps to prevent passenger accidents due
Last March, the Transportation to the platform gap.
department conducted a bidding for the
LRVs but declared it a failure as no offers Reserved Seats
were given by Japanese firms. Stickered with four eye-catching designs
that carry messages to encourage
Former secretary Joseph Emilio Abaya commuters to give up their seats to
attributed the lack of bids from Japanese those who need them more.
firms to the surge in demand of rolling
stocks in Japan as Tokyo prepares to host Wheelchair Bay
the 2020 Olympics. Two Wheelchair Bays are located in the
middle of every KSF train, at doors 12
Light Rail Manila Corp. which is and 13.
composed of Metro Pacific Investments
Corp.s Metro Pacific Light Rail Corp., The Emergency Communication Button is
Ayala Corp.s AC Infrastructure Holdings positioned lower, enabling wheelchair-
Corp. and the Philippine Investment bound passengers to gain access to the
Alliance for Infrastructures Macquarie feature.
Infrastructure Holdings (Philippines) Pte.
Ltd. bagged the P65 billon public-private Viewing Space + Emergency Exits
partnership project covering the Both ends of the train features a viewing
operations of the train line as well as space and an emergency exit.
extending it all the way to Niog, Bacoor
City, Cavite. The viewing space allows passengers to
have a view of the tunnel through the
The LRT-1s extension would cover 11.7 windscreen.
kilometers or eight new stations across
Pasay City, Paraaque City, Las Pias City The Emergency Exit Ramp will be
and Bacoor City, Cavite. deployed in an emergency.

The extended rail line is expected to help Gangway Lights


increase the capacity of LRT-1 to 800,000 Gangway Lights were installed to
passengers daily, and benefit more than illuminate the gangway area of the train
four million residents in the southwestern cars.
part of Metro Manila and of Cavite.
Overhead Hand Grips
Proposed features of BN ACEC 1st Three rows of hand grips are positioned
Generation LRV, Hyundai Precision along the aisles of the train cabins to
and Adtranz 2nd Generation LRV and provide standing passengers with
Kinki Sharyo and Nippon Sharyo 3rd increased support.
Generation LRV:
Grab-Handles at Doorways

5
Provide support for passengers boarding
or alighting the trains and for passengers
standing near the doors.

Door Closing Indicator


Red LED lights that are positioned above
each door will light up when the doors
are closing.

Train Travel Information System


The LED and LCD display panels shows
useful travel information to passengers,
such as in-train announcement texts, Now, the riding public can have the
current and next train stations which the
comfort and convenience of using the 32
train will call at.
elevators and escalators in Doroteo Jose,
Builder Plate EDSA, Roosevelt, Balintawak, and
The plate lists the companies involved in Monumento stations.
the manufacture of the train, and also
the year it was built. LRMC also upgraded Persons with
It is located at both ends of the train.
Disabilities (PWD)-compliant features,
Emergency Exits such as Braille buttons and accessibility
Emergency Exits are located at both ends of controls to persons in wheelchairs,
of the train. among other things.
The Emergency Exit Ramp will be
deployed in an emergency.
The operator partnered with original
Emergency Communication Button equipment manufacturers Schindler and
Emergency Communication Buttons are Otis for LRT 1s restoration and upgrade.
located at the side of the train doors to LRMC also recently announced the
contact the train staff in an emergency. increased number of light rail vehicles in
Passenger Communication Unit LRT-1 and its ongoing rail replacement
The Passenger Communication Unit is project for the train line.
located at the side of each train doors to
contact the train staff in an emergency. It Passenger comfort is main goal of
is positioned lower as compared to trains common-station deal
along other lines.

Restoration of LRT 1 elevators and PARTIES involved in the construction of


escalators is finally completed the long-delayed common station for the
Light Rail Transit (LRT) Line 1, the Metro
The Light Rail Manila Corporation (LRMC), Rail Transit (MRT) Line 3 and the future
the operator of the Light Rail Transit (LRT) MRT Line 7 have agreed to make
1, yesterday announced it has completed passenger comfort as the main
restoring the elevators and escalators in consideration in the crafting of the
all of the railways stations. memorandum of agreement (MOA) that
they are set to sign on Wednesday.

6
The memorandum of agreement will The common station was in limbo for a
include the details that all parties will couple of years after its conception, after
subscribe to ensure high level of service getting a stay order from the Supreme
to passengers, Transportation Court due to a possible breach in the
Spokesman Cherie Mercado-Santos original contract. SM Prime sued the
replied via text, when asked to give more previous transport officials for changing
details on the MOA that officials from the the location of the common station, even
transportation and public works with an existing naming-rights contract
departments, and executives from Ayala with the government.
Corp., San Miguel Corp., SM Prime
Holdings Inc. and Light Rail Manila Corp. While the previous administration pegged
will sign. the price of the common alignment at a
range of P1.4 billion to P2.6 billion, the
She did not elaborate, although she did final cost of the infrastructure will only be
say the main consideration in crafting the determined after the engineering and
agreement is passenger comfort. design have been finished.

We have moved forward with the When built, the common station will
designs. Basically, from the past signing, provide easy access to both malls and
we worked on all parties interests with major roads like EDSA, and will provide a
the prime consideration of passengers common concourse or atrium to facilitate
comfort, Santos said. That we have easy train-line transfer.
achieved nowall parties agreeing to a
design that puts passengers comfort at Solons decry failure of DOTr, DPWH,
prime priority. At the same time, LRTA to consult public on LRT-MRT
recognizing commitments given to them common station
by the past administration.
Members of the House committee on
Last September 28 all the parties Metro Manila development decried the
agreed to construct the common failure of the Department of
alignment for the LRT Line 1, the MRT Transportation (DOTr), Department of
Line 3 and the future MRT Line 7 placing Public Works and Highways (DPWH) and
it at the Annex of SM City North EDSA the Light Rail Transit Authority (LRTA) to
and Trinoma Mall. fully inform and consult the general
public about the deal creating a common
Transportation Secretary Arthur P. Tugade station between The Annex at SM City
is happy about this development, which North EDSA and Ayala Lands Trinoma
was not an easy task. Were happy Mall, linking LRT-1, MRT-3 and the
and proud we have managed to get proposed MRT-7.
everyone on a platform of level of service
to passengers, Santos said. The lawmakers expressed their
disenchantment during a recent hearing,
just days before the signing of the
7
Memorandum of Agreement (MOA) recurrence of similar problems of railway
between top businessmen and the transits in the future.
government on the building of an LRT-
MRT common station between The Annex Rep. Arnolfo A. Teves, Jr. (3rd District,
at SM City North EDSA and Trinoma in Negros Oriental) questioned the priority
Quezon City. The project will begin this of the DOTr, saying its focus should be on
December and expected to be completed the commuters rather than the
by April 2019. companies involved.

During the hearing presided by Rep. Manual Luis T. Lopez (1st District,
committee chairman Rep. Winston Manila) noted the two big names, Ayala
Winnie Castelo (2nd District, Quezon and Sy, appear to be a consideration in
City), the lawmakers scored the lack of the agreement. While the decision about
consultation by the DOTr, DPWH and the the common station falls on the
LRTA with the representatives of the executive, Lopez said the representatives
affected district and barangays, and of the people should have been
various citizens groups. consulted first by the government
agencies concerned.
The committee members even moved to
urge the three agencies to defer the MOA Minority Leader and Quezon Third District
signing until all concerned sectors shall Rep. Danilo E. Suarez said the common
have been consulted. station should be situated in an area
easily accessible to commuters. He noted
Timothy John Batan, DOTr project the one-page document presented by the
manager for rail transportation, said a DOTr on their proposal is not the same
Memoradum of Understanding (MOU) plan that was agreed upon three
was reached last September 2016 Congresses ago.
between the three government agencies
and the four stakeholders namely, the Rep. Vincent Bingbong P. Crisologo (1st
Ayala-owned North Triangle Depot Dsitrict, Quezon City), whose district
Commercial Corp., SM Prime Holdings, covers the area for the common station,
Light Rail Manila Consortium (LRMC) and said that focus for the common station
Universal LRT, Corp. (ULC), providing that construction is not on the welfare of the
an agreement to sign on January 18, commuting public but on the big
2017 a MOA on the area for the common businesses fighting over the right to
station. construct and secondly, on the area for
the common station.
Castelo said the agencies concerned
should have consulted all stakeholders. This is the first time Ive heard of an
He requested for a copy of the agreement supposedly reached between
agreement for further study and so that the agencies and stakeholders. How can
allegations relative to the construction that be when as representative of my
will be clarified. Moreover, this will avoid constituency, who will be affected by this
8
plan, I was not even consulted? said EDSA; SM paid the government P200
Crisologo. million for a deal that included naming
rights. However, when the Aquino
In a letter sent to Rep. Bernadette C. administration began, in 2010, the new
Herrera-Dy (Party-list, Bagong officials had second thoughts about the
Henerasyon), representatives of different plan and in 2014 decided on a new site
barangays surrounding the construction closer to Trinoma mall of Ayala. SM
area also opposed the building of the immediately went to court and obtained
common station due to several factors, a temporary restraining order from the
among them sewerage, garbage, traffic Supreme Court.
and pollution problems, which would be
set them once construction begins. There the matter rested for the next
three years until last January 18 when
Rep. Jose L. Atienza, Jr. (Part-list, Buhay) agreement was reached by all the
proposed that the committee be interested parties SM Prime Holdings,
furnished with a copy of the MOU for Ayala, the Department of Transportation
further study of the common station. (DOTr), the Department of Public Works
and Highways (DPWH), the LRT Authority,
Reps. Lopez, Jesulito A. Manalo (Party-list, the Light Rail Manila Corp., San Miguel
Angkla) and Rodel M. Batocabe (Party- Corp., and North Triangle Depot Corp.
list, Ako-Bicol) also motioned for the
committee to urge the concerned As agreed upon, the common station will
agencies, particularly the DOTr, to defer be built on a site between the two malls;
the MOA signing until all stakeholders, this apparently takes care of the original
including Congress, have been consulted dispute over its location. There will be an
first. / CM Area A, the platform and concourse for
LRT 1 and MRT 3, to be constructed by
A traffic plan for the common station the DOTr; an Area C for MRT 7, to be built
project by San Miguel; and an Area B connecting
Areas A and C, to be built by an affiliate
In 2009, it was decided that a common of Ayala Land. The total cost of this
station be built to allow travelers using Public-Private Partnership project is
Metro Manilas two main train systems expected to be P2.8 billion. Construction
the Light Rail Transit (LRT 1) and the is to begin in December and is expected
Metro Rail Transit (MRT 3) move from to be completed in April, 2019.
one system to the other. A third line from
San Jose del Monte in Bulacan MRT 7 Once completed, the common station will
will eventually connect to the two be serving millions of commuters daily. It
lines. is hoped that it will facilitate travel by
train around Metro Manila, thus lessening
The original plan was to build the road traffic and easing the traffic jams
common station on Epifanio delos Santos that have long plagued Metro Manila. The
Ave. (EDSA) right in front of SM North street-level area below the common
9
station will continue to serve trucks, partnering to implement major projects
buses, and private cars. involving railways, bridges, roads,
airports and green city developments.
There is some concern, however, about
traffic in the area during the two years Manila-Clark Railway, a major project of
that the common train station is under the Department of Transportation (DOTr)
construction. Even now, that confluence when completed would guarantee one
of EDSA and North Avenue is one of the hour travel from Metro Manila to Clark
busiest parts of the highway. When the International Airport. The other DOTr
tractors, earthmovers, cement mixers, projects are Metro Manila Bus Rapid Train
and trucks bearing steel and other System, regional airport and Roll-on/Roll-
construction materials start moving in, off development projects
the area will be one of the busiest traffic
sites in Metro Manila. The Mindanao Railway which is targeted
to start construction this year would
The House of Representatives wants to mean a two-hour travel time from Davao
review the agreement to ensure that the to Surigao and Cagayan de Oro (CDO).
project will truly benefit the people and The railway system would connect major
not just the business concerns that cities such as CDO, Iligan, Zamboanga,
signed the agreement last week. It is only Butuan, Surigao, Davao, and General
proper that Congress will look into the Santos.
project to ensure that it is truly worth the
P2.8 billion that it has appropriated for it. Projects under Bases Conversion and
Development Authority (BCDA) include
When it holds its hearings, we urge that the Clark Green City, Clark International
the congressmen also look into the Airport new terminal building, Bonifacio
possible havoc on traffic that the project Global City (BGC) to NAIA Bus Rapid
may cause during the construction Transit (BRT) system and Subic-Clark
period. A special effort must be made to Cargo Railway project. The railway
draw up a plan to ensure continued project is seen as a long-term solution to
smooth traffic as smooth, anyway, as it highly congested traffic in Metro Manila
is today during the two long years that by providing a more viable option (than
work on the common station is underway. trucks) for moving goods into and from
the capital.
Build. Build. Build.
Department of Public Works and
THE DUTERTE administration is expected Highways (DPWH) projects which aim to
to launch big ticket infrastructure address traffic and flooding include Santa
projects to drive economic growth in the Monica-Lawton- BGC linkbridge; UP-
next five years. Miriam-Ateneo Viaduct; NLEX-SLEX
connector road; Iloilo-Guimaras-Negros-
Build, build, and build. Under this mantra Cebu link bridge and Davao City bypass
several government agencies are construction project.
10
Construction of SMCs Metro Manila
These projects are expected to be Skyway (MMS) Stage 3 and MRT Line 7
completed in the next three to five years. project is ongoing.

Infrastructure spending reached 5.4 The MRT 7 is a 22 kilometers elevated


percent of Gross Domestic Product (GDP) railway which will have 14 stations from
this year higher compared to five Edsa (connected to MRT 3) to San del
previous administrations. The Marcos Monte, Bulacan. It is expected to be
government spent 3.2 percent, Corazon finished by 2020.
Aquino, Ramos and Estrada spent 2.2
percent, Arroyo 1.9 percent and Aquino The MMS or Skyway Stage 3 is 14.82 km.,
administration spent 2.9 percent. six-lane elevated expressway from
Buendia to Balintawak that will link the
According to International Monetary Fund South Luzon Expressway (SLEX) to NLEX
(IMF), a sustained increase in public was 19 percent completed as of
infrastructure spending to 5 percent of November, last year.
GDP would add a total of 5 to 6 percent
growth to GDP after 15 years. Megawide Construction Corp.s three
projects which include Southwest
Aside from these projects, NEDA has Terminal of the Integrated Transport
cited several projects worth P200 billion System, Mactan Cebu International
have been lined-up for approval including Airport and PPP for School Infrastructure
North and South railway up to Bicol and Project (PSIP) are under construction.
the Cebu Port. Three other projects are in
agriculture. Southwest Terminal of the Integrated
Transport System (ITS), started in the
Public Private Partnership (PPP) fourth quarter last year has been
targeted for completion by 2018.
Eleven major infrastructure projects
under the PPP which were carried over As of October, last year, PPP Center said
from the previous administration are the MCIA passenger terminal is 35.19
expected to be completed and be percent completed and expected to be
operational before the end of Duterte completed in the next three years.
administration.
The MPIC Group also has three major
Conglomerates San Miguel Corp, projects in the pipelineLRT 1 extension
Megawide Construction Corp. and Metro to Cavite, Cavite-Laguna Expressway and
Pacific Investment Corp. (MPIC) and Ayala NLEX-SLEX connector road.
Corp. projects under construction and
pre-constructions stage are expected to MPIC said Calax construction will start in
be finished in the next three to five the first half of this year, while the NLEX-
years. SLEX connector road is expected to begin
construction this year if the government
11
would be able to turn-over the right of
way for the phase 1. The DPWHs P 122.8 Billion Laguna
Lakeshore project is expected to go back
Light Rail Manila Corp., a consortium of to the conceptualization stage. The
MPIC and Ayala which operates LRT1, agency is considering revising the bid
said that construction of the LRT term and securing a new NEDA approval
extension to Cavite will start in the after last years failed bidding.
second quarter.
As of December, last year, four projects
The Duterte administration is keen on worth P 31.77 billion have been
continuing the bidding on PPP projects completed and are operational. These
left by the previous administration. include Muntinlupa-Cavite Expressway,
PPP for School Infrastructure project,
Last week, DOTr has started the bidding Automated Fare Collection System
of five unbundled regional airports (AFCS), and NAIA Expressway Phase II.
namely, Bacolod-Silay airport for P 20.26
billion, Davao airport worth P 40.57 Telecommunications
billion, New Iloilo airport for P 30.40
billion, Laguindingan for P 14.62 billion, The Department of Information and
and New Bohol (Panglao) worth P 4.57 Communications Technology (DICT) has
billion . submitted a proposal to President
Duterte to build a national broadband
The Ninoy Aquino International Airport infrastructure using the fiber-optic cable
(NAIA) Development project budgeted at network of the National Grid Corp. of the
P 74.56 billion was approved by NEDA Philippines (NGCP) with the goal of
last September and is expected to be bid delivering fast internet to unserved and
out this year. Several conglomerates underserved areas in the country
have already expressed interest.
DICT is optimistic about implementing
For the project, the private partner will the project in three years using the
improve, upgrade and enhance the privately-owned NGCPs 5,000 to 10,000
operational efficiencies of all existing fiber optic cable running from North to
terminals of the NAIA covering both South. This could allow the government
landside and airside, except air traffic to deploy broadband internet in the
services. government agencies in the countryside.

Other projects still lined up for bidding A National broadband plan, which would
include Light Rail Transit (LRT 2) ideally address the issues of high cost
operation and maintenance, regional and slow internet connections, would be
prison facilities, LRT Line 6 rail extension submitted for approval.
to Dasmarinas Cavite, Road Transport
Information Technology Infrastructure
among others.
12
DICT is looking at partnerships with contractor and all countries and areas in
private sector to help finance the project case of the sub-contractors.
rollout.
The winning bidder will cover the
The project is estimated to cost from P 77 coaches design, production, verification,
billion to P 200 billion if the NGCP would delivery, testing, commissioning,
allow the government the use of the land technical support materials associated
and fiber network to deliver broadband. with the operation and maintenance of
This cost would be higher if the the vehicles and training for maintenance
government would build its own staff, engineers and operators.
infrastructure.
The agency said the submission and
8 firms vying for P30-b LRT car opening of bids would take place on April
contract posted January 30, 2017 at 13.
09:15 pm by Darwin G. Amojelar
The 120 LRVs will be configured into 30
Eight local and foreign companies are four-car train sets to allow the rail line to
vying for the P30-billion contract to accommodate up to 750,000 passengers
supply 120 brand-new light rail vehicles daily.
for the oldest metro rail transit in
Southeast Asia. The Transportation Department in March
last year declared the bidding for 120
The Transportation Department identified LRVs a failure after no offers were
the eight bidders for the Light Rail Transit received by the agency from Japanese
Line 1 contract as Metro Builders Corp., companies.
Construcciones y Auxilliar de Ferrocariles
of Spain, GE Corp. of the US, Sojitz Corp., Marubeni and Sumitomo earlier
Mitsubishi Corp., Marubeni Corp. and expressed interest to participate in the
Sumitomo Corp. of Japan and Hyundai auction for the procurement of 120
Rotem of South Korea. brand-new cars for LRT Line 1.

Bidding will be conducted through The government allocated P30 billion for
procedures in accordance with the the 120 new coaches for the LRT Line 1
applicable guidelines for procurement under the P64.9-billion LRT Line 1 Cavite
under Japanese ODA loans and is open to extension project, which was awarded to
all bidders from eligible source countries Light Rail Manila Corp.
as define in the loan agreement, the
agency said. LRMC will construct the Cavite extension
over the next four and a half years,
The Transportation Department said the making the entire line operational by the
eligible nationality of the suppliers should fourth quarter of 2020.
be Japanese in case of the prime

13
LRMC, a joint venture between Ayala the Station Improvement Project is
Corp. and Metro Pacific Investments another significant component to
Corp., has been operating and improve the efficiency of the LRT-1
maintaining the existing LRT-1 system system for the safety, comfort, and
since the functions were handed over by convenience of around 450,000
Light Rail Transit Authority in September passengers daily across all 20 stations.
2016.
The Station Improvement Project covers
LRTA remains the regulator of the railway the redesign, structural repair,
while the Transportation Department is replacement of lighting fixtures,
the implementing agency of the 32-year repainting, restoration of elevators and
public-private partnership concession escalators, and general cleaning of LRT-1
agreement with LRMC. stations. Refurbishment of Doroteo Jose
began in December 2015. Other stations
The consortium would spend over P40 have since followed, including EDSA,
billion to rehabilitate and expand LRT Central Terminal, Gil Puyat, Pedro Gil,
Line 1. United Nations, R. Papa, and Jose Abad
Santos.
Eight new stations will be provided with According to Singson, the stations need
three intermodal facilities across Pasay to be able to handle the current demand,
City, Paraaque City, Las Pias City and resulting from operational and
Bacoor City, Cavite. engineering efficiencies in progress since
the company assumed operations and
LRMC to inaugurate new LRT-1 maintenance of the system on
Doroteo Jose station September 12, 2015.

Light Rail Transit 1 (LRT-1) operator Light Along with the inauguration of the new
Rail Manila Corporation (LRMC) will Doroteo Jose station, LRMC is also set to
inaugurate on Monday, February 6, the open the LRT-1 exhibit that pays tribute
improved Doroteo Jose Station which will to National Artist for Architecture,
serve a daily average of 27,000 Architect Francisco Bobby Maosa.
passengers interconnecting to LRT-2. Maosa designed the LRT-1 stations in
the early 1980s, during the time of the
Doroteo Jose station is the pilot for the train lines construction.
companys P500-million Station
Improvement Project, which includes the The exhibit is LRMCs way of honoring
enhancement of passenger exchange LRT-1s design legacy as well as
and the advertising environment. educating the public on LRT-1s roots. It
will feature the design sketches of
According to LRMC President and Chief Architect Maosa, a scale model of the
Executive Officer Rogelio L. Singson, train, and news clippings and other
With the increased number of light rail information which were culled from the
vehicles and additional commercial trips, collection of the National Artist himself.
14
15
16
17
18
19
20
21
22
23
LRT Line 1 North Extension Project Common Station

24
25
The Department of Transportation (DOTr) SM Prime Holdings Inc. president Hans
and the private sector stakeholders on Sy, Universal Light Rail Corp. BV Ltd.
September 9 agreed to build the MRT-LRT chairman and president Ramon Ang,
common station between SM North EDSA Light Rail Manila Corp. vice chairman
and TriNoma in Quezon City. Manuel Pangilinan and North Triangle
Depot Commercial Corp. represented by
The common station will connect the LRT Ayala Land Inc. vice chairman Jaime
Line 1, the MRT Line 3 and the yet-to-be- Augusto Zobel de Ayala.
constructed MRT Line 7.
Tugade said the completion of the
The groundbreaking for the project is set common station is expected in two and a
for the end of the year once its half years.
engineering design was finalized among
its stakeholders. Completion is between We have come to an agreement, a
two and a half to three years after the groundbreaking, assuming the doables
ground breaking. are done, the architectural and
engineering designs are done and agreed
The Common Station will enable upon, hopefully we can ground break
commuters to transfer from one line to before the end of this year, he said.
another. Thus, it is part of our vision to
establish an interconnected and inter- The signatories vowed to work together
operable transportation system in the to resolve all pending issues on the
country, DOTr Undersecretary for Rail common station to link the three railways
and Toll Roads Noel Kintanar said in a in Metro Manila.
press conference.
LRT-1, currently operated and managed
The common station linking the by LRMC comprised of Metro Pacific
upcoming Metro Rail Transit Line 7 to the Investments Corp., Ayala Corp. and
Light Rail Transit Line 1 and Metro Rail Macquarie Infrastructure Holdings
Transit Line 3 will be located between (Philippines) Pte. Ltd., runs from
The Annex at SM City North EDSA and Roosevelt station in Quezon City to
Landmark-Trinoma malls in the vicinity of Baclaran station in Pasay City, LRT-2 runs
EDSA and North Avenue, according to an from Santolan station in Pasig City to
agreement signed yesterday between the Recto Avenue station in Manila, while
government and major conglomerates. MRT-3 spans North Avenue station in
Quezon City to Taft Avenue station in
Pasay City.

MRT-7 being built by San Miguel Corp.


subsidiary ULC will cover EDSA corner
EDSA corner North Avenue in Quezon
City to Araneta-Colinas Verdes
Subdivision, City of San Jose del Monte in
Bulacan.

An example of which is that of the LRT1-


MRT loop, which to this day, despite
being inaugurated in February 2010
under her Beat the Odds program,
Signing the agreement were remains pending. Pending because of a
Transportation Secretary Arthur Tugade, common platform dispute and the

26
changing of the rules in the middle of the savings in construction cost and
ballgame, as some would say. convenience to passengers.

Construction of the common station was The agreement stated LRTA would not be
supposed to be completed back in May obliged to return the P200 million
2010 but disputes over cost, engineering payment to SM.
issues and naming rights caused a delay
that continues to this day. Even if the In exchange, therefore, DOTr and LRTA
physical infrastructure connecting the acknowledge SMPHIs naming and
two rail systems are in place and interconnectivity rights to the unified
successfully tested, commuters have to station, as provided in the SMPHI MOA
go down at the Roosevelt Avenue station dated Sept 28, 2009, the term sheet
of LRT-1 and walk over or take a tricycle read.
or jeepney for the one kilometer distance
to the Trinoma terminal of MRT-3. Sy said SM is open to working with the
other stakeholders on how to resolve the
They will also work on a timetable for the naming rights.
design preparation, construction and
commissioning of the common station. We agreed to support the whole thing.
In terms of the naming, we have not
After the signing of a more definitive reached that point, he said. We are
agreement/s among the stakeholders, open to see how we can resolve that.
SMPHI, the DoTr and the Light Rail Transit Eventually, as we work out the details,
Authority will forge a compromise we will resolve that issue also.
agreement which will determine the filing
of a Joint Motion for Judgment to pave the Pangilinan said he is hopeful the common
way for the development of the common station would be realized as soon as
station for the three railways and have possible.
the temporary restraining order of the
Supreme Court in 2014 lifted. Ayala said the group supports the move
to resolve issues on the common station,
SMPHI sought for and obtained a TRO a critical component and junction of the
from the SC to prevent the transportation three railway systems to come together.
and communications department, then
headed by Joseph Emilio Abaya, from To select an efficient site for the common
transferring the common station near the station, the authorities must consider:
Ayala Groups Trinoma mall from SM City Ridership population served; System
North EDSA mall. components (line alignment, station
locations, station design, etc.); Existing
SM had entered into an agreement with infrastructures; Station amenities
LRTA on September 28, 2009 to put up a (sheltered space, ventilation, ticket
common station near SM City North vending, etc.); Journey amenities (on
EDSA. board comfort i.e. emergency exits,
seating and standing capacities, seat
SM also secured naming rights to the design, etc.); First mile and last mile
common station following its payment of transportation service (bus, jeep taxi,
P200 million. tricycle); Vicinity lighting, public security
and local government CCTVs; and Station
Abaya wanted to move the common vicinity commerce (malls, supermarkets,
station near the Trinoma mall, citing groceries, etc.)

27
Party-List Rep. Calos Isagani Zarate of It should be remembered that the
Bayan Muna has called for an inquiry into compromise agreement of constructing
the decision of Transportation Secretary two terminals arose from former
Arthur P. Tugade to adopt a plan hatched Secretary Abayas highly anomalous,
by his predecessor for the common lackadaisical and patronage-driven
unified station of LRT Lines 1 and 2 and decision to scrap the original and
MRT 7 in Quezon City. commuter-convenient Integrated Rail
Terminal in front of the Annex at SM City
Zarate said the proposal was hatched by North EDSA. Instead, former Secretary
former Transportation and Abaya transferred the location of the
Communications Secretary Joseph Emilio project to TriNoma, as one of the
A. Abaya, in an apparent attempt to supposed sweetheart concessions given
appease competing business interests, to the Ayala-led Light Rail Manila
but is viewed by many to be Consortium (LRMC) under the P64-billion
disadvantageous to public convenience LRT Line 1 Cavite Extension, Operations
and interest. and Maintenance Project. Upon inclusion
of the common station in the public-
In House Resolution 470, Zarate asked private partnership (PPP) contract,
the Committee on Transportation to look responsibility in operating and
into the decision of Tugade to adopt maintaining the common station was also
Abayas proposed compromise transferred to the private concessionaire.
establishing two rail terminals, or the Thus, it is not coincidental that Ayala
Line 1, Line 3 and Line 7 unified station Corporation wanted the common station,
between The Annex at SM City North for all its revenue potential, to be near its
Edsa and TriNoma in Quezon City. very own TriNoma Mall. After all, DOTC
[Department of Transportation and
Just when the public thought that the Communications] justified the transfer as
common-station issue shall be resolved a complement with Ayala Corp.s North
in a way that is most beneficial, Triangle Development Plan, creating a
convenient and efficient to them commercial business district in the North
through the construction of a grand Triangle, Zarate explained.
central terminalTransportation
Secretary Art Tugade merely retained He also noted that current Transportation
then-Transportation and Communications Undersecretary Noel Kintanar was part of
Secretary Abayas compromise the LRMC Board before and was an
agreement: The clearly inefficient executive in various capacities at the
construction of two rail terminals Ayala Corp., the owner of TriNoma.
between The Annex at SM City North
EDSA and TriNoma. Kintanar is involved in the negotiations to
transfer the original location of the
Zarate said the Department of common station to TriNoma, Zarate said.
Transportation (DoTr) and major
conglomerates involved in the operations Many have assailed the transfer, and
of the rail lines recently agreed to even the current design since the original
establish a unified station, composed of design of the tri-station is more efficient,
two terminals (the LRT 1/MRT 3 transfer because it is designed as a grand central
station and the MRT 7 transfer station) terminal that neatly connects the three
and two common concourses, which shall lines in one place. The original plan also
serve as walkways that would connect took into consideration the plane of the
the two terminals. Department of Public Works and
Highways EDSA-North, West and

28
Mindanao Avenues Interchange, the After years of squabbling, feuding, and
lawmaker argued. meetings, Ayala, SM, and DoTr will sign
the deal to build the LRT-MRT common
Zarate pointed out that the Aquino III station at North EDSA. The signing will be
administration could not even give at done on neutral ground on Jan. 18.
least a convincing justification as to the
necessity of the transfer and stressed Not only will the linkup be of great
that during the plenary deliberations of convenience to commuters, it will also
the 2016 National Budget, former Party- mean saving the Veterans Memorial
list Rep. Neri Colmenares of Bayan Muna Medical Center from predators with an
compelled Abaya to admit that no eye on carving up the patch of green that
feasibility study was conducted with is Quezon Citys last remaining forest-in-
regard to the common-station project the-city. VMMC was snatched from the
transfer. jaws of death by the May 2016 elections,
and just in the nick of time, as there was
He warned that should the proposed no more time for the then DoTC and DND
unified station be built, commuters would to turn it over to private developers for
have to endure the same experience in what was euphemistically called a
the highly inefficient LRT 2-MRT 3 transportation hub. That project was
intersection, whereby commuters have to supposed to help commuters whod then
walk half a kilometer just to transfer from be able to change trains without walking
the terminal near Farmers Market (MRT a mile, but veterans of wars and their
3s location) to Gateway Mall (LRT 2 dependents, hospital staff, nurses and
terminal location), and vice versa. doctors, plus two former Presidents (FVR
and GMA) and some legislators, not to
Former Transportation and mention the most ordinary of citizens
Communications Secretary Manuel Roxas (including golfers) were up in arms
II, instead of building a central station in against the idea. The hub wouldve
Cubao, opted and approved for the added to the traffic slowdowns spawned
construction of two different terminals, by the two malls and the access road to
instead of one bistation, to the detriment NLEX.
of commuters, Zarate noted.
So, when Transportation Secretary Art
It is clear at the onset that the Tugade announced Tuesday that finally
compromise agreement is not primarily the signing will be done in a hotel owned
for the convenience and interest of the by neither the Sys nor the Ayalas, the
commuting public, but to merely appease question had to be asked: Will DoTr
competing business interestsand now revive the transportation hub? His reply
the DoTr under Secretary Tugade is was an unequivocal no and his own
carelessly adopting it. question, Hub?

The project will also involve construction It will be two and a half years before the
of head-to-head platforms for LRT 1 and common station is built and commuters
MRT 3 at EDSA with a 147.4-meter will enjoy the ride, so to speak.
elevated walkalator to MRT 7 on North
Avenue, near the SM City North EDSA The Department of Transportation (DOTr)
Skydome and also, the additional power is signing a more definitive deal with big
station and expansion of stabling yard / conglomerates today on a common
storage yard at the MRT-3 underground railway station that will link three major
office and train depot. elevated train lines traveling through
Quezon City.

29
of level of service to passengers, she
The DOTr said Tuesday that a added.
memorandum of agreement would be
sealed with SM Prime Holdings Inc., San The signing is seen as the next milestone
Miguel Corp. and Light Rail Manila Corp., after the stakeholders came together on
operator of the Light Rail Transit (LRT) Sept. 28 last year to broadly agree that a
Line 1 jointly owned by Metro Pacific common station would be built on a
Investments Corp. and Ayala Corp. property between The Annex at SM City
North EDSA and Ayala Land Inc.s
Also, joining the signing event are Trinoma shopping mall.
officials from the Department of Public
Works and Highways and the state-run That September 2016 memorandum of
Light Rail Transit Authority. understanding, which was short on
details, was nevertheless a welcome
DOTr spokesperson Cherie Mercado said development under the current
the parties were able to proceed with administration.
todays event after the common stations
design was finalized. It followed a multiyear legal quarrel
between the Aquino III administration-led
We have moved forward with the transportation and communications
designs. Basically, from the past signing, department and the SM Investments
we worked on all parties interests with Corporation, which sued for breach of
the prime consideration of passengers contract.
comfort, Mercado said in a text
message. Under that plan, a single railway station
would serve as a transfer point between
She said the agreement would likewise the LRT-1, Metro Rail Transit (MRT) Line 3
recognize commitments made under the and the MRT-7, which was expected to be
previous administration. completed by 2020. LRT-1 and MRT-3
already handle close to a million
Were happy and proud we have commuters a day.
managed to get everyone on a platform

Common Station Layout

30
The EDSA Wing using the LRT-1 Station below the Landmark Expansion and MRT-3
platform will be utilizing the existing North Avenue Station of MRT-3 with Footbridge
fronting Raberly U.K. Center and 937 Philam / The Annex while the old Landmark will
bridge towards the Vertis North Bus Terminal (Gateway to Northern and Central Luzon),
which shall be built in the area you might be seeing now from the Mindanao Parking view
towards Agham road.

31
LRT Line 1 Cavite Extension

The current LRT Line 1 will be extended starting from its existing Baclaran Station to the
future Niyog Station in Bacoor, Cavite which is approximately 11.7 kilometers. Of this
length, 10.5 kilometers will be elevated and 1.2 kilometers will be at-grade. The whole
stretch of the integrated LRT 1 will have a total length of approximately 32.4 kilometers
and will be operated and maintained by the private proponent.

The private partner will undertake the design, construction, and financing of the Cavite
Extension as well as the operation and maintenance of the integrated system upon
completion of the project. The concessionaire will also undertake future system
maintenance and upgrades as well as permitted commercial development.

The "pre-construction" activities (e.g. clearing of ROW, resettlement of affected settlers,


surveying, etc.) since last year. The actual construction will start by February 2017, next
month, actually.

32
The current status of each station and the main points is shown in Table 3.1-1.

Location Characteristic
Baclaran This station is the terminal station of
Station existing Line-1 and is located in center of
Pasay City. Commercial facilities such as
street vendors in front of the station area
is concentrated and congested with
shoppers, jeepneys, and buses. (photo 1)
near 0k600m In the vicinity of this area has a large
church and commercial facilities, it is a
district within a large number of people
gather. Road width is approximately
15m. The bus terminal from the southern
Manila regions near the crossing with
ROXAS BOULEVARD, and it is very
crowded with people or automobile
traffic. Orbit on the part of this
intersection is a sharp curve of radius
100m.
Redemptorist This station is located in the coastal strip
Station of Paranaque City, facing the ROXAS
BOULEVARD and the development area
of the along coast. This station is also
located at the entrance of the ASEANA
BUSINESS PARK currently in
development. (photo.3)
near 1k+500m The route on the waterway is located
between the landfill of coastal and
ROXAS BOULEVARD. On the route is not
particularly large obstacle and the route
have a lot of straight line.
MIA Station This station is located in the front of the
UNIWIDE COASTAL MALL, facing the
ROXAS BOULEVARD. The station is also
close to NINOY AQUINO INTERNATIONAL
AIRPORT and that place is the
intersection of a great deal of traffic on
wide road. (photo.4)
near 3k+000m The route on the waterway is located
between the landfill of coastal and
ROXAS BOULEVARD. The route is a
straight line mostly and there is no big
obstacle in particular.
Asia World This station is located in the coastal strip
Station of Paranaque City, facing the ROXAS
BOULEVARD. This station is also located
at the entrance of the ASEANA BUSINESS
PARK currently in development. (photo.5)
near 3k+800m The route passes over the ROXAS

33
Location Characteristic
PARANAQUE RIVER. The route passes
along the river and the characteristics of
the route is that have a s-shaped curve
that have two consecutive curves of
radius 100m in interval of approximately
900m. (photo.6)
Ninoy Aquino This station is located in the downstream
Avenue Station part of a Paranaque river, and is
connected to south Ninoy Aquino Avenue
from Ninoy Aquino International Airport.
The circumference of this station is an
area with many traffic and residential
sections.
near 5k+000m The route passes over the Ninoy Aquino
Avenue from a Ninoy Aquino station and
is extended to south. There is sufficient
space for building a LRT structure on a
road and the route resembles a straight
line. The route passing through the
bottom of the road that are planned for
the future near the Dr. Santos station is
planned. (photo 7)
Dr. Santos This station is located in the southwest
Station part of Paranaque City and is located in
the west side of the large-sized
supermarket SM CITY SUCAT which faced
as C5 EXTENSION. There are plans to
collocated bus terminal as intermodal
facility in front of the station. near
7k+000m The route will be extended to
over the C5 Extension street from the Dr.
Santos station. This three-lane street is a
new road. This street has many straight
lines and the visibility is good.
Manuyo Uno This station is located in the northern
Station end of Las Pias City and has been
(Future) planned construction to over the C5
Extension street in the future. There are
plans to develop a residential district on
the east side of this station.
near 8k+000m The route turns west along the C5
Extension street and to reach the Las
Pias station. There are two small
waterways in the middle but it is
considered there is no problem. (photo.9)
Las Pinas This station is located in the
Station northwestern part of Las Pias City and
planed near the QUIRINO AVENUE.
Housing, university or church along the
road are concentrated in this area.
34
Location Characteristic
near 9k+000m As it approaches the coast, the route
passes through the district waterways
and wetlands often. Some current landfill
is progressing well and the route parallel
to CAVITE EXPRESSWAY (CAVITEX) at
vicinity 500 meters short of the ZAPOTE
station.
Zapote Station This station is located in the northern
end of the Bacoor region in CAVITE
Province, close to the CAVITE
EXPRESSWAY (CAVITEX). Although the
swamp spreads out now, there is a plan
to build stations, a depot, and a
intermodal facility (bus terminal) there.
near The route intersects over the
10k+000m interchange of the CAVITE EXPRESSWAY
(CAVITEX). Furthermore, it passes near
the small-scale seaport and toward
Talaba region. There are many small-
scale rivers and ponds in this area.
Talaba Station This station is located at the northern
(Future) end of Bacoor City in CAVITE Province.
This area is a relay point of the road
leading to western Bacoor City from
CAVITE EXPRESSWAY (CAVITEX) and
there is some old residential area. near
11k+000m This route passes over the
road leading to the Bacoor region. There
is heavy traffic in the street and space is
wide.
Niyog Station This station is located in the
northern end of part of Bacoor City
in CAVITE Province. The station is a
turning point of the road leading to
a southern Bacoor region and a
Dasmarias region. Intermodal
facility (bus terminal) adjacent to
this station is planned to construct.
The residential section and
university along a street are near a
station. (photo 12)

35
36
Current Route Condition (1 and 2)

37
38
Figure 3.1-8 Alignment near Paraaque River

39
Location of Niyog station

Location of Satellite Depot

LRT-1 map
LRT 1 expansion line set to start in Light Rail Manila Corp., a consortium led
March by Ayala Corp. and Metro Pacific
Investments Corp., said Monday it
expects to start the construction of the
40
Light Rail Transit Line 1 Cavite extension LRMC said as of end-December 2016, it
project by early March. was able to deploy up to 100 light rail
vehicles or 30 trains per day. This was
As committed, we are ready to ground up from only 77 in September 2015,
break by late February or early March, when the company assumed operation
LRMC president and chief executive and maintenance of the train line.
Rogelio Singson told reporters.
It said with more LRVs serving a daily
Singson said the company expected to average of 420,000 passengers and
complete the construction of the project through the implementation of effective
by 2020 or 2021. management strategies, the time for a
train to complete a loop improved from
LRMC earlier won the P65-billion LRT Line 118 minutes to 108 minutes.
1 extension project, with a premium bid
of P9.35 billion in September 2014. LRT-1 Cavite extension set

LRMC is a responsible for the The Light Rail Manila Corp.(LRMC)


construction of the 11.7-kilometer expects to break ground for the LRT-1
extension from the present end point in extension by the end of February or early
Baclaran to Niog area in Bacoor City, March.
Cavite.
As committed, we are ready to hold
It will consist of elevated guideways groundbreaking by late February or early
throughout most of the alignment, except March, LRMC president and CEO Rogelio
for the guideway section at Zapote which Singson said during the inauguration of
will be located at grade. It will consist of the newly improved Doroteo Jose station
the satellite depot and new station. yesterday.

The extended rail line is expected to help LRMC, which is composed of Metro Pacific
increase the capacity of LRT 1 from Investments Corp.s Metro Pacific Light
500,000 to 800,000 passengers daily and Rail Corp., Ayala Corp.s AC Infrastructure
benefit more than four million residents Holdings Corp., and Macquarie
in Cavite and the southwestern part of Infrastructure Holdings (Philippines) PTE
Metro Manila. Ltd., was awarded the P65-billion public-
private partnership (PPP) project to
Singson said LRMC was also working on operate, maintain and extend the train
the rehabilitation of LRT 1 stations at system.
United Nations Avenue, Gil Puyat, Abad
Santos, Pedro Gil and R. Papa. The Under the contract for the PPP project,
company completed the rehabilitation of the LRT-1 which runs from Roosevelt
Doroteo Station, which is part the P500- station in Quezon City to Baclaran station
million station improvement project. in Pasay City will be extended to Bacoor
City in Cavite.
By end 2017, LRMC will deliver a wholly
refurbished train line, featuring stations Covering 11.7 kilometers (km), the
that have been renovated and equipped extension would involve putting up new
with structural upgrades and new stations across Pasay City, Paranaque
facilities to enhance passenger City, Las Pias City and Cavite. The new
experience, Singson said. stations are: Aseana, Manila International
Airport, Asia World, Ninoy Aquino, Dr.
Santos, Las Pinas, Zapote and Niyog.

41
Construction of the extension would be With the permit to enter, he said LRMC
done in phases and LRMC will start with could already fence the area to prevent
the first phase which covers six km. informal settlers from coming in, as well
as start engineering work.
While LRMC has yet to secure notice to
proceed with construction of the Prior to the start of construction of
extension from the government, Singson extension, LRMC has started undertaking
said the consortium has already received improvements on the train line.
a permit to enter the site.

Southwest Integrated Transport System

The Southwest Terminal of the Integrated Paranaque, and Las Pinas and Bacoor,
Transport System (ITS) project will be Cavite). The project will include
constructed within a site along the R-1 passenger terminal buildings, arrival and
Expressway area of 4.59 hectares. It will departure bays, public information
connect passengers coming from the systems, ticketing and baggage handling
Cavite side to other transport systems facilities, and park-ride facilities.
such as the future LRT Line 1 Southwest The private partner will undertake the
Extension, city bus, taxi, and other public design, construction, and financing of the
utility vehicles that are serving ITS terminal as well as the operation and
Southwestern Metro Manila (Pasay, maintenance of the whole facility. It can
42
also undertake commercial development along Coastal Road in Paraaque City
and collect revenues generated from the now being constructed by Megawide.
same. MWM Terminals, the consortium of
SWITS, located along the Manila-Cavite Megawide Construction Corp. and WM
Expressway in Paranaque City, is a Property Management Inc., expects to
Public-Private Partnership (PPP) project break ground on the P2.5-billion
that is seen to help decongest the Integrated Transport System (ITS) -
worsening Metro Manila traffic that Southwest public-private partnership
reportedly costs the economy P3 billion (PPP) project within the first quarter.
per day, Megawide chairman Michael Megawide said the consortium plans the
Cosiquien said. groundbreaking for the project within this
THE Metropolitan Manila Development quarter.
Authority (MMDA) on Sunday said Last October, the Department of
Megawide Construction Corp. has Transportation issued the notice to
committed to finish the southwest proceed for the project.
provincial terminal along Coastal Road in Preliminary construction work has
Paraaque City in 18 months as part of already begun. We are just refining
the Integrated Transport System (ITS) in terminal design with LRMC (Light Rail
various parts of Metro Manila. Manila Corp.) in terms of our connection
The representatives of Megawide to LRT (Light Rail Transit) 1, Megawide
committed to finish the terminal in 18 said.
months, MMDA Officer in Charge Project Cost: PHP 2.50 Billion | USD
Thomas M. Orbos said after the Inter- 0.05556 Billion
Agency Council on Traffic (iACT) on Procurement Mode: Solicited Mode;
Saturday conducted an ocular inspection Single-Stage Bidding
of the sites of the ITS. PPP Structure: Build-Transfer-and-
Orbos was joined by Transportation Operate (BTO)
Undersecretary Anneli Lontoc,
Cooperation Period: 35 years
Transportation Assistant Secretary Mark
inclusive of construction period
de Leon, Chairman Martin Delgra of the
Region: NCR REGION - NATIONAL
Land Transportation Franchising and
Regulatory Board (LTFRB), and CAPITAL REGION / METROPOLITAN
representatives from the Philippine MANILA
National Police-Highway Patrol Group Sector: Transport Terminal,
(PNP-HPG) and the Philippine Ports Transportation
Authority, in visiting the site of the Private Proponent: MWM Terminals,
permanent southwest provincial terminal a consortium of Megawide
Construction Corporation and WM
Property Management, Inc.

43
LRT LINE 1 CAVITE EXTENSION AND LAND OWNERSHIP