1
Preliminaries
2
SECTION
B
Measured
Works:
Earthworks
1
Concrete
Works
2
Masonry
Works
8
Metal
and
Wood
Works
9
Windows
and
Doors
10
Finishes
11
Furnishes
12
Services
13
SUMMARY SHEET
PRELIMINARIES $209,850.00
FINISHES $230,957.50
FURNISHINGS $52,400.00
SERVICES $185,600.00
$1,668,469.70
Page 2
Client
No:
MABR_201410_02 By:
AJWP-868-332-5714
PRELIMINARIES
CONTRACTOR ADMINISTRATION
CONSTRUCTION PLANT
EMPLOYER FACILITIES
SUNDRY ITEMS
B Return, fill and ram selected excavated material around fdn 95 cyds $52.40 $4,978.00
C Level and compact bottom of trench excavation 182 cyds $10.00 $1,820.00
D 6" thk hardcore to form lvl and well compacted unde slab 534 syds $36.85 $19,677.90
E 2" thick sand blinding laid in hardcore 534 syds $35.75 $19,090.50
CONCRETE
WORKS
SUBSTRUCTURE
REINFORCED
CONCRETE
IN-SITU
GRADE
30
SUPERSTRUCTURE
REINFORCEMENT
SUBSTRUCTURE
D Footing bars 3/8" 679 lbs $6.75 $4,583.25
SUPERSTRUCTURE
CONCRETE
WORKS
REINF.
A Beams beow deck 3/8" dia bars 765 lbs $7.50 $5,737.50
RC STAIRS
FORMWORK
SUBSTRUCTURE
E To vertical sides of trench foundations 91 syds $150.00 $13,650.00
G Vertical sides of floor slab 5" thick 105 lyds $120.00 $12,600.00
COLLECTION SHEET
MASONRY WORKS
BLOCKWORK
SUBSTRUCTURE
A Blockwalls 6" thk filled, ea. Core; inc. horizantal reinf. 130 syds $268.50 $34,905.00
SUPERSTRUCTURE
D Blockwalls
4"
thk,
fill
each
core
and
incl.
horizantal
reinf. 605 syds $268.50 $162,442.50
$0.00
E Blockwall
bar
1/2"
dia 6690 lbs $6.85 $45,826.50
STRUCTURAL
ROOF
A Allow
Provisional
Sum
for
Hip
roof
with
Rafters
2"
X
4"
I
Beam 520 ft
and
2"
x
4"
Z
purlins
at
3'-0"
spacing 1426 ft
Sheeted
with
26GA
Aluzinc 520 syds
inc.
all
connections 1 PS $56,600.00 $56,600.00
NON STRUCTURAL
WOOD WORK
WINDOWS
DOORS
FINISHES
FLOOR
A Cement and Sand Mortar bed (1:3) 25mm screed bed 625 syds $75.00 $46,875.00
WALL
C Cement and sand mortar(1:3 mix) 12mm plaster 605 syds $72.50 $43,862.50
D Apply one coat primer, one undercoat and coat finishing 605 syds $63.00 $38,115.00
E Wall tiles fixed with approved adhesive to rendered surfaces 105 syds $74.00 $7,770.00
DECORATIONS
F Apply primer and paint to posts and handles 2 syds $50.00 $100.00
FURNISHING
SERVICES
PLUMBIING INSTALLATION
ELECTRICAL INSTALLATION
A/C INSTALLATION
C Allow the Provisional Sum of $30,000 for A/C Services 1 PS $30,000.00 $30,000.00