Government of India-Ministry of Railways
RESEARCH DESIGNS & STANDARDS ORGANISATION
a deat weTe-22601 1 Forts
Our Reference SD-POL.12.10 LUCKNOW-226011 Date3.0-7-93
The following shall be added
The General Manager (Engg.)
1. Northern Railway, Baroda House, New Delhi-110 001.
2. Central Railway, Victoria Terminus, Bombay-400 001:
3. South Central Railway, Secunderabad-500 371.
4. Southern Railway, Park Town, Madras-600 003.
Sub: Speed certificate for running of Rajdhani type of
trains with WAP1 class of AC electric locomotives
between New Delhi and Madras.
Ref: This office letters of even No. dt. 30.12/92 & 2.7.93.
As desired by South Central Railway, to reduce the journey
time of North-South “Rajdhani Type" trains hauled by WaPl
locomotives, route proving runs were conducted on Balharshah -
Bellampalli section at 120 km/h with WAPL locomotive. The
results as contained in R.D.S.0.'6 Mech. Engg. Investigation
Report No. MR-424 of June, 1993 indicate that WAP] locomotive
is fit to run upto a maximum speed of 120 km/h on Balharshah
Bellampalli section of S.C.Rly. :
In view of the above, speed certificate issued vide this
office letters under reference shall be modified as follows:
Para 2 shall be replaced with the following :
"2. Based on the results of the above investigations and trials,
it is certified that the operation of single WAPl AC electric
locomotive hauling upto 19 ICF all coil air-braked coaches on New
Delhi - Madras section may be permitted upto a maximum speed of
130 km/h between New Delhi - Lalitpur, 120 km/h between Lalitpur—
Bellampalli and 110 km/h between Bellampalli - Madras subject to
the following conditions : aa
1
ow para
“Wherever points and crossings in station yards are of 90R
rail, maximum speed upto 120 km/h is permitted temporarily
with following stipulations.
i) All stock rail joints shall be welded and shifted
atleast one rail length ahead. a
ii) The rails shall be ultrasonically tested at closer
intervals, the frequency of which shall be decided by
Chief Engineer depending upon the condition of rail.iii) Points and crossings shall be maintained to “the
standard as per para 237 of IRPWM."
Para 2.4 pertaining to "Signalling" shall be relaced with
“2.4 Signalling z
For maximum speed of 120/130 km/h
2.4.1 Multi-aspect colour light signalling shall be provided.
Two distant signals - one located 1 km in advance of
the home signal and the 2nd located 2 km in advance of
the home Signal shall be provided. Sighting boards
shall be dispensed with.
2.4.1.1 An auxiliary Warning System can be provided in lieu of
the second distant signal, Track devices/magnets
located 800 metres in advance of the distant signals
would be used to give an audio-visual indication to the
driver, as also to control the speed of the train, if
required.
2.4.2 The above shall also be applicable to interlocked level
crossing gate located in the block section.
2.4.3 Where the second distant signal is not continuously
visible from 800 metres under normal conditions,
suitable speed restrictions shall be imposed by the,
CSTE/Chief Safety Officer.
2.4.4°° ALL the manned level crossing gates shall be connected
with adjacent station through a magneto telephone.
Agox maximum speed of 110 km/n¥
2.4.5 Multi-aspect colourlight Signalling shall be provided
with distant signal located 1 km in in rear of home
signal.
2
Encl: Wil (N.C. SINHA )
DIRECTOR STANDARDS (MOTIVE POWER)
Copy to:
0 The General Manager (Elec./Mech.),
1. Northern Railway, Baroda House, New Delhi-110 001.
2. Central Railway, Victoria Terminus, Bombay-400 001.
3. South Central Railway, Secunderabad-500 371.
4. Southern Railway, Park Town, Madras-600 003.
0° =‘ The Secretary (Traction/Elec./Mech./Engg. (G)) ,
Railway Board, New Delhi-110 001. y
Encl: Nil (N.C. SINHA )
DIRECTOR STANDARDS (MOTIVE POWER)