Professional Documents
Culture Documents
CHAPTER TITLE REMARKS CRITICALITY CORRECTIVE ACTION STATUS RESPONSIBILITY TIME FRAME COMMENTS
The PRV are set to 16 bars
X Verify the opening pressure setting of the PRV; this pressure must not
exceed the saturated vapor pressure of the product stored in the tank at
PRV SETTING the maximum design temperature.
WIP - Contractor
X awarded works.
Awaiting
GENERAL SITE LAYOUT It is not visible Has to be displayed outside the office templates
DOCUMENTATION, TRAINING AND PROCEDURES
WIP - Contractor
X awarded works.
Awaiting
LPG TANK DRAIN PROCEDURE It is not displayed in the field Show the procedure posted near the area where the operation is done. templates
WIP - Contractor
X awarded works.
Awaiting
MAP OF EXPLOSION HAZARD ZONES To be modified indications of Zone 0s The actual identification of Zone 0 has to chasnge to Zone 1 templates
PO issued to
oldham agent.
The gas detectors were installed long time XX Due to
ago,since they were installed thet are not Situation to be followed with the assistance of OMM - LPG to solve the commence
GAS DETECTORS working problem trouble shooting
Fire detectors on
X
FIRE DETECTORS There is no fire detection system in place Fire detectors to be installed in this areas order
Completed.
Flange type connectors are used,these type Awaiting
XXX
UNLOADING HOSES CONNECTING of connections are no longer permitted in The loading area must have a standardized connection equipment to standardisation
DEVICES Total AMO sites ensure the safety of connection and disconnection operations of trucks
The location of the connection points of the There is a project for installing loading arms.in this case attention must br
trucks are not uniform, in order to reach all paid to the situation of the connection position of the trucks, which has to
the truck connections, the LPG hose has to be standardized in all of the trucks, as well as standardization of thetruck's
TRUCK TRAQNSFER STATION,TANKS, PUMP SYSTEM, CYLINDER be very long (12m). The hoses are weak XXX connection system.
FILLING points in case of a rupture , the amount of Awaiting
product released to the atmosphere will be standardisation
UNLOADING HOSES serious. of trucks
The maximum drive away angle of the hose has to be 90 degrees. The
The position of the BAC is ok,but due to the length of the hose should be reduced.
length of the hoses in case of departure of
the truck without disconnecting the hoses, XXX Awaiting
the force will not be applied to the standardisation
BREAK AWAY COUPLINGS breakaway coupling of trucks
There are no automatic cut off valves XX At least the liquid phase of the gas must be equipped with an automatic
AUTOMATIC CUT OFF VALVES installed in the offloading area cut off valve and it is recommended to install it in the gas phse Completed
The loding/ offloading hose remains with Ensure by procedure that the liquid is flushed out before clsing operations
liquid during the day. XX at the end of the day to avoid the possibility of having a rupture of the
DRAIN OF THE HOSES hoses due to a full hydraulic Completed
The flanges must not make a risk of ignited joint leaksthat may impinge on
Some flanges are in aposition in which if the tank directly(it must be for example fitted with an appropriate
X
there is a leak, the impact of the leak will be orientation or be fitted with a detector in case of existing wrongly oriented
FLANGE POSITIONS directed towards the tank's shell flanges)
Some of the automatic cut off valves are
not mounted in the first flanged of the X Awaiting next
AUTOMATIC CUT OFF VALVES POSITION tanks To be relocated at the next re-test of the tanks tank outage
Proposed to
LPG STORAGE UNITS change to
reliable Enraf
The site has a very good measurement X servo motor
system(radar system), but there are doubts system in Capex
CONTINOUS MEASUREMENT SYSTEM to the accuracy of measurements Check the accuracy of the measurements (calibration equipments) 2017
The manufacturer's plate are painted, Plates with the equipment information must not be painted, the
X
TANK MANUFACTURER'S PLATE information is not visible information should remain visible
Access to the safety valves in tank 1 and 2 is Scoping in
X
GANGWAYS not possible, there are no gangways In tanks 1 and 2, the gangways have to be extended to the safety valves progress
IDENTIFICATION OF PHASE, NATURE Not indicated in the piping at the top of the
X
AND DIRECTION OF PRODUCT tanks To be indicated at the piping at the top of the tank
PIPING
Some thermal relief valves are not located
X
THERMAL RELIEF VALVES in a safe clear xone Relocate the TRV in a safe cleared sone (eg no obstacle within 1 metre)
PIPING
There is a check valve with long threaadeds
on the outside (sandwich type). This type of
X
SANDWICH TYPE WITH LONG equipment is not allowed in LPG Replacements on
THREADED BAR EQUIPMENTS installation. Change this type of equipment by a not exposed long threaded bars. order
Valve ordered.
CYLINDER FILLING There is no ESD - cut off device in the liquid X Installation in
AUTOMATIC CUT OFF VALVES arrival to the filling hall Install an ESD cut off device in the liquid arrival to the filling hall progress
The site is not suitable, very small and with
steps to access (taking to account that in an
FIRE FRILLS X
emergency the brigade must reachthe site
PLACE OF STORAGE OF THE SUITS quickly to take the suits Evaluate the relocation of the equipment in a more suitable place
The fire fighting pump has to be started automatically, water in the tank
SITE SHUTDOWN X
WATER PUMP The pump start up is manual has to be available in less than 1 minute
With current facilities, fire protection A review of the entire fire protection system including the possibility of
XX
DELIVERY RATE OF 7 L/ M2/MIN system is not able to deliver a flow of 7 moving yhe water storage tank and the inclusion of an additional position
ACCORDING TO STANDARD l/m2/min and cover the worst case scenario for unloading trucks and one for railways is currently in process
There are no adjustable nozzles to reach the A project to upgrade the systems to be inline with the standard and cover
X
ADJUSTABLE STATIONARY NOZZLES tanks the worst case scenario is in progress