GOOD PRACTICES :-
1. Signal Mans deployed at road Maintain the same and provide periodic
junctions with flags and batons. training by government body.
UNSAFE IDENTIFATIONS : -
1. It was observed that crawler crane I Take out the crane away from the Immediate.
operation very near to the high electric cable.
voltage - 440kv overhead cables.
L Reroute the cable from that area. One day
Consequence-
Area where crane need to be operator Before start of
There can be electrocution to needs to be checked with a checklist. work
operator due to static electricity and
failure of crane. Operator, supervisor and working crew
to be briefed about the hazards and Before start of
consequences related to machine and activity
area.
INTERNATIONAL GENERAL
CERTIFICATE Candidates observation
(2011 specification) sheet
2. Crawler crane used for lifting of dwell I Suspend the work Immediate
cage (appr. 11 ton) was found with
no third party certificate, no pre work L Third party inspection to be done and Within 2 days
inspection evidence and red tag Issued certificate to be pasted on
(Unsafe) pasted on it. crane body for easy verification.
3. It was found that 4 live electric cables I Disconnect the cable and take out the Immediate
Were routed on ground and one of cables from ground and water.
the cable found soaked in water in
its route. L- Cables should be either buried through Each time, when
the ground with proper damage cable needs to
Consequence- protection or by routed overhead at be routed.
standard height.
High risk of
Cables to be checked before using it. Each time of
i) damage of cable usage.
ii) electrocution
INTERNATIONAL GENERAL
CERTIFICATE Candidates observation
(2011 specification) sheet
4. It was found that ISMBs stocked near I Remove the ISMBs from the area 1 hour
the edge of shaft pit.
L Do not stack/store any materials near
Consequence- to the edge of shaft and at least keep Continual
materials 2mtrs away from the pit.
Fall of ISMB or collapse of soil due to
ISMB weight into the pit which can Designated area to be identified for 1 week
result in: stacking of ISMBs
i) Injury to person present inside the Toolbox talk on excavation safety for 1 day
shaft. all to be given
5. It was observed that access cage I Cordon the cage ladder entry and Immediately
ladder provided in the gantry place warning sign.
crane(casting yard) is not rigid
enough as it is waving on human L- Make the cage with rigid material and 1 day
holding. Check the stability of cage before
allowing any person.
Consequence-
After cage fixing, third party inspection Two days
Fall of person inside the shaft which to be done and issued certificate to be
can lead to: pasted on gantry body for easy
verification.
i) Injury to person in the form of cut,
fracture even fatal. While periodic check of gantry a
through check of cage ladder like One Month
ii) disturbance/damage to nearby stability of cage, rungs stability etc to
structure like segment reinforcement, be ensured.
welding m/c etc.
7. It was observed that sand in the fire I Remove the sand from the bucket and 1 hour
bucket was hardened/settled due to refill with fresh dry sand.
rain water.
L Daily visual inspection of sane and Daily
Consequence- fire bucket to be done.
Unable to act effectively on fire Periodic check of fire point to be done One month
emergency. and recorded.
8. It was observed that end of rebars, I cordon off the area with caution tape. Immediately
provided as support to ISMC,
not protected. L Provide caps to the rebar ends. 1 hour
9. It was observed that ASLI provided in I stop the hydra from the activity. Immediate
hydra not working.
L Check the ASLI and fix the problem 1 hour
Consequence- for working.
The hydra may be overloaded due to Ensure that checking of ASLI done Before start of
which there can be failure of hydra before start of work. work
10. Access to fire point no.04 I ISMBs to be removed and access to Immediate
obstructed by ISMBs. be made clear every time.
11. Water logging found near the I Clear the stagnated water Immediate
workmen rest shed.
L proper drainage system to be 1 week
Consequence- provided.
This can lead to mosquito breeding Periodic pesticide spraying to be done 1 week
In turn resulting diseases like malaria moisture porn areas.
etc.
12. Diesel oil spillage found on ground I Provide drip tray beneath the drum Immediate
while transferring diesel from drum and cans.
to oil cans.
L Toolbox talk on environmental safety 1 day
Consequence- to be given to store incharge and his
subordinates
This leads to the contamination of
soil.
13. general illumination (at night) near I Provide adequate illumination Immediate
the scrap yard found very low.
L monitoring of illumination to be Daily
Consequence- ensured.
14. It was found that the key of electric I Hand over the key to the authorised Immediate
Panel board left in the board itself. person i.e electrician/electrical incharge
15. It was found that security person I Remove the home made chair from Immediate
provided with chair made of steel security cabin and provide a
rods/rebars. comfortable chair.
16. It was found that man basket at site I Take out the basket from site and Immediate
not third party tested and place near store.
SWL/capacity not displayed.
L Third party inspection to be done. 2 days
Consequence-
Safe working load/capacity to be 3 days
Risk of over loading the basket and displayed on basket
consequent damage/failure of basket.
Periodic inspection of basket to be 1 month
ensured.
17. Painter found without hand glows, I Ask the painter to stop the work Immediate
safety goggles, nose mass while
painting. L Provide work related PPEs to the 1 hours
Workmen.
18. no evidence for gas and oxygen test I Stop all activity inside tunnel. Immediate
available.
L Find the oxygen level and presence Within 1 hour
Consequence- of toxic and flammable gases.
High risk of presence of toxic, Ensure check for oxygen level and Daily
Flammable gas presence in tunnel other gas presence and record the same.
and even deficiency of oxygen
which may lead to fatigue, fire, Ensure periodic calibration of gas
Explosion etc. detectors and oxygen detectors. 6 months
INTERNATIONAL GENERAL
CERTIFICATE Candidates observation
(2011 specification) sheet
19. Oil leakage found near Power I stop the power pack machine. Immediate
Pack machine and also inspection
sticker not fixed on machine. L provide drip tray beneath the machine 1 day
21. It was found that operator cabin in I Stop the gantry operation Immediate
Gantry(used for segment shifting)
provided at ground level. L- Contact manufacturer and take advise
for construction of operator cabin at 1 week
Consequence- specified height.
Risk being unable to view the other Ensure that statutory examination takes 12 months
side of gantry post/leg movement which place
may hit/crush persons
22. no evidence found for proper I- Collect all the wastage at one bin. 1 day
disposal of cotton waste/first aid
waste. L Identify an authorised biological 3 days
disposer.
Consequence-
Dispose biological wastes periodically 1 week
Risk of spreading of and record the same.
diseases/bacterias