20 :
DS02 Train 2 2017 / 2 / 23 :

:
/
/


DS02 Train 2 19/2/2017: 23/2/2017
, ...

SYS 507 - process support systems - Atmospheric vent


collection
22


.ISO No
N-DG-DG02-PE-ISO--065524 100% 5 4 80%
20 85% 13 13
4009-001
N-DG-DG02-PE-ISO--065524 50% 100% 3 0
6 3 3
4010-001
N-DG-DG02-PE-ISO--065524 100% 3 1 33.3%
6 60.6% 3 3
4003-001
N-DG-DG02-PE-ISO--065524 94.11 100% 4 3 75%
17 13 13
4004-001 %
N-DG-DG02-PE-ISO--065524 96.15 100% 12 10 83.33
52 38 38
4110-001 % %
N-DG-DG02-PE-ISO--065524 89.47 100% 4 0
38 34 34
4054-001 %
N-DG-DG02-PE-ISO--065524 80.47 100% 2 0
41 33 33
4082-001 %
N-DG-DG02-PE-ISO--065524 100% 9 0
46 84.8% 39 39
4086-001
N-DG-DG02-PE-ISO--065524 100% 3 3 100%
6 100% 3 3
4023-001
N-DG-DG02-PE-ISO--065524 100% 4 4 100%
16 100% 12 12
4024-001
N-DG-DG02-PE-ISO--065524 100% 10 8 80%
13 84.6% 3 3
4025-001
N-DG-DG02-PE-ISO--065524 100% 22 19 86.36
24 87.5% 2 2
4025-002 %
N-DG-DG02-PE-ISO--065524 100% 7 0
21 66.7% 14 14
3001-005
N-DG-DG02-PE-ISO--065524 90.47 100% 7 3 42.85
21 14 14
3002-005 % %
N-DG-DG02-PE-ISO--065524 100% 10 10 100%
13 100% 3 3
3002-007
N-DG-DG02-PE-ISO--065524 100% 17 0
23 26.1% 6 6
2002-001
N-DG-DG02-PE-ISO--065524 100% 100% 0 0
3 3 3
0021-001
N-DG-DG02-PE-ISO--065524 100% 100% 0 0
3 3 3
0022-001
N-DG-DG02-PE-ISO--065524 100% 100% 0 0
4 4 4
0023-001
N-DG-DG02-PE-ISO--065524 100% 100% 0 0
4 4 4
0024-001
N-DG-DG02-PE-ISO--065524 100% 100% 0 0
4 4 4
0025-001
N-DG-DG02-PE-ISO--065524 100% 100% 0 0
4 4 4
0026-001
SYS 503 - process support systems - HP Vent collection and KO drum
till now(TP01 = 4 , TP02 = 6) 10


.ISO No
N-DG-DG02-PE-ISO--065524 93.33 100% 2 100%
15 13 13 2
4011-001 %
N-DG-DG02-PE-ISO--065524 83.33 100% 5 71.42
12 5 5 7
4011-002 % %
N-DG-DG02-PE-ISO--065524 56.25 81.8%
16 11 9 5
4128-001 %
N-DG-DG02-PE-ISO--065524 75%
10 60% 8 6 4
4130-001
N-DG-DG02-PE-ISO--065524 100% 1 100%
4 100% 3 3 1
4018-001
N-DG-DG02-PE-ISO--065524 100% 7 100%
9 100% 2 2 7
4018-002
N-DG-DG02-PE-ISO--065524 100% 4 80%
8 87.5% 3 3 5
3001-006
N-DG-DG02-PE-ISO--065524 33.3%
9 22.2% 6 2 3
3001-007
N-DG-DG02-PE-ISO--065524 100%
14 71.4% 10 10 4
3001-003
N-DG-DG02-PE-ISO--065524 64.28 100%
14 9 9 5
3001-002 %
SYS 503 HP Flare Pipeline to HP Candles
2


.ISO No
N-DG-DG02-PE-ISO--065524 59% 0 13 59%
22 0 0 22
5028-002
N-DG-DG02-PE-DAL--065524 85.7% 85.7%
14 14 12 0
3001-004
SYS 501 LP Flare Pipeline to LP Candles
2


.ISO No
N-DG-DG02-PE-ISO--065524
40 0 0 40
0031-002
N-DG-DG02-PE-DAL--065524 36.4% 36.4%
11 11 4 0
3001-005


.ISO No
1- Welded Cap 16 on candle 16 x 8.
2- Fabricated and welded in progress in 2 joints size 10,16(pad 8 x 16
065524-N-DG-DG02-PE-ISO-3001- on candle 8 x 16)inside 8 & outside 16.
005 3- Cut and prepared 2 spools size 16 to required length.
4- welded 2 joints size 10,16(pad 8 x 16 on candle 8 x 16)inside 8
& outside 16
065524-N-DG-DG02-PE-DAL-3001- 1- Welded Candle 16 x 10 on candle 16 x 10.
004 2- Welded pipe 10 on candle 16 x 10.
3- Fabricated Flange 10 x 150 on pipe 10.
4- Cut pad size 10 x 16.
5- Fabricated 2 joints size 10,20(pad 10 x 16 on candle 10 x
16)inside 10 & outside 20
6- welded 2 joints size 10, 20(pad 10 x 16 on candle 10 x 16) inside
10 & outside 20
7- welded 1 joint size 10(flange 10 x 150 on spool 10)
8- Fabricated and welded in progress in 2 joints size 10,20(pad 10 x
16 on candle 10 x 16)inside 10 & outside 20.
9- Cutting and preparing 2 spools size 16 to required length.
10- welded 2 joints size 10,20(pad 10 x 16 on candle 10 x 16)inside
10 & outside 20
1- Fabricated (2) joints Elbow 2 x 90 on spool 2.
2- Welded (2) joints Elbow 2 x 90 on spool 2.
3- Fabricated T Equal 2 on spool 2.
4- Cut and prepared (4) spools size 2.
5- Fabricated 2 joints size 2(elbow 2 x 90 on spool 2)
065524-N-DG-DG02-PE-ISO-4128-
6- welded 2 joints size 2(elbow 2 x 90 on spool 2)
001
7- Fabricated 1 joint size 2(tee 2 on spool 2)
8- welded 2 joints size 2(tee 2 on spool 2)
9- Fabricated 1 joint size 2(spool 2 on spool 2)
10- welded 1 joint size 2(spool 2 on spool 2)
11- Cut and preparing 4 spools size 2 to required length.
1- Fabricated (4) joints Elbow 2 x 90 on spool 2.
065524-N-DG-DG02-PE-ISO-4130-
2- Welded (4) joints Elbow 2 x 90 on spool 2.
001
3- Cut and prepared (6) spools size 2.
1- Grinded inner diameter for reducer 28 x 24 to fit with pipe 28
2- Fabricated 1 joints size 28(reducer 28 x 24 on pipe 28
065524-N-DG-DG02-PE-ISO-3001- 3- Grinded inner diameter for reducer 28 x 24 to fit with pipe 28
007 4- Fabricated 1 joints size 28(reducer 28 x 24 on pipe 28)
5- Welded in progress in 2 joints size 28(reducer 28 x 24 on pipe 28)
6- Cut and preparing 1 pipe size 28.


.ISO No
1- Welded Pipeline 20.
2- Fabricated and welding in progress in 2 joints size 20 (pipeline 20).
3- Welded 2 joints size 20 (pipeline 20).
065524-N-DG-DG02-PE-ISO-5028-
4- Fabricated and welding in progress in 2 joints size 20 (pipeline 20).
002
5- Welded 2 joints size 20 (pipeline 20).
6- Welded 3 joints size 20 (pipeline 20).
7- welded 1 joint size 20(pipeline 20)
1- Manufactured and welded (1) dummy to install instead of 3 valve.
2- Cut and prepared spool size 3to required length.
065524-N-DG-DG02-PE-ISO-4003-
3- Cut 1 joint size 3(spool 3 on elbow 3 x 90)
001
4- Fabricated 1 joints size 3(elbow 3 x 90 on spool 3)
5- welded 1 joints size 3(elbow 3 x 90 on spool 3)
1- Cut 1 T-support to required length.
2- Installed the T-support under 10 pipe.
3- Welded the T-support with concrete base.
4- Cut and prepared 1 spool size 10to required length(from both ends)
5- Cut and preparing 2 spools size 10 to required length(from both ends)
6- Fabricated and welding in progress in 1 joints size 10(spool 10 on
spool 10).
7- prepared 1 spool size 10 + elbow 10 x 90
065524-N-DG-DG02-PE-ISO-
8- welding 1 joints size 10(spool 10 on spool 10)
4009-001
9- Fabricated and welded in progress in 1 joints size 10(spool 10 on
spool 10).
10- Prepared 1 spool size 10.
11- Cut and prepared 2 spools size 10
12- Fabricating and welding in progress in 2 joints size 10(elbow 10 x 90
on spool 10)-root + hot passes
13- welded 1 joints size 10(spool 10 on spool 10)
14- installed support for 10 pipe
1- Cut 1 T-support to required length.
065524-N-DG-DG02-PE-ISO-4004-
2- Installed the T-support under 10 pipe.
001
3- Welded the T-support with concrete base .
065524-N-DG-DG02-PE-ISO-4023- 1- Fabricated 2 joint size 3(elbow 3 x 90 on spool 3)
001 2- welded 1 joint size 3(elbow 3 x 90 on spool 3)
3- Cut and prepared 1 spool size 3to required length
4- welded 1 joint size 3(elbow 3 x 90 on spool 3)
5- Fabricated 1 joints size 3(elbow 3 x 90 + spool 3 on weldolete 3 x
10 + spool 3)
6- welded 1 joints size 3(elbow 3 x 90 + spool 3 on weldolete 3 x 10
+ spool 3)
7- Cut and prepared 2 spools size 3 to required length
8- welded 1 joints size 3(elbow 3 x 90 + spool 3 on spool 3)
9- Cutting 1 joint size 3(spool 3 on weldolete 3 x 10)
10- Removed the welded section from vessel V-211 to refabricate it due to
error in measurements
11- Cut 1 joint size 3(spool 3 on elbow 3 x 90)
12- Fabricated 1 joints size 3(elbow 3 x 90 on spool 3)
13- welded 1 joints size 3(elbow 3 x 90 on spool 3)
065524-N-DG-DG02-PE-ISO-0031- 1- Distributed 12 pipes along path.
001
- Collected 12 pipes & 20 pipes from RSB to HP & LP flare
line.
- Collected valves from RSB to system 507
- Collected fittings from RSB to system 507.
- PT done by inspection team to candle pads.
- PT done by inspection team to candles welded by supplier
(that collected from RSB).
- Transmitting 1 welded section from workshop to site.
-


(... ) 1
:19/2/2017 , 2
. ) ( -1
. ( Overhead) 3
. ,23/2/2017 , 4
.( Tons 30) 5
. 6