4. Required information;
Your actions and responsibility from the time you are embarking the
site.
Your method of offer, ie Lump sum, % of project cost or any other
structure of your choice
Your best cost estimate and split of the estimates in three parts:
a. Design / Engineering phase
b. Construction
c. Management
The time line should be estimated in Gantt type format and indicate
minimum each of following items:
a. Design/Engineering phase
b. Procurement phase
c. Construction phase
d. At what point is the Production area closed, ie floor, walls
& roof finished
Confidentiality Notice:
This file inclusive of attachments, is intended for the person(s) stated above and may contain confidential
information.
Unauthorized reading, disclosure, copying, distribution or use of this information may violate rights to
proprietary information.
If you are not an intended recipient, please return this file to the sender and delete your copy.
Thank you.
EH/MM
5. Organization chart; description of your set up of management structure
for a project like this, including minimum, Site manager, supervisors,
technical experts and quality assurance functions.
6. Reference objects; Present your selection of references that would be
relevant for Olbapack Plant and the Algerian market. We would either talk
to persons at reference object, or visit their sites.
Confidentiality Notice:
This file inclusive of attachments, is intended for the person(s) stated above and may contain confidential
information.
Unauthorized reading, disclosure, copying, distribution or use of this information may violate rights to
proprietary information.
If you are not an intended recipient, please return this file to the sender and delete your copy.
Thank you.
EH/MM