INITIAL RELIABILITY INCIDENT REPORT

Doc No. IRIR/01/2010


Date Prepared : 12/05/10
Revision: 00

IRIR

Incident Category : Production Loss Equipment Failure Environmental Hazard


Total down time Hrs.
minutes

Date of Incident : 29-11-16 Time of Incident : 1500 Hrs.

Title : Failure of Transmission of Wheel Loader L-26


Unit / Area of Incident: NP Plant PFL Contractor

Description / Details of Incident :


On 29-11-2016, abnormal noise was observed from forward gear of wheel loader WL-
02 TCM L-26 transmission.
on detailed checking, it was observed that broken bearing balls were present in its oil
console. So, it was decided
to completely dismantle the transmission to assess the damage.

Actions Taken ( If Any):


The loader was handed over to garage till complete overhauling of the gear box of
transmission.

IRIR submission date: 02-12-2016

26-10-
NAME : (UM / Incharge) Hamza Nouman SIGN: DATE:
16

Note: This initial report should reach PRF secretary within 02 working day of the incident