cere: rares-ees
Telegram : RAILMANAK (UCKNOW Pian 80667 8 50012
Wee ICMR Re RATT
aera afrnet silt are ast
Government of India-Ministry of Railways
RESEARCH DESIGNS & STANDARDS ORGANISATION
va der were-226011-Feats
Our Reference SD.POL.12.10 LUCKNOW-226011 Date 2e_7_93
The General Manager (Engg.),
1. South Central Railway, Secunderabad-500 371.
2. Southern Railway, Headquarters Office, Madras-600 003.
Sub: Speed certificate for operation of Rajdhani type of
trains with WOM2 locomotive on Secunderabad- Vikarabad,
Wadi-Gooty sections of S.C.Rly. and Bangalore City-
Dharmavaram section of S.Rly. at maximum speed of 110
km/h.
Based on the detailed oscillation trials and other investi-
gations, double headed WDM2 locomotives in multiple operation
have been permitted to haul passenger trains consisting of all-
coil ICF, IRS, BEML coaches fitted with DA/QA valves and slack
adjusters at a maximum speed of 110 km/h on track maintained to
RDSO's Report No. C&M -1 Vol. T as per speed certificate issued
vide this office letter No.SD.WDM2.11 dated 01-09-1971 on the
routes mentioned below :
i) New Delhi - Madras G.T. Express route
ii) New Delhi - Bombay Frontier Mail route
iii) Igatpuri - Nagpur - Howrah route
iv) Delhi - Kanpur route
1.1 Double headed WDM2 locomotives in multiple operation have
also been permitted to haul passenger trains consisting of all-
coil ICF, IRS, BEML coaches fitted with air brake equipment
including slack adjusters at a maximum speed of 110 km/h on
track maintained to RDSO's Report No. C&M-1 Vol.-I on the above
routes vide this office letter No.SD.WDM2.11 dated 24.7.92.
1.2 In order to increase the speed of North-South Rajdhani
express, route proving runs were conducted with WDM2 locomotive
on Secunderabad-Vikarabad and Wadi-Gooty sections of S.c.Rly. and
Bangalore City-Dharmavaram section of S.Rly. at a maximum speed
of 110 km/h. The results of these route proving runs as contained
in RDSO's Mech. Engg. Investigation Report Nos. MR-423 and MR-425
indicate that WDM2 locomotive is fit to run on these sections
upto a maximum speed of 110 km/h.
2. Based on the above investigations and trials, it is certified
that passenger trains consisting of all coil coaches provided
with air brake equipment including slack adjusters when hauled bysingle/double headed WDM2 locomotives fitted with dual/ pure air
brake equipment or passenger trains consisting of all coil
coaches provided with vacuum brake equipment including DA/QA
valves and slack adjusters when hauled by single/double headed
WDM2 locomotives fitted with vacuum/dual air brake system may be
permitted to run on Secunderabad-vikarabad and Wadi-Gooty
sections of S.C.Rly. and Bangalore City-Dharmavaram section of
S.Rly. upto a maximum speed of 110 km/h subject to the following
conditions +
2.1 track:
2eLeL The track shall be to a minimum standard of 90R rails
on sleepers to Mt4 density and depth of ballast cushion
below sleepers of 200 mm, which may consist of atleast
75 mm clean and the rest in caked up condition, on
compacted and stable formation and maintained to the
standards as recommended in RDSO's Report No. C&M -
1, Vol.I. In this connection the instructions for
maintenance of track on high speed routes, circulated
to the Railways under RDSO's D.O. letter No. CRA/509
dated 7.7.1971 and approved by the Railway Board under
their letters No. 71/W6/HS/8 dated 27.8.1971 and
71/W6/HS/1 dated 21.10.1971 should also be followed.
2.1.2 For track of lower standard than that mentioned above,
the Chief Engineer concerned shall decide the lower
maximum permissible speed. In this connection, Railway
Board's letter no.65/WDO/SR/26 dated 19/20.10.1966 may
be seen. When the Chief Engineer considers that the
road bed is not compacted or there is improper
drainage, he may suitably restrict the maximum
permissible speed depending on the local conditions.
2.1.3 The maximum permissible speed on curves shall be
decided on the basis of the existing provisions of the
Indian Railways Permanent Way Manual 1986. Higher
speeds may, however, be permitted subject to the
maximum cant deficiency of 100 mm and the rate of
change of cant and cant deficiency not exceeding 55 mm
per second.
2.2 Bridges:
2.2.1 Bridges shall be to MBG-1987, RBG or BGML standard
drawings.
2.2.2 For bridges of lower standard than that mentioned
above, the Chief Engineer concerned shall be referred
to.
2.2.3 The clearance with reference to bridges refers to
standard design of girders, slabs, pipe culverts etc.
issued by RDSO but not to :
(i) non-standard designs
ii) piers, abutments and foundations
(iii) bridges on curves etc.
which are to be examined under the direction of Chief2.3
2.341
2.3.3
2.41
2.4.2
Engineer concerned and certified by him in terms of
current IRS Bridge Rules, Steel Bridge Code, Bridge
Sub-structures and Foundation Code etc. read with upto
date correction slips.
Signalling:
Multi-aspect Colourlight Signalling shall be provided
with distant signal located 1 km in rear of home
signal.
In case of 2 aspect lower quadrant signalling
territory, where replacement of conventional signalling
by multiaspect signalling has been planned for, the
distant signal shall be located 1 km in rear of the
home signal.
During the interim period suitable speed restrictions
shall be imposed at stations, where the outer warner
signals are not visible from a distance of 1400 m under
normal visibility conditions.
On sections having 2 aspect lower quadrant signalling,
the outer/warner signals shall be split up and the
warner signal shall be mounted on a separate post,
located 1 km in rear of the home signal. The warner
signal shall be motor operated and electrically lit.
General
All the permanent and temporary speed restrictions in
force and those imposed from time to time due to track,
bridges, curves, signalling and interlocking etc. shall
be observed.
Attention is also invited to the note on "Preparation
of Electrical Equipment of Diesel and Electric Locomo-
tives for High Speed Operation" circulated with this
office letter No. EL/3.3.15/WAM2/GR-CON. dated 24-12-70
and the locomotives shall be attended accordingly.
he coaches shall be fitted with either vacuum brake or
air brake system and shall be without lateral shock
absorbers, The bogies and undergeat of these coaches
shall be maintained as per instructions laid down in
unified maintenance manual for coaching stock (BG)
issued by Railway Board irrespective of the type of
brake system provided on them. Coaches with vacuum
brake system shall be fitted with double acting slack
adjusters, DA valves, modified hose pipe cages, improved
(modified) brake cylinders and their brake system shall
be maintained as per instructions laid down in unified
maintenance manual. However, if the coaches are
provided with air brakes, their brake system shall be
maintained to the standards specified in Technical
Pamphlet No. C-8805 to the extent applicable.2.404
2.4.5
2.4.6
hel:
Copy
°
Encl:
Nil
to:
In case of air braked trains, operating instructions
contained in Technical Pamphlet no. C-9206 of Feb. 1992
shall be complied with to the extent applicable.
However, if the train is to be run double headed with
WDM2 locos, current limit as mentioned in Para 4.5 of
operating instructions No. C-9206 circulated vide
RDSO's letter No. MC/APB dated 20-1/13-2-92 shall be
followed.
In case of vacuum braked trains to be hauled by double
headed WDM2 locomotives, instructions contained in
RDSO's letter No.MC/SPD/BG/110-130 dated 3.1.81 shall
be complied with to the extent applicable.
The transition coupler of the locomotive used for
hauling double headed superfast trains should be of
strengthened design to RDSO Drawing Nos. SK.DL-2494
Alt. 5 and 2493 Alt. 3.
WDM2 locomotive infringes Clause 11 (ii) and 12 of
Chapter IV (c) of BG Schedule of Dimensions 1973
Reprint and side slopes at top of the profiles to
maximum moving dimensions of 1929 as indicated in RDSO
Drawing No. SK.DL~3591. Board have condoned these
infringements vide their letter No.SD/WDO/SR/29 dated
3.12.80.
—
(N.C. SINHA )
DIRECTOR STANDARDS (MOTIVE POWER)
The Secretary (Traction/Elec./Mech./Engg.(G)),
Railway Board, New Delhi- 110 001.
The General Manager (Mech./Optg.)
1, South Central Railway, Secunderabad-500 371
2, Southern Railway, Headquarters Office, Madr;
Nil
Ny
(CN, C. SINHA )
DIRECTOR STANDARDS (MOTIVE POWER)