You are on page 1of 4

COMMISSIONING TEST REPORT FOR

PROTECTION RELAY

Client : TORRENT POWER


Location : 132KV GIS SUBSTATION VASNA AHMADABAD.
Feeder : BAY-101-TRAFO-1 BCPU
MLFB No. : 7SJ6471-4EB91-1FG4-L0S Sr.No. BF 1508506123

Firm. V04.93.01
Aux. Volts : 110 VDC
Ver.
P.Set : V04.93.01

Relay I.P Add. : 20.0.15.112 Subnet


: 255.255.254.0

Gateway : 20.0.14.100

TESTING KIT :
Make : Doble Serial
No. : 120501561
Model : F6150
Date : 10/02/2017

CT Rated Primary Current : 400 A


CT Rated Secondary Current : 1A
Ignd-CT Rated Primary Current : 400 A
Ignd-CT Rated Secondary Current : 1A
Rated primary voltage : 132KV
Rated secondary voltage (L-L) : 110 V

1. MEASURED VALUE TEST:


Inject current in the relay as per the table below. Observe the reading
on the relay display, in primary values.

Current
Phase Primary Current read on relay display
injected
injected In A
(Amps)
IR IY IB 3I0

Tested By : SASIKUMAR.T Witnessed by : KETAN TANK


COMMISSIONING TEST REPORT FOR
PROTECTION RELAY

R-Y-B 1.0 400 400 400 0

Apply voltage in the relay as per the table below. Observe the reading
on the relay display.

Voltage
Phase
applied Primary Voltage read on the relay Display in Kv
applied
(Volts)
VR VY VB VRY VYB VBR VO
R-Y-B 110 76 76 76 132 132 132 0

2. NON-DIRECTIONAL OVERCURRENT & EARTH FAULT


PROTECTION :

Paramete
Description Setting
r
1507 51 Pickup 0.5 Amp
1508 51 Time Delay 0.20 sec
1504 50-1 Pickup oo Amp
1505 50-1Time Delay oo sec
1502 50-2 Pickup oo Amp
1503 50-2 Time Delay oo sec
1607 51N Pickup 0.1 Amp
1608 51N Time Delay 0.25 sec
1604 50N-1 Pickup oo Amp
1605 50N-1Time Delay oo sec
1602 50N-2 Pickup oo Amp
1603 50sN-2 Time Delay oo sec

OVER CURRENT IDMT 51

Pickup Current (in Amp) Operating Time in millisec


Phase Injected Current Settin Calculated Observed
Setting
2*I 5*I g 2*I 5*I 2*I 5*I
R-Y 0.5 1 2.5 0200 2005 0855 1980 830
Y-B 0.5 1 2.5 0200 2005 0855 1980 830
B-R 0.5 1 2.5 0200 2005 0855 1980 830

Tested By : SASIKUMAR.T Witnessed by : KETAN TANK


COMMISSIONING TEST REPORT FOR
PROTECTION RELAY

EARTH FAULT IDMT 51N

Pickup Current in
Operating Time in millisec
Amp
Phase
Injected Calculated Observed
Setting Setting
2*I 5*I 2*I 5*I 2*I 5*I
R-E 0.1 0.2 0.5 0250 2507 1069 2480 1050
0250 2507 1069 2490 1050
Y-E 0.1 0.2 0.5
0250 2507 1069 2480 1040
B-E 0.1 0.2 0.5

3. FUSE FAILURE MONITOR FUNCTION :

Apply 3-Phase voltage only and then remove any single phase
voltage. Check for fuse fail indication.
Apply 3-Phase voltage and current above 50% rated and then
remove any single phase voltage. Check for fuse fail.

Result:
Fuse Failure Monitor Function checked: OK / NOT OK

All Binary Inputs as per configuration Tested :


OK / NOT OK

All Binary outputs as per configuration Tested : OK /


NOT OK

All LED indicators.


: OK / NOT OK

87TX1 and 87TX2 relays on Trip checked. :


OK / NOT OK

P.T selection relays 75AB and 75CD checked and found healthy :
OK / NOT OK

Relay found healthy : YES /


NO

Tested By : SASIKUMAR.T Witnessed by : KETAN TANK


COMMISSIONING TEST REPORT FOR
PROTECTION RELAY

Tested By : SASIKUMAR.T Witnessed by : KETAN TANK