‘Andersen Engineering ‘Andersen Engineering 2304 Carlson Bivd. Richmond, CA 94804 February 24, 2017 Pagific Structures Construction Attn: Bob Figone 457 Minna Street ‘San Francisco, CA 94103 Re: 44 Tehama Strest, San Francisco, CA FINAL INSPECTION: Temporary repair and shoring of failed concrete forming platform. ‘SFDBI Notice of Violation (Complaint #201762691) Mr. Figone: Per your request, | have performed a site visit and visual inspection of the temporary shoring and Tepair installed at 41 Tehama Street, San Francisco. The intent of my inspection was to determine that the temporary shoring installed is in general conformance with the shoring and stabilization sequence that | recommended in my previous Repair Report, dated February 17, 2017. ‘On site, | confirmed that all shoring towers, wire rope tie-backs, the gantry jack system, and all lower level reshore posts are in place, and the Forming Concepts platform has been lifted to level. {tis my professional opinion that the shoring installed is in general conformance with my Repair Report, and that dismantlement of the forming platform may commence. NOTE: All shoring towers, wire rope tie-backs, the gantry jack system, and all lower level reshore posts must remain in place until dismantiement of the entire forming piatform is complete. The methods and ‘sequencing of dismantlement should be per the specifications of Forming Concepts, Inc. Sincerely, Erik Andersen, SE 2301 Carlson Blvd. Richmond, CA 94804 (415) 250-8473

You might also like