You are on page 1of 28

ITEM NO DIVISION

DIVISION 06 - FENESTRATION AND MILL WORKS


DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 10 - PAINTING WORKS


DIVISION 16 - ELECTRICAL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 10 - PAINTING WORKS


DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 09 - TILEWORKS AND FINISHES


DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 16 - ELECTRICAL WORKS
DIVISION 13 - MECHANICAL AND AIR CONDITIONING

DIVISION 06 - FENESTRATION AND MILL WORKS


DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 16 - ELECTRICAL WORKS
DIVISION 13 - MECHANICAL AND AIR CONDITIONING

DIVISION 10 - PAINTING WORKS


DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 09 - TILEWORKS AND FINISHES


DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 13 - MECHANICAL AND AIR CONDITIONING
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 16 - ELECTRICAL WORKS


DIVISION 16 - ELECTRICAL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 05 - CARPENTRY, CABINETS & CEILING
DIVISION 16 - ELECTRICAL WORKS

DIVISION 10 - PAINTING WORKS


DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 10 - PAINTING WORKS


DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 13 - MECHANICAL AND AIR CONDITIONING


DIVISION 13 - MECHANICAL AND AIR CONDITIONING
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 09 - TILEWORKS AND FINISHES


DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 05 - CARPENTRY, CABINETS & CEILING
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 15 - SANITARY AND PLUMBING FIXTURES


DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 06 - FENESTRATION AND MILL WORKS
DIVISION 15 - SANITARY AND PLUMBING FIXTURES
DIVISION 05 - CARPENTRY, CABINETS & CEILING
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS

DIVISION 10 - PAINTING WORKS


DIVISION 10 - PAINTING WORKS
DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 08 - ROOFING MATERIALS
DIVISION 09 - TILEWORKS AND FINISHES
DIVISION 02 - SITE WORKS

DIVISION 1A- SITE DEVELOPMENT


DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT
DIVISION 10 - PAINTING WORKS
DIVISION 10 - PAINTING WORKS
DIVISION 1A- SITE DEVELOPMENT

DIVISION 10 - PAINTING WORKS

DIVISION 10 - PAINTING WORKS

DIVISION 10 - PAINTING WORKS

DIVISION 1A- SITE DEVELOPMENT

DIVISION 1A- SITE DEVELOPMENT


DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT
DIVISION 13 - MECHANICAL AND AIR CONDITIONING
DIVISION 13 - MECHANICAL AND AIR CONDITIONING
DIVISION 1A- SITE DEVELOPMENT
DIVISION 10 - PAINTING WORKS

DIVISION 10 - PAINTING WORKS


DIVISION 10 - PAINTING WORKS
DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT
DIVISION 1A- SITE DEVELOPMENT

DIVISION 16 - ELECTRICAL WORKS


DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
DIVISION 16 - ELECTRICAL WORKS
REMAINING W
ITEM WORK SCOPE

VISITOR'S INFORMATION
Minor scratches on the window
Touch up paint on the base board tiles
Rubber sealant for the door - to make the room air tight
Cleaning of glass at the windows
Installation of blinds
Floor painting at the storage
Leveling of outlet and switches
Removal of residual paint at the out let and switches
Final painting of doors
Smoothen the paint edges at the glass of the door
Cleaning of Locksets
Final testing of outlets, lights, switches and aircon
OFFICE
Retouch paint on parts of the wall
Removal of tape on the lights
Touch up paint on the base board tiles
Cleaning of glass at the windows
Installation of blinds
Leveling of outlet and switches
Final testing of outlets, lights, switches and aircon
PANTRY & REFECTORY
Final painting of cabinets and drawers
Glass at cabinets
Straighthen the paint termination of the door and wall
Touch up paint on the base board tiles
Cleaning of glass at the windows
Installation of blinds
Cleaning of residual paints at the lights
Leveling of outlet and switches
Final testing of outlets, lights, switches and aircon
MALE LOCKER ROOM
Regrouting on some tile portions
Remove paint on tiles
Replace tissue dispenser with tissue towel dispenser
Hand dryer unit
Smoothen unlevel portions of the ceiling paint
Cleaning of glass at the windows
Cleaning of floor drains
Final testing of outlets, lights, switches
Installation of air conditioner unit (specs and cost to be determine)
FEMALE LOCKER ROOM
Cleaning of Locksets
Regrouting on some tile portions
Remove paint on tiles
Replace tissue dispenser with tissue towel dispenser
Hand dryer unit
Smoothen unlevel portions of the ceiling paint
Cleaning of glass at the windows
Cleaning of floor drains
Final testing of outlets, lights, switches
Installation of air conditioner unit (specs and cost to be determine)
FOREMAN'S OFFICE
Touch up paint on the base board tiles
Removal of the door closer
Cleaning of glass at the windows
Cleaning of residual paints at the windows
Installation of blinds
Retouch on ceiling paint
Cleaning of Locksets and hinges
Final testing of outlets, lights, switches and aircon
EQUIPMENT WASH AREA
Cleaning of cement, grout & paint in tiles
Final painting of doors
Floor painting
Retouch on wall paint
Smoothen unlevel portions of the ceiling paint
Installation of mechanical system at the fuel tank room
Cleaning of glass at the windows
Final testing of outlets, lights, switches
GEN SET ROOM
Installation of generator set
Termination of wires at the gen set room
Final painting of door
Final painting of louver
Floor painting
Retouch on ceiling paint
Cover small hole at the edge of ceiling light
Final testing of outlets, lights, switches and gen set
MECHANICAL AREA
Retouch of paint at portions of wall
Cleaning of glass at the windows
Floor painting
Cleaning & removal of paint and rust at the garage doors
Additional 1 fan
Leveling of outlet and switches
Final testing of outlets, lights, switches
SMALL EQUIPMENT & TOOLS AREA
Retouch on wall paint
Final painting of door
Smoothen unlevel portions of the ceiling paint
Cleaning of glass at the windows
Floor painting
Final testing of outlets, lights, switches
CHEMICAL STORAGE AREA
Floor painting
Final painting of door
Retouch on wall paint
Final testing of outlets, lights, switches
PUMP ROOM
Installation of pumps
Installation of the mechanical sytem and controllers
Final painting of door
Final painting of louvers
Closing of ceiling
Closing of slab
Final wall & ceiling paint
Leveling of slab( needs chpping at some areas)
Floor painting
Final testing of outlets, lights, switches, pumps and system
MALE TOILET
Refine grouting finish at the granite
Replace tissue dispenser with tissue towel dispenser
Hand dryer unit
Cleaning of toilet fixtures
Cleaning of glass at the windows
Cleaning of floor drains
Cover small hole at the edge of ceiling light
Remove residual paints at the exhaust Fan
Smoothen door edge paint
Installation of fan
Final testing of outlets, lights, switches
FEMALE TOILET
Replace tissue dispenser with tissue towel dispenser
Hand dryer unit
Cleaning of toilet fixtures
Installation of water supply line at the water closet
valve should be properly covered to hide the grouting
Cleaning of glass at the windows
Cleaning of floor drains
Cover small hole at the edge of ceiling light
Remove residual paints at the exhaust Fan
Smoothen door edge paint
Installation of fan
Final testing of outlets, lights, switches
EXTERIOR SERVICE BUILDING AREA
Retouch on wall and ceiling paint
Finishing of entrance gate paint
Refine grouting finish at the wainscot granite
Cleaning of wainscot of residual paint and cement(all areas)
Cleaning of debris and excess materials at the roof
Tiling at the faade
Manhole covers at the cistern tank
COURTYARD AREA
Trim asphalt near foreman's office
Refine asphalt finish, at the edge of the building and low fence
Rectify portions of asphalt pavement which has water ponding (side of low fence and motorcycle parking)
Painting bollards
Painting wheel stopper
Cleaning of metal panel at the low fence
Final paint on the walls of low fence
Painting of pedestal of the switchbox
Repaint manhole grating near the switchbox
Free all manholes with garbage and debris
Cleaning of gates
Manhole covers for the oil interceptors and other drainage manholes
Leveling of ground rod cover
Construction of motorcycle parking structure
Installation of fuel dispenser
Testing and commisioning of the fuel dispensing system
Installation of roofing for fuel dispenser
Proper paint termination on the downspouts
PARKING AREA
Painting of wheel stopper
Painting of parking slots
Rectify portions of asphalt pavement which has water ponding (near the main gate)
Installation of manhole covers
Landscaping
Refinish on the opening of the curb inlet manholes
Additional ramp for the access of the maintenance( to be finalized)
OTHER ELECTRICAL REQUIREMENTS
Provide grounding type outlets on all convenience outlet(, gen set room, exhaust outlets etc.)
Provide industrial type on the circuit breaker for ACCU unit
Use liquid thight flexible conduit for ACCU unit
Provide circuit directory and labelling for all panel boards
Provide blank cover for space circuits of exterior panel board
Provide 110/220 label for all convenience outlet
Installation lightning protection
Check finishing of exhaust fan wall
GENERAL REQUIREMENTS
As built drawings
Occupancy permit
Permanent power connection
Permanent water connection
Manual and turnover documents
Training and Seminar for the ABMC crew
KS/ PUNCH LIST
STATUS
ON GOING STOPPED COMPLETED TARGET DATE OF COMPLETION
NOTES AND REMARKS
ACTUAL COMPLETION DATE

For General Cleaning

For Re inspection
For Re inspection

For Final Testing

For Re inspection

For General Cleaning

For Final Testing

For Re inspection
For General Cleaning

For Final Testing

For Re inspection

Not yet Installed


Not yet Installed
For Re inspection
For General Cleaning
For General Cleaning
For Final Testing

For Re inspection

Not yet Installed


Not yet Installed
For Re inspection
For General Cleaning
For General Cleaning
For Final Testing

For General Cleaning


For Re inspection. Minor Scratches.

For Final Testing

For Re inspection
For Re inspection
For Re inspection
For Re inspection
Not yet Installed
For General Cleaning
For Final Testing

Not yet Installed


Not yet Installed

For Final Testing

For Re inspection

For Final Testing


For Re inspection
For Re inspection
For Re inspection

Cleaning
For Re inspection
For Re inspection

Not yet Installed


Not yet Installed
For Re inspection
For Re inspection

For Re inspection
Not yet Installed
Not yet Installed
For Re inspection
Not yet Installed
For Final Testing

Not yet Installed


Not yet Installed

For Re inspection

For Re inspection
Not yet Installed
For Final Testing

For Re inspection
For Re inspection
For Re inspection
For Re inspection
For Re inspection
Not yet painted

For General Cleaning

For Re inspection

Not yet Installed


Not yet Installed
For Re inspection

You might also like